O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Draft 2018-2021 STIP For Public Review To view or comment on this document, please visit https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N

2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Draft 2018-2021 STIP

For Public Review

To view or comment on this document, please visit

https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP

O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N

Page 2: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

TABLE OF CONTENTS

 

INTRODUCTION........................................................................................................................... 1 

WHAT IS THE STATEWIDE TRANSPORTATION IMPROVE- MENT PROGRAM? ...... 2 

Document Description ................................................................................................................ 2 

HOW TO USE THIS DOCUMENT .............................................................................................. 5 

Document Overview ................................................................................................................... 5 

How to Interpret Project Information ......................................................................................... 5 

KEY TO PROJECT LISTING ...................................................................................................... 6 

STIP DEVELOPMENT PROCESS OVERVIEW ....................................................................... 8 

Process Description and Participants .......................................................................................... 8 

What is an MPO? ........................................................................................................................ 9 

STIP DEVELOPMENT STEPS ................................................................................................... 11 

STIP Development Timeframe ................................................................................................. 11 

STIP Development Process Steps ............................................................................................. 11 

PROGRAMS FUNDED THROUGH THE STIP ....................................................................... 13 

Enhance .................................................................................................................................... 13 

Fix-It ......................................................................................................................................... 14 

Congestion Mitigation and Air Quality Improvement ........................................................ 15 

Federal Programs .................................................................................................................... 15 

Immediate Opportunity Fund ............................................................................................... 16 

Public Transit .......................................................................................................................... 16 

FEDERAL DISCRETIONARY FUNDING ............................................................................... 20 

PUBLIC INVOLVEMENT AND GOVERNMENT INVOLVEMENT .................................... 20 

Local Governments ................................................................................................................... 20 

Area Commissions on Transportation ...................................................................................... 21 

Page 3: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Outreach to the Public ............................................................................................................... 21 

Regional Solutions Team and Regional Partnerships ............................................................... 21 

Oregon Freight Advisory Committee ....................................................................................... 21 

Oregon Bicycle and Pedestrian Advisory Committee .............................................................. 22 

Public Transit Advisory Committee ......................................................................................... 22 

STIP Stakeholder Committee ................................................................................................... 22  

Page 4: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Page ii

 

 

Page 5: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

1  

INTRODUCTION The Draft 2018-2021 Statewide Transportation Improvement Program (STIP) is hereby presented for public review. The STIP (which consists of the Development STIP and the Construction STIP) is the Oregon Department of Transportation’s (ODOT) short term capital improvement program, providing project funding and scheduling information for ODOT and the state’s metropolitan planning organizations. It is a four-year program developed through the coordinated efforts of the department, federal and local governments, Area Commissions on Transportation, tribal governments, and the public.

While the public’s opinions and comments on the STIP are welcome year round, a spe- cific public review period for the Draft 2018-2021 STIP is January 2017 through February 2017. During this period, a series of public meetings will be held across the state. The public is invited to comment on the projects selected, the processes used to prioritize the projects, and the goals of the program. While it is the objective of the department to produce a draft document that will be essentially the same as the final, projects and/or priorities can be modified as a result of public input.

The Draft 2018-2021 STIP is available in both a searchable format and a down- loadable format on the internet. The web address is: https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP Public comments are welcomed through the STIP website. Comments received will be forwarded to the appropriate ODOT Region for response, and will also be made available to the office of the department’s director and the Government Liaison Office. These of-

fices maintain communication with the Ore- gon Legislative body and the office of the Governor.

The Draft 2018-2021 STIP contains about $2.7 billion in projects and programs. Sources available for funding include federal transportation funds, state highway funds, and other funds. Federal funding levels are based on the current federal funding act, Fixing America’s Surface Transportation Act (FAST Act), which was enacted December 4, 2015. Oregon is slated to receive approximately $575 million in federal fiscal year 2019 and $509 million in federal fiscal years 2020 and 2021. Actual federal funds coming to the state may vary considerably.

Readers should keep in mind that this is a draft document. Project descriptions, cost estimates, and construction schedules are subject to change as more information be- comes available. In addition, projects sub- mitted by Metropolitan Planning Organiza- tions (MPOs), the transportation decision- making body, as described by federal regu- lations, for metropolitan areas with more than 50,000 residents, may not be available for inclusion in the Draft STIP, and will be added as they become available. Definitive system conditions and outcomes are not available at this point in the STIP develop- ment process. That information will be pro- vided in the Final STIP, with an estimated approval date of June 2017.

Page 6: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

2  

WHAT IS THE STATEWIDE TRANSPORTATION IMPROVE- MENT PROGRAM? Document Description The Oregon Statewide Transportation Im- provement Program (STIP) is the state’s four-year transportation improvement pro- gram for state and regional transportation systems, including federal land and Indian reservation road systems, interstate, state, and regional highways, bridges, and public transportation. It covers state and federally- funded system improvements for which funding is approved and that are expected to be undertaken during the upcoming four- year period. The STIP is adopted by the Oregon Transportation Commission (OTC) and is approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) as required by federal law.

