24
May 25, 2018 Dear Sir: Attached is Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba Water Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water Treatment Plant Upgrades. Please verify receipt of this Addendum for our records by fax to (204) 726-6290. * ACKNOWLEDGEMENT OF RECEIPT OF ALL ADDENDUMS MUST BE INCLUDED IN THE TENDER SUBMISSION. Failure to include acknowledgement shall cause the tender to be rejected. If Tender is submitted before Addendum is issued, the Board will accept a faxed acknowledgement prior to the tender closing. Yours truly, R. Lytle Construction Manager ______________________________________________________________________ The Manitoba Water Services Board Unit #1A - 2010 Currie Blvd. Brandon, MB R7B 4E7 Dear Sir: We have received Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba Water Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water Treatment Plant Upgrades. Yours truly, ____________________________________ Company _____________________________________ Per

ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Embed Size (px)

Citation preview

Page 1: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

May 25, 2018

Dear Sir:

Attached is Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba Water

Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water Treatment

Plant Upgrades. Please verify receipt of this Addendum for our records by fax to (204) 726-6290.

* ACKNOWLEDGEMENT OF RECEIPT OF ALL ADDENDUMS

MUST BE INCLUDED IN THE TENDER SUBMISSION.

Failure to include acknowledgement shall cause the tender to be rejected. If Tender is submitted before Addendum is issued, the Board will accept a faxed acknowledgement prior to the tender closing. Yours truly,

R. Lytle

Construction Manager

______________________________________________________________________

The Manitoba Water Services Board

Unit #1A - 2010 Currie Blvd.

Brandon, MB R7B 4E7

Dear Sir:

We have received Addendum No. 3 dated May 25, 2018 to the Specifications for The Manitoba

Water Services Board Contract No. M.W.S.B. 1423, City of Portage la Prairie Phase 2A Water

Treatment Plant Upgrades.

Yours truly,

____________________________________

Company

_____________________________________

Per

Page 2: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

THE MANITOBA WATER SERVICES BOARD

CONTRACT NO. M.W.S.B. 1423

City of Portage la Prairie

Phase 2A Water Treatment Plant Upgrades

ADDENDUM NO. 3

Date: May 25, 2018

1) PRECEDENCE

This Addendum is issued prior to Tender closing to provide for certain revisions as noted

herein.

This addendum forms an integral part of the specifications describing all aspects of the

work and is to be read in conjunction therewith.

All work shall be performed in accordance with the Contract Documents.

2) SCOPE

The purpose of this addendum is to amend the following sections of the Tender

Documents:

.1 The calcium thiosulphate tanks (TK-1, TK-2) are constructed of polyethylene.

.2 Regarding Note 2 on Drawing 30-D101: The conduit referred to in this note is

accessible via a crawlspace. The approximate length of conduit between the Main

Building and the Pre-Treatment Building is 31 m.

.3 Contractor to have the existing vinyl tiles and adhesive above Ozone Contactor 2

tested for asbestos by Pinchin Environmental Ltd. prior to any tile replacement in this

area.

.4 The height from floor to ceiling of Ozone Contactor 2 (the contactor for Clarifier 3) is

7.97 m. The heights of the Ozone Contactor 2 and the Recarbonation Chamber 2 are

the same.

.5 Supply and install 3 pole, 600V, 15A breaker to panel 50A, cct. 20,22,24.

.6 Supply and install 3C#12 AWG Teck 90, 1000V cable from panel 50A to the actuator

for FCV 6044.

.7 The 100 mm vent piping described on Drawing 30-S105, Section B is constructed of

316 stainless steel. This piping is to be removed and reinstalled in chambers depicting

liner installation, in accordance to the drawings.

.8 Replace MWSB Form 3B Schedule of Prices with attached MWSB Form 3B

(Revision 2).

Page 3: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

.9 Amend Section 11105: The Knife Gate Valves shall have a Resilient Buna-N seat.

.10 Replace Section 01150, Clause 1.6.4.2 with the following:

.2 Basis of Payment: Payment for “Ozone Contactor Modifications” shall be paid for

at the Contract Lump Sum Price and shall include all work related to the supply,

installation and commissioning of ozone contactor modifications, including

benching of contactor corners, installation of stainless steel baffle walls,

installation of ozone analyzers, repair of Contactor 1 roof, testing tile materials for

asbestos, appurtenances, and other site improvements as required in the

Specifications.

.11 Add to Section 01150, Clause 1.6 the following:

.9 Tile Removal and Repair:

.1 Method of measurement: “Tile Removal and Repair” shall be

measured.

.2 Basis of Payment: Payment for “Tile Removal and Repair” shall be

paid for at the Contract Unit Price and shall include all work

related to the removal of the existing tiles above Ozone Contactor

2, the supply and installation of new tiles, appurtenances, and other

site improvements as required in the Specifications. Unit price to

be all inclusive labour, material, travel expenses, overhead and

profit.

.12 Replace Section 11710, Clause 1.1.1 with the following:

.1 Supply and install two (2) complete detention-type lime slaker systems including

all components specified or shown on the Drawings. Subcontract, pay all

necessary expenses, and coordinate STT Enviro Corp technicians (STT) to

complete these works, as noted in Clause 3.1. Submit complete Shop Drawings of

the entire lime slaker system.

.13 Replace Section 11710, Clause 3.1 with the following:

3.1 Installation

.1 STT shall be responsible for mechanical installation, including the

following:

.1 Installing support legs under existing feeder platform.

.2 Securing the new M-15 slakers to existing structure.

.3 Securing the new Grit Screens to existing structure.

.4 Routing slurry piping between M-15 slaker outlet and grit screen

inlet.

.5 Installing new feeder support for existing feeders.

Page 4: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

.6 Reinstalling existing feeders on new support structure.

.7 Fitting new chutes from existing silo outlet to newly located feeder

inlets.

.8 Installing flex connection between existing feeder outlet and slaker

inlet.

.9 Scope of work is mechanical installation from inlet of slaker to

outlet of grit screen.

.2 STT shall be responsible for programming and integration of controls for

the entire lime slaking system. Interface between the lime slaking system

and the plant SCADA system shall be the Contractor’s responsibility.

.3 Contractor shall be responsible for coordinating wiring, piping and other

appurtenances in order to provide a fully functional lime slaking system as

required in Clause 3.3.

.4 Contractor shall be responsible for the following:

.1 Removing the existing paste slakers.

.2 Removing the existing grit classifiers.

.3 Placing the new M-15 slakers into their correct location.

.4 Placing the new Grit Screens into their correct location.

.5 Mounting new control panels, as shown on 30-E101.

.6 Wiring of new control panels, as shown on 05-E002.

.7 Wiring new equipment in this section to the new control panels as

appropriate.

.14 Replace Section 14720, Clause 1.1.1 with the following:

.1 Supply and install hoist beam, low headroom type combined manual trolley and

hoist.

.15 Replace Section 17702 (Addendum 1) with the attached Section 17702.

.16 Delete SCADA Architecture Diagram SK-1-001 in Section 17500 (Addendum 1).

Refer to Drawing 05-I001 for the SCADA Architecture Diagram.

.17 Replace Section 17010, Clause 1.3.2.2 (Addendum 2) with the following:

.2 Schneider Electric Systems Canada.

.18 Replace Drawing 00-G000 (Addendum 1) with the attached Drawing 00-G000.

Page 5: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

.19 Replace Drawing 30-S101 with the attached Drawing 30-S101.

.20 Reference Drawing 30-S101: 400x400 concrete benching is required along all 4 walls

of each chamber/contactor, including the shared contactor wall.

.21 Replace Drawing 30-S102 with the attached Drawing 30-S102.

.22 Replace Drawing 00-D502 (Addendum 1) with the attached Drawing 00-D502.

.23 Replace Drawing 40-D101 with the attached Drawing 40-D101.

.24 Replace Drawing 40-D301 with the attached Drawing 40-D301.

.25 Reference Drawing 10-E001:

Amend the Luminaire Schedule in to include the following approved equals:

Type A, Manufacturer Catalog Number: BJTAKE BLV-4-4-835-UNV-L26

Type D, Manufacturer Catalog Number: BEGHELLI BRV-R-6V-LEDMR16-6V-5W

Type E, Manufacturer Catalog Number: BEGHELLI AQ-RM-6-36-L-1-OLR-W-

2SEA-6V-5W

.26 Add the attached Drawing 05-I001 to the Drawing Set.

