Appendix H – Geotechnical Assessment Report prepared by AECOM
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Endeavour Ave, Hamilton
Housing New Zealand Limited
18-Mar-2019
Endeavour Ave Development, Hamilton
Geotechnical Assessment Report
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Endeavour Ave Development, Hamilton
Geotechnical Assessment Report
Client: Housing New Zealand Limited
Co No.: 544867
Prepared by
AECOM New Zealand Limited
121 Rostrevor Street, Hamilton 3204, PO Box 434, Waikato MC, Hamilton 3240, New Zealand
T +64 7 834 8980 F +64 7 834 8981 www.aecom.com
18-Mar-2019
Job No.: 60597413
AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001.
© AECOM New Zealand Limited (AECOM). All rights reserved.
AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other
party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any
third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and
AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional
principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which
may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Quality Information
Document Endeavour Ave Development, Hamilton
Ref 60597413
Date 18-Mar-2019
Prepared by Aaron Huesser
Reviewed by Darren Maxwell, Kevin Anderson
Revision History
Rev Revision Date Details
Authorised
Name/Position Signature
0 18-Mar-2019 For Information Sarah Halliday Project Manager
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Table of Contents
1.0 Introduction 1 2.0 Scope of Assessment 1 3.0 Site Description 1 4.0 Geological Setting 2 5.0 Site Investigation 2
5.1 Ground Conditions 2 5.1.1 Shallow Ground Investigation 2 5.1.2 Cone Penetration Testing 3
6.0 Geotechnical Assessment 3 6.1 Static Settlement 3 6.2 Expansive Soils 3 6.3 Soil Liquefaction 3
6.3.1 General 3 6.3.2 MBIE and NZGS Geotechnical Guidelines 3 6.3.3 Seismic hazard 4 6.3.4 Assessment methodology 4 6.3.5 Aging Factors 4 6.3.6 Results and interpretation 5 6.3.7 Intermediate events 6 6.3.8 Lateral displacement 6
7.0 Development recommendations 7 7.1 Soil bearing capacity and settlement 7 7.2 Liquefaction 7 7.3 Pavements 7 7.4 Site Works 7
8.0 Summary 8 9.0 Limitations 8 10.0 References 9
Appendix A Plans A
Appendix B Logs B
Appendix C Liquefaction Analysis C
Appendix D Static Settlement Analysis D
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
1
1.0 Introduction
AECOM New Zealand Limited (AECOM) has been engaged by Housing New Zealand Limited (HNZ) to undertake a geotechnical assessment for the construction of 65 new residential units at a vacant site adjacent to the Flagstaff Shopping Centre, located on Endeavour Avenue, Hamilton (hereafter referred to as the site).
This report presents the results of the geotechnical investigation carried out on the site and provides a discussion of geotechnical constraints and preliminary recommendations for building foundations for the proposed development. We understand this report, if required, will support a land use consent application for the site.
Based on the plans provided to AECOM, the site covers an area of 19,695 m2 and HNZ propose to
develop 65 new residential units comprising 14 single bed units, 24 three bed units (duplex), 24 four bed units (duplex) and 3 five plus one bed units (duplex). Elevations or detailed drawings of the units have not been provided to AECOM.
The preliminary layout of the development presented in Appendix A.
2.0 Scope of Assessment
The scope of work for this assessment is based on the layout plan provided by HNZ. The limited scope of this assessment includes:
Review of available information relevant to the site including proposed site layout plan, topographical information, geological maps and existing geotechnical information.
Walkover of the site by an AECOM engineering geologist to identify geomorphic features that may impact development of the property
Seven hand augered drillholes with accompanying soil strength tests such as Dynamic Cone Penetrometer (DCP or Scala Penetrometer) tests and shear vanes tests, to a maximum depth of 3 m below existing ground level.
Cone Penetration Tests (CPT) to inform assessment of soil liquefaction and static settlement.
Assessment of geotechnical constraints that may impact development and preliminary recommendations for building foundations.
Preparation of a summary report to inform development planning
3.0 Site Description
The site has a total land area of approximately 19,700 m2 and is located in the Flagstaff suburb of
Hamilton. The site is located adjacent to the Flagstaff Shopping Centre, situated on Endeavour Avenue, Hamilton.
The site is currently vacant comprising a grassed recreational area and bounded by a sports field to the north, the shopping centre to the west and residential development to the south and east. The site is gently sloping towards the west which directs overland water flow to a swale running parallel to the western boundary.
Hamilton City Council wastewater and stormwater pipes cross the site. The wastewater pipe is buried approximately 5 metres below ground level, oriented roughly North West to South East, and extends across the entire site. The stormwater pipe extends from an existing structure near the South East corner of the site and extends towards north-northwest terminating near the sites northern boundary. It contains a short westward orientated extension, and the burial depth of the stormwater pipe is unknown but likely to be relatively shallow.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
2
4.0 Geological Setting
The site is located approximately in the centre of the Middle Waikato Basin (Hamilton Lowlands), in northern residential Hamilton. A geological map of the area (Edbrooke, 2005) indicates that the site is underlain by Hinuera Formation materials.
The youngest geological unit expected at the site is the Hinuera Formation which was deposited between 50,000 and 17,000 years ago by an ancient braided river system. The river system later became entrenched and formed the Waikato River. The Hinuera formation is typically the near surface geology of the plains in the Hamilton area.
The Hinuera Formation consists of rhyolitic and pumiceous gravel, sand and silt. Localised, surface and subsurface peat or organic silt deposits can be present. There is distinct cross-bedding throughout the formation, and soil conditions can be highly variable.
The site geology plan is shown in Appendix A.
5.0 Site Investigation
The site investigation was undertaken by AECOM engineering geologists on 13 February 2019. Each of the investigation holes were logged in general accordance with the New Zealand Geotechnical Society (NZGS) Guidelines for Field Description of Soil and Rock (2005). A plan showing the location of the investigations is presented in Appendix A.
Raw data reports of the CPT results and logs of the materials encountered in the auger holes along with the soil strength test results are presented in Appendix B.
5.1 Ground Conditions
5.1.1 Shallow Ground Investigation
Ground conditions encountered by the hand auger investigations indicate the near surface ground conditions consist of 0.1 m to 0.3 m of topsoil, overlying bedded alluvial fine to coarse sand and silt. Overall, the natural ground conditions are consistent with the Hinuera formation.
Peak undrained shear strength measured with a hand held shear vane were carried out in cohesive materials were generally between 81 kPa to over 200 kPa indicating stiff to hard consistency. Typical results ranged from 90 kPa to 150 kPa, indicating predominantly stiff to very stiff cohesive material.
Dynamic Cone Penetrometer test results indicate the granular materials range from loose to dense, with readings of 1 to 11 blows per 100 mm penetration. Typical results ranged from 3 to 7 blows, indicating the granular materials are predominantly medium dense.
