40
Examensarbete i Hållbar Utveckling 101 Addressing the Electricity Shortfall in Pakistan through Renewable Resources Addressing the Electricity Shortfall in Pakistan through Renewable Resources Ayoub Hameedi Ayoub Hameedi Uppsala University, Department of Earth Sciences Master Thesis E, in Sustainable Development, 30 credits Printed at Department of Earth Sciences, Geotryckeriet, Uppsala University, Uppsala, 2012. Master’s Thesis E, 30 credits

Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

Examensarbete i Hållbar Utveckling 101

Addressing the Electricity Shortfall in Pakistan through

Renewable Resources

Addressing the Electricity Shortfall in Pakistan through Renewable Resources

Ayoub Hameedi

Ayoub Hameedi

Uppsala University, Department of Earth SciencesMaster Thesis E, in Sustainable Development, 30 creditsPrinted at Department of Earth Sciences,Geotryckeriet, Uppsala University, Uppsala, 2012.

Master’s ThesisE, 30 credits

Page 2: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

Supervisor: Associate Professor Mikael Höök Evaluator: Professor Kjell Aleklett

Examensarbete i Hållbar Utveckling 101

Addressing the Electricity Shortfall in Pakistan through

Renewable Resources

Ayoub Hameedi

Page 3: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

 

Page 4: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

Content 1. Introduction................................................................................................................................ 1

1.1 Purpose of study........................................................................................................ 1 1.2 Significance of the study........................................................................................... 1 1.3 Previous research done on the subject...................................................................... 2

2. Lessons that need to be learned from China, India and Brazil.............................................. 3

2.1 Enhancing consumer awareness in Pakistan............................................................. 4 2.2 Enhancing the hydro capacity: a strategy adopted by China ................................... 5 2.3 Installation of solar panels on canals: a strategy adopted by India........................... 6 2.4 Sugarcane as a source of bioelectricity: a strategy adopted by Brazil...................... 7 2.5 Wind Power Strategy adopted in Navarra, Spain..................................................... 9

3. Case study: replicating Spanish solar power plants in Pakistan........................................... 10

3.1 Gemasolar power plant in Spain.............................................................................. 10 3.2 Concentrated solar power plant I (CSPP I).............................................................. 12 3.3 Concentrated solar power plant II (CSPP II)........................................................... 12 3.4 Concentrated solar power plant III(CSPPIII).......................................................... 13 3.5 Concentrated solar power plant IV (CSPP IV)........................................................ 14 3.6 Concentrated solar power plant V (CSPP V)...........................................................14 3.7 Reasons for site selection......................................................................................... 15 3.8 Establishing solar panel industry in Pakistan.......................................................... 15

3.9 Solar panel installation on motorways and highways in Pakistan........................... 16

4. Challenges faced by the renewable resource sector in Pakistan............................................ 17

4.1 Lack of proper policy implementation.................................................................... 17 4.2 Lack of appropriate research institutes................................................................... 18 4.3 Lack of community participation............................................................................ 18 4.4 Corruption in oil & gas regulatory authority........................................................... 18 4.5 Red tapery and bureaucracy.................................................................................... 19 4.6 Constraints of renewable energy sources................................................................ 19

5. Overall Impact of green electricity generation projects on the lives of people in Pakistan....................................................................................................................... 19

5.1 Managing surface water resources sustainably............................................................................................................... 20 5.1.1 Why sustainable water resource management is important for Pakistan....... 22 5.2 Infrastructure building............................................................................................. 22 5.3 Ensuring environmental sustainability.....................................................................23 5.3.1 Why sustainable forest management is important for Pakistan...................... 25 5.4 Awareness creation among masses.......................................................................... 25

6. Conclusion & Recommendations............................................................................................... 26 6.1 Conclusion............................................................................................................... 26 6.2 Recommendations.................................................................................................... 26

7. Acknowledgement.......................................................................................................................29 8. References................................................................................................................................... 30

Page 5: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

ADDRESSING THE ELECTRICITY SHORTFALL IN PAKISTAN THROUGH RENEWABLE RESOURCES AYOUB HAMEEDI Hameedi, A., 2012: Addressing the electricity shortfall in Pakistan through renewable resources. Master thesis in Sustainable Development at Uppsala University, No. 102, 33 pp, 30 ECTS/hp Abstract: This report focuses on addressing the electricity shortfall in Pakistan with the help of renewable resources. At present, the country is facing a shortfall of almost 7,000 megawatts (MW) which is affecting every walk of life and causing almost 1.5 to 2% GDP loss on annual basis. Previous research done on this subject reveals that electricity demand has always remained high then the total generation capacity of Pakistan. Similarly, it has been pointed out that the country is not taking maximum benefit from its available hydro, solar and wind resources. This leads us to the basic purpose of this research which is to have an exploratory understanding of the strategies adopted by India, China, Brazil and Spain for electricity generation in a green fashion and how can these strategies be implemented/adopted in Pakistan. Case study has been adopted as methodology for this purpose. This research work also discusses the factors contributing in the lack of promotion of renewable energy resources in Pakistan and provide detailed analyses of positive changes these projects can bring in lives of people in Pakistan. The sustainable management of surface water resource in Pakistan has been discussed in particular as the country faced worst floods in its history during years 2010 & 2011. It will result in enhancing the surface water storage ability of Pakistan which will significantly reduce our dependence on underground water reserves and will directly increase our electricity generation capacity through hydro dams as well. Similarly, sustainable forest management has been discussed at length as it will not only ensure environmental sustainability but will also result in increase availability of biomass. Not to mention the fact that wood biomass is much cheaper then conventional source of electricity generation provided it is obtained through sustainable forest management. Finally, if all the green strategies discussed in this research work will be implemented, it will increase the overall electricity generation capacity of Pakistan up to 9% respectively. Keywords: Sustainable Development, solar panels, Physical water scarcity, Gemasolar power plant, climate change, biogas plants, windmills Ayoub Hameedi, Department of Earth Sciences, Uppsala University, Villavägen 16, SE- 752 36 Uppsala, Sweden

Page 6: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

ADDRESSING THE ELECTRICITY SHORTFALL IN PAKISTAN THROUGH RENEWABLE RESOURCES AYOUB HAMEEDI Hameedi, A., 2012: Addressing the electricity shortfall in Pakistan through renewable resources. Master thesis in Sustainable Development at Uppsala University, No. 102, 33 pp, 30 ECTS/hp Summary: The United Nations declared year 2012 as an international year for sustainable energy for all and this report had been written while keeping this in mind. The main focus of this report was on Pakistan as it is facing an electricity shortfall of nearly 7,000 MW which is affecting every walk of life in the country. The basic aim was to understand as how Pakistan can satisfy its electricity shortfall with the help of available renewable resources. By doing so, the country will reduce its dependence on imported oil which is already consuming one-third of its total annual budget. For this purpose, the strategies adopted by India, China and Brazil had been studied extensively to understand as how these countries are utilizing their available renewable resources for electricity generation. Most importantly, how can these strategies be adopted/implemented in Pakistan. Case study was adopted as research methodology for this purpose. In addition, sustainable management of surface water resource in Pakistan has been addressed specifically as it will not only enhance electricity generation capacity but will also ensure food and water security as well, particularly in a situation when the country is expected to have an exponential growth in its population. Gemasolar power plant located near Seville, Spain had been studied closely as it was the main case study of this research project. Five different sites in Pakistan had been identified accordingly to replicate the idea. Besides this, particular attention had been given to canals, motorways and national highways in Pakistan as how can we use them for electricity generation in a green fashion. Last but not the least, forest cover in country had been studied as well as it is not only a prerequisite for environmental sustainability of any place but also enhances the biomass availability as well. All in all, this report will provide you a comprehensive inside of renewable resource availability in Pakistan and how they can be used to provide maximum benefit to the people of Pakistan. Keywords: Sustainable Development, solar panels, Physical water scarcity, Gemasolar power plant, climate change, biogas plants, windmills Ayoub Hameedi, Department of Earth Sciences, Uppsala University, Villavägen 16, SE- 752 36 Uppsala, Sweden

Page 7: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

 

Page 8: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

1

1. Introduction The world has overseen tremendous development and progress during the last fifty years which nobody has ever witnessed before. It has long been dominated by a single superpower but with the passage of time other countries like India, China and Brazil are progressing rapidly in terms of economic development. However, all this economic development has brought up other facts especially on the environment in terms of greenhouse gas emissions as the aim of continuous and sustained economic progress is incomplete without an increase in the electricity generation capacity. The ability to enhance electricity generation is directly related to millennium development goals and therefore it cannot be avoided. Quality of life cannot really be improved without having an adequate access to electricity. Therefore it is paramount that the whole population should have total access to electricity and at the same time electricity must be generated in an eco-friendly manner, which produces no or bare minimum effect on environment. 1.1. Purpose of this study: The purpose of this study is to explore the sustainable strategies adopted by China, India, Brazil and Spain in meeting their rapidly growing energy demands and how these strategies can be adopted/implemented in Pakistan. Pakistan is a developing country and is facing a number of challenges, however, one of the biggest challenges is electricity shortfall which is hindering the socio-economic progress of the country. The country is experiencing a shortage of electricity estimated to be around nearly 7,000 megawatts (MW) (i.e. 2.5 x 107 Mega Joules) per year (1 MWh = 3600 MJ). The situation becomes especially worse during summer as the demand sharply increases mainly due to air conditioning whereas system's generation ability remains the same. In winter the water level drops to its lowest in rivers and thus system's ability to generate electricity decreases significantly. The methodology adopted is case study which comprises of an exploratory understanding of the initiatives taken by China, Brazil and India to satisfy their increasing energy demands in a sustainable manner. For a broader perspective, the methods implied by the north-eastern and Southern part of Spain will be considered as well. It is important to mention here that Nevarra, in north-eastern part of Spain, a region with no coal, oil or gas of its own but is still able to satisfy 70% of its electricity demand with the help of over 1100 windmills. The Southern part of Spain, which is prominent for its rich sunlight and scarce rain, hosts numerous solar plants including Gemasolar which even has the ability to work during nights. Last but not the least, this study will serve as a policy guideline for Government of Pakistan to promote renewable energy resources in the country. The research questions addressed in this report are as follow: What are the strategies adopted by Spain, Brazil, India and China in taking maximum benefits from their available renewable energy resources? How can these strategies be implemented in Pakistan to satisfy the current electricity shortfall and to meet the future increase in demand? 1.2. Significance of the study: The primary reason for this study is the fact that Pakistan being an oil importing country spends the major part of its budget on oil import. During last financial year (2011-12), the country spent U.S 14 billion dollars on oil import to keep its power houses and cars running [1] when the total amount kept for the budget was U.S 43 billion dollars, this means that 32.5 percent of budget was allocated for the import of oil [2]. The oil import bill during financial year 2008- 09 was U.S 9.36 billion dollars respectively [1]. Thus if we assume that oil prices remain constant which is quite unlikely in current scenario, the country is expected to spend over 140 billion dollars in the next decade on oil import to meet its demand. Although, I agree that it is very difficult to

Page 9: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

2

shift cars on non-conventional sources at this point. However, I personally believe that if we promote renewable sources of energy, which is also a more sustainable system for electricity production, then the Government will be able to spare a portion of this amount for infrastructure building, promotion of education and improving health services which will support it's socio-economic progress. As per the Pakistan energy yearbook 2010, the total imported oil was either allocated to run power houses or to operate transport sector. During year 2004 – 05, 61.5% of the total imported oil was consumed in transport sector while 23.5% of the imported oil was utilized in power houses. However, during year 2009 – 10, almost 46.3% of the imported oil was allocated to transport sector while 46.1% was consumed to run power houses. This reflects an almost 100 % increase in the amount of oil used to run power houses. Thus on the basis of these figures, we can assume that almost half of total oil import bill goes directly in the operation of power houses [3]. As per the British Petroleum (BP) Statistical Review of World Energy report 2012, Pakistan was consuming 0.365 million barrels of oil on daily basis at the price of USD 22.81 per barrel in year 2001 which increased to 0.405 million barrels per day at the price of USD 106.18 per barrel in year 2011. This reflects that at present Pakistan is paying almost 5 times more per barrel in comparison to year 2001 [4]. Pakistan energy yearbook 2010 shows that 43.5% of the total gas produced during year 2004 – 05 was consumed in the power sector which was reduce to 28.7% during year 2009 – 10. The country is already experiencing 10 -15% shortfall in gas supply and due to unsustainable use and lack of proper planning, it's available gas reserves are expected to deplete within coming 2 decades [5]. Consequently, country's dependence on imported oil will be increased further, if appropriate measures will not be taken accordingly

Another reason in employing such strategies is that power shortfall has affected every sphere of life in the country. Not only has it caused unemployment but also forced a majority of its industries to relocate to Bangladesh which has lower labor cost and more consistent availability of electricity [6]. Thus, causing a permanent dent in the country's financial progress. As per a conservative estimation, Pakistan lost 1.5 to 2% of its GDP every year in the form of lost industrial output caused by power shortage [7]. The country is blessed with other resources that could potentially be utilized for electricity generation however unfortunately it still depends upon depletable resources for 66.4% of its energy requirement, which is exerting huge pressure on economy and thus hindering the progress of country. Although apparently the hydrocarbon sources of energy seems to be cheaper however, if we consider the subsidies given on these sources and their environmental impact, then the renewable sources will either seems to be cheaper or comparable to conventional source of energy.

