4th September 2006
UK Neutrino FactoryC.R. PriorCCLRC-ASTeC and Trinity College OxfordOn behalf of the UK Neutrino Factory Collaboration
CCLRCAdams InstituteCockcroft InstituteHigh Power RF Faraday PartnershipImperial College London Brunel UniversityUniversity of DurhamUniversity of GlasgowUniversity of LancasterUniversity of LiverpoolUniversity of OxfordUniversity of SheffieldUniversity of SouthamptonUniversity of Warwick
Neutrino Factory NF covers every aspect of
advanced accelerator study Aim is 1021 neutrinos per year Intense proton beams with very
short bunch length (~1ns) Secondary pion beam
Low production rate Targets capable of handling multi-
MW of beam power Tertiary muon beams (lifetime
2.2 μs at rest) Fast acceleration
Decay rings handling large muon beam power
Neutrinos are a quarternary beam New concepts
Ionization cooling FFAG accelerators (large
acceptance, rapid acceleration)
Time Line
1999 Inauguration of series of annual Neutrino Factory Workshops. Basic parameters set
RAL collaboration with CERN UK design of synchrotron proton drivers
PPARC funded UKNF study 2003-2006 International Scoping Study (ISS) 2005-2006
UK scientists playing a major role Identification of a self-consistent NF scenario Baseline design established
The future Further UKNF study 2007-2010 International Design Study, probably UK led.
UKNF 2003-2006 WP1 Conceptual Design Study
Designs for whole accelerating structure identified WP2 Proton Driver Front End Test Stand
Fundamental proton driver R&D WP3 Target R&D WP4 Preparation for International Design Study
Several new young enthusiastic recruits to Accelerator Physics.
Much progress has been made in all areas. The UK is at the forefront of NF studies and in a position
to lead and direct NF research.
UKNF 2007-2010
WP1 Conceptual Design Study Detailed analysis of integrated accelerator facility in accordance with ISS
recommendations
WP2 Proton Driver Front End Test Stand Through to completion
WP3 Target R&D Establish viability of a solid target solution
WP4 Development of High Gradient RF Cavities WP5 Survey and Geological Investigation
Explore feasibility of RAL as a site for a Neutrino Factory
WP6 International Design Study IDR 2010, CDR 2012
WP1 Conceptual Design Study
Proton driver UK designs at 5 GeV, 8 GeV, 10 Gev, 15 GeV, 30 GeV
Pion decay/muon capture Optimised solenoid scheme Recent new ideas for phase rotation to capture both µ+ and µ-
Cooling Cooling ring designed New modelling code under development Novel cooling schemes under investigation
Muon Acceleration New codes developed Investigation of J-PARC scheme (in collaboration) UK lattices for first-ever isochronous FFAGs
Muon storage and neutrino production UK designs for triangular and bow-tie rings Suitable detector sites identified for a facility based at RAL
Proton Drivers
ISS baseline: 4 MW beam power
50 Hz repetition rate
Energy 5-15 GeV
1-5 bunches per pulse,
each compressed to 1-2 ns
rms
20 μs delay between output
of bunches to target
UKNF 10 GeV design
meets all requirements
180 MeV H- linac
3 GeV RCS Booster
Radius=63.788m
10 GeV FFAG
Radius=127.6m
3 or 5 proton bunches
221 m
218
m
Proton Drivers
In-depth analysis required Potential difficulties
Beam chopping Beam injection into booster
synchrotron Bunch compression to ~1 ns
rms FFAG itself
Develop 3D modelling codes (including space charge) for synchrotrons and for FFAGs
R&D: design and build an electron model of a non-scaling proton FFAG Funding being sought
elsewhere
180 MeV H- linac
3 GeV RCS Booster
10 GeV FFAG
3 or 5 proton bunches
221 m
218
m
Pion Decay/Muon CaptureDistributed code for optimisation of
solenoid capture channel
Choice of Proton Driver Energy
New scheme to capture equal quantities of both sign muons
Optimise for 0.2 muons/proton through capture channel.
Phase rotation and bunching systems prior to cooling.
0
0.002
0.004
0.006
0.008
0.01
0.012
0.014
1 10 100 1000
Proton Energy (GeV)
Cap
ture
d P
arti
cles
per
p.G
eV Ta +
Ta -
Hg +
Hg -
C +
C -
Cu +
Cu -
Muon Acceleration
Initial stages of muon acceleration in linac and RLA (dogbone)
One or more FFAGs to reach final energy (20-40 GeV)
Both μ– and μ+ accelerated Muon beam has very large
emittance (~30,000 π mm.mrad)
F F D
Extraction Trajectory
Injection Trajectory
Beam trajectories in triplet FFAG
Schematic of ISS baseline for muon acceleration. Other layouts are under consideration.
New Modelling Code: end-end simulation Transverse emittance = 1 π mm.mrad
RF phase/2π
0
3 12
2 10
22
Kin
etic
ene
rgy
[GeV
]
0
3
Kin
etic
ene
rgy
[GeV
]
10
2212
2
Transverse emittance = 30,000 π mm.mrad
Linac RLA FFAG
Linac RLA FFAG
Electron FFAG test model
EMMA
EMMA fed by ERLP injector at Daresbury Laboratory
Essential R&D of a non-scaling FFAG
10-20 MeV electron model to test theory and demonstrate beam transport
Beam dynamics and simulation carried out under UKNF WP1
Bid for money for construction submitted to Basic Technology Fund.
Muon Decay Rings
Triangular design Bow-tie designInjection
ν
ν
425 m production straights
Advantages of Bow-tie design smaller depth (300 m compared with 435 m). higher efficiency (52.6 % compared with 49.6%). greater choice of the opening angle around 50°.
But needs a scheme to remove the beam polarization.
ν
ν
Circumference for both rings
= 1608 m
53°
Two parallel rings, one for each muon sign, in each tunnel, with μ± bunches interleaved in time.
Detector Sites for NF at RALSite 1 Baseline Site 2 Baseline Angle
WIPP, Carlsbad, NM
7513 kmArlit mine, Niger
3678 km 67°
INO, Pykara, India
7630 km Norsaq 2805 km60°
WIPP, Carlsbad,
7513 kmSAGE, Baksan
3375 km60°
WIPP, Carlsbad
7513 km Cyprus 3251 km 52°New Work Package WP5 to explore
geology and sites for decay rings
RFQ, 324 MHz, 3 MeV
MEBT, chopper
Ion source 70 mA, 2 ms, 10 % dc
3 Solenoid LEBT
WP2 Proton Driver R&D: The Front End Test Stand
Creating gaps in H- micro-pulse train (chopping) is essential for low-loss, high intensity, beam accumulation
Front-end Test Stand
2 copper “quadrants” of the RFQ cold model
waiting for brazing
ASTeC and EU FP6/HIPPI funded H- ion source: development goals:
Double output current 35mA →70mA Increase pulse length 200µs → 2ms Improve emittance Maximise lifetime
Design of Solenoid-based LEBT completed Production of 324 MHz RFQ
Cold model almost finished Preparing a computer controlled bead pull
system for field measurement Fast beam chopper
Electronics ready Alternative beamline optics under study
Diagnostics Laser-wire system for profile measurement
from different angles
ISIS ion source at
RAL
A generic project – could be used for any proton driver
Radio Frequency Quadrupole Linac
A 324 MHz klystron has been ordered from Toshiba for delivery towards the end of 2006.
A cold model RFQ is under construction. 0.5 m long, it models all significant features of the full 4 m design
Aluminium machining model
Design of the 4 vaneRFQ cold model
A novel tandem chopper technique has been developed at RAL to overcome the conflicting requirements of fast rise time (< 2ns) and long flat-top (up to 100 s).
FETS Fast Beam Chopper
A ‘fast’ chopper, with short
rise time but limited flat-top,
removes 2-3 microbunches.
In the gap created, a ‘slow’
chopper is switched on, with
longer rise time and flat-top,
able to remove a
succession of micropulses
(typically ~100).
The gap in the bunch train
is needed for low-loss
injection and extraction in
the accumulator rings.
