Page 1: A_company Profile 2014

COMPANY

PROFILE

JASMIG CONSTRUCTION

SUPPLY

Page 2: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

JASMIG CONSTRUCTION SUPPLY is a Filipino – owned company duly

registered by the Department of Trade and Industry and with the Philippine

Contractors Accreditation Board. A company built to accommodate the

increasing demand of our country to a competent and expert

professionals all quite respected in their own fields and have proven

attributes of professionalism, experience and expertise.

JASMIG CONSTRUCTION SUPPLY has the capability to undertake any

project phase, from initial planning, design, estimates, documentation,

project management, construction for any infrastructure project. Hence,

the company does not only engage with construction but as well as supply

of permanent construction materials, rentals of heavy equipment and all

matters regarding construction.

Page 3: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

CERTIFICATE OF REGISTRATION

Page 4: A_company Profile 2014
Page 5: A_company Profile 2014
Page 6: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

CONTRACTOR’S LICENSE

Page 7: A_company Profile 2014
Page 8: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

MAYOR’S PERMIT

Page 9: A_company Profile 2014
Page 10: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

ORGANIZATIONAL CHART (Engineering & Construction Division)

Page 11: A_company Profile 2014
Page 12: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

RESUMES

Page 13: A_company Profile 2014

PERSONAL DATA

JANE CASAS BERBERABE Entrepreneur, Licensed Pharmacist

HOME ADDRESS : 9007 BK National Highway,

Brgy. Alangilan, Batangas City, Philippines

OFFICE ADDRESS : 9007 BK National Highway,

Brgy. Alangilan, Batangas City, Philippines

TELEPHONE NUMBER : (+6343) 722-0416

+63925-387-6348

E-MAIL ADDRESS : [email protected]

CIVIL STATUS : Divorced

NATIONALITY : Filipino

BIRTH DAY : August 27, 1967

SEX : Female

EDUCATION:

Tertiary : University of Sto. Tomas, Manila

Bachelor of Science in Pharmacy

March 1988

Secondary : Saint Bridget College

March 1984

Primary : Saint Bridget College

March 1980

PRESENT WORK : Proprietress

Jasmig Construction Supply /

Jasmig Construction Corporation

from 1998 to present

PROJECTS UNDERGONE : Refer to Contractor’s Registration Certificate

(CRC)

AFFILIATION : Member

Provincial Unified Builders of Batangas

Page 14: A_company Profile 2014

R E S U M E

PERSONAL DATA:

Name: Frando L. Pulmano

Home Address: San Isidro, Batangas City

Position: Purchasing Engineer Supervisor / Project Engineer

Date of Birth: October 05, 1963

Place of Birth: Quezon City

Civil Status: Married

Sex: Male

Nationality: Filipino

Dialect Spoken: English / Filipino

Religion: Catholic

Weight: 120 lb s

Height: 5’6”

Father’s Name: Lucas A. Pulmano

Mother’s Name: Leonor L. Pulmano

EDUCATIONAL BACKGROUND

College: BS Civil Engineering

Graduated, March 1985

Cebu Institute of Technology

Cebu City

LICENSURE EXAMINATION:

Civil Engineering Board Examination

November 1985, FEU Girls High

License No.: 0047964

Page 15: A_company Profile 2014

SPECIAL SKILLS AND INTEREST

Computer literate, knowledge to operate softwares such as

MSexcels, MSWord, Powerpoint (for all windows)

WORK EXPERIENCES:

Period Company Craft Name of Project

Jan 1999 - Present Jasmig

Construction

Supply

Purchasing

Supervisor /

Project Engineer

Government Projects

Oct 1998 – Jan 1999 EEI Corporation

Construction

Division

Purchasing

Supervisor

Engineer

JG Summit

Petrochemical Plant,

Electro-Mech,

Simlong, Batangas

City

Aug 1997 - Sept

1998

EEI Corporation

Construction

Division

Purchasing

Supervisor

Engineer

GOTO-Semi

Conductor Plant,

Electro- Mech

Carmelray,

Canlubang, Laguna

Jun 1996 – Jul 1997 EEI Corporation

Construction

Division

Buyer II Philips Semi-

Conductor

Mechanical Piping

Lispi, Cabuyao,

Laguna

Feb 1994 – Apr 1996 EEI Corporation

Construction

Division

Buyer II Assigned at Main

Office

Oct 1993 – Feb 1994 EEI Corporation

Construction

Division

Buyer I Pilipinas Shell Refinery

(Star Project) Electo-

Mech &

Instrucmentation,

Tabangao, Batangas

City

Page 16: A_company Profile 2014

WORK DESCRIPTION:

o Review bill of materials (permanent materials) including consumable

materials such as cutting disc, welding rod in accordance to

specification for the preparation of purchase order after sourcing

from three of more suppliers regarding the availability and amount

of the said materials.

o Approved quotation with the lowest price from three suppliers and

award purchased order to the supplier which has the lowest prices.

o Review work scheduling (PERT-CPM) in order to procure in advance

the material needed for the said work activity.

o Prepare RFI (request for Information) for the submittal of material

sample, brochure and technical specification to customer for

approval.

o Prepare three quotations for the approved material thru inquiry from

three suppliers.

o Prepare evaluation of material to be purchased for approval by

project manager.

o Encoding of all information including description of materials

quantity, unit price and total amount of the said approved purchase

order and fed to computer.

o After inquiry and find out that the material needed was nowhere to

be founding the Philippine Market, we prepare formal inquiry from

supplier abroad with complete drawing & specification and sent thru

fax or to courier.

o Give instruction to buyers if the supplier with the lowest prices has the

complete quantity requirements, if not proceed to second supplier

with available material.

o Signing of purchase order to be awarded to supplier with lowest

price and with available material.

o Coordination to warehouse personnel if the material needed is

available to their office. If not make inquiry to three suppliers for the

availability of the said material.

o Arrange meeting with warehouse supervisor, material control

supervisor and field supervisor pertaining to imported and local

materials that will going to use as permanent materials for the said

project and discuss exactly the time of arrival at site and availability

of the said material to avoid delays resulting to poor progress.

I do hereby certify that the above information is true and correct in the

best of my knowledge and belief.

SGD. FRANDO L. PULMANO

Applicant

Page 17: A_company Profile 2014
Page 18: A_company Profile 2014

R E S U M E

PERSONAL DATA:

Name: Rodolfo H. Dimaandal

Home Address: Sta. Teresita, Batangas

Position: General Foreman

Date of Birth: September 19, 1960

Place of Birth: Batangas City

Civil Status: Married

Sex: Male

Nationality: Filipino

Dialect Spoken: English / Filipino

Experience Name of Company: Jasmig Construction Supply

Year: 1998 up to Present

Project Title Refer to Company’s Experience

Page 19: A_company Profile 2014

IRMINA B. DE VILLA REGISTERED CIVIL ENGINEER

License No. 0100643

Libra St., Madonna Homes, Alangilan, Batangas City

Mobile No.: +639164280239 / E-mail Address: [email protected]

OBJECTIVE

To work in a company that will further enhance and develop my

knowledge, ability and skills in the field of engineering and construction.

QUALIFICATIONS

Computer literate [AutoCAD; Microsoft applications (Word, Excel,

Power Point)]

Have excellent communication skills (oral and written)

Highly trainable, fast learner and have ability to stand pressure

BWC-DOLE Certified Safety Officer (Certificate No. 40-01-0655-06)

EXAMINATION TAKEN AND PASSED

Registered Civil Engineer Licensure Examination

Manila

November 2004

MEMBERSHIP / PROFESSIONAL AFFILIATION

Philippine Institute of Civil Engineers, Inc.

