Page 1: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings

Page 2: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

BREEAM for Refurbishment and Fit-out

– Follows 2 years of development

– Draft scheme published and consultation from 19th July 2014

– Launched at MIPIM 15th October 2014

– Replaces 2008 scheme for refurbishment from midnight on 16th

February 2015

– ‘Go live’ 31st October for manual, tools, assessments and registrations

Page 3: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Briefing session

– Background

– Introduction

– How to engage with the scheme

– Technical overview• Differences with BREEAM 2008 and BREEAM NC

2014• Consultation feedback and how this has been

addressed– Future work

Page 4: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Background

Page 5: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Key headlines

18% - UK emissions from non domestic buildings

90% - properties EPC Band C or worse

62% - proportion of tenanted commercial property

Page 6: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Green buildings pay

– There is increased investor demand for high quality properties with low risk

– Certified buildings are more highly valued and safer long-term investments

Page 7: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Aviva investors use of BREEAM

“All new acquisitions must have a BREEAM rating”

“BREEAM is a strong rating tool that helps sound, responsible property investment”

“Tenants will discard of buildings that don’t have BREEAM ratings”

Michael Borello, Aviva investors, MIPIM UK 2014

Page 8: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Benefits of BREEAM Refurbishment and Fit-out

• Flexible whilst being transparent about your scope of works

• Can be used for all building types (including mixed new build/refurb)

• Provides comparability between projects

• Empathetic with historic buildings e.g. grade 1, 2, 2* listed buildings

• Assists with Corporate Social Responsibility (CSR) obligations

Page 9: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Benefits of BREEAM Refurbishment and Fit-out

• Get ahead of your competition & showcase industry best practice

• Save operating costs and reduce risk

• Minimise water use, CO2 emissions and waste

• Enhance occupant comfort and increase productivity

Page 10: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

“should fill a gap for existing historic buildings that has been difficult to grapple with for a long time.”

“the increased sophistication in assessment for all types of refurbishment schemes is a breath of fresh-air”

Progressive Heritage

Feedback on the new scheme so far

Page 11: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Pilot projects

– Identify the opportunities and limitations with improving sustainability in existing building fit-out and refurbishment projects

– Develop a new flexible structure for BREEAM that can work for a wider range of refurbishment and fit-out projects

Page 12: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Pilot projects

Green Investment Bank, Edinburgh

– BREEAM ‘Excellent’ fit-out

– 7th floor of a BREEAM Excellent rated building

– Fit-out score benefitted from a high performing base build

– Helped highlight what issues they could influence as part of the fit-out i.e.• Base build services cannot

be further improved

Page 13: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Introduction to the scheme

Page 14: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Structure

– Modular structure with a mix and match type approach

– Clients can gain certification against the parts relevant to their scope of work

– Provides flexibility

– Provides comparability across the property market

Page 15: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

How it works:– The online assessment tool will filter the applicable criteria

automatically based upon rules set out in the technical manual– The criteria not applicable to an assessment part are filtered out from the

assessment

– The separate parts combine to provide a single score and rating e.g. a parts 2 & 3 assessment with an ‘Excellent’ rating

– All assessments are capable of achieving a rating from ‘Pass’ to ‘Outstanding’ to recognise the performance of that project

Page 16: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

– Parts assessed (and not assessed) are clearly labelled on the certificate

– Applicability of a part results in all criteria for that part being relevant – e.g. if Part 2 is applicable, all core services are assessed

– Aspects of the project that already perform well are given recognition – e.g. if the building already has highly efficient boiler plant, this will be recognised in

Ene 01.

– However, aspects that perform poorly that are not being improved, will bring the score down. This reflects that the scheme is a performance based assessment method. A part 2 assessment quantifies the performance of the projects core services.

How it works

Page 17: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Project types

Project type Part 1: Fabric and Structure

Part 2: Core services

Part 3: Local services

Part 4: Interior design

Full refurbishment

ü ü ü ü

Shell & Core to Cat A

ü ü

Cat B fit-out / re-fit

ü ü

Interior refresh ü

Upgrade of centralservices

ü

Page 18: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

When is a part applicable?

