Upload
james-escol
View
436
Download
29
Tags:
Embed Size (px)
DESCRIPTION
Jasmig. For reference purposes.
Citation preview
COMPANY
PROFILE
JASMIG CONSTRUCTION
SUPPLY
JASMIG CONSTRUCTION SUPPLY
JASMIG CONSTRUCTION SUPPLY is a Filipino – owned company duly
registered by the Department of Trade and Industry and with the Philippine
Contractors Accreditation Board. A company built to accommodate the
increasing demand of our country to a competent and expert
professionals all quite respected in their own fields and have proven
attributes of professionalism, experience and expertise.
JASMIG CONSTRUCTION SUPPLY has the capability to undertake any
project phase, from initial planning, design, estimates, documentation,
project management, construction for any infrastructure project. Hence,
the company does not only engage with construction but as well as supply
of permanent construction materials, rentals of heavy equipment and all
matters regarding construction.
JASMIG CONSTRUCTION SUPPLY
CERTIFICATE OF REGISTRATION
JASMIG CONSTRUCTION SUPPLY
CONTRACTOR’S LICENSE
JASMIG CONSTRUCTION SUPPLY
MAYOR’S PERMIT
JASMIG CONSTRUCTION SUPPLY
ORGANIZATIONAL CHART (Engineering & Construction Division)
JASMIG CONSTRUCTION SUPPLY
RESUMES
PERSONAL DATA
JANE CASAS BERBERABE Entrepreneur, Licensed Pharmacist
HOME ADDRESS : 9007 BK National Highway,
Brgy. Alangilan, Batangas City, Philippines
OFFICE ADDRESS : 9007 BK National Highway,
Brgy. Alangilan, Batangas City, Philippines
TELEPHONE NUMBER : (+6343) 722-0416
+63925-387-6348
E-MAIL ADDRESS : [email protected]
CIVIL STATUS : Divorced
NATIONALITY : Filipino
BIRTH DAY : August 27, 1967
SEX : Female
EDUCATION:
Tertiary : University of Sto. Tomas, Manila
Bachelor of Science in Pharmacy
March 1988
Secondary : Saint Bridget College
March 1984
Primary : Saint Bridget College
March 1980
PRESENT WORK : Proprietress
Jasmig Construction Supply /
Jasmig Construction Corporation
from 1998 to present
PROJECTS UNDERGONE : Refer to Contractor’s Registration Certificate
(CRC)
AFFILIATION : Member
Provincial Unified Builders of Batangas
R E S U M E
PERSONAL DATA:
Name: Frando L. Pulmano
Home Address: San Isidro, Batangas City
Position: Purchasing Engineer Supervisor / Project Engineer
Date of Birth: October 05, 1963
Place of Birth: Quezon City
Civil Status: Married
Sex: Male
Nationality: Filipino
Dialect Spoken: English / Filipino
Religion: Catholic
Weight: 120 lb s
Height: 5’6”
Father’s Name: Lucas A. Pulmano
Mother’s Name: Leonor L. Pulmano
EDUCATIONAL BACKGROUND
College: BS Civil Engineering
Graduated, March 1985
Cebu Institute of Technology
Cebu City
LICENSURE EXAMINATION:
Civil Engineering Board Examination
November 1985, FEU Girls High
License No.: 0047964
SPECIAL SKILLS AND INTEREST
Computer literate, knowledge to operate softwares such as
MSexcels, MSWord, Powerpoint (for all windows)
WORK EXPERIENCES:
Period Company Craft Name of Project
Jan 1999 - Present Jasmig
Construction
Supply
Purchasing
Supervisor /
Project Engineer
Government Projects
Oct 1998 – Jan 1999 EEI Corporation
Construction
Division
Purchasing
Supervisor
Engineer
JG Summit
Petrochemical Plant,
Electro-Mech,
Simlong, Batangas
City
Aug 1997 - Sept
1998
EEI Corporation
Construction
Division
Purchasing
Supervisor
Engineer
GOTO-Semi
Conductor Plant,
Electro- Mech
Carmelray,
Canlubang, Laguna
Jun 1996 – Jul 1997 EEI Corporation
Construction
Division
Buyer II Philips Semi-
Conductor
Mechanical Piping
Lispi, Cabuyao,
Laguna
Feb 1994 – Apr 1996 EEI Corporation
Construction
Division
Buyer II Assigned at Main
Office
Oct 1993 – Feb 1994 EEI Corporation
Construction
Division
Buyer I Pilipinas Shell Refinery
(Star Project) Electo-
Mech &
Instrucmentation,
Tabangao, Batangas
City
WORK DESCRIPTION:
o Review bill of materials (permanent materials) including consumable
materials such as cutting disc, welding rod in accordance to
specification for the preparation of purchase order after sourcing
from three of more suppliers regarding the availability and amount
of the said materials.
o Approved quotation with the lowest price from three suppliers and
award purchased order to the supplier which has the lowest prices.
o Review work scheduling (PERT-CPM) in order to procure in advance
the material needed for the said work activity.
o Prepare RFI (request for Information) for the submittal of material
sample, brochure and technical specification to customer for
approval.
o Prepare three quotations for the approved material thru inquiry from
three suppliers.
o Prepare evaluation of material to be purchased for approval by
project manager.
o Encoding of all information including description of materials
quantity, unit price and total amount of the said approved purchase
order and fed to computer.
o After inquiry and find out that the material needed was nowhere to
be founding the Philippine Market, we prepare formal inquiry from
supplier abroad with complete drawing & specification and sent thru
fax or to courier.
o Give instruction to buyers if the supplier with the lowest prices has the
complete quantity requirements, if not proceed to second supplier
with available material.
o Signing of purchase order to be awarded to supplier with lowest
price and with available material.
o Coordination to warehouse personnel if the material needed is
available to their office. If not make inquiry to three suppliers for the
availability of the said material.
o Arrange meeting with warehouse supervisor, material control
supervisor and field supervisor pertaining to imported and local
materials that will going to use as permanent materials for the said
project and discuss exactly the time of arrival at site and availability
of the said material to avoid delays resulting to poor progress.
I do hereby certify that the above information is true and correct in the
best of my knowledge and belief.
SGD. FRANDO L. PULMANO
Applicant
R E S U M E
PERSONAL DATA:
Name: Rodolfo H. Dimaandal
Home Address: Sta. Teresita, Batangas
Position: General Foreman
Date of Birth: September 19, 1960
Place of Birth: Batangas City
Civil Status: Married
Sex: Male
Nationality: Filipino
Dialect Spoken: English / Filipino
Experience Name of Company: Jasmig Construction Supply
Year: 1998 up to Present
Project Title Refer to Company’s Experience
IRMINA B. DE VILLA REGISTERED CIVIL ENGINEER
License No. 0100643
Libra St., Madonna Homes, Alangilan, Batangas City
Mobile No.: +639164280239 / E-mail Address: [email protected]
OBJECTIVE
To work in a company that will further enhance and develop my
knowledge, ability and skills in the field of engineering and construction.