END OF ADDENDUM

Page 6: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

MWSB 3B (Revision 2)

Page 1 of 1

SCHEDULE OF PRICES

PROJECT NO. MWSB

DESCRIPTION OF WORK

ESTIMATED

QUANTITIES UNIT

UNIT

PRICE

$0.00

TOTAL

$0.00

1. Raw Water Flow Control1

Lump

Sum

2. Pre-Treatment Screening 1 LumpSum

3. Lime Batching Alterations 1 Lump

Sum

4a. Ozone Contactor Modifications 1 Lump

Sum

4b. Tile Removal and Repair 35 m2

5. Makeup Water System for Chemical Batch

Tanks

1 Lump

Sum

6. City Distribution Pumps 1 Lump

Sum

7. PLC Upgrades 1 Lump

Sum

8. SCADA System Upgrades and McKay

Reservoir Control

1 Lump

Sum

Pump and Valve Refurbishment Allowance $ 37,500

Extra Work Allowance $ 200,000

Subtotal $

*PST must be included in unit prices. Goods & Services Tax (5% of Subtotal) $

TOTAL TENDER PRICE $

_________________________

Name of Bidder

Page 7: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

MWSB Project No. 1423

City of Portage la Prairie Section 17702

Phase 2A Water Treatment Plant Upgrades Page 1 of 11

60558429 May 2018

ADDENDUM 3

INSTRUMENT LOOP DRAWINGS

1. GENERAL

1.1 References – General

.1 Refer to Section 17010.

1.2 Instrument Loop Drawings

.1 The Drawings listed below show typical instrument loop and motor control wiring diagrams required for this project. The following Drawings are an integral part of this Specification Section:

ILD-001 Instrument Loop Wiring Diagram – Ultrasonic Level Transmitter

ILD-002 Instrument Loop Wiring Diagram – Not Used

ILD-003 Instrument Loop Wiring Diagram – Variable Frequency Drive

ILD-004 Instrument Loop Wiring Diagram – Magnetic Flow Meter

ILD-005 Instrument Loop Wiring Diagram – Dissolved Ozone Transmitter

ILD-006 Instrument Loop Wiring Diagram – ORP & pH Transmitter

ILD-007 Instrument Loop Wiring Diagram – UV Transmittance Transmitter

ILD-008 Instrument Loop Wiring Diagram – Modulating Valve or Gate Actuator

ILD-009 Instrument Loop Wiring Diagram – Typical FVNR Starter

ILD-010 Instrument Loop Wiring Diagram – Pump Low Water Level Interlock

2. PRODUCTS (NOT USED)

3. EXECUTION

.1 One (1) drawing per loop or motor drive will be completed by the contractor and submitted for approval after award of Contract.

.2 Review each wiring detail together with the reviewed Shop Drawings for the respective equipment and modify the Drawing to comply with the selected equipment manufacturer’s requirements.

.3 Record all as-constructed modifications, terminal numbers, wire numbers, etc. and update the loop drawings to Record Drawing status.

.4 Include copies of each record loop drawing in the as-constructed drawing set and the O&M manuals.

END OF SECTION

Page 8: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

PLC

LIT

XXX

FIELD PROCESS AREA CONTROL PANEL

XXX-71

XXX-70LT-XXXX

ANALOG INPUT

TANK LEVEL

XXX-SH

XXX-70

+

XXX-71

-

2 PAIR TPSH

+

-

G

RELAY

OUTPUT 1

LE

XXX

ULTRASONIC LEVEL

TRANSMITTER

4-20 MA

OUTPUT

+24 VDC

POWER

SUPPLY

L1 N1

XXX-32

XXX-31

XXX-32

XXX-N

LF-XXXX

DISCRETE INPUT

TRANSMITTER FAULT

120 VAC

POWER SUPPLY

Level Transmitter - Instrument Loop Diagram Loop No.XXX

+

-

+ -

24 VDC

POWER SUPPLY

PSC

+24V

SH

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

ULTRASONIC LEVEL

TRANSMITTER

ILD-001

1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM

OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.

2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR

TAG NUMBERS.

1 2018-05-10 ISSUED FOR ADDENDUM 1

2 2018-05-22 ISSUED FOR ADDENDUM 2

Page 9: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Blower - Instrument Loop Diagram Loop No.3550

LOCAL CONTROL STATION CONTROL PANEL

PDIT-3550 ANALOG

INPUT

DIFF. PRESSURE

INDICATION

TT-3550

ANALOG INPUT

TEMPERATURE

INDICATION

PI

3550

PL-3550

DISCRETE INPUT

LOW PRESSURE

VH1-3550

DISCRETE INPUT

HIGH BLOWER

VIBRATION

VH2-3550

DISCRETE INPUT

HIGH MOTOR

VIBRATION

TH-3550 DISCRETE

INPUT HIGH

TEMPERATURE

PLC

L1 N1

120 VAC

P

3550

BLOWER

TSH

3550

VS1

3550

MTR

VS2

3550

BLR

PSL

3550

PDIT

3550

TE

3550

DISCHARGE

AIR TO

PROCESS

TIT

3550

BLOWER PANEL

PSH

3550

3550-72

3550-SH

3550-71

FILTER

DIFFERENTIAL

PRESSURE

2PR TPSH #18 CABLE

3550-74

3550-SH

3550-73

ENCLOSURE

TEMPERATURE

TI

3550

3550-PSL

3550-VS1

3550-VS2

3550-TSH

3550-PSH

PH-3550 DISCRETE

INPUT HIGH

PRESSURE

10C #14 TECK CABLE

3550-72

3550-SH

3550-71

3550-74

3550-SH

3550-73

3550-72

3550-71

3550-74

3550-73

3550-32

3550-31

3550-34

3550-33

3550-36

3550-35

3550-38

3550-37

3550-40

3550-39

3550-32

3550-31

3550-34

3550-33

3550-36

3550-35

3550-38

3550-37

3550-40

3550-39

3550-32

3550-N

3550-34

3550-N

3550-36

3550-N

3550-38

3550-N

3550-40

3550-N

1. CONFIGURE ALARM RELAYS TO TRANSFER STATE UPON ALARM

OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

AERATION BLOWER

PANEL

ILD-002

1 2018-05-10 ISSUED FOR ADDENDUM

Page 10: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

VSD - Instrument Loop Diagram Loop No. XXX

LOCAL CONTROL STATION CONTROL PANEL

VARIABLE SPEED DRIVE

XXX

AI1+

AI1-

SPEED REFERENCE

XXX-75

XXX-74

SC-XXX

ANALOG OUTPUT

4-20 maDC

SPEED CONTROL

XXX-S

AO1+

AO1-

DRIVE SPEED OUTPUT

XXX-69

XXX-68

SI-XXX

ANALOG INPUT

4-20 maDC

SPEED INDICATION

XXX-S

C

O

H

X00

00X

00X

X00

HS-2

XXX

COH

VSD CONTROL PANEL

PUSH/PULL

STOP

HS-1

XXX

STOP

4 PR TPSH #16 CABLE

+24 VDC XXX-1

XXX-2

R

MN-XXX

DISCRETE OUTPUT

START / STOP COMMAND

DI1START

DI5

LOCAL SPEED

SELECTED

XXX-3

XXX-6

DI2START INTERLOCK

FIELD

INTERLOCK

(NOTE 2)

RUNNING

NO

C

NC

FAULT

NO

C

NC

XXX-14

XXX-13

XXX-25

XXX-24

4C #14 TECK CABLE

XXX-19

XXX-18

XXX-H

6C #14 TECK CABLE

XXX-R1

XXX-N

YS-XXX

DISCRETE INPUT

COMPUTER CONTROL SELECTED

MM-XXX

DISCRETE INPUT

RUNNING STATUS

UA-XXX

DISCRETE INPUT

FAULT

4C #14 TECK CABLE

XXX-74

XXX-68

PLC

XXX-75

XXX-69

XXX-1

XXX-2

XXX-25

XXX-19

XXX-N

XXX-N

AO2+

AO2-

DRIVE CURRENT

OUTPUT

XXX-67

XXX-66

II-XXX

ANALOG INPUT

4-20 maDC

CURRENT INDICATION

XXX-S

XXX-66

XXX-67

XXX-13

L1 N1

120 VAC

POWER SUPPLY

ENET

CAT 6 ETHERNET CABLE IN 20mm

RIGID ALUMINUM CONDUIT

CONNECT TO ETHERNET SWITCH

1. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR

TAG NUMBERS.

