1
A G E N D A
BOARD OF SELECTMEN
August 10, 2015
6:00 p.m. CALL TO ORDER
Non-Public Session – RSA 91-A:3,II(c)
Town Manager’s Office
7:00 p.m. PUBLIC MEETING
Knightly Meeting Room
1. Meeting Minutes
2. Chairman Comments
3. Additions and/or Requests by Public or Board by Vote Please note unscheduled matters are limited to a 15-minute discussion and must be
presented before 7:30 pm or item will be moved to after Old Business
4. Discussion on Adding to Scope of Work to Include Additional Properties
as Part of South Shore Road Sewer Extension Project
5. Proposal to Construct a Sidewalk Connecting Existing Sidewalk on Stiles
Road to Recently Constructed Sidewalk on Pelham Road
6. Proposal to Install Crypts at Pine Grove Cemetery/Discuss Other Cemetery
Locations
7. Update on North Policy Street Water Project
8. Clarification of Salem Municipal Code Chapter 90 – Use of Municipal
Property
9. Town Manager’s Report/Questions from Board of Selectmen
10. Selectmen Reports/Correspondence/Tabled and Pending Issues
Budget Committee Rep.
CART (Cooperative Alliance for Regional Transportation)
Conservation Commission Rep.
Council on Aging Rep.
Historic District Commission Rep.
2
Museum Committee Rep.
Planning Board Rep.
Recreation Advisory Committee Rep.
Field of Dreams Rep.
Town Wide Road Stabilization Committee Rep.
Economic Development Action Committee Rep.
11. Additions and/or Requests by Public or Board by Vote Please note unscheduled matters are limited to a 15-minute discussion
12. Upcoming Meetings
August 24, 2015
September 14, 2015 (Regular Meeting/2016 Budget Presentation)
September 21, 2015 (Budget Review – 6:30 p.m.)
September 23, 2015 (Budget Review – 6:30 p.m.)
September 24, 2015 (Budget Review – 6:30 p.m.)
13. Upcoming Events
Adjourn
GEORGE CAIRNS & SONS, INC.
PROJECT: I-93 Salem - Manchester, Exit 2
CONTRACT: 13933E
DESCRIPTION OF WORK:S:\All Projects\1205 Salem-Manch 13933E Exit 2\Extra Work\Stiles Sidewalk\[Stiles Rd Sidewalk.xls]10
LaborLabor (Straight Time) Labor (Over Time) Labor (Double Time) Totals
Code Description HR Rate Total HR Rate Total HR Rate Total Labor
Edwards, Steve Foreman 16 $62.47 $999.52 $999.52
MacElman, Ron Union Operator 16 $64.30 $1,028.80 $1,028.80
Correa, William Union Laborer 16 $62.20 $995.20 $995.20
Lage, Antonio Union Laborer 16 $62.20 $995.20 $995.20
Devarney, Richard Non-Union Driver 16 $28.44 $455.04 $455.04
Grasso, Dane Union Operator 4 $64.30 $257.20 $257.20
Sub Total $4,730.96
10% $473.10
Labor Total $5,204.06
EquipmentEquipment Totals
Code Description HR Rate Equip.
2096 2011 Ford F-250 PU Truck 16.00 $27.35 $437.60
15033 2006 Volvo EW 180B RT Excavat 16.00 $104.57 $1,673.12
37016 2011 CAT 966H Loader 4.00 $107.40 $429.60
3079 1997 Mack 600 RD600 16.00 $61.22 $979.52
Equipment Total $3,519.84
Material
Stiles Road Sidewalk
MaterialTotals
Description Rate Equip.
Brox01 Crushed Stone 22 $22.80 $501.60
Sub Total $501.60
15% $75.24
Material Total $576.84
SubcontractorTotals
Description Rate Equip.
Sub Total
5%
Subcontractor Total
Unit ItemsMaterial Totals
Code Description Units Rate Equip.
608.12 2" BITUMINOUS SIDEWALK (F) SY 167 $14.00 $2,338.00
Unit Item Total $2,338.00
Grand Total $11,638.74
1
Memo
To: Keith Hickey Town Manager
From: Rick Russell Public Works Director
Date: August 6, 2015
Re: Proposal to introduce crypts at the Pine Grove Cemetery
Keith,
Please find below talking points to be presented at the August 10th BOS meeting. As we are all aware we are running out of room at the Pine Grove Cemetery and have had land acquisition in the CIP for the past several years. Even though it is practically impossible to tell the exact amount of time in years we have left in Pine Grove because of the many variables I believe this proposal to install cremation crypts will definitely slow down the immediate need to acquire land and also provide residents an appealing alternative to ground burials for reasons to be explained at the meeting. I trust that once this is presented and the associated costs are updated that this will be a very viable solution to the land problem and a great project for the residents of our community. The following are topics to be placed on the screen for explanation.