QUALIFICATIONS
Computer literate [AutoCAD; Microsoft applications (Word, Excel,
Power Point)]
Have excellent communication skills (oral and written)
Highly trainable, fast learner and have ability to stand pressure
BWC-DOLE Certified Safety Officer (Certificate No. 40-01-0655-06)
EXAMINATION TAKEN AND PASSED
Registered Civil Engineer Licensure Examination
Manila
November 2004
MEMBERSHIP / PROFESSIONAL AFFILIATION
Philippine Institute of Civil Engineers, Inc.
Batangas Chapter
WORK EXPERIENCE
Project Engineer
Jasmig Construction Supply
Kumintang Ibaba, Batangas City
October 2008 – up to Present
Duties and Responsibilities:
• Coordinates and checks of engineering deliverables
• Monthly project status reports and change orders
Responsible for planning, scheduling, conducting and coordinating
the technical and management aspects of projects
• Accountable for the successful completion of engineering projects
• Requires extensive regular contact with assigned project Clients
• Assist in the preparation of engineering project proposals
• Budget monitoring and trend tracking
• Participating in Client/contractor meetings and resolving
Client/engineering and management project issues
Review and approve project Client invoices
• Ensure effective engineering and Client communications
Ensuring a project is fit-for-purpose and adheres to the project
budget and schedule
Ensuring all relevant safety objectives and legal requirements are
observed
Accounting for engineering tasks to ensure they meet contract
requirements
Developing project-specific procedures for the work to be carried
out
Interpreting clients' requirements, identifying and addressing design
parameters and engineering problems and ensuring solutions are
implemented
Ensuring all justifications for contractual variations during projects are
maintained to support subsequent commercial claims
Evaluating, organizing and prioritizing work within the overall project
schedule
Liaising and managing third party contractors to ensure all
equipment is fit for purpose
Taking responsibility for a team of engineers and training/mentoring
junior engineers
Keeps good communication with other Engineers
Piping Engineer
Atlantic, Gulf & Pacific Company of Manila - New Caledonia
(Inco Goro Nickel Mining Plant Project)
August 2008 – October 2008
Duties and Responsibilities:
Prepares and keeps records of test packages
Checks completeness of pipelines on P&IDs under each subsystems
before turnover to clients
HSE Engineer
Atlantic, Gulf &Pacific Company of Manila - New Caledonia
(Inco Goro Nickel Mining Plant Project)
July 2007 – August 2008
Duties and Responsibilities:
Orients newly mobilized manpower on the safety, health and
environmental rules of the project
Conducts daily prestart safety meeting and weekly toolbox meeting
with the workers and superiors
Conducts daily safety inspection of working area, workers’ situations
and job descriptions and randomly reminds workers on the safety
precautions that must be done before or as they do their respective
work
Gives alternative solutions on how to do their work safely
Conducts safety audits on the working area
Conducts routinely inspection of tools and equipment
Coordinates with clients and other constructors’ safety engineers
and workers to have a harmonious work place
Prepares daily safety reports and minutes of the Weekly Safety
coordination meeting and monthly Company Safety meeting
Office & Site Engineer
Jasmig Construction Supply
Kumintang Ibaba, Batangas City
June 2005 – July 2007
Duties and Responsibilities:
In charge in the preparation and submission of bid documents
- Prepares the Technical Documents / Eligibility documents to
bid
- Prepares the Financial Documents such as detailed estimates
and bar charts for bidding
Supervises the implementation / construction of the awarded
government & non-government projects
Conducts daily site inspection and prepares progress report
Checks if the activity meets the standard, time and cost as per
plan which includes materials, labor and equipment
Safety Engineer
Jasmig Construction Supply
Kumintang Ibaba, Batangas City
June 2005 – July 2007
Duties and Responsibilities:
Responsible for the safety and welfare of the workers
Conducts toolbox meetings
Prepares daily safety records and monthly safety reports
Conducts safety site inspection
Inspects the tools and equipment to be used in the project
TRAINING EXPERIENCE
Assistant Engineer
City Engineer’s Office
Batangas City
November 2004-May 2005
Duties and Responsibilities:
Assist the engineer-in-charge in surveying and inspection for the
construction / repair of projects to be bidded
Assist the engineer-in-charge in the preparations of program of
works, bill of materials, cost estimates and specification of the
proposed infrastructure projects
Drafts plans of the proposed vertical / horizontal infrastructure
projects
Trainee
Mar Castillo Contractor and Construction Supply
San Juan, Mabini, Batangas
June 2003-October 2003
Duties and Responsibilities:
Estimate and design of simple structures:
o Residential building, roads, breakwater
Supervise field works
Issue receipts for the orders of construction materials
Checking of available construction materials
EDUCATIONAL BACKGROUND
Short Courses: Auto-Cad Operator Course (109 Hours)
University of Batangas
Hilltop, Batangas City
August 30, 2013
Primavera 6.0
CIMS Technology
Makati
2009
College: Bachelor of Science in Civil Engineering
Batangas State University
Alangilan, Batangas City
March 31, 2004
Secondary: Batangas National High School
Rizal Avenue, Batangas City
March 26, 1999
Primary: Banaba East Elementary School
Banaba East Batangas City
March 24, 1995
SEMINARS ATTENDED
Consultation CUM Organizational Meeting of Safety Practitioners
Bureau of Working Conditions, Department of Labor and Employment
WODP Training Center, Batangas City
March 23, 2007
Basic Occupational Safety and Health
Bureau of Working Conditions, Department of Labor and Employment
WODP Training Center, Batangas City
July 28, 2006
Strengthening the Competitiveness of CALABARZON’s
PS Licensees to Ensure Consumer Safety & Protection
PhilSAAC First General Membership Forum
CEAT-EE Auditorium,
UPLB, Los Baños, Laguna,
October 20, 2005
Future Civil Engineers Facing the Challenges of the 21st Century
3rd REGIONAL STUDENTS’ CONFERENCE
Amphitheater, CEAFA Building, Batangas State University,
Alangilan, Batangas City
October 16 to 17, 2003
Theory and Practice of Pre-stressed Concrete
Multi-Media Center, University of Batangas
Hilltop, Batangas City
October 10, 2003
Strengthening Knowledge in the Civil Engineering Discipline towards Global
Competitiveness
2002 PICE REGION IV STUDENTS’ CONFERENCE
Divine Word College of Calapan
Calapan City, Orriental, Mindoro
October 18 to 19, 2002
Civil Engineering and Its Varied Profession
Amphitheater, CEAFA Building, Batangas State University,
Alangilan, Batangas City
September 27, 2002
PERSONAL DATA
Date of Birth : October 07, 1982
Place of Birth : Banaba East, Batangas City
Sex : Female
Status : Married
Religion : Roman Catholic
Height : 5' 1"
Weight : 68 kgs.