In addition, according to a calculated estimation Pakistan has the minimum physical ability to generate 100,000 MW (i.e. 8.76 x 108 MJ) of electricity through sun and almost 45,000 MW (i.e. 3.94 x 109 MJ) of electricity through wind. Moreover, it has rich hydro resources as the rivers flow through the length and breadth of Pakistan. Other estimation reflects it is physically able to generate 41,722 MW (i.e. 3.65 x 108 MJ) of electricity through hydro means but still 40,000 villages in the country have no access to electricity [8]. In order to properly utilize all these renewable resources we need to learn lessons from Spain, China, Brazil and India which are using their renewable resources to the fullest and thus satisfying their growing energy demand in a more sustainable manner. 1.3. Previous research done on the subject: 2012, has been declared as an international year for sustainable energy for all by the United Nations through its resolution 65/151. In the light of it, this document has been written with the aim that how Pakistan can achieve maximum benefits from its available renewable resources. At this point of discussion it is pertinent to define what renewable energy basically is: “it is the energy received from virtually inexhaustible sources found in natural environment like solar energy, wind energy, etc. They will remain present whether we harness them or otherwise. It is also referred as non-conventional sources of energy” [9]. A study “Sustainable Development through renewable energy – The fundamental policy dilemmas of Pakistan” reveals that educational system in the country is non-functional thus it does not pay much attention to the promotion of sustainable development. Furthermore, the situation becomes more complicated as the country has multiple types of educational systems namely i) Federal ii) Provincial iii) Cambridge is few examples. Also, majority of institutions ignore the broader perspective of sustainable development in Pakistan. Consequently, the country secures a ranking of 105 out of 137 countries on the chart of institutions,

Page 10: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

3

infrastructure and macroeconomics stabilities [10]. Electricity is the most widely used form of energy and is the focal point of discussion in this report. Several studies have already been carried out on the scope of renewable energy availability in Pakistan. For example in a study “Hydropower use in Pakistan: Past, Present and Future” revealed that the country has an approximate ability to generate 41,722 MW of electricity through hydro-means however only 15% is being harnessed at present and another 8 to 10% is in the phase of development. Thus 75% of this available hydro-potential is still untapped [11]. Similarly, another study “The relationship between electricity consumption, electricity prices and GDP in Pakistan” points out that electricity demand remains exceedingly high than the maximum generation ability in country. Also, the institutional ability for appropriate policy development, planning and implementation remained low [12]. In addition, one study on “Greener energy: Issues and Challenges for Pakistan – Solar energy prospective” highlights the number of solar cookers in the Hindu Kush-Himalayan region (HKH). As per the study, the number of cookers in India is around 14,500 and in China it’s around 60,000 whereas, in the similar region in Pakistan, the number of solar cookers is just above 2,000. However, the authors had also described that the main hindrance in the promotion of solar cooker in Pakistan is the public resistance to adopt this new technology [13]. Another study on “Renewable energy resource potential in Pakistan” reveals that there are approximately 57 million animals, comprising buffalo's and cattle's, in Pakistan with an annual growth rate of 8%. A medium sized animal has an average dung dropping rate of 10 kg per day. Thus if we assume that half of the total dung is collected makes the dung availability to 285 million kilograms per day. Thus if we further assume that 20 kg of wet mass form of dung can produce 1 cubic meter of gas per day then the total amount of bio-gas obtained through dung will be 14.25 million cubic meters per day which has the ability to meet the cooking requirement of 36 – 71 million people residing in rural areas of Pakistan [14]. “Renewable energy technology in Pakistan: Prospects and challenges” stressed that most of the masses living in rural areas are deprived of electricity. Thus in order to raise their standard of living, it is vital that electricity should be provided to them at their doorstep with the help of available renewable energy sources i.e. wind, micro-hydro, biogas and biomass [9]. Similarly, “Specific concerns of Pakistan in the context of energy security issues and geopolitics of the region” describes access to electricity as the basic right of every nation and therefore it shall be available to all [15]. Another study “Identifying and addressing barriers to renewable energy development in Pakistan” points out that electricity production through fossil fuel is amongst the main source of environmental destruction in country at present. Most importantly, the authors emphasize that during the phase of renewable resource planning and acquiring, its environmental impact should also be kept in mind. Not forgetting the fact that if the subsidies on fossil fuels are taken away and their environmental damage is also considered then the renewable resources will either become comparable or cheaper than the conventional sources of energy. Thus, subsidies on fossil fuel energy sources yield them an unfair vantage over non-conventional resources of energy. There is a dire need that prospering and replicable business models should also be established so that more and more people should be attracted to renewable energy technology adoption. It is important that private sector is also considered an equal stakeholder for the promotion of renewable energy resources. Amongst the major factors that cause hindrance in private sector participation is the absence of a well-defined policy for its engagement. Similarly, red-tapery and extensive bureaucracy surrounding clearance and allotment of projects to private operators are obstacles undermining the private sector engagement in such programs [16].

2. Lessons that need to be learned from China, India and Brazil: As mentioned earlier, the basic purpose of this research work is to examine the strategies adopted by China, India, Brazil and Spain as how these countries are taking maximum benefits form their available renewable resources and how can these strategies be implemented in Pakistan. Case study has been adopted as methodology to answer this question and it is what this chapter and the next all about. Pakistan is going through a rigorous phase of development however, its journey to economic progress is being severely affected by the power shortage. Currently, it is facing a power shortfall of 7,000 MW (i.e. 602 toe) on daily basis which increases further during winter when the water in the rivers drops to its lowest level. As per the Pakistan Energy year book 2011, the country is generating most of its energy through non-renewable energy

Page 11: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

4

resources mostly based on oil (35.1%) and gas (27.3%) which is exerting huge pressure on country's economy as the country has spent over 14 billion dollars on oil imports which makes almost one-third of the total budget allocation and thus surpassing all other expenditures made by the Government of Pakistan. Rest of the electricity is generated through Hydel (33.6%), coal (0.1%) and nuclear & imported (3.9%) respectively [17]. A graphic representation is as follow:

(Figure 1 courtesy: Pakistan Energy Year Book 2011)

Thus in true spirit, the country is meeting almost 66.4% of its electricity needs through depletable resources and only 33.6% from renewable resources when it can produce 100,000 MW (i.e. 8.76 x 108 MJ) of electricity through sun and 1,31,000 MW (i.e. 1.15 x 109 MJ) of electricity through wind [18]. It is not out of place to mention here that as per National Renewable Energy Laboratory (NREL), Colorado, USA almost 9% of surface area of Pakistan has class 3 or better wind resource (see chapter 3). Similarly, almost all of the geographical area of Pakistan receives appropriate amount of solar radiation which can easily be utilized for electricity generation purpose (see chapter 3). The per capita energy consumption has increased almost 7 times over the last fifty years. In 1950, it was 0.043 tons of oil equivalent (toe) which exponentially rose to 0.351 toe in 2004 [15] and is likely to increase further as energy is indispensable for the economic progress of any country (1 toe = 39.65 MMbtu). There is a dire need that the Government should focus upon establishing renewable energy facilities in Pakistan. This will not only create more jobs for the population but will also reduce the cost price of renewable energy sources in Pakistan significantly. Government's commitment for the promotion of renewable energy resources is very vital. The geographical location of Pakistan is ideal to generate renewable energy as the country is blessed with rivers that run across far and wide of Pakistan. Beside rivers, solar and wind energy is widely implementable across the country Following are the ways through which renewable energy resources can be promoted in Pakistan: 2.1. Enhancing consumer awareness in Pakistan: There is a desperate need that Government of Pakistan initiate programs for enhancing public awareness about energy conservation in the country. As it is obvious that more energy is conserved at consumers end the less will be required to be produced from the power houses and hence will have less impact on the environment. This can be done through advertisement in print and electronic media. Recently, Government of the Punjab organized a national conference on Energy for Growth and Sustainable Development in February

33.60%

35.10%

3.90%

27.30%

0.10%

Electricity Generation by Source 2010 - 11

HydelOilNuclear & ImportedGasCoal

Page 12: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

5

2012. In that conference, the main emphasis was on the conservation of energy at consumer level. I personally believe that this can also play an important role in addition to increasing generation capacity as almost half of the electricity produced in Pakistan is consumed by the domestic households. As per the Pakistan energy year book 2011 statistics, the highest consumption of electricity takes place at domestic level (46.5%), followed by industrial sector (27.5%), agriculture(11.6%), commercial (7.5%), bulk supplies (6.1%) and street lights (0.8%) [17]. A graphic representation of these figures is as follow:

(Figure 2 courtesy: Pakistan Energy Year Book, 2011) 2.2 Enhancing the hydro capacity: a strategy adopted by China As mentioned earlier, Pakistan is generating only 33.6% of its electricity through hydro means when in fact rivers flows through almost all major areas of Pakistan (see figure at the end of page) but still unfortunately 40,000 villages in Pakistan have no access to electricity. Actions should be taken to invest in establishing a network of small hydro dams across rivers in Pakistan. I agree that building up a network of small hydro dams can be very expensive for Pakistan however, it is necessary for the survival of its people. It will prove to be a counter strategy in combating floods during monsoon season and will reduce the infrastructural loss as a result of it. As far as arranging finance is concerned, Federal and Provincial governments can reduce their expenditures particularly when it comes to lavish government houses, protocols & security and can adopt to more simple way of living. By doing so, Government will also encourage masses of Pakistan to contribute to this noble cause as well. River Indus serves a key role as it flows through the whole country and the rest of the rivers are its tributaries. It is generally accepted that small hydro dams have less environmental impact in comparison to big dams. Also, a network of small hydro dams will have many positive affects as it will increase the water storage capacity of Pakistan and thereby reducing the risk of floods during the monsoon season. This effective water management strategy will help the country in combating water scarcity during winter as well and will also eventually increase the underground water level across Pakistan. It would not be out of place to mention that a wide network of small hydro dams will make remote areas of the country self-sufficient in a manner that each small dam will satisfy solely the energy demand of the area where it will be located. Thus a more decentralized energy distribution system will help in continuous provision of electricity in far flung remote areas of Pakistan. Most importantly, Government can hire construction labor from local areas where the dam is supposed to be constructed. This will not only reinstall the population's confidence on the democratically elected government but will also yield construction boom in the country. Government of Pakistan can seek advice from its Chinese counterparts for same. China is currently fulfilling the electricity needs of 300 million

46.50%

27.50%

11.60%

7.50%

6.10%0.80% Electricity Consumption by Sector2010 - 11

DomesticIndustrialAgricultureCommercialBulk SuppliesSt light, Traction & Ot

Page 13: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

6

people in rural areas with the help of small hydro-dams. In year 2008, China was producing 51,000 MW of electricity through small hydroelectric dams and the total installed capacity is likely to reach 75,000 MW by the end of 2020 [19]. By adopting the same strategy, Pakistan can also provide electricity to its population residing in remote areas of the country. According to a calculated estimation, the country can generate 41,722 MW of electricity through hydro means however, at present only 15% of this available potential is harnessed while another 8 – 10 % is currently in phase of development. Thus, 75% of the available potential is still untapped [11]. Baluchistan, the least developed province of the country, can take maximum benefits from this. The least developed areas of Baluchistan include Dasht, Gudri, Bhari, Hingol Arra, Nal have sufficient water resources however, due to the lack of storage facility all of the water in rivers ends up in Arabian Sea.

