ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
The Construction and Operation ofEwe Hill 22 Windfarm
Method Statement: Details for Directional Signage
Planning Consent ResponseBy ScottishPower Renewables (UK) Limited
Condition 2.19
Condition Reference: 2.19
“ 2.19 Prior to the commencement of the development the Company must submit tothe planning authority for their approval details of directional signage advising driversof heavy goods vehicles to remain on specified access routes. Thereafter the detailsapproved shall be implemented.
Reason: To protect the amenity of residents in the vicinity of the wind farm. ”
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 2/9
ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
PROJECT: EWE HILL 22 WINDFARM
CONDITION 2.19
DOCUMENT REFERENCE NUMBER: EWE/02/090/S36/2.19
Status: Version 01 – For Review
Original Issue: 22 nd June 2015
This Issue: 22 nd June 2015
Prepared by: Ashley Anderson – Assistant ProjectManager
Date: 22/06/2015
Reviewed by: Steven McLean – Project Manager Date: 22/06/2015
AMENDMENT LIST
IssueNumber
Date Brief Description of Change Section/sInvolved
PageNumbers
01 22/06/2015 Draft for review All All
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 3/9
ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
Document Control and Distribution List
This document is subject to periodic review and updating. The document is intended for useby ScottishPower Renewables (UK) Limited and their contractors specifically involved in theconstruction and operation of the Ewe Hill 22 Windfarm, Dumfries and Galloway. When thisdocument is updated, it will be issued to all personnel named on the distribution list below.
Organisat ion/Key Contacts Email Telepho neNumber
ScottishPower Renewables
Steven McLean [email protected] 0141 614 3100
Dumfries and GallowayCouncil
Mhairi Duff [email protected] 01387 260822
Users of this document should ensure that they have the most up to date version. Forfurther information please contact:
ScottishPower Renewables3rd Floor North WingCathcart Business ParkSpean Street,Glasgow
G44 4BE
Tel 0141 614 3100Fax 0141 568 4499Email: [email protected]
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 4/9
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 5/9
ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
1 INTRODUCTION
This Method Statement defining the details for directional signage has been preparedin accordance with the requirements of Planning Condition 2.19 of the Consent andDeemed Planning Permission for Ewe Hill 22 Windfarm dated 16 th May 2014.Planning Condition 2.19 states:
“ 2.19 Prior to the commencement of the development the Company must submit tothe planning authority for their approval details of directional signage advisingdrivers of heavy goods vehicles to remain on specified access routes. Thereafter
the details approved shall be implemented.
Reason: To protect the amenity of residents in the vicinity of the wind farm. ”
This Method Statement has been prepared with the aim of implementing necessaryprovisions to ensure any disruptions arising as a result of construction traffic from EweHill 22 Windfarm is kept to the minimum.
This Method Statement has been prepared by ScottishPower Renewables (UK)Limited. Any references to ScottishPower Renewables (UK) Limited shall beconsidered as a reference to SPR. The existence of this Method Statement andcompliance with it shall not operate to relieve SPR of any of its obligations under thestatutory requirements or legislation applicable to the development.
The location of Ewe Hill 22 Windfarm is shown on drawing referenced UKCO-DLO-EWE0002 Site Layout (as presented in Appendix 1).
2 BACKGROUND INFORMATION
The impacts of traffic and transport were assessed by RPS as part of theEnvironmental Impact Assessment process undertaken for the windfarm development.The considerations of traffic to and from Ewe Hill 22 Windfarm were presented in theEnvironmental Statement 1.
3 COMPLIANCE WITH THE METHOD STATEMENT
SPR will adhere to this Method Statement throughout the construction phase of thewindfarm in accordance with Planning Condition 2.19. If there is a need for anydeparture from the Method Statement during these works then SPR will consult with
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 6/9
ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
abnormal and indivisible loads, light goods vehicles and private vehicles will berequired to utilise the entrance of the site off the B7068 to gain access and take egress
from the site. Vehicles will not be permitted to access the site from any other point.Temporary roadside signage will highlight where the new Site entrance junction off theB7068 to road users associated with construction traffic.
Traffic will be monitored regularly to ensure that no alternative accesses to site areused by windfarm construction traffic. If any alternative access to site is identified asbeing used on a frequent basis by windfarm construction traffic then additional signagewill be installed as necessary. Should any vehicle driver be found to be contravening
the site access rules, they will be subject to disciplinary action and, in the case ofrepeat offenders, be removed from site.
Details of the planned Ewe Hill 22 Windfarm Construction Traffic and ConstructionWorkers Traffic Routes are shown on drawing referenced EWE-I-018 – Ewe Hill 6Section 69 Agreement (as presented in Appendix 1).