PERSON TO CONTACT IN CASE OF EMERGENCY:
MR. NESTOR A. DE VILLA
Libra St., Madonna Homes, Alangilan, Batangas City
+639268466413
CHARACTER REFERENCES
Jane C. Berberabe
Owner / President
Jasmig Construction Supply
Kumintang Ibaba, Batangas City
(043) 722 0416
Sonia D. Paglicauan
OIC- Construction Section
Department of Public Works and Highways
Batangas Second District Engineering Office
Batangas City
(043) 723 9791
Victoria G. Caibigan
Engineer II
DPWH – Batangas Second District Engineering Office
Batangas City, Philippines
(+6343) 4025900
I hereby certify that the above information is true and correct to the best of
my knowledge and belief.
SGD. IRMINA B. DE VILLA
JASMIG CONSTRUCTION SUPPLY
LIST OF COMPLETED PROJECTS
LIST OF CONSTRUCTION PROJECTS COMPLETED
Project Title/Description One storey Residential Building
Project Cost P 850,000.00
Year Finished 1995
Project Location Pulo, San Carlos, Rosario, Batangas
Name & Address of the
Owner
Mr. & Mrs. Monico Panganiban
Project Title/Description One Storey Residential Building
Project Cost P 600,000.00
Year Finished 1997
Project Location Baybayin, Rosario, Batangas
Name & Address of the
Owner
Mr. & Mrs. Cesar Agbay
Project Title/Description Const. of Multi-Purpose Gym
Project Cost P 7,000,000.00
Year Finished 1995
Project Location Capitol Site, Batangas City
Name & Address of the
Owner
PEO-Batangas
Project Title/Description PBMIT Gymnasium Repair (Sub-Con)
Project Cost P 3,474,900.00
Year Finished 1996
Project Location Rizal Avenue, Extension, Batangas City
Name & Address of the
Owner
PBMIT-Batangas City
Project Title/Description Calaca, Gymnasium (Sub-Con)
Project Cost P 2,0000,000.00
Year Fionished 1997
Project Location Calaca, Batangas
Name & Address of the
Owner
Municipality of Calaca
Project Title/Description Two Storey Residential Building
Project Cost P 900,000.00
Year Finished 1996
Project Location Matabungkay, Lian, Batangas
Name & Address of the
Owner
Mr. & Mrs. Robert Schalamon
Project Title/Description Construction of Two Storey Building
Project Cost P 2,500,000.00
Year Finished 1997
Project Location BNHS Batangas City
Name & Address of the
Owner
DPWH-1st Engineering Batangas City
Project Title/Description Concreting of Paraiso-Luya Road
Project Cost P 1,500,000.00
Year Finished 1999
Project Location Calatagan, Batangas
Name & Address of the
Owner
DPWH-Batangas 1st Engineering
Project Title/Description Concreting of Lucsuhin-Biga Road
Project Cost P 500,000.00
Year Finished 1999
Project Location Calatagan Batangas
Name & Address of the
Owner
DPWH-Batangas 1st Engineering
Project Title/Description Concreting of Sta. Ana-Bagong Silang Road
Project Cost P 1,000,000.00
Year Finished 1999
Poject Location Calatagan Batangas
Name & Address of the
Owner
DPWH-Batangas 1st Engineering
Project Title/Description Construction of Two Classroom
Project Cost P 645,000.00
Year Finished 2000
Project Location Bolbok Elementary School
Name & Address of the
Owner
DPWH-Batangas 1st Engineering
Project Title/Description Construction of CHB Lined Canal
Project Cost P 2,000,000.00
Year Finished 2000
Project Location Along Talisay-Agoncillo Road @ Tanauan Batangas
Name & Address of the
Owner
DPWH- Tanauan Batangas
Project Title/Description Improvement of Old Sangguniang Building
Project Cost P 1,105,000.00
Year Finished 2000
Project Location Batangas City
Name & Address of the
Owner
City Engineer’s Office
Project Title/Description Construction of Open Canal Project Cost P 300,000.00
Year Finished 2000
Project Location Danglayan, San Pascual Batangas
Name & Address of the
Owner
DPWH- Batangas Sub-District
Project Title/Description Construction of Lined Canal
Project Cost P 500,000.00
Year Finished 2000
Project Location Publacion 1, San Luis Batangas
Name & Address of the
Owner
DPWH-Batangas Sub District
Project Title/.Description Construction Of Tritran Terminal (Sub-Con)
Project Cost P 3,000,000.00
Year Finished 2000
Project Location Calicanto Batangas
Name & Address of the
Owner
Geroleo Balmes / Batangas City
Project Title/Description Construction of Extension of Line Canal
Project Cost P 350,000.00
Year Finished 2001
Project Location Brgy Aplaya, Bauan Batangas
Name & Address of the
Owner
PEO-Batangas
Project Title/Description Concreting of Brgy Road
Project Cost P 1,000,000.00
Year Finished 2000
Project Location Brgy Bulihan, Rosario Batangas
Name & Address of the
Owner
PEO-Batangas
Project Title/Description Package: a) Proposed Widening of Poblacion 6 Road,
Cuenca; b) Concreting of Road @ Sitio Kanluran , Brgy.
