Assembly and installation of CLIC TM0 Lab. F. Rossi. July 25, 2012. TM0: accelerating structures. Fiducialisation ( W30) Transport to Lab ( W30) Measurements on girders ( W31) Assembly test for EBW tooling ( W34) Transport to CERN workshop ( W35) EBW of 2 stacks ( W36) - PowerPoint PPT Presentation

Citation preview

Page 1: Assembly and installation of CLIC TM0 Lab

[email protected]

1 Assembly and installation of CLIC TM0 Lab

[email protected]

Assembly and installation of CLIC TM0 LabF. Rossi

July 25, 2012

Page 2: Assembly and installation of CLIC TM0 Lab

[email protected]

2 Assembly and installation of CLIC TM0 Lab

TM0: accelerating structures

1. Fiducialisation (W30)

2. Transport to Lab (W30)

3. Measurements on girders (W31)

4. Assembly test for EBW tooling (W34)

5. Transport to CERN workshop (W35)

6. EBW of 2 stacks (W36)

7. TIG welding of vacuum flanges (W37)

8. Transport to Lab (W38)

9. Installation on girders (W38)

Page 3: Assembly and installation of CLIC TM0 Lab

[email protected]

3 Assembly and installation of CLIC TM0 Lab

AS

# STEP DESCRIPTION

1st TM0

1st half 2nd half

AS #1 AS #2 AS #3 AS #4 AS #5 AS #6 AS #7 AS #8

1 MACHINING & DELIVERY V V V V V V V V

2 QUALITY CONTROL Inlet inspection V V V V V V V V

3 CLEANING V V V V V V V V

4 VACUUM BRAZING WFM, disks stack V V V V V V V V

5 QUALITY CONTROL Cooling circuit test V V V V V V V V

6 MACHINING WFM, disks stack V V V V V V V V

7 CLEANING WFM, disks stack V V V V V V V V

8 VACUUM BRAZING (1st step) Manifolds V V V V V V V V

9 VACUUM BRAZING (2nd step) Manifolds V V V V V V V V

10 MACHINING Manifolds V V V V V V V V

11 VACUUM BRAZING (1st step) AS (manifolds + disks) V V V V V V V V

12 VACUUM BRAZING (2nd step) AS (manifolds + disks) V V V V V V V V

13 VACUUM BRAZING Super AS V V V V

14 VACUUM BRAZING Stack V V

15 QUALITY CONTROL Fiducialisation V W30

16 EBW 1 stack + 1 stack W36

17 TIG WELDING Vacuum flanges W37

18 INSTALLATION ON GIRDERS W38

Page 4: Assembly and installation of CLIC TM0 Lab

[email protected]

4 Assembly and installation of CLIC TM0 Lab

SUMMARY

SUB-ASSEMBLY Q.TY(for 1 TM0)

STATUS

1st TM0 2nd TM0

Magnets 2 100% 100%

Vacuum tank 1 100% 100%

PETS units 2 100% 30%

AS 8 90% manufacturing

Clamps for AS and PETS 100% 100%

RF network 2+2 100% 70%

Compact load 20 100% 70%

Vacuum network 2+2 100% 100%

Extremity flanges 1+1 100% 100%

Supports for extremity flanges 2 100% 100%

Cooling circuits 100% 100%

Gaskets, blank flanges, screws, swagelok 100% 100%

Page 5: Assembly and installation of CLIC TM0 Lab

[email protected]

5 Assembly and installation of CLIC TM0 Lab

LAB CONFIGURATION: electric networks

AS heaterPETS heater

DBQ heaters

Temperature sensors (q.ty 29)

POWER SOCKETMax. 63 A

POWER SOCKETMax. 63 A

• Improvement of current electric network of Lab completed

POWER SOCKETMax. 16 A

POWER SOCKETMax. 32 A

Supporting system for:• Control valves (q.ty 7)• Flow transducer (q.ty 1)• Pressure sensor (q.ty 1)

• Electric scheme for control valves, heaters, temperature sensors, etc. under design (J. Blanc)

CUPBOARD for:• NI cDAQ-9178 8 slots (q.ty 1)• NI cDAQ-9174 4 slots (q.ty 1)• 24 V supply• Digital control electronics for proportional valves (q.ty 7)

SSR

Page 6: Assembly and installation of CLIC TM0 Lab

[email protected]

6 Assembly and installation of CLIC TM0 Lab

LAB CONFIGURATION: hydraulic system

Shoaib Azhar

Page 7: Assembly and installation of CLIC TM0 Lab

[email protected]

7 Assembly and installation of CLIC TM0 Lab

LAB CONFIGURATION: air temperature

2 m

1.2 m

1 m

1.3 m

• 5 thermocouples for each section

• 15 thermocouples in total

• Continuous acquisition during tests

NI 921316-Channel Thermocouple Input Module