2. REFER TO ILD-010 FOR FIELD INTERLOCK WIRING.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

VARIABLE SPEED DRIVE

ILD-003

1 2018-05-10 ISSUED FOR ADDENDUM 1

2 2018-05-22 ISSUED FOR ADDENDUM 2

Page 11: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Flow Meter - Instrument Loop Diagram Loop No. XXX

PLC

MAGNETIC FLOW TRANSMITTER

FIT

XXX

PLC

ANALOG INPUT

4-20 maDC

FLOW RATE

XXX-71

XXX-72

FE

XXX

FIELD PROCESS AREA CONTROL PANEL

XXX-S

XXX-32

XXX-31

R

XXX-71A

+

XXX-72

-

BOND ACROSS FLANGES

GROUNDING RINGS

(IF USED)

TRANSDUCER CABLE IN

RIGID ALUMINUM CONDUIT

+

-

4-20 ma OUTPUT

+

-

TOTALIZER

OUTPUT

PLC

DISCRETE INPUT

TOTALIZER

XXX-N

INTERPOSING

RELAY

(NOTE 2)

1 PR TPSH

L1

N

G

120 VAC

POWER

SUPPLY

XXX-33

+ -

POWER SUPPLY

(NOTE 2)

H N

120 VAC

POWER SUPPLY

1. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR

TAG NUMBERS.

2. PROVIDE POWER SUPPLY VOLTAGE AND RELAY TO MATCH

FLOW METER CONTACT REQUIREMENT.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

FLOW METER

ILD-004

1 2018-05-10 ISSUED FOR ADDENDUM

Page 12: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Dissolved OzoneTransmitter - Instrument Loop Diagram Loop No. XXX

PLC

FIELD PROCESS AREA CONTROL PANEL

DISSOLVED OZONE

XXX-PSC

XXX-S

+

-

24 VDC POWER SUPPLY

+

-

4-20 MaDC

ISOLATED

OUTPUT

WARNING RELAY

(NOTE 1)

ALARM RELAY

(NOTE 1)

FAULT RELAY

(NOTE 1)

AIT

XXX

XXX-24V

+ -

24 VDC

H N

120 VAC

XXX-72

XXX-S

XXX-71

PLC

ANALOG INPUT

DISSOLVED OZONE

INDICATION

XXX-71

XXX-72

XXX-30

XXX-H

PLC

DISCRETE INPUT

DISSOLVED OZONE

TRANSMITTER TROUBLE

XXX-33

XXX-N

PLC

DISCRETE INPUT

DISSOLVED OZONE

ALARM

XXX-31

XXX-N

XXX-31

XXX-33

PLC

DISCRETE INPUT

DISSOLVED OZONE

WARNING

XXX-31

XXX-N

AE

XXX

AE

XXX

PRE-DETERMINATED SIGNAL

CABLES SUPPLIED WITH THE

DEVICE

1. CONFIGURE ALARM RELAYS TO TRANSFER STATE UPON ALARM

OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.

2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR TAG

NUMBERS.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

DISSOLVED OZONE TRANSMITTER

ILD-005

1 2018-05-10 ISSUED FOR ADDENDUM 1

2 2018-05-22 ISSUED FOR ADDENDUM 2

Page 13: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

ORP+PH Transmitter - Instrument Loop Diagram Loop No. XXX

PLC

AIT

XXX

ORP

FIELD PROCESS AREA CONTROL PANEL

XXX-71

XXX-70PLC ANALOG

INPUT 4-20maDC

ORP INDICATION

120 VAC

POWER

SUPPLY

XXX-SH

XXX-70

+

XXX-71

-

1 PR TPSH #18 CABLE

XXX-30

XXX-31

PLC DISCRETE INPUT

TRANSMITTER FAULT

XXX-30

XXX-31

2C #14 TECK CABLE

-

+

CH. 1

RELAY

OUTPUT 1

XXX-H

XXX-N

2C #14 TECK CABLE

L1

N

G

CLEANING

CONTROL

AE

XXX

ORP + PH

S

IA

S

CA

BLE

P

RO

VID

ED

BY

S

UP

PLIE

R

XXX-71

XXX-70PLC ANALOG

INPUT 4-20maDC

PH INDICATION

XXX-SH

XXX-70

+

XXX-71

-

1 PR TPSH #18 CABLE

-

+

CH. 2

AIT

XXX

PH

1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM

OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.

2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR

TAG NUMBERS.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

ORP AND PH

TRANSMITTER

ILD-006

1 2018-05-10 ISSUED FOR ADDENDUM

Page 14: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

UVT Transmitter - Instrument Loop Diagram Loop No. ###

PLC

FIELD PROCESS AREA CONTROL PANEL

###-71

###-70PLC ANALOG

INPUT 4-20maDC

ORP INDICATION

###-SH

###-70

+

###-71

-

1 PR TPSH #18 CABLE

###-30

###-31

PLC DISCRETE INPUT

TRANSMITTER FAULT

###-30

###-31

2C #14 TECK CABLE

-

+

CH. 1

RELAY

OUTPUT 1

(NOTE 1)

UVT TRANSMITTER

+ 24V

PSC

+24V

SH

24 VDC

POWER

SUPPLY

24 VDC

POWER

SUPPLY

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

UV TRANSMITTANCE

TRANSMITTER

ILD-007

1. CONFIGURE ALARM RELAY TO TRANSFER STATE UPON ALARM

OR POWER FAILURE. CURRENTLY SHOWN DE-ENERGISED.

CONFIGURE ALARM RELAY TO TRIP ON TRANSMITTER FAULT.

2. THIS DRAWING IS TYPICAL. REFER TO I/O LIST AND P&ID FOR

TAG NUMBERS.

1 2018-05-10 ISSUED FOR ADDENDUM 1

2 2018-05-22 ISSUED FOR ADDENDUM 2

Page 15: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Modulating Valve / Gate Actuator - Instrument Loop Diagram Loop No. XXX

LOCAL CONTROL STATION CONTROL PANEL

PLC ANALOG

INPUT 4-20maDC

VALVE POSITION

PLC ANALOG

OUTPUT 4-20maDC

VALVE CONTROL

PLC DISCRETE

INPUT VALVE

OPEN STATUS

PLC DISCRETE

INPUT VALVE

CLOSED STATUS

PLC

L1 N1

120 VAC

ALT 1 -

ALT 1 +

2PR TPSH #18 CABLE

AO1 -

AO1 +

XXX-71

XXX-SH

XXX-75

XXX-SH

C

NO

C

NO

C

NO

XXX-61

XXX-63

XXX-19

PLC DISCRETE INPUT

REMOTE SELECTED

N999-N9

VALVE

POSITION

VALVE

CONTROL

2

3

1

EXTERNAL

POWER

SUPPLY

ZIT

XXX

ZC

XXX

ZSD

XXX

ZSB

XXX

HS1

XXX

L/O/R

HS2

XXX

O/C

COMPUTER

SELECTED

CLOSED

LIMIT

OPENED

LIMIT

###-70

###-74

###-60

###-62

###-18

1. REFER TO ACTUATOR SHOP DRAWING FOR POWER

REQUIREMENTS.

2. THIS DRAWING IS TYPICAL, REFER TO I/O LIST AND P&ID FOR

APPLICATIONS.

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

TYPICAL MODULATING VALVE /

GATE ACTUATOR

ILD-008

1 2018-05-10 ISSUED FOR ADDENDUM 1

2 2018-05-22 ISSUED FOR ADDENDUM 2

Page 16: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

FVNR Starter - Instrument Loop Diagram Loop No. XXXX

MCC AREA FIELD PROCESS AREA CONTROL PANEL

H

O

A

00X

00X

X00

HS-2

XXXX

HOA

LOCAL CONTROL STATION

XXXX-3

XXXX-1A

XXXX-3

XXXX-1A

PLC

DISCRETE OUTPUT

START COMMAND

XXXX-19

XXXX-X2

PLC

DISCRETE INPUT

REMOTE SELECTED

XXXX-X2XXXX-X2

XXXX-X1

XXXX-X1

O/L's

XXXX-X1

MM-XXXX

R

M

MO-XXXX

G

XXXX-3

Ma

Ma

XXXX-19

XXXX-14

XXXX-16

XXXX-X1

XXXX-14

XXXX-X1

XXXX-16

Ma

O/L

XXXX-14

XXXX-16

XXXX-X2

XXXX-X2

PLC

DISCRETE INPUT

RUNNING STATUS

PLC

DISCRETE INPUT

FAULT STATUS

PLC

X2 X1

120 VAC

8C #14 TECK CABLE

4C #14 TECK CABLE

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

TYPICAL FVNR STARTER

ILD-009

1. THIS DRAWING IS TYPICAL FOR SEVERAL DRIVES. REFER TO

INSTRUMENT INDEX FOR APPLICATIONS.

