UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2012 LICENSEE: Luminant Generation Company LLC FACILITY: Comanche Peak Nuclear Power Plant, Units 1 and 2 SUBJECT: SUMMARY OF JUNE 26, 2012, PRE-LICENSING PUBLIC MEETING WITH LUMINANT GENERATION COMPANY LLC TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST IN SUPPORT OF A PLANT MODIFICATION TO INSTALL A BACKUP TRANSFORMER FOR OFFSITE AC POWER SOURCE (TAC NOS. ME8615 AND ME8616) On June 26, 2012, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Luminant Generation Company LLC (Luminant, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated June 11,2012, is located in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 12171A184. The purpose of the meeting was to discuss the proposed license amendment request by the licensee for extended completion time for Technical Specification (TS) 3.8.1, HAC [Alternating Current] Sources - Operating," in support of a plant modification to install a backup transformer for offsite power sources at Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2. A list of meeting attendees is provided in Enclosure 1 to this meeting summary. Meeting Summary The discussion was based on the following meeting materials/handouts: Addition of New Transformer XST1A (ADAMS Accession No. ML 12156A205) The licensee provided a revised copy of the handout on the day of the meeting and a copy of the revised handout is provided in Enclosure 2 to this meeting summary. Results of Discussions 1. The NRC staff requested several clarifications in the area of probabilistic risk assessment (PRA) concerning the proposed extended completion time for Limiting Condition for Operation (LCO) 3.8.1, Required Action A.3. The results of the discussions are described below: a. Internal Events and Internal Flooding In response to the NRC staff question about timing of the peer review per NRC Regulatory GUide (RG) 1.200, Revision 2, HAn Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed

6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

UNITED STATES NUCLEAR REGULATORY COMMISSION

WASHINGTON, D.C. 20555-0001

July 18, 2012

LICENSEE: Luminant Generation Company LLC

FACILITY: Comanche Peak Nuclear Power Plant, Units 1 and 2

SUBJECT: SUMMARY OF JUNE 26, 2012, PRE-LICENSING PUBLIC MEETING WITH LUMINANT GENERATION COMPANY LLC TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST IN SUPPORT OF A PLANT MODIFICATION TO INSTALL A BACKUP TRANSFORMER FOR OFFSITE AC POWER SOURCE (TAC NOS. ME8615 AND ME8616)

On June 26, 2012, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Luminant Generation Company LLC (Luminant, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated June 11,2012, is located in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 12171A184. The purpose of the meeting was to discuss the proposed license amendment request by the licensee for extended completion time for Technical Specification (TS) 3.8.1, HAC [Alternating Current] Sources - Operating," in support of a plant modification to install a backup transformer for offsite power sources at Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2.

A list of meeting attendees is provided in Enclosure 1 to this meeting summary.

Meeting Summary

The discussion was based on the following meeting materials/handouts:

• Addition of New Transformer XST1A (ADAMS Accession No. ML 12156A205)

The licensee provided a revised copy of the handout on the day of the meeting and a copy of the revised handout is provided in Enclosure 2 to this meeting summary.

Results of Discussions

1. The NRC staff requested several clarifications in the area of probabilistic risk assessment (PRA) concerning the proposed extended completion time for Limiting Condition for Operation (LCO) 3.8.1, Required Action A.3. The results of the discussions are described below:

a. Internal Events and Internal Flooding

In response to the NRC staff question about timing of the peer review per NRC Regulatory GUide (RG) 1.200, Revision 2, HAn Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed

Page 2: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

- 2 ­

Activities," March 2009 (ADAMS Accession No. ML090410014), the licensee confirmed that it performed a peer review in early 2011. This peer review was performed after the previous application dated October 26, 2009, for installation of a backup transformer to XST2. The licensee agreed to document the Peer Review Facts and Observations (F&Os), the plant disposition, and the achieved capability category in its formal submittal.

