Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
1/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Introduction To
Lean Techniques
Introduction to Lean Techniques
Production History Craft Production Mass Production Lean Manufacturing
Statistics Systems Approach 8 Lean Principals
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
2/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
History: From Craft to Mass to Lean Production
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
3/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Ford History: 1913 vs 1914 Production Improvement
Component 1913 Craft ProductionCycle Time (min.)
1914 Mass ProductionCycle Time (min.)
% Improvement
Engine 594 266 62%
Magneto 20 5 75%
Axle 150 26.5 83%
Major Components
750 93 88%
1908Cycle Time514 min.
1913Cycle Time2.3 min.
1913Cycle Time1.19 min.
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
4/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Industrial Reflection of Effective Plant Utilization
56,3 4,5 12,6 12,3 14,3
31,900,5
12 55,7
60,51 6,8
22,3 9,5
61,32,2 4,6
16,7 15,3
59,6 49,9
23,9 2,6
57,52,4 2,8
21,4 16
0% 20% 40% 60% 80% 100%
Mec
hani
cal E
ng.
Aut
omot
ive
Effective Plant Utilization Quality LossesMaterial flow- &. C/Over Losses Availability LossesCapacity Losses
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
5/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Effects of Lean Techniques
Performance Japanese in Japan
Japanese in N.USA
Americans in N.USA
All Europe
Training of new workers (h)
380.3 370 46.4 173.3
Productivity (h/vehicle) 16.8 21.2 25.1 36.2
Quality (assembly defects/100 veh.) 60 65 82.3 97
Inventories(days of 8 samples) 0.2 1.6 2.9 2.0
% Workforce in teams 69.3 71.3 17.3 0.6
CIP - KAIZEN(Suggestions/Employee) 61.6 1.4 0.4 0.4
Job Classes (Levels of Hierarchy) 11.9 8.7 67.1 14.8
Job Rotation(0=none; 4=frequent) 3 2.7 0.9 1.9
Absenteeism 5 days 4.8 days 11.7 days 12 days
Source: IMVP World Assembly Plant Survey 1989 & JD Power initial Quality Survey 1989
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
6/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Systems Approach to Lean Thinking
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
7/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
No MUDA
The 7 types of WASTE to Combat:
1. Over Production
2. Idle Time
3. Transport
4. Processing
5. Parts/Material
6. Industrial Engineering
7. Re-Work What is
Waste?
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
8/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
KANBAN - JIT
Japanese for “card” or “ticket”, KANBAN is used in a PULL-System to improve flow to authorize production and movement of goods. It is a card which indicates standard quantity of production.
Two types of KANBAN are being used:1.“Production-Kanban” are located at the end of the production area where the part is produced. 2.“Move-Kanban” are located at the start of the production area.
Source: http://www.leaninstitute.in
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
9/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Just In Time – JIT – 6R
A system for producing and delivering the right Items at the right Time in the right Amounts..
The Key Elements are:1.Flow2.Pull3.Standard Work4.Takt Time
Source: http://www.leaninstitute.in
5S & 7 Muda Application
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
10/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
POKE YOKE
Source: http://www.leaninstitute.in
A system driven by unique engineering, design and innovation to prevent parts from being fitted or assembled incorrectly.
Do it RIGHT1St Time!!
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
11/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
1.Sort
2.Set in Order (Stabilize)
3.Shine
4.Standardise
5.Sustain
5 S Lean Thinking
Source: Lean Thinking – James P. Womack & Daniel T. Jones
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
12/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
System / Process Kaizen
Work / Task Kaizen
Top Management
Org. Entry Level
Focus
Plan
DoCheck
Act
AvoidStagnation
KAIZEN
KAIZEN is a concept that promotes a Continuous Improvement Process.
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
13/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
Jidoka
"Auto(no)mation" or "automation with a human touch." Jidoka does not allow defective parts to go from one work station to the next. Machine can be made to stop automatically in abnormal conditions .
Source: Siemens & http://www.leaninstitute.in
CMMS CBM Production Management
MRP?BAAN JD.E
P.Soft
QC
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
14/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce
A major and radical improvement done at an entire system level or value stream level or a major re-layout, or a process change, or a major modification of equipment, jigs or fixtures. The Kaikaku exercise requires detailed planning and well coordinated action in a short time window and can be used as an effective tool to overcome system inertia as well
KAIKAKU
Source: CDG & http://www.leaninstitute.in
Plant Design Layout Shortest Route Inventory
Process Design Product Design Tool Design
RAPID TECHNOLOGIES CAD CAM FEM Simulation Prototyping Tooling Quick 1st Batch
Development of Maintenance
European Maintenance Std.
Benchmarking
Maintenance Models
- RCM
- KZMG
- Integration Model - TPM
- Methods to Optimisation
- Introducing CMMS
Intro To Lean
Lean Toolbox
VSM Case Studies
Intro to VSM
VSM Workshop
Compiled By:Rudolf Schenker PMP Pr.Tech.Eng., Reg.Eng.TechMTECH.- Mech. Engineering
© All Rights Reserved 2009
15/15
Welcome & Intro
Lean in Action
VSM Current State
VSM Future State
Lean Reinforce
Future State Reinforce
Current State Reinforce