Mahabang Dahilig, Batangas City
Project Cost P 204, 495.00
Year Finished 2001
Project Location A) Cuenca, Batangas B) Mahabang Dahilig, Batangas City
Name and Address Of the
Owner
PEO – Batangas
Project Title/.Description Concreting of Brgy. Road @ Boot
Project Cost P 323,000.00
Year Finished 2001
Project Location Tanauan City, Batangas
Name & Address of the
Owner
PEO - Batangas
Project Title/.Description Construction of Open Classroom Building @ Santor
Elementary School
Project Cost P 490,000.00
Year Finished 2001
Project Location Tanauan City, Batangas
Name N& Address of the
Owner
PEO - Batangas
Project Title/Description Repair/Maintenance of Open Canal & Cross Drain @
Batangas-Lobo Road, San Jose Sico Section
Project Cost P 300,000.00
Year Finished 2001
Project Location San Jose – Sico, Batangas City
Name and Address Of the
Owner
DPWH – Sub-District
Project Title/.Description Construction of Prenza Lateral Canal
Project Cost P 247,000.00
Year Finished 2001
Project Location Lian, Batangas
Name & Address of the
Owner
DPWH – 1st District
Project Title/.Description Concreting of Manila – Batangas Pier Road
Project Cost P 760,000.00
Year Finished 2001
Project Location Batangas City
Name & Address of the
Owner DPWH –Sub District
Project Title/Description Construction of Two Storey (4 CL) Bldg. @ San Pascual NH/S,
San Pascual, Batangas
Project Cost 1,850,000.00
Year Finished 2002
Project Location San Pascual, Batangas
Name and Address Of the
Owner
Provincial Engineer’s Office
Project Title/.Description Construction of Rehabilitation Center, Kumintang Ibaba,
Batangas City
Project Cost 994,000.00
Year Finished 2002
Project Location Batangas City
Name & Address of the
Owner
Provincial Engineer’s Office
Project Title/.Description Concreting of Road @ Brgy. Mataywanak
Project Cost 500,000.00
Year Finished 2002
Project Location Tuy, Batangas
Name & Address of the
Owner DPWH – 1st District
Project Title/Description Concreting of Brgy. Road @ Acke-Tuyon-Tuyon
Project Cost 100,000.00
Year Finished 2002
Project Location Tuy, Batangas
Name and Address Of the
Owner
DPWH – 1st District
Project Title/.Description Concreting of Road @ Brgy. Dao
Project Cost 400,000.00
Year Finished 2002
Project Location Tuy, Batangas
Name & Address of the
Owner
DPWH – 1st District
Project Title/.Description Construction of Open Line Canal @ Brgy. Caysasay
Project Cost 300,000.00
Year Finished 2002
Project Location Taal, Batangas
Name & Address of the
Owner DPWH – 1st District
Project Title/.Description Concreting of Brgy. Road @ Humayingan
Project Cost 500,000.00
Year Finished 2002
Project Location Lian, Batangas
Name & Address of the
Owner DPWH – 1st District
Project Title/.Description Rehabilitation of Alupay E/S
Project Cost 380,000.00
Year Finished 2002
Project Location Rosario, Batangas
Name & Address of the
Owner PEO - Batangas City
Project Title/.Description Construction of One Classroom Building @ Kaingin E/S
Project Cost P 440,000.00
Year Finished June 2003
Project Location San Pascual, Batangas
Name & Address of the
Owner Municipality of San Pascual
Project Title/.Description Construction of Flood Control @ Matinggain I
Project Cost 300,000.00
Year Finished August 2003
Project Location Lemery, Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Construction of Canopy for Ground Floor @ Multi-Purpose
Covered Court, Provincial Sports Complex
Project Cost 2,800,000.00
Year Finished August 2003
Project Location Bolbok, Batangas City
Name & Address of the
Owner Provincial Engineer’s Office, Batangas City
Project Title/Description Improvement of Road @ Brgy. Bukal
Project Cost P 400,000.00
Date Finished September 2003
Project Location Padre Garcia, Batangas
Name & Address of the
Owner
DPWH – Bats. Sub Eng’g District
Project Title/Description Construction of MPB @ Tanauan School of Fisheries
Project Cost P 500,000.00
Date Finished December 2003
Project Location Ambulong, Tanauan City
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of MPH @ Bulihan
Project Cost P 300,000.00
Date Finished October 2003
Project Location Nasugbu, Batangas
Name & Address of the
Owner
DPWH – Bats. 1st Eng’g District
Project Title/Description Construction of Flood Control @ Wawa Ibaba
Project Cost P 200,000.00
Date Finished October 2003
Project Location Lemery, Batangas
Project Title/Description Construction of Flood Control @ Wawa Ibaba
Project Title/Description Construction of MPH @ Niugan
Project Cost P 200,000.00
Date Finished October 2003
Project Location Taal, Batangas
Name & Address of the
Owner
DPWH – Bats. 1st Eng’g District
Project Title/Description Construction of Multi-Purpose Structure/Bldg. @ Dacanlao
Project Cost P 500,000.00
Date Finished November 2003
Project Location Calaca, Batangas
Name & Address of the
Owner
DPWH – Bats. 1st Eng’g District
Project Title/Description Construction of Hanging Bridge @ Libato
Project Cost P 800,000.00
Date Completed October 2003
Project Location San Juan, Batangas
Name & Address of the
Owner
Provincial Engineer’s Office, Batangas City
Project Title/Description Concreting of Road @ Wawa
Project Cost P 500,000.00
Date Finished December 2003
Project Location Batangas City
Name & Address of the
Owner
Provincial Engineer’s Office, Batangas City
Project Title/Description Concreting of FMR @ Apacay
Project Cost P 500,000.00
Date Finished September 2003
Project Location Taal, Batangas
Name & Address of the
Owner
DPWH – Batangas 1st Engineering District
Project Title/Description Concreting of FMR @ Zone 14
Project Cost P 500,000.00
Date Finished December 2003
Project Location Taal, Batangas
Name & Address of the
Owner
DPWH – Batangas 1st Engineering District
Project Title/Description Concreting of Road @ the Municipality of Cuenca
Project Cost P 500,000.00
Date Finished February 2004
Project Location Cuenca, Batangas
Name & Address of the
Owner
DPWH – Batangas 3rd Engineering District
Project Title/Description Construction of Open Canal @ Manuel Quezon St.,
Poblacion 2
Project Cost P 500,000.00
Date Finished February 2004
Project Location Laurel, Batangas
Name & Address of the
Owner
DPWH – Batangas 3rd Engineering District
Project Title/Description Concreting of Various Barangay Roads
Project Cost P 2,000,000.00
Date Finished May 2004
Project Location Municipality of San Luis
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Construction of MPB (League of Municipalities of Batangas
Hall)
Project Cost P 5,000,000.00
Date Finished August 2004
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Concreting of Road @ Brgy. Sta. Monica to Brgy.