(Figure 3 courtesy: Maps of the world website, 2006) 2.3. Installation of solar panels on canals: a strategy adopted by

India Similarly, the rural area of the Punjab has a well-developed canal and barrage system installed to meet the agricultural requirement of the country. The overall length of canals in Pakistan is 62,648 kilometers (Km) [20] and due to a minimum 6 to 8 hours of daily exposure to sunlight, water loss is particularly high in these areas. However, this can be overcome by installing solar panels on the top of canals as this will not only reduce

the water loss through evaporation but will also generate electricity as well. Besides this, installation of solar panels on top of canals will also help in saving agricultural land in these areas as Punjab province serves as a breadbasket for the country. It is pertinent to mention here that this will serve as an additional source of electricity production to the proposed network of small hydro-dams. Indian state of Gujarat is currently implementing a similar pilot project of 1 MW on Narmada Canal and has taken the services of U.S based Sun Edison to construct it [21]. In the following picture, Gujarat state's Chief Minister Narendra Modi is inspecting the project site:

(Figure 4 courtesy: The Hindu Newspaper, 2012)

Page 14: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

7

(Figure 5 courtesy: The Hindu Newspaper, 2012)

It is pertinent to highlight here that a more detailed case study on solar technologies adoption will follow in chapter 3. 2.4. Sugarcane as a source of bioelectricity: a strategy adopted by

Brazil Brazil can act as a role model for Pakistan in terms of bioelectricity generation. In 1970's, it used to generate almost 80% of its electricity with the help of imported oil however, at present it is generating around 50% of its electricity through renewable resources. A descriptive chart of Brazil's current electricity production sources is as follow:

(Figure 6 Courtesy: The Brazilian Sugarcane Industry Association website, January 2012)

From the above chart we can see that Brazil is currently satisfying 18% of its electricity demand with the help of sugarcane even surpassing the hydro sources of electricity generation. Bioelectricity can be defined as follow [22]: “Bioelectricity is produced from bagasse, the dry and sugarous residue left after the sugarcane is crushed”. According the Food and Agriculture Organization (FAO) statistics 2010, Brazil is the largest producer of sugarcane with a production of over 719 million tons (MT) annually [23]. Due to proper planning

Page 15: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

8

and effective management of available resources, Brazil is not only the largest exporter of sugar in the world but is also using the remaining residue in form of bagasse to meet its growing energy demand. It is important to mention here that I strongly oppose the burning of food to produce electricity as I believe that access to food is the basic human right and that it should be available to all. It will not be out of place to mention here that sugarcane mills in Brazil are satisfying their energy demand by burning the bagasse in boilers to produce bioelectricity. Thus these mills are not only self-sufficient in terms of electricity production but in some cases provide surplus electricity which is then sold to the distribution companies. In first quarter of 2010, the sugarcane mills produced over 2.7 GW of electricity thus supplying 3 percent of the Brazil's total energy requirement. However, this method is likely produce some serious impact on soil fertility as bagasse is amongst the key components in maintaining the soil fertility and in the absence of it, the farmers will be required to import/purchase fertilizers which will be an additional expense for them. There is an alternate method as well, which has the ability to produce electricity and fertilizer all at the same time. Instead of burning bagasse directly into sugar-mills furnaces, we can utilize it in biogas plants. The later has more benefits than the former. The biggest edge with biogas plants is that it is based on anaerobic digestion which takes place in the absence of oxygen. Also, it takes bagasse, animal manure and human biodegradable waste into account and uses all three to produce electricity, heat and fertilizer at the same time. The fertilizer can then be sprayed on the soil which will not only keep its fertility intact but will also reduce the farmers additional expense on the import of fertilizer as well. As already discussed in background chapter that there are approximately 57 million buffaloes and cattle in Pakistan and if half of their dung is collected, almost 285,000 metric tons of dung would be available on daily basis. Besides this, as per an article published in The Pakistan Today, one of the leading newspapers of Pakistan, approximately 40 percent of the food prepared at different banquets is usually wasted in the country. Similarly, during the month of Ramadan (month for fasting) a lot of food usually gets waste all across Pakistan [24]. In fact, I personally believe that Federal and Provincial governments should constitute committees at their levels who would collect all the food to be wasted from domestic kitchens and from all the restaurant's & hotel's and to bring it to the proposed biogas plants so that it could be used in a more appropriate manner. Also, it will be nice if a certain percentage of that food is to distributed among the deprived population but on the same day as they were produced and only after seeking permission for the concerned food specialities. Pakistan is the sixth largest producer of sugarcane as per FAO 2010 statistics with an annual production of over 49 million tons [23]. However, surprisingly not a single KW of electricity is produced through bagasse. It is pertinent to mention here that a single ton of sugarcane crop yield 270 kilograms of bagasse [22] thus on a rough estimation Pakistan produces over 13 million metric tonnes of bagasse (i.e. 49 million x 270 kg) out of which a small amount is used as livestock feed while rest is burned. The reason behind this adopted behaviour is the fact that bagasse is basically treated as a waste of sugarcane industry and is returned to field to be used as fertilizer. However, by utilizing it along with animal manure and human edible waste in biogas plants we can take maximum available benefit from it. The Federal Government in collaboration with Provincial Governments can bring a huge industrial reform by introducing biogas plants in the country at both micro and macro levels. In this way, the sugarcane industry will be able to meet its own energy requirement and will become self-sufficient respectively.

Most importantly, the sugarcane harvestation takes place in Pakistan during the months of November and December when the water drops to the lowest level in rivers thus as a result, Pakistan electricity generation capacity decreases significantly during that period. If sugarcane mills satisfy their own energy requirements and provide surplus energy to other industries then the saved electricity which was previously allocated to these sectors could be more easily spared for the domestic consumption. As far as the introduction of biogas plants are concerned, this can be done through public - private partnership. At present the people of Pakistan are paying almost 18 cents per electricity unit, a cost which is too high for an average citizen of Pakistan. The biogas plants based electricity will give a boost to the industrial sector of Pakistan and will likely create more jobs for the people as when industries will perform operations at full scale this will increase production capacity and hence will attract further business. Last but not the least, Pakistan has an agriculture based economy with almost half of its population associated to agricultural activities thus if both federal and Punjab Provincial government pays particular attention to increase the per hectare sugarcane production, this will enhance both the GDP and export as well. It is significant to mention here that Pakistan produces 52.4 tons of sugarcane per hectare which is amongst the lowest in the region whereas neighbouring countries like India and China produces 66.1 tons and 65.7 tons per hectare respectively [25] however, I personally believe that when nutrient rich biofertilizer will be used on the soil, the per hectare crop productivity of Pakistan will likely

Page 16: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

9

increase as well.

2.5 Wind Power Strategy adopted in Navarra, Spain: Navarra is a region that lies in the northern part of Spain and is famous for its initiatives to generate electricity with the help of green resources. This small region has over 1100 windmills installed in whole Navarra. The most interesting fact about Navarra is that it has no coal, oil or gas of its own and is satisfying 70% of its electricity through windmills and solar panels respectively [26]. The coastline of Pakistan extends almost 1050 kilometers through Baluchistan and Sindh provinces of Pakistan. The Alternative Energy Development Board (AEDB), Government of Pakistan has estimated that this coastal belt of the country has the potential to generate almost 45,000 MW (i.e. 3.9 x 109 MJ) of electricity through windmills. As a result, AEDB has installed Pakistan's first windmill station in collaboration with a Turkish company named Zurlu Energy in the Jhimpir areas of Sindh, Pakistan. It has been designed to produce 50 MW (4.38 x 105 MJ) of electricity with the help of 5 wind turbines. This will open a new horizon for renewable energy sector in Pakistan. The need of hour is that more projects of similar nature must be initiated in the coastal areas of Pakistan. It is essential to mention here that masses living in these areas are the most deprived ones. They don't have access to electricity, clean drinking water and usually spend their lives in a hand to mouth situation. Also, these areas of the country are mostly deserted or have bare minimum population therefore, this additional edge will make the project runs more smoothly. There are ample chances that the local residents might not like the wind mills installation in their area and show resistance, this phenomena is commonly known as Not In My Backyard (NIMBY) however, it can be overcome with the help of community workers. They can help people realize the importance of renewable energy resources and the positive changes which these projects will bring in the lives of local residents. Also, Government of Pakistan can provide free electricity to residents of these areas and grass-root level jobs to local people on priority basis. Besides AEDB, National Renewable Energy Laboratory (NREL) in collaboration with United States Agency for International Development (USAID) has carried the wind resources assessment and mapping of Pakistan and has indicated that 9% of the country's land area possesses class 3 or better wind resource [27].

(Figure 7 courtesy: U.S. NREL, 2007) All of this available wind resource lies in the province of Sindh, Baluchistan and Northern areas of Pakistan. The best way to utilize this available wind resource is to establish a windmill manufacturing unit in Pakistan. Alternatively, Government of Pakistan can request international windmill manufacturing companies particularly from India and China to open their subsidiaries in Pakistan. It is worth mentioning here that the country has 1.2 billion tons of iron ore reserves in the province of Punjab which can be used to make steel and afterwards can be utilize to make tower, brake, controller, and gear box accordingly. As mentioned earlier, the rear earth elements required in the manufacturing of windmills can be imported from China or may be the said

Page 17: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

10

windmill manufacturing plant can be initiated through China-Pakistan mutual collaboration. This project will not only reduce the production price of windmills for Pakistan due to home advantage but will also give boost to economy and will provide jobs to people as well. However, there is a dire need that all the electricity generated through 5 proposed gemasolar plants, solar panels across motorways & highways and through wind mills should be immediately directed to provincial/national grids depending upon the feasibility and from there on it will be equally distributed among provinces in Pakistan.

3. Case study: replicating Spanish solar power plants in Pakistan: This section of the report examines the strategy adopted by Spain and how it can be replicated in Pakistan. The methodology adopted for this purpose is case study which highlights the salient features and functioning of Gemasolar power plant near Seville in southern Spain. It is pertinent to point out here that the replication of gemasolar solar power plant in Pakistan will serve as a raw model and there are chances that new challenges will arise during the implementation phase. However, these challenges can possibly be addressed with the passage of time. Most importantly, Government of Pakistan can take Spanish experts help in the installation of Gemasolar power plant in Pakistan. Thus it will not only serve as a possible solution for electricity shortfall but will also help in further improving the bilateral relations between Spain and Pakistan.

3.1 Gemasolar Power Plant in Spain The province of Andalucia lies in southern part of Spain and is famous for two reasons, first for acquiring a prominent place in the book “The Alchemist” by Paulo Coelho and second for a 19.9 MW “Gemasolar power plant” a renewable power plant with an ability to generate electricity during night as well. It is spread over an area of 185 hectares with 2,650 plain large mirrors known as heliostats and a 450 feet tall tower in the centre. The basic purpose of these heliostats is to divert the sunlight to a receiver at the top of the tower. In addition, this plant is comprised of two tanks of Molten Salt Energy Storage (MSES) which has the ability to store heat energy produced throughout the day. The salt is comprised of 60% sodium nitrate and 40% potassium nitrate and can retain 99% of the store heat for up to 24 hours. This stored heat can be released for up to 15 hours overnight or during periods without sunlight. Torresol, company which manufactured the plant expects that it will attain a capacity factor of 75% by producing electricity up to 6,400 hours a year. A pictorial representation of the same is as follow [28]:

(Figure 8 courtesy: Torresol Energy, 2010)

The process starts with the divergence of sunlight to the top of the tower with the help of heliostats. Then from the cold molten salt tank (i.e. tank A), molten salts is pumped up to the receiver at 290 degree Celsius where it is further heated up to 565 degree Celsius. It is then transfer to a hot molten salt tank (i.e. tank B) where the energy is stored in form of molten salt at very high temperature. It is then sent to steam generator where it transfer its heat to water, thus reducing its temperature. As a result of this heat transfer the water changes into high pressure steam which is then used to run turbine. The turbine runs the electric generator which produces electricity which is sent to distribution grid respectively. An aerial view is as follow [28]:

Page 18: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

11

(Figure 9 courtesy: Torresol Energy, 2010) During night, the heliostats are set into horizontal position while the rest of power plants still keep on working. This project is a joint-venture of Spain and Abu Dhabi and has been set up with a total investment of USD 325 million. It is expected to produce 110 GWh per year. Also, it will help Spain in reducing 30,000 tons of carbon dioxide gas on annual basis and will fulfil the electricity needs of 27,500 households. It is worth mentioning here that during the summer time this concentrated solar panel (CSP) plant can work twenty four hours to satisfy the increase in demand. Thus keeping in view the expected 110 GWh of electricity production per year by a single installation, a total of 5 such plants would be required to satisfy the household electricity demand in Pakistan. Also, it will reduce 150,000 tonnes of carbon dioxide on the account of the country as well. If we break down the collective output (i.e. 550 GWh) of these proposed gemasolar plants to per month level, it will produce 45,000 MW of electricity purely through sun which will be sufficient enough to replace the entire household electricity consumption in the Pakistan. Not to mention the fact that almost fifty percent of generated electricity is consumed at domestic level and over USD 14 billion were spent on the import of oil during year 2011-12. The prime questions which arises here is the fact that for 5 such plants, the Government of Pakistan would require almost USD 1.65 billion as an investment, identify potential spots in the country which can support the project and finally to get the require expertise. As far as managing finance is concerned, I personally believe that the country can generate the required amount on its own. At present almost 10% of the total population of Pakistan resides abroad and which sends over 10 billion U.S.D as foreign remittance on annual basis [29]. However, in order to ask the Pakistanis residing abroad to send remittance for these projects, the Federal Government will seriously need to work on to improve its credibility among its countrymen. Besides this, Transparency International Pakistan Chapter claims that the country lost almost USD 94 billion in corruption during the period (i.e. 2008-12) in which Yousaf Raza Gillani served as Prime Minister of Pakistan [30]. All these evidences show that the country has sufficient financial resources and it only lacks the will power and commitment to initiate such projects. Also, closer economic studies are required to initiate this project and such studies can be conducted in collaboration with China as it will prove to be mutually beneficial for both. In addition at times ignorance becomes a bless, same can happen with Pakistan as well as it has a population of almost 180 million and if each person donates Rs. 1/- (i.e. 1.5 cents) per day then almost in 2.5 years, the federal government would be able to collect USD 1.7 billion respectively which would be sufficient enough to meet the financial requirements of these green power plants. As far as allocating the place is concerned, the country is luckily blessed with four deserts which can accordingly be used to set up these concentrated solar panel plants. These deserts are Cholistan desert, Kharan desert, Thal desert and Thar Desert [31]. It is important to mention here that Thal Desert is amongst the largest deserts in the world and it serves as a natural border between India and Pakistan. It is the seventh largest desert in the world and the third largest in Asia.

