Applied PPAP within a Process Approach,
Including Fourth Edition Updates
Jim Collins
OutlineApplied PPAP within a Process Approach,
Including Fourth Edition Updates
• Process Approach Review
• Process Model Example
• Measuring Process Performance
• PPAP, 4TH Edition
• Developing Your Process Approach
• Questions
ISO 9001:2000 Model of a Process-Based Quality Management System
Continual improvement of The quality management system
Customers
Requirements
Managementresponsibility
Measurement, analysis and improvement
Productrealization
ResourceManagement
Customers
Satisfaction
ProductInput Output
Value-adding activities
Information flow
Defining Processes
INPUTCustomer who
has a need
OUTPUTCustomer who has a need met
Input
Step
1
Step
2
Step
3
Step
“N”
Output
Critical Elements of the Process Approach
Process owner exists
Process is defined
Process is documented, as appropriate
Linkages of process established
Process monitored, analyzed and improved
Records maintained
Input:Customer wants?
Input RequirementsWhat are the inputs that determine what theprocess should produce?
Customer Specifications:
Governmental/ Regulatory:
Other:
Output:Customer need is fulfilled for?
Output RequirementsWhat output criteria are used to determine what should have been produced has been produced?
What: What are the Materials, Equipment and other Resources for the Process?Materials:
Equipment (Production, test, inspection)
Buildings:
Hardware/Software:
Who: Who applies the Resources? Process Owner (competence issues):
Personnel (competence issues):
Who is involved?
Measure: Measurement/analysis of process effectiveness.Measurement and Metric Selection:
Use of Data:
How: How is this process controlled, including use of procedures, work instructions, and methods?Support Processes (Who helps and how?)
Procedures/Control Documents
Organization’s Process
Name/Description
The Automotive Required Method for Identifying
Processes
There isn’t one
How to Identify ProcessesThe organization may use any method as long as:
•Process steps are identified
•The finished identity reflects the reality of the organization's system as defined by the organization
• The sequence and interaction of processes are clear
The following slides show an example of one way to identify processes
An Example of one Core Process’s Sub-processes
Core Processes
Process Performance
• Meaningful in terms of customer satisfaction
• Tells how well organizational goals & objectives are being met through processes & tasks
• Simple, understandable, logical, & repeatable
• Shows a trend (measures over time)
• Defined in simple and certain terms
• Data economical to collect
• Timely
• Drives “Appropriate Action”
Metrics Success Factors• management becomes more aware of their
quantitative information requirements
• work centers become process driven
• metrics are integrated into daily practices
• measures are oriented to achieve objectives
• processes are managed from the numbers
• management uses the measures to improve capability
OEM MEASURES
Core Process
Core Process
Core Process
Core Process
Process Owner
Process Owner
Process Owner
Process Owner
Core Process
Core Process
Process Owner
Process Owner
Pr oducts to Speci fi cati on
• C/100 & EPUS• Advanced QualityPlanning
• Corrective Action• PPM• Field Campaign / Containment Sp ecific ation s for Produ cts
Customer’s Critical
Measures of Supplier
Performance
(Scorecard)Supplier’s
‘Alignment’ with the
Customer’s Measures
(Scorecard)
Which internal performance measures contribute to the customer’s Critical Measures? How will these measures be cumulated?
Measurement Flow and
Interactions
Tier 1 Supplier Organization
Management Review
Additional Management
Processes
• C/100 & EPUS• Advanced QualityPlanning
• Corrective Action• PPM• Field Campaign / Containment
Sub/support processes Sub/support processes Sub/support processes Sub/support processes
Sub/support processes Sub/support processes
–
ORGANIZATION
Project Owner&
Team
Completion of PPAP
Required Items
GatherInformation
Completionof
PSW
Submission (or Resubmission)
of PPAPWarrant
CUSTOMER CUSTOMER
CustomerPurchase Order /
Customer-SpecificRequirements
CustomerSpecifications
CustomerPart Design
Requirements
CustomerProcess DesignRequirements
CustomerLogistics
Requirements
ValidatedProcess
[PSO / Run at Rate]
Customer Initiated Changes to Part ,
Specifications, etc.