b. Internal Fire

The licensee agreed to provide an assessment which demonstrates the significance of an internal fire with respect to the acceptance guidelines of RG 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML1 0091 0006), and RG 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications," May 2011 (ADAMS Accession No. ML 100910008). The licensee, however, indicated that this assessment would be qualitative, supported by quantitative assessments and considerations. Insights would be derived from this assessment. The NRC staff recommended that Section 1.2.4, "Internal Fire Technical Elements," of RG 1.200 be discussed, in order to put the CPNPP, Units 1 and 2 fire insights and basis into perspective. The NRC staff suggested that the discussion related to Section 1.2.4 of RG 1.200 address the CPNPP baseline fire analysis and the fire analysis incorporating the extended completion time.

c. Other Hazards

Should a qualitative argument for other hazards (e.g., seismic, high winds, external floods) be important with respect to RGs 1.174 and 1.177 guidelines, the licensee should address the corresponding section in RG 1.200, Revision 2, on technical characteristics and attributes to place their insights into perspective. For example, such discussion may be needed for high winds, which corresponds to Section 1.2.7 of RG 1.200.

Consistent with RG 1.174, all hazards should be addressed in the submittal.

2. The NRC staff emphasized that to conclude the PRA assessment of hazards meets the guidelines provided by RGs 1.174 and 1.177, the assessment of hazards beyond internal events/flooding, needs to be rigorous.

3. The NRC staff indicated that the licensee's Individual Plant Examination External Events (IPEEE) assessment or any other previous assessment mayor may not have fully addressed the failure modes incorporated into the American Society of Mechanical Engineers/American Nuclear Society (ASME/ANS) PRA Standard, RA-Sa-2009. However, the NRC staff expects the licensee to incorporate all failure modes in its assessments and insights for the proposed submittal. For example for fire, hot shorts. and high-energy arcing faults should be assessed for their impact on the extended completion time.

Page 3: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

- 3 ­

4. The licensee indicated that fixed ignition sources are important to the fire insights. As a result, the NRC staff suggested that additional compensatory measures, such as infrared thermography, may be considered on the fixed ignition sources prior to entering the extended completion time. The licensee agreed to evaluate this option.

5. Based on the discussions during the meeting, the NRC staff understands that the licensee plans to implement the proposed plant modifications with both units operating at power. The NRC staff felt that a request to extend the completion time for T5 3.8.1 from 72 hours to 14 days (twice) (a total of 28 days) is unprecedented. The NRC staff believed that the proposed amendment request will need to provide a strong safety justification, with sufficient detail, to establish a position that the proposed offsite power system modifications can be conducted safely and without incident. The NRC staff questioned whether the plant will be safer if the proposed plant modifications are performed with at least one unit in refueling outage.

6. The NRC staff also suggested that the licensee discuss the following in the proposed amendment request:

• Condition of all major components relied upon to serve as the single offsite source during the extended completion time including a discussion of any systems, structures, and components covered by Title 10 of the Code of Federal Regulations (10 CFR), paragraph 50.65(a)(1) relied upon during this period.

• Historic loss-of-offsite power events at CPNPP, including corrective actions resulting from these events.

• Contingency plans for potential "what if' scenarios such as adverse weather, transmission system operator warnings or alerts of actual or predicted transmission system capacity or capability issue(s) affecting CPNPP, APDG inoperability occurring after the extended completion time is entered, loss of offsite power, etc.

• Justification for implementing the proposed plant modifications at power versus with one or both units in a shutdown condition.

No Public Meeting Feedback Forms were received for this meeting.

Page 4: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

- 4­

Please direct any inquiries to me at (301) 415-3016, or [email protected].

Sincerely,

bq\ \0otv.::\ ~~'~ Balwant K. Singai, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-445 and 50-446

Enclosures: 1. List of Attendees 2. Revised Handout

cc w/encl: Distribution via Listserv

Page 5: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

LIST OF ATTENDEES

JUNE 26,2012. MEETING WITH LUMINANT GENERATION COMPANY LLC

REGARDING TECHNICAL SPECIFICATION 3.8.1 EXTENSION OF COMPLETION TIME

COMANCHE PEAK NUCLEAR POWER PLANT. UNITS 1 AND 2

DOCKET NOS. 50-445 AND 50-446

NAME TITLE ORGANIZATION

Matthew Hamm Reactor Systems Engineer U.S. Nuclear Regulatory Commission (NRC)

