16
Aberdeen-Stavanger Gateway

Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group

Embed Size (px)

Citation preview

Aberdeen-Stavanger Gateway

DOF Subsea

DOF Subsea 2

• Welcome

• Giovanni Corbetta, Managing Director

• DOF Subsea, part of the DOF Group

DOF Subsea 3

4DOF Subsea

“To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day”

5

• Steady business• Time charter/ROV contracts• Long-term contracts

DOF Subsea

DOF Subsea business model

Company Capabilities• Integrated Subsea Construction

• Engineering

• Flexible & Umbilical Installation

• Subsea Structure Installation

• Mooring & Riser Installation

• Inspection Maintenance & Repair

• Tie-in & Diverless Intervention Capabilities

• Field Abandonment & Decommissioning

• Seabed Mapping

• Positioning Services

DOF Subsea

DOF Subsea Atlantic fleet

DOF Subsea 7

Skandi Skolten Skandi SkansenNormand Reach

Geosund Skandi InspectorGeoholm

DOF Subsea in Aberdeen

• Moved into Aberdeen in 2006

• Opportunities in subsea / marine construction

• Success to date

• Followed by a trend of vessel owners moving towards a more projects-based approach

DOF Subsea 8

Aberdeen – Norway

• Working together as a region

• 350 staff working in Atlantic operations

• People synergies

• Skills transfer and maximising knowledge

• Lessons learned

DOF Subsea 9

Challenges

• Cultural differences- office culture- business

relationships

• Communication- language barriers- physical distance

DOF Subsea 10

DOF Subsea

Focus regionsGlobal Locations

Current projects

DOF Subsea

Gina Krog FSO Field Development

Scope:

•Installation of TM Buoy

•Installation of Riser and Riser Base

•Design, Fabrication and Installation of Spool and Covers

•Offshore installation May and June 2016

Vessels:

•Skandi Skolten

•Normand Reach

DOF Subsea 13

Maersk Riser Replacement, North Sea

Scope:

•Removal of existing flexible riser system on the Dunbarton field

•Installation of new riser system

•Associated surveys

Offshore installation will commence July 2014

Vessel:

•Normand Reach

DOF Subsea 14

Shell – Corrib Natural Gass Field, Ireland

Scope:

•Disconnecting of the redundant flexible flowlines

•Install two flexible flowlines

•Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tie-in tool

Offshore Installation August 2014

Vessel:

•Normand Reach

DOF Subsea 15

Thank you!