Balagtasin
Project Cost P 1,000,000.00
Date Started August 2004
Project Location San Luis, Batangas
Name & Address of the Owner DPWH-Bats 2nd Engineering District
Project Title/Description Concreting of Road @ Brgy. Alagao to Brgy. San Vicente
Project Cost P 1,000,000.00
Date Started August 2004
Project Location Bauan, Batangas
Name & Address of the Owner DPWH-Bats 2nd Engineering District
Project Title/Description Construction of MPB, Brgy. Sinisian
Project Cost P 500,000.00
Date Finished October 2004
Project Location Calaca, Batangas
Name & Address of the Owner DPWH – Bats. 1st Eng’g District
Project Title/Description Concreting of FMR, Brgy. Cogonan
Project Cost P 500,000.00
Date Finished October 2004
Project Location Nasugbu, Batangas
Name & Address of the Owner DPWH – Bats. 1st Eng’g District
Project Title/Description Construction of MP Building / Structure at Aga
Project Cost P 500,000.00
Date Finished November 2004
Project Location Nasugbu, Batangas
Name & Address of the Owner DPWH – Bats. 1st Eng’g District
Project Title/Description Construction of MPB, Brgy. Gonzales
Project Cost P 4,000,000.00
Date Finished July 18, 2007
Project Location Tanauan City, Batangas
Name & Address of the Owner DPWH – Bats. 3rd Eng’g District
Project Title/Description Rehabilitation of Canal @ Brgy. Banay Banay 1st
Project Cost P 1, 000,000.00
Date Finished August, 2007
Project Location San Jose, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Concreting of FMR, Brgy. Pansipit, Pook, Pamiga, San
Jacinto
Project Cost P 1,000,000.00
Date Finished December 14, 2006
Project Location Agoncillo, Batangas
Name & Address of the Owner DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of Open Canal @ Brgy Bago
Project Cost P 1,000,000.00
Date Finished June 20, 2007
Project Location Ibaan, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Construction of Open Canal @ Brgy Coliat
Project Cost P 1,000,000.00
Date Finished July 20, 2007
Project Location Ibaan, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Concreting of Line Canal at Brgy. Pag-olingin Bata
Project Cost P 500,000.00
Date Finished April 30, 2007
Project Location Lipa City, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Construction /Concreting of Farm to Market Road at
Brgy. Anilao
Project Cost P 500,000.00
Date Finished June 20, 2007
Project Location Lipa City, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Concreting of Line Canal at Brgy. Pag-olingin West
Project Cost P 500,000.00
Date Finished June 8,, 2007
Project Location Lipa City, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Repair / Rehab of FMR at Brgy. Bukal-Maugat Road
Project Cost P 1,000,000.00
Date Finished October 16, 2006
Project Location Padre Garcia, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Improvement of MPB at Brgy 3
Project Cost P 300,000.00
Date Finished June 1, 2005
Project Location Talisay, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Concreting of FMR, Brgy. Banay Banay
Project Cost P 1, 000,000.00
Date Finished April 7, 2006
Project Location Padre Garcia, Batangas
Name & Address of the Owner DPWH – Bats. 4th Eng’g District
Project Title/Description Construction of MPB at Poblacion 5
Project Cost P 500,000.00
Date Finished April 17, 2007
Project Location Laurel, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of Four (4) Classrooms
Project Cost P 2,000,000.00
Date Finished December 18, 2007
Project Location Tanauan City, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of MPB
Project Cost P 4,000,000.00
Date Finished December 18, 2007
Project Location Pagaspas, Tanauan, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of MPB
Project Cost P 4,000,000.00
Date Finished April 7, 2007
Project Location Gonzales, Tanauan, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Construction of MPB
Project Cost P 3,000,000.00
Date Finished May 22, 2008
Project Location Brgy. Sampaloc, Talisay, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Repair/Impvt of Balele E/S, Balele, Tanauan City, Batangas
Project Cost P 1,349,728.00
Date Finished June 25, 2008
Project Location Brgy. Balele, Tanauan City, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Const. of 4 CL Bldg., Natatas NHS, Natatas, Tanauan City,
Bats
Project Cost P 2,892,997.00
Date Finished Sept. 6, 2008
Project Location Brgy. Natatas, Tanauan City, Bats
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Completion of MPB, Sampaloc, Talisay, Batangas
Project Cost P 1,445,900.00
Date Finished Feb. 10, 2009
Project Location Brgy. Sampaloc, Talisay, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Completion of MPB, Balas, Talisay, Batangas
Project Cost P 1,928,300.00
Date Finished Feb. 10, 2009
Project Location Brgy. Balas, Talisay, Batangas
Name & Address of the
Owner
DPWH – Bats. 3rd Eng’g District
Project Title/Description Conc. of Road ( Dayap to Butucan) & ( Bulihan to Looc),
Nasugbu
Project Cost P 4,774,623.00
Date Finished July 21, 2008
Project Location Nasugbu, Batangas
Name & Address of the
Owner
DPWH – Bats. 1st Eng’g District
Project Title/Description Const.of MPBldg, Brgy. Mahacot West, Bats. City
Project Cost P 3,858,990.20
Date Finished Sept. 15, 2008 Dec. 17, 2008
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Impvt./Rehab. of Road , Manila-Batangas Road, Bats. City
Project Cost P 9,647,900.00
Date Finished Sept. 15, 2008 Jan. 9, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Impvt./Rehab. of Road, Paharang West Road, Bats. City
Project Cost P 9,647,900.00
Date Finished Sept. 15, 2008 Jan. 7, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City
Project Cost P 9,647,900.00
Date Finished Sept. 15, 2008 Jan. 8, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Const.of MPBldg, Balete Relocation Site, Bats. City
Project Cost P 4,823,900.00
Date Finished Feb. 18, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Conc. of Road, Brgy. Gulod, Lemery, Bats.
Project Cost P 3,820,200.00
Date Finished Jan. 5, 2009
Project Location Lemery, Batangas
Name & Address of the
Owner
DPWH – Bats. 1st Eng’g District
Project Title/Description Repair/Maintenance of Creek, San Carlos, Lipa City, Bats.
Project Cost P 1,969,160.00
Date Finished Aug. 13, 2008
Project Location Lipa City, Batangas
Name & Address of the
Owner
DPWH – Bats. 4th Eng’g District
Project Title/Description Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City
Project Cost P 4,824,078.00
Date Finished Sept. 15, 2008 Jan. 8, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Const. of Gulod Labac to Gulod Itaas, Batangas City
Project Cost P 4,823,992.00
Date Finished Sept. 15, 2008 Nov. 12, 2008
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title/Description Repair/Rehab. of Revetment, Mabalanoy River, San Juan,
Bats.
Project Cost P 1,499,176.00
Date Finished Jun. 26, 2008
Project Location San Juan, Batangas
Name & Address of the
Owner
DPWH – Bats. 4th Eng’g District
Project Title/Description Const.of MPBldg, Brgy. Catandala, Bats. City
Project Cost P 4,823,900.00
Date Finished Mar. 18, 2009
Project Location Batangas City
Name & Address of the
Owner
DPWH – Bats. 2nd Eng’g District
Project Title /.Description Const. of Road at Anus, San Jose; Dayapan, Ibaan;
Laklakin, Balagtasin, San Jose & Sampal, Natunuan
Project Cost 2,122,347.00
Year Finished Spetember 25, 2008
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 4th Eng’g District
Project Title /.Description Improvement of Farm to Market Road at San Pedro And
Mahacot East
Project Cost 9,648,847.00
Year Finished June 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Rehabilitation/Reconstruction/Improvement of Batangas-
Tabangao-LoboRoad (Intermittent Section),Pinamucan-
Simlong Section (Phase I), Batangas City
Project Cost 9,647,900.00
Year Finished April 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement /Upgrading of Brgy. Pantay, Brgy. Makina
FMR, Calaca, Bats.
Project Cost 4,775,500.00
Year Finished Aug. 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab of Nasugbu-Ternate Road, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road
Section, Phase I, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road
Section, Phase I, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab of Nasugbu-Lian-Calatagan Road
Section, Phase II, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab. of Palico-Balayan-Batangas Road,
Phase I, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Improvement/Rehab. of Palico-Balayan-Batangas Road,
Phase II, Batangas
Project Cost 19,297,800.00
Year Finished Sept. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Repair and Rehabilitation of Nasugbu-Lian-Calatagan
Road, Batangas @ Km. 123+646 to Km. 124+764
Project Cost 9,997,200.00
Year Finished Oct. 10, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Asphalt Overlay/Improvement/Rehab. of Manila-Batangas
Road, Batangas City
Project Cost 18,092,479.88
Year Finished Jul. 23, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Asphalt Overlay/Improvement/Rehab. of Dumantay-
Paharang West Road, Batangas City
Project Cost 18,092,412.84
Year Finished Jul. 23, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Asphalt Overlay/Improvement of Gulod Labac-Gulod Itaas
Road, Bats. City
Project Cost 18,092,062.50
Year Finished Aug. 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Asphalt Overlay/Improvement of Mahacot East-Mahacot
West Road, Bats. City
Project Cost 18,092,062.50
Year Finished Aug. 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Asphalt Overlay/Improvement of Soro-soro Ilaya Road, Bats.
