November 22, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 38 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 38 for the period of November 10, 2019 through November 16, 2019.
Federal Energy Regulatory Commission -2- November 22, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By__________/s/_______________ Francisco Tarin Director, Regulatory
Enclosures
EPNG We
Docket N
Project N
County/S
Reportin
Environm
1. Summ
Line NNo wcomp
Mainadditof the
Line N1105EPNGlocatlevelsprope Tie‐inand c
2. Relev
DurinsevenDelaw All eq
3. Envir
No en 4. Envir
Durinand cof a wokswas c
eekly Enviro
No. CP19‐28‐
Name:
State:
ng Period:
mental Inspe
mary of Con
No. 31111 Lowork occurreplete at that
nline Valve ational punche bypass line
No. 1105 Hywas filled w
G began to ped at MLV 5s from the herty owned
ns were madcoated.
vant Environng this repon‐hundred fware Basin E
quipment wa
ronmental Pnvironmenta
ronmental Cng this reporconsisted of hydraulic h
space at MLVcontained to
onmental Ins
‐000
Nor
WinCou
Nov
ector: Dav
nstruction Ac
oop Line: ed on this pothis location
and Pig Lauh list items we and Line N
ydrostatic Tewith water apump water5. After the hydrostatic tby the Unive
de at MLV 4
nmental Actrting periodifteen (715) Expansion Pr
as checked f
Problems/Issal problems/
Compliance Irting period,approximat
hose seal onV 5 on Line o minimize t
spector Rep
rthern Delaw
nkler, Ector,unties, Texas
vember 10, 2
vid McCullou
ctivity for In
ortion of then with the e
uncher/Recewere compleo. 1103 at K
esting: Durinand successf back into tinstallation est water, Eersity of Tex
4 and the M
ivities: d, seven (7) people hav
roject.
for noxious w
sues and Co/issues were
Issues/Reso, one fluid stely two galln a truck thNo. 1105. Tthe amount
port No. 38
ware Basin E
, Crane ands
2019 to Nov
ugh
nspection Pe
e project durxception of
eiver Modifieted to incluKeystone Com
ng this reporfully tested he abovegroof a treatmPNG will bexas Lands.
P 41.0 test
people receve received e
weeds and fo
rrective Acte identified d
lutions: spill was recons of hydrahat was picThe truck wof contamin
Expansion Pr
d Upton D
vember 16, 2
eriod:
ring this repa few remai
ications: Dde touchup mpressor St
rting period,on 11/12/1ound tanks ament system gin to discha
break sites,
eived enviroenvironmen
ound to be c
ions Taken:during this re
orded. Thisaulic fluid thcking up a fwas immedianated soil. A
roject
Date: 11/22/
2019
porting perioining puch li
uring this r painting onation.
, the final se9. After theat the tempintended toarge the rem
and the we
onmental trantal training
clean.
eporting per
s spill occurrhat was causfrac tank atately shut doAn area of a
/2019
od. Most wost items.
reporting pen the interse
ection of Line successfulporary workso reduce chlmaining wat
elds were bla
aining. A toton the Nort
riod.
red on 11/1sed by the fat the tempown and thebout 3‐feet
ork is
eriod, ection
e No. test, space oride er on
asted
tal of thern
4/19, ailure orary e spill by 4‐
feet Trans
5. Issue
No la 6. Work
Opsu
InthInb
Ap
was contamsportation d
es and Concendowner iss
k Planned fo
On the new loig launcher/upport.
nstallation ohe remainden addition, tackfilled.
Additional puig launcher/
minated. Thrum to awai
erns Identifisues or conc
or the Follow
oop line por/receiver at
of a treatmeer of the wathe excavat
unch list item/receiver mo
he material it disposal.
ed by Landocerns were id
wing Reporti
rtion of the pWink Comp
nt system toater from thtions at the
ms will be coodifications.
was picked
owners: dentified du
ing Period:
project, excapressor Stat
o reduce che above gro previously
onducted as
d up and pl
ring this rep
avation withtion in orde
hloride levelsound tanks aidentified s
needed in r
laced into a
porting perio
h a hydrovacer to add an
s and continat MLV 5 ansuspected le
egards to m
a Departme
od.
c will occur an additional
nuing to dewnd Line No. 1eak sites w
mainline valve
nt of
at the pipe
water 1105. ill be
e and
Report N
Photos
Locationon Line NDirectionWest DescriptiDewaterinto one abovegroat MLV 5successfuof the finLine No.
LocationTest BreaLine No. DirectionNorthweDescriptiup equipthe test bafter thehydrotessection o1105.
No. 38
: MLV 5 SiteNo. 1105 n of Photo:
ion: ing the pipeof the ound tanks 5 after the ul hydrotest nal section o1105.
: MP 41.0 ak Site on 1105 n of Photo: est ion: Loadingpment from break site successful st of the finaof Line No.
e
f
g
l
Photos
Locationon Line NDirectionEast Descriptiup the hyspill.
LocationBreak Sit1105 DirectionSoutheasDescriptiup the pitie‐in wesuccessfu
: MLV 5 SiteNo. 1105 n of Photo:
ion: Cleaninydraulic fluid
: MLV 4 Testte on Line No
n of Photo: st ion: Lining ipe to make ld after the ul hydrotest
e
g d
t o.
a
.
Photos
LocationBreak Sit1105 DirectionNorthweDescriptiblasting twelds pr
LocationBreak Sit1105 DirectionSoutheasDescriptithe tie‐in
: MLV 4 Testte on Line No
n of Photo: est ion: Abrasivthe tie‐in ior to coatin
: MLV 4 Testte on Line No
n of Photo: st ion: Coatingn welds.
t o.
e
ng.
t o.
g
Photos
LocationTest BreaLine No. DirectionNorthweDescriptithe pipe making twelds aftsuccessfu
LocationTest BreaLine No. DirectionNorthweDescriptipipe at thsite.
: MP 41.0 ak Site on 1105 n of Photo: est ion: Lining uprior to he tie‐in ter the ul hydrotest
: MP 41.0 ak Site on 1105 n of Photo: est ion: Tied‐in he test brea
up
.
k
Photos
Locationat KeystoCompresDirectionEast Descriptithe pipin
Locationat KeystoCompresDirectionNorthweDescriptipipe.
: Bypass Lineone ssor Station n of Photo:
ion: Paintingng.
: Bypass Lineone ssor Station n of Photo: est ion: Painted
e
g
e
Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 22nd day of November 2019.
/s/ Francisco Tarin
Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517