The STIP identifies all transportation projects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded projects of statewide or regional sig- nificance (i.e. projects with high public in- terest or that have air quality impacts) re- gardless of funding source. It also includes federal transportation projects in national parks, national forests, and on Indian reser- vations.

The STIP is a project scheduling and fund- ing document; it is not a plan. The invest- ments or projects included in the STIP are consistent with metropolitan Transportation Improvement Programs (TIP) that are approved by the Governor. The STIP is also consistent with adopted transportation plans that involved local and regional governments, Area Commissions on Transportation (ACTs), other state and local transportation agencies, and the public. Projects in the STIP are approved in local and regional planning processes, such as city

and county transportation system plans (TSPs), metropolitan regional transportation plans (RTPs), and special state and federal planning documents. Major projects listed in the STIP have been reviewed for consistency with state and local land use plans and policies, and with applicable state policies and plans such as the Oregon Highway Plan, Oregon Freight Plan, Oregon Public Transportation Plan, Oregon Bicycle and Pedestrian Plan, Oregon Transportation Plan and Transportation Safety Action Plan.

Page 7: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

3  

Table 1: Statewide Policy Plan Overview

Plan Description Last Update or

Amendment

Scheduled Update or

Amendment Oregon Aviation Plan

Comprehensive evaluation of Oregon’s aviation system and serves as a guide for future aviation development. The plan looks beyond the traditional state aviation system planning elements by combining three planning studies that assess the condition of the existing aviation infrastructure, the economic benefit of the aviation industry, and the national importance and state significance of each airport.

2007

Oregon Bicycle and Pedestrian Plan

Policy foundation for the state, supporting decision making for walking and biking investments, strategies, and programs. Under the Oregon Transportation Plan, and parallel to associated mode and topic plans like the Oregon Highway Plan, the walking and biking direction established in this plan helps to bring about an interconnected, robust, efficient, and safe transportation system for Oregon. 

2016

Oregon Freight Plan

Roadmap for ODOT, other state and local agencies, and businesses to work together to enhance the system that keeps our economy moving. The purpose of the Oregon Freight Plan is to “improve freight connections to local, state, regional, national and global markets in order to increase trade-related jobs and income for Oregon workers and businesses.”

2011

2017

Oregon Highway Plan

Defines policies and investment strategies for Oregon’s state highway system for the next 20 years. It further refines the goals and policies of the Oregon Transportation Plan.

2015

Oregon Public Transportation Plan

Modal plan for public transportation, an element of the Oregon Transportation Plan. The Oregon Public Transportation Plan is the linkage between the Oregon Transportation Plan, corridor plans and the STIP.

1997

2018

Oregon State Rail Plan

Explores the issues affecting the state’s rail freight and passenger system over 25 years. It assesses both public and private transportation facilities and services at the state, regional and local level. The Oregon State Rail Plan focuses on the role of the rail freight and passenger services consistent with the Oregon Transportation Plan.

2014 2019

Oregon Transportation Options Plan

Provides policy guidance for state and local partners to enhance and expand transportation access for all Oregonians while ensuring that transportation investments are efficient and support broader community goals such as growing the economy and improving personal and environmental health.

2015

Oregon Transportation Plan

Explores the issues affecting all means of transportation and serves as a 25-year transportation plan that comprehensively assesses state, regional and local and both public and private transportation facilities and services.

2006

Oregon Transportation Safety Action Plan

Provides long-term goals, policies and strategies and near-term actions to eliminate deaths and life-changing injuries on Oregon’s transportation system by 2035.

2016 2021

Page 8: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

4

The STIP only includes projects for which there is committed funding available. In other words, the STIP is fiscally constrained. Also, the STIP typically only includes projects for which there is committed funding available to complete a discrete phase of the project. Projects listed in the STIP may include highway and bridge construction or repairs, project development activities such as environmental review, and other non- construction projects such as transit service improvements and capital purchases. Some projects, especially small and/or immediate need projects, may be added to the STIP by amendment. Reserves for these kinds of projects are shown in the STIP as “buckets” of funds that can be allocated later.

Oregon categorizes STIP projects into two broad types: Fix-It projects that maintain the existing transportation system and Enhance projects that improve the system. However, the money for these projects may come from state or federal programs that are designed to address certain transportation needs and therefore have limits on how the money may be spent. For example, Pavement Preservation money may not be used for bridge replacements, and a certain amount of money must be spent on capacity improvements and bicycle and pedestrian projects. The programs are the building blocks for the broad Enhance and Fix-It programs of the STIP; preparing the STIP determines which projects should be approved, when the work should be done, and what state or federal program(s) should be used to pay for them.

As part of the Enhance process, 12 percent of the funds, approximately $35 million, were set aside for the OTC’s discretion. This includes the infusion of $5 million of Enhance funding added by the passage of the federal legislation Fixing America’s Surface Transportation ACT (FAST Act). The discussion of these funds took place prior to the Area Commissions on Transportation role

in developing the 150 percent and 100 percent lists; with the exception of the FAST Act1 funding that was signed into law in December 2015.