Batangas Chapter

WORK EXPERIENCE

Project Engineer

Jasmig Construction Supply

Kumintang Ibaba, Batangas City

October 2008 – up to Present

Duties and Responsibilities:

• Coordinates and checks of engineering deliverables

• Monthly project status reports and change orders

Responsible for planning, scheduling, conducting and coordinating

the technical and management aspects of projects

• Accountable for the successful completion of engineering projects

• Requires extensive regular contact with assigned project Clients

• Assist in the preparation of engineering project proposals

• Budget monitoring and trend tracking

• Participating in Client/contractor meetings and resolving

Client/engineering and management project issues

Review and approve project Client invoices

• Ensure effective engineering and Client communications

Page 20: A_company Profile 2014

Ensuring a project is fit-for-purpose and adheres to the project

budget and schedule

Ensuring all relevant safety objectives and legal requirements are

observed

Accounting for engineering tasks to ensure they meet contract

requirements

Developing project-specific procedures for the work to be carried

out

Interpreting clients' requirements, identifying and addressing design

parameters and engineering problems and ensuring solutions are

implemented

Ensuring all justifications for contractual variations during projects are

maintained to support subsequent commercial claims

Evaluating, organizing and prioritizing work within the overall project

schedule

Liaising and managing third party contractors to ensure all

equipment is fit for purpose

Taking responsibility for a team of engineers and training/mentoring

junior engineers

Keeps good communication with other Engineers

Piping Engineer

Atlantic, Gulf & Pacific Company of Manila - New Caledonia

(Inco Goro Nickel Mining Plant Project)

August 2008 – October 2008

Duties and Responsibilities:

Prepares and keeps records of test packages

Checks completeness of pipelines on P&IDs under each subsystems

before turnover to clients

HSE Engineer

Atlantic, Gulf &Pacific Company of Manila - New Caledonia

(Inco Goro Nickel Mining Plant Project)

July 2007 – August 2008

Duties and Responsibilities:

Orients newly mobilized manpower on the safety, health and

environmental rules of the project

Conducts daily prestart safety meeting and weekly toolbox meeting

with the workers and superiors

Conducts daily safety inspection of working area, workers’ situations

and job descriptions and randomly reminds workers on the safety

precautions that must be done before or as they do their respective

work

Page 21: A_company Profile 2014

Gives alternative solutions on how to do their work safely

Conducts safety audits on the working area

Conducts routinely inspection of tools and equipment

Coordinates with clients and other constructors’ safety engineers

and workers to have a harmonious work place

Prepares daily safety reports and minutes of the Weekly Safety

coordination meeting and monthly Company Safety meeting

Office & Site Engineer

Jasmig Construction Supply

Kumintang Ibaba, Batangas City

June 2005 – July 2007

Duties and Responsibilities:

In charge in the preparation and submission of bid documents

- Prepares the Technical Documents / Eligibility documents to

bid

- Prepares the Financial Documents such as detailed estimates

and bar charts for bidding

Supervises the implementation / construction of the awarded

government & non-government projects

Conducts daily site inspection and prepares progress report

Checks if the activity meets the standard, time and cost as per

plan which includes materials, labor and equipment

Safety Engineer

Jasmig Construction Supply

Kumintang Ibaba, Batangas City

June 2005 – July 2007

Duties and Responsibilities:

Responsible for the safety and welfare of the workers

Conducts toolbox meetings

Prepares daily safety records and monthly safety reports

Conducts safety site inspection

Inspects the tools and equipment to be used in the project

TRAINING EXPERIENCE

Assistant Engineer

City Engineer’s Office

Batangas City

November 2004-May 2005

Duties and Responsibilities:

Assist the engineer-in-charge in surveying and inspection for the

construction / repair of projects to be bidded

Assist the engineer-in-charge in the preparations of program of

works, bill of materials, cost estimates and specification of the

proposed infrastructure projects

Page 22: A_company Profile 2014

Drafts plans of the proposed vertical / horizontal infrastructure

projects

Trainee

Mar Castillo Contractor and Construction Supply

San Juan, Mabini, Batangas

June 2003-October 2003

Duties and Responsibilities:

Estimate and design of simple structures:

o Residential building, roads, breakwater

Supervise field works

Issue receipts for the orders of construction materials

Checking of available construction materials

EDUCATIONAL BACKGROUND

Short Courses: Auto-Cad Operator Course (109 Hours)

University of Batangas

Hilltop, Batangas City

August 30, 2013

Primavera 6.0

CIMS Technology

Makati

2009

College: Bachelor of Science in Civil Engineering

Batangas State University

Alangilan, Batangas City

March 31, 2004

Secondary: Batangas National High School

Rizal Avenue, Batangas City

March 26, 1999

Primary: Banaba East Elementary School

Banaba East Batangas City

March 24, 1995

SEMINARS ATTENDED

Consultation CUM Organizational Meeting of Safety Practitioners

Bureau of Working Conditions, Department of Labor and Employment

WODP Training Center, Batangas City

March 23, 2007

Basic Occupational Safety and Health

Bureau of Working Conditions, Department of Labor and Employment

WODP Training Center, Batangas City

Page 23: A_company Profile 2014

July 28, 2006

Strengthening the Competitiveness of CALABARZON’s

PS Licensees to Ensure Consumer Safety & Protection

PhilSAAC First General Membership Forum

CEAT-EE Auditorium,

UPLB, Los Baños, Laguna,

October 20, 2005

Future Civil Engineers Facing the Challenges of the 21st Century

3rd REGIONAL STUDENTS’ CONFERENCE

Amphitheater, CEAFA Building, Batangas State University,

Alangilan, Batangas City

October 16 to 17, 2003

Theory and Practice of Pre-stressed Concrete

Multi-Media Center, University of Batangas

Hilltop, Batangas City

October 10, 2003

Strengthening Knowledge in the Civil Engineering Discipline towards Global

Competitiveness

2002 PICE REGION IV STUDENTS’ CONFERENCE

Divine Word College of Calapan

Calapan City, Orriental, Mindoro

October 18 to 19, 2002

Civil Engineering and Its Varied Profession

Amphitheater, CEAFA Building, Batangas State University,

Alangilan, Batangas City

September 27, 2002

PERSONAL DATA

Date of Birth : October 07, 1982

Place of Birth : Banaba East, Batangas City

Sex : Female

Status : Married

Religion : Roman Catholic

Height : 5' 1"

Weight : 68 kgs.

PERSON TO CONTACT IN CASE OF EMERGENCY:

MR. NESTOR A. DE VILLA

Libra St., Madonna Homes, Alangilan, Batangas City

+639268466413

Page 24: A_company Profile 2014

CHARACTER REFERENCES

Jane C. Berberabe

Owner / President

Jasmig Construction Supply

Kumintang Ibaba, Batangas City

(043) 722 0416

Sonia D. Paglicauan

OIC- Construction Section

Department of Public Works and Highways

Batangas Second District Engineering Office

Batangas City

(043) 723 9791

Victoria G. Caibigan

Engineer II

DPWH – Batangas Second District Engineering Office

Batangas City, Philippines

(+6343) 4025900

I hereby certify that the above information is true and correct to the best of

my knowledge and belief.

