Upload
krishna-murthy
View
220
Download
0
Embed Size (px)
Citation preview
8/10/2019 Am Lessonplan
1/2
Page 1of 2
Academic Year 2013-14Lesson Plan
Name of the Faculty:B.Krishna MurthySubject Name:Automation in ManufacturingCourse:B.Tech Class:IVMECH Semester:II
S.No Topics to be coveredExpected
dateTime
Completeddate
Ref withpage No.
TeachingMethod
UNIT I: Introduction
1. Introduction types and strategies ofautomation 1/1/2014 2.00-3.00 1(12~17) PPT
2. Pneumatic components circuits 2/1/2014 2.00-3.00 Internet PPT,BB
3. Hydraulic components, circuits 3/1/2014 9.00-9.55 Internet PPT,BB4. Automation in machine tools 7/1/2014 11.10-12.05 Internet PPT
5. Mechanical feeders 8/1/2014 2.00-3.00 1(484~486) PPT
6. Tool changing, automatic tool changer 9/1/2014 2.00-3.00 Internet PPT
7. Machine tool control transfer systems 10/1/2014 9.00-9.55 Internet PPT
8. Introduction to automated flow lines 14/1/2014 11.10-12.02 1(449~452) BB
UNIT II: Automated Flow Lines9. System configuration of automated flow lines 15/1/2014 2.00-3.00 1(452) PPT,BB
10. Methods of linear work part transfer mechanism 16/1/2014 2.00-3.00 1(452) PPT,BB
11. Methods of rotary work part transfer system 17/1/2014 9.00-9.55 1(453~456)) PPT,BB
12. Mechanical buffer storage system 21/1/2014 11.10-12.02 1(456~457) PPT
13. Automated flow lines control functions 22/1/2014 2.00-3.00 1(458~459) PPT
14. Design and fabrication considerations 23/1/2014 2.00-3.00 1(460~462) PPT
UNIT III: Analysis Of Automated Flow Lines15. Analysis of automated flow line 24/1/2014 9.00-9.55 1(462) PPT
16. General terminology of flow lines 29/1/2014 2.00-3.00 1(449) PPT
17. Analysis of transfer lines without buffer storage 30/1/2014 2.00-3.00 1(463~465) PPT
18. Analysis of transfer lines with buffer storage 31/1/2014 9.00-9.55 1(467~469) PPT
19. Analysis of partial automation 4/2/2014 11.10-12.02 1(497~498) PPT,BB
20. Implementation of automated flow lines 5/2/2014 2.00-3.00 Internet PPT
21. Problems on transfer lines without buffer storage 6/2/2014 2.00-3.00 1(465~466) BB
22. Problems on transfer lines with buffer storage 7/2/2014 9.00-9.55 1(470~473) BB
23. Problems on partial automation 11/2/2014 11.10-12.02 1(498~499) BB
UNIT IV: Assembly System & Line Balancing
24. Manual assembly lines 12/2/2014 2.00-3.00 1(482) PPT
25. Automated assembly lines 13/2/2014 2.00-3.00 1(482~483) PPT26. Line balancing methods 14/2/2014 9.00-9.55 1(412~414) PPT
27. Largest candidate rule 18/2/2014 11.10-12.02 1(415~418) BB
28. Problems on LCR method 19/2/2014 2.00-3.00 1(417~418) BB
29. Kilbridgewester method 20/2/2014 2.00-3.00 1(418) BB
30. Problems on kilbridgewester method 21/2/2014 9.00-9.55 1(419~420) BB
31. Ranked positional weights method problems 25/2/2014 11.10-12.02 1(421~422) BB
32.Ways of improving line balancing, flexible assemblylines
26/2/2014 2.00-3.00 1(410~412) BB
UNIT V: Automated Storage Systems
33. Automated material handling equipments 27/2/2014 2.00-3.00 1(274) PPT
34. Functions of material handling equipments 28/2/2014 9.00-9.55 1(275) PPT
35. Functions of industrial trucks, AGVs, monorails,conveyors, cranes and hoists 4/3/2014 11.10-12.02 1(275~295) PPT
8/10/2019 Am Lessonplan
2/2
Page 2of 2
Text books:1. Automation, Production Systems and Computer Integrated Manufacturing by M.P. Groover/
PE/PHIReferences :
1. Computer control of manufacturing systems by YoramCoreom2. CAD/CAM/CIM by Radhakrishnan3. Automation by W.Buekinsham
36. Design of material handling conveyor system 5/3/2014 2.00-3.00 1(276~279) PPT
37. Analysis of material handling systems 6/3/2014 2.00-3.00 1(296~303) BB
38. Problems on linear conveyor systems 7/3/2014 9.00-9.55 1(299) BB
39. Problems on rotary conveyor systems 11/3/2014 11.10-12.02 1(305) BB
UNIT VI: Automated Storage Systems
40. Automated storage systems 12/3/2014 2.00-3.00 1(321) PPT
41. Performance of automated storage systems 13/3/2014 2.00-3.00 1(314~316) PPT42. Automated storage system, working 14/3/2014 9.00-9.55 1(321~323) PPT
43. Automated retrieval systems 18/3/2014 11.10-12.02 1(324) PPT
44.Analysis of storage systems, working processstorage
19/3/2014 2.00-3.00 1(329~336) BB
45.Interfacing handling and storage withmanufacturing
20/3/2014 2.00-3.00 1(335~336) PPT
UNIT VII: Adaptive Control Systems
46. Introduction of adaptive control systems 21/3/2014 9.00-9.55 1(94~95) PPT
47. Adaptive control with optimization 25/3/2014 11.10-12.02 Internet PPT
48. Adaptive control with constraints 26/3/2014 2.00-3.00 Internet PPT
49.Adaptive control application in machining
operations
27/3/20142.00-3.00 Internet PPT
50. Use of cutting force parameter in adaptive control 28/3/2014 9.00-9.55 Internet PPT
51.Use of vibration parameter in adaptive controlsystem
1/4/2014 11.10-12.02 Internet PPT
52.Use of temperature parameter in adaptive controlsystem
2/4/2014 2.00-3.00 Internet PPT
53.Use of acoustic emission parameter in adaptivecontrol system
3/4/2014 2.00-3.00 Internet PPT
UNIT VIII: Business Processing Re-engineering
54.Introduction to BPE(business process Re-engineering)
4/4/2014 9.00-9.55 Internet PPT
55. Introduction to BPE logistics 8/4/2014 11.10-12.02 Internet PPT
56. ERP introduction 9/4/2014 2.00-3.00 Internet PPT
57. Software consideration of BPE 10/4/2014 2.00-3.00 Internet PPT58. Concurrent engineering 11/4/2014 9.00-9.55 Internet PPT
59. Rapid prototyping 15/4/2014 11.10-12.02 Internet PPT
60. Techniques on rapid prototyping 16/4/2014 2.00-3.00 Internet PPT
Prepared by Approved by
Signature
Name B.Krishna Murthy Dr. R.B.Choudary
Designation Assistant Professor HOD
Date