Dear Sir:
Attached is Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba Water
Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water Treatment
Plant Upgrades. Please verify receipt of this Addendum for our records by fax to (204) 726-6290.
* ACKNOWLEDGEMENT OF RECEIPT OF ALL ADDENDUMS
MUST BE INCLUDED IN THE TENDER SUBMISSION.
Failure to include acknowledgement shall cause the tender to be rejected. If Tender is submitted before Addendum is issued, the Board will accept a faxed acknowledgement prior to the tender closing. Yours truly,
R. Lytle
Construction Manager
______________________________________________________________________
The Manitoba Water Services Board
Unit #1A - 2010 Currie Blvd.
Brandon, MB R7B 4E7
Dear Sir:
We have received Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba
Water Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water
Treatment Plant Upgrades.
Yours truly,
____________________________________
Company
_____________________________________
Per
THE MANITOBA WATER SERVICES BOARD
CONTRACT NO. M.W.S.B. 1423
City of Portage la Prairie
Phase 2A Water Treatment Plant Upgrades
ADDENDUM NO. 3
Date: May 25, 2018
1) PRECEDENCE
This Addendum is issued prior to Tender closing to provide for certain revisions as noted
herein.
This addendum forms an integral part of the specifications describing all aspects of the
work and is to be read in conjunction therewith.
All work shall be performed in accordance with the Contract Documents.
2) SCOPE
The purpose of this addendum is to amend the following sections of the Tender
Documents:
.1 The calcium thiosulphate tanks (TK-1, TK-2) are constructed of polyethylene.
.2 Regarding Note 2 on Drawing 30-D101: The conduit referred to in this note is
accessible via a crawlspace. The approximate length of conduit between the Main
Building and the Pre-Treatment Building is 31 m.
.3 Contractor to have the existing vinyl tiles and adhesive above Ozone Contactor 2
tested for asbestos by Pinchin Environmental Ltd. prior to any tile replacement in this
area.
.4 The height from floor to ceiling of Ozone Contactor 2 (the contactor for Clarifier 3) is
7.97 m. The heights of the Ozone Contactor 2 and the Recarbonation Chamber 2 are
the same.
.5 Supply and install 3 pole, 600V, 15A breaker to panel 50A, cct. 20,22,24.
.6 Supply and install 3C#12 AWG Teck 90, 1000V cable from panel 50A to the actuator
for FCV 6044.
.7 The 100 mm vent piping described on Drawing 30-S105, Section B is constructed of
316 stainless steel. This piping is to be removed and reinstalled in chambers depicting
liner installation, in accordance to the drawings.
.8 Replace MWSB Form 3B Schedule of Prices with attached MWSB Form 3B
(Revision 2).
.9 Amend Section 11105: The Knife Gate Valves shall have a Resilient Buna-N seat.
.10 Replace Section 01150, Clause 1.6.4.2 with the following:
.2 Basis of Payment: Payment for “Ozone Contactor Modifications” shall be paid for
at the Contract Lump Sum Price and shall include all work related to the supply,
installation and commissioning of ozone contactor modifications, including
benching of contactor corners, installation of stainless steel baffle walls,
installation of ozone analyzers, repair of Contactor 1 roof, testing tile materials for
asbestos, appurtenances, and other site improvements as required in the
Specifications.
.11 Add to Section 01150, Clause 1.6 the following:
.9 Tile Removal and Repair:
.1 Method of measurement: “Tile Removal and Repair” shall be
measured.
.2 Basis of Payment: Payment for “Tile Removal and Repair” shall be
paid for at the Contract Unit Price and shall include all work
related to the removal of the existing tiles above Ozone Contactor
2, the supply and installation of new tiles, appurtenances, and other
site improvements as required in the Specifications. Unit price to
be all inclusive labour, material, travel expenses, overhead and
profit.
.12 Replace Section 11710, Clause 1.1.1 with the following:
.1 Supply and install two (2) complete detention-type lime slaker systems including
all components specified or shown on the Drawings. Subcontract, pay all
necessary expenses, and coordinate STT Enviro Corp technicians (STT) to
complete these works, as noted in Clause 3.1. Submit complete Shop Drawings of
the entire lime slaker system.
.13 Replace Section 11710, Clause 3.1 with the following:
3.1 Installation
.1 STT shall be responsible for mechanical installation, including the
following:
.1 Installing support legs under existing feeder platform.
.2 Securing the new M-15 slakers to existing structure.
.3 Securing the new Grit Screens to existing structure.
.4 Routing slurry piping between M-15 slaker outlet and grit screen
inlet.
.5 Installing new feeder support for existing feeders.
.6 Reinstalling existing feeders on new support structure.
.7 Fitting new chutes from existing silo outlet to newly located feeder
inlets.
.8 Installing flex connection between existing feeder outlet and slaker
inlet.
.9 Scope of work is mechanical installation from inlet of slaker to
outlet of grit screen.
.2 STT shall be responsible for programming and integration of controls for
the entire lime slaking system. Interface between the lime slaking system
and the plant SCADA system shall be the Contractor’s responsibility.
.3 Contractor shall be responsible for coordinating wiring, piping and other
appurtenances in order to provide a fully functional lime slaking system as
required in Clause 3.3.
.4 Contractor shall be responsible for the following:
.1 Removing the existing paste slakers.
.2 Removing the existing grit classifiers.
.3 Placing the new M-15 slakers into their correct location.
.4 Placing the new Grit Screens into their correct location.
.5 Mounting new control panels, as shown on 30-E101.
.6 Wiring of new control panels, as shown on 05-E002.
.7 Wiring new equipment in this section to the new control panels as
appropriate.
.14 Replace Section 14720, Clause 1.1.1 with the following:
.1 Supply and install hoist beam, low headroom type combined manual trolley and
hoist.
.15 Replace Section 17702 (Addendum 1) with the attached Section 17702.
.16 Delete SCADA Architecture Diagram SK-1-001 in Section 17500 (Addendum 1).
Refer to Drawing 05-I001 for the SCADA Architecture Diagram.
.17 Replace Section 17010, Clause 1.3.2.2 (Addendum 2) with the following:
.2 Schneider Electric Systems Canada.
.18 Replace Drawing 00-G000 (Addendum 1) with the attached Drawing 00-G000.
.19 Replace Drawing 30-S101 with the attached Drawing 30-S101.
.20 Reference Drawing 30-S101: 400x400 concrete benching is required along all 4 walls
of each chamber/contactor, including the shared contactor wall.
.21 Replace Drawing 30-S102 with the attached Drawing 30-S102.
.22 Replace Drawing 00-D502 (Addendum 1) with the attached Drawing 00-D502.
.23 Replace Drawing 40-D101 with the attached Drawing 40-D101.
.24 Replace Drawing 40-D301 with the attached Drawing 40-D301.
.25 Reference Drawing 10-E001:
Amend the Luminaire Schedule in to include the following approved equals:
Type A, Manufacturer Catalog Number: BJTAKE BLV-4-4-835-UNV-L26
Type D, Manufacturer Catalog Number: BEGHELLI BRV-R-6V-LEDMR16-6V-5W
Type E, Manufacturer Catalog Number: BEGHELLI AQ-RM-6-36-L-1-OLR-W-
2SEA-6V-5W
.26 Add the attached Drawing 05-I001 to the Drawing Set.
END OF ADDENDUM
MWSB 3B (Revision 2)
Page 1 of 1
SCHEDULE OF PRICES
PROJECT NO. MWSB
DESCRIPTION OF WORK
ESTIMATED
QUANTITIES UNIT
UNIT
PRICE
$0.00
TOTAL
$0.00
1. Raw Water Flow Control1
Lump
Sum
2. Pre-Treatment Screening 1 LumpSum
3. Lime Batching Alterations 1 Lump
Sum
4a. Ozone Contactor Modifications 1 Lump
Sum
4b. Tile Removal and Repair 35 m2
5. Makeup Water System for Chemical Batch
Tanks
1 Lump
Sum
6. City Distribution Pumps 1 Lump
Sum
7. PLC Upgrades 1 Lump
Sum
8. SCADA System Upgrades and McKay
Reservoir Control
1 Lump
Sum
Pump and Valve Refurbishment Allowance $ 37,500
Extra Work Allowance $ 200,000
Subtotal $
*PST must be included in unit prices. Goods & Services Tax (5% of Subtotal) $
TOTAL TENDER PRICE $
_________________________
Name of Bidder
MWSB Project No. 1423
City of Portage la Prairie Section 17702
Phase 2A Water Treatment Plant Upgrades Page 1 of 11
60558429 May 2018
ADDENDUM 3
INSTRUMENT LOOP DRAWINGS
1. GENERAL
1.1 References – General
.1 Refer to Section 17010.