Page 19: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

12

3.2. Concentrated solar power plant I (CSPP I): Cholistan desert lies at the boarder of Punjab and Sindh provinces in Pakistan and is spread over an area of 26,300 square kilometers. The best point to establish a CSP in Cholistan desert is at the border close to national park. The basic reason is the strategic location of this point as it is closest to the river sutlej and hence water can easily be drawn from sutlej to be employed in the proposed CSP plant I. Also two large cities of Punjab province namely Bahawalnagar and Bahawalpur lies closest to this point but in opposite directions. A pictorial presentation can be seen in Figure 10. However, with this project comes the great responsibility of managing water wisely. Both the federal

and provincial government need to take some serious steps in order to harvest the rainwater in the desert. Fortunately, the desert has an annual rainwater harvestation potential of 300 million meter cube which is more than sufficient in meeting the needs of people and livestock. As per the Indus Water Treaty which took place between India and Pakistan, India was granted right to use river Ravi, Sutlej and Beas respectively and Pakistan was allocated the western tributaries of river Indus. In order to increase the effectiveness of this project in Cholistan, the federal government needs to clean up the sand and mud from the river bottom to increase its water carrying capacity. Similarly, both sides of all these three rivers should be made solid in order to avoid water wastage. Most importantly, it is very vital that both federal and provincial government should focus on making large lakes in these rivers to store water as during summer and monsoon seasons, these three rivers have enough water while for the rest of year they remain partially dry.

3.3. Concentrated solar power plant II (CSPP II): Another most appropriate spot for setting up CSP plant II is the Gwadar city of Pakistan. Though at present this city is going through development phase but it is anticipated that within coming decade this port city can be the Dubai of Pakistan. Due to its location, it has the ability to bring economic reform in the country and if properly managed it can give Pakistan an upper hand in the region as well. The three direct beneficiaries from this port will be China, Afghanistan and Central Asian countries. Xinjiang province of China is located at a distance of 4,500 kilometers from China's eastern port whereas; it is only 2,500 kilometers from Gwadar sea port. It will also enable land locked countries like Afghanistan, Turkmenistan, Uzbekistan, Tajikistan and Kyrgyzstan to have an access to warm waters of Persian Gulf. As a result of it, goods, oil and gas will be sent in the international markets and Pakistan will get fair and square share of royalty against it. This will definitely have a positive impact on the economy of Pakistan. Also, it will ease the congestion of work load on Karachi sea port and thus the work could easily be distributed among two sea ports on equality basis. Here it is important to mention that the local people should have a primary right to the income earned in form of royalty from the port and also to the jobs that will be created as a result of it. It will be wise if the profit earned through this port will be reinvested in developing Gwadar area in particular and Baluchistan province in general. It is also necessary that a wide network of roads to be established in Baluchistan province in general, because it will facilitate the transportation of goods, oil and gas from Central Asian Countries to Pakistan and vice-versa. As it is the least developed province of Pakistan, therefore the central Government should focus on providing drinking water, electricity and education to the people in Baluchistan. It is pertinent to mention here that it is the largest province of Pakistan with the least population and receives the highest amount of sunlight on daily basis. Also, Gwadar's weather is quite similar to that of middle east and thus establishing a concentrated solar power plant here will provide the locals with electricity and jobs as well. Besides all the above mentioned bright aspects, the biggest challenge faced by the Gwadar in particular and Baluchistan province in general is the acute shortage of water supply. However, this problem can

(Figure 10 courtesy: Waterwiki website, 2009)

Page 20: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

13

be overcome with the installation of water desalination plants in Gwadar. General Electric can help Government of Pakistan for the same as it has over 20 years of experience in operation and maintenance of water desalination plants. It is currently operating Hamma seawater desalination plant which has an output capacity of 200,000 cubic meter per day and it's providing fresh drinking water to 25% population of Algeria's capital city [32]. Also, it is the largest desalination plant in operation in the continent of Africa. In addition, a network of small hydro-dams for rain water harvestation in Baluchistan will be an additional source of water supply and a conscious use of water resource at the consumer end will be an effective counter strategy as well. All these techniques will help in meeting the water demand of local population and will provide sufficient water to be used in CSP plant for electricity generation purposes as well. 3.4. Concentrated solar power plant III (CSPP III): Karachi is the port city of Pakistan and is the business and financial capital of the country as well. It generates 25% of total gross domestic product and any event happening in the city will likely have an impact on rest of the country. It lies in the Sindh province of Pakistan and like other parts of country it is also facing serious problems in supplying adequate water to satisfy the demand of its residents. However, this can be addressed by harnessing rainwater appropriately. Just last year in 2011, the province was met by 6 spells of monsoon rainfall which literally caused flooding in the whole province. Had there been an appropriate mechanism to harvest the rain water in the city of Karachi and Sindh province as a whole, the water poured in form of rain would have been more than enough to meet the needs of people for the rest of the year. However for this effective management of space will be a prerequisite. Residents of Karachi city and Sindh province can install water storage tanks on top of their houses to harvest rain water. Similarly, the City District Government can allocate areas to be used as ponds in the city. The need of hour is to use our creative thinking to get the maximum benefit from the available space in cities. What Government of Sindh can do in this regard is to make it compulsory for the residents in the province and in Karachi city in particular to harvest rain water to meet their daily water needs. An example has already been set in this regard in our neighboring country, India. In Chennai, an Indian Administrative Service (IAS) officer named Ms. Santha Sheela Nair with the support of the then government made rain water harvestation compulsory for households and thus avoided the water shortage problem from getting out of control. A pictorial representation of year 2010 and 2011 monsoon rainfall in Sindh province is as follow:

(Figure 11 courtesy: Dawn Newspaper, Pakistan, 2011)

The act of making rainwater harvestation compulsory for the people of Sindh will reduce the stress on underground water table in the province and provide the people with year round supply of water. It will

Page 21: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

14

have positive effect on cotton crop production as well, keeping in mind the fact that cotton is one of the major export products of Pakistan. Also, by doing so we would be able to spare water that can be used in proposed CSPP III to be built in Umerkot, the largest town in Thar desert. From the above chart we can see that Thar desert had more than enough monsoon rainfall during year 2011 and if that rainwater had been harvested and managed wisely, it could had been used to serve people for the rest of the year.

The proposed concentrated solar power plant in Umerkot at Thar Desert can be supplied with water through a canal drawn from River Indus as it lies close to the river. Also, the Government of Sindh should make it compulsory that each city administration in Sindh province should install a water recycling plant and manage it accordingly. Thus, rain water harvestation and water recycling plants will make Sindh self-sufficient in meeting its water needs. As a result, the additional water saved through this way can then be diverted to Umerkot so that it can be used in the proposed concentrated solar power plant. This will have a direct positive impact on whole province as the electricity produced through CSPP III installed at Umerkot will be distributed equally in the whole province.

3.5. Concentrated solar power plant IV (CSPP IV): Thal desert lies in the southern part of the Punjab province between river Indus and Jhelum. The most important thing regarding this desert is that the desert residents have been provided water through a project named as Thal Canal Project (TCP). However, the need of hour is that the said project must be upgraded to Greater Thal Canal Project (GTCP) which would be able to store more water during monsoon season and thus will provide water to the rural areas in Punjab and Baluchistan province. Also, the upgraded version of the Thal Canal Project will further increase the water availability in the Thal desert which can then be used in the proposed CSPP IV project respectively. It is pertinent to mention here that adequate infrastructure in form of Thal Canal Project is there; we only need to upgrade it to increase its water storage ability. It will have two direct impacts on the lives of people of Pakistan. First it will reduce the intensity of floods occurring almost every year and causing billions of dollars of loss to country in form of infrastructure destruction and secondly it will provide drinking water to the most poor and deprived people in Baluchistan province. Pakistan has a water based economy as almost half of its population is associated with agriculture. However, it is sad to mention here that despite this reality, the country lost water worth of USD 230 billion during 1990 to 2010 due to the absence of a second reservoir on river Indus [33]. Mr. Suleman N. Khan, convener of Water Resource Development Council (WRDC), claims that only Kalabagh Dam (KBD) provides an inexpensive and quick solution as a reservoir to annual water loss. As per my understanding, the basic problem with Pakistan is the fact that it receives its total annual water requirement within 3 months (i.e. monsoon season) however, due to lack of storage capacity, during monsoon it suffers from extreme floods and eventually all of this water finally ends up in Arabian sea and thus leaving country with inadequate water supply for the rest of the year.

3.6. Concentrated solar power plant V (CSPP V): Quetta is the capital city of Baluchistan province and is among the places which receive the highest amount of solar radiation on annual basis. As already mentioned that the province is the least developed in Pakistan and thus provides very few economic opportunities to its residents. There is a dire need that a concentrated solar power plant project should be initiated in the province to satisfy its present and future energy demand. It will not only provide masses with electricity but will also open new economic opportunities for them. The city of Quetta is densely populated; therefore it would be better to secure 185 hectares of land in the suburbs of Quetta city. The water can be made available by building micro dams for rain water harvestation and also through canals from Greater Thal Canal Project (GTCP). This project will likely improve the quality of life of people living in Baluchistan and thus help Pakistan in achieving Millennium Development Goals (MDGs) as well. It will not be out of place to mention here that building a network of small hydro-dams will increase the water storage ability of Pakistan which will make drinking water available for its people and will also help country in bringing green revolution as well. It will also enable the gradual restoration of underground water tables too. However, it is the responsibility of both provincial and federal government to make sure that the generated electricity should be first provided to the local residents and then to the other parts of the country.

Page 22: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

15

3.7. Reasons for selecting above mentioned sites for proposed Concentrated Solar Power plants: There are three basic reasons why I have selected above mentioned sites for the construction of proposed concentrated solar power plants which are as follow:

1. Majority of these areas are amongst the highest recipient of solar radiation across the country.

2. All these locations are found mostly in the least inhabitant areas of Pakistan. As a result, 185 hectors of land for each concentrated solar power plant can easily be acquired.

3. All proposed sites are located close to water bodies therefore, utilising water for steam generation in

proposed plants will not be a problem. 3.8. Establishing solar panel industry in Pakistan: In order to promote the use of solar panels in Pakistan, it is really important that the Government focuses on manufacturing solar panels at home. The core reason why solar panels are unpopular is because they are extremely expensive. Mostly in countries like Pakistan all of the renewable energy products i.e. solar panels or wind mills are usually imported from other countries. But once, it starts manufacturing at home, the cheap labor and low production cost will likely decrease the price and people will opt to renewable source of energy. It is worth mentioning here that Pakistan has most of the resources required to establish solar industry at home, only thing desired is the high tech machinery and the training of manpower. Appropriate help can be taken from China in this regard. It is worth mentioning here that China established a solar panel manufacturing factory “SUNTECH” in year 2001 which is now serving as the world's largest solar panel manufacturer with its offices in 13 different countries and its installations in 80 countries across the globe. Thus, Government of Pakistan can seek benefit from the rich experience of it's Chinese counterparts. There are ample chances that if Government of Pakistan show its interest on this issue at bilateral level, China would like to help Pakistan for the same. Both countries have diplomatic ties since 1951 and Pakistan was amongst the first ones to recognize People's Republic of China after its establishment. According to a report compile by The Forbes group, China is currently providing more than 95% of all the rare earth elements required to manufacture solar panels, wind turbines and other electronic equipment [34]. Thus all these facts provide solid evidences that China would like to guide and assist Pakistan in establishing a solar panel industry at home either on partnership or on sole basis. This can be achieved by bringing reforms in the higher education sector. It is really important to establish institutes or universities in Pakistan which are particularly dedicated to carry out research on renewable resources potential in Pakistan. As far as high tech machinery is concerned, during the first phase, all the required machinery can be imported and then in second phase, Pakistan can start making this machinery at home. Alternatively, Government of Pakistan can offer incentives to all companies manufacturing renewable technology to open their subsidiaries in Pakistan. This will not only promote renewable technology in the country but will also create more jobs and will help in capital formation as well.