SGD. IRMINA B. DE VILLA

Page 25: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

LIST OF COMPLETED PROJECTS

Page 26: A_company Profile 2014

LIST OF CONSTRUCTION PROJECTS COMPLETED

Project Title/Description One storey Residential Building

Project Cost P 850,000.00

Year Finished 1995

Project Location Pulo, San Carlos, Rosario, Batangas

Name & Address of the

Owner

Mr. & Mrs. Monico Panganiban

Project Title/Description One Storey Residential Building

Project Cost P 600,000.00

Year Finished 1997

Project Location Baybayin, Rosario, Batangas

Name & Address of the

Owner

Mr. & Mrs. Cesar Agbay

Project Title/Description Const. of Multi-Purpose Gym

Project Cost P 7,000,000.00

Year Finished 1995

Project Location Capitol Site, Batangas City

Name & Address of the

Owner

PEO-Batangas

Project Title/Description PBMIT Gymnasium Repair (Sub-Con)

Project Cost P 3,474,900.00

Year Finished 1996

Project Location Rizal Avenue, Extension, Batangas City

Name & Address of the

Owner

PBMIT-Batangas City

Project Title/Description Calaca, Gymnasium (Sub-Con)

Project Cost P 2,0000,000.00

Year Fionished 1997

Project Location Calaca, Batangas

Name & Address of the

Owner

Municipality of Calaca

Project Title/Description Two Storey Residential Building

Project Cost P 900,000.00

Year Finished 1996

Project Location Matabungkay, Lian, Batangas

Name & Address of the

Owner

Mr. & Mrs. Robert Schalamon

Page 27: A_company Profile 2014

Project Title/Description Construction of Two Storey Building

Project Cost P 2,500,000.00

Year Finished 1997

Project Location BNHS Batangas City

Name & Address of the

Owner

DPWH-1st Engineering Batangas City

Project Title/Description Concreting of Paraiso-Luya Road

Project Cost P 1,500,000.00

Year Finished 1999

Project Location Calatagan, Batangas

Name & Address of the

Owner

DPWH-Batangas 1st Engineering

Project Title/Description Concreting of Lucsuhin-Biga Road

Project Cost P 500,000.00

Year Finished 1999

Project Location Calatagan Batangas

Name & Address of the

Owner

DPWH-Batangas 1st Engineering

Project Title/Description Concreting of Sta. Ana-Bagong Silang Road

Project Cost P 1,000,000.00

Year Finished 1999

Poject Location Calatagan Batangas

Name & Address of the

Owner

DPWH-Batangas 1st Engineering

Project Title/Description Construction of Two Classroom

Project Cost P 645,000.00

Year Finished 2000

Project Location Bolbok Elementary School

Name & Address of the

Owner

DPWH-Batangas 1st Engineering

Project Title/Description Construction of CHB Lined Canal

Project Cost P 2,000,000.00

Year Finished 2000

Project Location Along Talisay-Agoncillo Road @ Tanauan Batangas

Name & Address of the

Owner

DPWH- Tanauan Batangas

Page 28: A_company Profile 2014

Project Title/Description Improvement of Old Sangguniang Building

Project Cost P 1,105,000.00

Year Finished 2000

Project Location Batangas City

Name & Address of the

Owner

City Engineer’s Office

Project Title/Description Construction of Open Canal Project Cost P 300,000.00

Year Finished 2000

Project Location Danglayan, San Pascual Batangas

Name & Address of the

Owner

DPWH- Batangas Sub-District

Project Title/Description Construction of Lined Canal

Project Cost P 500,000.00

Year Finished 2000

Project Location Publacion 1, San Luis Batangas

Name & Address of the

Owner

DPWH-Batangas Sub District

Project Title/.Description Construction Of Tritran Terminal (Sub-Con)

Project Cost P 3,000,000.00

Year Finished 2000

Project Location Calicanto Batangas

Name & Address of the

Owner

Geroleo Balmes / Batangas City

Project Title/Description Construction of Extension of Line Canal

Project Cost P 350,000.00

Year Finished 2001

Project Location Brgy Aplaya, Bauan Batangas

Name & Address of the

Owner

PEO-Batangas

Project Title/Description Concreting of Brgy Road

Project Cost P 1,000,000.00

Year Finished 2000

Project Location Brgy Bulihan, Rosario Batangas

Name & Address of the

Owner

PEO-Batangas

Page 29: A_company Profile 2014

Project Title/Description Package: a) Proposed Widening of Poblacion 6 Road,

Cuenca; b) Concreting of Road @ Sitio Kanluran , Brgy.

Mahabang Dahilig, Batangas City

Project Cost P 204, 495.00

Year Finished 2001

Project Location A) Cuenca, Batangas B) Mahabang Dahilig, Batangas City

Name and Address Of the

Owner

PEO – Batangas

Project Title/.Description Concreting of Brgy. Road @ Boot

Project Cost P 323,000.00

Year Finished 2001

Project Location Tanauan City, Batangas

Name & Address of the

Owner

PEO - Batangas

Project Title/.Description Construction of Open Classroom Building @ Santor

Elementary School

Project Cost P 490,000.00

Year Finished 2001

Project Location Tanauan City, Batangas

Name N& Address of the

Owner

PEO - Batangas

Project Title/Description Repair/Maintenance of Open Canal & Cross Drain @

Batangas-Lobo Road, San Jose Sico Section

Project Cost P 300,000.00

Year Finished 2001

Project Location San Jose – Sico, Batangas City

Name and Address Of the

Owner

DPWH – Sub-District

Project Title/.Description Construction of Prenza Lateral Canal

Project Cost P 247,000.00

Year Finished 2001

Project Location Lian, Batangas

Name & Address of the

Owner

DPWH – 1st District

Project Title/.Description Concreting of Manila – Batangas Pier Road

Project Cost P 760,000.00

Year Finished 2001

Project Location Batangas City

Name & Address of the

Owner DPWH –Sub District

Page 30: A_company Profile 2014

Project Title/Description Construction of Two Storey (4 CL) Bldg. @ San Pascual NH/S,

San Pascual, Batangas

Project Cost 1,850,000.00

Year Finished 2002

Project Location San Pascual, Batangas

Name and Address Of the

Owner

Provincial Engineer’s Office

Project Title/.Description Construction of Rehabilitation Center, Kumintang Ibaba,

Batangas City

Project Cost 994,000.00

Year Finished 2002

Project Location Batangas City

Name & Address of the

Owner

Provincial Engineer’s Office

Project Title/.Description Concreting of Road @ Brgy. Mataywanak

Project Cost 500,000.00

Year Finished 2002

Project Location Tuy, Batangas

Name & Address of the

Owner DPWH – 1st District

Project Title/Description Concreting of Brgy. Road @ Acke-Tuyon-Tuyon

Project Cost 100,000.00

Year Finished 2002

Project Location Tuy, Batangas

Name and Address Of the

Owner

DPWH – 1st District

Project Title/.Description Concreting of Road @ Brgy. Dao

Project Cost 400,000.00

Year Finished 2002

Project Location Tuy, Batangas

Name & Address of the

Owner

DPWH – 1st District

Project Title/.Description Construction of Open Line Canal @ Brgy. Caysasay

Project Cost 300,000.00

Year Finished 2002

Project Location Taal, Batangas

Name & Address of the

Owner DPWH – 1st District

Page 31: A_company Profile 2014

Project Title/.Description Concreting of Brgy. Road @ Humayingan

Project Cost 500,000.00

Year Finished 2002

Project Location Lian, Batangas

Name & Address of the

Owner DPWH – 1st District

Project Title/.Description Rehabilitation of Alupay E/S

Project Cost 380,000.00

Year Finished 2002

Project Location Rosario, Batangas

Name & Address of the

Owner PEO - Batangas City

Project Title/.Description Construction of One Classroom Building @ Kaingin E/S

Project Cost P 440,000.00

Year Finished June 2003

Project Location San Pascual, Batangas

Name & Address of the

Owner Municipality of San Pascual

Project Title/.Description Construction of Flood Control @ Matinggain I

Project Cost 300,000.00

Year Finished August 2003

Project Location Lemery, Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Construction of Canopy for Ground Floor @ Multi-Purpose