1.2 Instrument Loop Drawings
.1 The Drawings listed below show typical instrument loop and motor control wiring diagrams required for this project. The following Drawings are an integral part of this Specification Section:
ILD-001 Instrument Loop Wiring Diagram – Ultrasonic Level Transmitter
ILD-002 Instrument Loop Wiring Diagram – Not Used
ILD-003 Instrument Loop Wiring Diagram – Variable Frequency Drive
ILD-004 Instrument Loop Wiring Diagram – Magnetic Flow Meter
ILD-005 Instrument Loop Wiring Diagram – Dissolved Ozone Transmitter
ILD-006 Instrument Loop Wiring Diagram – ORP & pH Transmitter
ILD-007 Instrument Loop Wiring Diagram – UV Transmittance Transmitter
ILD-008 Instrument Loop Wiring Diagram – Modulating Valve or Gate Actuator
ILD-009 Instrument Loop Wiring Diagram – Typical FVNR Starter
ILD-010 Instrument Loop Wiring Diagram – Pump Low Water Level Interlock
2. PRODUCTS (NOT USED)
3. EXECUTION
.1 One (1) drawing per loop or motor drive will be completed by the contractor and submitted for approval after award of Contract.
.2 Review each wiring detail together with the reviewed Shop Drawings for the respective equipment and modify the Drawing to comply with the selected equipment manufacturer’s requirements.
.3 Record all as-constructed modifications, terminal numbers, wire numbers, etc. and update the loop drawings to Record Drawing status.
.4 Include copies of each record loop drawing in the as-constructed drawing set and the O&M manuals.
END OF SECTION
PLC
LIT
XXX
FIELD PROCESS AREA CONTROL PANEL
XXX-71
XXX-70LT-XXXX
ANALOG INPUT
TANK LEVEL
XXX-SH
XXX-70
+
XXX-71
-
2 PAIR TPSH
+
-
G
RELAY
OUTPUT 1
LE
XXX
ULTRASONIC LEVEL
TRANSMITTER
4-20 MA
OUTPUT
+24 VDC
POWER
SUPPLY
L1 N1
XXX-32
XXX-31
XXX-32
XXX-N
LF-XXXX
DISCRETE INPUT
TRANSMITTER FAULT
120 VAC
POWER SUPPLY
Level Transmitter - Instrument Loop Diagram Loop No.XXX
+
-
+ -
24 VDC
POWER SUPPLY
PSC
+24V
SH
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
ULTRASONIC LEVEL
TRANSMITTER
ILD-001
1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM
OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.
2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR
TAG NUMBERS.
1 2018-05-10 ISSUED FOR ADDENDUM 1
2 2018-05-22 ISSUED FOR ADDENDUM 2
Blower - Instrument Loop Diagram Loop No.3550
LOCAL CONTROL STATION CONTROL PANEL
PDIT-3550 ANALOG
INPUT
DIFF. PRESSURE
INDICATION
TT-3550
ANALOG INPUT
TEMPERATURE
INDICATION
PI
3550
PL-3550
DISCRETE INPUT
LOW PRESSURE
VH1-3550
DISCRETE INPUT
HIGH BLOWER
VIBRATION
VH2-3550
DISCRETE INPUT
HIGH MOTOR
VIBRATION
TH-3550 DISCRETE
INPUT HIGH
TEMPERATURE
PLC
L1 N1
120 VAC
P
3550
BLOWER
TSH
3550
VS1
3550
MTR
VS2
3550
BLR
PSL
3550
PDIT
3550
TE
3550
DISCHARGE
AIR TO
PROCESS
TIT
3550
BLOWER PANEL
PSH
3550
3550-72
3550-SH
3550-71
FILTER
DIFFERENTIAL
PRESSURE
2PR TPSH #18 CABLE
3550-74
3550-SH
3550-73
ENCLOSURE
TEMPERATURE
TI
3550
3550-PSL
3550-VS1
3550-VS2
3550-TSH
3550-PSH
PH-3550 DISCRETE
INPUT HIGH
PRESSURE
10C #14 TECK CABLE
3550-72
3550-SH
3550-71
3550-74
3550-SH
3550-73
3550-72
3550-71
3550-74
3550-73
3550-32
3550-31
3550-34
3550-33
3550-36
3550-35
3550-38
3550-37
3550-40
3550-39
3550-32
3550-31
3550-34
3550-33
3550-36
3550-35
3550-38
3550-37
3550-40
3550-39
3550-32
3550-N
3550-34
3550-N
3550-36
3550-N
3550-38
3550-N
3550-40
3550-N
1. CONFIGURE ALARM RELAYS TO TRANSFER STATE UPON ALARM
OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
AERATION BLOWER
PANEL
ILD-002
1 2018-05-10 ISSUED FOR ADDENDUM
VSD - Instrument Loop Diagram Loop No. XXX
LOCAL CONTROL STATION CONTROL PANEL
VARIABLE SPEED DRIVE
XXX
AI1+
AI1-
SPEED REFERENCE
XXX-75
XXX-74
SC-XXX
ANALOG OUTPUT
4-20 maDC
SPEED CONTROL
XXX-S
AO1+
AO1-
DRIVE SPEED OUTPUT
XXX-69
XXX-68
SI-XXX
ANALOG INPUT
4-20 maDC
SPEED INDICATION
XXX-S
C
O
H
X00
00X
00X
X00
HS-2
XXX
COH
VSD CONTROL PANEL
PUSH/PULL
STOP
HS-1
XXX
STOP
4 PR TPSH #16 CABLE
+24 VDC XXX-1
XXX-2
R
MN-XXX
DISCRETE OUTPUT
START / STOP COMMAND
DI1START
DI5
LOCAL SPEED
SELECTED
XXX-3
XXX-6
DI2START INTERLOCK
FIELD
INTERLOCK
(NOTE 2)
RUNNING
NO
C
NC
FAULT
NO
C
NC
XXX-14
XXX-13
XXX-25
XXX-24
4C #14 TECK CABLE
XXX-19
XXX-18
XXX-H
6C #14 TECK CABLE
XXX-R1
XXX-N
YS-XXX
DISCRETE INPUT
COMPUTER CONTROL SELECTED
MM-XXX
DISCRETE INPUT
RUNNING STATUS
UA-XXX
DISCRETE INPUT
FAULT
4C #14 TECK CABLE
XXX-74
XXX-68
PLC
XXX-75
XXX-69
XXX-1
XXX-2
XXX-25
XXX-19
XXX-N
XXX-N
AO2+
AO2-
DRIVE CURRENT
OUTPUT
XXX-67
XXX-66
II-XXX
ANALOG INPUT
4-20 maDC
CURRENT INDICATION
XXX-S
XXX-66
XXX-67
XXX-13
L1 N1
120 VAC
POWER SUPPLY
ENET
CAT 6 ETHERNET CABLE IN 20mm
RIGID ALUMINUM CONDUIT
CONNECT TO ETHERNET SWITCH
1. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR
TAG NUMBERS.
2. REFER TO ILD-010 FOR FIELD INTERLOCK WIRING.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
VARIABLE SPEED DRIVE
ILD-003
1 2018-05-10 ISSUED FOR ADDENDUM 1
2 2018-05-22 ISSUED FOR ADDENDUM 2
Flow Meter - Instrument Loop Diagram Loop No. XXX
PLC
MAGNETIC FLOW TRANSMITTER
FIT
XXX
PLC
ANALOG INPUT
4-20 maDC
FLOW RATE
XXX-71
XXX-72
FE
XXX
FIELD PROCESS AREA CONTROL PANEL
XXX-S
XXX-32
XXX-31
R
XXX-71A
+
XXX-72
-
BOND ACROSS FLANGES
GROUNDING RINGS
(IF USED)
TRANSDUCER CABLE IN
RIGID ALUMINUM CONDUIT
+
-
4-20 ma OUTPUT
+
-
TOTALIZER
OUTPUT
PLC
DISCRETE INPUT
TOTALIZER
XXX-N
INTERPOSING
RELAY
(NOTE 2)
1 PR TPSH
L1
N
G
120 VAC
POWER
SUPPLY
XXX-33
+ -
POWER SUPPLY
(NOTE 2)
H N
120 VAC
POWER SUPPLY
1. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR
TAG NUMBERS.
