AIC Muunyini Church Roof Project 2014 Scope of Muunyini Roof project: Fabricate, erect metal trusses & purloins. Install metal roof on a 55’x80’ church, with an office extension, 17’x 33’, plus three verandahs. Church located two hours south east of Nairobi, Kenya. Note: we need men who are not afraid of heights and who understand welding. Dates: First team of 4 to 5 skilled welders: January 17-31 Second team to complete installing roof: January 31-February 15 Requirements and cost per team member: Passports Air tickets to Nairobi, Kenya from wherever you live Shots: Your local health department can guide you & provide most shots. Malaria pills (the majority of these pills can be purchased in Nairobi for significantly less). Visa: $50 (purchase Nairobi airport) Local transportation and living expenses in Kenya: $600 Pocket money for personal items, such as souvenirs Optional: visit to the Nairobi game park ( + - $40 entrance fees, 20,000ksh ($125) for vehicle and guide (to be divided by number of passengers). Note: If we have extra volunteers on the second team, we have projects available at the Nduluku Bible College, which is located a half hour drive from Muunyini church.(See Nduluku Bible College Projects for details). Materials Cost: Although not a requirement of the team, the following monies are needed in order to accomplish the tasks above. Pray for God’s provision. Muunyini church roof: $12,000 for the main roof. Muunyini office extension and three verandah roofs: $5000 Contact David De Jong for more information at [email protected] See pictures below

AIC Muunyini Church Roof Project 2014 - DeJong Ministriesdejongministries.com/wp-content/uploads/aic-muunyini...AIC Muunyini Church Roof Project 2014 Scope of Muunyini Roof project:

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AIC Muunyini Church Roof Project 2014 - DeJong Ministriesdejongministries.com/wp-content/uploads/aic-muunyini...AIC Muunyini Church Roof Project 2014 Scope of Muunyini Roof project:

AIC Muunyini Church Roof Project 2014

Scope of Muunyini Roof project: Fabricate, erect metal trusses & purloins.

Install metal roof on a 55’x80’ church, with an office extension, 17’x 33’, plus three

verandahs. Church located two hours south east of Nairobi, Kenya.

Note: we need men who are not afraid of heights and who understand welding.

Dates: First team of 4 to 5 skilled welders: January 17-31

Second team to complete installing roof: January 31-February 15

Requirements and cost per team member:

Passports

Air tickets to Nairobi, Kenya from wherever you live

Shots: Your local health department can guide you & provide most shots.

Malaria pills (the majority of these pills can be purchased in Nairobi for significantly

less).

Visa: $50 (purchase Nairobi airport)

Local transportation and living expenses in Kenya: $600

Pocket money for personal items, such as souvenirs

Optional: visit to the Nairobi game park ( + - $40 entrance fees, 20,000ksh ($125) for

vehicle and guide (to be divided by number of passengers).

Note: If we have extra volunteers on the second team, we have projects available at

the Nduluku Bible College, which is located a half hour drive from Muunyini

church.(See Nduluku Bible College Projects for details).

Materials Cost: Although not a requirement of the team, the following monies are

needed in order to accomplish the tasks above. Pray for God’s provision.

Muunyini church roof: $12,000 for the main roof.

Muunyini office extension and three verandah roofs: $5000

Contact David De Jong for more information at [email protected]

See pictures below

Page 2: AIC Muunyini Church Roof Project 2014 - DeJong Ministriesdejongministries.com/wp-content/uploads/aic-muunyini...AIC Muunyini Church Roof Project 2014 Scope of Muunyini Roof project:

PROGRESS OF NEW AIC MUUNYNI BUILDING TO SEAT 1000 PEOPLE

David at AIC Muunyni Ground Breaking Ceremony in 2006, with his sister

Esther, Benjamin Nzwili (pastor of the church at that time) and Joseph Kavuli.

It is Joseph’s home church.

Muunyni youth and children brought sand

and gravel from the river bed to the church

property.

Page 3: AIC Muunyini Church Roof Project 2014 - DeJong Ministriesdejongministries.com/wp-content/uploads/aic-muunyini...AIC Muunyini Church Roof Project 2014 Scope of Muunyini Roof project:

Hand cut stones used for the wall

Overflow of packed church on a

rainy day

Congregation is praising God for the progress

Church leaders and builder met with David, March

2013, and assured him the church will be ready for

the roof by January! Pray that God will provide the

resources for the final preparations.