29
22 nd Plenary Meeting, 8 th – 10 th November 2012 - Rome Building Information Modeling (BIM) applied for the management of historical and monumental building heritage Ing. Vincenzo Donato Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Department of Civil and Enviroment Engineering (DICeA) University of Florence Supervisor: Prof. Ing. Pietro Capone Prof. Ing. Carlo Biagini Department of Civil and Enviroment Engineering (DICeA) University of Florence Prof. Ing. Manfred Krafczyk Institute for Computational Modeling in Civil Engineering (IRMB) Technische Universität of Braunschweig

22 nd Plenary Meeting , 8 th – 10 th November 2012 - Rome Building Information Modeling (BIM)

  • Upload
    brasen

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR). TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG). 22 nd Plenary Meeting , 8 th – 10 th November 2012 - Rome Building Information Modeling (BIM) - PowerPoint PPT Presentation

Citation preview

Page 1: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

22nd Plenary Meeting, 8th – 10th November 2012 - Rome

Building Information Modeling (BIM)applied for the management of historical and monumental building heritage

Ing. Vincenzo Donato

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Department of Civil and Enviroment Engineering(DICeA)University of Florence

Supervisor:

Prof. Ing. Pietro CaponeProf. Ing. Carlo Biagini

Department of Civil and Enviroment Engineering(DICeA)University of Florence

Prof. Ing. Manfred Krafczyk

Institute for Computational Modeling in Civil Engineering (IRMB)

Technische Universität of Braunschweig

Page 2: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Last presentation: What is B.I.M. ?

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

B.I.M. is a technology for the exchange information between several professional (non only with documents and papers but also with an available data format and between different systems)

Manufacturers

Architects

Engineer

Computer Graphics

and Marketing

Builder

Contractors and owners

Introduction

The term Building Information Modeling (BIM) has different meanings:- tridimensional model: typically produced using a 3d‐dimensional building modeling software;- database: include geometry, properties, quantities, spatial and functional relationships of building

components;

- procedure: it is the process of generating and managing building data during its life cycle (LCA).

The main goal of BIM is reduce the risk of failure of a project

BIM

BIM

Page 3: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

The research project

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

OBJECTIVE: develop an interoperability procedure for achieve an Existing Informative Model used as base for the Programming phase of the Building Process.

FIELD: building process, acquiring data, topography and survey

Building Process

PlannigProgramming Design Production

Costruction Closeout

Commission Maintenance Disposal

FOCUSType of different semantic information are subdivided in:

- Visual representation (document and drawings);- Artificial language and structured representation (IFC / BIM – XML

language);

Page 4: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

November 2012

November 2013

TOPIC:

- Interoperability mainly used inside the work team;

- 2d and 3d drawings;- Collaboration between several professionals;- Architectural design;- Adoption of BIM in the early design phase.

23rd

Ple

nary

M

eeti

ng

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoDottorando - DICeA

May 2013

- Interoperability between several semantic field;

- Development of the procedure for the research “point zero of design”;

- Study in detail the IFC and its structure;- Implementation of the IFC.

24th P

lena

ry

Mee

ting

SOBE School of the

Built EnvironmentManchester

6 months

Decision for the date of final dissertation

?

Last development

6 months

22nd

Ple

nary

M

eeti

ng

21st P

lena

ry

Mee

ting

TODAY

February 2012

GMP ArchitektenHamburg

Internship Visiting Researcher

Schedule

Page 5: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Internship experience

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

gmp Architekten von Gerkan, Marg und Partner

Activities undertaken:- Architectural design projects through several level of detail;- Use of the BIM technology;- Application of an experimental interoperable procedures of

work.

Research aspects:- Understanding of difficulties in a complex working

environment;- How to manage the high level of precision held by the the

parametric software also during the early phase of design;

Page 6: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

CONTEXT:A. Project for the Susa’s High Speed Train Station

- Type: competition under invitation- Level required: preliminary

B. Project for the Padua’s Conference Center- Type: tender for the construction- Level required: definitive

Level of design phase required by Italian law:- Preliminary design phase (Competition / Tender)- Definitive design phase- Executive phase

- Construction phase (Design variation)- As-Built phase (End of works)

Internship experience

Page 7: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Curtsey of GMP Architekten

Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs

Co-operation with: 5+1AA, Genua

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper,

Claudia Schultze, Vincenzo Donato

BIM was:① used as a communicative tool between the design actor involved during the project;② applied to valuate the different configuration for:

a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes)c. Structural (several solution were studied to achieve the better solution)

A. Susa’s High Speed Train Station

Page 8: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Curtsey of GMP Architekten

Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs

Co-operation with: 5+1AA, Genua

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper,

Claudia Schultze, Vincenzo Donato

A. Susa’s High Speed Train Station

BIM was:① used as a communicative tool between the design actor involved during the project;② applied to valuate the different configuration for:

a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes)c. Structural (several solution were studied to achieve the better solution)

Page 9: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Curtsey of GMP Architekten

Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs

Co-operation with: 5+1AA, Genua

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper,

Claudia Schultze, Vincenzo Donato

A. Susa’s High Speed Train Station

BIM was:① used as a communicative tool between the design actor involved during the project;② applied to valuate the different configuration for:

a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes)c. Structural (several solution were studied to achieve the better solution)

Page 10: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

B. Padua’s Conference CenterCurtsey of GMP Architekten

Design: Volkwin Marg

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo

Donato

① BIM was used to create bi-dimensional documents, modified with CAD in the second step;

② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building;

③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects;

④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer.

Page 11: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

B. Padua’s Conference CenterCurtsey of GMP Architekten

Design: Volkwin Marg

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo

Donato

Connection to the trade fair

foyer

auditorium

Connection to the trade fair

Main hall

“Palazzo delle Nazioni”(Building to be refurbished)

“IT WAS REQUIRED BY THE ADMINISTRATION THE

PROTECTION AND THE RESTORATION OF THE

SCULTURAL GATE AND THE RESTABILSHMENT OF THE

MEMORY OF THE OLD BUIDLING”

PRINCIPAL AXEX OF THE TRADE FAIR

① BIM was used to create bi-dimensional documents, modified with CAD in the second step;

② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building;

③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects;

④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer.

Page 12: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

B. Padua’s Conference CenterCurtsey of GMP Architekten

Design: Volkwin Marg

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo

Donato

① BIM was used to create bi-dimensional documents, modified with CAD in the second step;

② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building;

③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects;

④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer.

Page 13: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Curtsey of GMP Architekten

Design: Volkwin Marg

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo

Donato

B. Padua’s Conference Center

① BIM was used to create bi-dimensional documents, modified with CAD in the second step;

② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building;

③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects;

④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer.

Page 14: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Curtsey of GMP Architekten

Design: Volkwin Marg

Project leader: Stephanie Joebsch, Robert Friedrichs

Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo

Donato

B. Padua’s Conference Center

① BIM was used to create bi-dimensional documents, modified with CAD in the second step;

② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building;

③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects;

④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer.

Page 15: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

THE RESEARCH AND DEVELOPMENT ACHIEVED:Developed procedures to facilitate the design process, especially in the early design phase.

1) CAD to BIM to CAD: an interoperable procedure to obtain 2d drawing towards the dialog with a parametric 3d model;

2) BIM to 3Ddprinter: it was develop an optimized procedure which takes into account the level of detail (LOD) of the model;

3) Pictures to BIM: a simply procedure to obtain a conceptual 3d model from pictures where conduce solar simulation;

Note 1: Next development could be to realize a procedure for the automatic realization of report document connected to the spaces or geometry (especially for a tender.Note 2: It was developed also a procedure for the realization of rendering.Note 3: Pictures to BIM was published an article on the international conference “EGRAPHIA 2012”.Note 4: All the procedure were also acquired in the GMP system. They are interested because the company doesn't use BIM technology, especially in the early design phase.

The research

Page 16: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

THE RESEARCH AND DEVELOPMENT ACHIEVED:Developed procedures to facilitate the design process, especially in the early design phase.

