Rs.91.747/- Million
Rs.2752410/-
2-Year
Ch No Item No.
PCC SLAB
1 4 29Dismantling brick or flagged flooring without concrete
foundation.73970.00 Sft %Sft 650.75
2 31b+17(a)+17
bX12+24 b
Earthwork excavation undressed lead upto a single throw of
Kassi, phaorah or shovel:- b)In ordinary soil. Transportation of
earth all types when the total distance, including the lead
covered in the item of work, is more than 1000 ft. (300 m)
a)upto ¼ mile (400 m).b)for every 330 ft. (100 m) additional lead
or part thereof, beyond ¼ mile (400 m) upto one mile. (1.6 Km.)
Compaction of earthwork (soft, ordinary or hard soil) :-
b)Compaction by rolling with animal driven roller/hand rammed:
ii) ordinary soil
196305.4 Cft %o Cft 8711.20
3 18 3
Providing and laying sub-base course of stone product of
approved quality and grade, including placing, mixing, spreading
and compaction of sub-base material to required depth,
camber, grade to achieve 100% maximum modified AASHO dry
density, including carriage of all material to site of work except
gravel and. aggregate.ii)Crushed stone aggregate( Rate
Adjusted to 75% Compaction)
201911.16 Cft % cft 4019.63
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
163953.00 Cft % Cft 25014.00
5 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
386572.03 Cft % cft 1621.85
Surface Drain
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary18684.85 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:1212028.88 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:512028.88 Cft % cft 21733.85
4 20 3 b
Pacca brick on edge, laid in reimbursement, in cement, sand
mortar, on sides of drains and on other works where required.
All joints to be completely filled and struck flush:- b) ratio 1:548115.50 Sft % Sft 9837.60
5 20 6a.
Constructing Punjab Standard Drains. of cement concrete 1:2 ½
:5, with cement concrete bedding ratio 1:6:12, complete, laid to
lines, grades, slopes and shapes, rendering exposed surface of
concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per
Engineer's drawing (excluding excavation):- a) Type I
32077.00 Rft P Rft 122.45
Sullage Carrier(1.50X2.00)
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary15342.5 Cft %o Cft 6151.20
BID SCHEDULE
Standardized items
CONSTRUCTION OF PCC SLAB ,SEWERAGE/DRAINAGE SCHEME CHAKRALA Name of Scheme
Name of Work
Estimated Cost
(PCC Slab ,Surface Drain, Sullage carrier , & Tuff Tile With Other Allied Works)
E/Money
Time Limit
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
Page 1
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:12 7671.25 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:513537.50 Cft % cft 21733.85
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
2030.63 Cft % Cft 25014.00
5 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
1786.95 Cft % cft 1621.85
6 11 18Cement pointing struck joints, on walls, upto 20' (6.00 m) hiehgt:-
a)ratio 1:2 12635 Sft %Sft 2515.45
Sullage Carrier(4.00X3.50)
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary26250 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:1213125.00 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:531500.00 Cft % cft 21733.85
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
4838.75 Cft % Cft 25014.00
5 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
4258.10 Cft % cft 1621.85
6 11 18Cement pointing struck joints, on walls, upto 20' (6.00 m) hiehgt:-
a)ratio 1:222750 Sft %Sft 2515.45
Tuff Tile
1 18 3
Providing and laying sub-base course of stone product of
approved quality and grade, including placing, mixing, spreading
and compaction of sub-base material to required depth,
camber, grade to achieve 100% maximum modified AASHO dry
density, including carriage of all material to site of work except
gravel and. aggregate.ii)Crushed stone aggregate( Rate
Adjusted to 75% Compaction)
18160.00 Cft % cft 4019.63
2 3 43 b
ProvidingandlayingTuffpavers,having7000PSI,crushingstrength
ofapprovedmanufacturer,over2"to3"sandcushioni/cgroutingwiths
and in joints i/c finishing to require slope . complete in all
respect.(50% Grey / 50% Coloured)b)60-mm thick
55030 Sft P-Sft 110.85
3 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Kala Bagh
21791.88 Cft % cft 1621.85
Total
DEDUCTION OF OLD MATERIAL
1 Old brick 226171 No. %o No.
2 Old brick bats 10770.03 Cft % Cft
Total
G. Total
Page 2
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
1
2
3
4
5
6
7
Rs.91.743/- Million
Rs.2752290/-
2-Year
Ch No Item No.
