Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Bario Asal & Arur Layun Micro-Hydro Project
– INITIAL BRIEFING PACK
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Session Objectives
• To introduce the Micro-Hydro Project Scope & Plan
• To describe the benefits of implementing the hydro
• To present the project outline
• Cost Estimates
• Project Funding
• To describe how the community will be involved in the project
• Project Team – Roles & Responsibilities
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Outline
• Why are we doing this?
• What is a Micro-Hydro Power Plant?
• What are the benefits to Bario Asal & Arur Layun community?
• Where are we now and what next?
• Who will be involved in the Project?
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Why are we doing this?
• Provide the residents of Bario Asal & Arur Layun with electricity;
• Elevate the standard & quality of life of the local community;
• Encourage sustainable development.
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
What are the benefits to the community?
• A constant supply of electricity
• Savings on the cost of buying diesel for diesel powered generators
• Low environmental impact
• Low noise and air pollution
• Coupled with reforestation in the water catchments area, the project also aims to reduce the risk of flash floods in years to come.
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
What is a Micro-Hydro Power Plant?
• A small scale power plant that generates electricity using the energy potential of water.
• Micro-hydro power plants convert the energy of flowing water into electrical energy.
• The energy produced by them is renewable & the process does not emit polluting gases.
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Outline
• Why are we doing this?
• What is a Micro-Hydro Power Plant?
• What are the benefits to Bario Asal & Arur Layun community?
• Where are we now and what next?
• Who will be involved in the Project?
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Where are we now?
• A bank account at Maybank Boulevard, Miri has been set up in the name of JKK Kampung Bario Asal with over RM10k in the account
• A preliminary site survey has been carried out and a project paper has been drafted;
• Contacted various interested parties who have prior experience in executing similar projects in Borneo:
• The Borneo Project Team – Focal Point : Jessica Lawrence
• PACOS – Focal Point : Adrian Lasimbang
• Seacology.Org – Via Jessica Lawrence
PACOS & Seacology.Org previous projects website
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Micro hydro Gantt Chart
Q3 2006 Q4 2006 Q2 2007Q2 2006
Preliminary feasibility study
Full feasibility study and Project Plan
Excavation and civil works
Electromechanical component installation
Wiring and testing
Maintenance Training
Mapping, Reforestation and Training
Fundraising
Conceptual Design /Design
Build and test
Implement
Q1 2007 Q4 2007Q3 2007
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Cost Estimates – Total RM200,000
No. ITEM RM
1. Excavation (Estimation basis: Fuel Costs of 5 days work) Note: Propose that the usage of tractors & driver be provided in kind.
1,000
2. Material – Electromechanical (turbine & cabling) 70,000
3. Material – Civil Structures (pipes, gate valves, flanges, cement, rebar/brs) 20,000
4. Equipment rental – Surveyor’s equipment from PT Heksa Indonesia
Note: Genset & welder (in-kind. Value:RM2k); Truck & Tractor (in-kind. Value:RM5k)
2,000
5. Transportation – technical team from PACOS & HEKSA 1,000
6. Transportation – materials (Estimation basis: flight charter) Note: Propose that the followings are provided in kind: (a) transportation from airport to site; (b) transportation fuel
20,000
7. Mapping of upstream area 5,000
8. Reforestration activites of upstream area 15,000
9. Training 8,000
10. Administration, accounting & reporting (stationeries, printing etc.) 5,000
11. Technical Consultancies – In kind
Propose that food & lodging to Technical team be provided in kind
0
12. Unplanned costs 53,000
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Who will be involved in the project?
Everyone will be involved, at varying levels in the various phases.
• Project Team Will involve Local Project Team & PACOS Technical Advisors to effectively plan and execute the work
• JKK Kampung Bario Asal CommitteeOverall coordination of Bario Asal community efforts
• JKK Kampung Arur Layun CommitteeOverall coordination of Arur Layun community efforts
• The Community(refer next slide)
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Community Involvement?
• Food and lodging for technical team and volunteers • Transportation of equipment and people to and from microhydro site
• Volunteer labor for excavation and construction works
• Maintenance personnel
• Mapping, marking and reforestation of water catchments
• Conduct workshop to train end users on responsible resource management
• Fundraising activities, sourcing of materials
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Local Project Team – Roles & Responsibilites
Overall Project Coordinator – Plan & monitor project progress, liaise with NGOs & manage project team logistics;
Fund Raising Committee – Organise fund raising activities, contact governments or NGOs or Companies or Individuals for donations & materials;
Financial Controller – Manage project budget, focal point for donation, assist in raising funds;
Bario Asal Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers;
Arur Layun Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers.
IT Focal Point – to upload and manage documents on the project website
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
How to find us
Project updates will be posted at :
http://briefcase.yahoo.com/bariohydro
Emails pertaining to the project can be sent to :
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
End of Slides
Thank You
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang
Bank Account Details
• Bank : Maybank Boulevard, Miri
• Type of account: Savings account
• Account Name: JKK Kampung Bario Asal
• Account No.: 5942085
• Signatories: 1. Ribed Inan, 2. Sekan Berauk, 3. Aline Pasang
Return to slideReturn to slide
Item Transaction Date +ve -ve Total
Donation from Aline Pasang 5 June 2006 250.00 250.00
Donation from Datu Robert Lian 16 June 2006 9,997.00 10,247.00
Bario Micro-Hydro ProjectBario Micro-Hydro Project Prepared By: Sarah Balangalibun, Garnet Balangalibun, Aline PasangPrepared By: Sarah Balangalibun, Garnet Balangalibun, Aline Pasang