GerryWaig* Senior Reactor Systems Engineer NRC

Khadijah Hemphill General Engineer NRC

James Anderson Branch Chief -­ NRC

Rui Li Electrical Engineer NRC

Roy Matthew Team Leader NRC

JS Hyslop Senior Risk and Reliability Engineer NRC

Jigar Patel Risk and Reliability Engineer NRC -

Mike Snodderly Acting Branch Chief NRC

Balwant K. Singal Senior Project Manager NRC

Michael Markley** Branch Chief NRC

Fred Madden Director, Oversight and Regulatory Affairs

Luminant Generation Company LLC (Luminant)

Nathan Larson Senior Engineer, PRA Luminant

Robert Lichtenstein Project Manager Luminant

Tamera J. Ervin-Walker

Principal Engineer, Nuclear Luminant

* Participated via phone ** Attended the meeting part time

Enclosure 1

Page 6: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Modification of Offsite Power Supplies to Improve Reliability at Comanche Peak

Nuclear Power Plant

June 26, 2012

Enclosure 2

Page 7: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

luminant Pre-Application Meeting

Agenda

Introductions

Purpose

Current Plant Design, TS 3.8.1, and Offsite Power

Switchyard Upgrades

Proposed Plant Mod, TS 3.8.1, and Offsite Power

TS 3.8.1 Extended Completion Time Alternate Power Diesel Generators NUREG-0800

Limited Work Area Risk Analysis

Proposed Schedule

Closing Remarks

Page 8: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Introductions

Fred Madden Director Oversight & Reg Affairs

Jeff Lamarca Project Manager

Robert Slough Consult. Licensing Analyst

Tamera Ervin-Walker Principal Engineer Nuc.

Nathan Larson Risk & Reliability Engineer

Bob Lichtenstein Risk & Reliability Engineer

Page 9: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Purpose

The proposed plant modification will facilitate connection of Startup Transformer (ST) XSTl or an alternate ST XST1A to the lE buses within the current Technical Specification (TS) Completion Time (CT) of 72 hours. This is an improvement in plant design which eliminates the necessity to shutdown both Units if XSTl fails or requires maintenance that goes beyond the current Technical Specification (TS) Completion Time (CT) of 72 hours. This change will improve the long-term reliability of the 138kV offsite circuit by providing connection to the ESF buses through XSTl or the new spare startup transformer.

Page 10: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Proposed CPNPP Offsite AC Power Sources

r-'-'-'-'-'-'-'-'-'-'-'-'-'-'- ­ r"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-" 345 Kv Switchyard, . ~.............................. I .. ,j ••••••••••••••••••••••••••••• : ........................................................................................1 I ~'.

10"'''''''''''''''*-1--, I _._. --

.... .... .... .... I ............, '.'. .................... 1 ••••• ................................. .•..::..... ····~2ST

....................................... '" ".....";:'"2MT211 (;J il.l.J

~ V;;Zt ..···.··· MOAS Unit 2

1ST

...........2....._ Unit 1

XST2A

XST2

~ ••.+

!·-·-·-·-·-·-·-·-·-·R~~y-·-·-·-·-·-·-·-

Stephenville! I C1 Hou;.e ~ ! ;

I

.'i'i--r-[}-tf-.. 25 Kv loop

.. ~ .......·········r·································· ............ #

It. _ .... _ .... _ .. "_, .. _'" _ ... _ .. " _ .. ... ~ .. _ .. ....J# _ ... _ _ .... _ _." .... _"" _"

DeCordova ! <III--t

138 Kv Switchyard I

~._._._._._._._._._._._._._._._._._._._i

Page 11: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

345kV Switchyard Reliability Upgrades

• All 345kV breakers have been replaced except for three breakers (8020, 8030, and 8080) which will be replaced this fall.

• Installation of new bus tie 345kV breaker 8075 to 8080 feeds transformer 25T.

• Addition of two-345kV lines Everman and Parker 2.

• Future plans are to replace all the electro­mechanical relays with digital relays.

Page 12: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Current AC Distribution to CPNPP 1 E Busses 345 kV Switchyard i 138 kV Switchyard

XSu.LXST~ XS~ .Aft. .IIIIIift.