Chopper 1 (fast transition)
Chopper 2 / Beam dump(slower transition)
BEAM
Fast and slowchopper modules
WP3 Target Studies Potential Neutrino Factory show-stopper
Target station small nuclear power station, need to be in secure nuclear site Radiation safety very important Target feasibility not yet demonstrated
UKNF focus on solid targets Radiation safety “easier” + more World experience exists
Issues: Shock – simulations suggest could break target in 1 pulse Temperature rise – would melt target in < 50 pulses Radiation damage – could break target in many pulses
Shock Studies UKNF has developed world-leading expertise A shock test facility has been built without a 4 MW proton driver! A much better understanding of shock has been acquired
UK solid target work is based on a moving target – each “rod” is exposed to the proton beam only once every 3 sec
50kV, 8kA pulsed p/s
for ISIS kicker magnets
Pulse: rise time ~100ns, 800ns flat top
Tested 0.5mm Ta & W wires
Ta at 2000K
W after testing at 5 MW. Breaks caused by removal, not testing
Some Results of 0.5 mm diameter wires
Material Lngth
cm
Pulse Current
A
Pulse Temp
.K
Max. Temp
K
Rep RateHz
No. of pulses to
failureBeam Power
MW
Target dia
cmTantalum
4 3000 60 1800 12.5 0.2x106
Tantalum is not a very good material – too weak at high temperatures.
TungstenBroke when increased to 7200A (2200K)
3 4900 100 2000 12.5 >3.4x106
24
23
Stuck to top Cu connector
3 6400 170 1900 6.25 >1.6x106
48
23
Not broken;
still pulsing
2.5 5560
5840
130
140
1900
2050
12.5
12.5
>4.2x106
+PLUS+
>9x106
36-
23-
“Equivalent Target”: This shows the equivalent beam power (MW) and target radius (cm) in a real target for the same stress in the test wire. Assumes a parabolic beam distribution and 4 micro-pulses per macro-pulse, spaced at 30 s.
Equivalent Target
Target Studies: simulation
Code LSDyna Benchmarked against existing beam data Used to:
understand shock relate wires to NF targets study shock reduction determine size of effects study failure mechanisms
Codes MARS and GEANT4 Used to:
predict energy deposition in target study radiation damage monitor pion production (cf HARP data)
0.9
Tantalum Cylinder, 1x10 cm
1.9
0.4
1.4
2.4
1
5
9
13
17 44
24
34
14
4
Goran SKORO, Sheffield University
40
30
20
10
0
LS- DYNA simulations
surf
ace
disp
lace
men
t [
m]
0.9
Tantalum Cylinder, 1x10 cmTantalum Cylinder, 1x10 cm
1.9
0.4
1.4
2.4
1
5
9
13
17 44
24
34
14
4
Goran SKORO, Sheffield University
Goran SKORO, Sheffield University
40
30
20
10
0
40
30
20
10
0
LS- DYNA simulationsLS- DYNA simulations
surf
ace
disp
lace
men
t [
m]
Comparison with tests at ISOLDE
Target Plans 2007-2010 Results for shock and radiation damage in W look very promising – contrary to widely
held belief.
Continue shock measurements and supporting simulations find limits ■ show reproducibility ■ test different solids
test expected shock dependence ■ temperature dependence
Strengthen case for solid targets – also important for other projects
Engineer realistic mechanism for changing target at 50Hz including building a model
Study the effect of the 20T capture solenoid field
Engineer a target station around the target: simulations required of activation, heating, etc
incorporate a beam dump
Considerable expertise with W being developed by ISIS
Maintain ability to contribute to liquid target work (MERIT)
Main deliverable: realistic and defendable solid target solution for a Neutrino Factory
WP4 High Gradient RF Cavities
Experimental and theoretical studies Achievable accelerating gradient under a few Tesla magnetic fields
Ascertain what can be manufactured with repeatable specifications
Investigate surface factors that limit accelerating gradient Electro-polishing
Chemical mechanical polishing
Abrasive flow machining
Fabrication: Examine surface topology and chemical composition
Evaluate effects of fabrication on these properties
High power testing
Collaboration with overseas laboratories (FNAL, LBNL, J-Lab) and industry
(Shakespeare Engineering, North Eastern Metal Spinners, e2v, High Power
RF Faraday Partnership)
Cavity Fabrication ProcessCavity bodyCavity body
Ceramic RF window Water cooling line
RF PowerRF Power
Two couplersTwo couplers
Load
RF coupler conditioning RF coupler conditioning at SNS in ORNLat SNS in ORNL
Summary
Aim to complete conceptual NF design in framework of ISS recommendations and in collaboration with IDS, working towards the full (international) conceptual design report in 2012.
Complete proton driver front-end test stand and demonstrate fast, clean, beam chopping. Important for many applications besides NF.
Further studies of solid targets to find a feasible solution for NF. Again, other applications.
Develop techniques for production of reliable high-gradient RF cavities. Generic.
Undertake geological study of suitable site for a Neutrino Factory. Play a leading role in the International Design Study.
Organisation and summary
Management of UKNF programme
Summary of request
Project management:
UKNFSteering Group
Conceptual designC. Prior
Target studiesR. Edgecock
Front-end test standA. Letchford
High-gradient cavitydevelopment
R. Seviour
Site survey &geological studies
M. WarnerInternationalDesign StudyR. Edgecock
MICE-UK
KL
WP1: NF Conceptual design Principal deliverable:
Interim design report (IDR) In context of the International Design Study (IDS)
Resources for the UK contributions to the IDS Underpins:
UK leadership position Eventual development of bid to host or to make substantial
contributionsWork package title Neutrino Factory conceptual design
Work package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Proton driverCCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-PhysicsPozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99
Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89
OxfordCobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47
Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36
Muon accelerationCCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTECRees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75
Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTECPrior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88
Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Neutrino Factory conceptual designWork package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £kProton driver
CCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-Physics
Pozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41
Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89Oxford
Cobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81
Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36Muon acceleration
CCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTEC
Rees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46
CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTEC
Prior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00
VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Neutrino Factory conceptual designWork package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Proton driverCCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-PhysicsPozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99
Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89
OxfordCobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47
Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36
Muon accelerationCCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTECRees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75
Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTECPrior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88
Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Neutrino Factory conceptual designWork package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Proton driverCCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-PhysicsPozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99
Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89
OxfordCobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47
Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36
Muon accelerationCCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTECRees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75
Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTECPrior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88
Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Neutrino Factory conceptual designWork package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £kProton driver
CCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-Physics
Pozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41
Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89Oxford
Cobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81
Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36Muon acceleration
CCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTEC
Rees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46
CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTEC
Prior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00
VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Neutrino Factory conceptual designWork package number 1
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: PriorStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Proton driverCCLRC-ASTEC
Prior 0.25 36.19 0.25 37.45 0.25 38.76 0.75 112.40Rees 0.05 5.92 0.00 0.00 0.00 0.00 0.05 5.92
Poklonsky 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37Kelliher 0.10 7.99 0.10 8.27 0.20 17.11 0.40 33.37
Muon front-endCCLRC-ASTEC
Brooks 1.00 79.88 1.00 82.68 1.00 85.57 3.00 248.13Rogers 0.60 47.93 0.60 49.61 0.60 51.34 1.80 148.88
Poklonsky 0.20 15.98 0.20 16.54 0.20 17.11 0.60 49.63Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Imperial-PhysicsPozimski 0.10 8.69 0.10 8.99 0.10 9.31 0.30 26.99
Kurup 0.30 26.85 0.30 27.79 0.30 28.76 0.90 83.41Graduate student B 0.00 0.00 0.50 10.71 1.00 22.17 1.50 32.89