As shown in Table 1, groundwater was encountered at varying depths across the site.
Table 1 Depth to groundwater encountered in hand augured drillholes
Test Depth to groundwater (m)
HA01 GWNE
HA02 2.65
HA03 GWNE
HA04 GWNE
HA05 2.65
HA06 1.9*
HA07 2.7*
GWNE: groundwater not encountered
*perched groundwater table
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
3
5.1.2 Cone Penetration Testing
The CPT data was interpreted using the software CPeT-IT v.2.0.1.82 developed by GeoLogismiki. Ground conditions encountered within the tests showed a predominantly sand and silty sand profile up to 20 metres deep, interbedded with clay and silt layers. Average cone resistance recorded was within 5 to 15 MPa in the sandy layers, while the silt and clay lenses showed resistance readings of <1 to 2 MPa.
6.0 Geotechnical Assessment
6.1 Static Settlement
Static settlement can occur when a load is placed on the existing soil. Such loads may be from earth fill placed as part of the development, densification of upper ground layers by removal and replacement with higher density compacted material, or from structures.
A preliminary assessment of static settlement has been undertaken using the CPT data and the software package CPeT-IT. An imposed load of 12 kPa has been adopted over a footing width of 1.2 metres to simulate the load of the building foundations (simulating a two story dwelling with raft foundation).
Indicative settlement estimates from the CPT data under the imposed load show that there will be negligible total settlement.
6.2 Expansive Soils
Soil expansion is associated with water content changes in clay minerals. The greatest problems occur in soils with a high montmorillonite content (Coduto, 2012).
The near surface soils encountered on this site are alluvial sand and silt of the Hinuera Formation. The risk of soil expansion is therefore considered negligible.
6.3 Soil Liquefaction
6.3.1 General
During an earthquake cyclic ground motion can result in several changes to the soils characteristics. Pore-water pressure in the soil can increase which results in a loss of soil strength and a reduced bearing capacity of the soil.
If the excess pore pressure is great enough, liquefaction can occur. The pressure can be released with surface expressions such as ejection of soil/water at the ground surface or dissipate into surrounding soils. Following the liquefaction, the soil particles re-settle out of the suspension which manifests as ground surface settlement.
Soil liquefaction typically occurs in fine-grained, non-cohesive and low plasticity soils. The susceptibility of a site to soil liquefaction is a function of particle size distribution, groundwater level, and soil density.
Strain softening can occur in clay like soils when they are subjected to seismic loading. This results in a loss of strength but does not contribute to ground surface settlement. It can however contribute to lateral displacements, and result in a loss of bearing capacity.
6.3.2 MBIE and NZGS Geotechnical Guidelines
Ministry of Business, Innovation and Employment (MBIE) have partnered with New Zealand Geotechnical Society (NZGS) to create best practice guidelines for earthquake geotechnical engineering. Six modules have been published at the time of writing.
Our assessment is in general accordance with the guidelines hence forth referred to as Modules 1 to 6.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
4
6.3.3 Seismic hazard
Module 1 recommends using seismic loading determined from the NZTA Bridge Manual Third Edition (NZTA, 2016) which references NZS1170.5:2004. The seismic loading inputs are as follows:
Foundation soil classification: Class D – deep or soft soil site.
1000-year return period PGA coefficient (C0,1000): 0.28 (Table 6A.1, NZTA, 2016).
Structure importance level: 2 (Table 3.2, NZS 1170.0, 2002)
Structure design life: 50 years
The resulting seismic loadings are:
Serviceability limit state (1/25): SLS = 0.05 g Magnitude 5.9
Ultimate limit state (1/500): ULS = 0.22 g Magnitude 5.9
6.3.4 Assessment methodology
An assessment of soil seismic behaviour was undertaken using CLiq v.2.0.8.85 developed by GeoLogismiki, using the results of the CPT tests. The following methodologies were used to assess the seismic behaviour at the site as recommended by Module 3:
Analysis method: Boulanger and Idriss (2014)
Fine correction as per Boulanger and Idriss (2014)
Vertical Settlements according to Zhang et al. (2002)
An assessment of the susceptibility of the soils’ seismic response has been carried out for the site based on the results of in-situ CPT testing undertaken within the property. For this assessment we have adopted an earthquake groundwater level of 3 mbgl for all CPT tests. It is based on groundwater encountered in adjacent hand augered drillholes, the dipped levels within the CPT holes, or estimated using the dynamic pore pressure plots where the dipping was unsuccessful due to hole collapse. Table 2 presents the in situ depth to water table for each CPT.
Table 2 Depth to in situ ground water table for each CPT
Test In situ groundwater depth (m)
CPT01 2.651
CPT02 3.322
CPT03 4.003
CPT04 2.71
CPT05 1.91
CPT06 4.72
1Based on groundwater encountered in adjacent hand augered drillhole
2Based on dipped levels within the CPT holes
3Estimated using the dynamic pore pressure plots
6.3.5 Aging Factors
The Hinuera Formation was deposited in the period 17 to 50 thousand years ago. There is little evidence of liquefaction in materials of this age in case studies. Monaco and Schmertmann (2007) note that micro structure changes due to aging are not captured by CPT tests. They also go on to state “that giving insufficient weight to aging or disregarding it is equivalent to omitting a primary parameter in the correlation”.
Aging factors for the Hinuera Formation have been calculated using the correlations in Hayati et al (2008), Hayati & Andrus (2009) and Robertson & Cabel (2012). The aging factors from the various methods are presented in table 3 below.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
5
Table 3 Assessed aging factors
Hinuera Formation
Age [years]
Hayati et al (2008) Hayati & Andrus (2009)
Robertson & Cabel (2012)
Youngest 17,000 1.55 1.38 1.31
Mean 33,500 1.6 1.42 1.32
Oldest 50,000 1.63 1.44 1.33
Clayton & Johnson (2013) looked at the applicability of aging factors in the Hinuera Formation by comparing the estimated shear wave velocity to the measured shear wave velocity. They concluded that an ageing factor of 1.3 to 1.4 may be appropriate.
Our assessment adopts an aging factor of 1.32 for the Hinuera Formation deposits.
6.3.6 Results and interpretation
The site response to shaking and liquefaction effects is related to the liquefaction triggering factor (FL), Liquefaction Potential Index (LPI), and Liquefaction Severity Number (LSN). Based on our review of the assessment outputs and estimated ground surface deformations we have assigned a performance level for each CPT in accordance with Table 1, and presented in Table 2.
At SLS (Serviceability Limit State) loading the results of the liquefaction analysis predict that there is negligible liquefaction and no ground surface settlements.
At ULS (Ultimate Limit State) loading it is predicted that there will be a generally low risk of liquefaction occurring (LPI) with little to no expression of liquefaction predicted (LSN). Cumulative settlements in the order of 30mm to 60mm are expected if liquefaction were to occur. Liquefaction is most likely to occur from 4 m to 15 m depth. Based on the estimated LPI, LSN and vertical settlement, performance levels of mild are expected.