Covered Court, Provincial Sports Complex

Project Cost 2,800,000.00

Year Finished August 2003

Project Location Bolbok, Batangas City

Name & Address of the

Owner Provincial Engineer’s Office, Batangas City

Project Title/Description Improvement of Road @ Brgy. Bukal

Project Cost P 400,000.00

Date Finished September 2003

Project Location Padre Garcia, Batangas

Name & Address of the

Owner

DPWH – Bats. Sub Eng’g District

Page 32: A_company Profile 2014

Project Title/Description Construction of MPB @ Tanauan School of Fisheries

Project Cost P 500,000.00

Date Finished December 2003

Project Location Ambulong, Tanauan City

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Construction of MPH @ Bulihan

Project Cost P 300,000.00

Date Finished October 2003

Project Location Nasugbu, Batangas

Name & Address of the

Owner

DPWH – Bats. 1st Eng’g District

Project Title/Description Construction of Flood Control @ Wawa Ibaba

Project Cost P 200,000.00

Date Finished October 2003

Project Location Lemery, Batangas

Project Title/Description Construction of Flood Control @ Wawa Ibaba

Project Title/Description Construction of MPH @ Niugan

Project Cost P 200,000.00

Date Finished October 2003

Project Location Taal, Batangas

Name & Address of the

Owner

DPWH – Bats. 1st Eng’g District

Project Title/Description Construction of Multi-Purpose Structure/Bldg. @ Dacanlao

Project Cost P 500,000.00

Date Finished November 2003

Project Location Calaca, Batangas

Name & Address of the

Owner

DPWH – Bats. 1st Eng’g District

Project Title/Description Construction of Hanging Bridge @ Libato

Project Cost P 800,000.00

Date Completed October 2003

Project Location San Juan, Batangas

Name & Address of the

Owner

Provincial Engineer’s Office, Batangas City

Page 33: A_company Profile 2014

Project Title/Description Concreting of Road @ Wawa

Project Cost P 500,000.00

Date Finished December 2003

Project Location Batangas City

Name & Address of the

Owner

Provincial Engineer’s Office, Batangas City

Project Title/Description Concreting of FMR @ Apacay

Project Cost P 500,000.00

Date Finished September 2003

Project Location Taal, Batangas

Name & Address of the

Owner

DPWH – Batangas 1st Engineering District

Project Title/Description Concreting of FMR @ Zone 14

Project Cost P 500,000.00

Date Finished December 2003

Project Location Taal, Batangas

Name & Address of the

Owner

DPWH – Batangas 1st Engineering District

Project Title/Description Concreting of Road @ the Municipality of Cuenca

Project Cost P 500,000.00

Date Finished February 2004

Project Location Cuenca, Batangas

Name & Address of the

Owner

DPWH – Batangas 3rd Engineering District

Project Title/Description Construction of Open Canal @ Manuel Quezon St.,

Poblacion 2

Project Cost P 500,000.00

Date Finished February 2004

Project Location Laurel, Batangas

Name & Address of the

Owner

DPWH – Batangas 3rd Engineering District

Project Title/Description Concreting of Various Barangay Roads

Project Cost P 2,000,000.00

Date Finished May 2004

Project Location Municipality of San Luis

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Page 34: A_company Profile 2014

Project Title/Description Construction of MPB (League of Municipalities of Batangas

Hall)

Project Cost P 5,000,000.00

Date Finished August 2004

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Concreting of Road @ Brgy. Sta. Monica to Brgy.

Balagtasin

Project Cost P 1,000,000.00

Date Started August 2004

Project Location San Luis, Batangas

Name & Address of the Owner DPWH-Bats 2nd Engineering District

Project Title/Description Concreting of Road @ Brgy. Alagao to Brgy. San Vicente

Project Cost P 1,000,000.00

Date Started August 2004

Project Location Bauan, Batangas

Name & Address of the Owner DPWH-Bats 2nd Engineering District

Project Title/Description Construction of MPB, Brgy. Sinisian

Project Cost P 500,000.00

Date Finished October 2004

Project Location Calaca, Batangas

Name & Address of the Owner DPWH – Bats. 1st Eng’g District

Project Title/Description Concreting of FMR, Brgy. Cogonan

Project Cost P 500,000.00

Date Finished October 2004

Project Location Nasugbu, Batangas

Name & Address of the Owner DPWH – Bats. 1st Eng’g District

Project Title/Description Construction of MP Building / Structure at Aga

Project Cost P 500,000.00

Date Finished November 2004

Project Location Nasugbu, Batangas

Name & Address of the Owner DPWH – Bats. 1st Eng’g District

Project Title/Description Construction of MPB, Brgy. Gonzales

Project Cost P 4,000,000.00

Date Finished July 18, 2007

Project Location Tanauan City, Batangas

Name & Address of the Owner DPWH – Bats. 3rd Eng’g District

Page 35: A_company Profile 2014

Project Title/Description Rehabilitation of Canal @ Brgy. Banay Banay 1st

Project Cost P 1, 000,000.00

Date Finished August, 2007

Project Location San Jose, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Concreting of FMR, Brgy. Pansipit, Pook, Pamiga, San

Jacinto

Project Cost P 1,000,000.00

Date Finished December 14, 2006

Project Location Agoncillo, Batangas

Name & Address of the Owner DPWH – Bats. 3rd Eng’g District

Project Title/Description Construction of Open Canal @ Brgy Bago

Project Cost P 1,000,000.00

Date Finished June 20, 2007

Project Location Ibaan, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Construction of Open Canal @ Brgy Coliat

Project Cost P 1,000,000.00

Date Finished July 20, 2007

Project Location Ibaan, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Concreting of Line Canal at Brgy. Pag-olingin Bata

Project Cost P 500,000.00

Date Finished April 30, 2007

Project Location Lipa City, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Construction /Concreting of Farm to Market Road at

Brgy. Anilao

Project Cost P 500,000.00

Date Finished June 20, 2007

Project Location Lipa City, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Concreting of Line Canal at Brgy. Pag-olingin West

Project Cost P 500,000.00

Date Finished June 8,, 2007

Project Location Lipa City, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Page 36: A_company Profile 2014

Project Title/Description Repair / Rehab of FMR at Brgy. Bukal-Maugat Road

Project Cost P 1,000,000.00

Date Finished October 16, 2006

Project Location Padre Garcia, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Improvement of MPB at Brgy 3

Project Cost P 300,000.00

Date Finished June 1, 2005

Project Location Talisay, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Concreting of FMR, Brgy. Banay Banay