Supplier InitiatedChanges
toPart / Process
Record ofApproved
PSW
ApprovedPSWPPAP Table 4.1
Records
Receipt and Approval of
Submitted PSW
Notes: 1. Activities shown will not always be present.2. Records shown may be in various media and in various storage locations.
The PPAP Process ModelAn Example
Draft as of 1 Aug 05
PPAP’s Purpose
PPAP’s purpose continues to be to provide the evidence that all customer engineering design record and specification requirements are properly understood by the organization and that the process has the potential to produce product consistently meeting these requirements during an actual production run at the quoted production rate.
Draft as of 1 Aug 05
ApplicabilityPPAP shall apply to internal and external organization sites (see Glossary) of bulk materials, production materials, production or service parts.
For bulk materials, PPAP is not required unless specified by the authorized customer representative.
Draft as of 1 Aug 05
Effective Date
The PPAP Fourth Edition obsoletes the Third Edition effective
January 1, 2006
unless otherwise specified by your customer.
Draft as of 1 Aug 05
TABLE OF CONTENTS• INTRODUCTION• SECTION 1 – GENERAL• SECTION 2 – PPAP PROCESS REQUIREMENTS• SECTION 3 – CUSTOMER NOTIFICATION AND SUBMISSION
REQUIREMENTS• SECTION 4 – SUBMISSION TO CUSTOMER - LEVELS OF EVIDENCE• SECTION 5 – PART SUBMISSION STATUS• SECTION 6 – RECORD RETENTION• Appendix A – Completion of the Part Submission Warrant (PSW)• Appendix B – Completion of the Appearance Approval Report• Appendix C – Production Part Approval, Dimensional Results• Appendix D – Production Part Approval, Material Test Results• Appendix E – Production Part Approval, Performance Test Results• Appendix F – Bulk Material - Specific Requirements• Appendix G – Tires - Specific Requirements• Appendix H – Truck Industry - Specific Requirements• GLOSSARY
Draft as of 1 Aug 05
Changes in the 4th EditionThe Fourth Edition of PPAP includes the following changes, based upon demonstrated industry consensus on the need for these changes:
• Identified issues in the application of PPAP
• Removal of QS-9000 references
• Minor edits including typographical or grammatical corrections
Draft as of 1 Aug 05
Changes in the 4th Edition(Continued)
• Removal of Section II of PPAP 3rd Edition (DaimlerChrysler, Ford, and General Motors Specific Instructions will be available on OEM websites and on the IAOB website, www.iaob.org)
• The Truck OEM’s are responsible for their common Industry Requirements, which were revised and moved to Appendix H
Draft as of 1 Aug 05
Changes in the 4th Edition(Continued)
• Bulk Material retained in Section 1 and as Appendix F with some reorganization of the text
• PSW revised and re-organized
Draft as of 1 Aug 05
PSW Revised and Reorganized
Truck Industry Part Submission WarrantPart Name Customer Part Number Rev. ___________
If applicable
Dated
Additional Engineering Changes Dated
Shown on Drawing Number Purchase Order No. Weight (kg)
Checking Aid Number Engineering Change Level Dated
ORGANIZATION MANUFACTURING INFORMATION SUBMISSION INFORMATION
________________________________________________Organization Name and Code Customer Name/Division
Street Address Customer Contact
City State Zip Application
Note: Does this part contain any restricted or reportable substances?
Are plastic parts identified with appropriate ISO marking codes?
REASON FOR SUBMISSION (check at least one)Initial Submission Change to Optional Construction or MaterialEngineering Change(s) Sub-Supplier or Material Source ChangeTooling: Transfer, Replacement, Refurbishment, or Additional Change in Part ProcessingCorrection of Discrepancy Parts Produced at Additional LocationTooling Inactive > than 1 year Other - please specify below
SUBMISSION LEVEL (Check one)Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.Level 2 - Warrant with product samples and limited supporting data submitted to customer.Level 3 - Warrant with product samples and complete supporting data submitted to customer.Level 4 - Warrant and other requirements as defined by customer.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19(check)Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.