2. PROVIDE POWER SUPPLY VOLTAGE AND RELAY TO MATCH
FLOW METER CONTACT REQUIREMENT.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
FLOW METER
ILD-004
1 2018-05-10 ISSUED FOR ADDENDUM
Dissolved OzoneTransmitter - Instrument Loop Diagram Loop No. XXX
PLC
FIELD PROCESS AREA CONTROL PANEL
DISSOLVED OZONE
XXX-PSC
XXX-S
+
-
24 VDC POWER SUPPLY
+
-
4-20 MaDC
ISOLATED
OUTPUT
WARNING RELAY
(NOTE 1)
ALARM RELAY
(NOTE 1)
FAULT RELAY
(NOTE 1)
AIT
XXX
XXX-24V
+ -
24 VDC
H N
120 VAC
XXX-72
XXX-S
XXX-71
PLC
ANALOG INPUT
DISSOLVED OZONE
INDICATION
XXX-71
XXX-72
XXX-30
XXX-H
PLC
DISCRETE INPUT
DISSOLVED OZONE
TRANSMITTER TROUBLE
XXX-33
XXX-N
PLC
DISCRETE INPUT
DISSOLVED OZONE
ALARM
XXX-31
XXX-N
XXX-31
XXX-33
PLC
DISCRETE INPUT
DISSOLVED OZONE
WARNING
XXX-31
XXX-N
AE
XXX
AE
XXX
PRE-DETERMINATED SIGNAL
CABLES SUPPLIED WITH THE
DEVICE
1. CONFIGURE ALARM RELAYS TO TRANSFER STATE UPON ALARM
OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.
2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR TAG
NUMBERS.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
DISSOLVED OZONE TRANSMITTER
ILD-005
1 2018-05-10 ISSUED FOR ADDENDUM 1
2 2018-05-22 ISSUED FOR ADDENDUM 2
ORP+PH Transmitter - Instrument Loop Diagram Loop No. XXX
PLC
AIT
XXX
ORP
FIELD PROCESS AREA CONTROL PANEL
XXX-71
XXX-70PLC ANALOG
INPUT 4-20maDC
ORP INDICATION
120 VAC
POWER
SUPPLY
XXX-SH
XXX-70
+
XXX-71
-
1 PR TPSH #18 CABLE
XXX-30
XXX-31
PLC DISCRETE INPUT
TRANSMITTER FAULT
XXX-30
XXX-31
2C #14 TECK CABLE
-
+
CH. 1
RELAY
OUTPUT 1
XXX-H
XXX-N
2C #14 TECK CABLE
L1
N
G
CLEANING
CONTROL
AE
XXX
ORP + PH
S
IA
S
CA
BLE
P
RO
VID
ED
BY
S
UP
PLIE
R
XXX-71
XXX-70PLC ANALOG
INPUT 4-20maDC
PH INDICATION
XXX-SH
XXX-70
+
XXX-71
-
1 PR TPSH #18 CABLE
-
+
CH. 2
AIT
XXX
PH
1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM
OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.
2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR
TAG NUMBERS.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
ORP AND PH
TRANSMITTER
ILD-006
1 2018-05-10 ISSUED FOR ADDENDUM
UVT Transmitter - Instrument Loop Diagram Loop No. ###
PLC
FIELD PROCESS AREA CONTROL PANEL
###-71
###-70PLC ANALOG
INPUT 4-20maDC
ORP INDICATION
###-SH
###-70
+
###-71
-
1 PR TPSH #18 CABLE
###-30
###-31
PLC DISCRETE INPUT
TRANSMITTER FAULT
###-30
###-31
2C #14 TECK CABLE
-
+
CH. 1
RELAY
OUTPUT 1
(NOTE 1)
UVT TRANSMITTER
+ 24V
PSC
+24V
SH
24 VDC
POWER
SUPPLY
24 VDC
POWER
SUPPLY
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
UV TRANSMITTANCE
TRANSMITTER
ILD-007
1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM
OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.
CONFIGURE ALARM RELAY TO TRIP ON TRANSMITTER FAULT.
2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR
TAG NUMBERS.
1 2018-05-10 ISSUED FOR ADDENDUM 1
2 2018-05-22 ISSUED FOR ADDENDUM 2
Modulating Valve / Gate Actuator - Instrument Loop Diagram Loop No. XXX
LOCAL CONTROL STATION CONTROL PANEL
PLC ANALOG
INPUT 4-20maDC
VALVE POSITION
PLC ANALOG
OUTPUT 4-20maDC
VALVE CONTROL
PLC DISCRETE
INPUT VALVE
OPEN STATUS
PLC DISCRETE
INPUT VALVE
CLOSED STATUS
PLC
L1 N1
120 VAC
ALT 1 -
ALT 1 +
2PR TPSH #18 CABLE
AO1 -
AO1 +
XXX-71
XXX-SH
XXX-75
XXX-SH
C
NO
C
NO
C
NO
XXX-61
XXX-63
XXX-19
PLC DISCRETE INPUT
REMOTE SELECTED
N999-N9
VALVE
POSITION
VALVE
CONTROL
2
3
1
EXTERNAL
POWER
SUPPLY
ZIT
XXX
ZC
XXX
ZSD
XXX
ZSB
XXX
HS1
XXX
L/O/R
HS2
XXX
O/C
COMPUTER
SELECTED
CLOSED
LIMIT
OPENED
LIMIT
###-70
###-74
###-60
###-62
###-18
1. REFER TO ACTUATOR SHOP DRAWING FOR POWER
REQUIREMENTS.
2. THIS DRAWING IS TYPICAL, REFER TO I/O LIST AND P&ID FOR
APPLICATIONS.
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
TYPICAL MODULATING VALVE /
GATE ACTUATOR
ILD-008
1 2018-05-10 ISSUED FOR ADDENDUM 1
2 2018-05-22 ISSUED FOR ADDENDUM 2
FVNR Starter - Instrument Loop Diagram Loop No. XXXX
MCC AREA FIELD PROCESS AREA CONTROL PANEL
H
O
A
00X
00X
X00
HS-2
XXXX
HOA
LOCAL CONTROL STATION
XXXX-3
XXXX-1A
XXXX-3
XXXX-1A
PLC
DISCRETE OUTPUT
START COMMAND
XXXX-19
XXXX-X2
PLC
DISCRETE INPUT
REMOTE SELECTED
XXXX-X2XXXX-X2
XXXX-X1
XXXX-X1
O/L's
XXXX-X1
MM-XXXX
R
M
MO-XXXX
G
XXXX-3
Ma
Ma
XXXX-19
XXXX-14
XXXX-16
XXXX-X1
XXXX-14
XXXX-X1
XXXX-16
Ma
O/L
XXXX-14
XXXX-16
XXXX-X2
XXXX-X2
PLC
DISCRETE INPUT
RUNNING STATUS
PLC
DISCRETE INPUT
FAULT STATUS
PLC
X2 X1
120 VAC
8C #14 TECK CABLE
4C #14 TECK CABLE
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
TYPICAL FVNR STARTER
ILD-009
1. THIS DRAWING IS TYPICAL FOR SEVERAL DRIVES. REFER TO
INSTRUMENT INDEX FOR APPLICATIONS.
1 2018-05-10 ISSUED FOR ADDENDUM
Low Level Interlock - Instrument Loop Diagram Loop No.XXX
PROCESS AREA EXISTING PLC CONTROL PANEL
LSL
120 VAC
POWER SUPPLY
2000-25
2000-26 R
1
2000-27
2000-28
2C # 14 TECK
TO P-2000 VFD
2C # 14 TECK
TO P-2001 VFD
R1
2000-29
2000-30
R1
2C # 14 TECK
TO P-2002 VFD
2000-31
2000-32
R1
2C #14 TECK
NO
C
NC
EXISTING WETWELL
LOW LEVEL SWITCH
(NOTE 1)
SHEET TITLE
SHEET NUMBER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-1
8) L
ast P
lo
tte
d: 2
01
8-0
5-1
8
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
DE
S:
CH
K:
AP
P:
AA
AB
BB
CC
CF
ile
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\I\6
05
58
42
9-IL
D.D
WG
ISSUE/REVISION
I/R DATE DESCRIPTION
PROJECT
CITY OF PORTAGE LA PRAIRIE
PHASE 2A WATER TREATMENT
PLANT UPGRADES
THE MANITOBA WATER SERVICES BOARD
UNIT 1A 2010 CURRIE BOULEVARD
BRANDON, MB, R7B 4E7
CONSULTANT
AECOM Canada, Ltd.
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
NOTES
INSTRUMENT LOOP DIAGRAM
PUMP LOW WATER LEVEL
INTERLOCK
ILD-010
1. USE FAIL-SAFE WIRING, ALARM CONTACT SHOULD OPEN AT
LOW WATER LEVEL. RELKY RI SHOULD NORMALLY BE
ENERGIZED.