PCC SLAB
1 4 29Dismantling brick or flagged flooring without concrete
foundation.130170.00 Sft %Sft 650.75
2 4 19 c c)Dismantling cement concrete 1:2:4 plain. 37224.00 Cft %Cft 8421.60
3 4 19 d d)Dismantling cement concrete with brick aggregate. 37224.00 Cft %Cft 2296.80
4 31b+17(a)+17
bX12+24 b
Earthwork excavation undressed lead upto a single throw of
Kassi, phaorah or shovel:- b)In ordinary soil. Transportation of
earth all types when the total distance, including the lead
covered in the item of work, is more than 1000 ft. (300 m)
a)upto ¼ mile (400 m).b)for every 330 ft. (100 m) additional lead
or part thereof, beyond ¼ mile (400 m) upto one mile. (1.6 Km.)
Compaction of earthwork (soft, ordinary or hard soil) :-
b)Compaction by rolling with animal driven roller/hand rammed:
ii) ordinary soil
86648 Cft %o Cft 8711.20
Unit Rate
Rate to be
quoted by
the
contractor
Sr.
#
(1st Annual,
1st July 2021 to
31st Dec 2021) Description of Items Quantity
Estimated Cost
E/Money
Time Limit
Standardized items
BID SCHEDULE
Name of Scheme CONSTRUCTION OF PCC SLAB ,SEWERAGE/DRAINAGE SCHEME PAI KHEL
Name of Work (PCC Slab ,Surface Drain, Sullage carrier , & Rcc Sewer Pipe line Tuff Tile With Other Allied Works)
Mianwali Mianwali
Divisional Head Draftsman Executive Engineer
Public Health Engg: Division Public Health Engg: Division
CONDITIONS
Conditional tenders/rates will not be entertained.
Any item of work not included in this bid but during execution actually required to be executed at site will be paid after
approval by the competent au thority.
The Engineer in charge shall power to make any alteration in omission from addition in omission from addition to or
substituted for the original scope of work & specification, drawing, design & instruction that may appera to him to be
necessary or advisable during the progress of work.
Any omission of the completion /error there in,for interpretation will be referred to standardized rates posted at website
by finance department during Bi Annual (2nd Annual, 1st July 2021 to 31st Dec 2021) for District Mianwali and
decision of the competent authority will be final and binding upon the contractor.
All the conditions of "Revised Contract Agreement"and conditions mentioned in the DNIT will form part of the
agreement and binding upon the contractor.
In case of rates qouted less than estimate rates, deposit at call for amount equivelant to a difference of cost between
the BID amount and the estimate amount, from any scheduled Bank shall be provided by the contractor as performance
guarantee.
Construction schedule towards completion of work should be provided by the contractor within 1-week of the issuance
of Accaptance letter.
Page 3
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
5 18 3
Providing and laying sub-base course of stone product of
approved quality and grade, including placing, mixing, spreading
and compaction of sub-base material to required depth,
camber, grade to achieve 100% maximum modified AASHO dry
density, including carriage of all material to site of work except
gravel and. aggregate.ii)Crushed stone aggregate( Rate
Adjusted to 75% Compaction)
158575.56 Cft % cft 4019.63
6 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
141045.63 Cft % Cft 25014.00
7 3 43 b
ProvidingandlayingTuffpavers,having7000PSI,crushingstrength
ofapprovedmanufacturer,over2"to3"sandcushioni/cgroutingwiths
and in joints i/c finishing to require slope . complete in all
respect.(50% Grey / 50% Coloured)b)60-mm thick
53121 Sft P-Sft 110.85
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
314410.82 Cft % cft 1439.15
Surface Drain
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary18595.16 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:1211629.13 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:510691.63 Cft % cft 21733.85
4 20 3 b
Pacca brick on edge, laid in reimbursement, in cement, sand
mortar, on sides of drains and on other works where required.
All joints to be completely filled and struck flush:- b) ratio 1:542766.50 Sft % Sft 9837.60
5 20 1 b
Tega formed of pacca bricks on end, laid in and over cement
sand mortar projecting to a height of not more than 6" (150 mm)
top of drain along the property side where required, laid to lines,
grades, slopes and shape according to the Engineer's drawing:-
B) 4½" thick (113 mm) ii) ratio 1:5
10000.00 Sft % Sft 6876.70
6 20 6a.