Y x'T'Tv

I

1EA2.11 1EA2-2 1 pEA1.2 11EA1.1

1:BT4.- L~~ ) 1EG2 .) 1EG1

2EA2.11 2EA2­2 1 12EA1­2 12EA1-1

~Tr?-l~-f ) 2EG2 I) 2EG1

Train B Train B

1E

UNIT 1 NIT

Page 13: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Current Technical Specification 3.8.1

RECUIREDACTIC>NCONDfTlON COMPLETION TIME

1 hOur IncpeI:iIbIe.

A.. One requlre.d 01IUe croolt IA.1 Perrorm DR 3.8.1.1 fOr reqUired OPER.A8LE 01'I'sIte c:m:ufl

~NO once per 8 hours. tIlerea1ter

lAND

A.2 -----NOTE----­In MODES 1, 2 and 3, me TDAFW pump 1& oon&Idered a f1!quM"edredlrll:sant feature.

DE!CIa~ reqJ.8"ed fE'atuI'1!(S) 'tIt1II1 no 24 hol.lf5 frOm dl&CCJVeryDn&Ite power 3V3I'IaI:Me II'IOpef'abIe or no Dn&Ite power towhen /bi. redlrlilant required Dne train oonCUrren1 1'ea'tllre(&) IS IllOpI!'I'atlfe. wt1tIlnc:tpI!I'3b1tty.

~undaf1t reqllfl'1!d l'e3't1ft{&)

lAND

A.3 RI!'&1l::ft required oIT&Ite arcut 1D 72hol.lf5OPERABLE SlaM.

f!l 14 days 'RlI' .iii one-:Hme DLI'I3ge on XST2 to completE! 3 plant mDdl1'llca1l0n 10 De completed by M2d11.2D11.

Page 14: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

•• • •• • ••

~.

Current CPNPP Offsite AC Power Sources

r-'-' ­ r"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-'I 345kV Switchyard

.. ,,_.... I ..<i•••••••••••••••••••••••••••••: ........................................................................................ '

MOAS o···········.1-···11 XST2

1ST

XST2A

2ST

Unit2I __._ ~_...._........................_......_._.....

. 1 . Unit

i".'.'.'.'.' •.•.•. ··R~I;Y········ •.•.•.• Stephenville! I I,;;~',~,;I Hou~

'III ! I

••~XST1 • +

•• + •

••

I~~ 25 Kv loop .. ; •.... ···········r·································· ......•.•..• ­

.. _ ... _ .. _,. .. _ .. _.,,_ .. _.*_ .... _.,,_ .. _ .. _ .. ,,_ ... _ .. _ .. _ .. -J

OeCordova ! .......

iI I138kV Switchyard ............•...........•.•.•..........,.

Page 15: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Proposed Plant Modification Overview 345 kV Switchyard i 138 IchyardXS-aLXST~ XST1 XST1A

v x T Tv x'T' Tv I I

--------' I:r

I

New ........I Transfer Panel

1EA2-111EA2-21 PEA1-2 11EA1-11: ..(I L,... I)BTh BTT

) 1EG2 .) 1EG1

12EA1-2 12EA1-1

l~-f ) 2EG2 I) 2EG1

Train B Train B

1EG G1

NIT 1 NIT

Page 16: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Proposed Technical Specification 3.8.1

c::oNOrr tON I REQUIRE,D ACTtON COMPI.ETtON TIME

1 tl()g'A. 0rIe- r«f1Ui'ted df!iIe. cir(:uit r.t ~ sn.. 3.8.1 .1 few ~ite:J ~. OPERA.BLE otI'site-ctwit

,NO

2 NCITE-··----- ­In MODES 1.2' a.rd 3. the- TOAF'IN ....tnp d (X)tI~ a, ~ife.d tredUldant :Iifsa"re.

:[)oecl&re r«f'lire<l fe.8lure<f.$) ...11 "'" df!iIe. po'1IIINE!I' availll!lJ:ll!. in~ 'IItf1et't its IledUldaJ'l.,~ir«I 1islII~)is~.

,NO-.3 Re!; 'fI:MIe. ~ iirIed 1I:'JIIISite- (:jj(: uit b

OP,E:RABLE, sta..s.