1 2018-05-10 ISSUED FOR ADDENDUM
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
2) L
ast P
lo
tte
d: 2
01
8-0
5-2
2
AN
SI D
8
64
mm
x 5
59
mm
Printed on ___% Post-Consumer
Recycled Content Paper
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\G
\6
05
58
42
9-S
HT
-3
0-0
00
N-G
-0
00
0.D
WG
CIT
Y O
F P
OR
TA
GE
L
A P
RA
IR
IE
IS
SU
ED
F
OR
A
DD
EN
DU
M M
AY
24, 2018
Un
it 1A
2010 C
urrie B
ou
levard
, B
ran
do
n, M
an
ito
ba R
7B
4E
7
MW
SB
P
RO
JE
CT
14
23
6
05
58
42
9
PH
AS
E 2
A W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
U
PG
RA
DE
S
Th
e M
an
ito
ba
W
ate
r S
erv
ic
es
B
oa
rd
__
__
__
__
__
__
__
_
DRAWING INDEX
The Manitoba Water
Services Board
00 X - G 000
PROCESS AREA
00 GENERAL & SITEWORKS
05 DIAGRAMS & SCHEMATICS
10 RAW WATER PUMPING STATION
20 PRE-TREATMENT BUILDING
30 MAIN BUILDING
40 RESERVOIR & PUMPING STATION
50 McKAY RESERVOIR
DISCIPLINE
G GENERAL
C CIVIL
S STRUCTURAL
N PROCESS & INSTRUMENTATION
D PROCESS MECHANICAL
M MECHANICAL
E ELECTRICAL
I INSTRUMENTATION
DRAWING NUMBER
000 GENERAL NOTES & SCHEDULES
100 PLANS
200 ELEVATIONS
300 SECTIONS
400 DETAILS
500 STANDARD DETAILS
600 3D VIEWS
DRAWING PHASE
D DEMOLITION
NEW/ PROPOSED*
*NULL FOR NEW DRAWINGS
GENERAL + SITEWORKS
00-G000 COVER SHEET
00-G101 CIVIL OVERALL SITE PLAN
00-G102 CIVIL RAW WATER PUMPING STATION SITE PLAN
STRUCTURAL
10-S101 STRUCTURAL ELECTRICAL ROOM PLAN & SECTIONS
20-S101 STRUCTURAL CHAIN HOIST PLAN SECTION & DETAILS
30-S101 STRUCTURAL OZONE CONTACTORS PLAN & DETAILS
30-S102 STRUCTURAL OZONE CONTACTORS PLAN & SECTIONS
PROCESS & INSTRUMENTATION
00-N001 PROCESS & INSTRUMENTATION PROCESS MECHANICAL SYMBOL & ABBREVIATION
00-N002 INSTRUMENTATION INSTRUMENTATION SYMBOL & ABBREVIATION
00-N003 PROCESS & INSTRUMENTATION EXISTING DRAWING LEGENDS 2A & 2B
05D-N101 PROCESS & INSTRUMENTATION RW PUMPING STATION DIAGRAM - DEMOLITION
05-N101 PROCESS & INSTRUMENTATION RW PUMPING STATION UPGRADES DIAGRAM
05-N102 PROCESS & INSTRUMENTATION PRE-TREATMENT UPGRADE DIAGRAM
05-N103 PROCESS & INSTRUMENTATION PRE-TREATMENT SLUDGE DIAGRAM
05-N201 PROCESS & INSTRUMENTATION EXISTING CLARIFIERS 1-3 DIAGRAM
05-N202 PROCESS & INSTRUMENTATION OZONE CONTACTOR 1 UPGRADES DIAGRAM
05-N203 PROCESS & INSTRUMENTATION OZONE CONTACTOR 2 UPGRADES DIAGRAM
05-N204 PROCESS & INSTRUMENTATION CTH FEED SYSTEM UPGRADES DIAGRAM
05-N301 PROCESS & INSTRUMENTATION GRANULAR MEDIA FILTERS DIAGRAM
05-N302 PROCESS & INSTRUMENTATION GAC FILTERS & TW METERING DIAGRAM
05-N303 PROCESS & INSTRUMENTATION SIMPLOT PUMPING UPGRADE DIAGRAM
05D-N401 PROCESS & INSTRUMENTATION MAKE-UP WATER DIAGRAM - DEMOLITION
05-N401 PROCESS & INSTRUMENTATION MAKE-UP WATER DIAGRAM
05D-N501 PROCESS & INSTRUMENTATION LIME SLAKER SYSTEM DIAGRAM - DEMOLITION
05-N501 PROCESS & INSTRUMENTATION QUICKLIME SILO DIAGRAM
05-N502 PROCESS & INSTRUMENTATION LIME SLAKER 1 DIAGRAM
05-N503 PROCESS & INSTRUMENTATION LIME SLAKER 2 DIAGRAM
05-N504 PROCESS & INSTRUMENTATION LIME FEED SYSTEM DIAGRAM
05-N505 PROCESS & INSTRUMENTATION CLARIFIER CHEMICAL FEED SYSTEMS DIAGRAM
05-N506 PROCESS & INSTRUMENTATION SLUDGE LIFT STATION DIAGRAM
PROCESS MECHANICAL
00-D501 PROCESS MECHANICAL STANDARD DETAILS 1 OF 2
00-D502 PROCESS MECHANICAL STANDARD DETAILS 2 OF 2
05-D001 PROCESS MECHANICAL PROCESS FLOW DIAGRAM
10D-D101 PROCESS MECHANICAL MAIN LEVEL PLAN & SECTION - DEMOLITION
10-D101 PROCESS MECHANICAL MAIN LEVEL PLAN & SECTION
20-D101 PROCESS MECHANICAL PRE-TREATMENT UPGRADES LOCATION PLAN
30-D101 PROCESS MECHANICAL OVERALL PLAN
30-D102 PROCESS MECHANICAL SECOND LEVEL PLAN
30D-D103 PROCESS MECHANICAL OZONE CHAMBER 1 PLAN & SECTION - DEMOLITION
30-D103 PROCESS MECHANICAL BOOSTER PUMPS PLAN & SECTION
30-D104 PROCESS MECHANICAL OZONE CONTACTOR 1 PLAN & SECTIONS
30D-D105 PROCESS MECHANICAL LIME SLAKER SYSTEM PLANS & SECTION - DEMOLITION
30-D105 PROCESS MECHANICAL LIME SLAKER PLAN & SECTION
30-D106 PROCESS MECHANICAL MAIN LEVEL PLAN
40-D101 PROCESS MECHANICAL PUMP ROOM PLAN
40-D301 PROCESS MECHANICAL SECTIONS
MECHANICAL
10-M101 MECHANICAL MAIN FLOOR LEVEL HEATING & VENTILATION PLAN
20-M101 MECHANICAL DOMESTIC WATER SUPPLY UPGRADE
30-M101 MECHANICAL MAIN & SECOND FLOORS PLUMBING PART PLANS, NOTES
ELECTRICAL
00-E001 ELECTRICAL OVERALL SITE PLAN
00-E002 ELECTRICAL LEGEND
05D-E001 ELECTRICAL MAIN BUILDING - DEMOLITION SINGLE LINE DIAGRAM
05-E001 ELECTRICAL RAW WATER PUMPING STATION SINGLE LINE DIAGRAM
05-E002 ELECTRICAL MAIN BUILDING SINGLE LINE DIAGRAM
05-E003 ELECTRICAL RESERVOIR PUMPING STATION SINGLE LINE DIAGRAM
10-E001 ELECTRICAL LIGHTING SCHEDULE & PANELBOARD SCHEDULE
10-E101 ELECTRICAL LIGHTING SCHEDULE & PANELBOARD SCHEDULE
10-E102 ELECTRICAL ELECTRICAL ROOM POWER PLAN
30-E101 ELECTRICAL LIME SLAKER PLAN & SECTION
30-E102 ELECTRICAL LIME SLAKER SECOND FLOOR PLAN
30-E103 ELECTRICAL SECOND FLOOR BOOSTER PUMPS POWER PLAN
30-E104 ELECTRICAL SECOND FLOOR POWER PLAN
30-E401 ELECTRICAL MCC 5000 ELEVATION
40-E101 ELECTRICAL PUMP ROOM POWER PLAN
40-E401 ELECTRICAL MCC ELEVATION
INSTRUMENTATION
05-I001 INSTRUMENTATION SCADA ARCHITECTURE DIAGRAM
1
B1
C1
C2
654 7 9 10
EXISTING
OZONE
CONTACTOR
1
EXISTING
CLARIFIER 2
EXISTING
CLARIFIER 3
EXISTING OZONE
CONTACTOR 2
EXISTING
RECARBONATION
CHAMBER
EXISTING
RECARBONATION
CHAMBER
154208
145
67
36
175
R
2
1
2
6
8
7
692
4
6
8
310
4
9
3
321
R
4
4
4
R
4
4
4
4
9
2
298
364
R
2
0
0
EXISTING
200
20
0
3
1
4
2
0
5
0
283
68
243169
187
65
100
5
1
3
R
2
5
2
I/R DATE DESCRIPTION
ISSUE/REVISION
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
5) L
ast P
lo
tte
d: 2
01
8-0
5-2
5
SHEET TITLE
MAIN BUILDING
STRUCTURAL
OZONE CONTACTORS
PLAN & DETAILS
SHEET NUMBER
30-S101
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
__
__
__
__
__
__
__
_
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\S
\6
05
58
42
9-S
HT
-3
0-0
30
N-S
-0
10
1.D
WG
1
-
1 MOULD DETAIL
-
Scale 1:10
1
-
1
-
1
-
2
-
1
-
3
-
1
-
1
-
4
-
11 STD. INSTALLATION DETAIL
-
Scale 1:5
FORMWORK ANCHORS BY
FORMWORK DESIGNER.
