Upload
project-for-public-spaces-national-center-for-biking-and-walking
View
471
Download
2
Embed Size (px)
DESCRIPTION
Citation preview
The Elgin Story: Applying the Manual
Plan of Elgin 1917
General Improvements Plan prepared by: Elgin Commercial Club
Applying the Manual in Elgin: 1) NaEonal Street (C5)
2) Nesler Road &Rt. 20 (C2)
NaEonal Street Corridor
NaEonal Street Metra StaEon: TOD Study
Current NaEonal Street Streetscape
Proposed National Street Streetscape
U.S. Route 20 ExisEng CondiEons
Livability SoluEons Technical Assistance
• Blue, Springs, MO June 2012 day long workshop to apply the manual to Hwy 40 and and 7.
• hYp://www.cnu.org/streets/bluesprings
• June, 2012 workshop funded in part by the U.S. EPA's Office of Sustainable CommuniEes under their Building Blocks for Sustainable CommuniEes Program.
• The Building Blocks program funds quick, targeted assistance to communiEes that face common development problems.
• Webinar on all tools Friday, Sept. 21, 2012, 1:00-‐2:30 Eastern hYps://epa.connectsoluEons.com/epasmartgrowth No pre-‐registraEon is required.
• ApplicaEons Due November 2, 2012 • hYp://livabilitysoluEons.org/ for more informaEon
More InformaEon • www.cnu.org/streets • www.ite.org/css • Download recommended pracEce report (free)
– Fact sheets – Training opportuniEes – AddiEonal informaEon about CSS
• Contact – Phil Caruso, [email protected], (202) 785-‐0060, ext. 126
– Heather Smith [email protected] 312-‐551-‐7300 x15