Constructing Punjab Standard Drains. of cement concrete 1:2 ½
:5, with cement concrete bedding ratio 1:6:12, complete, laid to
lines, grades, slopes and shapes, rendering exposed surface of
concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per
Engineer's drawing (excluding excavation):- a) Type I
33511.00 Rft P Rft 122.45
7 6 3(a)(ii)
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded and
washed aggregate, in required shape and design, including forms,
moulds, shuttering, lifting, compacting, curing, rendering and finishing
exposed surface, complete (but excluding the cost of steel
reinforcement, its fabrication and placing in position, etc.):- (a)(ii)
Reinforced cement concrete in slab of rafts / strip foundation, base
slab of column and retaining walls; etc and other structural members
other than those mentioned in 5(a) (i) above not requiring form work
(i.e. horizental shuttering) complete in all respects:-(3) Type C
(nominal mix 1: 2: 4)
222.98 Cft P Cft 302.95
8 6 9 b
Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints and
fastenings, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removal of rust
from bars):- (b) Deformed bars (Grade-40)
506.17 Kg % Kg 19988.70
Page 4
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
9 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
196.22 Cft % cft 1439.15
Sullage Carrier(2.00X2.50)
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary69426 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:1234713.00 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:560291.00 Cft % cft 21733.85
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
10996.83 Cft % Cft 25014.00
5 11 8 (b)Cement plaster (1:3) upto 20 ft. (6.00 m) height :- (b) 1/2" (13 mm)
thick.65772 Sft %Sft 2406.70
6 6 3(a)(ii)
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing, rendering
and finishing exposed surface, complete (but excluding the cost
of steel reinforcement, its fabrication and placing in position,
etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip
foundation, base slab of column and retaining walls; etc and
other structural members other than those mentioned in 5(a) (i)
above not requiring form work (i.e. horizental shuttering)
complete in all respects:-(3) Type C (nominal mix 1: 2: 4)
262.50 Cft P Cft 302.95
7 6 9 b
Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints and
fastenings, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removal of rust
from bars):- (b) Deformed bars (Grade-40)
595.88 Kg % Kg 19988.70
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
9930.65 Cft % cft 1439.15
1 RCC PIPE SEWER
1 4 45 Dismantling and removing road metalling. 612.00 Cft %Cft 1531.20
2 3 42
Earthwork excavation in open cutting for sewers and manholes as
shown in drawings including shuttering timbering, dressing to correct
section and dimensions according to templates and levels, and
removing surface water, in all types of soil except shingle, gravel and
rock:-
A) 0'-7' depth:- 7184.63 Cft %0 Cft 6683.30B) 7'-15' depth:- 2052.75 Cft %0 Cft 11245.20
3 21 3
Providing and laying R.C.C. pipe sewers, moulded with cement
concrete 1:1½:3 conforming to ASTM Specification C-76-79,
Class II. Wall B, including carriage of pipe from factory to site of
work, lowering in trenches to correct alignment and grade,
jointing with rubber ring cutting pipes where necessary, testing,
etc., complete.
24"i/d 250.00 Rft P Rft 1305.70
4 3 13-a.Re-handling of earth work lead up to single throw of kassi. Lead
upto a single throw of Kassi, phaorah or shovel 7390 Cft %0 Cft 1914.00
CONST: OF MANHOLE CHAMBER
i 5'DIA FOR DEPTH 9' FOR 24"i/d SEWER PIPE (02-Nos) 2
Page 5
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering timbering, dressing to
correct section and dimensions according to templates and
levels, and removing surface water, in all types of soil except
shingle, gravel and rock:-
A) 0'-7' depth:- 940.94 Cft %0 Cft 6683.30B) 7'-15' depth:- 426.10 Cft %0 Cft 11245.20
2 6 2Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm)
gauge.67.20 Cft % Cft 4323.00
3 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:-Ratio 1: 6:1271.64 Cft % Cft 12390.30
4 7 7-h)Pacca brick work other than building upto 10ft. (3 m) height.