DECLARATIONI affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable customerdrawings and specifications and are made from specified materials on regular production tooling with no operations other than the regularproduction process. I also certify that documented evidence of such compliance is on file and available for review.
EXPLANATION/COMMENTS
List Molds / Cavities / Production Processes
Organization Authorized Signature Date
Print Name Phone No. Fax
Title E-mail
PPAP Warrant Disposition:Comment:
Customer Signature Date
Print Name
August2005
Engineering Drawing Change LevelTool PO Number___________________
FOR CUSTOMER USE ONLY
THE-1001
Yes No
Yes No
Approved Rejected
Interim Approval
2
5
1 3
4
6
7 8 9
10 11
12
13
14
15
16
17
18
19
20
21
22
Draft as of 1 Aug 05
Changes in the 4th Edition(Continued)
• Appendices C, D, and E forms clarified and made common
• Tire Appendix revised
Draft as of 1 Aug 05
Changes in the 4th Edition(Continued)
• Customer notification and submission requirements modified to exclude situations where customer notifications are NOT required (I.3.3, PPAP 3rd removed)
• Glossary aligned, revised, and simplified to be consistent with the updates in the text
Draft as of 1 Aug 05
Glossary Aligned, Revised, and Simplified
• Deleted: Agreement; Critical Characteristic (both Ford and GM definition); Customer Product Approval Activity; Documentation; Environment;Full Approval Gage Repeatability & Reproducibility (Gage R&R); Initial Sample; Interim Approval;
Draft as of 1 Aug 05
Glossary Aligned, Revised, and Simplified (continued)
• Deleted (continued) Key Characteristics (All four); MSA Studies; Rejected; Remote Location; Repeatability and Reproducibility; Safety Characteristics; Self Certifying Supplier;Subcontractor; Tooling Maintenance; Tooling Refurbishment
Draft as of 1 Aug 05
Glossary aligned, revised, and simplified (continued)
• Revised: ApprovedAttribute DataCustomerInitial Process StudyPart Submission WarrantProcess; Process Flow Diagram;Quality Indices;Saleable Product
Draft as of 1 Aug 05
Glossary aligned, revised, and simplified (continued)
• Revised (continued): Significant Production Run;Site;Special Characteristics;Specification; Stable Process; Suppliers;Statistical Control;Submission Level;Variables Data
Draft as of 1 Aug 05
Glossary aligned, revised, and simplified (continued)
• Added:
Authorized Customer Representative(s); Black Box; Organization; Production Rate
Draft as of 1 Aug 05
PPAP RequirementsThe organization shall also meet all customer-specific
PPAP requirements.
1. Design Record
2. Engineering Change Documents, if any
3. Customer Engineering approval, if required
4. Design FMEA5. Process Flow Diagrams
6. Process FMEA7. Control Plan8. Measurement System Analysis
Studies9. Dimensional Results
10. Material, Performance Test Results
11. Initial Process Studies12. Qualified Laboratory
Documentation13. Appearance Approval Report
(AAR), if applicable14. Sample Product15. Master Sample16. Checking Aids17. Records of Compliance With
Customer-Specific Requirements
18. Part Submission Warrant (PSW)
Draft as of 1 Aug 05
APQP
APQP processes as Core Processes
Customer Expectations / Specifications
Returns, Complaints and Surveys
Approved Production Part Plan
Process Requirements /
Changes
Approved Engineering
Design
Approved Product
Assurance Plan
Product Assurance
Plan
Engineering Drawings and Specifications
Corrections to Product,
Process and System
Product or Service
Process Capability
Studies
Engineering Purchasing Manufacturing Sales Quality Shipping Marketing
Planning
Product Design
Feedback / Correction
Validation
Process Design
Production / Delivery
Input Core Process Output
PPAP
Input Process
Definition
Output
Who What
Analysis How
Input
Organization’s COP / Core
Process Name /Description:
Output
Linkages
Requirements
Process Management
Measurement and Data Analysis
Market Analysis / Customer Req’s
Organization and all Support
and Management Process
Customer Customer
Custmr
Customer
Custmr
Customer
