Answers to queries for EOI dated 21-12-2012.
SI.
No.
Functional
Area / Section
Page
No.
Clause Query / Clarification
Items
Response Clarification
Date
1 2. Introduction 3 Support functions – Finance,
Accounting, HR, Admin and facility
management, vendor management
The overall intent is that the above
solution blocks should seamlessly
integrate such that the end to end
capabilities are provided to all Business
functions of the JV TPA. In addition, the
holistic solution should have operational
interfaces to ensure effective support to
the Core and Support functions of the
TPA.
What are the specific
requirements around
Admin and Facility
management?
Technology solutions for end to end
management of support functions -
Finance, Accounting, Purchase Module,
HR, Admin, Facility Management, Asset
Management etc is what is expected to
be taken care of by the Service Provider.
All aspects of the support function, its
interaction/integration with other
business units is also considered part of
scope.
08-Jan-13
2 4.1 Some key
considerations
7 The proposed IT solution should have
capability to provide seamless service
and support to proposed JV TPA’s
manpower sitting in centralized
processing center(s) and branches
located in all major cities in India
How many CPC and
branches are envisaged
to be covered as part of
the solution?
How many users by
branch/ role needs to be
covered?
Initially one CPC is planned to be set up,
followed by another processing center in
3 years time. To provide for Business
Continuity one branch in Delhi NCR will
have the capacity to handle processing at
the level of 10-20% of the main CPC.
TPA shall have branches in all major
cities by 3rd/4th year of its operation. A
branch shall have field staff ranging from
5 to 20-25 employees attached to it
depending on business needs.
08-Jan-13
3 4.1 Some key
considerations
7 The proposed IT solution should be
compatible and capable of seamless
integration with insurers, their operating
offices as well as controlling offices
including life insurers
How many offices are
envisaged for
integration?
How many users from
insurance companies are
expected to access the
proposed IT system?
Applicants are advised to refer to market
data on PSGIC office network. The
integration would follow a gradual tiered
approach depending on business
migration and specific business function.
08-Jan-13
4 4.1 Some key
considerations
8 Principal Insurer Management – ‘SLA
terms, service rule engine, organization
hierarchy protocols’
What is the expectation
from a ‘service rule
engine’?
Service rule engine should lay framework
for adherence to all agreed terms as per
contract e.g. service standards, turn
around time, login rights for different
levels and roles at insurer end, auto
escalation in case of breach etc.
08-Jan-13
5 4.1 Some key
considerations
8 Principal Insurer Management - Self-
help portal with login rights
How many users from
insurance/IRDA company
are expected to be given
login rights?
Will be detailed in RFP. At present
applicants may use market information.
08-Jan-13
6 4.1 Some key
considerations
9 Product configuration & Membership
Management - Enrolment (customer
unique id across products and
insurers), special status flagging,
compatibility with Aadhaar Id, field
enrolment capability
Customer self-help portal
Does field enrolment
require to be done over
mobile or hand-held
devices?
Are there any other
mobility requirements –
for example, customer
self service through
smart phones & mobile
devices?
Capability for field enrolment should
include all media - mobile, hand held
devices, smart card machines etc. It is
expected that customers shall access
self service portal through smart phones,
mobile devices.
08-Jan-13
7 4.1 Some key
considerations
9 Pre-authorization - Overseas travel
claims authorization
How would overseas
travel pre-authorization
requests be received?
Are there any
requirements to integrate
with any other system/
application?
Are there any special
requirements around
communicating the
approval – for example
any defined EDI format
such as HIPPA 270?
Overseas pre-authorization would usually
be received through mail, fax and other
electronic media. At present no
integration with a system outside India is
envisaged, however interaction and
exchange of documents and information
over electronic media is envisaged.
Approval formats may need to be
compatible with local laws and formats
(e.g. HIPAA) prevailing in the country.
08-Jan-13
8 4.1 Some key
considerations
11 Customer Service – Call centre set-up
and Management
We assume that the
selected vendor is
expected to provide
functionality to manage
the call centre. Please
confirm.
Yes, the selected SI is expected to
provide functionality to manage the
Technology solution component of
contact center operations and its
integration with other business functions.
08-Jan-13
9 4.1 Some key
considerations
12 Business Process Management -
Standard data formats as per IIB,
ACCORD, industry standards
ACORD standards for
India Health Insurance
are not yet defined. What
is the expectation around
conforming to ACORD
standards?
The system should be so designed as to
be compatible with Indian industry and
Regulator requirements from the
beginning and to eventually be compliant
with international standards like ACORD
in future/as and when implemented in
India.
08-Jan-13
10 4.1 Some key
considerations
12 Infrastructure Services – Records
facility management
We assume that the
selected vendor is
expected to provide
functionality for archival
and retrieval of records.
Please confirm.
Yes. 08-Jan-13
11 4.1 Some key
considerations
15 Providing facility management (FM) for
the period of contract including
helpdesk and end user computing
(Laptop/Desktop support).
What is the scope of
facility management? Is it
limited to end user
support?
It is intended that service provider shall
facilitate facility management through
technology solution and application. End
user support for laptops and desktops
and few peripheral activities like physical
security (electronic badges, bar codes,
access cards etc) are also required. IT
Service Desk support should be ITIL
compliant.
08-Jan-13
12 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Question 2.3 Question 2.3 is missing
in this section. Can you
please provide the
question?
Please ignore 08-Jan-13
13 General - - Is PSGIC looking for a
single application that will
service the end to end
requirements or is it okay
if the Vendor proposes a
combination of
interfacing applications
that would provide the
desired service /
functionality ?
It is left for the applicant to propose either
way so long as business needs,
functionality, seamless integration, data
flow and SOA etc. are ensured. In case
applicant proposes combination of
applications then applications belonging
to same family will be preferred.