Ratio 1;3196.44 Cft % Cft 23948.40
5 7 10Extra for pacca brick work in steining of wells or any other
circular masonry. 196.44 Cft % Cft 2060.90
6 6 5
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): ration 1:2:4.68.54 Cft % Cft 25014.00
7 21 9Extra for making and finishing benching floor work in manhole
chamber, with 1/8" (3 mm) thick cement finish39.28 Sft %Sft 2052.90
8 21 13
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.10 No Each 396.65
9 11 8 bCement plaster 1:3 upto 20' (6.00 m) height:- ½" (13 mm) thick
out side of dome294.92 Sft %Sft 2406.70
10 21 15-A
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set set weighing 37.324 Kg.
or one maund as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
2 No Each 11442.75
11 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Musa Khel
60.32 Cft % cft 1439.15
iCONSTRUCTION OF GULLY GRATING CHAMBER FOR
12"x12" (7-Nos)7
1 21 7 (b)Constructing gully grating chamber, 12"x12", ( 300x300 mm)
complete in all respects:concrete Gully trap. 7 No Each 3405.55
1 3 44
Excavation of trenches in all kinds of soil, except cutting rock, for
watersupply pipelines upto 5 ft. (1.5 m) depth from ground level,
including trimming, dressing sides, leveling the beds of trenches to
correct grade and cutting pits for joints, etc. complete in all respects.
643.16 Cft %0Cft 5755.20
3 7 30 Supplying and filling sand under floor, or plugging in wells. 105.56 Cft % Cft 1999.00
4 21 1
Providing and laying R.C.C. pipe sewers, moulded with cement
concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II.
Wall B, including carriage of pipe from factory to site of work, lowering
in trenches to correct alignment and grade, jointing with rubber ring
cutting pipes where necessary, testing, etc., complete.
6"i/d 84 Rft P Rft 220.95
5 3 13-a.Re-handling of earth work lead up to single throw of kassi. Lead
upto a single throw of Kassi, phaorah or shovel 515 Cft %0 Cft 1914.00
Non Standardized Items
RCC PIPE SEWER
1
Supply and placing filling crushed stone aggregate 1/4" to 1" size(from
aproved Govt quary) for beding material under and around RCC
sewer pipe up to half of pipe in trenches at required depth below
ground level as per drawing grade & alignment complete in all
respect to the satisfaction of the Engineer-in-charge
1341.69 Cft P Cft
Page 6
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
Total
DEDUCTION OF OLD MATERIAL
1 Old brick 398007.79 No. %o No.
2 Old brick bats 18952.75 Cft % Cft
Total
G. Total
1
2
3
4
5
6
7
Rs.91.743/- Million
Rs.2752290/-
2-Year
Ch No Item No.
1 RCC PIPE SEWER
1 4 45 Dismantling and removing road metalling. 502.00 Cft %Cft 1531.20
Unit Rate
Rate to be
quoted by
the
contractor
Sr.
#
(1st Annual,
1st July 2021 to
31st Dec 2021) Description of Items Quantity
Estimated Cost
E/Money
Time Limit
Standardized items
BID SCHEDULE
Name of Scheme CONSTRUCTION OF PCC SLAB ,SEWERAGE/DRAINAGE SCHEME SWANCE
Name of Work (Rcc Sewer Pipe line PCC Slab ,Surface Drain, & Sullage carrier , With Other Allied Works)
Public Health Engg: Division Public Health Engg: Division
Mianwali Mianwali
In case of rates qouted less than estimate rates, deposit at call for amount equivelant to a difference of cost between
the BID amount and the estimate amount, from any scheduled Bank shall be provided by the contractor as performance
guarantee.
Construction schedule towards completion of work should be provided by the contractor within 1-week of the issuance
of Accaptance letter.
The Engineer in charge shall power to make any alteration in omission from addition in omission from addition to or
substituted for the original scope of work & specification, drawing, design & instruction that may appera to him to be
necessary or advisable during the progress of work.
Divisional Head Draftsman Executive Engineer
Conditional tenders/rates will not be entertained.
Any item of work not included in this bid but during execution actually required to be executed at site will be paid after
approval by the competent au thority.
Any omission of the completion /error there in,for interpretation will be referred to standardized rates posted at website
by finance department during Bi Annual (2nd Annual, 1st July 2021 to 31st Dec 2021) for District Mianwali and
decision of the competent authority will be final and binding upon the contractor.
All the conditions of "Revised Contract Agreement"and conditions mentioned in the DNIT will form part of the
agreement and binding upon the contractor.
CONDITIONS
Page 7
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
2 3 42
Earthwork excavation in open cutting for sewers and manholes as
shown in drawings including shuttering timbering, dressing to correct
section and dimensions according to templates and levels, and
removing surface water, in all types of soil except shingle, gravel and
rock:-
A) 0'-7' depth:- 6292.13 Cft %0 Cft 6683.30B) 7'-15' depth:- 1797.75 Cft %0 Cft 11245.20
3 21 3
Providing and laying R.C.C. pipe sewers, moulded with cement
concrete 1:1½:3 conforming to ASTM Specification C-76-79,
Class II. Wall B, including carriage of pipe from factory to site of
work, lowering in trenches to correct alignment and grade,
jointing with rubber ring cutting pipes where necessary, testing,
etc., complete.
