SUBMITTAL REVIEW Submittal: No. 004 Spec Section: 03-3000 CAST-IN-PLACE CONCRETE Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 11, 2012 Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner
This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following:
NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted
1. 03 3000 2.6 A, B ADMIXTURES Project Data Sheets NEN 2. 03 3000 2.11 A, B, C, D CONCRETE MIXTURES Project Data Sheets NEN FOR BUILDING ELEMENTS
Notes:
1. See engineer’s comments.
END OF REVIEW
EMAIL TRANSMITTALPROJECT: DATE:
JOB#SUBMITTAL#
TO: Comma-Q ArchitectureADDRESS:
ATTENTION:PHONE:FAX:
TRANSMITTED:
ITEM DATE COPIES
(406) 585-1112
DESCRIPTION
5/11/201211011
109 N. Rouse Ave., #1
New Belgrade Elementary School
(406) 585-5518
Bozeman, MT. 59715
Laura Landon
108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992
Prints
Proposal OtherShop Drawings
RFI Response
Field Report
Specifications
CalculationsLetter Sketches
No Exceptions Taken
These are Transmitted as Checked Below:
For Your File
For Your Use
Revise As Noted And Resubmit
Make Corrections Noted
Rejected/Resubmit As Specified
Reviewed For Load To Structure Only
As Requested
Submitted Previously
ITEM DATE COPIES1
TRANSMITVia:
No. Page: 1
REMARKS:
COPY TO:
DESCRIPTION
TRANSMITTED BY:
03-3000 Concrete Mix Designs & Admixtures
Scott Higinbothamfile
108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992
TRANSMITTAL May 07, 2012
To: Nishkian Monks Attention: Scott Higginbotham
From: Laura Landon
Project: BPS – Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03 Copy to: File
we are sending you :Attached
Under separate cover the following:
Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other:
these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment:
date qty description
5/7/2012 1 (elec) Submittal 004- 03 3000 Cast-in-Place Concrete
Remarks:
Scott, please review the attached submittal, please return an electronic version to our office with your comments.
Thanks
MARTEL CONSTRUCTION, INC. LETTER OF TRANSMITTAL1203 South Church AvenueBozeman, MT 59715-5801Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/07/12 JOB NO. 12-001
TRANSMITTAL/SUBMITTAL NO. 4.00TO: Comma Q Architects RE: Concrete Mix Designs and Admixtures
109 North Rouse Ave #1Bozeman, MT 59715
ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL
We are hand deliveringWe are sending via Email
ATTACHED UNDER SEPARATE COVER TheThe following items:
Shop drawings Prints Plans Samples Specifications
Copy of letter Change order X Product Data
COPIES DATE DWG NO. DESCRIPTION
1111
Section 03 3000 2.11 Mix Design 4000 psi FootingsSection 03 3000 2.11 Mix Design 3000 psi Footings, WallsSection 03 3000 2.11 Mix Design 3500 psi SOG and SOMDSection 03 3000 2.6 A,B Concrete Admixtures
5/7/12
5/7/12
5/7/12
5/7/12
THESE ARE TRANSMITTED as checked below:X For approval Approved as Submitted Resubmit Copies for Approval
For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment
FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US
REMARKS:
COPY TO File Scott -Nishkian SIGNED: Mike Wilkinson - Project Engineer
If enclosures are not as noted, kindly notify us at once.
� NO�EXCEPTIONS�TAKEN�
� MAKE�CORRECTIONS�NOTED�
� REVISE�AS�NOTED�AND�RESUBMIT�
� REJECTED/RESUBMIT�AS�SPECIFIED�
� REVIEWED�FOR�LOAD�TO�STRUCTURE�ONLY�
� SUBMITTED�PREVIOUSLY:�� Not�reviewed�� Reviewed,�identified�additional�data�only�
Notations� Do� Not� Authorize� Changes� to� Contract� Sum.��Submittal� was� reviewed� for� structural� design� conformity�and� general� conformance� to� contract� documents� only.��Contractor� is� responsible� for� confirming� and� correlating�dimensions� at� job� sites� for� tolerances,� clearances,�quantities,� fabrication� processes� and� techniques� of�construction,� coordination� of� his� work� with� other� trades�and�full�compliance�with�contract�documents.�
Date:�________________By:�__________________�
NISHKIAN�MONKS�CONSULTING�&�STRUCTURAL�ENGINEERS�
✔
05/11/2012 SPH
� NO�EXCEPTIONS�TAKEN�
� MAKE�CORRECTIONS�NOTED�
� REVISE�AS�NOTED�AND�RESUBMIT�
� REJECTED/RESUBMIT�AS�SPECIFIED�
� REVIEWED�FOR�LOAD�TO�STRUCTURE�ONLY�
� SUBMITTED�PREVIOUSLY:�� Not�reviewed�� Reviewed,�identified�additional�data�only�
Notations� Do� Not� Authorize� Changes� to� Contract� Sum.��Submittal� was� reviewed� for� structural� design� conformity�and� general� conformance� to� contract� documents� only.��Contractor� is� responsible� for� confirming� and� correlating�dimensions� at� job� sites� for� tolerances,� clearances,�quantities,� fabrication� processes� and� techniques� of�construction,� coordination� of� his� work� with� other� trades�and�full�compliance�with�contract�documents.�
Date:�________________By:�__________________�
NISHKIAN�MONKS�CONSULTING�&�STRUCTURAL�ENGINEERS�
✔
05/11/2012 SPH
� NO�EXCEPTIONS�TAKEN�
� MAKE�CORRECTIONS�NOTED�
� REVISE�AS�NOTED�AND�RESUBMIT�
� REJECTED/RESUBMIT�AS�SPECIFIED�
� REVIEWED�FOR�LOAD�TO�STRUCTURE�ONLY�
� SUBMITTED�PREVIOUSLY:�� Not�reviewed�� Reviewed,�identified�additional�data�only�
Notations� Do� Not� Authorize� Changes� to� Contract� Sum.��Submittal� was� reviewed� for� structural� design� conformity�and� general� conformance� to� contract� documents� only.��Contractor� is� responsible� for� confirming� and� correlating�dimensions� at� job� sites� for� tolerances,� clearances,�quantities,� fabrication� processes� and� techniques� of�construction,� coordination� of� his� work� with� other� trades�and�full�compliance�with�contract�documents.�
Date:�________________By:�__________________�
NISHKIAN�MONKS�CONSULTING�&�STRUCTURAL�ENGINEERS�
✔
05/11/2012 SPH