Outputs from the assessment are presented in Appendix C.
Table 4 General performance levels for liquefied deposits (reproduced from Table 5.1 in Module 3)
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
6
Table 5 Summary of performance levels from liquefaction results
CPT ULS Vertical Settlement (mm)
LPI LSN Performance Level
Effect
CPT01 30 0 3.8 L2 Mild
CPT02 66 0.6 8.0 L2 Mild
CPT03 46 0.3 5.7 L2 Mild
CPT04 59 0.9 7.8 L2 Mild
CPT05 58 0.5 6.3 L2 Mild
CPT06 44 0.6 5.8 L2 Mild
6.3.7 Intermediate events
The New Zealand Building Code requires that the structure remains serviceable following a SLS event. A ULS event is required to prevent loss of life and maintain egress from the building; however, the building may suffer damage that is irreparable.
It is now recognised that the seismic behaviour of soil is non-linear and damage to foundations can be significant at events much lower than the ULS event. This can result in irreparable damage to structures at events that are less than ULS. As shown in Figure 1, the analysis on this site shows that settlement estimates from intermediate earthquakes more frequent than a ULS event also have damaging effects at a PGA of 0.18.
Figure 1 Vertical settlement versus peak ground acceleration
6.3.8 Lateral displacement
As the site is level and no free-faced slopes or near-by waterbodies are within the vicinity of the site, it can be expected that no lateral displacements are likely to occur during a seismic event.
0
5
10
15
20
25
30
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4
Ve
rtic
al S
ett
lem
en
t (c
m)
Peak Ground Acceleration (PGA) (g)
CPT-01
CPT-02
CPT-03
CPT-04
CPT-05
CPT-06
1/2500
1/2000
1/1000
1/500
1/250
1/100
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
7
7.0 Development recommendations
7.1 Soil bearing capacity and settlement
Based on the findings of the preliminary investigation, it is considered that foundations designed in accordance with NZS3604:2011, the New Zealand Standard for Timber Framed Buildings, are likely to be appropriate providing any uncontrolled fill, loose or soft near surface materials are excavated and replaced.
Alternatively proprietary raft foundations such as the Firth RibRaft system could be adopted. The Firth RibRaft system modifies the bearing capacity requirements of the soil from that given in NZS 3604:2011 Timber Framed Dwellings. The RibRaft foundation system requires a minimum DCP blow count of 8 blows per 300 mm of penetration (or shear vane strengths in excess of 50 kPa) for a two storey dwelling with light weight cladding.
Indicative settlement estimates from the CPT data show that there will be negligible total settlement under an imposed load of 12 kPa and, therefore, the risk of static settlement is considered low.
Final foundation types and ground improvement requirements will be subject to building design, any liquefaction mitigation considered necessary and additional geotechnical testing to inform building consent.
7.2 Liquefaction
Vertical settlement from liquefaction induced ground deformation could occur at a ULS event and possibly at lower seismic loadings. The effects of liquefaction are likely to be mild with little to no surface expression expected.
Based on the outcome of the liquefaction assessment, it is unlikely that liquefaction mitigation will be required. However, as development proposals advance additional site investigation is likely to be required and the liquefaction risk should be revisited.
7.3 Pavements
Preliminary soil tests indicate that any roads within the proposed development can be constructed using a standard multi-layer crushed rock pavement or a cement stabilised subgrade pavement.
To enable the various pavement options to be assessed, at the detailed design stage, tests on the pavement subgrade layer would be required to determine the in-situ CBR strength and what subgrade strengths can be achieved. This may include sampling and lab testing to infer detailed pavement design.
The design and construction of the pavements should be undertaken in accordance with the Waikato District Council Supplement within the Regional Infrastructure Technical Specification (RITS).
7.4 Site Works
No excavation or retaining has been envisaged to build level building platforms. Any earthworks that are proposed will require specific engineering design and should be referred back to AECOM.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
8
8.0 Summary
AECOM have carried out geotechnical investigation and assessment to inform development of the block of land adjacent to the Flagstaff Shopping Centre, located on Endeavour Avenue, Hamilton.
Ground conditions encountered by the hand auger investigations indicate the near surface ground conditions consist of 0.1 m to 0.3 m of topsoil, overlying bedded alluvial fine to coarse sand and silt. Overall, the natural ground conditions are consistent with the Hinuera formation.
Ground conditions are likely to be suitable for shallow foundations designed in accordance with NZS 3604 or proprietary raft foundations such as Firth RibRaft foundation system.
Mitigation of liquefaction induced settlement or static settlement are not expected to be required based on the results of the liquefaction and settlement assessment.
It should be noted that at the time this report was written details of the proposed structures were not made available to AECOM. We have assumed two story timber framed buildings are proposed.
9.0 Limitations
The recommendations and opinions contained in this report are based upon data obtained from the hand augured drillholes, cone penetration tests and observations made during the walkover inspection. Inferences about the nature and continuity of subsoil conditions away from investigation locations are made using geological principles and engineering judgement.
Should development proceed, it would be in the interest of all parties that AECOM be retained to inspect foundation excavations and to verify ground conditions. In any event, AECOM should be notified if conditions differ from those described in this report.
This report has been prepared for the project described in the owner’s brief to us and no responsibility is accepted for the use of any part of this report in other contexts or for any other purposes.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
9
10.0 References
Boulanger, R.W., Idriss, I.M. 2014, CPT and SPT Based Liquefaction Triggering Procedures. Davis, California: University of California, Department of Civil and Environmental Engineering.
Burns D. Farquhar, G. Mills, M., Williams, A (editors), 2005. Field Description of Soil and Rock, Guideline for the classification and description of soil and rock for engineering purposes. New Zealand Geotechnical Society.
Coduto, D.P. 2012. Foundation Design Principals and Practices, Second Edition, Pearson.
Edbrooke, S.W. (compiler) 2005. Geology of the Waikato area. Institute of Geological and Nuclear Sciences 1:250 000 geological map 4. 1 sheet + 68p. Lower Hutt, New Zealand: Institute of Geological and Nuclear Sciences Limited.
Hayati, H. Andrus, R, Gassman, S. Hasek, M, Camp, W. Talwani, P. 2008, Characterizing the Liquefaction resistance of aged soils, Geotechnical Earthquake and Engineering and Soil Dynamics IV Congress.
Ishihara, K., 1985. Stability of Natural Deposits During Earthquakes, a proceedings in the 11th
International Conference on Soil Mechanics and Foundation Engineering, San Francisco, A.A. Balkema, Rotterdam, pp.321 – 376.
Monaco, P. Schmertmann, J. 2007, Discussion of Accounting for soil aging when assessing liquefaction potential by Evangelia Leon, Sarah L. Gassman and Pradeep Talwani, Journal of Geotechnical and Geoenvironmental Engineering September 2007.