The biggest gift to Pakistan is that the country has most of the important components in abundance that are required to manufacture solar panels. There are basically two components named quartz and silica required to manufacture solar panels and both can be found easily in Pakistan. Other rare earth elements including silver that are usually required in small amounts to manufacture solar panels and windmills can be easily acquired through China. Not to mention the fact that both countries have timely tested friendship over six decades. Also, Pakistan has the ability to serve as an energy and trade corridor for China. Already a number of Chinese companies are involved in several small and big projects in Pakistan. A significant example in this regard will be of Gwadar Sea Port of Pakistan, which has been constructed in financial and technical assistance of China. The Gwadar Sea Port is located at Persian Gulf and is the route to 40 percent of global oil supplies. This not only highlights the strategic importance of Pakistan itself, but also points out the necessity for China to invest in Pakistan as it can provide the shortest way to China to have access to the energy reserves of Middle East and Africa. River Indus which serves as the backbone of water system in Pakistan has rich silica reserves. Similarly, quartz is found in such abundance in Khyber PakhtoonKhwa Province (previously known as North Western Frontier Province) that people construct the walls of their houses with quartz. Most fortunately, Pakistan has sound sunlight for at least 8 to 10 hours per day round the year, thus enabling the country to satisfy its

Page 23: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

16

electricity shortfall. It will not be out of place to mention here that most of the electricity consumption takes place during evening time (i.e. peak hours) however through proper planning, adequate electricity can be supplied during those hours. A map reflecting annual solar radiation of the country is as follow [35]:

(Figure 12 courtesy: U.S. NREL, 2006)

As it is clear from the above map that Baluchistan and Sindh receives the highest amount of sunlight annually followed by Punjab and Khyber Pakhtunkhwa (KPK). Similarly, Kashmir and Northern areas of Pakistan receives the least amount of solar radiation on annual basis [13]. Thus if the use of renewable energy resources is promoted at grass root level then it can have profound impact on the economy of Pakistan as at present the highest portion of generated electricity goes to the household consumption. This can be achieved by installing solar panels on roof tops on the houses and then to integrate the generated electricity into the already existing electricity supply infrastructure in each area through transmission lines. According to a calculated estimation the population of Pakistan is 180 million, out of which almost sixty percent lives in the province of Punjab, the agricultural breadbasket of the country. Both federal and provincial governments can play a vital role in this regard as currently the Ministry of Water and Power comes under Federal Government of Pakistan. A significant step in this regard can be to decentralize the Ministry and to give powers to the provinces to take decisions and develop their own energy policy. A similar decision has already been proposed and accepted in form of 18th amendment in the constitution of Pakistan. However, its implementation in true letter and spirit is still required. We need to understand that this will not only reduce the federal government expenses but will also promote a positive competition among provincial governments in Pakistan. 3.9 Solar panel installation on motorways & national highways in Pakistan: M2 is the name of motorway that has been constructed to connect capital city of Punjab province Lahore to Islamabad, capital city of Pakistan. Its total length is 367 kilometers and goes through the rural areas of the Punjab province. It is significant to mention here that as it passes through the rural area therefore steel fence has been installed on both sides of the motorway to keep pedestrians and animals away from it. There exist a considerable gap between the steel fence and motorway on both sides which can be used for the installation of solar panels. Thus if the total length of both sides is considered then altogether 734 kilometers will be available that can be used for the generation of electricity. Similarly with the slight modification in the dividers installed between the M2, this space can also be used for electricity generation through solar panels. Thus, with the effective management of M2, altogether 1101 kilometers will be available which can be utilized to produce electricity in an eco-friendly manner.

Page 24: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

17

Similarly, M3 is the title of the motorway that links the Faisalabad city to M2 and is 53 kilometers long. It is the shortest motorway in the country and if it is also managed wisely for the installation of solar panels along the sides and in the middle, the Government of Pakistan will have another 159 kilometers which can then be used for the generation of clean electricity. Likewise, M4 (i.e. Faisalabad – Multan motorway) is currently going through the phase of development and is marked to be 233 kilometers long. As it is under construction therefore, if federal government consider keeping appropriate space for the installation of solar panels in between motorway, it will reduce the future expenses in case of modifications for the same. Appropriate management of available space on both sides of motorway and in between will enable federal government to utilize almost 700 kilometers for electricity generation through solar radiation. Collectively, M2, M3 & M4 will provide us 1960 kilometers of land to be used for the solar panels installation [36].

Pakistan also has a big network of national highway that connects different parts of country to each other. Makran coastal highway (N-10) is a part of this chain and it connects Gwadar city to Karachi. It is spread over an area of 653 kilometers and has helped a lot in reducing the travel distance and time between Sindh and Baluchistan. It has also produce significant positive impact on the provincial economy of Baluchistan as it has made the mobility of goods much easier. The most beneficial thing about this coastal highway is that it passes through area which receives the highest amount of solar radiation in Pakistan. In addition, Karachi – Torkham national highway (N-5) spreads over 1819 kilometers.

Collectively, N-5, N-10 along with the other 15 national highways provides us with an area of 8909 kilometers which can be appropriately used for electricity generation through solar panel installation [37]. If both sides of the national highways are taken into account, it will make 17,818 kilometers of land available to us. Also, if we add 1960 kilometers of motorway to this, the overall available area will become 19,778 kilometers which can be utilized for the installation of solar panels and to generate electricity accordingly. It will not only improve the quality of life of people but will also have a very strong impact on gross domestic product as well. All in all, effective management of Motorways and National highways will enable us in getting maximum benefit from our available resources.

4. Challenges faced by renewable resource sector in Pakistan: This section of the report discusses the challenges faced by the renewable energy resource sector in Pakistan. It is a sad fact the renewable resources have not given due importance in the country and consequently, we are spending almost one-third of our total annual budget on the import of oil. There are several factors that are limiting the promotion of renewable resources in the country and few important ones are as follow: 4.1. Lack of proper policy implementation: The most prominent hindrance is the lack of appropriate policy implementation for the promotion of renewable resources in Pakistan, especially when it comes to the power purchase agreements. In China, the Central Government passed a “Renewable Energy Law” in 2005 which took effect from 2006 and with the introduction of this law, the Chinese government made it compulsory for electric utilities to purchase the electricity produced through renewable resources in every circumstance and imposed economic penalties on those who fail to do so. Similarly, recent amendment in the same law exempted renewable energy projects from provincial income taxation [38]. It is important to mention here that Government of Pakistan (GOP) also designed a Policy for Development of Renewable Energy for Power Generation in year 2006. Following the footsteps of it's Chinese counterparts, Government of Pakistan made it mandatory for all electric utilities in Pakistan to purchase electricity offered by the renewable projects [39] and I highly appreciate this bold step of GOP, however, on ground this policy has not produced any fruitful results since its introduction. It is really important that Government of Pakistan should look into this policy and try to find out the factors causing the lack of promotion and adaptation of this policy. Most importantly, both Federal and Provincial governments at their respective levels should make it sure that renewable energy projects proposed by private sector in the country should be examined and if feasible should be cleared on immediate basis. We cannot ignore the fact that in Pakistan, private sector is more successful and financially stable in comparison to the public sector and thus for successful completion and

Page 25: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

18

implementation of any project on macro-level it is important that it should be initiated on public - private partnership basis. 4.2. Lack of appropriate research institutions: Research and Development has a great significance in every field and so does in renewable resources. However, in Pakistan not so much emphasize is usually placed on carrying out research in this field. Consequently, besides having rich physical availability of solar, wind and hydro resources we are still relying heavily on non-conventional sources of electricity generation. It is paramount that Government of Pakistan should focus on establishing institutes particularly dedicated to carry out research on renewable resources. Also, how can these resources be used to their fullest to provide maximum benefit to the people of Pakistan. It is equally important that both central and provincial government should allocate special funds for research activities in this field. Not to mention the fact that universities and degree awarding institutes in Pakistan should introduce courses / degree programmes particularly dedicate to this cause. This will help us in creating awareness within academia as well. Also, it will be a great idea, if each university and institute within Pakistan allocates special developmental funds/budget to make a gradual transition to satisfy their electricity demand through renewable sources instead of traditional ones. 4.3. Lack of community participation: For any idea to be implemented in true letter and spirit it is vital that it should be accepted and supported by the people from grass root level. Community participation is a vital factor which decides that whether a project will make a significant difference in the existing structure or will maintain status quo. Daily Times, one of the leading English newspapers in Pakistan published an article on a Green Energy Campaign held by a not-for-profit organization FACES Pakistan in Lahore city. The basic aim of this campaign was to create awareness among masses about renewable energy resources in the country and to develop a strong public opinion for their promotion as well. The volunteers of the not-for-profit organization distributed caps installed with solar fans among people in the streets of Lahore city for beating the heat of summer. In the following picture, a volunteer is spreading awareness about solar fan caps among residents of Lahore city, Pakistan [40]: 4.4. Corruption in Oil & Gas regulatory authority (OGRA): The National Assembly of Pakistan has formulated a standing committee to keep an eye on the affairs of Oil & Gas Regulatory Authority (OGRA), which is under huge criticism for corruption allegations. The Standing Committee has recommended the Federal Government to either formulate a new ministry for oil and gas and thus to make it completely independent or to bring it under the supervision of petroleum ministry. As per an article published in Daily Times, the standing committee members took serious notice of the involvement of OGRA officials into massive corruption taking place within the regulatory authority [41].

(Figure 13 courtesy: Daily Times Newspaper, 2012)

Page 26: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

19

4.5. Red-tapery and Bureaucracy: As mentioned earlier that GOP has designed Policy for the development of renewable resources for power generation in year 2006 and has offered numerous incentives for those interested in producing electricity through renewable resources. Besides making it mandatory for the electric grids to purchase all the electricity produced through renewable energy projects, the GOP has also given fiscal incentives including no tax duty or sales tax on the import of machinery equipment and spares for the initial instalments, up-gradation or expansion of renewable energy projects [39]. However with all these friendly incentives, the policy is still unable to produce desired results. There can be several factors responsible for it. The most likely element can be the Bureaucratic culture in our public sector organizations, where cases usually suffers from red-tapery, a phenomena where simple projects/cases take months or even years to get approved from concerned authorities. Also, another prominent factor can be the growing corruption in Pakistan and the way through which all important governmental post are being awarded to people on personal likes and dislikes and thus completely ignoring the merit and people who comes on merit. This is also amongst the root cause of social injustice and inequality in Pakistani society. As a result of it, Transparency International Pakistan Chapter has chalk out a 14 points anti-corruption agenda for Pakistan, in which the first priority is given to the appointment and promotion in civil and public offices on merit basis [42]. Growing instability can also be amongst the root cause for the lack of promotion of renewable energy resources as it will make foreign experts and companies feel reluctant to invest their time and money in Pakistan. 4.6. Constraints of Renewable Energy sources: The federal government along with the provincial governments can face challenges regarding the installation of renewable energy resource infrastructure across the country. The first challenge in the regard will be to integrate the electricity generated from these projects into national grids. For this purpose, Government of Pakistan may have to established new national grid stations close to the identified points so that the electricity generated can be directly added to the national grids with the help of transmission lines. The second challenge in this regards will be to revise and implement already existing electricity supply policy according to the needs of renewable projects. For example, during daytime most of the electricity can be supplied through renewable resources while in the evening it can be supplied through conventional sources of electricity production. Similarly, it is vital to have a backup plan during monsoon season when the sky remains mostly cloudy. This can be done through enhancing water storage ability through micro-hydro dams which will result in electricity generation through hydro means during monsoon season. Likewise, tariff setting can be a bit challenging as well, electricity produced through renewable resources should be at least of the same price to electricity generated through conventional sources in order to make it acceptable among masses. Most important point which arises here is that how can these installations be made safe from theft and damage. A combination of two strategies can be adopted in this regard. First the Government of Pakistan can insure these infrastructure from state owned and private insurance companies. Secondly, government can make a special security force on the lines of motorway police and airport security force for the protection of these installations and can hire youth from local areas. This will provide employment to the local community residents and will enable the government to take maximum benefit from the project. Community participation will not only increase the project's resilience but will also enhance people confidence on government as well.