OxfordCobb 0.20 16.25 0.20 16.82 0.20 17.41 0.60 50.47
Apollonio 0.20 15.07 0.20 15.60 0.20 16.14 0.60 46.81Cooper 0.00 0.00 0.20 22.78 0.20 23.58 0.40 46.36
Muon accelerationCCLRC-ASTEC
Machida 1.00 98.66 1.00 102.11 1.00 105.69 3.00 306.46Kelliher 0.10 7.99 0.50 41.34 0.60 51.34 1.20 100.67
Poklonsky 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Oxford
Yokoi 0.58 54.88 1.00 97.51 1.00 100.92 2.58 253.30Storage ring
CCLRC-ASTECRees 0.15 17.75 0.00 0.00 0.00 0.00 0.15 17.75
Kelliher 0.60 47.93 0.20 16.54 0.00 0.00 0.80 64.46CCLRC-RAL-ISIS
Engineering support 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85Management and oversight
CCLRC-ASTECPrior 0.30 43.42 0.30 44.94 0.30 46.52 0.90 134.88
Rolling-grant staff totals 0.95 69.82 1.15 95.04 1.15 98.37 3.25 263.23Staff totals: 7.16 651.43 8.30 744.67 8.90 790.38 24.36 2186.48
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 30.00 30.00 30.00 90.00
Total: 686.43 779.67 825.38 2291.48
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
WP2: Proton driver f/e test stand Principal deliverable:
Front-end test stand: LEBT, RFQ, Chopper, and diagnostics
High-quality chopped beams critical for development of high-power proton driver for the Neutrino Factory
Complementarity: EU FP6 HIPPI Future high-power proton facilities (e.g. ISIS upgrade, ESS, …)
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
2007/08 2008/09 2009/10 Total
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Proton driver front-end test standWork package number 2
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: LetchfordStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Ion sourceCCLRC-RAL-ISIS
Faircloth 0.50 45.03 0.50 46.61 0.50 48.24 1.50 139.89Low-energy beam transport
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.40 33.12 0.40 34.28 0.40 35.48 1.20 102.88
DiagnosticsImperial-Physics
Pozimski 0.20 17.38 0.20 17.99 0.20 18.62 0.60 53.99Jolly 1.00 89.51 1.00 92.64 1.00 95.88 3.00 278.03
Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97
RFQImperial-Physics
Pozimski 0.30 26.07 0.30 26.98 0.30 27.93 0.90 80.98Savage 0.40 15.78 0.40 16.33 0.40 16.91 1.20 49.02Cheng 1.00 30.68 1.00 31.75 1.00 32.86 3.00 95.28Kurup 0.70 62.66 0.70 64.85 0.70 67.12 2.10 194.62Hare 0.00 0.00 0.15 5.18 0.20 7.15 0.35 12.33
Graduate student A 0.25 5.18 0.50 10.71 0.50 11.09 1.25 26.97Chopper
CCLRC-RAL-ISISClarke-Gayther 0.40 36.03 0.40 37.29 0.40 38.59 1.20 111.91
Medium-energy beam transportCCLRC-RAL-ISIS
Physicist (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Management, oversight and infrastructure
CCLRC-RAL-ISISLetchford 0.20 21.61 0.20 22.37 0.20 23.15 0.60 67.13
Engineer (WP2, ISIS, Band4) 0.20 17.81 0.20 18.43 0.20 19.08 0.60 55.31Technical (WP2, ISIS, Band4) 0.20 18.01 0.20 18.64 0.20 19.30 0.60 55.96
Craft (WP2, ISIS, Band5) 0.20 14.59 0.20 15.10 0.20 15.62 0.60 45.30Imperial-Physics
Savage 0.20 7.89 0.20 8.17 0.20 8.45 0.60 24.51Rolling-grant staff totals 0.70 58.36 0.85 65.58 0.90 69.66 2.45 193.60Staff totals: 7.20 495.01 7.85 528.22 7.90 548.50 22.95 1571.73
Low-energy beam transportLenses 30.00 30.00Supports and stands 15.00 15.00Power supplies and controls 30.00 30.00
DiagnosticsLaser 100.00 100.00Epsilon? 50.00 50.00Rho? 30.00 30.00Conv? 70.00 70.00
RFQRFQ 40.00 40.00 80.00Tuners and ancillary items 15.00 15.00 30.00
ChopperCold models 150.00 150.00Chopper 100.00 100.00
Medium-energy beam transportMEBT 110.00 100.00 210.00Power supplies and controls 75.00 75.00
InfrastructureKlystron 200.00 200.00RF distribution and control 100.00 50.00 150.00
Inflation 17.00 18.48 21.14 56.62Eqipment total 697.00 383.48 296.14 1376.62VAT 121.98 67.11 51.83 240.91Working margin (10%) 81.90 45.06 34.80 161.75Contingency (20%) 163.80 90.12 69.59 323.51Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 1569.67 1123.99 1010.86 3704.52
2007/08 2008/09 2009/10 Total
WP3: Target studies Principal deliverable
Conceptual design for NF target station for inclusion in IDR
High-power target key engineering challenge Require to:
Complete solid-target material studies; Develop engineering concept of target station
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
SheffieldBooth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62
Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66
Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EIDMechanical engineer (WP3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (WP3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
BrunelKhan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
MERIT and liquid mercury studiesCCLRC-RAL-PPD
Physicist (WP3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27VAT 15.25 15.63 33.92 64.80Working margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost Profile
Issue Date: 18/07/2006
Manager: Edgecock
Start Date: 2007
End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
Sheffield
Booth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22
Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45
CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EID
Mechanical engineer (W P3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (W P3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
Brunel
Khan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
Warwick
Harrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95MERIT and liquid mercury studies
CCLRC-RAL-PPD
Physicist (W P3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27
VAT 15.25 15.63 33.92 64.80W orking margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
SheffieldBooth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62
Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66
Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EIDMechanical engineer (WP3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (WP3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
BrunelKhan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
MERIT and liquid mercury studiesCCLRC-RAL-PPD
Physicist (WP3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27VAT 15.25 15.63 33.92 64.80Working margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
SheffieldBooth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62
Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66
Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EIDMechanical engineer (WP3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (WP3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
BrunelKhan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
MERIT and liquid mercury studiesCCLRC-RAL-PPD
Physicist (WP3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27VAT 15.25 15.63 33.92 64.80Working margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost Profile
Issue Date: 18/07/2006
Manager: Edgecock
Start Date: 2007
End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
Sheffield
Booth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22
Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45
CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EID
Mechanical engineer (W P3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (W P3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
Brunel
Khan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
Warwick
Harrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30
Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95MERIT and liquid mercury studies
CCLRC-RAL-PPD
Physicist (W P3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27
VAT 15.25 15.63 33.92 64.80W orking margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Target studiesWork package number 3
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Solid-target studiesCCLRC-RAL-EID
Brownsword 0.25 25.16 0.00 0.00 0.00 0.00 0.25 25.16Densham 0.20 24.15 0.20 24.99 0.20 25.87 0.60 75.00Rochford 0.20 20.13 0.00 0.00 0.00 0.00 0.20 20.13
SheffieldBooth 0.10 9.54 0.10 9.87 0.10 10.22 0.30 29.62
Daw 0.10 7.15 0.10 7.40 0.10 7.66 0.30 22.22Skoro 1.00 62.35 1.00 64.53 1.00 66.79 3.00 193.66
Hodgson 0.10 5.65 0.20 11.70 0.20 12.11 0.50 29.45CCLRC-RAL-ISIS
Bennett 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD
Edgecock 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63Target-station concept development
CCLRC-RAL-EIDMechanical engineer (WP3, EID, Band 4) 0.50 50.32 1.00 104.16 1.00 107.81 2.50 262.29Mechanical engineer (WP3, EID, Band 5) 0.00 0.00 1.00 104.16 1.00 107.81 2.00 211.97
BrunelKhan 0.10 12.50 0.10 12.93 0.10 13.39 0.3 38.82
Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Glasgow
Soler 0.05 3.31 0.05 3.43 0.05 3.55 0.15 10.29Physicist 0.30 19.87 0.30 20.57 0.30 21.29 0.90 61.73
WarwickHarrison 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Back 0.40 26.50 0.40 27.42 0.40 28.38 1.20 82.30Barker 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
PostDoc 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
MERIT and liquid mercury studiesCCLRC-RAL-PPD
Physicist (WP3, PPD, Band5) 0.50 36.29 1.00 75.13 1.00 77.76 2.50 189.18Rolling-grant staff totals 1.35 99.42 1.45 108.75 1.45 112.55 4.25 320.72Staff totals: 5.75 416.83 8.40 605.62 8.40 626.82 22.55 1649.27
Target system prototype 0.00 50.00 100.00 150.00Magnetic forces experiment 0.00 25.00 75.00 100.00Shock tests at RAL 20.00 10.00 5.00 35.00Shock tests at CERN 65.00 0.00 0.00 65.00
Inflation 2.12 4.30 13.84 20.27Eqipment total 87.13 89.30 193.84 370.27VAT 15.25 15.63 33.92 64.80Working margin (10%) 10.24 10.49 22.78 43.51Contingency (20%) 20.47 20.99 45.55 87.01Consumables 0.00Travel 10.00 10.00 10.00 30.00
Total: 559.91 752.03 932.91 2244.86
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
WP4: Development of high-gradient cavities Principal deliverable:
Robust, reproducible manufacturing process Completion of IDR requires specification of accelerating gradients in
acceleration systems: Challenge: high-gradient in magnetic field Requirement: to build many cavities to spec.