Project Cost P 1, 000,000.00

Date Finished April 7, 2006

Project Location Padre Garcia, Batangas

Name & Address of the Owner DPWH – Bats. 4th Eng’g District

Project Title/Description Construction of MPB at Poblacion 5

Project Cost P 500,000.00

Date Finished April 17, 2007

Project Location Laurel, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Construction of Four (4) Classrooms

Project Cost P 2,000,000.00

Date Finished December 18, 2007

Project Location Tanauan City, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Construction of MPB

Project Cost P 4,000,000.00

Date Finished December 18, 2007

Project Location Pagaspas, Tanauan, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Construction of MPB

Project Cost P 4,000,000.00

Date Finished April 7, 2007

Project Location Gonzales, Tanauan, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Page 37: A_company Profile 2014

Project Title/Description Construction of MPB

Project Cost P 3,000,000.00

Date Finished May 22, 2008

Project Location Brgy. Sampaloc, Talisay, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Repair/Impvt of Balele E/S, Balele, Tanauan City, Batangas

Project Cost P 1,349,728.00

Date Finished June 25, 2008

Project Location Brgy. Balele, Tanauan City, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Const. of 4 CL Bldg., Natatas NHS, Natatas, Tanauan City,

Bats

Project Cost P 2,892,997.00

Date Finished Sept. 6, 2008

Project Location Brgy. Natatas, Tanauan City, Bats

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Completion of MPB, Sampaloc, Talisay, Batangas

Project Cost P 1,445,900.00

Date Finished Feb. 10, 2009

Project Location Brgy. Sampaloc, Talisay, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Completion of MPB, Balas, Talisay, Batangas

Project Cost P 1,928,300.00

Date Finished Feb. 10, 2009

Project Location Brgy. Balas, Talisay, Batangas

Name & Address of the

Owner

DPWH – Bats. 3rd Eng’g District

Project Title/Description Conc. of Road ( Dayap to Butucan) & ( Bulihan to Looc),

Nasugbu

Project Cost P 4,774,623.00

Date Finished July 21, 2008

Project Location Nasugbu, Batangas

Name & Address of the

Owner

DPWH – Bats. 1st Eng’g District

Page 38: A_company Profile 2014

Project Title/Description Const.of MPBldg, Brgy. Mahacot West, Bats. City

Project Cost P 3,858,990.20

Date Finished Sept. 15, 2008 Dec. 17, 2008

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Impvt./Rehab. of Road , Manila-Batangas Road, Bats. City

Project Cost P 9,647,900.00

Date Finished Sept. 15, 2008 Jan. 9, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Impvt./Rehab. of Road, Paharang West Road, Bats. City

Project Cost P 9,647,900.00

Date Finished Sept. 15, 2008 Jan. 7, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City

Project Cost P 9,647,900.00

Date Finished Sept. 15, 2008 Jan. 8, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Const.of MPBldg, Balete Relocation Site, Bats. City

Project Cost P 4,823,900.00

Date Finished Feb. 18, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Conc. of Road, Brgy. Gulod, Lemery, Bats.

Project Cost P 3,820,200.00

Date Finished Jan. 5, 2009

Project Location Lemery, Batangas

Name & Address of the

Owner

DPWH – Bats. 1st Eng’g District

Project Title/Description Repair/Maintenance of Creek, San Carlos, Lipa City, Bats.

Project Cost P 1,969,160.00

Date Finished Aug. 13, 2008

Project Location Lipa City, Batangas

Name & Address of the

Owner

DPWH – Bats. 4th Eng’g District

Page 39: A_company Profile 2014

Project Title/Description Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City

Project Cost P 4,824,078.00

Date Finished Sept. 15, 2008 Jan. 8, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Const. of Gulod Labac to Gulod Itaas, Batangas City

Project Cost P 4,823,992.00

Date Finished Sept. 15, 2008 Nov. 12, 2008

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title/Description Repair/Rehab. of Revetment, Mabalanoy River, San Juan,

Bats.

Project Cost P 1,499,176.00

Date Finished Jun. 26, 2008

Project Location San Juan, Batangas

Name & Address of the

Owner

DPWH – Bats. 4th Eng’g District

Project Title/Description Const.of MPBldg, Brgy. Catandala, Bats. City

Project Cost P 4,823,900.00

Date Finished Mar. 18, 2009

Project Location Batangas City

Name & Address of the

Owner

DPWH – Bats. 2nd Eng’g District

Project Title /.Description Const. of Road at Anus, San Jose; Dayapan, Ibaan;

Laklakin, Balagtasin, San Jose & Sampal, Natunuan

Project Cost 2,122,347.00

Year Finished Spetember 25, 2008

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 4th Eng’g District

Project Title /.Description Improvement of Farm to Market Road at San Pedro And

Mahacot East

Project Cost 9,648,847.00

Year Finished June 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Page 40: A_company Profile 2014

Project Title /.Description Rehabilitation/Reconstruction/Improvement of Batangas-

Tabangao-LoboRoad (Intermittent Section),Pinamucan-

Simlong Section (Phase I), Batangas City

Project Cost 9,647,900.00

Year Finished April 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement /Upgrading of Brgy. Pantay, Brgy. Makina

FMR, Calaca, Bats.

Project Cost 4,775,500.00

Year Finished Aug. 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Improvement/Rehab of Nasugbu-Ternate Road, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road

Section, Phase I, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road

Section, Phase I, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Page 41: A_company Profile 2014

Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road

Section, Phase II, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Improvement/Rehab. of Palico-Balayan-Batangas Road,

Phase I, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Improvement/Rehab. of Palico-Balayan-Batangas Road,

Phase II, Batangas

Project Cost 19,297,800.00

Year Finished Sept. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Repair and Rehabilitation of Nasugbu-Lian-Calatagan

Road, Batangas @ Km. 123+646 to Km. 124+764

Project Cost 9,997,200.00

Year Finished Oct. 10, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Asphalt Overlay/Improvement/Rehab. of Manila-Batangas

Road, Batangas City

Project Cost 18,092,479.88

Year Finished Jul. 23, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Asphalt Overlay/Improvement/Rehab. of Dumantay-

Paharang West Road, Batangas City

Project Cost 18,092,412.84

Year Finished Jul. 23, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Page 42: A_company Profile 2014

Project Title /.Description Asphalt Overlay/Improvement of Gulod Labac-Gulod Itaas

Road, Bats. City

Project Cost 18,092,062.50

Year Finished Aug. 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Asphalt Overlay/Improvement of Mahacot East-Mahacot

West Road, Bats. City

Project Cost 18,092,062.50

Year Finished Aug. 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Asphalt Overlay/Improvement of Soro-soro Ilaya Road, Bats.

City

Project Cost 18,092,062.50

Year Finished Aug. 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement/Rehab of Palico-Balayan Road, Bats. City

Project Cost 18,090,187.50

Year Finished Aug. 20, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement/Rehab of San Pedro Road, Bauan, Bats.

Project Cost 9,647,998.00

Year Finished Oct. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Repair/Rehab/Impv't of Manila-Batangas-Pier Road,

Batangas City

Project Cost 9,647,998.00

Year Finished Oct. 9, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Page 43: A_company Profile 2014

Project Title /.Description Improvement/Rehab of Pitogo Road, Bauan, Bats.

Project Cost 9,647,998.00

Year Finished Oct. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement/Rehab of Colvo Road, Bauan, Bats.

Project Cost 9,647,998.00

Year Finished Oct. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement/Rehab of Sto. Nino - Bagong Silang Road,

Bauan, Bats.