1 2018-05-10 ISSUED FOR ADDENDUM

Page 17: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Low Level Interlock - Instrument Loop Diagram Loop No.XXX

PROCESS AREA EXISTING PLC CONTROL PANEL

LSL

120 VAC

POWER SUPPLY

2000-25

2000-26 R

1

2000-27

2000-28

2C # 14 TECK

TO P-2000 VFD

2C # 14 TECK

TO P-2001 VFD

R1

2000-29

2000-30

R1

2C # 14 TECK

TO P-2002 VFD

2000-31

2000-32

R1

2C #14 TECK

NO

C

NC

EXISTING WETWELL

LOW LEVEL SWITCH

(NOTE 1)

SHEET TITLE

SHEET NUMBER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-1

8) L

ast P

lo

tte

d: 2

01

8-0

5-1

8

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

DE

S:

CH

K:

AP

P:

AA

AB

BB

CC

CF

ile

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\I\6

05

58

42

9-IL

D.D

WG

ISSUE/REVISION

I/R DATE DESCRIPTION

PROJECT

CITY OF PORTAGE LA PRAIRIE

PHASE 2A WATER TREATMENT

PLANT UPGRADES

THE MANITOBA WATER SERVICES BOARD

UNIT 1A 2010 CURRIE BOULEVARD

BRANDON, MB, R7B 4E7

CONSULTANT

AECOM Canada, Ltd.

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

NOTES

INSTRUMENT LOOP DIAGRAM

PUMP LOW WATER LEVEL

INTERLOCK

ILD-010

1. USE FAIL-SAFE WIRING, ALARM CONTACT SHOULD OPEN AT

LOW WATER LEVEL. RELKY RI SHOULD NORMALLY BE

ENERGIZED.