To define manufacturing process require: To understand of effect steps in manufacture have on achievable gradient To devise cost optimised manufacturing process
Work package title Development of high-gradient RF cavitiesWork package number 4
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: SeviourStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Surface studies and development of fabrication techniquesCCLRC-ASTEC
RF Engineer (WP4, ASTEC, Band5) 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25Engineering support (WP4, ASTEC, Band5) 0.10 7.99 0.10 8.27 0.10 8.56 0.30 24.81
Imperial-Mech.Eng.Ristic 0.20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
Engineer PDRA 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257.20Industrial CASE Student (EPSRC award) 1.00 0.00 1.00 0.00 1.00 0.00 3.00 0.00
UKNF project student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Imperial-PhysicsBarber 0.00 0.00 0.00 0.00 0.10 4.66 0.10 4.66Kasey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
Khaleeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40D.Clarke 0.00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/CockcroftEngineer PDRA 1 1.00 65.63 1.00 67.93 1.00 70.30 3.00 203.86Engineer PDRA 2 1.00 66.66 1.00 69.00 1.00 71.41 3.00 207.07
Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Seviour 0.15 14.28 0.15 14.77 0.15 15.29 0.45 44.34Stables 0.50 32.30 0.50 33.43 0.50 34.60 1.50 100.32
Rolling-grant staff totals 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40Staff totals: 6.15 347.82 6.80 376.51 7.15 402.76 20.10 1127.08
Atomic-force microscope 24.00 24.00Air scrubber & extraction system 10.00 10.00Electropolishing system 15.00 15.00
PQD controller 5.11 5.11CMP system 15.00 15.00Abrasive flow system 15.00 15.00Chemicals for polishing 8.00 8.00 8.00 24.00Waste management 7.00 7.00 7.00 21.00Safety cabinet and safety system 21.86 21.86Secondary containment area 17.63 17.63Sample Buttons 1.00 1.00 1.00 3.00High end PC 4.00 4.00Acclrsys Software 15.00 15.00High-pressure water wash system 1.50 1.50Water purification system 3.53 3.53LEG63 electron gun 11.75 11.75VG100AX electron analyser 28.75 28.75Tool set 1.50 1.50Vaccum Vessel 10.00 10.00Residual-gas analyser 5.88 5.88Robotic arm 5.00 5.00Control system 5.00 5.00Vacuum pump 9.40 9.40Shipping 3.00 7.00 10.00Glovebox 6.00 6.00Cavity Tuning system 12.50 12.50Cavity RF Windows 50.00 50.00Prototype Coupler manufacture 70.00 70.00Prototype Cavity manufacture 57.00 57.00Ultrasonic bath 0.80 0.80Hazardous materials training 5.21 0.00 5.21
Inflation 6.20 4.38 11.53 22.11Eqipment total 254.09 90.88 161.53 506.51VAT 44.47 15.90 28.27 88.64Working margin (10%) 29.86 10.68 18.98 59.51Contingency (20%) 59.71 21.36 37.96 119.03Consumables 12.00 5.00 17.00Travel 10.00 10.00 10.00 30.00
Total: 757.94 530.33 659.50 1947.77
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Development of high-gradient RF cavitiesWork package number 4
P R O JE C T: U K N F C ost P ro file
Issue D ate: 18 /07 /2006
M anager: S eviour
S tart D ate: 2007
E nd D ate: 2010
S taff
Fraction £k Fraction £k Fraction £k Fraction £k
S urface stud ies and developm ent o f fabrication techn iques
C C LR C -AS TE C
R F E ng ineer (W P 4, A S T E C , B and5) 0 .40 31.95 0.40 33.07 0.40 34.23 1.20 99.25
E ng ineering support (W P 4, A S T E C , B and5) 0 .10 7 .99 0.10 8.27 0.10 8.56 0.30 24.81
Im peria l-M ech .E ng .
R istic 0 .20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
E ng ineer P D R A 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257 .20
Industria l C A S E S tudent (E P S R C aw ard) 1 .00 0 .00 1.00 0.00 1.00 0.00 3.00 0.00
U K N F pro ject s tudent 0 .50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
E ng ineering support 0 .10 8 .28 0.10 8.57 0.10 8.87 0.30 25.72
Im peria l-P hysics
B arber 0 .00 0 .00 0.00 0.00 0.10 4.66 0.10 4.66
K asey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
K ha leeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40
D .C la rke 0 .00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/C ockcro ft
E ng ineer P D R A 1 1 .00 65.63 1.00 67.93 1.00 70.30 3.00 203 .86
E ng ineer P D R A 2 1 .00 66.66 1.00 69.00 1.00 71.41 3.00 207 .07
E ng ineering support 0 .10 8 .28 0.10 8.57 0.10 8.87 0.30 25.72
S eviour 0 .15 14.28 0.15 14.77 0.15 15.29 0.45 44.34
S tab les 0 .50 32.30 0.50 33.43 0.50 34.60 1.50 100 .32
R olling -gran t s ta ff to ta ls 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
S taff to ta ls : 6 .15 347 .82 6.80 376 .51 7.15 402 .76 20.10 1127.08
A tom ic-fo rce m icroscope 24.00 24.00
A ir scrubber & extraction system 10.00 10.00
E lectropo lish ing system 15.00 15.00
PQD controller 5 .11 5 .11
C M P system 15.00 15.00
A bras ive f low system 15 .00 15.00
C hem ica ls fo r po lish ing 8 .00 8.00 8.00 24.00
W aste m anagem ent 7 .00 7 .00 7.00 21.00
S afe ty cab ine t and sa fe ty system 21.86 21.86
S econdary con ta inm ent a rea 17.63 17.63
S am ple B uttons 1 .00 1.00 1.00 3.00
H igh end P C 4.00 4.00
A cc lrsys S o ftw are 15.00 15.00
H igh-pressure w ate r w ash system 1.50 1.50
W ater purif ica tion system 3.53 3.53
LE G 63 e lectron gun 11.75 11.75
V G 100A X e lectron ana lyser 28 .75 28.75
T oo l se t 1 .50 1 .50
V accum V esse l 10 .00 10.00
R esidua l-gas ana lyser 5 .88 5 .88
R obotic a rm 5.00 5.00
C ontro l system 5.00 5.00
V acuum pum p 9.40 9.40
S h ipp ing 3 .00 7.00 10.00
G lovebox 6.00 6.00
C avity T un ing system 12.50 12.50
C avity R F W indow s 50.00 50.00
P ro to type C oup le r m anufactu re 70 .00 70.00
P ro to type C avity m anufactu re 57 .00 57.00
U ltrason ic ba th 0 .80 0 .80
H azardous m ateria ls tra in ing 5 .21 0.00 5.21
In fla tion 6.20 4.38 11.53 22.11
E qipm ent to ta l 254 .09 90.88 161 .53 506 .51
V A T 44.47 15.90 28.27 88.64
W ork ing m arg in (10% ) 29.86 10.68 18.98 59.51
C ontingency (20% ) 59.71 21.36 37.96 119 .03
C onsum ab les 12.00 5.00 17.00
T rave l 10 .00 10.00 10.00 30.00
Tota l: 757 .94 530 .33 659 .50 1947.77
Fo llow ing C C LR C gu ide lines, in fla tion a t 3 .5% has been added in the s ta ff lines w h ile in fla tion a t 2 .5% has been added (and ca lled ou t exp lic itly) in the
equ ipm ent request.