Part 1 example– Part 1 may be appropriate where alterations are being

made to 50% of the surface area of at least 2 of the following:• Building façade • Roof• Windows• Floor

E.g.

- Replacing 50% of windows

- Renewing cladding on 50% of external walls

Page 19: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

When is a part applicable?Part 3 examplePart 3 may be appropriate where at least two of the following are being installed or upgraded:

• Replacement of more than 50% of light fittings, system and controls

• Upgrade of zone controls

• Local ventilation

• Local heating units

• Local cooling units

• Point of use water heaters.

Page 20: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

How to engage with the scheme

Page 21: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Register and assess on www.breeam.com/projects

Page 22: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Understand

– Final technical manual available on www.breeam.com/ndrefurb

Page 23: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Create a pre-assessment

Page 24: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Find an assessor, or explore BREEAM data

Page 25: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Current Fees– Listed in Fee Sheet FS037

• £190 registration fee• Certification fees depend on the parts assessed and size of project

Examples:

250m2 Fit-out certified against parts 3 and 4:– £315 for design stage interim certificate– £160 for final stage certificate (PCR)

2000m2 Major refurbishment certified against parts 1, 2, 3 and 4– £950 for design stage interim certificate

– £295 for final certificate (PCR)

Page 26: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Technical overview

Page 27: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Management

Man 01 Project brief and design

4 credits

Man 02 Life cycle cost and service life planning

4 credits

Man 03 Responsible construction practices

6 credits

Man 04 Commissioning and handover

4 credits

Man 05Aftercare

3 credits

Page 28: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Management– Significant change from 2008, aligning with 2014

– Promotes integrated design and best practice in project management in order to achieve the best sustainability outcome.

Design

Construction

Handover & Aftercare

Page 29: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Management

Man 01: Project brief and design– Aligns with BREEAM New Construction 2014

– Requirement for a project brief to be in place with clear objectives e.g. target energy performance

Man 02: Lifecycle costing and service life planning– Appraisal of fabric options relating to expected life of

refurbished building e.g. looking at 20, 30, 50+ years

– Services looked at for 15+ year life

– Fit-out for 10 year plan

Page 30: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

– Man 03: Responsible construction practices• Aligns with BREEAM New Construction 2014

Alternative option for low value projects• Option to achieve 1 credit as alternative to CCS for small value

projects (e.g. Retail fit-out project of less than £1million) where contractor has considerate construction policy implemented e.g. procedures for site cleanliness, reducing impacts on neighbours.

Page 31: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Man 04: Commissioning and handover– Aligns with new construction 2014 and includes:

• Commissioning of new or upgraded services and equipment (Parts 2, 3 and 4)

• Testing and inspection of any work to building fabric (Part 1)

Man 05: Aftercare– Aligns with new construction 2014– Covers development of building users guide and provision of

training for building occupants

Page 32: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Health & wellbeing

Hea 01 Visual Comfort

7 credits

Hea 02 Indoor Air Quality

5 credits

Hea 03 Safe containment in laboratories

2 credits

Hea 04 Thermal comfort

3 credit

Hea 05Acoustic Performance

1 - 4 credits

Hea 06 Safety and security

1 credit

Page 33: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Feedback“Achieving the daylighting criteria in a new build is difficult, never mind in an existing building”

Revised daylighting criteria:1. Improve existing daylighting (aimed at Part 1 projects)

1. 15% for 1 credit2. 30% for 2 credits

2. Maximise use of spaces that benefit from good daylighting through design of internal layout (aimed at fit-out)

View out criteria:1. One credit where 80% of spaces meet the view out criteria2. Two credits where 95% of spaces meet the view out criteria

(aligning with BREEAM New Construction)

Page 34: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Thermal comfort criteria

Feedback“A fit-out will have little impact on thermal comfort as it is mainly influenced by the base building performance”

Thermal modelling– A Part 4 (interior design) assessment should assess suitability of

existing building services and controls

– Fully dynamic modelling not required simple modelling acceptable for simple systems e.g. parts 3 and 4

– Thermal modelling for a projected climate change scenario not required for a part 3 or 4 assessment

