15
MILAN MARRIOTT HOTEL • MILAN, ITALY • 9-11 APRIL 2018 After downturn, how to safely remobilize our assets Nicolas Seguin Africa Region HSSEQ Director

After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MILAN MARRIOTT HOTEL • MILAN, ITALY • 9-11 APRIL 2018

After downturn, how to safely remobilize our assets

Nicolas SeguinAfrica Region HSSEQ Director

Page 2: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Market context

0

1000

2000

3000

4000

janv.-13 janv.-14 janv.-15 janv.-16 janv.-17 janv.-182014 2015 2016 2017 2018

International Offshore Rig CountUSD WTI

2

Page 3: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Page 4: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

A word of caution…

• There is no magic recipe here

• Sharing experiences

Page 5: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Return To Work Plan: Overview

Page 6: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Return To Work Plan: Procedures – People - Plant

Training

Competence Assessment

Onshore Line Management

PPE

Housekeeping

OMT Walkarounds

Safety Officers, MeetingsCommittees and Reps

Vessel Sponsor Programme

Standard Operating Procedures and Specific Procedures

Permit to Work System

Task Planning and Risk Assessment

Tool Box Talks

Observation and Intervention Cards

Confined Space Entry

Substance Abuse (D&A)

Lift Planning

Working at Height

Rigging Control

Planned Maintenance

Vessel Assurance Audits

People

Plant

Procedures

Page 7: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Return To Work Plan: Competence Risk Analysis• Competence Assurance Assessment Program (CAAP)• Training delivery• Coaching• Slow start

Page 8: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Return To Work Plan: Stakeholders engagement

• Vesselo OMT (Captain, Offshore

Manager, Chief Engineer)o Shift Supervisorso Chief Stewardo Supervisors

• Onshore Teamo Project Manager / Directoro Business Unit Directoro Operations Managero HSE Focal pointo Ship Operations Managero Vessel Superintendanto Site Sponsor

Page 9: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

People Engagement: (Re) forming the team

• Balancing experience• Resilience Awareness Programme• Early engagement

Page 10: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

People Engagement: What keeps us safe ?

• Individual task-planning initiative launched onboard SevenAntares as part of her re-start

• Based on Ishikawa diagram• Roll-out to all personnel• Supervision to ensure any task is preceded by a « What

keeps us safe! » discussion• OMT / PMT / Supervisors to commit during morning brief

to one daily random verification among the planned works

Page 11: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

People Engagement: Workforce Engagement Survey Tool

• ‘Step Change In Safety ’ industry tool• Survey is completed by the workforce• Defines 5 levels of workforce engagement• Enables comparison with previous years• Follow up actions identified

LEVEL 1

Workforce disengaged with the safety effort

LEVEL 2Workforce partially engaged with the safety effort

LEVEL 3Workforce routinely engaged with the safety effort

LEVEL 4Workforce and management working in partnership to improve safety

LEVEL 5Workforce leading the safety improvement effort

Page 12: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

People Engagement: Workforce Engagement Survey Tool

• Case study: DSV survey launched end 2017 after completion of Return To Work protocol• No major change in Workforce engagement

• Top 6 progress:

Dimension

2016Favorable

2017Favorable

Industry Average

Deviation from Industry

AverageVessel trend

Visibility 89% 88% 77% 11% -1%Communication 88% 87% 81% 6% -1%Involvement 90% 91% 83% 8% 1%Support 86% 87% 81% 7% 1%Participation 89% 86% 83% 3% -3%Challenge 87% 85% 83% 3% -2%

2016Favorable

2017Favorable

Industry Average

Deviation from Industry

AverageVessel Trend

I receive feedback on the H&S issues and concerns I raise 80% 88% 78% 10% 8%

My direct supervisor makes specific efforts to engage me in H&S 90% 96% 84% 11% 6%

My direct supervisor involves team members when planning H&S improvements 88% 93% 78% 15% 5%

Senior managers follow-up the H&S issues and concerns raised during worksite visits 88% 93% 81% 13% 5%

I am personally motivated to improve H&S at this worksite 92% 96% 93% 2% 4%

Workers have a strong influence on how H&S is managed at this worksite 78% 82% 77% 5% 4%

Page 13: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Outcome

• To date, we have re-started 6 assets, another 3 are planned to restart in 2018

• 2017 Vs 2016 HSE performanceo Offshore manhours increased by 22% o Lost Time Injury frequency reduced by 35%o Total Recordable Injuries frequency reduced by 5%

-

0,05

0,10

0,15

0,20

0,25

0,30

0,35

0,40

0,45

0,50

-

2000 000

4000 000

6000 000

8000 000

10000 000

12000 000

14000 000

16000 000

18000 000

2013 2014 2015 2016 2017

Offshore Injury Rates Vs Manhours

Offshore Manhours TRIF LTIF

Page 14: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Conclusion

• Both assets and personnel require careful management and preparation prior to their reintroduction to enable safe operation.

• A systematic approach is required (3P, Ishikawa…)• Early and continuing stakeholder engagement is key in

making these Return To Work plans successful

Page 15: After downturn, how to safely remobilize our assets › wp-content › uploads › 2018 › 04 › ... · janv.-17. janv.-18 USD WTI. ... Chief Engineer) o Shift Supervisors o Chief

MCE Deepwater Development 2018

Questions & Answers