HOLES NEED TO BE FILLED
WITH GROUT AFTER
FORMWORK REMOVED
10M VERTICALS
@ 200 o/c, MIN. 3
NOTES:
1. ALL ARC DIMENSIONS SHALL BE VERIFIED TO SITE
CONDITION PRIOR TO FABRICATION OF FORMWORKS.
2. SEE GENERAL NOTES ON SHEET 20-S101.
OZONE CONTACTORS PLAN
Scale 1:100
N
10
0 E
XT
EN
SIO
N
100 EXTENSION
Printed on ___% Post-Consumer
Recycled Content Paper
Th
is d
ra
win
g h
as b
ee
n p
re
pa
re
d fo
r th
e u
se
o
f A
EC
OM
's clie
nt a
nd
m
ay n
ot b
e u
se
d, re
pro
du
ce
d o
r re
lie
d u
po
n b
y th
ird
p
artie
s, e
xce
pt a
s a
gre
ed
b
y A
EC
OM
a
nd its clie
nt, as re
quired
by law
o
r fo
r u
se
b
y g
overn
me
nta
l review
in
g ag
en
cie
s. A
EC
OM
a
ccep
ts n
o resp
on
sib
ility, a
nd
d
en
ies an
y liab
ility w
ha
tso
eve
r, to
a
ny p
arty th
at m
od
ifie
s th
is d
ra
wing
w
itho
ut A
EC
OM
's exp
re
ss w
ritte
n con
se
nt. D
o n
ot sca
le th
is do
cu
me
nt. A
ll m
ea
sure
me
nts m
ust b
e o
btain
ed
fro
m sta
te
d dim
en
sion
s.
AN
SI D
8
64
mm
x 5
59
mm
REGISTRATION
CONSULTANT
AECOM
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
CLIENT
The Manitoba Water
Services Board
Unit 1A 2010 Currie Boulevard
Brandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGE
LA PRAIRIE
PHASE 2A WATER
TREATMENT PLANT
UPGRADES
MWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2018-05-01 ISSUED FOR TENDER
Certificate of Authorization
AECOM Canada Ltd.
No. 4671 Date:_____________2018-05-01
A
R
C
2nd FLOOR
SERVICE ROOM
2 MOULD DETAIL
-
Scale 1:20
3 MOULD DETAIL
-
Scale 1:20
4 MOULD DETAIL
-
Scale 1:10
BAFFLES WILL BE REMOVED
BY OTHER TO FACILITATE
VERT. & HORIZ. BENCHING, TYP.
±30 x DEEP CHASE
CUT INTO EXISTING
CONCRETE WALLS, TYP.
ROUGHEN
SURFACES
400 x 400 CONCRETE BENCHING
AT WALL & FLOOR INTERSECTION, TYP.
50mm CLEAR COVER
10M BENT BARS @ 300 o/c
PRESSURE GROUT WITH
35MPa CONCRETE
10M DOWELS
@ 300 o/c MIN.
100 EMBED
w/ HILTI HIT
HY-200 ADHESIVE
FORMWORK BY
CONTRACTOR
1
1
3 2018-05-25 ISSUED FOR ADDENDUM
B1
C1
C2
654 7 9 10
EXISTING
CLARIFIER 2
EXISTING
CLARIFIER 3
EXISTING
OZONE
CONTACTOR 2
EXISTING
RECARBONATION
CHAMBER
EXISTING
RECARBONATION
CHAMBER
EXISTING
OZONE
CONTACTOR
1
400
400
EXISTING OZONE
CONTACTOR 1
2400 1
800
Ø100 TO OZONE
DESTRUCT UNIT
150
150
EXISTING OZONE
CONTACTOR 2
EXISTING
RECARBONATION
CHAMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
5) L
ast P
lo
tte
d: 2
01
8-0
5-2
5
SHEET TITLE
MAIN BUILDING
STRUCTURAL
OZONE CONTACTORS
PLAN & SECTIONS
SHEET NUMBER
30-S102
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
__
__
__
__
__
__
__
_
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\S
\6
05
58
42
9-S
HT
-3
0-0
30
N-S
-0
10
2.D
WG
N
OZONE CONTACTORS PLAN
Scale 1:100
REMOVE DAMAGED VINYL COMPOSITE TILES,
(VCT) REPAIR CRACK WITH EPOXY INJECTION,
INSTALL NEW FLOOR TILES.
A SECTION
-
Scale 1:50
WATER LINE
HDPE LINER GLUED TO
CONCRETE STRUCTURE, TYP.
TO MANUFACTURER'S INSTRUCTIONS
B SECTION
-
Scale 1:50
REMOVE DAMAGED VINYL COMPOSITE TILES,
(VCT) REPAIR CRACK WITH EPOXY INJECTION,
INSTALL NEW FLOOR TILES.
HDPE LINER GLUED TO
CONCRETE STRUCTURE,
TYP. TO MANUFACTURER'S
INSTRUCTIONS.
B
-
WATER LINE WATER LINE
2ND FLOOR
2ND FLOOR SERVICE ROOM
EL 104.470
CLARIFIER #3
FLOOR TILE DAMAGE ENLARGED VIEW
EL 104.470
CLARIFIER #3
REMOVE DAMAGED VINYL COMPOSITE TILES,
(VCT) REPAIR CRACK WITH EPOXY INJECTION,
INSTALL NEW FLOOR TILES.
30
0
HDPE LINER GLUED TO
CONCRETE STRUCTURE,
TYP. TO MANUFACTURER'S
INSTRUCTIONS
30
0
30
0
Printed on ___% Post-Consumer
Recycled Content Paper
Th
is d
ra
win
g h
as b
ee
n p
re
pa
re
d fo
r th
e u
se
o
f A
EC
OM
's clie
nt a
nd
m
ay n
ot b
e u
se
d, re
pro
du
ce
d o
r re
lie
d u
po
n b
y th
ird
p
artie
s, e
xce
pt a
s a
gre
ed
b
y A
EC
OM
a
nd its clie
nt, as re
quired
by law
o
r fo
r u
se
b
y g
overn
me
nta
l review
in
g ag
en
cie
s. A
EC
OM
a
ccep
ts n
o resp
on
sib
ility, a
nd
d
en
ies an
y liab
ility w
ha
tso
eve
r, to
a
ny p
arty th
at m
od
ifie
s th
is d
ra
wing
w
itho
ut A
EC
OM
's exp
re
ss w
ritte
n con
se
nt. D
o n
ot sca
le th
is do
cu
me
nt. A
ll m
ea
sure
me
nts m
ust b
e o
btain
ed
fro
m sta
te
d dim
en
sion
s.
AN
SI D
8
64
mm
x 5
59
mm
REGISTRATION
CONSULTANT
AECOM
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
CLIENT
The Manitoba Water
Services Board
Unit 1A 2010 Currie Boulevard
Brandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGE
LA PRAIRIE
PHASE 2A WATER
TREATMENT PLANT
UPGRADES
MWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2018-05-01 ISSUED FOR TENDER
Certificate of Authorization
AECOM Canada Ltd.
No. 4671 Date:_____________2018-05-01
VERTICAL
BENCHING
CONC. BENCHING
CONC. BENCHING
A
-
EL. 104,470m
EL. 104,470m
Ø100 TO OZONE
DESTRUCT SYSTEM
Ø100
EXISTING Ø100 VENT PIPE
UP 1000m ABOVE ROOF
Ø100
1
-
1 BLOW UP DETAIL
-
Scale 1:20
REMOVE AND RE-INSTALL EXISTING
VENT PIPE AS REQUIRED FOR
INSTALLATION OF HDPE LINER
5
0
40
0
400
2-10M
CONT. BARS
10M @ 300 o/c
2-10M DOWELS
@ 300 o/c
VERTICAL
BENCHING
m
m
C
L
E
A
R
C
O
V
E
R
±30 x DEEP CHASE
CUT INTO EXISTING
CONCRETE WALL AND
BASE SLAB, TYP.