NZS 1170.0:2002 - New Zealand Standard, Structural design actions Part 0: General Principals – New Zealand, Standards New Zealand, Wellington.
NZS 3604:2011 – New Zealand Standard, Timber framed buildings – New Zealand, Standards New Zealand, Wellington.
NZTA Bridge Manual Third Edition, 2014. SP/M/022.
Robertson P.K. and Cabal (Robertson) K.L. 2012. Guide to Cone Penetration Testing for Geotechnical Engineering, 5th Edition, Gregg Drilling and Testing Inc. California.
Zhang, G. Robertson, P. K. Brachman, R. W. I. 2002, Estimating liquefaction-induced ground settlements from CPT for level ground. Canadian Geotechnical Journal 39(5), 1168-1180.
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Appendix A
Plans
Q3a
Q2a
Q3a
eQa
Q2a
Q1a
Q1a
eQa
eQa
eQa
eQa
Q1a
Q1a
Q3a - OIS3-OIS2 (LatePleistocene) river deposits
(Hinuera Formation):Cross-bedded pumicesand, silt and gravel
with interbedded peat.
Q2a - OIS3-OIS2 (LatePleistocene) river deposits
(Hinuera Formation):Cross-bedded pumicesand, silt and gravel
with interbedded peat.
Q1a - OIS1 (Holocene) river deposits:Alluvial and colluvial sand, silt,
mud and clay with local gravel and peat beds.
eQa - UndifferentiatedWalton Subgroup alluvium:
PPumiceous mud, silt, sand andgravel with muddy peat
beds; rhyolite pumice, includingnon-welded ignimbrite, tephraand alluvial pumice deposits.
¯
0 50100Meters
References
Site Location
27/02/2019 Geological Map TemplateI
Note: Geological boundaries are inferred and may not accurately represent the material found on site.
QMAP WaikatoEdbrooke, S.W. (compiler)Sheet N65 HamiltonKear, D. Schofield J. C. 1965Service Layer Credits: Source:Esri, DigitalGlobe, GeoEye,Earthstar Geographics,CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, andthe GIS User Community
CPT01
CPT02
CPT03
CPT04CPT05
CPT06HA01
HA02
HA03
HA04
HA05
HA06HA07
¯
0 50 100Meters
References
Site Location
6/03/2019 Site mapI
Note: Geological boundaries are inferred and may not accurately represent the material found on site.
QMAP WaikatoEdbrooke, S.W. (compiler)Sheet N65 HamiltonKear, D. Schofield J. C. 1965Service Layer Credits: Source:Esri, DigitalGlobe, GeoEye,Earthstar Geographics,CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, andthe GIS User Community
SW pipe
WW pipe
Swale
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Appendix B
Logs
Log!
KE
Y S
HE
ET
2/0
8/20
10 1
2:44
:25
PM
Organic Material
Silt
Gravel / Cobbles No recovery
Mudstone
SPT "N" value; uncorrected blow count for 300 mm penetration
Volcanic Rock
Sandstone
Relative DensityNon-cohesive soils
Water Strike
Siltstone
SPT "N" Value(uncorrected)< 44 - 1010 - 3030 - 50> 50
Su (kPa)< 1212 - 2525 - 5050 - 100100 - 200200 - 500
Very LooseLooseMedium DenseDenseVery Dense
- Continuous Flight Hollow Stem Auger.- Continuous Flight Solid Stem Auger.- Dynamic Cone Penetrometer.- Hand Auger.- HQ Triple Tube.- HQ Wire Line.- Heavy Weight Open Barrel.- NQ Triple Tube.- NQ Wire Line.- 100mm diameter Open Barrel.- 70mm diameter Open Barrel.- Percussion.- PQ Triple Tube.- PQ Wire Line.- Reverse Circulation.- Reverse Circulation Down Hole Hammer.- Standard Penetration Test.- Push Tube Sample- Vacuum Excavation.- Wash Drilling.
PTUDB
- Thin Wall Push Sample- Undisturbed- Disturbed (Core)- Disturbed (Pit)
Test Results
Seep
Groundwater Records Samples
Rock Defect AbbreviationsDefect TypeJ = JointSlk = SlickensideBP = Bedding Plane DefectSZ = Shear ZoneFZ = Fracture ZoneWZ = Weak ZoneF = FractureBkJ = Broken JointL = LaminationHJ = Healed JointDB = Drilling Break
Rock Classification Abbreviations
ConsistencyCohesive Soils
GSI = Geological Strength IndexRQD = Rock Quality DesignationJn = Joint Set NumberJr = Joint Roughness NumberJa = Joint Alteration Number
ESVSSMSWVWEW
Relative Strength- Extremely strong- Very Strong- Strong- Moderately Strong- Weak- Very Weak- Extremely Weak
USC (MPa)> 250100 - 25050 - 10020 - 505 - 201 - 5< 1
Piezometer InstallationStandpipe
Slotted Standpipe Cement
Gravel Pack Filer
Weathering
Soil and rock descriptions generally as in "Guidelines forthe Field Description of Soil and Rock for EngineeringPurposes" by the NZ Geotechnical Society Inc, December2005.
Infill MaterialMn = ManganeseFe = Iron OxideQtz = QuartzS = SandGr = GraphiteCh = ChloriteNF = No InfillCo = CoalifiedPy = PyriteSlt = SiltCC = CalciteCb = CarbonaceousCl = ClayV = VeneerCalc = Calcareous
Defect ApperanceBkJ = Broken JointL = LaminationHJ = Healed JointDB = Drilling BreakR = RoughvR = Very RoughSm = SmoothT = TightPl = PlanarCn = CleanBed = Bedding\\ = ParallelUd = UndulatingSt = SteppedOp = OpenPol = PolishedH = Healed
Graphic Log (typical symbols)
SOIL DESCRIPTIONS
Standing Water Level
Sand
Drill Cuttings
Bentonite
ROCK DESCRIPTIONS
CFHSACFSSADCPHAHQ3HQWLHWOBNQ3NQWLOBOB70PERCPQ3PQWLRCRCDHHSPTPTVAC EXWASH
Drilling / Investigation Methods
Grout
# / # / # blows per 150 mm penetration
UWSWMWHWCW
Very SoftSoftFirmStiffVery StiffHard
TERMINOLOGY AND SYMBOLS
ss - Standard Penetration Test - split spoonsc - Standard Penetrattion Test - solid coneSUOW - Sunk Under Own Weight
Sand Pack Filter
- Unweathered- Slightly Weathered- Moderately Weathered- Highly Weathered- Completely Weathered
Clay
Vane Shear Strength Tests
# / # Vane shear strenght test results given as peak / remoulded shear strengths(kPa). Test as per NZGS Guideline, 2001.# = Vane test performed on core recovered prior to extrusion from core barrel.* = Vane test performed on excavated material of suitable size.