Customer Customer
Customer
Bid / Tender
Order / Request
Product and Process Decision
Product and Process Verification & Validation
Product Production
Delivery
Payment
Warranty / Service
Post Sales / Customer Feedback
Customer
Acquire Define Plan Buy Build Support
Core Process Mapping Input Core Process
Output
Current Organizational Functions
Customer Expectations / S pecifications
Returns, Complaints and
Surveys
Approved Production Part
Plan
Process Requirements /
Changes
Approved Engineering
Design
Approved Product
Assurance Plan
Product Assurance Plan
Engineering Drawings and Specifications
Corrections to Product, Process
and System
Product or Service
Production Part Approval
Process Capability
Studies
Engineering Purchasing Manufacturing Sales and Accounting Management QualityAnd Shipping Marketing
Planning
Product Design
Feedback / Correction
Validation
Process Design
Production / Delivery
Input Process
Definition
Output
Who What
AnalysisHow
Organization
O
I
O I
O
O
I
I
COP
COP
Support Process
Support Process
Management Processes
Support ProcessSupport Process
Support ProcessSupport
ProcessSupport Process
Support Process
Support Process
Market Analysis / Customer Req’s
Organization and all Support
and Management Process
Customer Customer
Custmr
Customer
Custmr
Customer
Customer Customer
Customer
Bid / Tender
Order / Request
Product and Process Decision
Product and Process Verification & Validation
Product Production
Delivery
Payment
Warranty / Service
Post Sales / Customer Feedback
Customer
Input
Organization’s COP / Core
Process Name /Description:
Output
Linkages
Requirements
Process Management
Measurement and Data Analysis
Quality Manual
?Input? O rganization’s
CO P / Core Process Nam e /
Description:
?Output?
?Linkages? ?
?Requirem ents?
?Process
M anagem ent? ?M easurem ent and
Data Analysis?
?Input? O rganization’s
COP / Core Process Name /
Description:
?Output?
?Linkages? ?
?Requirements?
?Process
Management? ?Measurement and
Data Analysis?
Step 1 Step 2 Step 3 Step 4 Step 5
Step 1 – To analyze the organization’s system “find the processes”Components – 1) Entire organization, 2) Analytic Turtle Tool (or equivalent)Actions – Identify all of the main processes without classifying themDeliverables – Listing of all main processes
Step 2 – To define the system’s model based on work from Step 1Components – A single concept model (in this case the Octopus, which is based on the COP) Note: 2 other models are shown – 1) Value Stream model, 2) APQP modelActions – Determine modelDeliverables – A model which identifies / classifies key processes, sequence and interaction
Step 3 – To define the support and management processesComponents – 1) The actual processes 2) Analytic Turtle Tool (or equivalent), 3) LevelsActions – Identify the support and management processesDeliverables – Listing of all support and management processes to the detail appropriate to the organization
Step 4 – To adequately define and communicate the QMSComponents – 1) System documentation, 2) Communication Turtle Tool (or equivalent)Actions – Develop the documentation that can adequately communicate the systemDeliverables – Documents, tools, procedures and forms
Step 5 – To align 1st and 3rd
party audits by standardizing the analytic and communication toolsComponents – 1) Communication Turtle Tool, 2) Internal Audit, 3) Third-party Audit, 4) Analytic TurtleToolActions – Communicate system to internal and external auditorsDeliverables – 1) Picture of the system, 2) Internal audit, 3) External audit, 4) Accurateassessment of organization
Input Process
Definition
Output
Who What
AnalysisHow
“5 Steps to “5 Steps to achieving achieving expected expected Process Process
Approach Approach Improvements”Improvements”
Who is the customer?Are customer requirements understood and fulfilled?Is the process value added?What are the results of Process Performance and Effectiveness?What is the evidence of Continual Improvement?
Key Questions to Ask of Your Process Approach
Questions and Discussion