.. li(JUts ~ di.!!loc:Jwer)' lfII::)oII$l.e~b e 'IrIIin O;)ft:1I.ftlI!!ifI. hinopenllHB)'of fldaJ'lt,~ife.d

'1I!!!II'.t"n!(S)

Page 17: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Proposed CPNPP Offsite AC Power Sources

,- r"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-',345 Kv Switchyard

j' _.- ._._. _. _.-.-. -'R~I;y-'-'-'-' _._. -'-, Stephenville! I L;,:.d Houke

.. ! )

I~. ··i················r

MOAS I Unit ~_.____._.__."._

···········2.···.I -;:;t1 XST2

XST2A

.+

...• ··································............~

I

I

I ~. _." _ .. " _ .. " _" '" _ .... _" .. _ .. " _ "'" _ w .. _ .. " _"" _"" _ "'. - '" __ "' .. _ ... --'

DeCordova ! <If--;

I 138 Kv Switchyard i

~._._._._._._._._._._._._._._._._._._._i

Page 18: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Alternate Power Diesel Generators (APDGs)

As a defense-in-depth feature concerning XST2 modification, a set of APDGs were installed for each Unit.

APDGs maintains the capability to provide power for one train of ESF equipment needed for safe shutdown and long term cooling of each Unit during the two extended CT to respond to a beyond design basis event if loss of XST2 occurs and both EDGs of a Unit fail. The installed APDGs are rated higher than the ones described in LAR 09-003 and in CPNPP's response to NRC RAls.

Page 19: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

NUREG-0800

The NRC Standard Review Plan NUREG­

0800, BTP 8-8, dated Initial - February

2012 states, "An EDG or offsite power

AOT license amendment of more than 14

days should not be considered by the

staff for review."

Page 20: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation
Page 21: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation
Page 22: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation
Page 23: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Risk Analysis

- Summarize PRA Model Scope and Quality

- Describe the Risk Assessment

- Discuss the Sensitivity Analyses

- Discuss the Configuration Risk Management Program (CRMP)and Risk Reduction Measures

Page 24: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

PRA Model Scope and Quality

• Internal Events and Internal Flooding models were developed per RG 1.200 Rev 2 requirements and have been Peer Reviewed

Per the Peer Review Team

"Overalt the CPNPP PRA was found to substantially meet the ASME PRA Standard at Capability Category /I and can be used to support risk-informed applicationsN

Page 25: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

PRA Model Scope and Quality

• Subsequent to the Peer Review, Findings and Observations were addressed and incorporated into the current Revision 4A model

- All "Not Met"... now Cat II or better

- 4 of 7 previous Cat I ... now Cat II or better Remaining 3 with no application impact

- All Findings were resolved and incorporated

- All but one suggestion incorporated One was deferred with no application impact

- All remaining Support Requirements (SR) meet Cat II or better

• External Events based on IPEEE and will be used for insights

Page 26: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

PRA Model Scope and Quality

• Adequately addresses as-built, as-operated plant

• Plant specific data and plant specific best estimate Thermal-Hydraulic address success criteria

• Switchyard and electrical power system modeling is detailed

• Alternate Power Diesel Generator (APDG) is installed and modeled in the PRA to improve onsite power capabilities

• RCP Seal LOCA modeling uses the WOG 2000 model for high temperature seals

• Convolution method used for LOOP recovery analyses

Page 27: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Description of Risk Assessment

• Applicable Guidance and Criteria • Rev 2 of RG 1.174, Rev 1 of RG 1.177, and Rev 2 of RG 1.200

• Quantitative Analyses for Internal Events and Flood, Levell and II

• Qualitative Analyses for External Events • Qualitative discussion combined with IPEEE risk insights for the Fire,

High Winds (Tornado), and Seismic (Margins)

• Supported by detailed walk-down of plant

Page 28: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Discussion of Sensitivity Analyses

• Sensitivity studies are used to address uncertainties. These studies will include but are not limited to: - Reliability of components important to the risk contributions of the CT

extension

- No Credit for the APDG

- LOOP Recovery Probabilities

- Increased duration of XSTl CT

- Conservation of maintenance

• Uncertainty analysis will be performed per NUREG­1855. - Common Cause Failure discussion

Page 29: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Configuration Risk Management Program

• CPNPP has a Configuration Risk Management Program - Incorporates the characteristics of the model Configuration Risk