1 2018-05-10 ISSUED FOR ADDENDUM

Page 18: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

2) L

ast P

lo

tte

d: 2

01

8-0

5-2

2

AN

SI D

8

64

mm

x 5

59

mm

Printed on ___% Post-Consumer

Recycled Content Paper

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\G

\6

05

58

42

9-S

HT

-3

0-0

00

N-G

-0

00

0.D

WG

CIT

Y O

F P

OR

TA

GE

L

A P

RA

IR

IE

IS

SU

ED

F

OR

A

DD

EN

DU

M M

AY

24, 2018

Un

it 1A

2010 C

urrie B

ou

levard

, B

ran

do

n, M

an

ito

ba R

7B

4E

7

MW

SB

P

RO

JE

CT

14

23

6

05

58

42

9

PH

AS

E 2

A W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

U

PG

RA

DE

S

Th

e M

an

ito

ba

W

ate

r S

erv

ic

es

B

oa

rd

__

__

__

__

__

__

__

_

DRAWING INDEX

The Manitoba Water

Services Board

00 X - G 000

PROCESS AREA

00 GENERAL & SITEWORKS

05 DIAGRAMS & SCHEMATICS

10 RAW WATER PUMPING STATION

20 PRE-TREATMENT BUILDING

30 MAIN BUILDING

40 RESERVOIR & PUMPING STATION

50 McKAY RESERVOIR

DISCIPLINE

G GENERAL

C CIVIL

S STRUCTURAL

N PROCESS & INSTRUMENTATION

D PROCESS MECHANICAL

M MECHANICAL

E ELECTRICAL

I INSTRUMENTATION

DRAWING NUMBER

000 GENERAL NOTES & SCHEDULES

100 PLANS

200 ELEVATIONS

300 SECTIONS

400 DETAILS

500 STANDARD DETAILS

600 3D VIEWS

DRAWING PHASE

D DEMOLITION

NEW/ PROPOSED*

*NULL FOR NEW DRAWINGS

GENERAL + SITEWORKS

00-G000 COVER SHEET

00-G101 CIVIL OVERALL SITE PLAN

00-G102 CIVIL RAW WATER PUMPING STATION SITE PLAN

STRUCTURAL

10-S101 STRUCTURAL ELECTRICAL ROOM PLAN & SECTIONS

20-S101 STRUCTURAL CHAIN HOIST PLAN SECTION & DETAILS

30-S101 STRUCTURAL OZONE CONTACTORS PLAN & DETAILS

30-S102 STRUCTURAL OZONE CONTACTORS PLAN & SECTIONS

PROCESS & INSTRUMENTATION

00-N001 PROCESS & INSTRUMENTATION PROCESS MECHANICAL SYMBOL & ABBREVIATION

00-N002 INSTRUMENTATION INSTRUMENTATION SYMBOL & ABBREVIATION

00-N003 PROCESS & INSTRUMENTATION EXISTING DRAWING LEGENDS 2A & 2B

05D-N101 PROCESS & INSTRUMENTATION RW PUMPING STATION DIAGRAM - DEMOLITION

05-N101 PROCESS & INSTRUMENTATION RW PUMPING STATION UPGRADES DIAGRAM

05-N102 PROCESS & INSTRUMENTATION PRE-TREATMENT UPGRADE DIAGRAM

05-N103 PROCESS & INSTRUMENTATION PRE-TREATMENT SLUDGE DIAGRAM

05-N201 PROCESS & INSTRUMENTATION EXISTING CLARIFIERS 1-3 DIAGRAM

05-N202 PROCESS & INSTRUMENTATION OZONE CONTACTOR 1 UPGRADES DIAGRAM

05-N203 PROCESS & INSTRUMENTATION OZONE CONTACTOR 2 UPGRADES DIAGRAM

05-N204 PROCESS & INSTRUMENTATION CTH FEED SYSTEM UPGRADES DIAGRAM

05-N301 PROCESS & INSTRUMENTATION GRANULAR MEDIA FILTERS DIAGRAM

05-N302 PROCESS & INSTRUMENTATION GAC FILTERS & TW METERING DIAGRAM

05-N303 PROCESS & INSTRUMENTATION SIMPLOT PUMPING UPGRADE DIAGRAM

05D-N401 PROCESS & INSTRUMENTATION MAKE-UP WATER DIAGRAM - DEMOLITION

05-N401 PROCESS & INSTRUMENTATION MAKE-UP WATER DIAGRAM

05D-N501 PROCESS & INSTRUMENTATION LIME SLAKER SYSTEM DIAGRAM - DEMOLITION

05-N501 PROCESS & INSTRUMENTATION QUICKLIME SILO DIAGRAM

05-N502 PROCESS & INSTRUMENTATION LIME SLAKER 1 DIAGRAM

05-N503 PROCESS & INSTRUMENTATION LIME SLAKER 2 DIAGRAM

05-N504 PROCESS & INSTRUMENTATION LIME FEED SYSTEM DIAGRAM

05-N505 PROCESS & INSTRUMENTATION CLARIFIER CHEMICAL FEED SYSTEMS DIAGRAM

05-N506 PROCESS & INSTRUMENTATION SLUDGE LIFT STATION DIAGRAM

PROCESS MECHANICAL

00-D501 PROCESS MECHANICAL STANDARD DETAILS 1 OF 2

00-D502 PROCESS MECHANICAL STANDARD DETAILS 2 OF 2

05-D001 PROCESS MECHANICAL PROCESS FLOW DIAGRAM

10D-D101 PROCESS MECHANICAL MAIN LEVEL PLAN & SECTION - DEMOLITION

10-D101 PROCESS MECHANICAL MAIN LEVEL PLAN & SECTION

20-D101 PROCESS MECHANICAL PRE-TREATMENT UPGRADES LOCATION PLAN

30-D101 PROCESS MECHANICAL OVERALL PLAN

30-D102 PROCESS MECHANICAL SECOND LEVEL PLAN

30D-D103 PROCESS MECHANICAL OZONE CHAMBER 1 PLAN & SECTION - DEMOLITION

30-D103 PROCESS MECHANICAL BOOSTER PUMPS PLAN & SECTION

30-D104 PROCESS MECHANICAL OZONE CONTACTOR 1 PLAN & SECTIONS

30D-D105 PROCESS MECHANICAL LIME SLAKER SYSTEM PLANS & SECTION - DEMOLITION

30-D105 PROCESS MECHANICAL LIME SLAKER PLAN & SECTION

30-D106 PROCESS MECHANICAL MAIN LEVEL PLAN

40-D101 PROCESS MECHANICAL PUMP ROOM PLAN

40-D301 PROCESS MECHANICAL SECTIONS

MECHANICAL

10-M101 MECHANICAL MAIN FLOOR LEVEL HEATING & VENTILATION PLAN

20-M101 MECHANICAL DOMESTIC WATER SUPPLY UPGRADE

30-M101 MECHANICAL MAIN & SECOND FLOORS PLUMBING PART PLANS, NOTES

ELECTRICAL

00-E001 ELECTRICAL OVERALL SITE PLAN

00-E002 ELECTRICAL LEGEND

05D-E001 ELECTRICAL MAIN BUILDING - DEMOLITION SINGLE LINE DIAGRAM

05-E001 ELECTRICAL RAW WATER PUMPING STATION SINGLE LINE DIAGRAM

05-E002 ELECTRICAL MAIN BUILDING SINGLE LINE DIAGRAM

05-E003 ELECTRICAL RESERVOIR PUMPING STATION SINGLE LINE DIAGRAM

10-E001 ELECTRICAL LIGHTING SCHEDULE & PANELBOARD SCHEDULE

10-E101 ELECTRICAL LIGHTING SCHEDULE & PANELBOARD SCHEDULE

10-E102 ELECTRICAL ELECTRICAL ROOM POWER PLAN

30-E101 ELECTRICAL LIME SLAKER PLAN & SECTION

30-E102 ELECTRICAL LIME SLAKER SECOND FLOOR PLAN

30-E103 ELECTRICAL SECOND FLOOR BOOSTER PUMPS POWER PLAN

30-E104 ELECTRICAL SECOND FLOOR POWER PLAN

30-E401 ELECTRICAL MCC 5000 ELEVATION

40-E101 ELECTRICAL PUMP ROOM POWER PLAN

40-E401 ELECTRICAL MCC ELEVATION

INSTRUMENTATION

05-I001 INSTRUMENTATION SCADA ARCHITECTURE DIAGRAM

1

Page 19: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

B1

C1

C2

654 7 9 10

EXISTING

OZONE

CONTACTOR

1

EXISTING

CLARIFIER 2

EXISTING

CLARIFIER 3

EXISTING OZONE

CONTACTOR 2

EXISTING

RECARBONATION

CHAMBER

EXISTING

RECARBONATION

CHAMBER

154208

145

67

36

175

R

2

1

2

6

8

7

692

4

6

8

310

4

9

3

321

R

4

4

4

R

4

4

4

4

9

2

298

364

R

2

0

0

EXISTING

200

20

0

3

1

4

2

0

5

0

283

68

243169

187

65

100

5

1

3

R

2

5

2

I/R DATE DESCRIPTION

ISSUE/REVISION

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

5) L

ast P

lo

tte

d: 2

01

8-0

5-2

5

SHEET TITLE

MAIN BUILDING

STRUCTURAL

OZONE CONTACTORS

PLAN & DETAILS

SHEET NUMBER

30-S101

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

__

__

__

__

__

__

__

_

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\S

\6

05

58

42

9-S

HT

-3

0-0

30

N-S

-0

10

1.D

WG

1

-

1 MOULD DETAIL

-

Scale 1:10

1

-

1

-

1

-

2

-

1

-

3

-

1

-

1

-

4

-

11 STD. INSTALLATION DETAIL

-

Scale 1:5

FORMWORK ANCHORS BY

FORMWORK DESIGNER.

HOLES NEED TO BE FILLED

WITH GROUT AFTER

FORMWORK REMOVED

10M VERTICALS

@ 200 o/c, MIN. 3

NOTES:

1. ALL ARC DIMENSIONS SHALL BE VERIFIED TO SITE

CONDITION PRIOR TO FABRICATION OF FORMWORKS.

2. SEE GENERAL NOTES ON SHEET 20-S101.

OZONE CONTACTORS PLAN

Scale 1:100

N

10

0 E

XT

EN

SIO

N

100 EXTENSION

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt a

nd

m

ay n

ot b

e u

se

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd its clie

nt, as re

quired

by law

o

r fo

r u

se

b

y g

overn

me

nta

l review

in

g ag

en

cie

s. A

EC

OM

a

ccep

ts n

o resp

on

sib

ility, a

nd

d

en

ies an

y liab

ility w

ha

tso

eve

r, to

a

ny p

arty th

at m

od

ifie

s th

is d

ra

wing

w

itho

ut A

EC

OM

's exp

re

ss w

ritte

n con

se

nt. D

o n

ot sca

le th

is do

cu

me

nt. A

ll m

ea

sure

me

nts m

ust b

e o

btain

ed

fro

m sta

te

d dim

en

sion

s.

AN

SI D

8

64

mm

x 5

59

mm

REGISTRATION

CONSULTANT

AECOM

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

CLIENT

The Manitoba Water

Services Board

Unit 1A 2010 Currie Boulevard

Brandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGE

LA PRAIRIE

PHASE 2A WATER

TREATMENT PLANT

UPGRADES

MWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

0 2018-05-01 ISSUED FOR TENDER

Certificate of Authorization

AECOM Canada Ltd.

No. 4671 Date:_____________2018-05-01

A

R

C

2nd FLOOR

SERVICE ROOM

2 MOULD DETAIL

-

Scale 1:20

3 MOULD DETAIL

-

Scale 1:20

4 MOULD DETAIL

-

Scale 1:10

BAFFLES WILL BE REMOVED

BY OTHER TO FACILITATE

VERT. & HORIZ. BENCHING, TYP.

±30 x DEEP CHASE

CUT INTO EXISTING

CONCRETE WALLS, TYP.

ROUGHEN

SURFACES

400 x 400 CONCRETE BENCHING

AT WALL & FLOOR INTERSECTION, TYP.

50mm CLEAR COVER

10M BENT BARS @ 300 o/c

PRESSURE GROUT WITH

35MPa CONCRETE

10M DOWELS

@ 300 o/c MIN.

100 EMBED

w/ HILTI HIT

HY-200 ADHESIVE

FORMWORK BY

CONTRACTOR

1

1

3 2018-05-25 ISSUED FOR ADDENDUM

AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
M. M. HOQUE
AutoCAD SHX Text
2018/05/01
Page 20: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

B1

C1

C2

654 7 9 10

EXISTING

CLARIFIER 2

EXISTING

CLARIFIER 3

EXISTING

OZONE

CONTACTOR 2

EXISTING

RECARBONATION

CHAMBER

EXISTING

RECARBONATION

CHAMBER

EXISTING

OZONE

CONTACTOR

1

400

400

EXISTING OZONE

CONTACTOR 1

2400 1

800

Ø100 TO OZONE

DESTRUCT UNIT

150

150

EXISTING OZONE

CONTACTOR 2

EXISTING

RECARBONATION

CHAMBER

I/R DATE DESCRIPTION

ISSUE/REVISION

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

5) L

ast P

lo

tte

d: 2

01

8-0

5-2

5

SHEET TITLE

MAIN BUILDING

STRUCTURAL

OZONE CONTACTORS

PLAN & SECTIONS

SHEET NUMBER

30-S102

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

__

__

__

__

__

__

__

_

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\S

\6

05

58

42

9-S

HT

-3

0-0

30

N-S

-0

10

2.D

WG

N

OZONE CONTACTORS PLAN

Scale 1:100

REMOVE DAMAGED VINYL COMPOSITE TILES,

(VCT) REPAIR CRACK WITH EPOXY INJECTION,

INSTALL NEW FLOOR TILES.

A SECTION

-

Scale 1:50

WATER LINE

HDPE LINER GLUED TO

CONCRETE STRUCTURE, TYP.

TO MANUFACTURER'S INSTRUCTIONS

B SECTION

-

Scale 1:50

REMOVE DAMAGED VINYL COMPOSITE TILES,

(VCT) REPAIR CRACK WITH EPOXY INJECTION,

INSTALL NEW FLOOR TILES.

HDPE LINER GLUED TO

CONCRETE STRUCTURE,

TYP. TO MANUFACTURER'S

INSTRUCTIONS.

B

-

WATER LINE WATER LINE

2ND FLOOR

2ND FLOOR SERVICE ROOM

EL 104.470

CLARIFIER #3

FLOOR TILE DAMAGE ENLARGED VIEW

EL 104.470

CLARIFIER #3

REMOVE DAMAGED VINYL COMPOSITE TILES,

(VCT) REPAIR CRACK WITH EPOXY INJECTION,

INSTALL NEW FLOOR TILES.

30

0

HDPE LINER GLUED TO

CONCRETE STRUCTURE,

TYP. TO MANUFACTURER'S

INSTRUCTIONS

30

0

30

0

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt a

nd

m

ay n

ot b

e u

se

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd its clie

nt, as re

quired

by law

o

r fo

r u

se

b

y g

overn

me

nta

l review

in

g ag

en

cie

s. A

EC

OM

a

ccep

ts n

o resp

on

sib

ility, a

nd

d

en

ies an

y liab

ility w

ha

tso

eve

r, to

a

ny p

arty th

at m

od

ifie

s th

is d

ra

wing

w

itho

ut A

EC

OM

's exp

re

ss w

ritte

n con

se

nt. D

o n

ot sca

le th

is do

cu

me

nt. A

ll m

ea

sure

me

nts m

ust b

e o

btain

ed

fro

m sta

te

d dim

en

sion

s.