5. Overall Impact of green electricity generation projects on the lives of people in Pakistan:

In this section , the overall impact of green electricity generation projects on the lives of people in Pakistan will be analysed thoroughly. As mentioned earlier the electricity shortfall in country is causing 1.5 to 2 % GDP loss to Pakistan on annual basis and is forcing industries to relocate to Bangladesh which has cheaper and more consistent supply of electricity. As a result, it is causing unemployment and spreading distress among people in Pakistan. Following are the ways through which green electricity generation projects can improve the overall quality of life of people in Pakistan:

Page 27: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

20

5.1. Managing water resources sustainably: Pakistan is utilizing it's available hydro resource up to 15% and another 10% is in developmental phase while remaining 75% of the available hydro electricity generation capacity is still untapped. This provides the country with a window of opportunity to improve its overall socio economic condition by utilising its available hydro potential to its fullest. Particularly in a situation where almost 80 million people living in 40,000 villages have no access to electricity. In addition, the country was hit by massive floods in 2010, affecting 14 million people which the United Nations (UN) later described as the worst in living memory [43]. Thus all these factors collectively makes it impossible for Pakistan to achieve the Millennium Development Goals (MDG's) by 2015. This had also been confirmed by the Planning Commission 2010 report on achieving MDG's in Pakistan [44]. A pictorial representation of 2010 floods in the country is as follows [43]:

(Figure 14 courtesy: British Broadcasting Corporation website, 2010)

The primary reason for mentioning 2010 flood's here is the fact that unavailability of adequate infrastructure can sometime lead to even worse situations and that is what actually happened in the country at the time of 2010 floods. Similarly, as per British Broadcasting Corporation (BBC), extraordinary monsoon rains in year 2011, affected over 7.5 million people out of which 3 million people faced extreme shortage of food [45]. A pictorial representation of 2011 flood's in Pakistan is as follow:

(Figure 15 courtesy: British Broadcasting Corporation website, 2011)

Page 28: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

21

As per a report published by Pakistan Meteorological Department (PMD), the overall monsoon rainfall during year 2011 was 72% above average and was categorized as the fifth heaviest down pour during last 5 decades [46]. World Bank experts in a report states that climate change will likely intensify the monsoon rainfall in Pakistan, consequently enhancing the areas affected by the floods [47]. Also, an increase in the glacier melt will further act as a catalyst as river Indus exclusively relay's on the glaciers of western Himalayas. It is paramount to mention here that the country has only 30 days of water storage ability in Indus basin whereas; United States of America (USA) is able to store water for 900 days on Colorado and Murray Darling rivers. I personally believe that if there had been a wide network of small hydro-dams on river Indus, the intensity of 2010 flood could have been greatly reduced. Likewise, if micro dams to store rain water had been installed then the country would have avoided or reduced the intensity of 2011 floods as well. Two continuous years of flooding have not given people enough time to rebuild their houses and to resume their economic activities , consequently, increasing the overall poverty ratio in Pakistan. A wide network of micro-hydro dams will increase the surface water storage ability of Pakistan and as a result, will reduce our dependence on underground water reserves as more surface water will be available to use throughout the year. It is sad to mention that the country is near to use all of its available groundwater and according to a calculated estimation, it will require 30% more water in next two decades to satisfy its growing agriculture, domestic and industrial demands. As per the World Bank experts, the population in Pakistan is growing exponentially from 80 million (in 1980) to 230 million (in 2025) [47]. Due to our limited ability to store surface water, most of it eventually ends up into Arabian sea. As a result, we tend to rely more on underground water reserves which is producing serious effects on our underground water availability. It is pertinent to mention here that all big cities in Pakistan except Islamabad and Karachi gets its water supply from tube wells which draw raw water from local aquifers and not to mention, Lahore the second largest city of Pakistan with a population of over 10 million has 300 tube wells to satisfy its water demand. Thus exponential growth in population and rapid urbanization, all these factors, collectively, put huge pressure on local aquifers which are already drowning down rapidly. Pakistan is already categorized as a water stressed country and with the current growth in population it will soon be a water scarce country [47].

(Figure 16 courtesy: Food and Agriculture Organization and World Resource Institute, 2007)

As per the International Water Management Institute (IWMI), Pakistan will face physical water scarcity by year 2025 due to unsustainable use of water resources and an exponential growth in population [48].

Page 29: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

22

(Figure 17 courtesy: International Water Management Institute projection, 2000)

5.1.1 Why sustainable water resource management is important for Pakistan:

During the year 2010 & 2011, Pakistan has faced two severe floods which has produced serious impacts on the economy and lives of people in the country. These floods had not only destroyed the already installed infrastructure including houses and roads but had also severely affected the crops as well. It is important to reiterate here that the intensity of 2010 & 2011 floods could have been reduced if there had been a network of micro-hydro dams installed before the monsoon season. Besides electricity generation, these micro hydro dams will enhance the country's surface water storage ability as a result, more water will be available to satisfy growing demands. It will directly reduce our dependence on underground water reserves and will significantly decrease the import of oil as well. The enhanced water storage capacity will make water available to grow crops throughout the year thus not only crop production will be increased, more jobs will be produced and thus better food security will be achieved. In addition, there is a dire need that the agriculture in the country should be based more on surface water instead of depending drastically upon the groundwater reserves. Increasing surface water storage ability will also lead country to water security and thus it will be easier for the government to provide clean drinking water at doorstep, food and electricity to people living in remote areas of Pakistan. As a result, government will be able to achieve MDG goal no 1 which is to eradicate extreme poverty and hunger. Also, in far and distant areas of the country, women usually spend on average 2 – 3 hours per day to fetch water and when water will be available at an arm's length, the women will be able to spare this time to take part in educational and other social activities. As a result not only women will be empowered but also gender equality will be promoted which is directly related to MDG goal number 3. 5.2. Infrastructure building: Provision of clean drinking water across the country will ensure the construction of wide network of roads in the remote areas as well. An effective road system is pertinent for the economic progress as it will ease the access of masses to more developed areas of the country and vice-versa. It will have two direct impacts on the lives of people living in the far flung areas. First, as roads will be developed thus these areas will be easy to reach which will eventually up lift the local economy and local businesses will likely expand as a result of it. However, there are ample chances that improved road/transport infrastructure can result in brain drain, exploitation of resources and increase in poverty. However, if appropriate strategies are designed accordingly and people are given ample chances to display their true potential then people would more likely stay in their home country. Also, in such situations country's would start to have brain gain, which is actually happening in the case of India [49]. It will also ease the transfer of information from regional, national and international level to these area

Page 30: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

23

Most importantly, it will help in establishing primary, secondary and tertiary level educational institutions in these areas. Thus masses will not only get education but also, Pakistan would be able to produce more skilled labor as well. Besides this, the governmental writ in these areas will be more easily established. At present in the remote areas of Baluchistan and Khyber-Pakhtonkhwa (KPK) provinces, there are elements which play the role of state within state. Thus not only try to challenge governmental writ but also cause hindrance in the progress and prosperity of these areas. The best way to deal with these elements is to establish a wide network of roads in these areas so that people will have access to information and their businesses will flourish as well. As a result, the contribution of small businesses in the national economy will significantly increase. Further, educational institutions will enable people to tackle most of their problems in a more appropriate manner. Thus, the overall quality of life of masses living in remote areas will definitely improve and hence the sense of deprivation of these people will likely abolish. The primary benefit of this initiative will be the equal promotion of the development all across the country. I personally believe that unequal distribution of development is one of the major challenges faced by Pakistan today. As big cities like Karachi, Lahore and Islamabad are developing at a rapid pace whereas, far flung remote areas are completely ignored by the Federal and the Provincial governments of Pakistan. If the country has to commence rapid progress then it is vital to focus the development arena in remote areas too. It will not only promote trade within the country but will also serve as a pivotal role in trade with central Asian countries as well.

5.3. Ensuring environmental sustainability: Forest cover is proportional to environmental sustainability of any place, as it not only improves the quality of air but also ensures the ecological balance as well. Besides this, sustainable forest management also enhance the availability of biomass which can be used appropriately, if needed. However, It is unfortunate to mention here that the forest cover in Pakistan has decreased with the passage of time. As per a report compiled by the Guardian newspaper, the forest cover in Pakistan decreased from 2,527 thousand hectares (in 1990) to 1,902 thousand hectares (in 2005) while in the same time period, the forest cover in India increased from 63,939 thousand hectares to 67,701 thousand hectares respectively. Similarly, in China it increased from 157,141 thousand hectares to 197,290 thousand hectares during same time period [50]. For improving environmental sustainability, I personally believe that Government of Pakistan along with other four provincial governments should collectively initiate a national tree plantation program across the country. In order to motivate the people in Pakistan, government can take support from media, for example government can start advertising the plan to set the world record of planting highest number of trees in a minimum time by the people of Pakistan and if it will be successful to mobilize half of the population in country for this cause, it will likely increase the national forest cover significantly. At present, the record for highest number of tree plantation in a minimum time is held by the Philippines where 7,000 people planted over 64,000 trees in just 15 minutes [51]. The government can allocate specific areas across the country for this activity and can start registering the volunteers for the same. If it is successful in mobilizing half of population in Pakistan (i.e. 90 million) and half of this motivated population show's up on the said day and plant a tree per person, in that case the government will be successfully able to plant 45 million trees in a minimum time. Thus Pakistan will not only set up a world record for the highest

number of tree plantation in a short span, but also the forest cover will be multiplied significantly. This activity will provide an opportunity to create awareness among people in the country. Once the target is achieved and the activity is done, the federal and provincial governments can then take control of those designated area's to make sure the proper growth of the planted trees. This initiative will prove to be a giant leap for attaining environmental sustainability in Pakistan. As per Germanwatch, Pakistan stood 8th among countries who faced extreme weather events during last two decades. A pictorial representation of the same is as follow [52]

Page 31: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

24

(Figure 18 courtesy: Germanwatch Organization, 2011) According to World Wide Fund for Nature - Pakistan Chapter, the forest cover is less then 5% of the total land area and the fact which make things even worse, the country is facing the highest rate of deforestation across the globe [53]. Similarly, there exist a wide gap between production and consumption of wood in the country as indicated in “The underlying causes of deforestation and forest degradation in Pakistan” [54]. The wood demand was 29.5 million cubic meters in 1993 which is expected to grow sharply and will reach over 50 million cubic meter by year 2020. Whereas, the country is currently producing only 14 million cubic meter of wood thus this huge gap between production and consumption is amongst the root cause of deforestation in the country. Although, Government of Pakistan has put up a ban on deforestation since 1993, but it is ineffective due of the political affiliation of timber mafia, theft, corruption and lack of commitment on the Government's side [55]. A pictorial representation of forest distribution is displayed in Figure 19.

It is important to mention here that fuel wood is considered as a primary source of energy in the rural areas of Pakistan and contributes to almost 37.52% respectively [55]. A pictorial representation of the same during year 1992 is as follows in Figure 20. A more recent figure (in 2003) regarding fuel wood consumption by weight is as follow in Figure 20 [55]. As per the world bank

estimation, about 0.1 million people are currently employed in the forest sector, in fuel wood trade, out of which 73% work on a permanent basis while rest are employed temporarily. It gives 11.3 billion rupees per year which makes 10% of the Pakistan's export. However, due to increase in wages in other sectors and with more people looking to work in other spheres, all these factors collectively make people less interested to work for forest conservation [55].