Virtual tour showing location of the proposed site in Pine Grove Cemetery
Part II of above showing remaining available space in newer section
Slide show with narration
Slide of existing site/section proposed to be utilized in its current state
Description of proposed area/section on approx. 2-1/2 acres
Slide with architectural concept drawings of typical proposed crypts on existing site
Slide showing styles, sizes and prices of typical crypts
Slide comparing costs associated with ground burials Vs. costs of cremation crypts
Page 2
Slide showing expected benefits of crypts
Slide with pictures of cremation crypts at the NH Veterans Cemetery in Boscawen
Slides with pictures of other recently installed crypts in area
Questions from the BOS as Jeff Hardy representative from Hardy Doric Inc. will be in attendance.
Rick
Rick Russell
Director
Department of Public Works
603-890-2150
603-890-3882 - Fax
ActID Description Orig
DurRemDur
EarlyStart
EarlyFinish
20JUL
2015
27AUG
03SEP
10OCT
17NOV
24 31 07 14 21 28 05 12 19 26 02 09 16 23
MobilizationBase Bid
1000 Moblize to Project 1d 1d 17AUG15 17AUG151010 Install Erosion Control 1d 1d 18AUG15 18AUG15
Alternate-A Joseph Road2000 Moblize to Project 4h 4h 19AUG15 19AUG152010 Install Erosion Control 4h 4h 19AUG15 19AUG15
Installation of Water MainBase Bid
1020 Install Water Mains 30d 30d 19AUG15 30SEP151030 Test Water Main 5d 5d 01OCT15 07OCT15
Alternate-A Joseph Road
2020 Install Water Mains 5d 5d 01OCT15 07OCT152030 Test Water Main 5d 5d 08OCT15 15OCT15
Installation of ServicesBase Bid1040 Install Services 10d 10d 08OCT15 22OCT15
Alternate-A Joseph Road2040 Install Services 3d 3d 23OCT15 27OCT15
Misc Work and CleanupBase Bid1050 Temp Pavement 5d 5d 19OCT15 23OCT15
1070 Loam and Seed Road Edges and Services 3d 3d 26OCT15 28OCT15Alternate-A Joseph Road
2050 Temp Pavement 5d 5d 22OCT15 28OCT152060 Loam and Seed Road Edges and Services 3d 3d 29OCT15 02NOV15
Moblize to ProjectInstall Erosion Control
Moblize to ProjectInstall Erosion Control
Install Water MainsTest Water Main
Install Water MainsTest Water Main
Install Services
Install Services
Temp Pavement
Loam and Seed Road Edges and Services
Temp PavementLoam and Seed Road Edges and Services
Start date 30JUL15Finish date 02NOV15Data date 17AUG15Run date 30JUL15Page number 1A© Primavera Systems, Inc.
DeFelice CorporationNorth Policy_Rockingham Road W ater
Early barProgress barCritical barSummary barStart milestone pointFinish milestone point
Chapter 90
MUNICIPAL PROPERTY
ARTICLE I ARTICLE IIRenting of Town Hall Political Activity
§ 90-1. Rental policy. § 90-2. Restrictions on use for partisanpolitical activities.
[HISTORY: Adopted by the Town of Salem as indicated in article histories.Amendments noted where applicable.]
ARTICLE IRenting of Town Hall
[Adopted by the Board of Selectmen 6-22-1959 (Ch. 67, Art. I, of the 1995 Code)]
§ 90-1. Rental policy.
The T own Hall w ill not be r ented to p rivate p arties a nd will b e r eserved f or t he u se of loc alorganizations.
ARTICLE IIPolitical Activity
[Adopted by the Board of Selectmen 8-5-1974 (Ch. 67, Art. II, of the 1995 Code)]
§ 90-2. Restrictions on use for partisan political activities.
In order to p rovide a guideline for a ll interested parties and persons on t he use of municipallyowned property for partisan political activities, the following policy is hereby adopted by theBoard of Selectmen:
A. Political advertising signs and/or s tickers f or a ny party, is sue or c andidate s hall not b eplaced on public property, on public buildings, structures or municipal vehicles.
B. Political p arties ma y r ent, a t the established rate, p ublic b uildings ha ving meeting r oomfacilities f or t he p urpose of b usiness meetings, organizational meetings, elections,candidate nights and similar activities; s uch p ublic f acilities w ill not b e a vailable f orcampaign purposes p rior t o any election f or a po litical pa rty, po litical c ommittee o rpolitical candidate.
C. The following activities on municipal property are prohibited:
(1) Any activity which disrupts the normal business operation of the site or facility.
(2) The use of sound trucks, mobile sound systems or loudspeakers, other than on thepublic way.