08-Jan-13
14 General - - Is PSGIC okay with the
Vendor proposing
a) A Commercial Of The
Shelf (COTS) application
with readymade
functionalities or
B) To build a custom
application that would
fulfill the requirements or
C) A combination of
COTS + Custom
application that would
fulfill the requirements ?
JV TPA is open to every option, as long
as all requirements are met as well as
the timelines for operationalization are
complied with. However when a COTS
application is customised then, the
version upgrades of the application will
be the responsibility of vendor including
porting of the customisation in the
upgraded version.
08-Jan-13
15 General - - Would PSGIC be okay if
the Vendor proposes to
partner with other
product
vendors/application
service providers to
jointly propose a solution
for the JV TPA ?
It is envisaged that JV TPA shall enter
into agreement with only one service
provider (i.e. applicant bidder for end to
end solution as per EOI). The applicant
bidder may enter into partnerships with
best fit solution providers at its own
discretion, but it will be responsible and
accountable for the same.
08-Jan-13
16 General - - What is the deal term in
years that the Vendor is
required to Implement,
Support and Maintain the
JV TPA ?
Will be specified in the RFP. 08-Jan-13
17 General - - What are the expected
timelines for the first
implementation (from the
time of the award of the
contract) ?
The pilot implementation is expected to
be completed within 5 months from the
date of award of contract, however
vendor should also propose a timeline for
implementation of project.
08-Jan-13
18 General - - It is mentioned that the IT
solution should be
capable of managing
varied health insurance
products including Life
Insurance; Could you pls.
list down the various
health insurance
products that the solution
should support ?
Applicants are advised to refer to various
health insurance products available in
the market for this purpose. The IT
solution should be capable of managing
future variant of health products too, in
line with IRDA guidelines.
08-Jan-13
19 General - - How is PSGIC handling
the current business and
is there a plan to migrate
the current book of
business (data) into the
new JV TPA solution ?
At present PSGICs utilize services of
empanelled TPAs. There is a standard
process of migration of business that is
followed at the time of change of
empanelled TPA which shall be followed
in this case also.
08-Jan-13
20 General - - Would there be a
situation where PSGIC
would award the contract
to multiple vendors for
various activity blocks
based on the technical
solution (E.g. Pre-
Authorization to Vendor 1
and Member Enrollment
to Vendor 2) ?
Only one vendor to provide end to end
solution is envisaged.
08-Jan-13
21 General - - Would there be a
situation where PSGIC
would award the contract
to multiple vendors for
Software Services and
Infrastructure services
separately ?
No. 08-Jan-13
22 General - - Is PSGIC also looking for
a (the) vendor to provide
TPA manpower (BPO)
services apart from the
Software and
Infrastructure solutions ?
JV TPA is not expecting vendor to
provide the manpower for BPO services,
except for call center solution. In case of
Call Center solution, JV TPA is
considering both options.
Vendor has to provide the manpower for
the maintenance of Infrastructure
solutions though, including System
Administrators, DBAs, IT Service Desk,
Security etc that are required from IT-
Operations perspective.
08-Jan-13
23 4.1 Some key
considerations
7 The proposed IT solution should be
capable to seamlessly transact with pan
India network of around 4500 hospitals
initially, growing to more than 15,000
hospitals including those for mass
schemes, international providers for
travel product etc., also extendable to a
large network of pathology labs,
physicians, consultants and other
healthcare entities like pharmacies,
wellness clinics, assistance companies
etc.
According to our
understanding, this will
be a portal based
access. Request you to
please confirm the same.
Yes, apart from that the access can also
be web services based or template
based. It is envisaged that there shall be
a healthcare information exchange
system.
08-Jan-13
24 4.1 Some key
considerations
12 Business Process Management Does the web portal /
security requirement
include single-sign-on
validation for agents etc.
when integrated with
Agency / Broker / Bank
assurance self-service
portal?
Sign-on validation/protocols for different
roles shall be discussed at RFP stage,
and the same shall follow standard
protocols observed to ensure system and
data security at all times.
08-Jan-13
25 6.1.5 Section 5
– Functional
and Technical
capabilities
29 2.2 Describe the limitations of the
solution in terms of size of database,
number of concurrent users supported
etc. ( if any). Please provide details of
benchmarking certificates obtained
The solution would have
various Components viz
Claims Management
System, MIS/Reporting,
Data Warehousing,
Portal, CRM, HR,
Finance, Accounting etc.;
will it be ok to share
Benchmarking Reports
for the solution in
entirety. Benchmarking
reports could be shared
for Individual Solution
components. Request
you to please advise on
the same.
The size of the database
, scalability of the
solution etc. would
depend on the Total no
of users and volumes of
data to be processed.
Request you to please
share the Total Number
of users and the number
of Concurrent users
Benchmarking reports to be submitted for
the system in entirety. However,
individual solution benchmarking reports
should also be submitted along with the
Entire system benchmarking report.
The projected number of users and
transaction volume will be clarified at the
time of RFP.
Further, during the implementation phase
JV TPA expects that appropriate load
testing must be undertaken to ensure
that the performance benchmarks are
complied with.
08-Jan-13
26 6.1.5 Section 5
– Functional
and Technical
capabilities
29 2 Functional and Technical details of the SolutionUnder point 2, point 2.3
seems missing. Request
you to please clarify if
this is intentional
Please ignore the typographical error. 08-Jan-13
27 4.5 Submission
and receipt of
EoIs
18 EOI document states Representative
authorization to be confirmed by Power
of Attorney Or by way of a Board
Solution of Applicant Company.