The need of hour is that Government should take the deforestation seriously and should allocate funds and proper attention to this issue on immediate basis. I personally believe that all political parties in Pakistan whether in government or in opposition should unite for this noble task as it will have an everlasting impact on over society. A strong political will is the utmost requirement for achieving this goal. We need to realize the fact that trees basically are the lungs of this planet and like humans can't survive or work properly without healthy lungs so does the planet. Trees are directly related to the quality of air we breathe in, the more the trees less will be the amount of carbon dioxide in the air and as a

(Figure 19 courtesy: Pakistan forest distribution, 2004)

(Figure 20 courtesy: Pakistan forest distribution, 2004)

(Figure 21 courtesy: Pakistan forest distribution, 2004)

Page 32: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

25

result people will get clean and fresh air to breathe in. Similarly, lesser the trees more polluted the air will be and consequently, more people will suffer from health issues. This will directly increase the government's expenditure on health related facilities and will reduce the number of healthy labor force in the country which will eventually have an impact on the country’s gross domestic product (GDP). Effective management of green belts in cities will help us in acquiring places for tree plantation. Also, each city district government can reserve places/patches of land to be used for tree plantation. Another useful strategy will be to promote the vertical expansion of cities in Pakistan instead of current horizontal trend. The government of Pakistan should remember what Bryce Nelson once said [56]:

“People who will not sustain trees will soon live in a world which cannot sustain people” The prime responsibility lies on the national and provincial forestry departments and it is vital that these institutions should have effective coordination among them. Most importantly, the effective implementation of law is a prerequisite for achieving this goal. The core reason is the fact that almost 90% people in rural areas do not have access to electricity or gas to satisfy their energy and dietary needs. As a result, they tend to rely on wood as a source of energy. However, this issue can easily be addressed with the introduction of various type of solar cookers in rural areas of Pakistan. Women in these areas commonly use firewood for cooking purposes as it is readily available and is free of cost, they just have to collect it. It is vital that Government of Pakistan should take the promotion of solar cookers more seriously. At present the number of solar cookers in the country is around 2,000 in Hindu Kush-Himalayan (HKH) region, when the neighbouring countries like India and China have 7 and 30 times more solar cookers in the similar region [13]. The Government of Pakistan should also have such ambitious programmes for solar heating at grass-root level like the way China and India have. This initiative will be a significant step towards MDG's no. 7 which is to ensure environmental sustainability. Baluchistan is the largest province of Pakistan in terms of geographical area and has the lowest population concentration as well but still 80% of its villages do not have access to electricity. Not to mention that the province receives the maximum amount of sunshine per day. Most importantly, the houses here are comprised of a single room and usually require a maximum of 50 to 100 Watts (W) to satisfy their energy demand. The core reason for lack of provision of electricity is due to the fact that these villages are located at distance from each other with no connecting roads in between. Consequently, it is not feasible to provide them electricity through transmission lines [9]. However, with proper planning and appropriate strategies these villages can easily be supplied with electricity through solar panels. 5.3.1 Why sustainable forest management is important for Pakistan: As mentioned earlier, biomass plays a significant role at grass root level as people in rural areas of Pakistan mostly rely on forest wood to satisfy their heating and cooking needs. However, the unsustainable deforestation has significantly reduced the forest cover in Pakistan. At present, It is less then 5% of the total geographical area of country and is likely decrease in future due to increase in demand as a result of expected population growth. It is vital that Government of Pakistan along with all provincial governments should focus on forest regeneration and try to achieve a forest cover of at least 10% in Pakistan. Afterwards through sustainable forest management use the additional forest wood as a source biomass which has the ability to serve as a renewable source of energy generation. 5.4. Awareness creation among masses: The biggest impact of renewable energy projects will be the awareness creation among masses in rural areas of Pakistan. It is vital to highlight here that almost half of the population of Pakistan resides in rural areas which are usually subject to long hours of load shedding each day. This severely affects the education of school going children in these areas as they are unable to study after evening. Electricity provision through renewable resources will enable these children to study long hours which will eventually have good impact on their overall academic career. As a result their chances to excel further in their future lives will be brighten. The current electricity requirement of Pakistan is in between 18000 MW – 19000 MW respectively, whereas, under current estimation, the country can produce at least 100000 MW from solar energy, 41000 MW from hydro means, 45000 MW from wind energy and at least a 1000 MW of bioelectricity. However, due to public unawareness regarding renewable energy resources, corruption, lack of political will and inappropriate

Page 33: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

26

management of available resources, the country is producing 66.4 % of its required electricity through highly unsustainable means. It is also putting the country in huge economic debt. The increasing price of oil is causing inflation which is badly affecting every sphere of life in the country. There is a famous Chinese proverb which states as follow [57]:

“If you are thinking a year ahead, sow a seed. If you are thinking ten years ahead, plant a tree. If you are thinking one hundred years ahead educate the people”

Once government decides to utilize renewable sources of electricity production, public unawareness can be overcome with the help of community mobilizers or social workers. Various not-for-profit organizations can prove to be an effective tool for awareness creation at grass-root level in interior Sindh and interior Baluchistan provinces in Pakistan. Government can also spread awareness regarding renewable energy with the help of local theatrical shows. These plays are not only close to the local culture and traditions but also have a great impact on the lives of the people in these areas.

6. Conclusion and Recommendation: 6.1 Conclusion: All in all, the renewable resources are gaining importance across the globe with the passage of time especially when the United Nations (UN) has declared year 2012 as International year for sustainable energy however, in Pakistan these clean energy resources are still lacking due importance which is not only putting the country under huge economic pressure but also spreading instability as people are losing jobs due to interrupted supply of electricity. There is a dire need that Government of Pakistan along with all the provincial Governments in the country should seriously focus all their energies and efforts to take maximum benefits from the available renewable resources particularly in a situation where 40,000 villages in the country have literally no access to electricity and those who have it are suffering from load shedding. “Pakistan can produce 5,50,000 MW of electricity through 5 concentrated solar power plants, over 35,000 MW of electricity (i.e. 75% of total available capacity) through micro hydro dams, 45,000 MW from wind resource and 1,000 MW from biogas plants. The daily electricity requirement of Pakistan is around 18000 – 19000 MW respectively. Thus on the basis of this we can conclude that Pakistan can enhance its electricity generation capacity up to 9 % through the utilization of available renewable resources”. It is paramount that Government of Pakistan and the whole Pakistani society should take appropriate measures on priority basis as the time is slipping from our hands. Pakistan is facing multiple serious challenges all at the same time. This include electricity shortfall crisis which is greatly affecting masses lives, dropping underground water tables at an alarming rate and most importantly, the vanishing forest which is deteriorating the quality of air people breadth in. All these factors collectively increasing Government of Pakistan's direct and indirect expenses which can easily be saved if appropriate measures are to be taken on priority basis. 6.2 Recommendations: Government of Pakistan can take following actions to counter the existing complex problems: 1. For the sake of national integrity, all political parties either in government or in opposition should sit together and chalk out a national energy policy for the benefit of all and thus try to achieve a win-win situation. 2. The prime responsibility lies with the Government in-charge at federal and provincial levels. For example, both governments at their appropriate level can decide to shift all the street lights in Pakistan on solar technology. This step appears to be a minor one, but this initiative can prove to be a gradual transition to clean energy at micro level. I personally believe that six months’ time period will be sufficient for this project. We cannot forget the fact that if we start to bring change from grass-root level, then it will be more result oriented and sustainable. It is paramount to mention here that all the lights on motorway from Lahore city to Islamabad

Page 34: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

27

(capital city of Pakistan) are currently powered by sunlight. Thus we already have an example set for us however, the need of hour is to expand it to the whole geographical areas of Pakistan. 3. It is highly in the interest of the country if the Government of Pakistan enforce a strong ban on having children more than two. In fact, I personally believe that it should be enforced as a law approved by the Parliament of Pakistan. The root of all problems for Pakistan is its enormously growing population which is expected to reach 225 million by year 2025 from the current 180 million population figure (2012). It is significant to mention here that the family planning awareness creation campaign started decades ago in Pakistan. However, it failed to produce desired results and therefore, Government of Pakistan along with all the not-for-profit organizations, lady health workers and gynaecologists should chalk out improvements in the existing family planning policy in Pakistan. Besides chalking out improvements, GOP should make it sure that this time the improved family planning policy should be implemented in true letter and spirit and those who failed to abide by the family planning law should be dealt with strict financial punishments. Also, the contraceptions should be made available to people as a social service and particularly on free basis. This policy will have a direct impact on exponential growth of population in Pakistan. 4. Government of Pakistan along with all the other sections of society should start a massive awareness campaign on how to use water wisely in a country which is already categorized as a water stressed country and with an exponential growth in population soon it will be a water scarce country. However, on this issue the prime responsibility lies on Government of Punjab as Punjab province is the breadbasket of Pakistan and comprises over 60 percent population of the country and then lies on the federal government. Irrigation in province can be carried out through drip irrigation method instead of relying heavily on tube wells. There is a dire need that Government of Punjab should built the capacity of local farmers for the same. Also, the federal government should focus on recycling greywater which can then be utilize for more useful purposes afterwards. In addition the Government of Pakistan should address the issue of construction of small hydro dams on priority basis as it is vital for shifting agriculture from underground water to rain fed and river water. In order to raise money the federal Government must take some tough decisions at national level. The most prominent step would be to ask parliamentarians in national assembly to give up their benefits including protocol staff, lavish houses from government, and paid charter trips etc. It is important to mention here that this also includes the President and Prime Minister of Pakistan as well as it will be a golden opportunity for them to set a good example for others. As per the website of National Assembly of Pakistan, there are 271 person's currently serving as a member in national assembly. Once, it is achieved at national assembly level then it can be implemented at provincial levels as well. 5. Government and civil society organizations should also focus on delivering small scale solar products among communities in far and flung areas of Pakistan. Commodities like solar heater, solar cooker and water heater should be distributed by GOP in collaboration with local not-for-profit organization in remote areas of country as it will not only make the people lives much easier but will also ensure the forest cover as well. Most importantly, this small step will help Government of Pakistan in achieving MDG's by improving women health and ensuring environmental sustainability. 6. It is really important for the well-being of the society that Government should appoint all people in its offices on merit basis. It is the only way to eliminate corruption and nepotism from our society and particularly from Oil and Gas Regulatory Authority (OGRA), Water and Power Development Authority (WAPDA) and Pakistan Electric Power Company (PEPCO). 7. It will be a good decision to form a local bank whose main motive is to give people soft loans who would like to make a transition to renewable sources of electricity generation. The easiest way to generate capital fund for the establishment of this bank is to ask 180 million people of Pakistan to donate 1 Pakistani Rupee (i.e. 1 U.S cent) per day. Thus, in a couple of months, the GOP would have sufficient funds to establish a bank. Also, Government can borrow a certain percentage of capital from China as well and can save a big chunk of money by reducing their lavish expenses too. This will also improve the credibility of government in front of its masses and I personally believe that once people start having faith on democratically elected government, they will give much more than 1 U.S cent. 8. Most importantly, the federal government of Pakistan should pass a law from the national assembly that all families who own a 10 marla house, villa or apartment should install solar panels on their roofs

Page 35: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

28

to meet their energy requirement and to harvest rain water accordingly. It should be made compulsory and those not abiding by it should be dealt strictly with iron hands. 9. Federal government along with the provincial governments should install water recycling plant in every city and make it sure that industrial waste should be treated appropriately before releasing into rivers. Similarly, greywater should be recycled and channelized accordingly. This strategy will help in approving the overall water situation and will thus reduce pressure on local aquifers. 10. Awareness regarding renewable energy resources should be made a mandatory part of education system at primary, secondary and tertiary levels in the country. It is equally important that middle age people and elderly citizens should also be included in it. The easiest way to do so is to impart awareness among children, youth in schools, high schools, colleges, universities and ask them to convey the same information to their parents and grandparents at home.

Page 36: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

29

7. Acknowledgement

I am extremely thankful to my supervisor Associate Professor Michael Höök for his constant support, guidance and prompt replies to my queries. I feel blessed to have him as my supervisor as he provided me the room to work in my own way. Without his backing, this research work would not have been possible for me and I am sure one cannot desire for a better or amicable supervisor. I also, highly appreciate my evaluator Professor Kjell Aleklett for his kind concern, patience and timely feedback. I am grateful to my thesis coordinator Elisabeth Almgren for her moral support and for being there, whenever I wanted her guidance. I express my utmost gratitude to my former thesis coordinator Karin Hogdahl for her timely responses to my queries. I am highly indebted to Sweden, its government and people for giving me the opportunity to study in Uppsala University and thus making one of my dreams to come true. Finally, I would like to dedicate my thesis to my parents: Akram Hameedi and Birjees Zohra Hameedi, my siblings: Kiran Hameedi and Alley Hameedi for their generous support, affection and love throughout my life.

