ACES December 12, 2012
Adapting to an Environmental
Management Paradigm Based on
Protecting the Service of Nature
Private
Sector
Challenges
Gregory R. Biddinger, Ph.D.
Natural Land Management
Houston, TX
ACES December 12, 2012
Governance
Business Analysis / Strategic planning
Research and Development
Project Planning – Gated systems
External Communication
Facility Operations/Decommissioning
Project Development / Financing
Market Place Performance
Corporate Environmental Consideration
Internal
Process
External
Processes
ACES December 12, 2012
Corporate Management Systems - Not Monolithic
Highly organic and integrated with the business
Reflect operational purpose, & historic
development of a corporation – “the culture”
Respond to external regulatory / market processes
40+ year evolution with current regulatory
systems
Specific to industrial categories – self regulation
Type and flow of information useful for business
decisions is defined by existing systems and
processes
Ecosystem Service (ES) information must have
utility in these systems to influence business
performance
3
ACES December 12, 2012
Is Change Inevitable ?
“The question is no longer if ecosystem Services
will be a key framing of environmental issues
among multilateral institutions in coming years ,
but rather exactly when, where and how it will
occur”
Global Public Sector Trends in
Ecosystem Services, 2009—2011
Summary
BSR March 212
4
ACES December 12, 2012
Governance
Business Analysis / Strategic planning
Research and Development
Project Planning – Gated systems
External Communication
Facility Operations/Decommissioning
Project Development / Financing
Market Place Performance
Voluntary Corporate ES Applications
Internal
Process
External
Processes
ACES December 12, 2012
Corporate Policy Commitment to ES Growing
Growing numbers
of corporations
are making to
commitment to
consider both
Biodiversity & ES
as part of their
Governance
processes.
AkzoNobel
Barrick Gold
BC Hydro
BHP Billiton
British American Tobacco
BP
Coca-cola
Dow
Eni
ExxonMobil
Nestle
Puma
Rabobank
Rio Tinto
Shell
The Walt Disney Company
Weyerhaeuser
7
ACES December 12, 2012
Corporate Reporting – External Communication
• We identify biodiversity
protection objectives and
consider ecosystem services
and exploration activity through
our ESHIA process, the
preparation of Environmental
Management Plans, and our
Environmental Business
Planning efforts.
www.exxonmobil.com/Corporate/safety_env_biodiversity.aspx
Biodiversity and Ecosystem Services
ACES December 12, 2012
Environmental Business Planning
Environmental Business
planning a part of annual
planning process for all
Business units and facilities
ISO 14000 linkage
Traditional focus
Compliance
Environmental injury
Difficult to justify going
beyond compliance
Environmental
Aspects Analysis
Environmental
Impacts
Compliance
Assessment
Performance
improvement
Projects
Investment
Analysis
ACES December 12, 2012
Environmental Business Planning
Environmental Business
planning a part of annual
planning process for all
Business units and facilities
ISO 14000 linkage
Traditional focus
Compliance
Environmental injury
Difficult to justify going
beyond compliance
Ecosystem services values
help understand benefits
beyond compliance
Environmental
Aspects Analysis
Environmental
Impacts
Compliance
Assessment
Performance
improvement
Projects
Ecosystem
Services
Analysis
Investment
Analysis
Cost – Benefit
Analysis
ACES December 12, 2012
R&D – Ecosystem Service Tools
Exploring tools to
assess the value of
ecosystem services
through stakeholder
engagement in Artic
• Using expert solicitation
to develop planning
matrix for deep water Gulf
of Mexico Ecosystem
Services
ACES December 12, 2012
12
Integration of ES into Property Design and Management
Operate
Retire
Acquire
Redevelop
Divest
Natural
Landscaping
Wildlife
Property Tax
Institutional
Controls on
Future uses
Natural
Remediation
Strategies
Hold or Donate for
Conservation
Marketable
Conservation
Credits
Sustainable
Design Design
Low Impact
Design / Green
infrastructure
ACES December 12, 2012
Integrating New Design with Existing ES
Low Impact Design (LID) / Sustainable Sites Initiative
Manage storm runoff with natural
infrastructure that will enhance water quality and increase diversity of habitats
Rain gardens Bio-swales vs. piping Meadows vs. lawns
Lakes are operational components of site non-potable water supply
Forest modulates microclimate
Natural floodplain buffers retained
Extensive trail system provides access to nature
ACES December 12, 2012
ES in Corporate Investment Decisions
Value based analysis (e.g. NPV) of management
options and trade-offs generally require value
inputs as monetary estimates
Many ES have biophysical values but can’t be
monetized in absolute terms - Exceptions Provisioning ES which trade in commodity
markets (e.g. lumber)
Ecosystem structure (i.e. green infrastructure)
that can be normalized to engineered structure
for function can be valued as a replacement cost
ES information often relegated to economic or
community sensitivities
14
ACES December 12, 2012
Governance ? – ES as EPIs? Business Analysis / Strategic
planning – Delivered value? Research and Development Project Planning – Economic ? External Communication – EPIs? Facility
Operations/decommissioning Project financing Market place performance – P&L?