If authorized
representative is
providing a declaration
through an authenticated
documentary evidence
that he/she is
empowered by the
competent authority to
sign the necessary
documents instead of
having his/her written
Power of Attorney, then
would this be considered
as acceptable? Power of
Attorney for Competent
authority, authorizing the
representative, would be
submitted along with the
EOI response. Please
confirm if this is OK.
The Power of Attorney document may be
vested on a responsible officer of the
applicant organization, by a senior official
who is authorized to delegate the power
of attorney. The same must be
admissible in a court of law and be
subject to further legal scrutiny.
08-Jan-13
28 6.1.1 Section 1
– Eligibility
Criteria
25 Eligibility criteria, “The applicant should
have a turnover of at least INR 1000
crore per annum for the last 5 years”.
Our company “ABC"
(name changed) is a
global organization with
head office in the US,
which is also
incorporated in India as a
Limited Company. Our
global turnover is more
than INR 1000 crore in
the last 5 years.
However, our India
turnover is less than INR
1000 crore in the last 5
years.
We request clarification
on whether we will be
eligible to submit EOI for
the aforesaid project,
from the annual turnover
point of view.
The applicant bidder (not the global or
Indian parent company) must fulfill the
stated criterion mentioned in EOI.
08-Jan-13
29 Consortium
arrangement
- - ABC (name changed) is
an XYZ owned (name
changed) company & we
are one of the industry
leaders in providing the
BPO services, IT
solutions and back office
processing. We are
interested to bid for this
TPA opportunity. We
plan to enter into a
strategic alliance with
one of our preferred
partners to deliver the
requirements jointly. We
want to understand if we
can bid for this
opportunity as a
consortium.
Consortium bids are not allowed. 08-Jan-13
30 Scope of
services
- - We understand that the
existing TPA opportunity
comprise of IT system
build as well as
management of the same
on a go-forward basis.
We want to understand
whether BPO services
(ex. Data entry, any
manual processing
requirements and
exception handling) for
the same & (after the
new system goes live) is
also in scope. If yes,
what is the estimated
size of this BPO services
and are there any
location preferences from
where they are to be
delivered.
BPO Services are not in scope. JV TPA
is not expecting applicant to provide the
manpower except in case of Call Center
support. For Call Center, JV TPA is open
to both considerations at this stage.
Further details will be provided at RFP
stage.
08-Jan-13
31 4.1 Some key
considerations
7 The proposed IT solution should have
capability to provide seamless service
and support to proposed JV TPA’s
manpower sitting in centralized
processing center(s) and branches
located in all major cities in India
There is a mention that
proposed JV TPA
manpower will be sitting
in centralized processing
center as well as
branches located in all
major cities in India.
What is going to be role
of this manpower? Is it
the same as BPO
services mentioned in
our S. No. 2. which is
part of this bid or
something else which will
stay with GIC companies
BPO services are not part of scope of
EOI, nor solicited. However, for Call
Center support refer to Question No 30
also.
08-Jan-13
32 4.1 Some key
considerations
7 Branches are expected to house the
fraud management field staff, corporate
liaisons, provider liaisons and insurance
company liaisons
How many TPA branches
across India are
expected to be put in
place. Should we
assume at-least 1-2
branches in each of
states.
Yes, JV TPA shall have a branch in each
of major city by 3rd-4th year of operation
08-Jan-13
33 Facility
management
4 - There is a mention that
applicant is expected to
provide facility
management services as
a part of this opportunity.
We want to understand if
the applicant is expected
to arrange for facility
(either self owned or
rented) & then provide all
services (system related
as well as BPO) from
these facilities across
various offices planned
to be set up in India
(centralized office as well
as branches).
Refer Q No. 11 for facility management
and also refer the EOI document to
understand the requirement
08-Jan-13
34 General - - Can the bidder form a
Consortium and bid?
Consortium bids are not allowed. 08-Jan-13
35 General - - If not, can the Prime
Bidder contract/sub
contract with a software
developer and showcase
their experience?
Yes, if need be and only after ensuring
that the said software developer meets
the requirements. However the JVTPA
shall contract only with prime bidder.
08-Jan-13
36 Eligibility
Criteria
25 - Is it ESSENTIAL to be
Rs 1000 crore turnover?
Yes 08-Jan-13
37 Eligibility
Criteria
25 - If the Indian company
has a member of its
group, which is an
international company
having Rs 1000+ crore
turnover, can the Indian
company bid?
The applicant bidder (not global or Indian
parent company) must fulfill the stated
criterion mentioned in EOI.
08-Jan-13
38 Eligibility
Criteria
25 The Applicant should have a turnover of
at least INR 1000 Crore per annum for
the last 5 years as per the audited
consolidated financial statements.
1. Should the
requirement of INR 1000
crore be met by the
Indian entity only or can
we also consider the
turnover of parent
company (whether in
India or Abroad).
Refer to Question No 37. 08-Jan-13
39 General - - 2. In cases of
merger/Acquisition/Reorg
anization there are
possibilities that different
entities are formed. Can
we combine the entities
to calculate the Turnover
criteria. In such cases
the group will remain the
same.
The revenue criteria will have to be
complied with by the legal entity which is
acting as the Prime Bidder. In the event
of a prior M&A / re-organization, if the
acquiring entity's revenue fails to comply
with the minimum requirement it may not
be satisfactory.
08-Jan-13
40 General - - 3. In case the turnover
criteria is not met by the
Indian entity can the
Global entity participate
in the EOI process
directly. In such case the
contracting party will be
the global entity and
contract support will be
provided by the Indian
entity.
Refer to Question No 37. 08-Jan-13
41 Eligibility
Criteria
26 The Applicant must disclose if it or its
group companies or any of its
promoters or significant shareholders,
have any conflict of interest with respect
to the proposed JV TPA (as on the time
of submitting the EoI), which include,
but are not limited to, the following:
insurance venture/TPA venture in India.
venture in the above businesses over
the course of implementation.