AN

SI D

8

64

mm

x 5

59

mm

REGISTRATION

CONSULTANT

AECOM

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

CLIENT

The Manitoba Water

Services Board

Unit 1A 2010 Currie Boulevard

Brandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGE

LA PRAIRIE

PHASE 2A WATER

TREATMENT PLANT

UPGRADES

MWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

0 2018-05-01 ISSUED FOR TENDER

Certificate of Authorization

AECOM Canada Ltd.

No. 4671 Date:_____________2018-05-01

VERTICAL

BENCHING

CONC. BENCHING

CONC. BENCHING

A

-

EL. 104,470m

EL. 104,470m

Ø100 TO OZONE

DESTRUCT SYSTEM

Ø100

EXISTING Ø100 VENT PIPE

UP 1000m ABOVE ROOF

Ø100

1

-

1 BLOW UP DETAIL

-

Scale 1:20

REMOVE AND RE-INSTALL EXISTING

VENT PIPE AS REQUIRED FOR

INSTALLATION OF HDPE LINER

5

0

40

0

400

2-10M

CONT. BARS

10M @ 300 o/c

2-10M DOWELS

@ 300 o/c

VERTICAL

BENCHING

m

m

C

L

E

A

R

C

O

V

E

R

±30 x DEEP CHASE

CUT INTO EXISTING

CONCRETE WALL AND

BASE SLAB, TYP.

30

30

CONC.

BENCHING

2

0

1

1

3 2018-05-25 ISSUED FOR ADDENDUM

11

AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
M. M. HOQUE
AutoCAD SHX Text
2018/05/01
Page 21: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

PIPE SIZE

(mm)

ROD SIZE

(mm)

MAX LOAD

(kg)

36

00

M

AX

.

CAST IN PLACE CONCRETE

INSERT OR HV HANGER

ROD

REFER TO TABLE FOR

APPROPRIATE SIZING

GALVANIZED PIPE CLAMP

REFER TO TABLE FOR

APPROPRIATE SIZING

CEILING

25

50

75

100

150

200

250

300

350

400

450

500

600

10.0

10.0

12.0

16.0

20.0

22.0

25.0

25.0

25.0

29.0

29.0

38.0

44.0

280

280

510

800

1230

1710

2250

2250

2250

2250

2250

3630

3630

GRINNELL OR SIMILAR, SAFETY FACTOR = 5

100

30

0

20

0

400

NOTE: GALVANIZE EXTERIOR STEEL SUPPORTS

6

6

6

C150x12

C100x8

4-12Ø SS ANCHOR BOLTS

300x200x16mm THK PLATE

PIPE SIZE

(mm)

SUPPORT PIPE

(mm)

PLATE SIZE

(mm)

MAXIMUM

SUPPORT PIPE

LENGTH (mm)

REINFORCING PLATE

FOR STAINLESS STEEL

PIPE ONLY

M.S. PLATE

BOLTED TO FLOOR WITH

4-16Ø 316 STAINLESS STEEL

BOLTS C/W ANCHORS

GROUT TO SUIT

(25mm MIN.)

SUPPORT PIPE

6mm VENT HOLE

100

150

200

250

300

350

400

500

600

750

900

50 SCH 40

50 SCH 40

100 SCH 40

100 SCH 40

150 SCH 40

200 SCH 40

200 SCH 40

200 SCH 40

250 SCH 40

300 SCH 40

300 SCH 40

200 X 200 X 6

200 X 200 X 6

250 X 250 X 6

250 X 250 X 6

300 X 300 X 10

350 X 350 X 10

350 X 350 X 10

350 X 350 X 10

400 X 400 X 10

450 X 450 X 10

450 X 450 X 10

1525

1525

1625

1625

1830

1830

1830

1830

1830

1830

1830

6

6

100

MIN

AS

R

EQ

'D

(1

50

M

IN

.)

100

MIN.

A, BOLTS AS REQ'D BY

EQUIPMENT SUPPLIER

DRILL & EPOXY GROUT

15M @ 300 o/c TOP, E.W.

ROUGHEN CONC.

SURFACE

EXISTING CONCRETE

SUPPORT SLAB

20mm CHAMFER, TYP.

NOTES:

1. SIZE, NUMBER, TYPE, LOCATION AND THREAD PROJECTION OF ANCHOR BOLTS

IS TO BE DETERMINED BY THE EQUIPMENT SUPPLIER.

2. BASES SHALL BE LEVEL UNLESS NOTED OTHERWISE.

3. CONTRACTOR TO SIZE AND LOCATE PAD REINFORCEMENT TO SUIT ANY

ALTERNATIVE BOLT ARRANGEMENTS.

4. REFER TO DIVISION 3 FOR CONCRETE MIX DETAILS.

15M DOWELS @ 300 o/c

AROUND PERIMETER,

DRILLED AND EPOXY

GROUTED 130mm INTO

CONCRETE. UTILIZING HILTI

HIT HY-150 ADHESIVE.

MIN TWO DOWELS PER SIDE.

GUARDRAIL MOUNTED

RAIN HOOD

REQUIRED FOR OUTDOOR

INSTALLATION

SECURE INSTRUMENT TO

SUPPORT CHANNEL WITH

SS BOLTS

41x41mm SS SUPPORT CHANNEL

SPACE TO SUIT INSTRUMENT

MOUNTING REQUIREMENTS.

SECURE HANDRAILS TOP &

BOTTOM WITH 6mm SS U-BOLTS

ROUND OFF EXPOSED CORNERS

OF SUPPORT CHANNEL (TYP.)

SPACE AS REQUIRED

FOR CONDUIT ENTRY

TO SUIT INSTRUMENT

TOP GUARDRAIL

BOTTOM GUARDRAIL

GUARDRAIL POST

SECURE INSTRUMENT

TO WALL WITH SS

CONCRETE ANCHORS

FLOOR

WALL

13mm SS

STANDOFF

(TYP.)

13

72

SENSOR LOCATION

23

12

1372

1524

DIMENSION AS

RECOMMENDED BY

SENSOR MANUFACTURER

ULTRASONIC LEVEL

TRANSMITTER

SENSOR FLANGE ADAPTER

50 mm HIGH PVC SPACER

BLOCK WITH 75mm HOLE

THROUGH CENTER

POLYETHYLENE

TANK

15mm CLEAR

POLYETHELENE

TUBING

25mm BALL VALVE (TYP)

NOTES:

1. CONTRACTOR TO CONFIRM VALVE REQUIREMENTS WITH INSTRUMENT MANUFACTURER ,

INSTRUMENT ISOLATION VALVES (BV-377, NV-338, BV-339) TO BE SIZED BASED ON

INTRUMENT FEED LINE.

10mm CLEAR

POLYETHELENE

TUBING

12mm NEEDLE

VALVE

PROCESS PIPE

25mm TEE

25mm

BALL VALVE

(TYP)

Exit Enter

V

V

AMI pH-Redox

TO FLOOR

DRAIN

VENDOR

PACKAGE WALL

MOUNTED

ANALYZER PANEL.

OUTPUT SIGNALS

TO PLC.

POWER SUPPLY

FROM CONTROL

PANEL.

25mm NPT

TO 10mm

HOSE BARB.

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

2) L

ast P

lo

tte

d: 2

01

8-0

5-2

2

SHEET TITLE

GENERAL & SITEWORKS

PROCESS MECHANICAL

STANDARD DETAILS

2 OF 2

SHEET NUMBER

00-D502

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

__

__

__

__

__

__

__

_

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\D

\6

05

58

42

9-S

HT

-3

0-0

00

N-D

-0

50

2.D

WG

9 SINGLE PIPE HANGER

-

N.T.S.

10 WALL MOUNTED PIPE SUPPORT

-

N.T.S.

11 TEE SUPPORT FOR STEEL

-

N.T.S.

12 TYPICAL HOUSEKEEPING PAD DETAIL

-

N.T.S.

13 FIELD INSTRUMENT PANEL MOUNTING

-

N.T.S.

14 LEVEL TRANSMITTER

-

N.T.S.

CALCIUM THIOSULPHATE

1 2018-05-10 ISSUED FOR ADDENDUM

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt a

nd

m

ay n

ot b

e u

se

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd its clie

nt, as re

quired

by law

o

r fo

r u

se

b

y g

overn

me

nta

l review

in

g ag

en

cie

s. A

EC

OM

a

ccep

ts n

o resp

on

sib

ility, a

nd

d

en

ies an

y liab

ility w

ha

tso

eve

r, to

a

ny p

arty th

at m

od

ifie

s th

is d

ra

wing

w

itho

ut A

EC

OM

's exp

re

ss w

ritte

n con

se

nt. D

o n

ot sca

le th

is do

cu

me

nt. A

ll m

ea

sure

me

nts m

ust b

e o

btain

ed

fro

m sta

te

d dim

en

sion

s.