Project Cost 9,647,998.00

Year Finished Oct. 22, 2009

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan

Phase I, Km 101+500 - Km 102+500

Project Cost 19,298,200.00

Year Finished Feb. 20, 2010

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan

Phase II, Km 101+500 - Km 102+500

Project Cost 19,298,200.00

Year Finished Feb. 20, 2010

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 1st Eng’g District

Project Title /.Description Construction/Rehabilitation of 2 Storey Building At Batangas

National High School, Batangas City

Project Cost 24,123,500.00

Year Finished June 21, 2010

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Page 44: A_company Profile 2014

Project Title /.Description Construction/Improvement of School Building Facilities at

Batangas Calicanto, Batangas City

Project Cost 14,471,999.00

Year Finished Mar. 23, 2010

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Improvement of Drainage and Other Related Structure at

Manila-Batangas City Road, Batangas City

Project Cost 46,376,365.00

Year Finished June 24, 2010

Project Location Batangas

Name & Address of the

Owner DPWH – Bats. 2nd Eng’g District

Project Title /.Description Construction of Ospital ng Lipa (Phase II), Brgy. Marawoy, Lipa

City

Project Cost 99,648,156.00

Year Finished November 28, 2012

Project Location Brgy. Marawoy, Lipa City, Batangas

Name & Address of the

Owner City Engineer’s Office-Lipa City

Project Title /.Description Concreting of Batangas-Tabangao-LoboRoad, Road

Upgrading (Gravel to Paved) Based on Gravel Road

Strategies Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-Project Analysis) (MFO-2) KO137+006.00 –

KO144+408.00 (Intermittent Sections), Batangas City,

Batangas Province

Project Cost 99,325,912.60

Year Finished November 26, 2012

Project Location Batangas

Name & Address of the

Owner DPWH –Region IV-A, EDSA QC

Page 45: A_company Profile 2014

Title: Construction of Ospital ng Lipa (Phase II),

Location: Brgy. Marawoy, Lipa City

Amount: 99,648,156.00

Date Started: January 10, 2012

Date Completed: November 28, 2012

Page 46: A_company Profile 2014

Title: Concreting of Batangas – Tabangao – Lobo Road, Road

Upgrading (Gravel to Paved) based on Gravel Road

Strategies Traffic Benchmark for upgrading Gravel to

Paved Road Standard (HDM-Project Analysis) (MFO-2)

KO137+006.00 – KO144+408.00 (Intermittent Sections)

Location: Batangas City, Batangas Province

Amount: 99,325912.60

Date Started: March 29, 2012

Date Completed: November 26, 2012

Page 47: A_company Profile 2014

Title: 08DC0013 Repair/Improvement of

Balele Elementary School

Location: Brgy. Balele, Tanauan City, Batangas

Amount: 1,400,000.00

Date Started: April 21, 2008

Date Completed: June 25, 2008

Page 48: A_company Profile 2014

Title: BRH-001 Rehabilitation of Perimeter Fence

Location: Batangas Regional Hospital, Batangas City

Amount: 3,189,311.79

Date Started: December 2007

Date Completed: June 2008

Page 49: A_company Profile 2014

Title: 08DE-0116 Construction of Multi-Purpose Building

Location: Mahacot West, Batangas City

Amount: 3,858,990.20

Date Started: October 22, 2008

Date Completed: Dececember 17, 2008

Page 50: A_company Profile 2014

Title: 08DE-0059 Improvement/Rehabilitation of Road,

Catandala & Dumantay-Mahacot, Batangas City

Location: Batangas City

Amount: 9,648,156.00

Date Started: August 22, 2008

Date Completed: September 15, 2008

Page 51: A_company Profile 2014

Title: 08DB0127 Concreting of Farm to Market Road

Location: Brgy. Gulod, Lemery, Batangas

Amount: 3,820,200.00

Date Started: November 27, 2008

Date Completed: January 5, 2009

Page 52: A_company Profile 2014

Title: 08DE-0276 Improvement/Rehabilitation of Gulod Itaas

Road

Location: Brgy. Gulod, Itaas, Batangas City

Amount: 9,647,900.00

Date Started: December 15, 2008

Date Completed: January 8, 2009

Page 53: A_company Profile 2014

Title: 08DE-0115 Construction of Gulod Labac to Gulod Itaas

Road

Location: Batangas City

Amount: 4,823,992.00

Date Started: October 17, 2008

Date Completed: November 12, 2008

Page 54: A_company Profile 2014

Title: 08DE-0279 Construction of Multi-Purpose Building

Location: Balete Relocation Site, Batangas City

Amount: 4,823,900.2

Date Started: January 2, 2009

Date Completed: February 18, 2009

Page 55: A_company Profile 2014

Title: Rehabilitation/Reconstruction/Improvement of

Batangas – Tabangao – Lobo Road (Intermittent

Section) Pinamucan Simlong Section, (Phase I)

Location: Batangas City

Amount: 9,647,900.00

Date Started: March 8, 2009

Date Completed: April 20, 2009

Page 56: A_company Profile 2014

Title: Construction of Two-Storey 6 Cl RGR Type SB

Location: Banilad E/S, Nasugbu, Batangas

Amount: 8,547,065.75

Date Started: July 14, 2006

Date Completed: February 20, 2007

Page 57: A_company Profile 2014

Title: 08DD-0041 Repair/Maintenance of Revetment at

Lawaye Bridge Malabanoy River

Location: San Juan, Batangas

Amount: 1,499,176.00

Date Started: May 23, 2008

Page 58: A_company Profile 2014

Title: 07DC-0361 Construction of Multi-Purpose Building at

Brgy. Pagaspas, Tanauan, Batangas

Location: Tanauan, Batangas

Amount: 3,855,825.00

Date Started: September 4, 2007

Date Completed: December 10, 2007

Page 59: A_company Profile 2014

Title: 08DE-0274 Improvement/Rehabilitation of Manila –

Batangas Road, Batangas City

Location: Batangas City

Amount: 9,647,900.00

Date Started: December 15, 2008

Date Completed: January 9, 2008

Page 60: A_company Profile 2014

Title: 08DE-0278 Construction of Multi-Purpose Building at Brgy.

Catandala, Batangas City

Location: Batangas City

Amount: 4,823,900.00

Date Started: December 26, 2008

Date Completed: March 18, 2009

Page 61: A_company Profile 2014

Title: 08DD-0099 Construction of Multi-Purpose Building at

Brgy. Gonzales, Tanauan City

Location: Tanauan City, Batangas

Amount: 3,855,825.00

Date Started: April 9, 2007

Date Completed: July 18, 2007

Page 62: A_company Profile 2014

Title: 08DD-0094 Construction of Multi-Purpose Building at

Brgy. Tampoy, San Jose, Batangas

Location: San Jose, Batangas

Amount: 1,109,115.00

Date Started: October 27, 2008

Date Completed: November 10, 2008

Page 63: A_company Profile 2014

Title: 08DD-0093 Construction of Multi-Purpose Building at

Brgy. Tugtog, San Jose, Batangas

Location: San Jose, Batangas

Amount: 1,109,115.00

Date Started: October 27, 2008

Date Completed: November 10, 2008

Page 64: A_company Profile 2014

Title: 08DC-0253 Completion of Multi-Purpose Building at Brgy.