30
30
CONC.
BENCHING
2
0
1
1
3 2018-05-25 ISSUED FOR ADDENDUM
11
PIPE SIZE
(mm)
ROD SIZE
(mm)
MAX LOAD
(kg)
36
00
M
AX
.
CAST IN PLACE CONCRETE
INSERT OR HV HANGER
ROD
REFER TO TABLE FOR
APPROPRIATE SIZING
GALVANIZED PIPE CLAMP
REFER TO TABLE FOR
APPROPRIATE SIZING
CEILING
25
50
75
100
150
200
250
300
350
400
450
500
600
10.0
10.0
12.0
16.0
20.0
22.0
25.0
25.0
25.0
29.0
29.0
38.0
44.0
280
280
510
800
1230
1710
2250
2250
2250
2250
2250
3630
3630
GRINNELL OR SIMILAR, SAFETY FACTOR = 5
100
30
0
20
0
400
NOTE: GALVANIZE EXTERIOR STEEL SUPPORTS
6
6
6
C150x12
C100x8
4-12Ø SS ANCHOR BOLTS
300x200x16mm THK PLATE
PIPE SIZE
(mm)
SUPPORT PIPE
(mm)
PLATE SIZE
(mm)
MAXIMUM
SUPPORT PIPE
LENGTH (mm)
REINFORCING PLATE
FOR STAINLESS STEEL
PIPE ONLY
M.S. PLATE
BOLTED TO FLOOR WITH
4-16Ø 316 STAINLESS STEEL
BOLTS C/W ANCHORS
GROUT TO SUIT
(25mm MIN.)
SUPPORT PIPE
6mm VENT HOLE
100
150
200
250
300
350
400
500
600
750
900
50 SCH 40
50 SCH 40
100 SCH 40
100 SCH 40
150 SCH 40
200 SCH 40
200 SCH 40
200 SCH 40
250 SCH 40
300 SCH 40
300 SCH 40
200 X 200 X 6
200 X 200 X 6
250 X 250 X 6
250 X 250 X 6
300 X 300 X 10
350 X 350 X 10
350 X 350 X 10
350 X 350 X 10
400 X 400 X 10
450 X 450 X 10
450 X 450 X 10
1525
1525
1625
1625
1830
1830
1830
1830
1830
1830
1830
6
6
100
MIN
AS
R
EQ
'D
(1
50
M
IN
.)
100
MIN.
A, BOLTS AS REQ'D BY
EQUIPMENT SUPPLIER
DRILL & EPOXY GROUT
15M @ 300 o/c TOP, E.W.
ROUGHEN CONC.
SURFACE
EXISTING CONCRETE
SUPPORT SLAB
20mm CHAMFER, TYP.
NOTES:
1. SIZE, NUMBER, TYPE, LOCATION AND THREAD PROJECTION OF ANCHOR BOLTS
IS TO BE DETERMINED BY THE EQUIPMENT SUPPLIER.
2. BASES SHALL BE LEVEL UNLESS NOTED OTHERWISE.
3. CONTRACTOR TO SIZE AND LOCATE PAD REINFORCEMENT TO SUIT ANY
ALTERNATIVE BOLT ARRANGEMENTS.
4. REFER TO DIVISION 3 FOR CONCRETE MIX DETAILS.
15M DOWELS @ 300 o/c
AROUND PERIMETER,
DRILLED AND EPOXY
GROUTED 130mm INTO
CONCRETE. UTILIZING HILTI
HIT HY-150 ADHESIVE.
MIN TWO DOWELS PER SIDE.
GUARDRAIL MOUNTED
RAIN HOOD
REQUIRED FOR OUTDOOR
INSTALLATION
SECURE INSTRUMENT TO
SUPPORT CHANNEL WITH
SS BOLTS
41x41mm SS SUPPORT CHANNEL
SPACE TO SUIT INSTRUMENT
MOUNTING REQUIREMENTS.
SECURE HANDRAILS TOP &
BOTTOM WITH 6mm SS U-BOLTS
ROUND OFF EXPOSED CORNERS
OF SUPPORT CHANNEL (TYP.)
SPACE AS REQUIRED
FOR CONDUIT ENTRY
TO SUIT INSTRUMENT
TOP GUARDRAIL
BOTTOM GUARDRAIL
GUARDRAIL POST
SECURE INSTRUMENT
TO WALL WITH SS
CONCRETE ANCHORS
FLOOR
WALL
13mm SS
STANDOFF
(TYP.)
13
72
SENSOR LOCATION
23
12
1372
1524
DIMENSION AS
RECOMMENDED BY
SENSOR MANUFACTURER
ULTRASONIC LEVEL
TRANSMITTER
SENSOR FLANGE ADAPTER
50 mm HIGH PVC SPACER
BLOCK WITH 75mm HOLE
THROUGH CENTER
POLYETHYLENE
TANK
15mm CLEAR
POLYETHELENE
TUBING
25mm BALL VALVE (TYP)
NOTES:
1. CONTRACTOR TO CONFIRM VALVE REQUIREMENTS WITH INSTRUMENT MANUFACTURER ,
INSTRUMENT ISOLATION VALVES (BV-377, NV-338, BV-339) TO BE SIZED BASED ON
INTRUMENT FEED LINE.
10mm CLEAR
POLYETHELENE
TUBING
12mm NEEDLE
VALVE
PROCESS PIPE
25mm TEE
25mm
BALL VALVE
(TYP)
Exit Enter
V
V
AMI pH-Redox
TO FLOOR
DRAIN
VENDOR
PACKAGE WALL
MOUNTED
ANALYZER PANEL.
OUTPUT SIGNALS
TO PLC.
POWER SUPPLY
FROM CONTROL
PANEL.
25mm NPT
TO 10mm
HOSE BARB.
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
2) L
ast P
lo
tte
d: 2
01
8-0
5-2
2
SHEET TITLE
GENERAL & SITEWORKS
PROCESS MECHANICAL
STANDARD DETAILS
2 OF 2
SHEET NUMBER
00-D502
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
__
__
__
__
__
__
__
_
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\D
\6
05
58
42
9-S
HT
-3
0-0
00
N-D
-0
50
2.D
WG
9 SINGLE PIPE HANGER
-
N.T.S.
10 WALL MOUNTED PIPE SUPPORT
-
N.T.S.
11 TEE SUPPORT FOR STEEL
-
N.T.S.
12 TYPICAL HOUSEKEEPING PAD DETAIL
-
N.T.S.
13 FIELD INSTRUMENT PANEL MOUNTING
-
N.T.S.
14 LEVEL TRANSMITTER
-
N.T.S.
CALCIUM THIOSULPHATE
1 2018-05-10 ISSUED FOR ADDENDUM
Printed on ___% Post-Consumer
Recycled Content Paper
Th
is d
ra
win
g h
as b
ee
n p
re
pa
re
d fo
r th
e u
se
o
f A
EC
OM
's clie
nt a
nd
m
ay n
ot b
e u
se
d, re
pro
du
ce
d o
r re
lie
d u
po
n b
y th
ird
p
artie
s, e
xce
pt a
s a
gre
ed
b
y A
EC
OM
a
nd its clie
nt, as re
quired
by law
o
r fo
r u
se
b
y g
overn
me
nta
l review
in
g ag
en
cie
s. A
EC
OM
a
ccep
ts n
o resp
on
sib
ility, a
nd
d
en
ies an
y liab
ility w
ha
tso
eve
r, to
a
ny p
arty th
at m
od
ifie
s th
is d
ra
wing
w
itho
ut A
EC
OM
's exp
re
ss w
ritte
n con
se
nt. D
o n
ot sca
le th
is do
cu
me
nt. A
ll m
ea
sure
me
nts m
ust b
e o
btain
ed
fro
m sta
te
d dim
en
sion
s.
AN
SI D
8
64
mm
x 5
59
mm
REGISTRATION
CONSULTANT
AECOM
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
CLIENT
The Manitoba Water
Services Board
Unit 1A 2010 Currie Boulevard
Brandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGE
LA PRAIRIE
PHASE 2A WATER
TREATMENT PLANT
UPGRADES
MWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2018-05-01 ISSUED FOR TENDER
1
15 ORP ANALYZER INSTALL DETAIL
-
N.T.S.