AN

SI D

8

64

mm

x 5

59

mm

REGISTRATION

CONSULTANT

AECOM

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

CLIENT

The Manitoba Water

Services Board

Unit 1A 2010 Currie Boulevard

Brandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGE

LA PRAIRIE

PHASE 2A WATER

TREATMENT PLANT

UPGRADES

MWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

0 2018-05-01 ISSUED FOR TENDER

1

15 ORP ANALYZER INSTALL DETAIL

-

N.T.S.

2 2018-05-24 ISSUED FOR ADDENDUM

1

AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
R. BOGDANOV
AutoCAD SHX Text
2018/05/01
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
C. ULLOA
AutoCAD SHX Text
2018/05/01
Page 22: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt a

nd

m

ay n

ot b

e u

se

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

on

sib

ility, a

nd

d

en

ie

s a

ny lia

bility w

ha

tso

eve

r, to

a

ny p

arty th

at m

odifie

s th

is d

ra

win

g w

ith

ou

t A

EC

OM

's e

xpress w

ritten

co

nse

nt. D

o n

ot sca

le th

is do

cu

me

nt. A

ll m

ea

surem

en

ts m

ust b

e ob

ta

in

ed

fro

m sta

ted

d

im

en

sio

ns.

AN

SI D

8

64

mm

x 5

59

mm

REGISTRATION

CONSULTANT

AECOM

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

CLIENT

The Manitoba Water

Services Board

Unit 1A 2010 Currie Boulevard

Brandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGE

LA PRAIRIE

PHASE 2A WATER

TREATMENT PLANT

UPGRADES

MWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

0 2018-05-01 ISSUED FOR TENDER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

3) L

ast P

lo

tte

d: 2

01

8-0

5-2

3

SHEET TITLE

RESERVOIR & PUMP HOUSE

PROCESS MECHANICAL

PUMP ROOM PLAN

----

SHEET NUMBER

40-D101

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

__

__

__

__

__

__

__

_

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\D

\6

05

58

42

9-S

HT

-3

0-0

40

N-D

-0

10

1.D

WG

170

P

SIMPLOT

PUMP

250 - TW - CS

CL EL. 265.592m

330

P

SIMPLOT

PUMP

250±

1060±

1060± 3160±

1500±

1750±

40-D301

A

40-D301

C

PUMP ROOM PLAN

Scale 1 : 100

PRV-173

PRV-333

BF

V - 3

34

400 - TW - CS

CL EL. 267.660m

2000±690±2140±

510±460±

1500±

BFV-332

300x400

890±

200x250

250x150

(NOTE 1)

300 - TW - CS

CL EL. 265.738m

NOTE:

1. CONFIRM THAT WATER STOP FLANGE IS INSTALLED. REFER TO

DRAWING 00-D501, DETAIL 2.

NOTICE:

AS-CONSTRUCTED DIMENSIONS,

MEASUREMENTS AND OTHER DETAILS

CONTAINED IN THIS RECORD DRAWING

HAVE BEEN OBTAINED BY AECOM CANADA

LTD. ("AECOM") FROM VARIOUS SOURCES.

SUCH INFORMATION REPRESENTS THE

BEST INFORMATION AVAILABLE TO AECOM

AT THE TIME OF PREPARATION OF THIS

RECORD DRAWING. AECOM DOES NOT IN

ANY WAY REPRESENT OR WARRANT THAT

SUCH INFORMATION IS ACCURATE AND

ASSUMES NO RESPONSIBILITY FOR ANY

ERRORS OR OMISSIONS CONTAINED

THEREIN.

3

00-D501

3

00-D501

N

BF

V-1

74

130

TWP

140

TWP

IV-172

IV-221

600 - TW - ST40

40-D301

B

30

0x1

50

IV-325

320

TWP

310

TWP

160

TWP

150

TWP

IV-174600 - TW - ST40

AE

337

ORP

15

00-D502

1

2 2018-05-24 ISSUED FOR ADDENDUM

AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
C. ULLOA
AutoCAD SHX Text
2018/05/01
Page 23: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt a

nd

m

ay n

ot b

e u

se

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

on

sib

ility, a

nd

d

en

ie

s a

ny lia

bility w

ha

tso

eve

r, to

a

ny p

arty th

at m

od

ifie

s th

is d

ra

win

g w

ith

ou

t A

EC

OM

's e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

th

is d

ocu

me

nt. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

fro

m sta

te

d d

im

en

sio

ns.

AN

SI D

8

64

mm

x 5

59

mm

REGISTRATION

CONSULTANT

AECOM

99 Commerce Drive

Winnipeg, Manitoba R3P 0Y7

204.477.5381 tel 204.284.2040 fax

www.aecom.com

CLIENT

The Manitoba Water

Services Board

Unit 1A 2010 Currie Boulevard

Brandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGE

LA PRAIRIE

PHASE 2A WATER

TREATMENT PLANT

UPGRADES

MWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

0 2018-05-01 ISSUED FOR TENDER

La

st sa

ve

d b

y: A

NN

A.A

RA

UJO

(2

01

8-0

5-2

3) L

ast P

lo

tte

d: 2

01

8-0

5-2

5

SHEET TITLE

RESERVOIR & PUMP HOUSE

PROCESS MECHANICAL

SECTIONS

----

SHEET NUMBER

40-D301

Pro

je

ct M

an

ag

em

en

t In

itia

ls:

De

sig

ne

r:

Ch

ecke

d:

Ap

pro

ve

d:

__

__

__

__

__

__

__

_

File

na

me

: P

:\6

05

58

42

9\9

00

-C

AD

_G

IS

\9

10

-C

AD

\2

0-S

HE

ET

S\D

\6

05

58

42

9-S

HT

-3

0-0

40

N-D

-0

30

1.D

WG

170

P

DISTRIBUTION

PUMP

250 - TW - CS

330

P

DISTRIBUTION

PUMP

170

P

DISTRIBUTION

PUMP

BFV-172

BFV-172

CV-171

BFV-332

CV-331

PRV-333

PRV-173

A SECTION

40-D101

Scale 1 : 50

B SECTION

40-D101

Scale 1 : 50

400 - TW - CS

CL EL. 267.660m

300 x 400

250X400

PRV-173

250 - TW - CS

300 - TW - CS

200 x 250

250 x 400

25

4

TOC EL 265.200m

CL EL. 268.700m

CL EL. 265.592m

CL EL. 265.738m

8

00-D501

NOTICE:

AS-CONSTRUCTED DIMENSIONS,

MEASUREMENTS AND OTHER DETAILS

CONTAINED IN THIS RECORD DRAWING

HAVE BEEN OBTAINED BY AECOM CANADA

LTD. ("AECOM") FROM VARIOUS SOURCES.

SUCH INFORMATION REPRESENTS THE

BEST INFORMATION AVAILABLE TO AECOM

AT THE TIME OF PREPARATION OF THIS

RECORD DRAWING. AECOM DOES NOT IN

ANY WAY REPRESENT OR WARRANT THAT

SUCH INFORMATION IS ACCURATE AND

ASSUMES NO RESPONSIBILITY FOR ANY

ERRORS OR OMISSIONS CONTAINED

THEREIN.

EXISTING

NEW

TP

09

EXISTING

NEW

TP

11

330

P

DISTRIBUTION

PUMP

400 - TW - CS

CL EL. 267.660m

BFV-332

CV-331

C SECTION

40-D101

Scale 1 : 50

PRV-333

150 x 300

25

4

TOC EL 265.200m

11

00-D502

EXISTING

NEW

TP

11

600 - TW - ST40

600 - TW - ST40

EXISTING

NEW

TP

09

PFV-334

600 - TW - ST40

IV-325IV-174

IV-172

2 2018-05-24 ISSUED FOR ADDENDUM

FE-167

1

AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
SIGNED BY
AutoCAD SHX Text
C. ULLOA
AutoCAD SHX Text
2018/05/01
Page 24: ACKNOWLEDGEMENT OF RECEIPT OF ALL … · .1 Supply and install two (2) complete detention-type lime slaker systems including ... .2 STT shall be responsible for programming and integration

OPERATORWORKSTATION

(NOTE 10)

PRE-TREATMENTBUILDING

RAW WATER PUMPINGSTATION

CAT 6ETHERNET

EN

ET

6F F

IBE

R O

PTI

C C

AB

LE

EXISTING FIBREOPTIC CABLE

EXISTINGMOMENTUMPLC PANEL.(NOTE 1)

P2000VFD

P2001VFD

P2002VFD

EN

ET

EN

ET

EN

ET

PRE-TREATMENTBUILDING

EN

ET

EXISTING FIBREOPTIC CABLE

EXISTINGMOMENTUMPLC PANEL.( NOTE 2)