UTP - Unable to penetrate.
Soil and rock decriptions generally as in "Guidelines for the Field Description of Soil and Rock for Engineering Purposes" by the NZ Geotechnical Society Inc, December 2005.
0-11-33-77-17>17
Dynamic Cone(blows / 100mm)
Vane Shear Strength Tests
# / # Vane shear strength test results given as peak / remoulded shear strengths (kPa). Test as per NZGS Guideline, 2001.
UTP - Unable to penetrate
Dynamic Cone Penetrometer (DCP) Test Results
Test recorded as blows per 100mm penertration.
Test Results
Graphic Log (typical symbols) Groundwater Records
Soil Descriptions
0m: Topsoil.
0.1m: Bedded alluvial sandsand silts.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.1m: Fine SAND; light yellowish brown. Medium denseto dense; dry; poorly graded.
0.4m: Fine to coarse SAND; light brownish orange.Medium dense; dry; well graded.
0.55m: Fine to medium SAND; brownish grey. Loose tomedium dense; moist; well graded.
0.7m: Light brownish grey.
1.1m: SILT; light brownish grey. Very stiff; moist; highplasticity; sensitive to moderately sensitive.
1.4m: Mottled orange.
1.7m: Silty fine to medium SAND; light grey. Mediumdense; wet; well graded.
1.8m: Fine to medium SAND; brownish grey. Mediumdense; wet; gap graded.
2m: Fine to coarse SAND; light grey. Medium dense;wet; well graded.
2.5m: SILT; light grey. Stiff; wet; high plasticity;moderately sensitive.
14
9
4
4
3
4
4
4
3
2
2
2
1
1
1
4
5
6
5
5
5
4
4
5
5
6
3
4
7
8
HIN
UE
RA
FO
RM
AT
ION
102/37
139/19
114/37
121/56
HA01 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820832.66mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA01
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.No groundwater encountered.*216 kPa is the shear vane limitNZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
GEOVANE 2018: 19mm blade: Correction Factor = 1.546
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
31.5m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
NL
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798651.34mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
0m: Topsoil.
0.2m: Bedded alluvial sandsand silts.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.2m: SILT; light brown, speckled white. Firm; moist; lowplasticity.
0.4m: Mottled orange.
0.5m: Sandy SILT; light grey, mottled orange. Very stiff;moist; low plasticity; moderately sensitive.
0.7m: SILT, trace sand; brownish grey, mottled orange.Firm; moist; low plasticity; sand, fine.
1m: Silty fine SAND; brownish grey, mottled orange.Loose to medium dense; moist; poorly graded.
1.4m: SILT, trace sand; grey, mottled orange. Stiff tovery stiff; wet; high plasticity; moderately sensitive;sand, fine.
1.6m: No sand.
1.8m: Fine SAND, minor silt; grey, mottled orange.Medium dense to dense; moist; poorly graded.
1.95m: Gravel, medium, rounded, pumice.
2.1m: Silty fine SAND; blueish grey, mottled orange.Medium dense to dense; wet; poorly graded.
2.4m: Silty fine to coarse SAND; blueish grey, mottledorange. Dense; wet; well graded.
2.65m: Saturated.
2.8m: Clayey SILT; blueish grey, mottled brownishorange. Stiff; saturated; high plasticity.
2.9m: Silty fine SAND; blueish grey. Medium dense;moist; poorly graded.
14
14
6
6
4
6
6
4
3
4
3
3
3
1
2
4
4
5
7
6
7
6
7
9
8
7
8
4
4
5
HIN
UE
RA
FO
RM
AT
ION
155/54
97/29
141/67
13/02/2019 00:00 3.00 - 2.65
HA02 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820843.69mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA02
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.Perched water encountered at 2.65 m.*202 kPa is the shear vane limitNZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
DR1870: 19mm blade: Calibrated May 2018: Correction Factor = 1.680
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
31.5m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
GM
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798709.45mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
3
0m: Topsoil.
0.15m: Bedded alluvial sandsand silts.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.15m: Sandy SILT; light grey. Stiff to hard; dry; lowplasticity; sensitive to moderately sensitive; sand, fine.
0.7m: Mottled orange.
1.5m: Minor fine sand.
2m: Fine to medium SAND; light grey. Medium dense todense; moist; well graded.
2.3m: Light brownish grey.
2.5m: Fine SAND; brownish grey. Medium dense;moist; poorly graded.
2.7m: Mottled orange; wet.
2.9m: Fine to coarse SAND; black. Medium dense; wet;well graded.
10
9
9
5
4
4
2
3
3
2
2
4
3
4
6
5
3
4
5
8
7
10
6
4
5
7
3
3
3
4
HIN
UE
RA
FO
RM
AT
ION
201/31
96/15
142/31
124/40
HA03 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820892.79mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA03
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.No groundwater encountered.*216 kPa is the shear vane limitNZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
GEOVANE 2018: 19mm blade: Correction Factor = 1.546
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
31.5m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
NL
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798722.28mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
0m: Topsoil.
0.15m: Bedded alluvial sandsand silts.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.15m: Sandy SILT; brownish grey. Dry; low plasticity;sand, fine.
0.45m: Fine to coarse SAND, trace gravel; brownishgrey. Medium dense; dry; gravel, fine, subangular tosubrounded, rhyolite.
0.7m: Medium to coarse SAND, trace gravel; brownishgrey. Medium dense; dry; gravel, fine, subangular,rhyolite.
1m: Coarse SAND, minor gravel; dark brownish grey.Loose to dense; dry; gravel, fine to medium, subangularto subrounded, rhyolite. 1.15m: Moist.
1.85m: Wet.
6
10
8
8
8
6
6
7
6
3
5
4
6
4
2
2
3
3
5
5
6
7
7
6
3
3
6
8
7
8
HIN
UE
RA
FO
RM
AT
ION
HA04 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820951.6mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA04
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.No groundwater encountered.
NZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
31.5m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
NL
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798714.88mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
0m: Topsoil.
0.15m: Uncontrolled fillconsisting of sand, silt, andgravel.
1.5m: Bedded alluvial sands.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.15m: Fine SAND, minor silt; brown. Dense; dry; poorlygraded.
0.6m: Fine to medium SAND, minor silt; brownish grey.Medium dense; dry; well graded.
0.8m: Fine to coarse SAND, minor silt; brownish grey,grey, and black. Medium dense to dense; moist; gapgraded.
1m: Minor gravel, fine to medium, angular to subrounded,lithics.
1.2m: No silt.
1.5m: Medium to coarse SAND, trace gravel; lightbrown. Loose to medium dense; moist to wet; wellgraded; gravel, fine to medium, subrounded, rhyoliterock fragments.
2m: Light brownish grey.
2.2m: Fine to coarse SAND; light brownish grey.Medium dense; wet; well graded.