If the Applicant (or any of its promoters
/significant shareholders) do have any
conflict of interest (as stated above or
otherwise), the Applicants must indicate
how the risks arising out of such conflict
would be mitigated. The PSGICs
reserve the right to evaluate each case
and consequently disqualify the
Applicant’s EoI.
Can a consortium
respond to this EOI? If
yes, can members of the
consortium use their
credentials to satisfy
eligibility criteria.
Consortium bids are not allowed. 08-Jan-13
42 Eligibility
Criteria
25 The applicant should have experience
in implementing one or more of health
insurance claims management system
for an Insurance company /TPA within
the last 5 years preceding the date of
submitting the EOI
Please clarify if IT
Applicant (Bidder)
provide both Global
References to satisfy this
eligibility criteria.
Implementation of health insurance
claims management system in any
market - Indian or global shall satisfy the
criteria
08-Jan-13
43 4.1 Some key
Considerations
7 Proposed IT solution should also be
capable of servicing health insurance
claims of other insurers including life
insurers.
Will the life insurance
player be public player or
private player;
Should this be
provisioned for Will this
requirement be part of
RFP?
The system should be capable of
servicing health insurance products of all
insurance players - private, public, life,
non-life, stand alone health insurers.
08-Jan-13
44 6.15 Functional
& Technical
Capabilities
30 User Base in Insurance Industry in
general and in India in particular (Page
30)
Is it a qualifying criteria to
have an installation in
India?
It is a sub-heading, not a qualifying
criteria
08-Jan-13
45 Eligibility
Criteria (Page
5)
5 The Applicant should disclose any
failure to perform on any contract (as
evidenced by imposition of a penalty or
a judicial pronouncement or arbitration
award against the Applicant), or
expulsion from any project or contract,
or termination of any contract for breach
by such Applicant, in the last three
years, preceding the date of submitting
the EoI. Such a contract may be with
the government or private party and
penalty/expulsion/termination may be
levied by the government or such
private party. The PSGICs reserve the
right to evaluate the severity of such a
failure / breach and consequently
disqualify the Applicant’s EoI.
Kindly add public sector
companies across
Industries (Banking,
Insurance,
manufacturing).
Information sought is in respect of all
contracts/awards, across all sectors, not
confined to public sector or BFSI or
manufacturing
08-Jan-13
46 4.1 Some key
considerations
7 The proposed IT solution should have
capability to provide seamless service
and support to proposed JV TPA’s
manpower sitting in centralized
processing center(s) and branches
located in all major cities in India
Please clarify the no of
cities, locations
Refer Q No. 2. 08-Jan-13
47 4.1 Some key
considerations
7 The processing centre shall house the
call centre, enrolment, cashless and
claims management team and customer
service with one centralized location
initially and another processing centre
thereafter
Please clarify if the entire
call centre staff is on IT
Service providers roles or
will the JV TPA provide
some of the staff
Service provider may provide staff to
man contact center.
08-Jan-13
48 4.1 Some key
considerations
7 The proposed IT solution should be
compatible and capable of seamless
integration with insurers, their operating
offices as well as controlling offices
including life insurers
Please clarify if any
particular integration
standards have to be
followed.
Integration via Web services, File based
integration and standards like MT 940
standard used by insurers and banks
must be complied with.
08-Jan-13
49 Customer
Service
11 Call Centre setup and Management,
multi-lingual support, IVR, domestic and
international toll free
Does the scope include
to actually a setup a call
centre or just application
support?
Application and technology support,
integrated with other business functions
08-Jan-13
50 Eligibility
Criteria
25 Letter of Incorporation, Client Citations /
Copies of Work Order
Due to NDA with
customers and
confidentiality clause we
cannot share copies of
Work Order, but being a
public listed company we
will take ownership of the
information that will be
provided. Hope this is
fine.
For evaluation, copies of work order or
similar credential with actual client
references are required.
08-Jan-13
51 Communication
s
- - Do we also need to
consider implementation
of Exchange server and
any form of SMS
gateway for various
modes of
communications?
Yes 08-Jan-13
52 Infrastructure 12 DRP and BCP capabilities Can you provide any
specific details on this?
Overall solution must provide DR
capabilities at DR site with appropriate
recovery objectives frozen during
implementation with JV TPA.
DR location may be suggested by the
Prime Bidder and agreed with JV TPA
during implementation. The DR solution
should be able to handle the volume of
transactions, as well as provide mirroring
capability in the case of an actual
contingency.
08-Jan-13
53 Hosting 14 The Applicant should be capable of
Supplying, Customizing, Deploying,
Hosting, Maintaining, and Supporting
an integrated solution for the above
mentioned applications.
Is this referring to in-
premise hosting of
PSGICS or out of
premise? In case of out
of premise is it allowed
as per IRDA guidelines?
Out of premise hosting may be
considered, to the effect that appropriate
Security, Access and Hosting support is
declared and provided by an established
Data Centre hosting services entity.
Further details to be clarified at the stage
of RFP.
08-Jan-13
54 4.5 Submission
and receipt of
EoIs
17 The EoI must be prepared as per Form
1, provided in the Annexure.
Assuming that this is
referring to Section 6.1
Format for Expression of
Interest as there is no
Form 1 in the Annexure.
Assumption is correct. 08-Jan-13
55 Analytics 11 Analytics With respect to data
analytics do you have
any requirements for
unstructured data like e-
mail, Web sites, office
productivity tools, content
repositories and rich
media (audio, video) etc?
Current focus is on Business Intelligence
and Data Analytics on the structured data
08-Jan-13
56 Membership
Management
8 Member ID Card Issuance (compatible
with multiple types including value
loadable, smart card with biometrics,
policy, claim and medical records),
upload membership data
Is "value loadable"
referring to loaded with
monetary limits which
can be used as a debit
card depending on the
rules.
