June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 15 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 15 for the period of June 2, 2019 through June 8, 2019.

888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 15 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 15 for the period of June 2, 2019 through June 8, 2019.

Page 2: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

Federal Energy Regulatory Commission -2- June 13, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

Respectfully submitted,

EL PASO NATURAL GAS COMPANY, L.L.C.

By___________/s/______________ Francisco Tarin Director, Regulatory

Enclosures

Page 3: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

EPNG We

Docket N

Project N

County/S

Reportin

Environm

 1. Summ

Durin(Line Compcontilowe Ditch

 Lowe

 Backf

 2. Relev

Durintotal North

 All eqwalkenoted On Juthe hout opotho On Juthe  pOfficeprojehydroNo pStatioover 

 

eekly Enviro

No. CP19‐28‐

Name: 

State: 

ng Period: 

mental Inspe

mary of Conng this reporNo.  31111

pressor  Statnued  betwering in, and 

hing activitie

ering‐In activ

fill activities 

vant Environng  this  repoof three‐huhern Delawa

quipment wed on a dailyd in the ditch

une 7, 2019,hole.  The poof the pothoole was back

une 3‐4, 201project  sitese  on  June  3ect were visiotest portionroblem areaon No. 58+0in the wind.

onmental Ins

‐000 

Nor

WinCou

Jun

ector:  Dav

nstruction Acrting period1),  with  cretion  at  Staeen  Station backfill activ

s were cond

vities were c

were condu

nmental Actrting  periodndred sixty‐are Basin Exp

was checked y basis to enh during this

 a calf steppothole crew nole under  itskfilled.   

19, Douglas .    After  Safe3,  2019,  varited.   On  Jun of the proas or non‐co00 to repair    

spector Rep

rthern Delaw

nkler,  Ector,unties, Texas

e 2, 2019 to

vid McCullou

ctivity for In, mainline wws  complettion  No.  7No.  228+00

vities were c

ducted betw

onducted be

ucted betwe

ivities: d,  twenty‐fo‐four (364) ppansion Proj

for noxiousnsure that nos reporting p

ped into a ponearby was s own powe

Cotton, FERety  and  Envrious  sites  ane 4, 2019, oject as well ompliance  issome geote

port No. 15

ware Basin E

,  Crane  ands 

o June 8, 201

ugh 

nspection Pewelding activting  welds 62+38.    Ab0  and  Statioconducted al

een Station 

etween Stat

en Station N

ur  (24)  peopeople haveject.   

 weeds ando animals haperiod.   

othole near Sable to slopr without  in

RC Project Mvironmental along  the  Ladditional  sas the Loopssues were nech material 

Expansion Pr

d  Upton  D

19 

eriod: vities continfrom  Statiobrasive  blason  No.  618long the new

No. 94+00 a

tion No. 62+0

No. 62+00 an

ple  received received en

d found to bad become e

Station No. e the hole, ancident.   Aft

Manager, conTraining  atine  No.  110sites were vp Line No. 31noted thougwhich was 

roject 

Date: 6/13/2

ued along ton  No.  700+sting  and  c+00.    Additw loop line. 

and Station N

00 and Stati

nd Station N

d environmenvironmenta

be clean.   Alentrapped.  

393+08 andand the calf ter the calf  l

nducted a fit  the  Kinder05  hydrotesvisited on  th1111 portiongh a crew wnot staked 

2019 

he new loop+00  up  to coating  actitionally,  ditc

No. 212+00.

on No. 168+

o. 128+00.

ental  traininal training o

l open ditchNo animals 

d became stuwas able toleft the hole

eld inspectir Morgan Odst  portion  ohe Line No. ns of the prowas dispatchdown and b

 

p line Wink vities ching, 

 

+00. 

ng.    A n the 

h was were 

uck in  walk e, the 

on of dessa of  the 1105 oject.  ed to blown 

Page 4: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

3. EnvirA fluiThe  sStatioabsorcontapicke As  a encoanalyDepa

 4. Envir

No en 5. Issue

No la 6. Work

Durinand bpermof thean alt

  

ronmental Pid spill occurspill was  cauon No.  186+rbent  mateaminated soed up and pla

follow  up untered duryzed  were  dartment is co

ronmental Cnvironmenta

es and Concendowner iss

k Planned fong  the next backfill  of  th

mitting agence Line No. 1ternative me

Problems/Issrred on Juneused by  the+00.    The  trerials  were oil.  An area aced into DO

to  the  lastring  trenchindetermined oordinating r

Compliance Ial complianc

erns Identifisues or conc

or the Followreporting phe new  loopcy clearance1105 hydrosteasures requ

 

sues and Coe 7, 2019 con  failure of  aack  hoe  immplaced  to of about 2‐fOT drums to 

t  environmeng  activitiesto  be  asberemediation

Issues/Resoces issues we

ed by Landocerns were id

wing Reportieriod, activip  line.    As  ps and landowtatic testing uest once al

rrective Actnsisting of apa hydraulic  hmediately  shabsorb  thefeet by 3‐feeawait dispo

ental  inspecs  at  Station estos  conta efforts by a

lutions: ere identifie

owners: dentified du

ing Period:ties will  conpreviously  nwner approvactivities.  El clearances 

ions Taken:pproximatelhose on a  thut  down,  te  fluid  andet was contaosal. 