AIT

3121

AIT

3122

UVTUVT

OPERATORWORKSTATION AND BACKUP

SCADA SERVER(NOTE 10)

RESERVOIRPUMPING STATION

RESERVOIRPUMPING STATION

CAT 6ETHERNET

EN

ET

EXISTING FIBREOPTIC CABLE

EXISTINGQUANTUM PLCPANEL.( NOTE 3 )

P330VFD

AIT

337

AIT

169

NEW PUMP VFD'sAND FIELDINSTRUMENTS

NEW ETHERNETAND CONTROLWIRING

PHORPP170VFD

OPERATOR WORKSTATIONS ANDPRIMARY SCADA SERVER

(NOTE 10)

MAIN CONTROL ROOM

MAIN WATERTREATMENT PLANT

MCC 4000

EN

ET

EXISTING ETHERNETSWITCH (NOTE 8)

EXISTINGQUANTUM PLCPANEL. (NOTE 4)

STARTERP4061

ENETSWITCH

AIT

4255

AIT

5423

NEW FIELDINSTRUMENTSAND STARTERS

NEW CONTROLWIRING

DISSOLVEDOZONE

DISSOLVEDOZONE

STARTERP4060

PLCPANEL

PLCPANEL

NEW LIMESLAKERPLC PANEL(NOTE 5)

EXISTING QUANTUMRIO PLC PANEL.(NOTE 6)

EN

ET

EN

ET

MO

DB

US

PLU

S (

NO

TE 1

2 )

McKAYTELEMETRY

6F F

IBE

R O

PTI

C C

AB

LE6F

FIB

ER

OP

TIC

CA

BLE

6F F

IBE

R O

PTI

C C

AB

LE

6F F

IBE

R O

PTI

C C

AB

LE

HISTORIANCOMPUTER(NOTE 10)

MANAGERS OFFICEWORKSTATION

(NOTE 10)

EXISTING ANTENNAON LIME SILO ROOF

EXISTING 900 MHZRADIO PANEL WITHMEDIA CONVERSION

McKAYTELEMETRY

NEW 900MHZ RADIOWITH MEDIACONVERSION(NOTE 9)

6F FIBER OPTIC CABLE

KEYNOTES:

1. EXISTING MOMENTUM PLC WILL BE DE-COMMISSIONED AFTER THE NEW PUMPS ARE COMMISSIONED. THE NEW RAW WATER PUMP VFD DRIVES WILL USEETHERNET CONTROL FROM MAIN PLC AND WILL BE COMMISSIONED SEQUENTIALLY WHILE EXISTING PUMPS REMAIN IN SERVICE.

2. EXISTING MOMENTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHERWITH NEW I/O SPECIFIED ON THIS UPGRADE.

3. EXISTING QUANTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHERWITH NEW I/O SPECIFIED ON THIS UPGRADE.

4. EXISTING QUANTUM PLC (3 RACKS) WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTSTOGETHER WITH NEW I/O SPECIFIED ON THIS UPGRADE. EXISTING ETHERNET CONNECTIONS TO INTERNET, WAN, AND OTHER COMPUTERS AND PERIPHERALSARE TO BE INCORPORATED INTO NEW DESIGN.

5. THE EXISTING LIME SLAKER PLC WILL BE UPGRADED TO SCHNEIDER M340 PLC AS PART OF A VENDOR SUPPLY PACKAGE. THE CONTROL SYSTEM INTEGRATORFOR THIS PROJECT WILL BE RESPONSIBLE FOR FULL INTEGRATION OF THE UPGRADED LIME SLAKER SYSTEM.

6. EXISTING QUANTUM REMOTE I/O PLC PANEL WITH MODBUS PLUS COMMUNICATION WILL BE UPGRADED TO SCHNEIDER X80 I/O WITH ETHERNET COMMUNICATION.THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS TOGETHER WITH NEW I/O SPECIFIED ON THIS UPGRADE.

7. EXISTING QUANTUM PLC WILL BE UPGRADED TO SCHNEIDER M580 PLC WITH X80 I/O SYSTEM. DUE TO SPACE LIMITATIONS IN THE EXISTING PANEL, THE NEW PLCAND I/O WILL BE INSTALLED IN A NEW PANEL AND I/O WIRING WILL BE EXTENDED. THE PLC I/O WILL INCLUDE ALL EXISTING I/O POINTS.

8. EXISTING FIBRE CABLES, FIBRE TERMINATION BOX, PATCH PANEL AND ETHERNET SWITCHES WILL BE RE-USED BUT THE EXISTING MEDIA CONVERTERS WILL BEREPLACED AND NEW MEDIA CONVERTERS ADDED.

9. NEW ETHERNET RADIO TELEMETRY PANELS WILL BE INSTALLED TO FACILITATE FULL INTEGRATION OF THE McKAY PLC WITH THE MAIN PLANT PLC AT MCC 4000..10. SCADA SYSTEM COMPUTERS AND SOFTWARE WILL BE REPLACED AND NEW WORKSTATIONS WILL BE ADDED.11. A NEW ETHERNET SWITCH WITH ENCLOSURE SHALL BE PROVIDED AT McKAY RESERVOIR PUMPING STATION.12. EXISTING MODBUS PLUS WILL BE DE-COMMISSIONED.13. PROVIDE NEW FIBRE TERMINATION AND PATCH PANEL.

PLCPANEL

LIME SLAKER SYSTEM

OPERATOR WORKSTATIONAND SCADA SERVER

(NOTE 10)

McKAY RESERVOIRPUMPING STATION

McKAY RESERVOIRPUMPING STATION

EN

ET

EN

ET

NEW ETHERNETSWITCH

(NOTE 11)

EXISTINGQUANTUMPLC PANEL.(NOTE 7)

McKAYTELEMETRY

EXISTING900 MHZRADIO

NEW DIRECTIONALANTENNA ON LIMESILO ROOF

EXISTING ANTENNAAND MAST

EN

ET

PLCPANEL

PLCPANEL

EXISTING FIBER TERMINATION,PATCH PANEL, MEDIACONVERSATION ANDETHERNET SWITCH(NOTE 8)

EXISTINGMOMENTUMPLC PANEL.( NOTE 1)

NEW ETHERNETAND CONTROLWIRING

NEW PUMPVFD's

MAIN WATER PLANTMCC 5000

McKAYTELEMETRY

NEW 900 MHZRADIO (NOTE 9)

NEW DIRECTIONALANTENNA ONEXISTING MAST

6F F

IBE

R O

PTI

C C

AB

LE

6F F

IBE

R O

PTI

C C

AB

LE

NEW ETHERNETSWITCH

EXISTING FIBER TERMINATION,PATCH PANEL, MEDIACONVERSATION ANDETHERNET SWITCH(NOTE 8)

EXISTING FIBERTERMINATION, PATCH

PANEL, MEDIACONVERSATION ANDETHERNET SWITCH

(NOTE 8)

25mm CONDUIT WITH2F FIBRE CORD

25mm CONDUIT WITH2F FIBRE CORD

NEW FIBRE TERMINATIONAND PATCH PANEL

(NOTE 13)

Last

sav

ed b

y: C

HA

VE

ZR(2

018-

05-2

5)

Las

t Plo

tted:

201

8-05

-25

SHEET TITLE

DIAGRAMS & SCHEMATICSINSTRUMENTATIONSCADA ARCHITECTUREDIAGRAM

SHEET NUMBER

05-I001

Pro

ject

Man

agem

ent I

nitia

ls:

Des

igne

r:C

heck

ed:

App

rove

d:__

___

____

___

___

File

nam

e: P

:\605

5842

9\90

0-C

AD

_GIS

\910

-CA

D\0

5-M

OD

ELS

\I\60

5584

29 -

05-1

001.

DW

G

1 2018-05-10 ISSUED FOR ADDENDUM

2 2018-05-24 ISSUED FOR ADDENDUM

Printed on ___% Post-ConsumerRecycled Content Paper

AN

SI D

864

mm

x 5

59m

m

REGISTRATION

CONSULTANT

AECOM99 Commerce DriveWinnipeg, Manitoba R3P 0Y7204.477.5381 tel 204.284.2040 faxwww.aecom.com

CLIENT

The Manitoba WaterServices BoardUnit 1A 2010 Currie BoulevardBrandon, MB, R7B 4E7

PROJECT

CITY OF PORTAGELA PRAIRIEPHASE 2A WATERTREATMENT PLANTUPGRADESMWSB PROJECT #1423

PROJECT NUMBER

60558429

PHASE 2A

I/R DATE DESCRIPTION

ISSUE/REVISION

Certificate of Authorization

AECOM Canada Ltd.

No. 4671 Date:_____________2018-05-25