Management Program described in RG 1.177 - CRMP description has been incorporated into plant Technical

Specifications - 5.5.18 - Previously approved for one time 14-day change to Technical

Specifications for AC Sources - Operating - B 3.8.1 Required Action A.3 (XST2A transformer installation)

• CRMP is a requirement of the Maintenance Rule Program. CPNPP endorses the guidance in NUMARC 93-01, "Industry Guideline For Monitoring the Effectiveness Of Maintenance At Nuclear Power Plants"

• CPNPP will meet the fire (a)(4) requirement by December 1, 2013

Page 30: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Configuration Risk Management Program ­Risk Mitigation Actions

[Implemented during the extended CTs]

1. Restricted Access to and Suspension of Maintenance in the Switchyard.

2. Testing of Diesel Generators (EDG and APG) and Turbine Driven Auxiliary Feedwater Pumps within the Two (2) Weeks Prior to the Start of the XST1 extended CT.

3. Rescheduling of Testing and Maintenance on the EDGs, APGs, TDAFWPs, XST2, CCWPs and SSWPs to occur outside the extended CT window.

4. Suspension of Hot Work Activities Near XST2 Power and Control Cabling.

5. Roving Hourly Fire Watch Along Paths of XST2 Power and Control Cabling.

6. Operations preparations and grid monitoring during the CT. 7. Selection of Time of Year Due to Weather Considerations.

Page 31: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

----

• •

V)

C

e ......, co i-

Q)

-0

V)

c e

U

i-

Q)

..c......, CO Q

)

$ Q

) i-

OJ

>

Q)

V)

l-

Q)

.0

0..... u 0 0 -O

l

"e c:

c: "0

, Q

)

co I~

Q)

-u j)

u- cu::s C

C

a: 0

" ~ S­0 ....

~~

:2!- 0 "0c:

w I

, •

I I

In

C\I In

...

In

C\I • ...

CD

(%)

ftlTT

TqeqO

Jd

!i9E

L£E

60£

"'O~

EGa

Gaa

L ~ OJ

L6t >

69"' 0 ::n

1"1 c ~

Ell

GO

LG

6a

CD"'

Page 32: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Preliminary Conclusions of Risk Assessment

• The preliminary PRA results show that the extension of the total XSTl CT will have minimal impact on plant risk

Page 33: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

Proposed Schedule for LAR Submittal and Staff Review

* Luminant Power will Submit the LAR by September 2012.

* Luminant Power requests approval of the proposed License Amendment by September 30, 2013, to be implemented within 120 days of the issuance of the license amendment.

Page 34: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation
Page 35: 6/26/12 Summary of Meeting with Luminant Generation ... · UNITED STATES NUCLEAR REGULATORY COMMISSION . WASHINGTON, D.C. 20555-0001 . July 18, 2012 . LICENSEE: Luminant Generation

-4­

Please direct any inquiries to me at (301) 415-3016, or [email protected].

Docket Nos. 50-445 and 50-446

Enclosures: 1. List of Attendees 2. Revised Handout

cc w/encl: Distribution via Listserv

DISTRIBUTION: PUBLIC LPLIV r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsNrrDraApla Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMComanchePeak Resource RidsOgcRp Resource RidsRgn4MailCenter Resource

ADAMS Accession No ML 12188A697

Sincerely,

IRA!

Balwant K. Singai, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

TWertz, NRR SKennedy, EDO RIV JHyslop, NRR/DRAIAPLA MSnodderly, NRR/DRAIAPLA JPatel, NRRIDRAIAPLA RMathew, NRRlDE/EEEB MHamm, NRRlDSS/STSB RLi, NRRlDE/EEEB KHemphill, NRR/DSS/STSB GWaig, NRR/DSS/STSB

"'Via e-mail

OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRAlAPLAlBC NRR/DSS/STSB/BC

NAME BSingal JBurkhardt MSnodderly (A) BBeasley for'" RElliott

DATE 7/16/12 7/9112 7/16/12 7/16/12

OFFICE NRR/DE/EEEB/BC NRR/LPL4/BC NRR/LPL4/PM

NAME JAndersen'" MMarkley JSebrosky for BSingal

DATE 7/9/12 7/17/2012 7/18/12

OFFICIAL RECORD COpy