Yes 08-Jan-13
57 Claims
Management
System / Pre-
Authorization
10 Concurrent Audit Assumption is that this is
to ensure proper
processing of the claim.
In case of any
discrepancy the auditor
should be able to stop
the further processing
and assign it to the
previous stage.
The assumption is correct. Additionally,
the work-flow must support completion of
processing.
08-Jan-13
58 4.1 Some key
considerations
13 Current & Future requirements Assuming that the RFP
will segregate the current
and the future
requirements as it needs
to be a phased
implementation.
The phasing of implementation of
futuristic requirements shall be discussed
with selected service provider post RFP.
The system should be designed in such a
way that all the futuristic technologies
can be integrated seamlessly.
08-Jan-13
59 Innovative
Feature
14 Reward and recognition to IT Service
Providers basis claim filings efficiency
Is this with reference to
transaction based pricing
model?
No 08-Jan-13
60 EOI Submission - Submission is on 21st Jan 13. Request an extension till
28th Jan 13.
Cannot be extended 08-Jan-13
61 Analytics 12 ICD-CPT Coding Is CPT coding required /
mandatory? ICD codes
are being consistently
used by Insurers.
ICD coding is essential. In times to come,
CPT code capability could become
mandatory as per regulatory guidelines.
Thus the system should be built
accordingly.
08-Jan-13
62 Section 6.1.5 34 - What is expectation from
section 6.1.5 as a part of
EOI response? Are we
supposed to provide a
detailed functional &
technical solution at this
stage?
A detailed Solution Architecture is
expected
08-Jan-13
63 Section 6.1.5 34 - If yes, then can we
change design proposed
in the EOI stage, based
on actual requirements
received during RFP
stage?
The applicant bidder should be in
position to envisage the overall solution
during EOI stage, minor
changes/tweaking can be expected
during RFP
08-Jan-13
64 Section 6.1.5 34 - Do you have any
preferences for the
technologies that will be
used in proposed
solution?
No. 08-Jan-13
65 General - - Request to share the
current landscape, since
understanding of the
same especially around
the non-insurance
components is essential
to come up with a
suitable functional and
technical solution?
It is a Greenfield project, there is no
current landscape so far as JV TPA is
concerned
08-Jan-13
66 General - - Can bidders form a
consortium with another
service provider/software
vendor to meet tender
requirements? If yes,
please detail out specific
conditions for it.
Consortium bids are not allowed. 08-Jan-13
67 General - - Please specify the
geographical scope of
the implementation of
this project. Are there
any rollout locations of
PSGIC where the
application will be rolled
out?
CPC shall be located in NCR, second
processing center shall be set up in 2-3
years time in another center. Branches
across various major cities shall come up
gradually from day zero to 3-4 years
08-Jan-13
68 General - - Please confirm, in case
of bidder qualifying in
EOI stage, is it
mandatory to participate
in the RFP process.
Yes 08-Jan-13
69 General - - Is there any vendor
preference for hardware
required as part of this
project for PSGIC?
Please provide hardware
specifications.
No preference for particular hardware.
Applicant bidder free to choose and offer
suitable proposal, based on the technical
requirements specified in the RFP.
08-Jan-13
70 General - - Does PSGIC have any
preferred
methodology/approach/m
odel for
implementation/project
execution?
No, the applicant Bidder may propose a
methodology that is in-line with the best-
in-class standards
08-Jan-13
71 General - - Please provide indicative
timelines for
“Implementation,
Warranty and Support”
phases of PSGIC project.
Go-live is expected in 5 months of award
of contract, vendor may also propose a
timeline. Warranty and support shall be
defined in RFP.
08-Jan-13
72 Introduction 4 Support functions – Finance,
Accounting, HR, Admin and facility
management, vendor management
What is the functionality
expected out of Facility
and Admin Management,
Vendor Management
Refer Q No. 1 and Q. No. 11 08-Jan-13
73 Key
consideration
7 The proposed IT solution should have
capability to provide seamless service
and support to proposed JV TPA's
manpower sitting in centralized
processing center(s) and branches
located in all major cities in India
What is the estimated
no. of branches and
location in which JV TPA
will operate
Refer Q No. 2 08-Jan-13
74 Business
Process Block
11 Customer Relationship Management -
end to end integrated for all modes of
communication, CTI
Is the requirement for an
end to end CRM
application?
Yes 08-Jan-13
75 Business
Process Block
11 Call Centre setup and Management,
multi-lingual support, IVR, domestic and
international toll free
Is the setup & operation
of the call center in
scope?
Yes 08-Jan-13
76 Support
Process Block
13 Human Resource Management and
Finance & Accounting
Is TPSA JV ok to go with
a hosted model (SaaS)
No 08-Jan-13
77 Support
Process Block
13 Human Resource Management and
General Administration
What is the
approximation no. of
employees that TPA JV
would be having (who
will be on HRMS) during
the go-live and what is
the year-on-year growth
expected
These relevant volumes will be clarified
at the time of RFP
08-Jan-13
78 Business
Process Block
7/8/9/
10/11
- Is TPA JV looking for
compatibility of the
application on mobile
devices
Yes 08-Jan-13
79 Requirements 14 Providing Data ware house capabilities Can you please
elaborate on the
requirement
The data-ware house must be built to
provide a cross functional view of the
Business, including the data coming from
Hospitals, Insurers and other stake-
holders in the JV TPA eco-system. The
essence of MIS, Fraud Analytics, Claims
Analytics, Regulatory and associated
reports supporting all aspects of Core
and Support functions of the JV TPA
must be enabled.
