Upload
sankalp-computer
View
229
Download
0
Embed Size (px)
Citation preview
7/27/2019 Binary Plan-Sankalp Tech
1/15
8/14/2013
Sankalp Computer and Systems Pvt Ltd
7/27/2019 Binary Plan-Sankalp Tech
2/15
Binary Plan
A binary plan is a multilevel marketing compensation plan which allow
distributors to have only two front-line distributors.
If a distributor sponsors more than two distributors, the excess are pl
at levels below the sponsoring distributors front-line.
You can sign only two people onto your first level. Everyone else goe
beneath those people. One of the good feature in binary plans is that yare not paid base on levels at all, but instead, on a specified, maximum
purchases (over some period of time, often weekly).
Since you can only sign two people directly under yourself, you end u
a structure that has two "legs" - two spots that in turn have all the othe
spots under them.
8/14/2013
http://www.sankalptech.com/readymade-binary-mlm-software.asphttp://www.sankalptech.com/readymade-binary-mlm-software.asp7/27/2019 Binary Plan-Sankalp Tech
3/15
Binary Plan Flow
Registration
Confirm Registration
Payout Calculation
Confirm Payout
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
4/15
Session Includes:
Binary Plan
Binary Plan Flow
Binary Plan Advantages
Binary Plan Requirements. Types of Binary Plan
Payout Calculation in Binary Plan
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
5/15
Binary Plan Advantages:
A binary plan allows every member a mopre equal opportunity toearn rewards from the same size teams and distribute rewards more
fairly.
A binary allows you to get paid to UNLIMITED depth in your team
and there is no disadvantage working with people a 1000 levels
depth in your team.
Matching bonuses create an incentive to help the people you
introduce earn more, the more they earn the more YOU earn.
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
6/15
Binary Plan Requirements:
1.Binary Plan Requirements2. Commission Related
3. Achievement Award/Reward
4. Deduction from payout
5. Registration number and login ID
6. Facilities required for members
7. SMS related(mobile SMS)8. Convention for members
9. All Reports/Transactions
10. Cheque Printing
11. Domain related information
12. Company Information
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
7/15
Types of Binary Plan:
1. Daily Binary
2. Level Binary
3. PV/BV Binary
4. Hyper Binary
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
8/15
Payout Calculation in Binary Plan
Considerations1. Ratio required to form a first pair is 1:2 or 2:1
2. After that second set onwards ratio required is 1:1
3. Set value for first pair is Rs.300
4. Set value for second pair onwards is Rs.200
5. TDS Amount 11.33%
6. Service charges 2%
Steps
Step 1: Joining Date of Members: 01/07/10 Member will join by Epin/DD/Cash/Credit.
U is the root id joined by Epin.
U
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
9/15
Under root id two members get joined A and B; on left and right side
U
Respectively. U is sponsor of A and B.
A B
U
DC
BA
U
Under A one more members joins on left side and one member on right side.
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
10/15
A is the sponsor for both C and D.
These all members are joined on 01/01/2009.
Calculation for first payout (01/07/2010 to 01/07/2010)
In this payout U has been qualify for income.
Left Count of U: 3 (A, C, D)
Right Count of U: 1 (B)
Total No. of pairs: 1
First Pair: 2:1
Carry Forward: 1:0Set Value for 1st Pair: 300
Binary Pair Amount/ Commission:
Total Commission=No. of Pairs * Set Value
Total Commission=1*300 = 300
TDS= 11.33/100 * 300 = 33.99
Service Charge=2/100 * 300 = 6
Net Amount = Total Commission Total Deduction
= 300 - (33.99 + 6)
= 260.01
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
11/15
Mem
ber
Left
Coun
t
Right
Count
Total
Pair
Binary
Pair
Amount
CF TDS Servic
e
Charge
Net
Amou
nt
U 3 1 1(2:1) 300 1:0 33.99 6 260.0
1
A 1 1 0 0 1:1 0 0 0
B 0 0 0:0 0 0 0 0 0
C 0 0 0:0 0 0 0 0 0
D 0 0 0:0 0 0 0 0 0
7/27/2019 Binary Plan-Sankalp Tech
12/15
Step 2: Joining Date of Members: 02/07/10
BA
U
DC EF
G H I J
K
B is sponsor for E and F.
C is sponsor for G and H.
D is sponsor for I and J.
J is sponsor for K who joined at
right side of J.
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
13/15
Calculation for second payout (02/07/2010 to 02/07/2010
Member New Left
Count
New
RightCount
BF Total
Pair
Binary
PairAmount
CF TDS Service
Charge
Net
Amount
U 5 2 1:0 2(1:1,1:1
)
400 4:0 45.32 8 346.68
A 2 3 1:1 1(1:2)2(1
:1)
700 0 79.31 14 606.69
B 1 1 0:0 0 0 1:1 0 0 0
C 1 1 0:0 0 0 1:1 0 0 0
D 1 2 0:0 1(1:2) 300 0 33.99 6 260.01
E 0 0 0:0 0 0 0 0 0 0
F 0 0 0:0 0 0 0 0 0 0
G 0 0 0:0 0 0 0 0 0 0
H 0 0 0:0 0 0 0 0 0 0
I 0 0 0:0 0 0 0 0 0 0
J 0 1 0:0 0 0 0:1 0 0 0
K 0 0 0:0 0 0 0 0 0 0
7/27/2019 Binary Plan-Sankalp Tech
14/15
Payout Details for Member U:
Payout No. Total Commission Net Amount
1 300 260.01
2 400 346.68
Cummulative Earning
606.69
8/14/2013
7/27/2019 Binary Plan-Sankalp Tech
15/15
Thank You
8/14/2013
Reach Us anytime:
Sankalp Computers and Systems Pvt. Ltd
Visit: www.sankalptech.com
Call: +91-20-41062300,+91-8605030333
http://www.sankalptech.com/http://www.sankalptech.com/