Some Corporate ES Applications Uncertain
Internal
Process
External
Processes
ACES December 12, 2012
Governance
Business Analysis / Strategic planning
Research and Development
Project Planning – Gated systems
External Communication
Facility Operations/Decommissioning
Project Development / Financing
Market Place Performance
Regulated Corporate ES Applications
Internal
Process
External
Processes
ACES December 12, 2012
Regulatory and Policy Uncertainty High
Ecosystem Service concept useful to understand
value of environmental protection.
Significant international effort to explore ES
approaches for regulatory purposes
(e.g. USEPA ORD, EU/EA, UNEP- IPBES )
Utility of ES metrics as compliance endpoint
needs further development and demonstration
Many scientific challenges ESV measure consumer preference not ecological integrity
ESV changes across a landscape as community changes
Lack of service and value data at scale of compliance
18
ACES December 12, 2012
Barriers - Challenges
Current Regulatory Approaches
ES information aligns well with Land Use decision;
but land use mostly regulated locally
Major federal and state regulations driven by risk
mitigation or Injury avoidance not ES production
Regulations require biophysical or engineering data
or targets ; ES data not included
Linkage between stressor exposure, impact to
structure or function and ES is intellectually
apparent but not often scientifically demonstrated
19
ACES December 12, 2012
U.S. Clean Water Act
Today
Protection goals
linked to services
(fishable, swimmable
and drinkable)
Regulatory controls
linked to engineering
and toxicity based
standards
Delegated to states –
Basin plans
Site specific criteria
allowed
Administrator
flexibility
Tomorrow
Could set performance
based on ES tied to
WQS
Requires significant
research
State or regional basin
plans objectives tied to
ES beneficiaries
Requires regional data
Routine use of
Administrator flexibility
Rely on NEBA (net
Environmental Benefits
Analysis)
20
ACES December 12, 2012
Houston - Galveston Region – Natural Value
SE Texas ecological diversity = economic impact
Recreational use / Commercial fisheries $3.2 B / year from Recreational fishing and boating
Significant conservation Initiatives in play
Houston
Wilderness
Trail
System
Houston
Green
Bayous
National
Recreation
Area
Designation
ACES December 12, 2012
Water is Dominant Landscape Feature
Freshwater for drinking water
Stormwater management / Flood control
Industrial Use / Commercial Transportation
Freshwater inflow – Streams, wetlands, estuaries
N
S
Context
and
recipient
can vary
across a
region.
So
The
service of
water
changes
as move
from
North to
South
What is the value of 1 acre ft. of water or an acre of freshwater wetlands?
ACES December 12, 2012
Management of Change Process Required
Change to Ecosystem Services as basis of
performance requires change management process
Current environmental management systems evolved
with regulations founded on bio-physical science and
engineering principles.
Current compliance focuses on risk mitigation or
injury avoidance not on ecological systems
production.
Current regulations have ES as aspirational goals but
not as compliance goals or targets
Any change to ES based regulatory performance will
require new infrastructure New management frameworks
New forms of data
New skill sets for Regulators and users
23
ACES December 12, 2012
Change Demands a Robust Dialogue
Are we replacing or updating regulatory
systems?
Is an ES assessment an ecological or a socio-
economic analysis?
Fit for Purpose ? - What type and scale of data
are we collecting and how will it be used.
ES type and intensity are influenced by context
and audiences; can regulations be adaptable
and flexible for spatial and cultural
differences?
What scientific information and methods are
needed prior to installation of regulations?
24
ACES December 12, 2012
26