2007/08 2008/09 2009/10 Tota l
Work package title Development of high-gradient RF cavitiesWork package number 4
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: SeviourStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Surface studies and development of fabrication techniquesCCLRC-ASTEC
RF Engineer (WP4, ASTEC, Band5) 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25Engineering support (WP4, ASTEC, Band5) 0.10 7.99 0.10 8.27 0.10 8.56 0.30 24.81
Imperial-Mech.Eng.Ristic 0.20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
Engineer PDRA 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257.20Industrial CASE Student (EPSRC award) 1.00 0.00 1.00 0.00 1.00 0.00 3.00 0.00
UKNF project student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Imperial-PhysicsBarber 0.00 0.00 0.00 0.00 0.10 4.66 0.10 4.66Kasey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
Khaleeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40D.Clarke 0.00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/CockcroftEngineer PDRA 1 1.00 65.63 1.00 67.93 1.00 70.30 3.00 203.86Engineer PDRA 2 1.00 66.66 1.00 69.00 1.00 71.41 3.00 207.07
Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Seviour 0.15 14.28 0.15 14.77 0.15 15.29 0.45 44.34Stables 0.50 32.30 0.50 33.43 0.50 34.60 1.50 100.32
Rolling-grant staff totals 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40Staff totals: 6.15 347.82 6.80 376.51 7.15 402.76 20.10 1127.08
Atomic-force microscope 24.00 24.00Air scrubber & extraction system 10.00 10.00Electropolishing system 15.00 15.00
PQD controller 5.11 5.11CMP system 15.00 15.00Abrasive flow system 15.00 15.00Chemicals for polishing 8.00 8.00 8.00 24.00Waste management 7.00 7.00 7.00 21.00Safety cabinet and safety system 21.86 21.86Secondary containment area 17.63 17.63Sample Buttons 1.00 1.00 1.00 3.00High end PC 4.00 4.00Acclrsys Software 15.00 15.00High-pressure water wash system 1.50 1.50Water purification system 3.53 3.53LEG63 electron gun 11.75 11.75VG100AX electron analyser 28.75 28.75Tool set 1.50 1.50Vaccum Vessel 10.00 10.00Residual-gas analyser 5.88 5.88Robotic arm 5.00 5.00Control system 5.00 5.00Vacuum pump 9.40 9.40Shipping 3.00 7.00 10.00Glovebox 6.00 6.00Cavity Tuning system 12.50 12.50Cavity RF Windows 50.00 50.00Prototype Coupler manufacture 70.00 70.00Prototype Cavity manufacture 57.00 57.00Ultrasonic bath 0.80 0.80Hazardous materials training 5.21 0.00 5.21
Inflation 6.20 4.38 11.53 22.11Eqipment total 254.09 90.88 161.53 506.51VAT 44.47 15.90 28.27 88.64Working margin (10%) 29.86 10.68 18.98 59.51Contingency (20%) 59.71 21.36 37.96 119.03Consumables 12.00 5.00 17.00Travel 10.00 10.00 10.00 30.00
Total: 757.94 530.33 659.50 1947.77
2007/08 2008/09 2009/10 Total
Work package title Development of high-gradient RF cavitiesWork package number 4
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: SeviourStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Surface studies and development of fabrication techniquesCCLRC-ASTEC
RF Engineer (WP4, ASTEC, Band5) 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25Engineering support (WP4, ASTEC, Band5) 0.10 7.99 0.10 8.27 0.10 8.56 0.30 24.81
Imperial-Mech.Eng.Ristic 0.20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
Engineer PDRA 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257.20Industrial CASE Student (EPSRC award) 1.00 0.00 1.00 0.00 1.00 0.00 3.00 0.00
UKNF project student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Imperial-PhysicsBarber 0.00 0.00 0.00 0.00 0.10 4.66 0.10 4.66Kasey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
Khaleeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40D.Clarke 0.00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/CockcroftEngineer PDRA 1 1.00 65.63 1.00 67.93 1.00 70.30 3.00 203.86Engineer PDRA 2 1.00 66.66 1.00 69.00 1.00 71.41 3.00 207.07
Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Seviour 0.15 14.28 0.15 14.77 0.15 15.29 0.45 44.34Stables 0.50 32.30 0.50 33.43 0.50 34.60 1.50 100.32
Rolling-grant staff totals 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40Staff totals: 6.15 347.82 6.80 376.51 7.15 402.76 20.10 1127.08
Atomic-force microscope 24.00 24.00Air scrubber & extraction system 10.00 10.00Electropolishing system 15.00 15.00
PQD controller 5.11 5.11CMP system 15.00 15.00Abrasive flow system 15.00 15.00Chemicals for polishing 8.00 8.00 8.00 24.00Waste management 7.00 7.00 7.00 21.00Safety cabinet and safety system 21.86 21.86Secondary containment area 17.63 17.63Sample Buttons 1.00 1.00 1.00 3.00High end PC 4.00 4.00Acclrsys Software 15.00 15.00High-pressure water wash system 1.50 1.50Water purification system 3.53 3.53LEG63 electron gun 11.75 11.75VG100AX electron analyser 28.75 28.75Tool set 1.50 1.50Vaccum Vessel 10.00 10.00Residual-gas analyser 5.88 5.88Robotic arm 5.00 5.00Control system 5.00 5.00Vacuum pump 9.40 9.40Shipping 3.00 7.00 10.00Glovebox 6.00 6.00Cavity Tuning system 12.50 12.50Cavity RF Windows 50.00 50.00Prototype Coupler manufacture 70.00 70.00Prototype Cavity manufacture 57.00 57.00Ultrasonic bath 0.80 0.80Hazardous materials training 5.21 0.00 5.21
Inflation 6.20 4.38 11.53 22.11Eqipment total 254.09 90.88 161.53 506.51VAT 44.47 15.90 28.27 88.64Working margin (10%) 29.86 10.68 18.98 59.51Contingency (20%) 59.71 21.36 37.96 119.03Consumables 12.00 5.00 17.00Travel 10.00 10.00 10.00 30.00
Total: 757.94 530.33 659.50 1947.77
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title Development of high-gradient RF cavitiesWork package number 4
P R O JE C T: U K N F C ost P ro file
Issue D ate: 18 /07 /2006
M anager: S eviour
S tart D ate: 2007
E nd D ate: 2010
S taff
Fraction £k Fraction £k Fraction £k Fraction £k
S urface stud ies and developm ent o f fabrication techn iques
C C LR C -AS TE C
R F E ng ineer (W P 4, A S T E C , B and5) 0 .40 31.95 0.40 33.07 0.40 34.23 1.20 99.25
E ng ineering support (W P 4, A S T E C , B and5) 0 .10 7 .99 0.10 8.27 0.10 8.56 0.30 24.81
Im peria l-M ech .E ng .
R istic 0 .20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
E ng ineer P D R A 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257 .20
Industria l C A S E S tudent (E P S R C aw ard) 1 .00 0 .00 1.00 0.00 1.00 0.00 3.00 0.00
U K N F pro ject s tudent 0 .50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
E ng ineering support 0 .10 8 .28 0.10 8.57 0.10 8.87 0.30 25.72
Im peria l-P hysics
B arber 0 .00 0 .00 0.00 0.00 0.10 4.66 0.10 4.66
K asey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
K ha leeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40
D .C la rke 0 .00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/C ockcro ft
E ng ineer P D R A 1 1 .00 65.63 1.00 67.93 1.00 70.30 3.00 203 .86
E ng ineer P D R A 2 1 .00 66.66 1.00 69.00 1.00 71.41 3.00 207 .07
E ng ineering support 0 .10 8 .28 0.10 8.57 0.10 8.87 0.30 25.72
S eviour 0 .15 14.28 0.15 14.77 0.15 15.29 0.45 44.34
S tab les 0 .50 32.30 0.50 33.43 0.50 34.60 1.50 100 .32
R olling -gran t s ta ff to ta ls 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
S taff to ta ls : 6 .15 347 .82 6.80 376 .51 7.15 402 .76 20.10 1127.08
A tom ic-fo rce m icroscope 24.00 24.00
A ir scrubber & extraction system 10.00 10.00
E lectropo lish ing system 15.00 15.00
PQD controller 5 .11 5 .11
C M P system 15.00 15.00
A bras ive f low system 15 .00 15.00
C hem ica ls fo r po lish ing 8 .00 8.00 8.00 24.00
W aste m anagem ent 7 .00 7 .00 7.00 21.00
S afe ty cab ine t and sa fe ty system 21.86 21.86
S econdary con ta inm ent a rea 17.63 17.63
S am ple B uttons 1 .00 1.00 1.00 3.00
H igh end P C 4.00 4.00
A cc lrsys S o ftw are 15.00 15.00
H igh-pressure w ate r w ash system 1.50 1.50
W ater purif ica tion system 3.53 3.53
LE G 63 e lectron gun 11.75 11.75
V G 100A X e lectron ana lyser 28 .75 28.75
T oo l se t 1 .50 1 .50
V accum V esse l 10 .00 10.00
R esidua l-gas ana lyser 5 .88 5 .88
R obotic a rm 5.00 5.00
C ontro l system 5.00 5.00
V acuum pum p 9.40 9.40
S h ipp ing 3 .00 7.00 10.00
G lovebox 6.00 6.00
C avity T un ing system 12.50 12.50
C avity R F W indow s 50.00 50.00
P ro to type C oup le r m anufactu re 70 .00 70.00
P ro to type C avity m anufactu re 57 .00 57.00
U ltrason ic ba th 0 .80 0 .80
H azardous m ateria ls tra in ing 5 .21 0.00 5.21
In fla tion 6.20 4.38 11.53 22.11
E qipm ent to ta l 254 .09 90.88 161 .53 506 .51
V A T 44.47 15.90 28.27 88.64
W ork ing m arg in (10% ) 29.86 10.68 18.98 59.51
C ontingency (20% ) 59.71 21.36 37.96 119 .03
C onsum ab les 12.00 5.00 17.00
T rave l 10 .00 10.00 10.00 30.00
Tota l: 757 .94 530 .33 659 .50 1947.77
Fo llow ing C C LR C gu ide lines, in fla tion a t 3 .5% has been added in the s ta ff lines w h ile in fla tion a t 2 .5% has been added (and ca lled ou t exp lic itly) in the
equ ipm ent request.