1) CAD to BIM to CAD: an interoperable procedure to obtain 2d drawing towards the dialog with a parametric 3d model;

2) BIM to 3Ddprinter: it was develop an optimized procedure which takes into account the level of detail (LOD) of the model;

3) Pictures to BIM: a simply procedure to obtain a conceptual 3d model from pictures where conduce solar simulation;

The research

Page 17: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

1) CAD TO BIM TO CAD DESIGN PROCESSThe BIM technology was used to compare several design solution.The procedure was based for the production of 2d documents drawings and the parametric environment was use only like a tool to facilitate the decision making process.The decision making process was based on:- Subjective observation (perspective view);- Collection of data (solar analysis and shading simulation).Generic Scheme of Design Process

Concept Design

BIM model3D

Check Design

Solution

2d document

Elaboration of:1. Hand drawings2. Architectural

study models3. CAD drawings

PHASE:

ACTIVITIES:

Elaboration of:1. 3d model base on

parametric object2. Perspective

representation

INPU

T: 2

D CA

D

OUTP

UT: 2

D CA

D

The research

Page 18: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

1) CAD TO BIM TO CAD ORGANIZATIONEntry requirements:- Criteria for the classification of the name of file;- Subdivision of the Building in:

- Functional department;- Architectural / Structural compounds.

- Congruent coordinates system for all the file cad;

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

Interoperable Process

The research

3d modelCheck Design

SolutionIN

PUT:

2D

CAD

OUTPUT: 2D CAD

Grid(Raster)

CAD Block2d drawing

Criteria of evaluation:1. Visual reason;2. Functional aspects;3. Intersections (ARC/STR/MEP)

OUTP

UT: P

lot d

rawi

ng

2d document

CAD ENVIRONMENT

BIM ENVIRONMENT

Page 19: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

ENVIRONMENT

BUILDING

Levels

Sections

Elevations

Level 0

Level 1

Level 2

Level 3

model3d

LINK OF 2D CADTOWORDS THE PARAMETRIC ENVIROMENT

Level 0 - Foyer

Level 0 - Auditorium

Level 0 – Hall

Level 1 - Foyer

Level 1 - Auditorium

Level 1 – Hall

FUNCTIONAL SUBDIVISION(WHEN IS POSSIBLE)

1) CAD TO BIM TO CAD SEMANTIC CAD ENVIRONMENT

OUTPUT 2D FILE(.DWG)

EACH CIRLE REPRESENT A CAD FILE LINKED TO THE OTHER WITH A SPECIFIC HIERACHICAL RELATION

Page 20: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

Semantic structure

CAD Block : levels

Project Navigator

identical to the BIM structure

Page 21: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

CAD BlockIt is an external reference

Page 22: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

CAD Block : Auditorium

Page 23: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research1) CAD TO BIM TO CAD SEMANTIC BIM ENVIRONMENT

Architectural Model

(Container)

Structural Model

INPUT 2D FILE(.DWG)

Level 0

Level 1

Level 2

Level 3

Check Design Solution

MEP Model

Page 24: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

CAD Block liked to the Revit file

Page 25: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

Bidirectional verification of drawings cad and parametric model

Page 26: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

Structural elementArchitectural element

Page 27: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

The research

BUILDING

LevelsSectionsElevations

Level 0

Level 1

Level 2

Level 3

1) CAD TO BIM TO CAD

OUTPUTPRINTING

PhysicalDocument

3d Architectural

Model (Container)

UPDATIONG AND CORRENCTION OF 2D DRAWING

OUTPUT 2D FILE(.DWG)

Page 28: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Vincenzo DonatoPhD Candidate - DICeA

ACTIVITIES AT SOBE:- Master Degree course in distributed intelligence in design phase;- Generative/computational design,- Augmented/mixed reality applications in design;- Emergent design strategies and techniques in architectural and

Urban Design;- Courses based on teaching B.I.M. (B.Eng. and M.eng.);

REASON AND EXPECTED OBJECTIVE:- The use of B.I.M. will be made mandatory on all the government

projects within five years (right now, in UK, B.I.M. is mandatory for which recommended BIM being used on projects over £50m);

- IFC specialist knowledge;- Application on B.I.M. and early design phase;- Application on B.I.M. and laser scanner.

Not last:- Gain more international experience and improving the languages …

Visiting research at SOBESchool of the Built EnvironmentManchester

Page 29: 22 nd Plenary Meeting ,  8 th –  10 th  November 2012 - Rome Building Information Modeling (BIM)

Università degli Studi di FirenzeDottorato Internazionale Congiunto (MIUR)

TU “Carolo Wilhelmina” zu BraunschweigInternationales Graduiertenkolleg 802 (DFG)

Thank you

22nd Plenary Meeting, 8th – 10th November 2012 – Rome

Building Information Modeling (BIM)applied for the management of historical and monumental building heritage