Hea 04 Thermal comfort

3 credit

Page 35: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Energy

Ene 01 Red’n of energy use and carbon emissions

12 credits

Ene 02 Energy monitoring

2 credits

Ene 03 External lighting

1 credit

Ene 04 Low carbon design

3 credits

Ene 05 Energy efficient cold storage

2 credits

Ene 06 Energy efficient transportation

3 credits

Ene 07 Energy efficient laboratories

5 credits

Ene 08 Energy efficient equipment

2 credits

Ene 09 Drying space

1 credit

Page 36: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Summary – differences from BREEAM 2008

Energy

Ene01– Ene 01 credits based upon improvement over existing

– No longer just based upon CO2 index, now using triple metric

– New elemental approach tailored for fit-out

Other changes– New Ene04 credit focusing on low carbon design

– Transportation credit tailored for existing transportation systems

– Other issues based on New Construction 2014, adapted for refurbishment and applicability

Page 37: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Ene 01: Recognising existing baseline

A B C D E F G

35%

30%

25%

20%

15%

10%

5%

0%

– If a building already performs well, it will require smaller improvements to achieve energy credits

– If a building perform poorly, it will require significant improvements to achieve credits

Page 38: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

BREEAM Refurbishment elemental approach (option 2) – Assesses performance based upon the influence a project has over

building energy performance

– BREEAM refurbishment energy tool can assess performance of landlord areas separately from tenant areas

- Fabric U values- Infiltration rates

- Heat generation - Cooling generation

- - Distribution systems

- Air handling units etc.

- Lighting- Local heating

- Local hot water- Local cooling

- Local ventilation- Controls

Page 39: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Historic buildings report: 2 credits– Where a historic buildings report has been developed with input

from a ‘Suitably Qualified Heritage Conservation Specialist’

– A detailed study to look at options that may be adopted within constraints of the building e.g. potential glazing options

– Use of best practice to consider responsible retrofit

Page 40: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

New paper: Sustainable refurbishment of heritage buildings

Key finding: Heritage buildings tend to out-perform standard refurbishment projects and almost perform as well as new build projects!

– Outlines the common challenges and solutions for heritage buildings in achieving high BREEAM ratings

– Includes example solutions from case study buildings

Page 41: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Materials

Mat 02 Hardlandscaping & boundary protection

1 credit

Mat 03 Responsible sourcing of materials

4 credits

Mat 04 Insulation

1 credit

Mat 05 Designing for durability & resilience

1 credit

Mat 06 Material efficiency

1 credit

Mat 01 Life cycle impacts

6 credits

Page 42: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Mat 01 Environmental Impact of materials

Option 1: Whole project / BIM LCA– 6 Credits available

– Credits awarded depending on:• Scope of LCA study• Quality of data• Robustness of LCA tool

Option 2: Elemental approach– 4 Credits available

– Credits awarded depending on:• Percentage of elements re-used in situ• Percentage of new products with robust environmental

information

Mat 01 Environmental impact of materials

6 credits

Page 43: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Mat 06: Material efficiency

– Measures have been identified and implemented that optimise material use

Examples:Fabric: Can existing windows be repaired, rather than replaced?

Services: Can lengths of ductwork be reduced or the need for services avoided?

Interiors: Can the size of materials be adjusted to reduce offcuts, can partitions be re-used or demountable partitions used?

Mat 06 Material efficiency

1 credit

Page 44: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Waste

Wst 01 Project waste management

4 credits

Wst 02 Recycled aggregates

1 credit

Wst 03 Operational waste

1 credits

Wst 04 Speculative floor & ceiling finishes

1 credit

Wst 05 Adaptation to climate change

1 credit

Wst 06 Functional adaptability

1 credit

Page 45: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Wst 01 Project waste management

New criteria for:• Conducting a Pre-refurbishment audit prior to strip-out

• 2 credits for direct re-use of materials onsite, offsite or closed-loop recycling • e.g. returning ceiling tiles to ceiling tile manufacturer for

closed loop recycling• New resource efficiency benchmarks and requirements for

recording waste data

Wst 01 Project waste management

4 credits

Page 46: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Wst 06 Functional adaptability

– Functional adaptability study

– Implementation of measures that enable changes to the future function of the space