2007/08 2008/09 2009/10 Tota l
Work package title Development of high-gradient RF cavitiesWork package number 4
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: SeviourStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Surface studies and development of fabrication techniquesCCLRC-ASTEC
RF Engineer (WP4, ASTEC, Band5) 0.40 31.95 0.40 33.07 0.40 34.23 1.20 99.25Engineering support (WP4, ASTEC, Band5) 0.10 7.99 0.10 8.27 0.10 8.56 0.30 24.81
Imperial-Mech.Eng.Ristic 0.20 16.56 0.20 17.14 0.20 17.74 0.60 51.44
Engineer PDRA 1.00 82.80 1.00 85.70 1.00 88.70 3.00 257.20Industrial CASE Student (EPSRC award) 1.00 0.00 1.00 0.00 1.00 0.00 3.00 0.00
UKNF project student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72
Imperial-PhysicsBarber 0.00 0.00 0.00 0.00 0.10 4.66 0.10 4.66Kasey 0.10 2.74 0.10 2.84 0.10 2.93 0.30 8.51
Khaleeq 0.00 0.00 0.00 0.00 0.20 6.40 0.20 6.40D.Clarke 0.00 0.00 0.15 5.81 0.20 8.02 0.35 13.82
Lancaster/CockcroftEngineer PDRA 1 1.00 65.63 1.00 67.93 1.00 70.30 3.00 203.86Engineer PDRA 2 1.00 66.66 1.00 69.00 1.00 71.41 3.00 207.07
Engineering support 0.10 8.28 0.10 8.57 0.10 8.87 0.30 25.72Seviour 0.15 14.28 0.15 14.77 0.15 15.29 0.45 44.34Stables 0.50 32.30 0.50 33.43 0.50 34.60 1.50 100.32
Rolling-grant staff totals 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40Staff totals: 6.15 347.82 6.80 376.51 7.15 402.76 20.10 1127.08
Atomic-force microscope 24.00 24.00Air scrubber & extraction system 10.00 10.00Electropolishing system 15.00 15.00
PQD controller 5.11 5.11CMP system 15.00 15.00Abrasive flow system 15.00 15.00Chemicals for polishing 8.00 8.00 8.00 24.00Waste management 7.00 7.00 7.00 21.00Safety cabinet and safety system 21.86 21.86Secondary containment area 17.63 17.63Sample Buttons 1.00 1.00 1.00 3.00High end PC 4.00 4.00Acclrsys Software 15.00 15.00High-pressure water wash system 1.50 1.50Water purification system 3.53 3.53LEG63 electron gun 11.75 11.75VG100AX electron analyser 28.75 28.75Tool set 1.50 1.50Vaccum Vessel 10.00 10.00Residual-gas analyser 5.88 5.88Robotic arm 5.00 5.00Control system 5.00 5.00Vacuum pump 9.40 9.40Shipping 3.00 7.00 10.00Glovebox 6.00 6.00Cavity Tuning system 12.50 12.50Cavity RF Windows 50.00 50.00Prototype Coupler manufacture 70.00 70.00Prototype Cavity manufacture 57.00 57.00Ultrasonic bath 0.80 0.80Hazardous materials training 5.21 0.00 5.21
Inflation 6.20 4.38 11.53 22.11Eqipment total 254.09 90.88 161.53 506.51VAT 44.47 15.90 28.27 88.64Working margin (10%) 29.86 10.68 18.98 59.51Contingency (20%) 59.71 21.36 37.96 119.03Consumables 12.00 5.00 17.00Travel 10.00 10.00 10.00 30.00
Total: 757.94 530.33 659.50 1947.77
2007/08 2008/09 2009/10 Total
WP5: Site survey and geological studies Site survey:
Essential pre-requisite to preparation of bid to host Geological studies:
Performance optimum for given cost requires understanding cost of reducing matter density uncertainty Work package title Site survey and geological studies
Work package number 5
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: WarnerStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
Site layoutCCLRC-RAL-ISIS
Engineer 0.10 7.29 0.10 7.55 0.10 7.81 0.30 22.65Site survey and geological studies
Imperial-ESEDurucan 0.05 6.21 0.05 6.43 0.05 6.65 0.15 19.29Warner 0.15 18.63 0.15 19.28 0.15 19.96 0.45 57.87
Post-doctoral research associate 0.50 45.73 1.00 94.66 1.00 97.98 2.50 238.37Graduate student 0.50 10.35 1.00 21.42 1.00 22.17 2.50 53.95
Geological studiesRolling-grant staff totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Staff totals: 1.30 88.21 2.30 149.34 2.30 154.57 5.90 392.13
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 10.00 10.00 10.00 30.00
Total: 103.21 164.34 169.57 437.13
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
WP6: International Design Study UK demonstrated international leadership by initiating the
ISS Essential to maintain and enhance this position by
Resources required to: Allow UK personnel to play key leadership roles in the negotiations
leading to the formation of the International Design Study collaboration
Allow UK personnel to play leading roles in the preparation of a successful bid to EU Framework Programme 7
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
IDS coordination and FP7 preparationCCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EIDEngineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
Imperial-PhysicsDornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77
Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96
LiverpoolGamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost Profile
Issue Date: 18/07/2006
Manager: Edgecock
Start Date: 2007
End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £kIDS coordination and FP7 preparation
CCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EID
Engineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99Imperial-Physics
Dornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37
Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96Liverpool
Gamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00
VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
IDS coordination and FP7 preparationCCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EIDEngineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
Imperial-PhysicsDornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77
Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96
LiverpoolGamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
2007/08 2008/09 2009/10 Total
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
IDS coordination and FP7 preparationCCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EIDEngineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
Imperial-PhysicsDornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77
Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96
LiverpoolGamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost Profile
Issue Date: 18/07/2006
Manager: Edgecock
Start Date: 2007
End Date: 2010
Staff
Fraction £k Fraction £k Fraction £k Fraction £kIDS coordination and FP7 preparation
CCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EID
Engineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99Imperial-Physics
Dornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37
Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96Liverpool
Gamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00
VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
Following CCLRC guidelines, inflation at 3.5% has been added in the staff lines while inflation at 2.5% has been added (and called out explicitly) in the equipment request.