City
Project Cost 18,092,062.50
Year Finished Aug. 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement/Rehab of Palico-Balayan Road, Bats. City
Project Cost 18,090,187.50
Year Finished Aug. 20, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement/Rehab of San Pedro Road, Bauan, Bats.
Project Cost 9,647,998.00
Year Finished Oct. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Repair/Rehab/Impv't of Manila-Batangas-Pier Road,
Batangas City
Project Cost 9,647,998.00
Year Finished Oct. 9, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement/Rehab of Pitogo Road, Bauan, Bats.
Project Cost 9,647,998.00
Year Finished Oct. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement/Rehab of Colvo Road, Bauan, Bats.
Project Cost 9,647,998.00
Year Finished Oct. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement/Rehab of Sto. Nino - Bagong Silang Road,
Bauan, Bats.
Project Cost 9,647,998.00
Year Finished Oct. 22, 2009
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan
Phase I, Km 101+500 - Km 102+500
Project Cost 19,298,200.00
Year Finished Feb. 20, 2010
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan
Phase II, Km 101+500 - Km 102+500
Project Cost 19,298,200.00
Year Finished Feb. 20, 2010
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 1st Eng’g District
Project Title /.Description Construction/Rehabilitation of 2 Storey Building At Batangas
National High School, Batangas City
Project Cost 24,123,500.00
Year Finished June 21, 2010
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Construction/Improvement of School Building Facilities at
Batangas Calicanto, Batangas City
Project Cost 14,471,999.00
Year Finished Mar. 23, 2010
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Improvement of Drainage and Other Related Structure at
Manila-Batangas City Road, Batangas City
Project Cost 46,376,365.00
Year Finished June 24, 2010
Project Location Batangas
Name & Address of the
Owner DPWH – Bats. 2nd Eng’g District
Project Title /.Description Construction of Ospital ng Lipa (Phase II), Brgy. Marawoy, Lipa
City
Project Cost 99,648,156.00
Year Finished November 28, 2012
Project Location Brgy. Marawoy, Lipa City, Batangas
Name & Address of the
Owner City Engineer’s Office-Lipa City
Project Title /.Description Concreting of Batangas-Tabangao-LoboRoad, Road
Upgrading (Gravel to Paved) Based on Gravel Road
Strategies Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-Project Analysis) (MFO-2) KO137+006.00 –
KO144+408.00 (Intermittent Sections), Batangas City,
Batangas Province
Project Cost 99,325,912.60
Year Finished November 26, 2012
Project Location Batangas
Name & Address of the
Owner DPWH –Region IV-A, EDSA QC
Title: Construction of Ospital ng Lipa (Phase II),
Location: Brgy. Marawoy, Lipa City
Amount: 99,648,156.00
Date Started: January 10, 2012
Date Completed: November 28, 2012
Title: Concreting of Batangas – Tabangao – Lobo Road, Road
Upgrading (Gravel to Paved) based on Gravel Road
Strategies Traffic Benchmark for upgrading Gravel to
Paved Road Standard (HDM-Project Analysis) (MFO-2)
KO137+006.00 – KO144+408.00 (Intermittent Sections)
Location: Batangas City, Batangas Province
Amount: 99,325912.60
Date Started: March 29, 2012
Date Completed: November 26, 2012
Title: 08DC0013 Repair/Improvement of
Balele Elementary School
Location: Brgy. Balele, Tanauan City, Batangas
Amount: 1,400,000.00
Date Started: April 21, 2008
Date Completed: June 25, 2008
Title: BRH-001 Rehabilitation of Perimeter Fence
Location: Batangas Regional Hospital, Batangas City
Amount: 3,189,311.79
Date Started: December 2007
Date Completed: June 2008
Title: 08DE-0116 Construction of Multi-Purpose Building
Location: Mahacot West, Batangas City
Amount: 3,858,990.20
Date Started: October 22, 2008
Date Completed: Dececember 17, 2008
Title: 08DE-0059 Improvement/Rehabilitation of Road,
Catandala & Dumantay-Mahacot, Batangas City
Location: Batangas City
Amount: 9,648,156.00
Date Started: August 22, 2008
Date Completed: September 15, 2008
Title: 08DB0127 Concreting of Farm to Market Road
Location: Brgy. Gulod, Lemery, Batangas
Amount: 3,820,200.00
Date Started: November 27, 2008
Date Completed: January 5, 2009
Title: 08DE-0276 Improvement/Rehabilitation of Gulod Itaas
Road
Location: Brgy. Gulod, Itaas, Batangas City
Amount: 9,647,900.00
Date Started: December 15, 2008
Date Completed: January 8, 2009
Title: 08DE-0115 Construction of Gulod Labac to Gulod Itaas
Road
Location: Batangas City
Amount: 4,823,992.00
Date Started: October 17, 2008
Date Completed: November 12, 2008
Title: 08DE-0279 Construction of Multi-Purpose Building
Location: Balete Relocation Site, Batangas City
Amount: 4,823,900.2
Date Started: January 2, 2009
Date Completed: February 18, 2009
Title: Rehabilitation/Reconstruction/Improvement of
Batangas – Tabangao – Lobo Road (Intermittent
Section) Pinamucan Simlong Section, (Phase I)
Location: Batangas City
Amount: 9,647,900.00
Date Started: March 8, 2009
Date Completed: April 20, 2009
Title: Construction of Two-Storey 6 Cl RGR Type SB
Location: Banilad E/S, Nasugbu, Batangas
Amount: 8,547,065.75
Date Started: July 14, 2006
Date Completed: February 20, 2007
Title: 08DD-0041 Repair/Maintenance of Revetment at
Lawaye Bridge Malabanoy River
Location: San Juan, Batangas
Amount: 1,499,176.00
Date Started: May 23, 2008
Title: 07DC-0361 Construction of Multi-Purpose Building at
Brgy. Pagaspas, Tanauan, Batangas
Location: Tanauan, Batangas
Amount: 3,855,825.00
Date Started: September 4, 2007
Date Completed: December 10, 2007
Title: 08DE-0274 Improvement/Rehabilitation of Manila –
Batangas Road, Batangas City
Location: Batangas City
Amount: 9,647,900.00
Date Started: December 15, 2008
Date Completed: January 9, 2008
Title: 08DE-0278 Construction of Multi-Purpose Building at Brgy.
