    Academic Year 2013-14Lesson Plan

    Name of the Faculty:B.Krishna MurthySubject Name:Automation in ManufacturingCourse:B.Tech Class:IVMECH Semester:II

    S.No Topics to be coveredExpected

    dateTime

    Completeddate

    Ref withpage No.

    TeachingMethod

    UNIT I: Introduction

    1. Introduction types and strategies ofautomation 1/1/2014 2.00-3.00 1(12~17) PPT

    2. Pneumatic components circuits 2/1/2014 2.00-3.00 Internet PPT,BB

    3. Hydraulic components, circuits 3/1/2014 9.00-9.55 Internet PPT,BB4. Automation in machine tools 7/1/2014 11.10-12.05 Internet PPT

    5. Mechanical feeders 8/1/2014 2.00-3.00 1(484~486) PPT

    6. Tool changing, automatic tool changer 9/1/2014 2.00-3.00 Internet PPT

    7. Machine tool control transfer systems 10/1/2014 9.00-9.55 Internet PPT

    8. Introduction to automated flow lines 14/1/2014 11.10-12.02 1(449~452) BB

    UNIT II: Automated Flow Lines9. System configuration of automated flow lines 15/1/2014 2.00-3.00 1(452) PPT,BB

    10. Methods of linear work part transfer mechanism 16/1/2014 2.00-3.00 1(452) PPT,BB

    11. Methods of rotary work part transfer system 17/1/2014 9.00-9.55 1(453~456)) PPT,BB

    12. Mechanical buffer storage system 21/1/2014 11.10-12.02 1(456~457) PPT

    13. Automated flow lines control functions 22/1/2014 2.00-3.00 1(458~459) PPT

    14. Design and fabrication considerations 23/1/2014 2.00-3.00 1(460~462) PPT

    UNIT III: Analysis Of Automated Flow Lines15. Analysis of automated flow line 24/1/2014 9.00-9.55 1(462) PPT

    16. General terminology of flow lines 29/1/2014 2.00-3.00 1(449) PPT

    17. Analysis of transfer lines without buffer storage 30/1/2014 2.00-3.00 1(463~465) PPT

    18. Analysis of transfer lines with buffer storage 31/1/2014 9.00-9.55 1(467~469) PPT

    19. Analysis of partial automation 4/2/2014 11.10-12.02 1(497~498) PPT,BB

    20. Implementation of automated flow lines 5/2/2014 2.00-3.00 Internet PPT

    21. Problems on transfer lines without buffer storage 6/2/2014 2.00-3.00 1(465~466) BB

    22. Problems on transfer lines with buffer storage 7/2/2014 9.00-9.55 1(470~473) BB

    23. Problems on partial automation 11/2/2014 11.10-12.02 1(498~499) BB

    UNIT IV: Assembly System & Line Balancing

    24. Manual assembly lines 12/2/2014 2.00-3.00 1(482) PPT

    25. Automated assembly lines 13/2/2014 2.00-3.00 1(482~483) PPT26. Line balancing methods 14/2/2014 9.00-9.55 1(412~414) PPT

    27. Largest candidate rule 18/2/2014 11.10-12.02 1(415~418) BB

    28. Problems on LCR method 19/2/2014 2.00-3.00 1(417~418) BB

    29. Kilbridgewester method 20/2/2014 2.00-3.00 1(418) BB

    30. Problems on kilbridgewester method 21/2/2014 9.00-9.55 1(419~420) BB

    31. Ranked positional weights method problems 25/2/2014 11.10-12.02 1(421~422) BB

    32.Ways of improving line balancing, flexible assemblylines

    26/2/2014 2.00-3.00 1(410~412) BB

    UNIT V: Automated Storage Systems

    33. Automated material handling equipments 27/2/2014 2.00-3.00 1(274) PPT

    34. Functions of material handling equipments 28/2/2014 9.00-9.55 1(275) PPT

    35. Functions of industrial trucks, AGVs, monorails,conveyors, cranes and hoists 4/3/2014 11.10-12.02 1(275~295) PPT

  • 8/10/2019 Am Lessonplan

    2/2

    Page 2of 2

    Text books:1. Automation, Production Systems and Computer Integrated Manufacturing by M.P. Groover/

    PE/PHIReferences :

    1. Computer control of manufacturing systems by YoramCoreom2. CAD/CAM/CIM by Radhakrishnan3. Automation by W.Buekinsham

    36. Design of material handling conveyor system 5/3/2014 2.00-3.00 1(276~279) PPT

    37. Analysis of material handling systems 6/3/2014 2.00-3.00 1(296~303) BB

    38. Problems on linear conveyor systems 7/3/2014 9.00-9.55 1(299) BB

    39. Problems on rotary conveyor systems 11/3/2014 11.10-12.02 1(305) BB

    UNIT VI: Automated Storage Systems

    40. Automated storage systems 12/3/2014 2.00-3.00 1(321) PPT

    41. Performance of automated storage systems 13/3/2014 2.00-3.00 1(314~316) PPT42. Automated storage system, working 14/3/2014 9.00-9.55 1(321~323) PPT

    43. Automated retrieval systems 18/3/2014 11.10-12.02 1(324) PPT

    44.Analysis of storage systems, working processstorage

    19/3/2014 2.00-3.00 1(329~336) BB

    45.Interfacing handling and storage withmanufacturing

    20/3/2014 2.00-3.00 1(335~336) PPT

    UNIT VII: Adaptive Control Systems

    46. Introduction of adaptive control systems 21/3/2014 9.00-9.55 1(94~95) PPT

    47. Adaptive control with optimization 25/3/2014 11.10-12.02 Internet PPT

    48. Adaptive control with constraints 26/3/2014 2.00-3.00 Internet PPT

    49.Adaptive control application in machining

    operations

    27/3/20142.00-3.00 Internet PPT

    50. Use of cutting force parameter in adaptive control 28/3/2014 9.00-9.55 Internet PPT

    51.Use of vibration parameter in adaptive controlsystem

    1/4/2014 11.10-12.02 Internet PPT

    52.Use of temperature parameter in adaptive controlsystem

    2/4/2014 2.00-3.00 Internet PPT

    53.Use of acoustic emission parameter in adaptivecontrol system

    3/4/2014 2.00-3.00 Internet PPT

    UNIT VIII: Business Processing Re-engineering

    54.Introduction to BPE(business process Re-engineering)

    4/4/2014 9.00-9.55 Internet PPT

    55. Introduction to BPE logistics 8/4/2014 11.10-12.02 Internet PPT

    56. ERP introduction 9/4/2014 2.00-3.00 Internet PPT

    57. Software consideration of BPE 10/4/2014 2.00-3.00 Internet PPT58. Concurrent engineering 11/4/2014 9.00-9.55 Internet PPT

    59. Rapid prototyping 15/4/2014 11.10-12.02 Internet PPT

    60. Techniques on rapid prototyping 16/4/2014 2.00-3.00 Internet PPT

    Prepared by Approved by

    Signature

    Name B.Krishna Murthy Dr. R.B.Choudary

    Designation Assistant Professor HOD