08-Jan-13
80 Infrastructure
Solution
14 Procurement, installation and
maintenance of hosting solution
(DC/DRC)
Is the requirement only
for setting up the
infrastructure in DC/DR
or is the requirement for
end to end build of the
DC/DR
End to end build and maintenance is in
scope of requirements
08-Jan-13
81 Evaluation
Criteria
19 Relevant CVs upto a maximum of 15 for
the key personnel detailed below
should be provided
Can we provide sample
CVs at this stage instead
of committed CVs.
(Typically it is the sample
CVs that is provided as
earmarking resources for
long periods till the
contract is finalized is
practically difficult). We
assure that resources
with similar skills will be
deployed in the project.
PLs Confirm
No, CVs of actual planned resources
should be provided. In case of any
change in resource, replacement by
similar skilled resource, which is mutually
agreed, would be envisaged.
08-Jan-13
82 Support
Process Block
18 Finance and Accounting -Payroll
processing linked to access enabled
attendance records
Is Payroll functionality in
scope
Yes 08-Jan-13
83 JV TPA 3 - What are the key
business objectives for
the proposed JV TPA?
What is the need to
create this separate JV?
Are these some of the
objectives:
- Increase profitability
- Contain fraudulent
claims
- Streamline claim
management process,
increase efficiency
- Saving on fees paid
currently to the TPA
- Cost benefit and
revenue generation
Kindly refer to EOI document 08-Jan-13
84 JV TPA 3 - What are the drawbacks
in the existing claim
managements systems
of the individual Insurer?
This is a Greenfield project. 08-Jan-13
85 JV TPA setup 3 - By when will PSGICS JV
TPA be incorporated and
by when it will be fully
operational?
Will be detailed in RFP. 08-Jan-13
86 JV TPA
locations /
offices
7 - Please inform in which all
locations will this JV TPA
have its offices / how
many branches? And
approx. people
strength/users at each
office? What is the
employee strength of the
proposed TPA entity?
Refer Q No. 2 08-Jan-13
87 JV TPA DC /
DR
14 - PSGICS is looking for
building DC and DR or
looking at hosting
option?
JV TPA is open to either option for the
DC/DR site; in effect it will have to be
supported by the Applicant Bidder and
must meet SLAs and Recovery
objectives agreed with the JV TPA during
implementation.
08-Jan-13
88 Past
Implementation
Experience
5 - The applicant should
have past
implementation
experience for claims
management in India or
Abroad? Should these
references be on
applicant’s letterhead?
Yes past implementation is necessary.
Work order copy shall be the reference
document
08-Jan-13
89 Claims volumes 7 - Please provide details on
claim volumes and you
growth? 60 – 80 lakh
volume by when?
60-80 lakh claims volume per annum
shall be reached in 5-6 years time
approximately
08-Jan-13
90 Other insurers 3 - The solution to be
scalable to include other
insurers (both public and
private) in future? If yes,
from when? How many
insurers / organizations
are expected to be
serviced by this JV TPA?
Other insurers servicing is not linked to
any time period, capability to service
multiple insurers, as many as possible,
needs to be built in from day 1 - 4
PSGICs to begin with.
08-Jan-13
91 Page 7 to 13 –
Business
Process Block
and Support
Block
7 - Is that list of
functionalities expected
complete? Any more
functionality is expected?
Does PSGICS expect the
applicant to propose
additional functionalities
apart from the innovative
features?
Yes, innovative features and additional
functionalities are expected to be
proposed by Applicant bidders.
08-Jan-13
92 Green field
development
and
maintenance
and support
14 - What is the expectation
on implementation
timelines? For how long
PSGICs expect the
applicant to support the
entire system / solution
post implementation for
all apps, infra and
DC/DR?
Basic implementation should be
completed within 5 months from the date
of award of contract, vendor may also
propose a timeline.
The applicant is expected to support the
entire system for a certain tenure post
implementation that will be specified in
the RFP.
08-Jan-13
93 JV TPA - - Will the JV TPA be
charging back for the
services to the 4
companies and more
insurers in future? Will
the service costing
mechanism have to be
defined?
TPA shall charge respective insurance
principal for services as per service level
agreements signed between two parties.
08-Jan-13
94 Claims –
Current
Scenario
- - How is the claims
administration done
currently? Who does it
for the 4 insurers? Is it In-
house currently?
This is a Greenfield project. 08-Jan-13
95 Existing IT
Landscape and
claims
management
systems
- - Will PSGICS reuse the
existing IT landscape
(apps and infra) for the
new JV TPA? If yes,
what all will be reused?
with the new proposed
TPA how will the existing
claims process be
impacted?
This is a Greenfield project. 08-Jan-13
96 Networking
amongst
branches
7 - Will the applicant be
required to setup network
connectivity between
branches and HO and
hospital network?
Yes, network connectivity between
branches, CPC and HO will be required
such that they are part of same WAN.
Connectivity with hospitals may be
served via web-services portals, template
based formats, file transfer and other
existing models like fax, e-mail etc.
08-Jan-13
97 Processing
Center
7 - Where is the first
processing center
planned? When and
where will the second
processing center be?
Refer Q. No. 2. 08-Jan-13
98 Data and
backup
- - Please provide details
about size of data,
growth in data, backup
and retention period
Details will be provided in RFP 08-Jan-13
99 Introduction 3 As part of the existing health insurance
business and to bring in greater
efficiency in claims management,
PSGICs are looking to setup a
technology enabled, best-in-class third
party administrator for providing health
insurance claims administration
services. As part of the existing health
insurance business and to bring in
greater efficiency in claims
management, PSGICs are looking to
setup a technology enabled, best-in-
class third party administrator for
providing health insurance claims
administration services
Will the primary
responsibility of
proposed TPA be
specific to Health
insurance or will it also
cater to other general
Insurance like Auto?