Catandala, Batangas City
Location: Batangas City
Amount: 4,823,900.00
Date Started: December 26, 2008
Date Completed: March 18, 2009
Title: 08DD-0099 Construction of Multi-Purpose Building at
Brgy. Gonzales, Tanauan City
Location: Tanauan City, Batangas
Amount: 3,855,825.00
Date Started: April 9, 2007
Date Completed: July 18, 2007
Title: 08DD-0094 Construction of Multi-Purpose Building at
Brgy. Tampoy, San Jose, Batangas
Location: San Jose, Batangas
Amount: 1,109,115.00
Date Started: October 27, 2008
Date Completed: November 10, 2008
Title: 08DD-0093 Construction of Multi-Purpose Building at
Brgy. Tugtog, San Jose, Batangas
Location: San Jose, Batangas
Amount: 1,109,115.00
Date Started: October 27, 2008
Date Completed: November 10, 2008
Title: 08DC-0253 Completion of Multi-Purpose Building at Brgy.
Balas, Talisay, Batangas
Location: Talisay, Batangas
Amount: 1,928,300.00
Date Started: December 22, 2008
Date Completed: February 10, 2009
Title: 09DE0048 – Improvement of Farm to Market Road at San
Pedro & Mahacot East Road
Location: Batangas City
Amount: 9,648,847.00
Date Started: June 06, 2009
Date Completed: June 22, 2009
Title: 09DE0067 – Improvement/Rehabilitation of Batangas –
Lobo Road Km.105-469 to Km 113+360
Location: Batangas City
Amount: 18,090,187.50
Date Started: August 7, 2009
Date Completed: August 20, 2009
Title: 10DE0103 Construction/Rehabilitation of 2 Storey
Building
At Batangas National High School, Batangas City
Location: Batangas National High School, Batangas City
Amount: 24,123,500.00
Date Started: March 9, 2010
Date Completed: June 21, 2010
Title: 10DE-0209: Construction/Improvement of School
Building Facilities
At Batangas Calicanto, Batangas City
Location: Calicanto Elementary School, Batangas City
Amount: 14,471,999.80
Date Started: February 03, 2010
Date Completed: March 23, 2010
Title: 10DE-0104: Improvement of Drainage and Other
Related Structure at
Manila-Batangas City Road, Batangas City
Location: Batangas City
Amount: 46,376,365.00
Date Started: March 25, 2010
Date Completed: June 24, 2010
JASMIG CONSTRUCTION SUPPLY
LIST OF EQUIPMENT OWNED
LIST OF EQUIPMENT
UNIT TYPE/DESCRIPTION CONDITION
1 unit Hyundai Excavator – ROBEX-220LC9S Good Running
1 unit CAT Excavator – 320D Good Running
1 unit KOMATSU Road Grader – GD405-A Good Running
1 unit KOMATSU Road Grader – GD405-2 Good Running
1 unit CATERPILLAR Vibratory Compactor – CS-533E(10tons) Good Running
1 unit SAKAI Vibratory Compactor – TW-40(4tons) Good Running
1 unit SAKAI Vibratory Compactor – SG-41(4tons) Good Running
1 unit YANMAR Mini Excavator – B37 Good Running
1 unit ISUZU Dump Truck – PC-10 (Plate No. URS-260) Good Running
1 unit FUSO Boom Truck – Fighter (Plate No. RGL-880) Good Running
1 unit IZUSU Mini Dump Truck – Forward (Plate NO. RVK-156) Good Running
1 unit IZUSU Mini Dump Truck – Giga (Plate NO. RKC-365) Good Running
1 unit IZUSU Elf Truck – Dropside (Plate NO. DTR -340) Good Running
1 unit IZUSU Elf Truck – Dropside (Plate NO. XAS -519) Good Running
1 unit Hydraulic Breaker - OKADA Good Running
1 unit HYUNDAI Excavator – ROBEX-2200LC-7S Good Running
1 unit CAT Bulldozer – D6-C Good Running
1 unit SAKAI Vibratory Compactor- SG-25(2.5tons) Good Running
1 unit Air Compressor – 175 CFM Good Running
1 unit Welding Machine – MILLER 500A Good Running
1 unit Welding Machine – YAMATO 300A Good Running
1 unit Speed Cutter BOSCH Good Running
2 units Concrete Vibrator Good Running
4 units Concrete Cutter Good Running
7 units 1 Bagger Concrete Mixer Good Running
4 units Water Pump Good Running
4 units Bar Cutter Good Running
4 units Concrete Screeder Good Running
2 units Electric Jackhammer Good Running
1 Lot Carpentry Tools Good Running
1 Lot Steel Scaffolding Good Running
Specifications
Brand Name: Hyundai
Model Number: Robex 220LC-9S
Condition: Good Running Condition
Bucket capacity: 1.44m3
Machine Weight: 22,515 lbs
Moving Type: Crawler Excavator
Maximum Digging Height: 9,780 lbs
Max Digging Radius: 20' 11"
Operating Weight: 22,515 lbs
Maximum Digging Depth: 21' 6"
Cummins B5.9 - C water cooled, 4 cycle Diesel, 6-cylinders in line, direct
injection,
turbocharged, charger air cooled.
Hydraulic system - Variable displacement tandem axis piston pumps.
Two speed axial piston motor with brake valve and parking brake
Drives & brakes - Fully hydrostatic type
Swing System - Fixed displacement axial piston motor
Fuel tank 400 liter
X-leg type
Specifications
Make: CATERPILLAR
Model: 320D
Year: 2011
Category : Track Mounted
Bucket Capacity: 1 m3
Bucket Width: 1,150 mm
Dig Depth: 6,640mm
Reach at Ground Level: 9,780mm
Dump Height: 6,570mm
Bucket Breakout: 13,358kgf
Engine Make-Model: Cat C6.4 ACERT
Net Engine Power SAE Rated: 103kW
Engine Displacement: 6.4lt
Number of Cylinders: 6
Pump Types : Variable displacement axial piston pump
Relief Valve Pressure Main Pumps: 350bar
Operating Weight: 21.5MT
DimensionsTransport Length: 9,440mm
Transport Height: 3,440mm
Width: 3,180 mm
Track Length: 3,650mm
Speed: 5.5kph
Gradeability: 70%
Specifications
Engine Make: Komatsu
Model: 6D105
Net Power Gear 5-6: 110 hp; 82 kw
Max Power: 110 hp; 82 kw
Net Torque Gears 5-6: 282 lb ft; 382.3 Nm
Displacement: 396 cu in; 6.5 L
Operational Std Operation Weight - Front Axle: 5621.8 lb; 2550 kg
Std Operation Weight - Rear Axle: 13955.3 lb; 6330 kg
Std Operation Weight – Total: 19577.1 lb; 8880 kg
Tire Size
front 9.00-20-10PR,
rear 11.00-20-10PR
Transmission Type: hydroshift
Number of Gears – Forward 6
Number of Gears – Reverse 6
Max Speed – Forward: 26.1 mph; 42 km/h
Max Speed – Reverse: 28 mph; 45 km/h
Steering Articulation L/R: 27 degrees
Turning Radius: 18.4 ft in; 5.6 m
Front Axle Wheel Lean: 22 degrees
Oscillation – Total: 26 degrees
Ground Clearance: 1.4 ft in; 435 mm
Moldboard Width: 10.2 ft in; 3100 mm
Moldboard Height: 24.6 in; 625 mm
Moldboard Thickness: 0.75 in; 19 mm
Max Depth of Cut: 17.3 in; 440 mm
Circle Max Reach Outside Tires – Left: 53.9 in; 1370 mm
Max Reach Outside Tires – Right: 55.9 in; 1420 mm
Max Lift Above Ground: 14.2 in; 360 mm
Dimensions:
Height to Top of Cab: 10.9 ft in; 3315 mm
Overall Length: 23 ft in; 7025 mm
Width Over Tires: 7.1 ft in; 2165 mm
Wheelbase: 16.1 ft in; 4900 mm
Blade Base: 6.9 ft in; 2100 mm
Tandem Axle Wheelbase: 4.3 ft in; 1305 mm
Rear Ground Clearance: 0.98 ft in; 300 mm
Front Ground Clearance: 1.4 ft in; 435 mm
Specifications
Title: 1997 KOMATSU GD405-2
Make: KOMATSU
Category: Articulated
Net Engine Power: 115KW
Operating Weight: 10,250Kg
Specifications
Engine Model: Caterpillar 3054C
Gross Power: 130 hp (97 kW)
Net Power (ISO 9249): 125 hp (93 kW)
Net Power (SAE J1349): 124 hp (92 kW)
Net Power (EEC 80/1269): 125 hp (93 kW)
Bore: 4.13 inches (105 mm)
Stroke: 5 inches (127 mm)
Dimensions
Overall Length: 217 inches (5510 mm)
Overall Width: 90 inches (2290 mm)
Specifications
YEAR : 1986/87,
WEIGHT: 3.5 TON,
ENGINE: ISUZU ENGINE
Specifications
SAKAI COMPACTION ROLLER
MADE IN 1990
MADE IN Japan
Specifications
The B37 Mini Excavator comes with a three-cylinder, 27 horsepower
(approximate) Yanmar diesel engine. It has a two-speed transmission
and weighs roughly 7,500 pounds. Different models come with either 15-
inch rubber or steel tracks.