Example– Part 1: use of systems that allow easy replacement

of components– Part 2/3: potential for future expansion of systems

Wst 06 Functional adaptability

1 credit

Page 47: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Water

Wat 01 Water consumption

5 credits

Wat 02 Water monitoring

1 credit

Wat 03 Water leak detection

2 credits

Wat 04 Water efficient equipment

1 credit

Page 48: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Wat 01: water consumption

– Adjusted to take account of tenant/landlord demise• WC facilities in common areas come under Part 2: Core

services• Part 3 and 4 assessments only include WC facilities, where

within fit-out zone (e.g. tenant areas)• Fit out of a School, hospital etc. would include nearest facilities

Wat 01 Water consumption

5 credits

Page 49: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Wat 02: Water monitoring

Part 2: Core services– Water meter on incoming mains

Parts 2, 3 and 4– Accessible sub-meters for systems that consume more than 10%

of buildings energy demand

– Where the refurbishment or fit-out zone contains minimal water consuming systems (e.g. small kitchenette), this issue is filtered out

Wat 02 Water monitoring

1 credit

Page 50: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Pollution

Pol 01 Impact of Refrigerants

3 credits

Pol 02 NOx Emissions

2 - 3 credits

Pol 03 Flood risk management and reducing runoff

5 credits

Pol 04 Reduction of Night Time Light Pollution

1 credit

Pol 05 Reduction of noise pollution

1 credit

Page 51: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Pol 01 Impact of refrigerants and Pol 02 NOx Emissions

– Aligns with new construction 2014

– Adapted for Part 3 – only applicable where there is local heating or local cooling

– Not applicable to Part 3 where heating and cooling from central plant

Pol 01 Impact of Refrigerants

3 credits

Pol 02 NOx Emissions

2 - 3 credits

Page 52: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Pol 03 Flood risk management and reducing run-off

Parts 1 - 4– Significant changes to make it more applicable

to existing buildings to recognise

“You can’t move the building to an area that is not in a flood risk zone”

– Focus on flood reliance measures for properties on the ground floor level that are at risk

– Upper floors in flood risk zones need a flood management plan e.g. business contingency plan in the event of a flood

Pol 03 Flood risk management and reducing runoff

5 credits

Page 53: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

– Pol 04: Reducing night time light pollution– Aligns with New Construction 2014– Applicable for parts 2, 3 and 4 where external

lighting within scope

– Pol 05: Reduction of noise pollution– Aligns with New Construction 2014– Applicable for Parts 2 and 3 where externally

mounted plant is present or newly specified

Pol 04 Reduction of Night Time Light Pollution

1 credit

Pol 05 Reduction of noise pollution

1 credit

Page 54: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Tra 01 Sustainable transport solutions

– First credits available relate to access index based on available transport links

– Where transport links are poor, additional credit is gained where alternative measures implemented e.g.• Electric vehicle charging points• Car share spaces• Digital display points for transport information • Dedicated video conferencing facilities• Enhanced cycling provision• Dedicated bus service• Other measures can be recognised and will be added to the list

once approved

Tra 01Sustainable transport solutions

Up to 5 credits

Page 55: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Ecology categorySite selection issues assessed in BREEAM 2008 removed to recognise a refurbishment or fit-out can’t influence this

LE01 Contaminated land: – removed

LE02 – protection of ecological features– Criteria for selecting a site of low value

removed

LE03: Minimising impacts on site ecology– Removed

Page 56: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Ecology category

LE04: Enhancing ecological value– Only applicable to Part 1 (Fabric and structure)– Change of value criteria removed– Based on site specific advice from an ecologist

LE05: Long term impact on biodiversity– Based on New Construction 2014– Applicable where there is existing landscaped areas

Page 57: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Q&A

Page 58: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Summary

Page 59: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Summary

– Highly relevant and workable scheme for refurbishment and fit-out projects

– Pilots and early adopters already

– Keen growing interest across wide range of sectors

– Future revisions already scheduled

– Welcome continued input and feedback

– Case studies

– Bradford Uni DEC rating E to B

Page 60: BREEAM Refurbishment and Fit-out 2014 Briefings Latest.ppt Events... · 2015. 2. 3. · Man 01: Project brief and design –Aligns with BREEAM New Construction 2014 –Requirement

Thank you.