ctor  report’sNo.  10+00, ining  matera third party 

ed during thi

ring this rep

ntinue on cooted,  EPNGvals related EPNG will sehave been o

ly 2 gallons otrack hoe wthe  spill wasd  minimize aminated.  T

s  mention the materiarial.    EPNG’contractor. 

s reporting 

porting perio

oating, ditch  is  securingto modificateek Commissobtained.   

of hydraulic hile digging s  containedthe  amoun

This materia

of  the  trasals  collected’s  Environm  

period.   

od. 

hing,  lowerin  the  approption to the ssion approv

 

fluid. near ,  and nt  of l was 

h  pit d  and mental 

ng‐in, priate scope al for 

Page 5: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Report N

Photos 

Location31111 RONo. 721+DirectionNorth Descriptiwelding cweld.   

Location31111 RONo. 721+DirectionNorth Descriptiwelding cthe bead

 

No. 15 

: Line No. OW at Statio+00 n of Photo: 

ion: Mainlincrew lining u

: Line No. OW at Statio+00 n of Photo: 

ion:  Mainlincrew makingd weld. 

on 

e up a 

on 

ne g 

 

 

 

Page 6: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

 

Photos 

Location31111 RONo. 718+DirectionSouth Descriptithe weld

Location31111 RONo. 479+DirectionNorth Descriptitrack hoePan Ranc

 

: Line No. OW at Statio+00 n of Photo: 

ion: Capping. 

: Line No. OW at Statio+00 n of Photo: 

ion: Crossinge across Fryich Road 

on 

on 

g a ng 

 

 

 

 

Page 7: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 RONo. 431+DirectionSouthweDescriptiblasting a

Location31111 RONo. 432+DirectionSouthweDescriptiweld. 

 

: Line No. OW at Statio+00 n of Photo: est ion:  Abrasiva weld.   

: Line No. OW at Statio+00 n of Photo: est ion: Coating

on 

ve 

on 

g a 

 

 

 

Page 8: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 RONo. 422+DirectionWest DescriptiGang creup pipe s

Location31111 RONo. 252+DirectionNortheasDescriptifor foreig

 

: Line No. OW at Statio+00 n of Photo: 

ion:  Mini ews welding sections.   

: Line No. OW at Statio+00 n of Photo: st ion: Potholingn lines.   

on 

on 

ng 

 

 

Page 9: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 ROStation NDirectionSouth Descriptiwith a tra

Location31111 ROStation NDirectionNorth Description the noTexas Higprior to broad boa

 

: Line No. OW at No. 207+00 n of Photo: 

ion:  Ditchinackhoe.   

: Line No. OW at No. 186+00 n of Photo: 

ion: Bore pitorth side of ghway 874 beginning thar.   

 

 

Page 10: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 ROStation NDirectionSouthweDescriptithe ditchforeign li

Location31111 ROStation NDirectionSouthweDescriptia tie‐in w

 

: Line No. OW at No. 172+00 n of Photo: est ion: Digging h near a ne crossing.

: Line No. OW at No. 84+00 n of Photo: est ion: Making weld. 

.  

 

 

Page 11: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 RONo. 64+0DirectionSouthweDescriptiblasting a

Location31111 RONo. 66+0DirectionSouthweDescriptiinstalled foreign li

 

: Line No. OW at Statio00 n of Photo: est ion:  Abrasiva tie‐in weld

: Line No. OW at Statio00 n of Photo: est ion: Pipelineunder ne crossings

on 

ve d.   

on 

s.  

 

 

 

Page 12: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

  

 

Photos 

Location31111 ROStation NDirectionNortheasDescriptiBackfillinline with 

Location31111 ROStation NDirectionNortheasDescriptiContouriafter thebeen bac

: Line No. OW at No. 72+00 n of Photo: st ion: ng the ditch a trackhoe. 

: Line No. OW at No. 74+00 n of Photo: st ion: ng the ROW ditch has ckfilled. 

  

 

 

Page 13: 888 First Street, N.E. Washington, D.C. 20426 Re: El …...June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 13th day of June 2019.