Yanmar B37 Mini Excavators come with a 60-inch backfill blade and an
adjustable 40/90 boom swing with a 21-tooth bucket. It has an
approximate digging depth of 10 to 13 feet.
Pilot and Controls
The Yanmar B37 comes with canopy or cab; cabs can be heated. The
pilot operates the mini excavator with joystick controls.
Specifications
Brand Name:
Isuzu Elf Dropside
Type: Trucks
Year: 1996
Made In: Japan
Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu
Elf Drop Side (4 wheeler 10 ft.)
Specifications
Brand Name: Isuzu Elf Dropside
Type: Trucks
Year: 1996
Made In: Japan
Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu
Elf Drop Side (4 wheeler 10 ft.)
Specification
Gross Power: 26 kW
Max Speed: 7.5 mph
Weight: 2579 kg
Wheelbase: 1737 mm
Working Width: 1199 mm
Specification
Isuzu Forward Dump Truck 6-Wheeler
Brand: Isuzu
Model: Forward
Year: 2000
Body Type: Dump Truck
Transmission: Manual
Specification
ENGINE
The 6M60-3AT1 and 3AT2 features intercooler turbo, common rail fuel
injection, cooled EGR and oxidation catalyst, superior fuel economy,
enhanced torque, reduced engine noise and exceeds EPA04 emission
standards.
BRAKING POWER
Most of the new Fighter series comes equipped with full air brakes. Anti-
lock brakes (ABS) are standard on all models.
EASY SHIFTING
The Fighter comes with a 6-speed manual transmission or a 9-speed
manual transmission that deliver better performance while realising fuel
savings.
AIR SUSPENSION
All 6X2 and selected 4X2 and 6X4 Fighters feature air suspension on the rear
axle.
Specification
CAT Bulldozer D6-C
The Caterpillar D6 uses a six-cylinder engine. The required fuel is diesel.
The piston displacement measures 638 cubic inches, and the engine
has a rated rpm of 1,800. Earlier models had an engine drawbar rating
of 63 horsepower and a belt rating of 78 horsepower; the total drawbar
pull originally was 16,674 lbs. By 1955, the drawbar power had been
increased to 73 horsepower and the belt to 93 horsepower; the
drawbar pull also increased to 17,486.
Dimensions
Caterpillar's D6 has a length of 184 inches, a width of 96 inches and a
height of 105 inches. The gross weight of the machine measures 33,000
lbs. The company equipped the D6 with front and rear tracks that
measure either 60 or 74 inches. The fuel tank has a maximum capacity
of 65 gallons.
Specification
HYUNDAI EXCAVATOR
MODEL : ROBEX 2200LC-7S
BUCKETCAPACITY: 0.92M3
WEIGHT : 21.5 TON
ENGINE : CUMMINS-B5.9-C (145PS / 1950RPM)
LENGTH : 9520
WIDTH : 2990
HEIGHT : 2990
MANUFACTURED : 2008
BREAKER LIND QUICK CLAMP INSTALLED
Yamato Welding Machine 300A
Miller Welding Machine 500A
Air Compressor 175CFM
Specification
Isuzu Dump Truck 10-Wheeler PC-10
Brand: Isuzu
Year: 2010
Fuel: Diesel
Body Type: Dump Truck
Transmission: Manual
Specification
Brand: Isuzu
Model: Giga
Year: 1996
Fuel: Diesel
Body Type: Mini Dump Truck
Transmission: Manual
4UNITS- CONCRETE CUTTERS
7-UNITS – 1 BAGGER CONCRETE MIXER
Specification
OKADA HYDRAULIC BREAKER
WORKING PRESSURE: 14-18 MPa
OIL FLOW CONSUMPTION: 120-160L/MIN
FREQUENCY: 465-625 BPM
OPERATING WEIGHT
(STANDARD/SILENT): 1640/1505 KG
OVERALL LENGTH W/O BRAKET: 2205 MM
WORKING STEEL DIAMETER: 125 MM
CARRIER MACHINE WEIGHT RANGE:
WEIGHT: 14-26 TON
RATE FLOW: 140-230L/MIN
BOSCH SPEED CUTTER
4 – UNITS CONCRETE SCREEDER
2 - UNITS CONCRETE VIBRATOR
4-UNITS WATER PUMPS
4 – UNITS BAR CUTTER
2 UNITS ELECTRIC JACKHAMMER
1-LOT CARPENTRY TOOLS
1-LOT STEEL SCAFFOLDING
JASMIG CONSTRUCTION SUPPLY
BUSINESS OFFICE
JASMIG CONSTRUCTION SUPPLY
FINANCIAL STATEMENT
JASMIG CONSTRUCTION SUPPLY
VALUE ADDED TAX REGISTRATION and TAX CLEARANCE
JASMIG CONSTRUCTION SUPPLY
GOVERNMENT AFFILIATION DOLE
PhilGEPS
SAFETY CERTIFICATES
IRMINA C. BLANCO
JASMIG CONSTRUCTION SUPPLY
OFFICE MAP