Traffic will be monitored regularly to ensure that the correct vehicle classifications arefollowing the appropriate/approved routes to access the site. The InfrastructureContractor shall operate a site induction scheme to ensure all employees / contractors/sub – contractors and suppliers on the site are aware of the designated access routesand associated vehicle classification and any vehicle/personnel found to becontravening the site access rules will be subject to disciplinary action and, in the caseof repeat offenders, be removed from site.
4.1 Provision of approp riate s ignin g/ l ining arrangements
Signage will be implemented both within and outwith the windfarm includingappropriate signage at the site entrance to provide drivers with all the necessaryinformation regarding permissible access routes to and from the windfarm, and whilsttravelling within the windfarm, including travelling along the B7068. The temporaryroute identification signage scheme will be prepared with the aim of protecting theamenity of residents in the vicinity of the windfarm during the construction of Ewe Hill22 Windfarm. The temporary route identification signage scheme will provideguidance to all drivers, including HGV drivers, in respect of the specified access routes
that should be followed, both in gaining access to and egress from the windfarm site.Whilst the scheme will apply to all drivers associated with the windfarm site, abnormaland indivisible loads to be delivered to the windfarm site will be subject to additionalrequirements agreed with Transport Scotland and the relevant Roads Authority.
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 7/9
ScottishPower Renewables (UK) LimitedEwe Hill 22 Windfarm
Planning Condition No. 2.19Details for Directional Signage
APPENDIX 1 – DRAWINGS
This Appendix contains the following drawings:
Drawing No. Revision Description
EWE-I-018 Rev E Ewe Hill 6 Section 69 Agreement
UKCO-DLO-EWE0002 Rev 3 Ewe Hill 22 Windfarm Site Layout Plan
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 8/9
320000
320000
330000
330000
5 8 0 0 0 0
5 8 0 0 0 0
¯
LegendSite Boundary
General Access
B7068
Turbine Access
B7068
B7076
B722
C61a
C63a
U231a
1:60,000
Rev Date CommentBy
Scale @ A3 0 1 20.5Km
© Crown Copyright 2014. All rights reserved.Ordnance Survey Licence 0100031673.
Ewe Hill 6Section 69 Agreement
Drg No
Rev
Date
Figure
E
22/07/14
18
Datum:OSGB36Projection:TM
EWE-I-01822/07/14E HA Amended turbine access route.
Note: Drawing to be read in conjunctionwith Ewe Hill 6 Section 69 Agreement.
14/01/14D HA Fourth Issue.
26/11/13C HA Third Issue.
8/19/2019 2.19 - Details for Directional Signage
http://slidepdf.com/reader/full/219-details-for-directional-signage 9/9
N
S
TA3
A2
A1
B5
B6
C7
C8
C9
C10C11
C13
C12
C14
D15
D16
D17
D18
D19
D20
D21
D22
B4
x
x
BORROW PITS
EWE HILL 6 AS-BUILT TEMPORARYCONSTRUCTION COMPOUND
EWE HILL 16 PROPOSEDTURBINE LOCATIONS
SITE BOUNDARY
KEY
APPROXIMATE AREA OF FORESTRY TO BECLEAR FELLED
APPROXIMATE AREA OF FORESTRY TOREMAIN
x NGT GAS PIPELINE ROAD CROSSING
EWE HILL 6 AS-BUILTMET MAST
EWE HILL 6 AS-BUILT
ACCESS ROADS
EWE HILL 6 AS-BUILTCCTV LOCATION
EWE HILL 16 PROPOSED ACCESS ROADS
EWE HILL 6 AS-BUILTTURBINE LOCATIONS
EWE HILL 16 PROPOSED
CCTV LOCATION
EWE HILL 16 PROPOSED TEMPORARYCONSTRUCTION COMPOUND
SITE LAYOUT PLANSCALE 1:10000
Reference: Environmental Statement for Ewe Hill6 Windfarm undertaken by RPS, 2009
65 7 8 9 10 1 1 1 24 13321 14 15 16
65 7 8 9 10 1 1 1 24 13321 14 15 16
E
D
F
G
H
J
C
B
A
K
L
M
E
D
F
G
H
J
K
L
M
C
B
A
Ordnance Survey Licence 0100031673.)
NOTES:
1.
2.
TurbineNo
EWE HILL 6 AS BUILT COORDINATES
Met Mast
A1 A2 A3B4B5B6
EWE HILL 22 PROPOSED COORDINATES
C7C8C9
C10C11C12C13C14D15D16D17D18D19D20D21D22
Northing
585503
584988585340585652585315584795584655
585159585538586007586489586530587270586959587400584862585197585520585926586349586791587207587537
Easting
326151
326759326485326329327099327158327510
327649327543327362327453327076327648327138327215327890328124327928327810327817327910328171328070
Reference: Environmental Statement for Ewe HillWindfarm undertaken by RPS, 2004
3.