Page 1: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

ArrowheadWestonTransmission Line

Project

Dave Van HouseMinnesota Power

Page 2: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Description & Overview

220 mile 345,000 volt electric transmission line

Approved by the Minnesota and Wisconsin regulators in 2001

Construction Began in Minnesota February 2004

Construction to Begin in Wisconsin Fall 2004

Construction scheduled to be completed in 2008

Page 3: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Why was it proposed?

Reliability!!

Improves Regional System Security

Provides Maintenance & Operational Flexibility

Allows Customers Greater Access to Generation Sources

Page 4: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

1

0

100

200

300

400

500

600

700

1

Intertie Capacity vs Energy Usage by State

Per

Un

it I

nte

rtie

Cap

acit

y (k

VA

/GW

h)

Wisconsin Minnesota Iowa Illinois Nebraska S. Dakota N. Dakota

RankLast

Page 5: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 6: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

www.powerupwisconsin.com

Minnesota

Minnesota’s electric network is tied to neighboring states.

If Wisconsin has a problem, Minnesota has a problem.

Minnesota Power customers have been knocked off line by electric system disturbances related to the weak Minnesota-Wisconsin connection.

Page 7: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Recent Regional Problems

June 11, 1997

June 25, 1998

June 10, 1999

Page 8: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 9: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 10: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

IMPACT OF June 25, 1998 DISTURBANCE

IN MAPP■ 60+ TRANSMISSION LINES TRIPPED■ 4,000+ MW OF GENERATION LOST■ More Than 39,000+ CUSTOMERS

AFFECTED

IN NW ONTARIO■ BLACK OUT TO 113,000 CUSTOMERS■ 650 MW OF LOAD LOST ■ 270 MW OF Generation Lost

Page 11: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 12: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 13: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Wisconsin Actions

1997 events raise concerns about electric supply reliability in Wisconsin

Wisconsin utilities and regulators form Wisconsin Reliability Assessment Organization (WRAO)

WRAO forms engineering group to study alternatives - WIRES group

Page 14: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 15: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

PERFORMANCE EVALUATION

DETAILED POWER FLOWS SIMULATION

GENERATOR RESPONSE

DYNAMIC STABILITY

VOLTAGE STABILITY

IMPACT ON MAPP

CONSTRUCTION COSTS

LOSS EVALUATION

Page 16: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Power Flow Analysis

Reactive Voltage Support Requirements

Steady State Maximum Transfer capability

Sensitivity to Modeling Assumptions

Transmission System Loss Analysis

Page 17: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Generator Response

Mechanical Stress on Weston Generator Shaft

■ Large Phase Angle Across MAPP MAIN Interface

■ Eau Claire Arpin Line Switching

■ Instanteous change in Power output

Page 18: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Dynamic Stability

Ability of Systems Generators to remain synchronized and recover from Major System Disturbance

MAPP WUMS Disturbances Loss of New Facilities Impact on Existing Limiting Conditions Dynamic Reactive Support Requirements

Page 19: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Voltage Stability

Ability of the System to Maintain Adequate Voltage Following a Disturbance

Without Adequate Voltage Support System can Experience■ Increased Current Demand (P = VI)■ Slowly Declining Voltage■ Loss of Voltage Sensitive Loads■ Voltage Collapse

Page 20: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Engineering to Support Permitting

Calculation of;■ AUDIBLE NOISE■ ELECTRIC FIELD■ MAGNETIC FIELD

Analysis of Potential Farm Impacts■ Stray Voltage■ Earth Currents

Page 21: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Magnetic Field Electric Field Spark Discharge

Multiple Routes Multiple Structures Multiple Circuits Multiple Flows Future Years

EMF Issues

Page 22: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Transmission Line Noise

Due to Corona Discharge■ Electric Field at surface of the conductor

exceeds the breakdown strength of air■ Generates light, audible noise radio noise

and energy losses

Mitigation■ Increase Conductor Surface area

• Larger Conductors• Multiple conductors

Page 23: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Substation Noise Monitoring

Long Term

Short Term

ExistingEquipment

Impact ofAdditions

Page 24: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Arrowhead Substation Noise

Page 25: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Other Engineering Issues

Differential GPS Interference (Precision Farming)

Electric & Magnetic Field

■ Impacts on Pacemakers and implantable Defibulators

■ Impacts on Railroad, Pipeline and AM Radio Transmitter sites

Page 26: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 27: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Opposition to the project:

Save Our Unique Lands Citizens Utility Board Wisconsin Environmental Decade North American Water Office Hillside Dairy World Organization of Landowner

Freedom

Page 28: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 29: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 30: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Common Utility Corridor

Page 31: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Visual Impact Of Crossing

Page 32: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Existing 161 kV H-Frame

Page 33: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

954 ACSR 2-ConductorBundle with Shield Wire

Page 34: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Single 3M Composite Conductor

Page 35: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Post Permit Studies

Equipment Specification

Construction Support Analysis

Operating studies

Page 36: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Equipment Specifications Transient studies

■ Breaker Switching Duties• Shunt Reactor• Shunt Capacitor• 345 & 230 kV line breakers

■ Capacitor Bank Switching Issues• Voltage Magnification

■ Insulation Coordination• Surge Arrester rating & placement• Equipment BIL requirements• Line Insulation

Page 37: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power
Page 38: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Construction Impact Studies

Constructability■ Line outage concerns■ Maintenance issues■ Ownership Issues

Increased Cost Landowner Opposition

Page 39: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Operating Studies

Determination of Operating Limits■ Reactive Support Requirements

• Shunt Capacitor location optimization■ Line Loadability Issues

• System Intact and Post Contingency■ Phase Shifter Requirements

• Line load sharing optimization• Post Contingency requirements

■ New Flow-Gate Limits• System Intact and Post Contingency

Page 40: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Summary

Operating experience has shown there is a significant risk to electrical reliability in the upper Midwest and Wisconsin

Engineering study commissioned through Assembly Act 204

WRAO recommendation Arrowhead Weston 345 kV Line

Page 41: Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power

Summary

The Arrowhead-Weston Project will substantially alleviate the reliability problems being experienced due to the weak electrical tie between the upper Midwest and Wisconsin.

It will also provide import capability for Wisconsin to meet its emergency power supply requirements.