7/29/2019 7UM62 Rotor Earth Fault Protection
1/26
The year of Profitable Growth
Global network of innovation
Rotor-Earth-Fault
Protection
7/29/2019 7UM62 Rotor Earth Fault Protection
2/26
Power Automation 2
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Presenter: Dr. Hans-Joachim Herrmann
PTD PA13Phone +49 911 433 8266
E-Mail: [email protected]
Generator Protection
Rotor-Earth-Fault Protection
7/29/2019 7UM62 Rotor Earth Fault Protection
3/26
Power Automation 3
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Requirement for Rotor Earth Fault Protection
in case of an earth fault, only small currents flow due to the galvanical isolation
Problem:
Double earth faults and interturn faults as a consequence of an earth fault cause:
magnetical unbalance (unbalanced forces; violent vibration)
high currents at the fault location
Task: Detection an earth fault already when it starts to build up
Destruction of the Rotor(Generator)
Earth fault in the rotor
RE CE
Rotor
Excitation
system
+
-Stator
7/29/2019 7UM62 Rotor Earth Fault Protection
4/26
Power Automation 4
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Protection Principle
Excitationsystem
+
-
VoltageSource
Earthing brush
CouplingUnit
Measuring
- Incoupling of an AC voltage (50 Hz or 60 Hz)- Measuring of the earth fault current- Measuring of the earth fault resistance
- Incoupling of low frequency square wave voltage
Principles:
HigherSensitivity
7/29/2019 7UM62 Rotor Earth Fault Protection
5/26
Power Automation 5
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Current CriterionPrinciple (50 Hz/60Hz - Voltage Injection)
Coordinated
resonant circuit to fN
>40V
If disturbance influence from the excitation is to large
IE
Protection
Pick-up limit:
IE,Fault > IE,Dist...
L1 L2 L3
IE,Distr.
IE,Fault
4QF105;
0,75H
Connectionon the earthing
brush
7/29/2019 7UM62 Rotor Earth Fault Protection
6/26
Power Automation 6
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Current MeasurementConnection
Also IEE2at 7UM62
is
possible
IEE
7
B
B
AA
-
A
B
3PP1336Err.
2B
Connection on the
phase to phasevoltage
7XR61
100 - 125
105;
105;
AC VoltageSourceappr. 42V or65V
Documentation for Coupling Device in the Internetwww.siprotec.com
External resistorsat excitation voltages> 150 V (circulating current >0,2A)
7/29/2019 7UM62 Rotor Earth Fault Protection
7/26
Power Automation 7
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Gain Characteristic of the R, C, L-Circuit
Z 50( ) 169.65! Z 60( ) 69.531!
0 50 100 150 200 250 3000
500
1000
1500
2000Filter er alte Ba d a
Freque z i Hz
Im
edaz
iO
m
Z f( )
f
mA27k1,5170
V45I
RZ
UI
fCouli
}
!
!
Imax approx. 300 mA
7/29/2019 7UM62 Rotor Earth Fault Protection
8/26
Power Automation 8
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Current CriterionProtection Settings
Protection with two stages:Measuring circuit supervision
m23k1,5400
45I
Z
UI
f ou
li
};;
!
! ZCouplingl(50Hz) = 400;
ZCouplingl(60Hz) = 335;
Imax ca. 100 mA
(voltage source decreases a little bit )
Note: Coupling impedance only with R and C
Finally setting during commissioning
7/29/2019 7UM62 Rotor Earth Fault Protection
9/26
Power Automation 9
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Current CriterionLogic
7/29/2019 7UM62 Rotor Earth Fault Protection
10/26
Power Automation 10
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Calculation of the Fault Resistance RE(50Hz/60Hz- Voltage Injection)
100V 42V u
Digital
protection(7UM62)
calculation
of RE
RE CE
RV CK
RV CK
L1 L2 L3
iL1)
1) Recommendedat static excitation
with inject harmonics
(3rd harm.; 6th harm.)
7/29/2019 7UM62 Rotor Earth Fault Protection
11/26
Power Automation 11
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Calculation Formula of the Fault Resistance RE
(1) (2)
(3)
(4)
combining (3) and (4):
Note: RV* and XK* are measured during commissioning
Model:
Zers ZMess Z
X*K R*V
XERE
_ aVE
2
E
2
E
2
EE*R-
,ZR
XR
XRR !
!
_ a _ aZZRZ j meMess I!
!
2
E
2
E
E
2
E
K2
EE
2
EE
V
--
2
rs
XR
XR*X
XR
XR*RZ
_ a Km2E
2
E
E
2
E -
,*I!
!
_ a _ a
_ aV
Ve
2
Km
2
E-e-
--,,, *RZR
*RZR
*XZRR
XR !!I
7/29/2019 7UM62 Rotor Earth Fault Protection
12/26
Power Automation 12
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Fault Resistance CalculationLogic
7/29/2019 7UM62 Rotor Earth Fault Protection
13/26
Power Automation 13
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Earth Fault Resistance CalculationSettings
Measured during commissioning
Measuring circuit supervision
Measured current can be influenced by disturbancesCorrection during primary test,(in most case the alarm stage is concerned)
7/29/2019 7UM62 Rotor Earth Fault Protection
14/26
Power Automation 14
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Injection of Square Wave Voltage with Low FrequencyBasic Diagram
Excitation
+
-CE
RE
Digital
Protection
(7UM62)
UH
RV
RV
Ucontrol
Umeas.RM
7XR6004
Controlling device
(7XT71)IE
Measuringtransducer
RE Fault resistance
RV Coupling resistor
UH Auxiliary supply ( s 50V)
RM Measuring shunt resistor
CE Rotor capacitance
Typical frequency:
1 - 3 Hz
7/29/2019 7UM62 Rotor Earth Fault Protection
15/26
Power Automation 15
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Injection of Square Wave VoltageConnection Diagram (7UM62)
onnection on t ease to ase
olta e
Exc.1
15
11
25
-
27
7XR600425
27
7UM62
7 T71
TD1K14
K1
TD2
K16
K15
40k;
40k;
Control olt e
Meas ring oltage
100V
110V
120V
9
7
7/29/2019 7UM62 Rotor Earth Fault Protection
16/26
Power Automation 16
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Injection of Square Wave Voltage with LowFrequencyBasic Principle
RV
2
RECEUH
UMRM
UH
UM
UM
50V
- 50V
1,88V
- 1,88V
0,75V
- 0,75V
t
t
t
iE
50375
20k2
H
M
s!;!