2.65m: Coarse SAND; light grey. Dense; saturated;poorly graded.
8
9
11
8
10
5
4
5
4
6
9
7
6
4
4
4
2
3
4
3
2
5
5
4
3
3
7
7
7
8
Unc
ontr
olle
d F
illH
INU
ER
A F
OR
MA
TIO
N
13/02/2019 00:00 3.00 - 2.65
HA05 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820966.83mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA05
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.
NZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
32m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
NL
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798658.46mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
3
0m: Topsoil.
0.3m: Bedded alluvial sandsand silts.
0m: SILT, trace organics; brown. Dry; organics, rootlets.
0.3m: SILT, some sand; light brown, speckled white.Stiff; moist; low plasticity; sand, fine to coarse.
0.65m: SILT, some sand; brown. Very stiff; moist; lowplasticity; moderately sensitive; sand, fine.
1m: Mottled orange.
1.3m: SILT, trace sand; grey, mottled orange. Firm;moist; low plasticity; sand, fine.
1.8m: Silty fine to medium SAND; grey, mottled orange.Very loose; wet; poorly graded. 1.9m: Saturated.
2m: SILT; blueish grey. Stiff; saturated; high plasticity;moderately sensitive.
2.3m: Fine SAND, trace silt; brownish orange, mottledorange. Medium dense; moist; poorly graded.
2.7m: SILT; blueish grey, speckled black. Very stiff; wet;high plasticity.
2.85m: Some fine sand.
7
8
13
7
9
4
3
3
2
2
3
3
3
4
4
6
6
3
3
4
3
4
7
8
10
11
10
12
17
13
TO
PS
OIL
HIN
UE
RA
FO
RM
AT
ION
171/47
138/54
134/30
81/30
13/02/2019 00:00 3.00 - 1.9
HA06 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820912.75mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA06
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.Perched water encountered at 1.9 m.*202 kPa is the shear vane limitNZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
DR1870: 19mm blade: Calibrated May 2018: Correction Factor = 1.680
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
32m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
GM
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798681.84mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
3
0m: Topsoil.
0.2m: Bedded alluvial sands,silts and gravels.
0m: SILT, trace organics; light brown. Dry; organics,rootlets.
0.2m: SILT; yellowish brown, speckled black. Hard;moist; low plasticity. 0.3m: Mottled orange.
0.6m: Clayey SILT; light grey, mottled orange. Moist;high plasticity.
0.9m: Sandy SILT; light grey, mottled orange. Very stiff;moist; low plasticity; moderately sensitive to sensitive;sand, fine.
1.1m: Clayey SILT, trace sand; light grey, mottledorange. Stiff; moist; high plasticity; sand, fine.
1.2m: Clayey sandy SILT; light grey, mottled orange.Very stiff; moist; high plasticity; insensitive; sand, fine.
1.35m: Silty fine SAND; light grey, mottled orange.Medium dense; moist; poorly graded.
1.7m: Wet.
2.1m: Fine SAND, trace silt; light grey. Medium dense todense; moist; poorly graded.
2.4m: Wet.
2.5m: Silty fine to medium GRAVEL; grey. Mediumdense; wet; poorly graded; rounded, pumice.
2.7m: Silty CLAY, some sand; grey, mottled reddishbrown. Stiff; saturated; high plasticity; sand, fine tomedium.
2.8m: Fine to coarse SAND; brownish grey. Mediumdense to dense; moist; well graded.
4
6
6
4
7
5
6
5
5
3
4
5
6
7
5
6
7
5
6
8
7
9
8
6
7
6
5
5
7
7
HIN
UE
RA
FO
RM
AT
ION
202*
151/37
124/74
13/02/2019 00:00 3.00 - 2.7
HA07 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
5820913.41mN
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA07
Hand Held Shear Vane
SOIL PROPERTIESTest Records
13/02/2019
27/02/2019
Endeavour Ave Development
Elevation from HCC GIS Viewer contours.Perched water encountered at 2.7 m.*202 kPa is the shear vane limitNZGD2000 / New Zealand Transverse Mercator 2000
LOG OF AUGERHOLE
DR1870: 19mm blade: Calibrated May 2018: Correction Factor = 1.680
Feature Building Foundations.
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
31.5m (Approx)
Vane shear strength per NZGS guideline
Project number 60597413
2
Drilled Depth(m)
Housing New Zealand Corp.
Page of1
StartedRemarks
8
Logged
GM
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1798626.75mE
1
2
3
13/02/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
13/02/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Endeavour Avenue, Flagstaff, Hamilton.
AU
GE
RH
OLE
LO
G E
ND
EA
VO
UR
AV
E_L
OG
S.G
PJ
BA
SE
.GD
T
27/0
2/19
3
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.99 m, Date: 15/02/2019
Surface Elevation: 30.00 m
Endeavor Ave
Coords: lat -37.738088° lon 175.255087°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-01
Location:
Cone resistance qt
HAND AUGER
Tip resistance (MPa)151050
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)5000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour TypeHAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Organic soilClay & silty clayClay & silty clay
Sand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltClaySand & silty sandSand & silty sand
Clay
Sand & silty sand
Silty sand & sandy siltClay & silty clayClay & silty clayClay & silty claySilty sand & sandy siltSilty sand & sandy siltSand & silty sand
Sand & silty sandSilty sand & sandy siltSilty sand & sandy silt
Silty sand & sandy silt
Sand & silty sand
Silty sand & sandy siltSilty sand & sandy siltSensitive fine grainedClay & silty clay
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:03 p.m. 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.93 m, Date: 15/02/2019
Surface Elevation: 31.00 m
Endeavor Ave
Coords: lat -37.737575° lon 175.255381°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-02
Location:
Cone resistance qtHAND AUGER
Tip resistance (MPa)100
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)6004002000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour TypeHAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Organic soilSilty sand & sandy siltClay & silty claySilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sand
Sand & silty sandSilty sand & sandy siltSilty sand & sandy siltClay & silty claySensitive fine grainedSand & silty sandSilty sand & sandy siltClaySilty sand & sandy siltClaySand & silty sandSilty sand & sandy siltSand & silty sandClay & silty clay
Sand & silty sandSilty sand & sandy siltClaySand & silty sand
Sand & silty sand
Sand & silty sand
Silty sand & sandy siltSilty sand & sandy silt
Silty sand & sandy siltClay & silty clay
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:03 p.m. 2Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.15 m, Date: 15/02/2019
Surface Elevation: 34.00 m
Endeavor Ave
Coords: lat -37.736855° lon 175.255093°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-03
Location:
Cone resistance qt
HAND AUGER
Tip resistance (MPa)10
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)5000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour Type
HAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Silty sand & sandy siltSilty sand & sandy silt
Sand & silty sandSand & silty sandSand & silty sandSilty sand & sandy siltClay
Sand & silty sandSilty sand & sandy siltClayClay
Sand & silty sand
Silty sand & sandy siltSilty sand & sandy siltSilty sand & sandy silt
Sand & silty sandSilty sand & sandy siltClay & silty clayClay & silty claySand & silty sandSand & silty sandSilty sand & sandy siltClay & silty clayClay & silty clay
Sand & silty sand
Silty sand & sandy siltSand & silty sandClay & silty clayClay & silty claySilty sand & sandy silt