Balas, Talisay, Batangas

Location: Talisay, Batangas

Amount: 1,928,300.00

Date Started: December 22, 2008

Date Completed: February 10, 2009

Page 65: A_company Profile 2014

Title: 09DE0048 – Improvement of Farm to Market Road at San

Pedro & Mahacot East Road

Location: Batangas City

Amount: 9,648,847.00

Date Started: June 06, 2009

Date Completed: June 22, 2009

Page 66: A_company Profile 2014

Title: 09DE0067 – Improvement/Rehabilitation of Batangas –

Lobo Road Km.105-469 to Km 113+360

Location: Batangas City

Amount: 18,090,187.50

Date Started: August 7, 2009

Date Completed: August 20, 2009

Page 67: A_company Profile 2014

Title: 10DE0103 Construction/Rehabilitation of 2 Storey

Building

At Batangas National High School, Batangas City

Location: Batangas National High School, Batangas City

Amount: 24,123,500.00

Date Started: March 9, 2010

Date Completed: June 21, 2010

Page 68: A_company Profile 2014

Title: 10DE-0209: Construction/Improvement of School

Building Facilities

At Batangas Calicanto, Batangas City

Location: Calicanto Elementary School, Batangas City

Amount: 14,471,999.80

Date Started: February 03, 2010

Date Completed: March 23, 2010

Page 69: A_company Profile 2014

Title: 10DE-0104: Improvement of Drainage and Other

Related Structure at

Manila-Batangas City Road, Batangas City

Location: Batangas City

Amount: 46,376,365.00

Date Started: March 25, 2010

Date Completed: June 24, 2010

Page 70: A_company Profile 2014
Page 71: A_company Profile 2014
Page 72: A_company Profile 2014
Page 73: A_company Profile 2014
Page 74: A_company Profile 2014
Page 75: A_company Profile 2014
Page 76: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

LIST OF EQUIPMENT OWNED

Page 77: A_company Profile 2014

LIST OF EQUIPMENT

UNIT TYPE/DESCRIPTION CONDITION

1 unit Hyundai Excavator – ROBEX-220LC9S Good Running

1 unit CAT Excavator – 320D Good Running

1 unit KOMATSU Road Grader – GD405-A Good Running

1 unit KOMATSU Road Grader – GD405-2 Good Running

1 unit CATERPILLAR Vibratory Compactor – CS-533E(10tons) Good Running

1 unit SAKAI Vibratory Compactor – TW-40(4tons) Good Running

1 unit SAKAI Vibratory Compactor – SG-41(4tons) Good Running

1 unit YANMAR Mini Excavator – B37 Good Running

1 unit ISUZU Dump Truck – PC-10 (Plate No. URS-260) Good Running

1 unit FUSO Boom Truck – Fighter (Plate No. RGL-880) Good Running

1 unit IZUSU Mini Dump Truck – Forward (Plate NO. RVK-156) Good Running

1 unit IZUSU Mini Dump Truck – Giga (Plate NO. RKC-365) Good Running

1 unit IZUSU Elf Truck – Dropside (Plate NO. DTR -340) Good Running

1 unit IZUSU Elf Truck – Dropside (Plate NO. XAS -519) Good Running

1 unit Hydraulic Breaker - OKADA Good Running

1 unit HYUNDAI Excavator – ROBEX-2200LC-7S Good Running

1 unit CAT Bulldozer – D6-C Good Running

1 unit SAKAI Vibratory Compactor- SG-25(2.5tons) Good Running

1 unit Air Compressor – 175 CFM Good Running

1 unit Welding Machine – MILLER 500A Good Running

1 unit Welding Machine – YAMATO 300A Good Running

1 unit Speed Cutter BOSCH Good Running

2 units Concrete Vibrator Good Running

4 units Concrete Cutter Good Running

7 units 1 Bagger Concrete Mixer Good Running

4 units Water Pump Good Running

4 units Bar Cutter Good Running

4 units Concrete Screeder Good Running

2 units Electric Jackhammer Good Running

1 Lot Carpentry Tools Good Running

1 Lot Steel Scaffolding Good Running

Page 78: A_company Profile 2014

Specifications

Brand Name: Hyundai

Model Number: Robex 220LC-9S

Condition: Good Running Condition

Bucket capacity: 1.44m3

Machine Weight: 22,515 lbs

Moving Type: Crawler Excavator

Maximum Digging Height: 9,780 lbs

Max Digging Radius: 20' 11"

Operating Weight: 22,515 lbs

Maximum Digging Depth: 21' 6"

Cummins B5.9 - C water cooled, 4 cycle Diesel, 6-cylinders in line, direct

injection,

turbocharged, charger air cooled.

Hydraulic system - Variable displacement tandem axis piston pumps.

Two speed axial piston motor with brake valve and parking brake

Drives & brakes - Fully hydrostatic type

Swing System - Fixed displacement axial piston motor

Fuel tank 400 liter

X-leg type

Page 79: A_company Profile 2014

Specifications

Make: CATERPILLAR

Model: 320D

Year: 2011

Category : Track Mounted

Bucket Capacity: 1 m3

Bucket Width: 1,150 mm

Dig Depth: 6,640mm

Reach at Ground Level: 9,780mm

Dump Height: 6,570mm

Bucket Breakout: 13,358kgf

Engine Make-Model: Cat C6.4 ACERT

Net Engine Power SAE Rated: 103kW

Engine Displacement: 6.4lt

Number of Cylinders: 6

Pump Types : Variable displacement axial piston pump

Relief Valve Pressure Main Pumps: 350bar

Operating Weight: 21.5MT

DimensionsTransport Length: 9,440mm

Transport Height: 3,440mm

Width: 3,180 mm

Track Length: 3,650mm

Speed: 5.5kph

Gradeability: 70%

Page 80: A_company Profile 2014

Specifications

Engine Make: Komatsu

Model: 6D105

Net Power Gear 5-6: 110 hp; 82 kw

Max Power: 110 hp; 82 kw

Net Torque Gears 5-6: 282 lb ft; 382.3 Nm

Displacement: 396 cu in; 6.5 L

Operational Std Operation Weight - Front Axle: 5621.8 lb; 2550 kg

Std Operation Weight - Rear Axle: 13955.3 lb; 6330 kg

Std Operation Weight – Total: 19577.1 lb; 8880 kg

Tire Size

front 9.00-20-10PR,

rear 11.00-20-10PR

Transmission Type: hydroshift

Number of Gears – Forward 6

Number of Gears – Reverse 6

Max Speed – Forward: 26.1 mph; 42 km/h

Max Speed – Reverse: 28 mph; 45 km/h

Steering Articulation L/R: 27 degrees

Turning Radius: 18.4 ft in; 5.6 m

Front Axle Wheel Lean: 22 degrees

Oscillation – Total: 26 degrees

Ground Clearance: 1.4 ft in; 435 mm

Moldboard Width: 10.2 ft in; 3100 mm

Moldboard Height: 24.6 in; 625 mm

Moldboard Thickness: 0.75 in; 19 mm

Max Depth of Cut: 17.3 in; 440 mm

Circle Max Reach Outside Tires – Left: 53.9 in; 1370 mm

Max Reach Outside Tires – Right: 55.9 in; 1420 mm

Max Lift Above Ground: 14.2 in; 360 mm

Dimensions:

Height to Top of Cab: 10.9 ft in; 3315 mm

Overall Length: 23 ft in; 7025 mm

Width Over Tires: 7.1 ft in; 2165 mm

Wheelbase: 16.1 ft in; 4900 mm

Blade Base: 6.9 ft in; 2100 mm

Tandem Axle Wheelbase: 4.3 ft in; 1305 mm

Rear Ground Clearance: 0.98 ft in; 300 mm

Front Ground Clearance: 1.4 ft in; 435 mm

Page 81: A_company Profile 2014

Specifications

Title: 1997 KOMATSU GD405-2

Make: KOMATSU

Category: Articulated

Net Engine Power: 115KW

Operating Weight: 10,250Kg

Page 82: A_company Profile 2014

Specifications

Engine Model: Caterpillar 3054C

Gross Power: 130 hp (97 kW)

Net Power (ISO 9249): 125 hp (93 kW)

Net Power (SAE J1349): 124 hp (92 kW)

Net Power (EEC 80/1269): 125 hp (93 kW)

Bore: 4.13 inches (105 mm)

Stroke: 5 inches (127 mm)

Dimensions

Overall Length: 217 inches (5510 mm)

Overall Width: 90 inches (2290 mm)

Page 83: A_company Profile 2014

Specifications

YEAR : 1986/87,

WEIGHT: 3.5 TON,

ENGINE: ISUZU ENGINE

Page 84: A_company Profile 2014

Specifications

SAKAI COMPACTION ROLLER

MADE IN 1990

MADE IN Japan

Page 85: A_company Profile 2014

Specifications

The B37 Mini Excavator comes with a three-cylinder, 27 horsepower

(approximate) Yanmar diesel engine. It has a two-speed transmission

and weighs roughly 7,500 pounds. Different models come with either 15-

inch rubber or steel tracks.

Yanmar B37 Mini Excavators come with a 60-inch backfill blade and an

adjustable 40/90 boom swing with a 21-tooth bucket. It has an

approximate digging depth of 10 to 13 feet.

Pilot and Controls

The Yanmar B37 comes with canopy or cab; cabs can be heated. The

pilot operates the mini excavator with joystick controls.

Page 86: A_company Profile 2014

Specifications

Brand Name:

Isuzu Elf Dropside

Type: Trucks

Year: 1996

Made In: Japan

Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu

Elf Drop Side (4 wheeler 10 ft.)

Page 87: A_company Profile 2014

Specifications

Brand Name: Isuzu Elf Dropside

Type: Trucks

Year: 1996

Made In: Japan

Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu

Elf Drop Side (4 wheeler 10 ft.)

Page 88: A_company Profile 2014

Specification

Gross Power: 26 kW

Max Speed: 7.5 mph

Weight: 2579 kg

Wheelbase: 1737 mm

Working Width: 1199 mm

Page 89: A_company Profile 2014

Specification

Isuzu Forward Dump Truck 6-Wheeler

Brand: Isuzu

Model: Forward

Year: 2000

Body Type: Dump Truck

Transmission: Manual

Page 90: A_company Profile 2014

Specification

ENGINE

The 6M60-3AT1 and 3AT2 features intercooler turbo, common rail fuel

injection, cooled EGR and oxidation catalyst, superior fuel economy,

enhanced torque, reduced engine noise and exceeds EPA04 emission

standards.

BRAKING POWER

Most of the new Fighter series comes equipped with full air brakes. Anti-

lock brakes (ABS) are standard on all models.

EASY SHIFTING

The Fighter comes with a 6-speed manual transmission or a 9-speed

manual transmission that deliver better performance while realising fuel

savings.

AIR SUSPENSION

All 6X2 and selected 4X2 and 6X4 Fighters feature air suspension on the rear

axle.

Page 91: A_company Profile 2014

Specification

CAT Bulldozer D6-C

The Caterpillar D6 uses a six-cylinder engine. The required fuel is diesel.

The piston displacement measures 638 cubic inches, and the engine

has a rated rpm of 1,800. Earlier models had an engine drawbar rating

of 63 horsepower and a belt rating of 78 horsepower; the total drawbar

pull originally was 16,674 lbs. By 1955, the drawbar power had been

increased to 73 horsepower and the belt to 93 horsepower; the

drawbar pull also increased to 17,486.

Dimensions

Caterpillar's D6 has a length of 184 inches, a width of 96 inches and a

height of 105 inches. The gross weight of the machine measures 33,000

lbs. The company equipped the D6 with front and rear tracks that

measure either 60 or 74 inches. The fuel tank has a maximum capacity

of 65 gallons.

Page 92: A_company Profile 2014

Specification

HYUNDAI EXCAVATOR

MODEL : ROBEX 2200LC-7S

BUCKETCAPACITY: 0.92M3

WEIGHT : 21.5 TON

ENGINE : CUMMINS-B5.9-C (145PS / 1950RPM)

LENGTH : 9520

WIDTH : 2990

HEIGHT : 2990

MANUFACTURED : 2008

BREAKER LIND QUICK CLAMP INSTALLED

Page 93: A_company Profile 2014

Yamato Welding Machine 300A

Miller Welding Machine 500A

Page 94: A_company Profile 2014

Air Compressor 175CFM

Page 95: A_company Profile 2014

Specification

Isuzu Dump Truck 10-Wheeler PC-10

Brand: Isuzu

Year: 2010

Fuel: Diesel

Body Type: Dump Truck

Transmission: Manual

Page 96: A_company Profile 2014

Specification

Brand: Isuzu

Model: Giga

Year: 1996

Fuel: Diesel

Body Type: Mini Dump Truck

Transmission: Manual

Page 97: A_company Profile 2014

4UNITS- CONCRETE CUTTERS

Page 98: A_company Profile 2014

7-UNITS – 1 BAGGER CONCRETE MIXER

Page 99: A_company Profile 2014

Specification

OKADA HYDRAULIC BREAKER

WORKING PRESSURE: 14-18 MPa

OIL FLOW CONSUMPTION: 120-160L/MIN

FREQUENCY: 465-625 BPM

OPERATING WEIGHT

(STANDARD/SILENT): 1640/1505 KG

OVERALL LENGTH W/O BRAKET: 2205 MM

WORKING STEEL DIAMETER: 125 MM

CARRIER MACHINE WEIGHT RANGE:

WEIGHT: 14-26 TON

RATE FLOW: 140-230L/MIN

Page 100: A_company Profile 2014

BOSCH SPEED CUTTER

Page 101: A_company Profile 2014

4 – UNITS CONCRETE SCREEDER

2 - UNITS CONCRETE VIBRATOR

4-UNITS WATER PUMPS

4 – UNITS BAR CUTTER

2 UNITS ELECTRIC JACKHAMMER

1-LOT CARPENTRY TOOLS

1-LOT STEEL SCAFFOLDING

Page 102: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

BUSINESS OFFICE

Page 103: A_company Profile 2014
Page 104: A_company Profile 2014
Page 105: A_company Profile 2014
Page 106: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

FINANCIAL STATEMENT

Page 107: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

VALUE ADDED TAX REGISTRATION and TAX CLEARANCE

Page 108: A_company Profile 2014
Page 109: A_company Profile 2014
Page 110: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

GOVERNMENT AFFILIATION DOLE

PhilGEPS

SAFETY CERTIFICATES

Page 111: A_company Profile 2014
Page 112: A_company Profile 2014
Page 113: A_company Profile 2014

IRMINA C. BLANCO

Page 114: A_company Profile 2014
Page 115: A_company Profile 2014
Page 116: A_company Profile 2014
Page 117: A_company Profile 2014
Page 118: A_company Profile 2014
Page 119: A_company Profile 2014

JASMIG CONSTRUCTION SUPPLY

OFFICE MAP

Page 120: A_company Profile 2014