2 2018-05-24 ISSUED FOR ADDENDUM
1
Printed on ___% Post-Consumer
Recycled Content Paper
Th
is d
ra
win
g h
as b
ee
n p
re
pa
re
d fo
r th
e u
se
o
f A
EC
OM
's clie
nt a
nd
m
ay n
ot b
e u
se
d, re
pro
du
ce
d o
r re
lie
d u
po
n b
y th
ird
p
artie
s, e
xce
pt a
s a
gre
ed
b
y A
EC
OM
a
nd
its clie
nt, a
s re
qu
ire
d b
y la
w o
r fo
r u
se
b
y g
ove
rn
me
nta
l re
vie
win
g a
ge
ncie
s. A
EC
OM
a
cce
pts n
o re
sp
on
sib
ility, a
nd
d
en
ie
s a
ny lia
bility w
ha
tso
eve
r, to
a
ny p
arty th
at m
odifie
s th
is d
ra
win
g w
ith
ou
t A
EC
OM
's e
xpress w
ritten
co
nse
nt. D
o n
ot sca
le th
is do
cu
me
nt. A
ll m
ea
surem
en
ts m
ust b
e ob
ta
in
ed
fro
m sta
ted
d
im
en
sio
ns.
AN
SI D
8
64
mm
x 5
59
mm
REGISTRATION
CONSULTANT
AECOM
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
CLIENT
The Manitoba Water
Services Board
Unit 1A 2010 Currie Boulevard
Brandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGE
LA PRAIRIE
PHASE 2A WATER
TREATMENT PLANT
UPGRADES
MWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2018-05-01 ISSUED FOR TENDER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
3) L
ast P
lo
tte
d: 2
01
8-0
5-2
3
SHEET TITLE
RESERVOIR & PUMP HOUSE
PROCESS MECHANICAL
PUMP ROOM PLAN
----
SHEET NUMBER
40-D101
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
__
__
__
__
__
__
__
_
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\D
\6
05
58
42
9-S
HT
-3
0-0
40
N-D
-0
10
1.D
WG
170
P
SIMPLOT
PUMP
250 - TW - CS
CL EL. 265.592m
330
P
SIMPLOT
PUMP
250±
1060±
1060± 3160±
1500±
1750±
40-D301
A
40-D301
C
PUMP ROOM PLAN
Scale 1 : 100
PRV-173
PRV-333
BF
V - 3
34
400 - TW - CS
CL EL. 267.660m
2000±690±2140±
510±460±
1500±
BFV-332
300x400
890±
200x250
250x150
(NOTE 1)
300 - TW - CS
CL EL. 265.738m
NOTE:
1. CONFIRM THAT WATER STOP FLANGE IS INSTALLED. REFER TO
DRAWING 00-D501, DETAIL 2.
NOTICE:
AS-CONSTRUCTED DIMENSIONS,
MEASUREMENTS AND OTHER DETAILS
CONTAINED IN THIS RECORD DRAWING
HAVE BEEN OBTAINED BY AECOM CANADA
LTD. ("AECOM") FROM VARIOUS SOURCES.
SUCH INFORMATION REPRESENTS THE
BEST INFORMATION AVAILABLE TO AECOM
AT THE TIME OF PREPARATION OF THIS
RECORD DRAWING. AECOM DOES NOT IN
ANY WAY REPRESENT OR WARRANT THAT
SUCH INFORMATION IS ACCURATE AND
ASSUMES NO RESPONSIBILITY FOR ANY
ERRORS OR OMISSIONS CONTAINED
THEREIN.
3
00-D501
3
00-D501
N
BF
V-1
74
130
TWP
140
TWP
IV-172
IV-221
600 - TW - ST40
40-D301
B
30
0x1
50
IV-325
320
TWP
310
TWP
160
TWP
150
TWP
IV-174600 - TW - ST40
AE
337
ORP
15
00-D502
1
2 2018-05-24 ISSUED FOR ADDENDUM
Printed on ___% Post-Consumer
Recycled Content Paper
Th
is d
ra
win
g h
as b
ee
n p
re
pa
re
d fo
r th
e u
se
o
f A
EC
OM
's clie
nt a
nd
m
ay n
ot b
e u
se
d, re
pro
du
ce
d o
r re
lie
d u
po
n b
y th
ird
p
artie
s, e
xce
pt a
s a
gre
ed
b
y A
EC
OM
a
nd
its clie
nt, a
s re
qu
ire
d b
y la
w o
r fo
r u
se
b
y g
ove
rn
me
nta
l re
vie
win
g a
ge
ncie
s. A
EC
OM
a
cce
pts n
o re
sp
on
sib
ility, a
nd
d
en
ie
s a
ny lia
bility w
ha
tso
eve
r, to
a
ny p
arty th
at m
od
ifie
s th
is d
ra
win
g w
ith
ou
t A
EC
OM
's e
xp
re
ss w
ritte
n co
nse
nt. D
o n
ot sca
le
th
is d
ocu
me
nt. A
ll m
ea
su
re
me
nts m
ust b
e o
bta
in
ed
fro
m sta
te
d d
im
en
sio
ns.
AN
SI D
8
64
mm
x 5
59
mm
REGISTRATION
CONSULTANT
AECOM
99 Commerce Drive
Winnipeg, Manitoba R3P 0Y7
204.477.5381 tel 204.284.2040 fax
www.aecom.com
CLIENT
The Manitoba Water
Services Board
Unit 1A 2010 Currie Boulevard
Brandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGE
LA PRAIRIE
PHASE 2A WATER
TREATMENT PLANT
UPGRADES
MWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2018-05-01 ISSUED FOR TENDER
La
st sa
ve
d b
y: A
NN
A.A
RA
UJO
(2
01
8-0
5-2
3) L
ast P
lo
tte
d: 2
01
8-0
5-2
5
SHEET TITLE
RESERVOIR & PUMP HOUSE
PROCESS MECHANICAL
SECTIONS
----
SHEET NUMBER
40-D301
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
__
__
__
__
__
__
__
_
File
na
me
: P
:\6
05
58
42
9\9
00
-C
AD
_G
IS
\9
10
-C
AD
\2
0-S
HE
ET
S\D
\6
05
58
42
9-S
HT
-3
0-0
40
N-D
-0
30
1.D
WG
170
P
DISTRIBUTION
PUMP
250 - TW - CS
330
P
DISTRIBUTION
PUMP
170
P
DISTRIBUTION
PUMP
BFV-172
BFV-172
CV-171
BFV-332
CV-331
PRV-333
PRV-173
A SECTION
40-D101
Scale 1 : 50
B SECTION
40-D101
Scale 1 : 50
400 - TW - CS
CL EL. 267.660m
300 x 400
250X400
PRV-173
250 - TW - CS
300 - TW - CS
200 x 250
250 x 400
25
4
TOC EL 265.200m
CL EL. 268.700m
CL EL. 265.592m
CL EL. 265.738m
8
00-D501
NOTICE:
AS-CONSTRUCTED DIMENSIONS,
MEASUREMENTS AND OTHER DETAILS
CONTAINED IN THIS RECORD DRAWING
HAVE BEEN OBTAINED BY AECOM CANADA
LTD. ("AECOM") FROM VARIOUS SOURCES.
SUCH INFORMATION REPRESENTS THE
BEST INFORMATION AVAILABLE TO AECOM
AT THE TIME OF PREPARATION OF THIS
RECORD DRAWING. AECOM DOES NOT IN
ANY WAY REPRESENT OR WARRANT THAT
SUCH INFORMATION IS ACCURATE AND
ASSUMES NO RESPONSIBILITY FOR ANY
ERRORS OR OMISSIONS CONTAINED
THEREIN.