24"i/d 220.00 Rft P Rft 1305.70
4 3 13-a.Re-handling of earth work lead up to single throw of kassi. Lead
upto a single throw of Kassi, phaorah or shovel 6472 Cft %0 Cft 1914.00
CONST: OF MANHOLE CHAMBER
i 5'DIA FOR DEPTH 9' FOR 24"i/d SEWER PIPE (02-Nos) 2
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering timbering, dressing to
correct section and dimensions according to templates and
levels, and removing surface water, in all types of soil except
shingle, gravel and rock:-
A) 0'-7' depth:- 940.94 Cft %0 Cft 6683.30B) 7'-15' depth:- 426.10 Cft %0 Cft 11245.20
2 6 2Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm)
gauge.67.20 Cft % Cft 4323.00
3 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:-Ratio 1: 6:1271.64 Cft % Cft 12390.30
4 7 7-h)Pacca brick work other than building upto 10ft. (3 m) height.
Ratio 1;3196.44 Cft % Cft 23948.40
5 7 10Extra for pacca brick work in steining of wells or any other
circular masonry. 196.44 Cft % Cft 2060.90
6 6 5
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): ration 1:2:4.68.54 Cft % Cft 25014.00
7 21 9Extra for making and finishing benching floor work in manhole
chamber, with 1/8" (3 mm) thick cement finish39.26 Sft %Sft 2052.90
8 21 13
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.10 No Each 396.65
9 11 8 bCement plaster 1:3 upto 20' (6.00 m) height:- ½" (13 mm) thick
out side of dome294.92 Sft %Sft 2406.70
10 21 15-A
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set set weighing 37.324 Kg.
or one maund as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
2 No Each 11442.75
11 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Kala Bagh
60.32 Cft % cft 1621.85
iCONSTRUCTION OF GULLY GRATING CHAMBER FOR
12"x12" (3-Nos)3
1 21 7 (b)Constructing gully grating chamber, 12"x12", ( 300x300 mm)
complete in all respects:concrete Gully trap. 3 No Each 3405.55
Page 8
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
2 3 44
Excavation of trenches in all kinds of soil, except cutting rock, for
watersupply pipelines upto 5 ft. (1.5 m) depth from ground level,
including trimming, dressing sides, leveling the beds of trenches to
correct grade and cutting pits for joints, etc. complete in all respects.
275.64 Cft %0Cft 5755.20
3 7 30 Supplying and filling sand under floor, or plugging in wells. 45.24 Cft % Cft 1999.00
4 21 1
Providing and laying R.C.C. pipe sewers, moulded with cement
concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II.
Wall B, including carriage of pipe from factory to site of work, lowering
in trenches to correct alignment and grade, jointing with rubber ring
cutting pipes where necessary, testing, etc., complete.
6"i/d 36 Rft P Rft 220.95
5 3 13-a.Re-handling of earth work lead up to single throw of kassi. Lead
upto a single throw of Kassi, phaorah or shovel 221 Cft %0 Cft 1914.00
PCC SLAB
1 4 29Dismantling brick or flagged flooring without concrete
foundation.46920.00 Sft %Sft 650.75
2 31b+17(a)+17
bX12+24 b
Earthwork excavation undressed lead upto a single throw of
Kassi, phaorah or shovel:- b)In ordinary soil. Transportation of
earth all types when the total distance, including the lead
covered in the item of work, is more than 1000 ft. (300 m)
a)upto ¼ mile (400 m).b)for every 330 ft. (100 m) additional lead
or part thereof, beyond ¼ mile (400 m) upto one mile. (1.6 Km.)