JV TPA is proposed to be set up
exclusively to service health business of
all players in the Indian insurance market
08-Jan-13
100 Introduction 4 The systems should ensure seamless
bi-directional data transfer between the
proposed JV TPA and insurance
companies as well as banks and
healthcare service providers like
hospitals, diagnostic centers,
physicians and pharmacies etc. On the
other hand the system should integrate
seamlessly with IRDA portal in order to
meet the required regulatory
requirements.
From integration with
Insurance companies
and IRDA perspective,
are you looking at an
integration platform like a
middleware too?
Yes, applicant bidder are expected to
propose appropriate technology solution
for the same
08-Jan-13
101 Some key
Considerations
8 The processing centre shall house the
call centre, enrolment, cashless and
claims management team and customer
service with one centralized location
initially and another processing centre
thereafter
What are the specific
functions at another
processing center that
the proposed TPA is
planning to conduct
outside of the centralized
location
Second CPC shall perform similar
functions as first CPC. Branch and field
activities like provider empanelment and
monitoring, fraud control investigation,
member enrolment, wellness camps,
relationship management etc would be
conducted outside the centralized
locations
08-Jan-13
102 Some key
Considerations
7 The proposed IT solution should have
capability to provide seamless service
and support to proposed JV TPA’s
manpower sitting in centralized
processing center(s) and branches
located in all major cities in India
Can you specify the
location of the
centralized processing
center and branch
locations?
Refer Q No. 2. 08-Jan-13
103 Self-help portal
with login rights
8 - Will the self-help portal
be used by only the
insurance companies or
will it be also available to
end customers/ insured?
what are the likely user
volumes for the portal?
Self help portals will be used by all the
stake holders like customers, insurance
companies, IRDA, hospitals etc.
Volumes shall be specified in RFP.
08-Jan-13
104 Some key
Considerations
7 The proposed IT solution should be
capable to seamlessly transact with pan
India network of around 4500 hospitals
initially
What will be the
proposed mode of
interface with other
entities like hospitals/
Physicians/ labs? Will it
be online/ batch/ email
considering the technical
interface limitations at
the hospitals/ labs etc.
Information and data exchange with
hospitals may be served via web-
services portals, template based formats,
file transfer to the extent possible; some
support for existing models like fax, e-
mail should be planned for.
08-Jan-13
105 Some key
Considerations
8 Exchange of policy data, member
details, photographs, premium
payment, endorsement details
Since there will be lot of
document management,
are you also wanting a
document management
solution to manage all
the policy/ claims related
data/ supporting
documentation?
Will the same be
procured separately or is
one already available
with the client?
Yes, DMS is part of scope. Applicant
bidder is expected to procure as part of
end to end solution.
08-Jan-13
106 Legal cases
support
8 - Can you elaborate on
what is expected in terms
of support for Legal
cases?
Expectation from solution is to support
entire process of retrieval, representation
and settlement of Legal / Ombudsman /
Grievance cases, dispute cases etc. and
preserve necessary records for required
time period.
08-Jan-13
107 Data/claim files
archive
8 - With regards to the
existing cases/ archives
of claims data with
NIA/NIC/OICL/UIIC, is it
expected to migrate all
the archived data from
these companies to the
proposed TPA? If yes,
what is the data volume/
data size of the data to
be migrated?
Shall be discussed at RFP stage. 08-Jan-13
108 Enrollment
(customer
unique id across
products and
insurers)
8 - The enrollment of the
customers will happen at
the Insurance company’s
end. How will the
proposed TPA ensure
unique id across
products/ insurers?
It is expected that configuration protocol
of member enrolment of JV TPA system
shall be based on certain data points and
criteria which would enable deduping and
allotting a unique id to each customer
irrespective of product, insurer. Further
details shall be discussed later.
08-Jan-13
109 Member ID
Card Issuance
8 - Will the enrolled
insurance companies
stop customer/ card
issuance post the
formation of this TPA?
Insurance companies are not expected to
issue Member id cards.
08-Jan-13
110 smart card with
biometrics
8 - Will the procurement of
smart card be part of the
current project?
Smart cards are envisaged to be used
during later stage, however capability to
integrate with member enrolment system
should exist and also for mass schemes
like RSBY as and when serviced by JV
TPA
08-Jan-13
111 Rule based
engine,
9 - Do you need a separate
rules engine along with
Business process
management (BPM)
solution? Or will only
BPM suffice the
requirements of
proposed TPA?
It is expected that the Prime Bidder may
suggest the best fit solution to this
requirement, keeping in mind ease of
integration as well as handling of large
volume of claims. Audits and assurance
functions, as well as auto-adjudication
must be supported progressively over
time.
08-Jan-13
112 Concurrent
audit
9 - Can you provide more
elaborate details on the
audit functionality?
This is to ensure proper checks and
balances are applied during processing
of the claims. In case of any discrepancy
the auditor should be able to stop the
further processing and assign it to the
previous stage; as well as take the claim
forward.
08-Jan-13
113 mobile reporting 10 - Incase of mobile
reporting, which are the
devices that the client is
planning to support?
It is envisaged that all standard mobile
devices on major platforms like Android,
iOS (Apple), Blackberry, Symbian,
Windows Phone etc will be supported.
08-Jan-13
114 Repricing 9 - Won’t the repricing
decision be taken by the
insurance companies?
What are the kind of
inputs expected for
repricing from the
proposed solution?
Negotiation, repricing etc. are expected
to be performed by TPA and the
proposed solution should enable
capturing of relevant information, provide
inputs e.g. on possible areas for
negotiation, repricing, benchmark rates,
tariffs etc.
08-Jan-13
115 Master Data
Management
10 - Can you provide more
details on the MDM
requirement?