EXISTING
NEW
TP
09
EXISTING
NEW
TP
11
330
P
DISTRIBUTION
PUMP
400 - TW - CS
CL EL. 267.660m
BFV-332
CV-331
C SECTION
40-D101
Scale 1 : 50
PRV-333
150 x 300
25
4
TOC EL 265.200m
11
00-D502
EXISTING
NEW
TP
11
600 - TW - ST40
600 - TW - ST40
EXISTING
NEW
TP
09
PFV-334
600 - TW - ST40
IV-325IV-174
IV-172
2 2018-05-24 ISSUED FOR ADDENDUM
FE-167
1
OPERATORWORKSTATION
(NOTE 10)
PRE-TREATMENTBUILDING
RAW WATER PUMPINGSTATION
CAT 6ETHERNET
EN
ET
6F F
IBE
R O
PTI
C C
AB
LE
EXISTING FIBREOPTIC CABLE
EXISTINGMOMENTUMPLC PANEL.(NOTE 1)
P2000VFD
P2001VFD
P2002VFD
EN
ET
EN
ET
EN
ET
PRE-TREATMENTBUILDING
EN
ET
EXISTING FIBREOPTIC CABLE
EXISTINGMOMENTUMPLC PANEL.( NOTE 2)
AIT
3121
AIT
3122
UVTUVT
OPERATORWORKSTATION AND BACKUP
SCADA SERVER(NOTE 10)
RESERVOIRPUMPING STATION
RESERVOIRPUMPING STATION
CAT 6ETHERNET
EN
ET
EXISTING FIBREOPTIC CABLE
EXISTINGQUANTUM PLCPANEL.( NOTE 3 )
P330VFD
AIT
337
AIT
169
NEW PUMP VFD'sAND FIELDINSTRUMENTS
NEW ETHERNETAND CONTROLWIRING
PHORPP170VFD
OPERATOR WORKSTATIONS ANDPRIMARY SCADA SERVER
(NOTE 10)
MAIN CONTROL ROOM
MAIN WATERTREATMENT PLANT
MCC 4000
EN
ET
EXISTING ETHERNETSWITCH (NOTE 8)
EXISTINGQUANTUM PLCPANEL. (NOTE 4)
STARTERP4061
ENETSWITCH
AIT
4255
AIT
5423
NEW FIELDINSTRUMENTSAND STARTERS
NEW CONTROLWIRING
DISSOLVEDOZONE
DISSOLVEDOZONE
STARTERP4060
PLCPANEL
PLCPANEL
NEW LIMESLAKERPLC PANEL(NOTE 5)
EXISTING QUANTUMRIO PLC PANEL.(NOTE 6)
EN
ET
EN
ET
MO
DB
US
PLU
S (
NO
TE 1
2 )
McKAYTELEMETRY
6F F
IBE
R O
PTI
C C
AB
LE6F
FIB
ER
OP
TIC
CA
BLE
6F F
IBE
R O
PTI
C C
AB
LE
6F F
IBE
R O
PTI
C C
AB
LE
HISTORIANCOMPUTER(NOTE 10)
MANAGERS OFFICEWORKSTATION
(NOTE 10)
EXISTING ANTENNAON LIME SILO ROOF
EXISTING 900 MHZRADIO PANEL WITHMEDIA CONVERSION
McKAYTELEMETRY
NEW 900MHZ RADIOWITH MEDIACONVERSION(NOTE 9)
6F FIBER OPTIC CABLE
KEYNOTES:
1. EXISTING MOMENTUM PLC WILL BE DE-COMMISSIONED AFTER THE NEW PUMPS ARE COMMISSIONED. THE NEW RAW WATER PUMP VFD DRIVES WILL USEETHERNET CONTROL FROM MAIN PLC AND WILL BE COMMISSIONED SEQUENTIALLY WHILE EXISTING PUMPS REMAIN IN SERVICE.
2. EXISTING MOMENTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHERWITH NEW I/O SPECIFIED ON THIS UPGRADE.
3. EXISTING QUANTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHERWITH NEW I/O SPECIFIED ON THIS UPGRADE.
4. EXISTING QUANTUM PLC (3 RACKS) WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTSTOGETHER WITH NEW I/O SPECIFIED ON THIS UPGRADE. EXISTING ETHERNET CONNECTIONS TO INTERNET, WAN, AND OTHER COMPUTERS AND PERIPHERALSARE TO BE INCORPORATED INTO NEW DESIGN.
5. THE EXISTING LIME SLAKER PLC WILL BE UPGRADED TO SCHNEIDER M340 PLC AS PART OF A VENDOR SUPPLY PACKAGE. THE CONTROL SYSTEM INTEGRATORFOR THIS PROJECT WILL BE RESPONSIBLE FOR FULL INTEGRATION OF THE UPGRADED LIME SLAKER SYSTEM.
6. EXISTING QUANTUM REMOTE I/O PLC PANEL WITH MODBUS PLUS COMMUNICATION WILL BE UPGRADED TO SCHNEIDER X80 I/O WITH ETHERNET COMMUNICATION.THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHER WITH NEW I/O SPECIFIED ON THIS UPGRADE.
7. EXISTING QUANTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. DUE TO SPACE LIMITATIONS IN THE EXISTING PANEL, THE NEW PLCAND I/O WILL BE INSTALLED IN A NEW PANEL AND I/O WIRING WILL BE EXTENDED. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS.
8. EXISTING FIBRE CABLES, FIBRE TERMINATION BOX, PATCH PANEL AND ETHERNET SWITCHES WILL BE RE-USED BUT THE EXISTING MEDIA CONVERTERS WILL BEREPLACED AND NEW MEDIA CONVERTERS ADDED.
9. NEW ETHERNET RADIO TELEMETRY PANELS WILL BE INSTALLED TO FACILITATE FULL INTEGRATION OF THE McKAY PLC WITH THE MAIN PLANT PLC AT MCC 4000..10. SCADA SYSTEM COMPUTERS AND SOFTWARE WILL BE REPLACED AND NEW WORKSTATIONS WILL BE ADDED.11. A NEW ETHERNET SWITCH WITH ENCLOSURE SHALL BE PROVIDED AT McKAY RESERVOIR PUMPING STATION.12. EXISTING MODBUS PLUS WILL BE DE-COMMISSIONED.13. PROVIDE NEW FIBRE TERMINATION AND PATCH PANEL.
PLCPANEL
LIME SLAKER SYSTEM
OPERATOR WORKSTATIONAND SCADA SERVER
(NOTE 10)
McKAY RESERVOIRPUMPING STATION
McKAY RESERVOIRPUMPING STATION
EN
ET
EN
ET
NEW ETHERNETSWITCH
(NOTE 11)
EXISTINGQUANTUMPLC PANEL.(NOTE 7)
McKAYTELEMETRY
EXISTING900 MHZRADIO
NEW DIRECTIONALANTENNA ON LIMESILO ROOF
EXISTING ANTENNAAND MAST
EN
ET
PLCPANEL
PLCPANEL
EXISTING FIBER TERMINATION,PATCH PANEL, MEDIACONVERSATION ANDETHERNET SWITCH(NOTE 8)
EXISTINGMOMENTUMPLC PANEL.( NOTE 1)
NEW ETHERNETAND CONTROLWIRING
NEW PUMPVFD's
MAIN WATER PLANTMCC 5000
McKAYTELEMETRY
NEW 900 MHZRADIO (NOTE 9)
NEW DIRECTIONALANTENNA ONEXISTING MAST
6F F
IBE
R O
PTI
C C
AB
LE
6F F
IBE
R O
PTI
C C
AB
LE
NEW ETHERNETSWITCH
EXISTING FIBER TERMINATION,PATCH PANEL, MEDIACONVERSATION ANDETHERNET SWITCH(NOTE 8)
EXISTING FIBERTERMINATION, PATCH
PANEL, MEDIACONVERSATION ANDETHERNET SWITCH
(NOTE 8)
25mm CONDUIT WITH2F FIBRE CORD
25mm CONDUIT WITH2F FIBRE CORD
NEW FIBRE TERMINATIONAND PATCH PANEL
(NOTE 13)
Last
sav
ed b
y: C
HA
VE
ZR(2
018-
05-2
5)
Las
t Plo
tted:
201
8-05
-25
SHEET TITLE
DIAGRAMS & SCHEMATICSINSTRUMENTATIONSCADA ARCHITECTUREDIAGRAM
SHEET NUMBER
05-I001
Pro
ject
Man
agem
ent I
nitia
ls:
Des
igne
r:C
heck
ed:
App
rove
d:__
___
____
___
___
File
nam
e: P
:\605
5842
9\90
0-C
AD
_GIS
\910
-CA
D\0
5-M
OD
ELS
\I\60
5584
29 -
05-1
001.
DW
G
1 2018-05-10 ISSUED FOR ADDENDUM
2 2018-05-24 ISSUED FOR ADDENDUM
Printed on ___% Post-ConsumerRecycled Content Paper
AN
SI D
864
mm
x 5
59m
m
REGISTRATION
CONSULTANT
AECOM99 Commerce DriveWinnipeg, Manitoba R3P 0Y7204.477.5381 tel 204.284.2040 faxwww.aecom.com
CLIENT
The Manitoba WaterServices BoardUnit 1A 2010 Currie BoulevardBrandon, MB, R7B 4E7
PROJECT
CITY OF PORTAGELA PRAIRIEPHASE 2A WATERTREATMENT PLANTUPGRADESMWSB PROJECT #1423
PROJECT NUMBER
60558429
PHASE 2A
I/R DATE DESCRIPTION
ISSUE/REVISION
Certificate of Authorization
AECOM Canada Ltd.
No. 4671 Date:_____________2018-05-25