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:04 p.m. 3Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.98 m, Date: 15/02/2019
Surface Elevation: 32.00 m
Endeavor Ave
Coords: lat -37.73729° lon 175.254024°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-04
Location:
Cone resistance qt
HAND AUGER
Tip resistance (MPa)1050
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)5000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour TypeHAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Silty sand & sandy silt
Silty sand & sandy siltSand & silty sandSand & silty sandSand & silty sandSilty sand & sandy siltClay & silty clay
ClayClay & silty claySilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltClay & silty claySand & silty sandSand & silty sandClayClay & silty clay
Sand & silty sandSilty sand & sandy siltSilty sand & sandy siltSand & silty sand
Sand & silty sand
Silty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty clay
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:04 p.m. 4Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.00 m, Date: 15/02/2019
Surface Elevation: 32.00 m
Endeavor Ave
Coords: lat -37.737455° lon 175.254728°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-05
Location:
Cone resistance qt
HAND AUGER
Tip resistance (MPa)15105
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)5000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour TypeHAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Silty sand & sandy siltClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClay & silty claySand & silty sandClay & silty claySilty sand & sandy silt
ClaySilty sand & sandy silt
Sand & silty sandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy silt
Sand & silty sandSilty sand & sandy siltClay & silty claySilty sand & sandy silt
Sand & silty sand
Silty sand & sandy siltClay & silty clayClay & silty claySand & silty sand
Sand & silty sand
Silty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy silt
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:05 p.m. 5Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project: Endeavor Ave Site Investigation
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.00 m, Date: 15/02/2019
Surface Elevation: 29.00 m
Endeavor Ave
Coords: lat -37.738217° lon 175.254436°
Cone Type: CPTuCone Operator: Drill Force
CPT: CPT-06
Location:
Cone resistance qtHAND AUGER
Tip resistance (MPa)15105
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Pore pressure u
HAND AUGER
Pressure (kPa)5000
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Pore pressure uFriction ratioHAND AUGER
Rf (%)1086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Friction ratio SBT Index
I(SBT)4321
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SBT Index Soil Behaviour TypeHAND AUGER
SBT (Robertson, 2010)181614121086420
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Soil Behaviour Type
Silty sand & sandy siltSilty sand & sandy siltClaySilty sand & sandy siltSilty sand & sandy siltClay & silty claySilty sand & sandy silt
Sand & silty sandSilty sand & sandy siltSand & silty sand
ClayClay & silty clay
Sand & silty sand
Silty sand & sandy siltClayClay & silty clayClaySilty sand & sandy siltSilty sand & sandy silt
Sand & silty sand
Silty sand & sandy siltSilty sand & sandy siltSilty sand & sandy silt
Sand & silty sand
Silty sand & sandy siltClay & silty clay
Clay & silty claySilty sand & sandy silt
Sand & silty sand
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to silty clay
5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand to clayey sand
9. Very stiff fine grained
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 18/02/2019, 3:36:05 p.m. 6Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Appendix C
Liquefaction Analysis
This software is licensed to: AECOM CPT name: CPT-01
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)3210
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:47 p.m. 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.222.65 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-02
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)6420
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:48 p.m. 2Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.223.32 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-03
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)43210
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:49 p.m. 3Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.224.00 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-04
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)6420
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:50 p.m. 4Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.222.70 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-05
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)420
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:51 p.m. 5Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.221.90 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-06
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0LPI Vertical settlements
Settlement (cm)43210
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 13/03/2019, 1:58:53 p.m. 6Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.224.70 m
Depth to GWT (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:
3.00 m32.60Based on SBTNoN/A
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Overall Liquefaction Potential Index report
Project title :
Location :
CPTU name
CPT-
01
CPT-
02
CPT-
03
CPT-
04
CPT-
05
CPT-
06
LPI
valu
e
17.00
16.00
15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0.3490.613
0.266
0.9210.488 0.568
LPI color schemeVery high risk
High risk
Low risk
Basic statistics
Total CPT number: 6
100.00% low risk
0.00% high risk
0.00% very high risk
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Overall Liquefaction Severity Number report
Project title :
Location :
CPTU name
CPT-
01
CPT-
02
CPT-
03
CPT-
04
CPT-
05
CPT-
06
LSN
val
ue
12.00
11.50
11.00
10.50
10.00
9.50
9.00
8.50
8.00
7.50
7.00
6.50
6.00
5.50
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
3.825
8.027
5.655
7.751
6.301
5.765
Basic statistics
Total CPT number: 6
100.00% little liquefaction
0.00% minnor liquefaction
0.00% moderate liquefaction
LSN color schemeSevere damageMajor expression of liquefactionModerate to severe exp. of liquefactionModerate expression of liquefactionMinor expression of liquefactionLittle to no expression of liquefaction
0.00% moderate to major liquefaction
0.00% major liquefaction
0.00% severe liquefaction
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Overall vertical settlements report
Project title :
Location :
CPTU name
CPT-
01
CPT-
02
CPT-
03
CPT-
04
CPT-
05
CPT-
06
Ver
tica
l set
tlem
ent
(cm
)
7.50
7.00
6.50
6.00
5.50
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
3.045
6.611
4.61
5.9365.752
4.42
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Liquefaction\Endeavour Park.clq
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
PGA Based Parametric Analysis
Settlements vs PGA
PGA (g)0.50.450.40.350.30.250.20.150.10.05
Set
tlem
ents
(cm
)
26
2524
2322
2120
1918
1716
1514
1312
1110
98
76
54
32
10
C PT-01 copyC PT-02 copyC PT-03 copyC PT-04 copyC PT-05 copyC PT-06 copy
Settlements vs PGA
:: CPT main liquefaction parameters details ::
GWT in situ(m)
CPT Name EarthquakeMag.