2007/08 2008/09 2009/10 Total
Work package title International Design StudyWork package number 6
PROJECT: UKNF Cost ProfileIssue Date: 18/07/2006
Manager: EdgecockStart Date: 2007End Date: 2010
StaffFraction £k Fraction £k Fraction £k Fraction £k
IDS coordination and FP7 preparationCCLRC-RAL-PPD
Edgecock 0.10 10.76 0.10 11.13 0.10 11.52 0.30 33.41Administrative support (WP6, PPD, Band6) 0.10 7.36 0.20 15.24 0.20 15.77 0.50 38.38
CCLRC-RAL-EIDEngineering support (WP6, EID, Band4) 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
Imperial-PhysicsDornan 0.05 5.36 0.05 5.55 0.03 2.87 0.13 13.77
Long 0.20 19.76 0.20 20.45 0.20 21.16 0.60 61.37Barlow 0.05 5.36 0.10 11.10 0.10 11.49 0.25 27.96
LiverpoolGamet 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58Cooke 0.10 6.62 0.10 6.86 0.10 7.10 0.30 20.58
Rolling-grant staff totals 0.45 38.36 0.45 39.71 0.43 38.23 1.33 116.29Staff totals: 0.75 66.88 1.05 98.01 1.23 120.13 3.03 285.02
Inflation 0.00 0.00 0.00 0.00Eqipment total 0.00 0.00 0.00 0.00VAT 0.00 0.00 0.00 0.00Working margin (10%) 0.00 0.00 0.00 0.00Contingency (20%) 0.00 0.00 0.00 0.00Consumables 5.00 5.00 5.00 15.00Travel 40.00 40.00 40.00 120.00
Total: 111.88 143.01 165.13 420.02
2007/08 2008/09 2009/10 Total
Summary
Resources will allow UKNF to: Deliver IDR for the Neutrino Factory by 2010
As a leading member of the IDS collaboration As a step on the way to producing the NF CDR by 2012
Carry out a targeted programme of hardware R&D that will: Establish UK competence in key systems and technologies Engage appropriately with industry to ensure cost models for CDR are
accurate
PROJECT: UKNF Overview of project costsIssue Date: 18/07/2006
Manager: LongStart Date: 2007End Date: 2010
Id Name Fraction £k Fraction £k Fraction £k Fraction £kStaff effort, summary by instituteUKNF
1 Neutrino Factory conceptual designCCLRC-ASTEC 4.85 449.57 4.65 440.81 4.75 464.79 14.25 1355.17
CCLRC-RAL-ISIS 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85CCLRC-RAL-PPD 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63
Glasgow 0.45 29.81 0.45 30.85 0.45 31.93 1.35 92.59Imperial-Physics 0.40 35.54 0.90 47.50 1.40 60.25 2.70 143.29
Oxford 0.98 86.20 1.60 152.70 1.60 158.05 4.18 396.942 Proton driver front-end test stand
CCLRC-RAL-ISIS 1.90 170.89 1.90 176.87 1.90 183.06 5.70 530.81Imperial-Physics 4.70 276.10 5.35 301.65 5.40 314.00 15.45 891.75
Warwick 0.60 48.02 0.60 49.70 0.60 51.44 1.80 149.173 Target studies
CCLRC-RAL-EID 1.15 119.75 2.20 233.31 2.20 241.48 5.55 594.55CCLRC-RAL-ISIS 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD 0.90 79.31 1.40 119.66 1.40 123.84 3.70 322.81
Brunel 0.60 22.85 1.10 34.36 1.10 35.56 2.80 92.76Glasgow 0.35 23.18 0.35 24.00 0.35 24.84 1.05 72.01Sheffield 1.30 84.69 1.40 93.50 1.40 96.77 4.10 274.96Warwick 1.20 60.03 1.70 72.84 1.70 75.39 4.60 208.27
4 Development of high-gradient RF cavitiesCCLRC-ASTEC 0.50 39.94 0.50 41.34 0.50 42.79 1.50 124.06
Imperial-Mech.Eng. 2.80 117.99 3.30 132.83 3.30 137.48 9.40 388.30Imperial-Physics 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
Lancaster/Cockcroft 2.75 187.15 2.75 193.70 2.75 200.48 8.25 581.325 Site survey and geological studies
CCLRC-RAL-ISIS 0.10 7.29 0.10 7.55 0.10 7.81 0.30 22.65Imperial-ESE 1.20 80.92 2.20 141.80 2.20 146.76 5.60 369.48
6 International Design StudyCCLRC-RAL-EID 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
CCLRC-RAL-PPD 0.20 18.12 0.30 26.37 0.30 27.29 0.80 71.78Imperial-Physics 0.30 30.48 0.35 37.10 0.33 35.52 0.98 103.10
Liverpool 0.20 13.25 0.20 13.71 0.20 14.19 0.60 41.15Staff sub-totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71Staff totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71
Non-staff cost summaryUKNF
1 Neutrino Factory conceptual design 35.00 35.00 35.00 105.002 Proton driver front-end test stand 1074.67 595.76 462.36 2132.793 Target studies 143.08 146.41 306.09 595.594 Development of high-gradient RF cavities 410.13 153.82 256.74 820.695 Site survey and geological studies 15.00 15.00 15.00 45.006 International Design Study 45.00 45.00 45.00 135.00
Non-staff sub-totals 1722.88 990.99 1120.20 3834.06Non-staff totals 1722.88 990.99 1120.20 3834.06
Total staff and non-staff by work packageUKNF
1 Neutrino Factory conceptual design 686.43 779.67 825.38 2291.482 Proton driver front-end test stand 1569.67 1123.99 1010.86 3704.523 Target studies 559.91 752.03 932.91 2244.864 Development of high-gradient RF cavities 757.94 530.33 659.50 1947.775 Site survey and geological studies 103.21 164.34 169.57 437.136 International Design Study 111.88 143.01 165.13 420.02
Sub-totals 3789.04 3493.38 3763.36 11045.78
Grand totals 3789.04 3493.38 3763.36 11045.78
2009/10 TotalWork package 2007/08 2008/09
PROJECT: UKNF Overview of project costsIssue Date: 18/07/2006
Manager: LongStart Date: 2007End Date: 2010
Id Name Fraction £k Fraction £k Fraction £k Fraction £kStaff effort, summary by instituteUKNF
1 Neutrino Factory conceptual designCCLRC-ASTEC 4.85 449.57 4.65 440.81 4.75 464.79 14.25 1355.17
CCLRC-RAL-ISIS 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85CCLRC-RAL-PPD 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63
Glasgow 0.45 29.81 0.45 30.85 0.45 31.93 1.35 92.59Imperial-Physics 0.40 35.54 0.90 47.50 1.40 60.25 2.70 143.29
Oxford 0.98 86.20 1.60 152.70 1.60 158.05 4.18 396.942 Proton driver front-end test stand
CCLRC-RAL-ISIS 1.90 170.89 1.90 176.87 1.90 183.06 5.70 530.81Imperial-Physics 4.70 276.10 5.35 301.65 5.40 314.00 15.45 891.75
Warwick 0.60 48.02 0.60 49.70 0.60 51.44 1.80 149.173 Target studies
CCLRC-RAL-EID 1.15 119.75 2.20 233.31 2.20 241.48 5.55 594.55CCLRC-RAL-ISIS 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD 0.90 79.31 1.40 119.66 1.40 123.84 3.70 322.81
Brunel 0.60 22.85 1.10 34.36 1.10 35.56 2.80 92.76Glasgow 0.35 23.18 0.35 24.00 0.35 24.84 1.05 72.01Sheffield 1.30 84.69 1.40 93.50 1.40 96.77 4.10 274.96Warwick 1.20 60.03 1.70 72.84 1.70 75.39 4.60 208.27
4 Development of high-gradient RF cavitiesCCLRC-ASTEC 0.50 39.94 0.50 41.34 0.50 42.79 1.50 124.06
Imperial-Mech.Eng. 2.80 117.99 3.30 132.83 3.30 137.48 9.40 388.30Imperial-Physics 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
Lancaster/Cockcroft 2.75 187.15 2.75 193.70 2.75 200.48 8.25 581.325 Site survey and geological studies
CCLRC-RAL-ISIS 0.10 7.29 0.10 7.55 0.10 7.81 0.30 22.65Imperial-ESE 1.20 80.92 2.20 141.80 2.20 146.76 5.60 369.48
6 International Design StudyCCLRC-RAL-EID 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
CCLRC-RAL-PPD 0.20 18.12 0.30 26.37 0.30 27.29 0.80 71.78Imperial-Physics 0.30 30.48 0.35 37.10 0.33 35.52 0.98 103.10
Liverpool 0.20 13.25 0.20 13.71 0.20 14.19 0.60 41.15Staff sub-totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71Staff totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71
Non-staff cost summaryUKNF
