33
Aerial View of Valdez Marine Terminal

Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Aerial View of

Valdez Marine Terminal

Page 2: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Valdez Marine Terminal

• Currently 2 Berths in service

– 200,000 bph loading capacity, both with Vapor Recovery

• 18 Storage Tanks built originally - 510,000 bbl. each or 9.18 million bbl. total capacity

• Currently 14 tanks in service in east tank farm

Page 3: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Tankers Loading at Berths 4 and 5

Page 4: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Cathodic Protection—Berth Platform Legs

• OK

Causeway to Berth 5

Page 5: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual
Page 6: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

East Metering Facility Including Pig Trap and Back Pressure Control System

Page 7: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

East Tank Farm – 14 500,000-BBL Tanks

Page 8: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Tanks 2, 4, and 3 at Valdez Marine Terminal

Page 9: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Wintertime Operations May Require Manual Removal of Snow from Tank Tops

Page 10: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Interior of Crude Oil Storage Tank

Page 11: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Roof Structure of Crude-Oil Storage Tank

Page 12: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual
Page 13: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Four loading arms and

one vapor arm are

visible on Berth 4.

The tees at which

ballast water piping

separates from oil

piping are also visible.

Counter-weights are

used to balance the

arms during loading

operations

Page 14: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Row of Five Large Vapor Compressors

Page 15: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Power Vapor Facility

Page 16: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual
Page 17: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Firewater Pumps Building

Firewater intake PWSRCAC consultant confers with Alyeska in main pumps building

Page 18: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Fire Protection on Berths

Firefighting monitors on Berth 4 Tank of firefighting foam on Berth 4

Foam Pumping Shed on Berth 4 Close up of berth monitor

Page 19: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Tank Farm Fire Protection

Tanks that hold foam at East Tank Farm

Foam Shed that feeds the tire suppression spiders in crude oil tanks

Fire hydrant above West Tank Farm

Spiders are in the bottom of crude oil storage tanks. Foam would be ejected from spiders and rise to the top of the oil to smother a fire if needed

Page 20: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Trailer mounted, high volume foam /water monitor

Portable Fire Protection Assets

Fire engine in Alyeska Fire House, with hose ready to deploy

Page 21: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Gleason pressure reducing valve

With water pressure around 250 psi at VMT fire hydrants, some fire engines like most from the City of Valdez need a Gleason Valve to reduce the water pressure. There are three Gleason Valves at the VMT.

Page 22: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Berth fire protection

Secondary water supply to berths Protection of Cable trays to fire monitors on berth

Page 23: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

One of the Three Main Diesel-Powered Fire Water Pumps

Page 24: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual
Page 25: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Interior of a Large Ballast Water Treatment Tank

Page 26: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Biological Treatment Tank Microbial Treatment of Ballast Water

Page 27: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Gravity Separation Tanks for Treatment of Ballast Water in Winter

Page 28: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Gravity Separation and Biological Treatment Tanks

Page 29: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual
Page 30: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Valdez Marine Terminal from the Water

Page 31: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

500-2 Response Barge

Quick Time™ and aTIFF (Uncompress ed) dec ompres sor

are needed to s ee this picture.

Page 32: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Heavy Snow at the Valdez Marine Terminal

Page 33: Aerial View of Valdez Marine Terminal · 1/23/2014  · East Tank Farm – 14 500,000-BBL Tanks . Tanks 2, 4, and 3 at Valdez Marine Terminal . Wintertime Operations May Require Manual

Control Console at Operational Control Center