MDM solution should be easily
maintainable. A unified master data
solution which can handle all the master
data to be maintained under one roof
may be adopted; basic idea is to
dispense with data inconsistencies. JV
TPA is open to suggestions from Prime
Bidders on this component.
08-Jan-13
116 end to end
integrated for all
modes of
communication,
11 - Which all modes of
communication is the
client planning to have?
All standard modes of communication
including web/internet based
communication
08-Jan-13
117 4.1 Some key
considerations
12 - Can you elaborate on the
BCP activities required
by the client?
BCP function must support the business
functions with appropriate Recovery
Objectives agreed during
implementation; it must cover the critical
applications supporting Core and Support
functions.
08-Jan-13
118 General - - Is the TPA also planning
to create a consolidated
claims repository which
will be used by all the
member Insurers before
issuing/ renewing new
policies?
It is envisaged that claims history and
data shall be utilized for various
purposes as permitted by Regulations
and inter company MOU.
08-Jan-13
119 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Please describe the architecture of your
solution with diagram and how is your
solution tiered.
The particular details of
architecture can be
finalized based on the
details provided in RFP,
what are the details
required at this stage of
EOI?
The applicant may propose the best fit
solution architecture, incorporating global
standards from its other implementation
experiences.
08-Jan-13
120 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Describe the limitations of the solution Since it would be difficult
to finalize the exact
solution/ OEM at this EOI
stage, providing
limitations/ benchmarks
at this stage would be
difficult. Please confirm
is the same is required at
this stage?
Same is required at EOI stage. 08-Jan-13
121 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Does your solution provide best
practices in respect of the activity
Blocks mentioned below, which are
those?
Some of the components
of the solutions can be
out of box while some of
the components can be
built based on platforms
like BPM, under such
scenario some of the
capabilities can be built
on the available
platforms based on past
expertise. In such a
scenario where in we are
proposing a platform
based approach, how is
the response to this
query expected?
Applicant bidders are expected to
integrate best-in-class solutions custom
built on robust platforms
08-Jan-13
122 6.1.5 Section 5
– Functional
and Technical
capabilities
30 Please provide a list of testing tools Is the client expecting
automated testing?
Applicant bidder is expected to suggest
the automated Testing tools that would
be used.
08-Jan-13
123 Member
enrollment
8 - Does the member
enrollment require a one
to one meeting with
every policy holders and
capture details and bio
metric information?
If yes, whether the skill
and facility need to be
factored as part IT
services or only the
solution needs to be
covered.
Regular process of member enrolment
does not envisage one to one meeting
and capturing of biometric information
except for mass schemes at present.
However, system should be built such to
accommodate the same in future.
08-Jan-13
124 Processing
Centers
12 - What is the service
window for processing
centers and the expect
number of seats?
Will be detailed in RFP. 08-Jan-13
125 FMS for
Desktops and
Laptops
20 - Whether the IT service
desk to be operated from
JV TPA premises or IT
service provider
premises?
Both options are possible for different
services, subject to adherence to
committed service standards
08-Jan-13
126 Support Post-
Implementation
11 - Post implementation,
what support structure is
PSGICS looking for from
the applicant?
Will be detailed later, applicant bidder
can propose at present from its own end.
08-Jan-13
127 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Please describe the architecture of your
solution with diagram and how is your
solution tiered.
Can SI Provide different
options available in terms
of architectures/
technologies for the
solution? The exact
architecture that suits the
need can only be
identified once all the
technical details are
released in the RFP.
Applicant bidder is expected to propose
best fit architecture, technologies and
solution from EoI stage, few
modifications may be made at later stage
08-Jan-13
128 6.1.5 Section 5
– Functional
and Technical
capabilities
29 Please describe the architecture of your
solution with diagram and how is your
solution tiered.
During the RFP stage,
can the SI propose only
the
architecture/technologies
proposed in the EOI or
can SI propose
architecture/technologies
that suits the
requirements of the RFP
best even if it was not
proposed in the EOI.
Refer Q No. 127. Minor modifications are
permissible.
08-Jan-13
129 6.1.5 Section 5
– Functional
and Technical
capabilities
20 - How will the 30 marks
assigned to “Functional &
Technical capabilities” be
split among the line items
given in Section 5 –
Functional and Technical
capabilities?
All the sub questions will have equal
weightage except the last sub-question
which will carry double weightage.
08-Jan-13
130 6.1.5 Section 5
– Functional
and Technical
capabilities
29 - Line item 2.3 is missing. Please ignore typographical error 08-Jan-13
131 4.1 Some key
considerations
13 Cloud Computing What business initiatives
you have planned for the
Cloud Computing. (Short
/Medium /Long Term)
Applicant bidders are expected to
propose from their end
08-Jan-13
132 4.1 Some key
considerations
13 Cloud Computing What Model of Cloud
Infrastructure is decided?
(Private Cloud/Public
Cloud/Community
Cloud/Hybrid Cloud)
Applicant bidders are expected to
propose from their end
08-Jan-13
133 4.1 Some key
considerations
13 Cloud Computing What are the services
you want to offer?
(IaaS/PaaS/SaaS)
Applicant bidders are expected to
propose from their end
08-Jan-13
134 4.1 Some key
considerations
13 Cloud Computing When do you anticipate
starting your Cloud
project?
Applicant bidders are expected to
propose from their end
08-Jan-13
135 4.1 Some key
considerations
13 Cloud Computing Where do you want to
locate your Cloud
Infrastructure?
DC
DR
Applicant bidders are expected to
propose from their end
08-Jan-13
136 4.1 Some key
considerations
13 Cloud Computing Please provide an
overview of your existing
IT Infrastructure
/Datacenter facilities
(Compute, Storage &
Network)
This is a greenfield IT project. Applicant
bidders are expected to propose from
their end
08-Jan-13