1 Neutrino Factory conceptual design 35.00 35.00 35.00 105.002 Proton driver front-end test stand 1074.67 595.76 462.36 2132.793 Target studies 143.08 146.41 306.09 595.594 Development of high-gradient RF cavities 410.13 153.82 256.74 820.695 Site survey and geological studies 15.00 15.00 15.00 45.006 International Design Study 45.00 45.00 45.00 135.00
Non-staff sub-totals 1722.88 990.99 1120.20 3834.06Non-staff totals 1722.88 990.99 1120.20 3834.06
Total staff and non-staff by work packageUKNF
1 Neutrino Factory conceptual design 686.43 779.67 825.38 2291.482 Proton driver front-end test stand 1569.67 1123.99 1010.86 3704.523 Target studies 559.91 752.03 932.91 2244.864 Development of high-gradient RF cavities 757.94 530.33 659.50 1947.775 Site survey and geological studies 103.21 164.34 169.57 437.136 International Design Study 111.88 143.01 165.13 420.02
Sub-totals 3789.04 3493.38 3763.36 11045.78
Grand totals 3789.04 3493.38 3763.36 11045.78
2009/10 TotalWork package 2007/08 2008/09
PROJECT: UKNF Overview of project costsIssue Date: 18/07/2006
Manager: LongStart Date: 2007End Date: 2010
Id Name Fraction £k Fraction £k Fraction £k Fraction £kStaff effort, summary by instituteUKNF
1 Neutrino Factory conceptual designCCLRC-ASTEC 4.85 449.57 4.65 440.81 4.75 464.79 14.25 1355.17
CCLRC-RAL-ISIS 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85CCLRC-RAL-PPD 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63
Glasgow 0.45 29.81 0.45 30.85 0.45 31.93 1.35 92.59Imperial-Physics 0.40 35.54 0.90 47.50 1.40 60.25 2.70 143.29
Oxford 0.98 86.20 1.60 152.70 1.60 158.05 4.18 396.942 Proton driver front-end test stand
CCLRC-RAL-ISIS 1.90 170.89 1.90 176.87 1.90 183.06 5.70 530.81Imperial-Physics 4.70 276.10 5.35 301.65 5.40 314.00 15.45 891.75
Warwick 0.60 48.02 0.60 49.70 0.60 51.44 1.80 149.173 Target studies
CCLRC-RAL-EID 1.15 119.75 2.20 233.31 2.20 241.48 5.55 594.55CCLRC-RAL-ISIS 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD 0.90 79.31 1.40 119.66 1.40 123.84 3.70 322.81
Brunel 0.60 22.85 1.10 34.36 1.10 35.56 2.80 92.76Glasgow 0.35 23.18 0.35 24.00 0.35 24.84 1.05 72.01Sheffield 1.30 84.69 1.40 93.50 1.40 96.77 4.10 274.96Warwick 1.20 60.03 1.70 72.84 1.70 75.39 4.60 208.27
4 Development of high-gradient RF cavitiesCCLRC-ASTEC 0.50 39.94 0.50 41.34 0.50 42.79 1.50 124.06
Imperial-Mech.Eng. 2.80 117.99 3.30 132.83 3.30 137.48 9.40 388.30Imperial-Physics 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
Lancaster/Cockcroft 2.75 187.15 2.75 193.70 2.75 200.48 8.25 581.325 Site survey and geological studies
CCLRC-RAL-ISIS 0.10 7.29 0.10 7.55 0.10 7.81 0.30 22.65Imperial-ESE 1.20 80.92 2.20 141.80 2.20 146.76 5.60 369.48
6 International Design StudyCCLRC-RAL-EID 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
CCLRC-RAL-PPD 0.20 18.12 0.30 26.37 0.30 27.29 0.80 71.78Imperial-Physics 0.30 30.48 0.35 37.10 0.33 35.52 0.98 103.10
Liverpool 0.20 13.25 0.20 13.71 0.20 14.19 0.60 41.15Staff sub-totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71Staff totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71
Non-staff cost summaryUKNF
1 Neutrino Factory conceptual design 35.00 35.00 35.00 105.002 Proton driver front-end test stand 1074.67 595.76 462.36 2132.793 Target studies 143.08 146.41 306.09 595.594 Development of high-gradient RF cavities 410.13 153.82 256.74 820.695 Site survey and geological studies 15.00 15.00 15.00 45.006 International Design Study 45.00 45.00 45.00 135.00
Non-staff sub-totals 1722.88 990.99 1120.20 3834.06Non-staff totals 1722.88 990.99 1120.20 3834.06
Total staff and non-staff by work packageUKNF
1 Neutrino Factory conceptual design 686.43 779.67 825.38 2291.482 Proton driver front-end test stand 1569.67 1123.99 1010.86 3704.523 Target studies 559.91 752.03 932.91 2244.864 Development of high-gradient RF cavities 757.94 530.33 659.50 1947.775 Site survey and geological studies 103.21 164.34 169.57 437.136 International Design Study 111.88 143.01 165.13 420.02
Sub-totals 3789.04 3493.38 3763.36 11045.78
Grand totals 3789.04 3493.38 3763.36 11045.78
2009/10 TotalWork package 2007/08 2008/09
PROJECT: UKNF Overview of project costsIssue Date: 18/07/2006
Manager: LongStart Date: 2007End Date: 2010
Id Name Fraction £k Fraction £k Fraction £k Fraction £kStaff effort, summary by instituteUKNF
1 Neutrino Factory conceptual designCCLRC-ASTEC 4.85 449.57 4.65 440.81 4.75 464.79 14.25 1355.17
CCLRC-RAL-ISIS 0.08 7.29 0.30 28.29 0.30 29.28 0.68 64.85CCLRC-RAL-PPD 0.40 43.02 0.40 44.53 0.40 46.08 1.20 133.63
Glasgow 0.45 29.81 0.45 30.85 0.45 31.93 1.35 92.59Imperial-Physics 0.40 35.54 0.90 47.50 1.40 60.25 2.70 143.29
Oxford 0.98 86.20 1.60 152.70 1.60 158.05 4.18 396.942 Proton driver front-end test stand
CCLRC-RAL-ISIS 1.90 170.89 1.90 176.87 1.90 183.06 5.70 530.81Imperial-Physics 4.70 276.10 5.35 301.65 5.40 314.00 15.45 891.75
Warwick 0.60 48.02 0.60 49.70 0.60 51.44 1.80 149.173 Target studies
CCLRC-RAL-EID 1.15 119.75 2.20 233.31 2.20 241.48 5.55 594.55CCLRC-RAL-ISIS 0.25 27.01 0.25 27.96 0.25 28.94 0.75 83.91CCLRC-RAL-PPD 0.90 79.31 1.40 119.66 1.40 123.84 3.70 322.81
Brunel 0.60 22.85 1.10 34.36 1.10 35.56 2.80 92.76Glasgow 0.35 23.18 0.35 24.00 0.35 24.84 1.05 72.01Sheffield 1.30 84.69 1.40 93.50 1.40 96.77 4.10 274.96Warwick 1.20 60.03 1.70 72.84 1.70 75.39 4.60 208.27
4 Development of high-gradient RF cavitiesCCLRC-ASTEC 0.50 39.94 0.50 41.34 0.50 42.79 1.50 124.06
Imperial-Mech.Eng. 2.80 117.99 3.30 132.83 3.30 137.48 9.40 388.30Imperial-Physics 0.10 2.74 0.25 8.64 0.60 22.01 0.95 33.40
Lancaster/Cockcroft 2.75 187.15 2.75 193.70 2.75 200.48 8.25 581.325 Site survey and geological studies
CCLRC-RAL-ISIS 0.10 7.29 0.10 7.55 0.10 7.81 0.30 22.65Imperial-ESE 1.20 80.92 2.20 141.80 2.20 146.76 5.60 369.48
6 International Design StudyCCLRC-RAL-EID 0.05 5.03 0.20 20.83 0.40 43.12 0.65 68.99
CCLRC-RAL-PPD 0.20 18.12 0.30 26.37 0.30 27.29 0.80 71.78Imperial-Physics 0.30 30.48 0.35 37.10 0.33 35.52 0.98 103.10
Liverpool 0.20 13.25 0.20 13.71 0.20 14.19 0.60 41.15Staff sub-totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71Staff totals 28.31 2066.16 34.70 2502.39 35.88 2643.16 98.89 7211.71
Non-staff cost summaryUKNF
1 Neutrino Factory conceptual design 35.00 35.00 35.00 105.002 Proton driver front-end test stand 1074.67 595.76 462.36 2132.793 Target studies 143.08 146.41 306.09 595.594 Development of high-gradient RF cavities 410.13 153.82 256.74 820.695 Site survey and geological studies 15.00 15.00 15.00 45.006 International Design Study 45.00 45.00 45.00 135.00
Non-staff sub-totals 1722.88 990.99 1120.20 3834.06Non-staff totals 1722.88 990.99 1120.20 3834.06
Total staff and non-staff by work packageUKNF
1 Neutrino Factory conceptual design 686.43 779.67 825.38 2291.482 Proton driver front-end test stand 1569.67 1123.99 1010.86 3704.523 Target studies 559.91 752.03 932.91 2244.864 Development of high-gradient RF cavities 757.94 530.33 659.50 1947.775 Site survey and geological studies 103.21 164.34 169.57 437.136 International Design Study 111.88 143.01 165.13 420.02
Sub-totals 3789.04 3493.38 3763.36 11045.78
Grand totals 3789.04 3493.38 3763.36 11045.78
2009/10 TotalWork package 2007/08 2008/09