GWT earthq.(m)
Assesment method
AECOM
Endeavour Ave, Hamilton
Endeavour Ave Development, Hamilton – Geotechnical Assessment Report
\\NZHAM1FP001\Projects\605X\60597413\500_DELIV\502_Final Reports\Geotech\190318_Geotechnical Assessment Report_Endeavor Ave.docx Revision 0 – 18-Mar-2019 Prepared for – Housing New Zealand Limited – Co No.: 544867
Appendix D
Static Settlement Analysis
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.99 m, Date: 15/02/2019Surface Elevation: 30.00 m
Coords: X:-37.74, Y:175.26Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-01
Location:
Cone resistance qt
Tip resistance (MPa)151050
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)1911419141
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
1
Constrained Modulus Cumulative settlement
Settlement (cm)0.030 .020 .010
Dep
th (
m)
1.5
1 .45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75
0 .7 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.65 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 4/03/2019, 3:15:25 p.m. 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-01
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
Total primary settlement: 0.03Total secondary settlement: 0.00
Total calculated settlement: 0.03
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 4/03/2019, 3:15:25 p.m. 4Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.93 m, Date: 15/02/2019Surface Elevation: 31.00 m
Coords: X:0.00, Y:0.00Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-02
Location:
Cone resistance qt
Tip resistance (MPa)151050
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)206156106566
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
Constrained Modulus Cumulative settlement
Settlement (cm)0.020 .01
Dep
th (
m)
1.45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75
0 .7
0 .65
0 .6 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.55 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 4/03/2019, 3:17:15 p.m. 1Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-02
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
91 1.45 1.46 0.01 0.91 5.77 9.16 0.48 0.001 0.000 0.001
92 1.46 1.47 0.01 0.92 5.70 9.21 0.48 0.001 0.000 0.001
93 1.47 1.48 0.01 0.93 5.63 9.38 0.47 0.001 0.000 0.001
94 1.48 1.49 0.01 0.94 5.56 9.84 0.46 0.001 0.000 0.001
Total primary settlement: 0.03Total secondary settlement: 0.00
Total calculated settlement: 0.03
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 4/03/2019, 3:17:15 p.m. 4Project file: P:\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.15 m, Date: 15/02/2019Surface Elevation: 34.00 m
Coords: X:0.00, Y:0.00Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-03
Location:
Cone resistance qt
Tip resistance (MPa)15105
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)1831338333
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
1
Constrained Modulus Cumulative settlement
Settlement (cm)0.030 .020 .010
Dep
th (
m)
1.55
1 .5
1 .45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.70 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:01:04 p.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-03
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
Total primary settlement: 0.03Total secondary settlement: 0.00
Total calculated settlement: 0.03
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:01:04 p.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 19.98 m, Date: 15/02/2019Surface Elevation: 32.00 m
Coords: X:0.00, Y:0.00Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-04
Location:
Cone resistance qt
Tip resistance (MPa)1050
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)151101511
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
1
Constrained Modulus Cumulative settlement
Settlement (cm)0.030 .020 .010
Dep
th (
m)
1.5
1 .45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75
0 .7
0 .65 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.60 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:03:18 p.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-04
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
91 1.50 1.51 0.01 0.91 5.77 21.38 0.48 0.000 0.000 0.000
92 1.51 1.52 0.01 0.92 5.70 20.18 0.48 0.000 0.000 0.000
Total primary settlement: 0.03Total secondary settlement: 0.00
Total calculated settlement: 0.03
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:03:18 p.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.00 m, Date: 15/02/2019Surface Elevation: 32.00 m
Coords: X:0.00, Y:0.00Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-05
Location:
Cone resistance qt
Tip resistance (MPa)15105
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)1731237323
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
1
Constrained Modulus Cumulative settlement
Settlement (cm)0.060 .040.020
Dep
th (
m)
1.5
1 .45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75
0 .7
0 .65 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.60 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:05:13 p.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-05
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
91 1.50 1.51 0.01 0.91 5.77 25.61 0.48 0.000 0.000 0.000
92 1.51 1.52 0.01 0.92 5.70 25.67 0.48 0.000 0.000 0.000
Total primary settlement: 0.06Total secondary settlement: 0.01
Total calculated settlement: 0.07
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:05:13 p.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
Project:
AECOM NZ Limited121 Rostrevor StreetHamiltonNew Zealand
Total depth: 20.00 m, Date: 15/02/2019Surface Elevation: 29.00 m
Coords: X:0.00, Y:0.00Cone Type: CPTu
Cone Operator: Drill Force
CPT: CPT-06
Location:
Cone resistance qt
Tip resistance (MPa)15105
Dep
th (
m)
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0Cone resistance qt Constrained Modulus
M(CPT) (MPa)158108588
Dep
th (
m)
2019.5
1918.5
1817.5
1716.5
1615.5
1514.5
1413.5
1312.5
1211.5
1110.5
109.5
98.5
87.5
76.5
65.5
54.5
43.5
32.5
21.5
10.5
Constrained Modulus Cumulative settlement
Settlement (cm)0.040.020
Dep
th (
m)
1.45
1 .4
1 .35
1 .3
1 .25
1 .2
1 .15
1 .1
1 .05
1
0.95
0 .9
0 .85
0 .8
0 .75
0 .7
0 .65
0 .6
0 .55 End of PrimaryOv erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculat ion propert ies
Footing type: RectangularFooting width: 1.20 (m)L/B: 1.0Footing pressure: 12.00 (kPa)Embedment depth: 0.50 (m)Footing is rigid: NoRemove excavation load: NoApply 20% rule: YesCalculate secondary settlements: YesTime period for primary consolidation: 6 monthsTime period for second. settlements: 600 months
* Primary settlements calculation is performed according to
the following formula:
)log(S tzCa ×D×=
* Secondary (creep) settlements calculation is performed
according to the following formula:
zCPT
v DMD
=å sS
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:07:48 p.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt
This software is licensed to: AECOM CPT name: CPT-06
Point No Start depth(m)
End depth(m)
Thickness(m)
Relativedepth(m)
M(CPT)
(MPa)Iz Settlement
(cm)Delta P(kPa)
Second.settlement
(cm)
Overallsettlement
(cm)
:: Tabular results ::
91 1.40 1.41 0.01 0.91 5.77 10.51 0.48 0.001 0.000 0.001
92 1.41 1.42 0.01 0.92 5.70 10.80 0.48 0.001 0.000 0.001
93 1.42 1.43 0.01 0.93 5.63 11.26 0.47 0.001 0.000 0.001
94 1.43 1.44 0.01 0.94 5.56 11.71 0.46 0.000 0.000 0.000
95 1.44 1.45 0.01 0.94 5.49 12.05 0.46 0.000 0.000 0.000
96 1.45 1.46 0.01 0.95 5.42 12.17 0.45 0.000 0.000 0.001
Total primary settlement: 0.05Total secondary settlement: 0.00
Total calculated settlement: 0.05
AbbreviationsStart depth:End depth:Thickness:Relative depth:Iz:Delta P:Eff. stress:M(CPT):Settlement:Second. settlement:
Start depth of soil layer (penetration depth measured from ground free surface)End depth of soil layer (penetration depth measured from ground free surface)Thickness of soil layerDepth of calculation relative to footingStress influence factorFooting impossed stress:Effective stressConstrained modulus from CPTPrimary settlementSecondary settlemends due to creep
CPeT-IT v.2.0.1.82 - CPTU data presentation & interpretation software - Report created on: 27/02/2019, 12:07:48 p.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60597413\400_TECH\431_Geotech\Analysis\Endeavour Park.cpt