Page 37: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

30

8. References:

1. Sherani, Tahir., 2011. Country relying on oil imports more and more. The Daily Mail, [Online]. Available at: <http://www.dailymailnews.com/0711/13/FrontPage/index.php?id=3> [Accessed on 23 March 2012]

2. Anonymous. 2011. Pakistan unveils USD 43 billion budget for 2011-12. Available at :

<http://www.newkerala.com/news/2011/worldnews-367.html#.T_x9wTgX5Uz> [Accessed on 11 July 2012]

3. Pakistan Energy Yearbook, 2010. Available at:<http://www.scribd.com/doc/53512742/Pakistan-

Energy-Yearbook-2010> [Accessed on 11 July 2012]

4. British Petroleum Statistical Review of World Energy. June 2012. Available at:<http://www.bp.com/sectionbodycopy.do?categoryId=7500&contentId=7068481> [Accessed on 19 July 2012]

5. State Bank of Pakistan Annual Report 2010 – 11. Available at:

<http://www.sbp.org.pk/reports/annual/arFY11/Energy.pdf> [Accessed on 13 July 2012]

6. Rana, Imran. 2011. Textile Industry:'Give me electricity or I'll move to Bangladesh'. The Express Tribune, [Online]. Available at: <http://tribune.com.pk/story/233698/textile-industry-give-me-electricity-or-i-will-move-to-bangladesh/> [Accessed on 13 August 2012]

7. Sanghvi, A.P., 1991. Power shortages in developing countries: Impacts and policy implications. Energy

Policy 19 (1991), 425-440.

8. Anonymous, 2011. 40,000 villages without access to electricity. The Dawn Newspaper [Online]. Available at: <http://dawn.com/2011/03/31/40000-villages-without-access-to-electricity/> [Accessed on 25 March 2012]

9. Chaudhry, M. A., Raza. R., Hayat, S. A., 2009. Renewable energy technologies in Pakistan: prospects

and challenges. Renewable and Sustainable Energy Review 13 (2009) 1657 – 1662.

10. Shah, A. A., Qureshi, S. M., Bhutto, Arabella., Shah, Ambreen., 2011. Sustainable development through renewable energy – the fundamental policy dilemmas of Pakistan. Renewable and Sustainable Energy Reviews 15(2011) 861-865.

11. Mirza, Umar. K., Ahmad, Nasir., Majeed, Tariq., Harijan, Khanji., 2008. Hydro power use in Pakistan:

Past, Present and Future. Renewable and Sustainable Energy Review 12(2008) 1641-1651.

12. Jamil, F., Ahmad, E., 2010. The relationship between electricity consumption, electricity prices and GDP in Pakistan. Energy Policy 38(2010) 6016-6025.

13. Bhutto, A.W., Bazmi, A.A., Zahedi, G.,2012. Greener energy: Issues and Challenges for Pakistan –

Solar energy prospective. Renewable and Sustainable Energy Reviews 16(2012) 2762-2780.

14. Sheikh, Munawar. A., 2009. Renewable energy resource potential in Pakistan. Renewable and Sustainable Energy Reviews 13 (2009) 2696-2702.

15. Mukhtar, H. Sahir., Arshad, H. Quershi., 2007. Specific Concerns for Pakistan in the context of energy

security issues and geopolictics of region. Energy Policy 35(2007), 2031-2037.

16. Umar K. Mirza, Nasir Ahmad, Khanji Harijan, Tariq Majeed., 2007. Identifying and addressing barriers to renewale energy development in Pakistan. Renewable and Sustainable Energy Reviews 13(2009) 927-931.

Page 38: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

31

17. Pakistan Energy Year Book, 2011. Available at:<http://www.slideshare.net/asharahmed/pakistan-energy-year-book-2011-highlights> [Accessed on 4 May 2012]

18. Hussain, M. M. B., 2012. Opportunity in Crisis. Pakistan Today, [Online]. Available

at:<http://www.pakistantoday.com.pk/2012/03/01/comment/columns/opportunity-in-crisis/> [Accessed on 4 May 2012]

19. Information regarding China hydro-dams is available

at:<http://www.chinahydroelectric.com/web/guest/market-overview> [Accessed on 8 May 2012]

20. Akhtar, Naseem., 2004. The use of irrigation systems for sustainable fish production in Pakistan. Food and Agriculture Organization [Online]. Available at: <http://www.fao.org/docrep/007/y5082e/y5082e05.htm> [Accessed on 13 May 2012]

21. Pandit, Virendra., 2012. Narmada canals can give 2,200 MW of Solar Power. The Hindu Newspaper

[Online]. Available at: <http://www.thehindubusinessline.com/industry-and-economy/economy/article3352783.ece> [Accessed on 15 May 2012]

22. Brazilian Sugar Cane Industry Association (UNICA). Official website of UNICA:

http://sugarcane.org/sugarcane-products/bioelectricity [Last Accessed on 20 May 2012]

23. Food and Agriculture Organization of the United Nations (FAO). Official website of FAO: http://faostat.fao.org/site/339/default.aspx [Last Accessed on 21 May 2012]

24. Rao, Inam., 2011. Food Wastage on the Rise. Pakistan Today, [Online]. Available

at:<http://www.pakistantoday.com.pk/2011/08/04/city/lahore/food-wastage-on-the-rise/> [Accessed on 10 July 2012]

25. Ahmed, Mansoor., 2012. Pakistan lags behind in per hectare crop yield. The News International,

[Online]. Available at: <http://www.thenews.com.pk/Todays-News-3-99616-Pakistan-lags-behind-in-per-hectare-crop-yield> [Last Accessed on 23 May 2012]

26. Lungescu, Oana., 2007. Navarra embraces green energy. British Broadcasting Corporation (BBC)

[Online]. Available at:<http://news.bbc.co.uk/2/hi/europe/6430801.stm> [Accessed on 31 July 2012]

27. Elliott, Dennis., Wind Resource Assessment and Mapping for Afghanistan and Pakistan. National Renewable Energy Laboratory, Golden, Colorado, USA [Online]. Available at: <pdf.usaid.gov/pdf_docs/PNADO338.pdf> [Accessed on 16 May 2012]

28. Information about Gemasolar power plant is available

at:<http://www.torresolenergy.com/TORRESOL/gemasolar-plant/en> [Accessed on 2 August, 2012]

29. Anonymous, 2012. Foreign Remittances to touch USD 13.5 Billion this year: Shaikh. Dawn Newspaper [Online]. Available at:<http://dawn.com/2012/04/24/foreign-remittances-to-touch-13-5-bn-this-year-shaikh/> [Accessed on 2 August, 2012]

30. Abbasi, Ansar., 2012. Rs. 8,500 Billion corruption mars Gilani Tenure: Transparency. Geo Television

[Online]. Available at:<http://www.geo.tv/GeoDetail.aspx?ID=34007> [Accessed on 2 August, 2012]

31. Information regarding deserts in Pakistan is available at:<http://daaira.com/other-natural-beauty-of-pakistan-deserts/> [Accessed on 2 August, 2012]

32. Anonymous, 2012. Hamma water desalination: Bringing drinking water to desert [Online]. Available at

:<http://www.opic.gov/projects/hamma> [Accessed on 2 August, 2012]

33. Khan, Suleman. N., 2012. The case for large dams. The Nation [Online]. Available at:<http://www.nation.com.pk/pakistan-news-newspaper-daily-english-online/columns/08-Apr-2012/the-case-for-large-dams> [Accessed on 2 August, 2012]

Page 39: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

32

34. Bell, Larry., 2012. China's Rare Earth Metal's Monopoly Need not put an electronic stranglehold on

Amercia. The Forbes [Online]. Available at: <http://www.forbes.com/sites/larrybell/2012/04/15/chinas-rare-earth-metals-monopoly-neednt-put-an-electronics-stranglehold-on-america/> [Last Accessed on 9 July 2012]

35. National Renewable Energy Laboratory (NREL). Official website of NREL:

<http://www.nrel.gov/international/ra_pakistan.html> [Last Accessed on 17 May 2012]

36. Information regarding motorways of Pakistan is available at: <http://www.howpakistan.com/transport/motorways.html>[Accessed on 2 August, 2012]

37. Information regarding national highways of Pakistan is available

at:<http://en.wikipedia.org/wiki/National_Highways_of_Pakistan>[Accessed on 2 August, 2012]

38. Martinot, Eric., Junfeng, Li., 2010. Renewable Energy Policy Update for China. Available at: <http://www.renewableenergyworld.com/rea/news/article/2010/07/renewable-energy-policy-update-for-china> [Accessed on 11 July 2012]

39. Government of Pakistan, 2006. Policy for Development of Renewable Energy for Power Generation

Employing Small Hydro, Wind, and Solar Technologies. Available at:<http://www.pc.gov.pk/Policies/PakistanREDevelopmentPolicy-Dec092006.pdf> [Accessed on 11 July 2012]

40. Staff Report, 2012. Green Energy Campaign: Fan fitted solar cap introduced in city. Daily Times

[Online]. Available at:<http://www.dailytimes.com.pk/default.asp?page=2012\05\27\story_27-5-2012_pg13_6> [Accessed on 13 July 2012]

41. Javaid, Zeeshan., 2012. National Assembly suggests measures to check corruption in OGRA. Daily

Times [Online]. Available at: <http://www.dailytimes.com.pk/default.asp?page=2012\05\11\story_11-5-2012_pg5_9> [Accessed on 13 July 2012]

42. Transparency International Pakistan Chapter, 2012. TI Pakistan outlines 14 point anti-corruption

agenda. Official website of TI Pakistan:<http://www.transparency.org.pk/news_detail.php?nid=7794> [Accessed on 13 July 2012]

43. British Broadcasting Corporation (BBC), 2010. Pakistan floods: Maps and Graphics. Available at:

<http://www.bbc.co.uk/news/world-south-asia-10986220> [Accessed on 30 May 2012]

44. Planning Commission, Government of Pakistan, 2010. Pakistan Millennium Development Goals Report. United Nations Development Programme (UNDP) [Online]. Available at:<http://undp.org.pk/mdgs-in-pakistan.html> [Accessed on 30 May 2012]

45. British Broadcasting Corporation (BBC), 2011. Pakistan floods: Maps and Graphics. Available at:

<http://www.bbc.co.uk/news/world-south-asia-14994663> [Accessed on 30 May 2012]

46. Mahmood, A., Faisal, N., Jameel, A., Junuary 2012. Special report of Pakistan's monsoon 2011 rainfall. Pakistan Meteorological Department [Online]. Available at:<www.pmd.gov.pk/cdpc/prg/Pakistan%20Monsoon%202011.pdf>[Accessed on 30 May 2012]

47. World Bank, 2012. Pakistan: Country Water Resource Assistance Strategy [Online]. Available at:

<http://www.worldbank.org.pk/WBSITE/EXTERNAL/COUNTRIES/SOUTHASIAEXT/PAKISTANEXTN/0,,contentMDK:21103136~pagePK:141137~piPK:141127~theSitePK:293052,00.html> [Accessed on 30 May 2012]

48. Rijsberman, Frank R., 2004. Water Scarcity: Fact or Fiction?. Australian Society of Agronomy

[Online]. Available at:<http://www.regional.org.au/au/asa/2004/plenary/1/1994_rijsbermanf.htm> [Accessed on 30 May 2012]

Page 40: Addressing the Electricity Shortfall in Pakistan through578723/FULLTEXT01.pdf · 2012-12-18 · Abstract: This report focuses on addressing the electricity shortfall in Pakistan with

33

49. Gentleman, Amelia., 2008. Brain gain for India as elite return. Guardian [Online]. Available

at:<http://www.guardian.co.uk/world/2008/apr/20/india.globaleconomy> [Accessed on 30 May 2012]

50. Brown, Felicity. 2009. Total forest coverage by country. Guardian Newspaper (Online). Available at:<http://www.guardian.co.uk/environment/datablog/2009/sep/02/total-forest-area-by-country?intcmp=239> [Accessed on 30 May 2012]

51. Zelman, Joanna, 2011. Tree plantation record broken in Philippine. The Huffington Post [Online].

Available at: <http://www.huffingtonpost.com/2011/02/27/tree-planting-record-philippines_n_828462.html> [Accessed on 30 May 2012]

52. Global Climate Risk Index 2012 is available at:<http://germanwatch.org/klima/cri.htm> [Accessed on

30 May 2012]

53. World Wide Fund for Nature (WWF) – Pakistan Chapter, 2012. Official Website: <http://www.wwfpak.org/forests.php> [Accessed on 31 May 2012]

54. Saeed, Asif., 2003. The underlying causes of deforestation and forest degradation in Pakistan. Food

and Agriculture Organization of United Nations [Online]. Available at: <http://www.fao.org/docrep/article/wfc/xii/0983-b1.htm> [Accessed on 31 May 2012]

55. Ministry of Environment, Government of Pakistan, 2009. Pakistan forestry outlook study. Asia-Pacific

Forestry Sector outlook study II, working paper series, working paper no. APFSOSII/WP/2009/28. [Accessed on 31 May 2012]

56. Proverbs are available at: <http://www.flickr.com/photos/22544551@N04/6804653166/> [Accessed on

1 June 2012]

57. Proverbs are available at: <http://www.learnoutloud.com/content/blog/archives/2005/10/thinking_100_ye.html> [Accessed on 1 June 2012]