Compaction of earthwork (soft, ordinary or hard soil) :-
b)Compaction by rolling with animal driven roller/hand rammed:
ii) ordinary soil
307068.74 Cft %o Cft 8711.20
3 18 3
Providing and laying sub-base course of stone product of
approved quality and grade, including placing, mixing, spreading
and compaction of sub-base material to required depth,
camber, grade to achieve 100% maximum modified AASHO dry
density, including carriage of all material to site of work except
gravel and. aggregate.ii)Crushed stone aggregate( Rate
Adjusted to 75% Compaction)
259521.57 Cft % cft 4019.63
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
204727.00 Cft % Cft 25014.00
5 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Kala Bagh
491585.64 Cft % cft 1621.85
Surface Drain
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary10106.38 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:126506.25 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:56506.25 Cft % cft 21733.85
4 20 3 b
Pacca brick on edge, laid in reimbursement, in cement, sand
mortar, on sides of drains and on other works where required.
All joints to be completely filled and struck flush:- b) ratio 1:526025.00 Sft % Sft 9837.60
5 20 6a.
Constructing Punjab Standard Drains. of cement concrete 1:2 ½
:5, with cement concrete bedding ratio 1:6:12, complete, laid to
lines, grades, slopes and shapes, rendering exposed surface of
concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per
Engineer's drawing (excluding excavation):- a) Type I
17350.00 Rft P Rft 122.45
Sullage Carrier(2.00X2.50)
Page 9
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
1 3 10 i
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:- i)ordinary36717.50 Cft %o Cft 6151.20
2 6 3-dCement concrete brick or stone ballast 1½ " to 2" (40 mm to 50
mm) gauge, in foundation and plinth:- (d) Ratio 1: 6:1218358.75 Cft % Cft 12390.30
3 7 4 iPacca brick work in foundation and plinth in:- i)Cement, sand
mortar:- Ratio 1:534785.00 Cft % cft 21733.85
4 6 5 f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate): (f) Ratio 1: 2: 4
5305.00 Cft % Cft 25014.00
5 11 8 (b)Cement plaster (1:3) upto 20 ft. (6.00 m) height :- (b) 1/2" (13 mm)
thick.34785 Sft %Sft 2406.70
6 6 3(a)(ii)
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing, rendering
and finishing exposed surface, complete (but excluding the cost
of steel reinforcement, its fabrication and placing in position,
etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip
foundation, base slab of column and retaining walls; etc and
other structural members other than those mentioned in 5(a) (i)
above not requiring form work (i.e. horizental shuttering)
complete in all respects:-(3) Type C (nominal mix 1: 2: 4)
73.50 Cft P Cft 302.95
7 6 9 b
Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints and
fastenings, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removal of rust
from bars):- (b) Deformed bars (Grade-40)
166.82 Kg % Kg 19988.70
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Upto Kala Bagh
4733.08 Cft % cft 1621.85
Non Standardized Items
RCC PIPE SEWER
1
Supply and placing filling crushed stone aggregate 1/4" to 1" size(from
aproved Govt quary) for beding material under and around RCC
sewer pipe up to half of pipe in trenches at required depth below
ground level as per drawing grade & alignment complete in all
respect to the satisfaction of the Engineer-in-charge
1176.39 Cft P Cft
Total
DEDUCTION OF OLD MATERIAL
1 Old brick 143463 No. %o No.
2 Old brick bats 6831.55 Cft % Cft
Total
G. Total
1
2
3
Conditional tenders/rates will not be entertained.
Any item of work not included in this bid but during execution actually required to be executed at site will be paid after
approval by the competent au thority.
Any omission of the completion /error there in,for interpretation will be referred to standardized rates posted at website
by finance department during Bi Annual (2nd Annual, 1st July 2021 to 31st Dec 2021) for District Mianwali and
decision of the competent authority will be final and binding upon the contractor.
CONDITIONS
Page 10
Ch No Item No.
Sr.
#Quantity Unit
Rate to be
quoted by
the
contractor
RateDescription of Items
(1st Annual,
1st July 2021 to
31st Dec 2021)
4
5
6
7
Public Health Engg: Division Public Health Engg: Division
Mianwali Mianwali
In case of rates qouted less than estimate rates, deposit at call for amount equivelant to a difference of cost between
the BID amount and the estimate amount, from any scheduled Bank shall be provided by the contractor as performance
guarantee.
Construction schedule towards completion of work should be provided by the contractor within 1-week of the issuance
of Accaptance letter.
The Engineer in charge shall power to make any alteration in omission from addition in omission from addition to or
substituted for the original scope of work & specification, drawing, design & instruction that may appera to him to be
necessary or advisable during the progress of work.
Divisional Head Draftsman Executive Engineer
All the conditions of "Revised Contract Agreement"and conditions mentioned in the DNIT will form part of the
agreement and binding upon the contractor.
Page 11