;!
UR
R
EMM iRU !
g!ER
;} 5kE
R
0M}(U
E
V 2
CR }X
E
M
1
~R
U(
Equivalent circuit:
7/29/2019 7UM62 Rotor Earth Fault Protection
17/26
Power Automation 17
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Sources of Error and Error Compensation
Influence of field voltage and earth fault location
a) Earth fault location
Shifting of measuring voltage with
a positive or negative dc voltage
b) Jumps in the field voltage
a change in the field voltage takes
to jumps in the dc-voltage shifting
Udc = dc voltage shifting
Solution:
Calculation of the difference voltage
( U = |UM1 - UM2|
(U1 = |UM1 - UM2| ( U3 = |UM3 - UM4|( U2 = |UM2 - UM3|
Solution:
Block of measuring
at jumps (e.g. (U1 = (U2)
UM
UdcUdc1
UM1
UM2
UM3UM4
UM1 UM2 Udc2
UM
7/29/2019 7UM62 Rotor Earth Fault Protection
18/26
Power Automation 18
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Calculation Formulas
RECEUH
UMRM
RV
2
UMU1
U2
Algorithm
Voltage divider:
Filtering:
Amplitude-log frequency curve: fA = 800 Hz; N = 64
2-1-2 VM
M
HE
M
MEV
M
H RR
U
UR
R
RRR
U
U
!
!
!!!!
NN
uN
UuN
U1i
i2,2
1ii1,1
1;
1
2
-::
21
M
UUUU !(!
1KKII
(}( UU
(!(!
8
1kkU
8
1U
0 30 60 90 120 150 180 210240 270 300
0.001
0.01
0.1
1
f in Hz
G(f)
Continuity supervision:
Validity requirement
otherwise
7/29/2019 7UM62 Rotor Earth Fault Protection
19/26
Power Automation 19
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Logic Diagram Rotor Earth Fault Protection (1-3Hz)
7/29/2019 7UM62 Rotor Earth Fault Protection
20/26
Power Automation 20
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Rotor Earth Fault Protection (1-3Hz)Setting Values
Measuring circuit supervision
If the integrated test function is used,pick-up value of test resistor
Advanced parameteronly visible in DIGSI
7/29/2019 7UM62 Rotor Earth Fault Protection
21/26
Power Automation 21
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Connection of the Rotor Earth Fault Protection
GRW
RECE
EM
EX-TL+
RWUG
RE CE
L-
(50/60 Hz)
(1 - 3 Hz)
(50/60 Hz)
(1 - 3 Hz)
40k;
4 F
4 F
a) rotating diodes
b) separate Exciter
(static excitation)
40k;
7/29/2019 7UM62 Rotor Earth Fault Protection
22/26
Power Automation 22
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Generator with Rotating ExcitationFault Free Condition (Square Wave Principle)
Chance of charge of
rotor earth capacitance
Disturbances by the
excitation generator
7/29/2019 7UM62 Rotor Earth Fault Protection
23/26
Power Automation 23
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Generator with Rotating ExcitationTest Condition with a Fault Resistor
Fault resistor is inverse proportional to the difference voltage
7/29/2019 7UM62 Rotor Earth Fault Protection
24/26
Power Automation 24
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Parallel Operation of Rotor Earth Fault Protections
100V 42V
CK;4 F
CK;4 F
RK;105;
RK;105;RV;40k;
RV;40k;
RE
7UM62 7UM62uControl
uMeas.
iREF
uREF
7UM61
nur
iREF
or
1- 3 Hz principle 50 Hz principle
7/29/2019 7UM62 Rotor Earth Fault Protection
25/26
Power Automation 25
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
Parallel Operation of Rotor Earth FaultProtectionsMeasurement with the 50/60 Hz Principle
( );20k2
RV
*K
R *K
C
ER
2ll:* VEER
RR !
;!!
g!
20k2
*
V
E
E
RR
R
;!
;!
4k*
5k
E
E
R
R
Measurement 7UM61 or 7UM62
(RV is earthed for an AC voltage)
Equivalent circuit:
seen from the 7UM6, RV alreadyis interpreted as a rotor-to-earth
resistance
Measurement:
measured as a fault resistance
Case 1:
Case 2:
alarm stage becomes less sensitive
open brushes can not be find out
7/29/2019 7UM62 Rotor Earth Fault Protection
26/26
Power Automation 26
Power Transmission and Distribution
Power Automation
Progress. Its that simple.
RV2
RERM2CK(8 F)
Umeas
(U
2
Measurement 7UM62 (1- 3 Hz)(CK is earthed for a DC voltage)
Equivalent circuit:
seen from the 7UM6:
high rotor capacitance
capacitors will not be
completely loaded
( U ~ RE-1
under no-earth-fault conditions
a fault resistance is already measured
alarm stage becomes less sensitive
(approx. 50k;)
longer measuring time
Parallel Operation of Rotor Earth Fault ProtectionsMeasurement with the Square Wave Principle