FAST Act authorizes the Federal surface transportation programs for highways, highway safety, rail and transit; and provides federal funds for transportation projects to move people and freight. The 2018-2021 Draft STIP meets the requirements of FAST Act. For more information on FAST Act, please visit https://www.fhwa.dot.gov/fastact/.

By adopting the STIP, the OTC allocates available state and federal funding to specific projects. When preparing the STIP, ODOT seeks agreement from federal and state government agencies, MPOs, transportation interest groups, and other affected local jurisdictions about which projects have the highest priority in the upcoming four-year period. Projects are approved and scheduled according to their priority, available funding, and readiness to proceed.

The participants in the STIP process expect that the projects listed in the STIP will be funded and built as scheduled. They recognize, however, that actual revenues may be higher or lower than originally forecasted, or that a project may be unavoidably delayed. Therefore, they agree that project priorities may shuffle within the STIP, and if a project must be delayed, it may retain its priority for funding at another time in the program. These changes are subject to approval of the OTC, FHWA, and FTA. While ODOT and the other STIP partners intend to deliver the projects listed in the STIP as described, they may modify or replace some projects if more effective solutions to the transportation problems are identified during project development. Projects and/or their priority

1 Codified in Title 23 and Title 49 of the United States Code. 

Page 9: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

5  

also may be modified as a result of input received during the public review for the draft STIP. HOW TO USE THIS DOCUMENT

Document Overview This STIP includes important information about state and federally funded transportation projects for the 2018-2021 timeframe. The program covers the four year period beginning with an approval by FHWA and FTA in September, 2017, and ending September 30, 2021, which is the end of the 2021 federal fiscal year. Amendments to the final document may occur periodically that alter the scope, schedule, and number of approved projects in the STIP. After the Final STIP is approved it is posted online, accompanied by the updated 2018-2021 STIP to reflect completed amendments: https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP 

For readers who want to learn about the pro- cedures involved in preparing the STIP doc- ument, there is an overview of the process in the section of this introduction titled “STIP Development Process Overview”.

How to Interpret Project Information The reader will note that project information included in the STIP is cursory. The entries include the project’s name, key number and responsible agency; a sufficient description that identifies general project location, purpose, scope and phase; an estimated cost including the amount of Federal funds to be obligated by year; and the program(s) being used to pay for the work2. The entries may use terms with which the reader is not familiar.

The STIP document includes lists of ap- proved state, federal, and local transporta- tion

                                                            2 Code of Federal Regulations. November 2016. 23 CFR 450.218(i)

projects. Projects are listed in the STIP according to which ODOT region they are located in, and then in which county they are located. If a reader is unsure about which ODOT re- gion their project may be located in, there is a map of ODOT regions at the end of this section. Most Oregon counties are entirely in one region, but some counties are split. For example, parts of Washington County There also is a discussion about how to use and interpret the information in the project entries at the end of this section. Readers who would like to get more information about a particular project, such as the project’s scope, proposed alignment, or construction schedule, should contact the ODOT region office in which the project is located. There is contact information for ODOT region offices on the divider page for each region in the Proposed STIP Projects section. On the next page is a guide to reading the brief entry for each project in the STIP. Following that is a map of ODOT Regions and ACTs.

Page 10: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

6  

KEY TO PROJECT LISTING

Describes the work being done on the project.

Unique identifier for each project

Shows the name and location of each project

Shows the primary type of work.

Identifies who is sponsoring the project or who requested the project.

Identifies which MPO boundary the project falls within (or Non-MPO for those outside).

Shows estimated amount of funds, the federal share (as applicable), the year the funds are committed, and the type of funds committed to the project.

Shows the year project is set to go to contract.

Identifies Area Commission on Transportation

Status indicates what is happening with the project

Page 11: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

7  

Figure 1 – Area Commissions and ODOT Regions Map

Key to ACT/AREA Acronyms used throughout the STIP

North West Oregon ACT: NWACT Central Oregon ACT: COACT

Mid-Willamette Valley ACT: MWACT North East ACT: NEACT

Cascades West ACT: CWACT South East ACT: SEACT

South West ACT: SWACT Lane County ACT: LANECO

Rogue Valley ACT: RVACT Region 1 ACT: R1ACT

Lower John Day ACT: LJDACT Various Jurisdictions: VARIOUS

South Central Oregon ACT: SCOACT Statewide Only: STATEWIDE

Page 12: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

8  

STIP DEVELOPMENT PROCESS OVERVIEW Process Description and Participants The STIP is a compilation of multiple project review and programming efforts, some of which are carried out by different organizations. ODOT is responsible for coordinating these separate processes and for integrating them into a single document – the STIP. Table 2 outlines the major components that are compiled in the STIP.

The person responsible for managing the process is the Statewide STIP Manager. The Statewide STIP Coordinator manages the project data for the STIP. Each ODOT region also has a Region STIP Coordinator. This team is responsible for ensuring that all the projects approved through these separate processes are compiled into the STIP document.

Table 2 – STIP Development Processes and Participants

Programming Process Lead Advisory Body Comment

1. Enhance Program

ODOT Regions ACTs, MPOs, statewide advisory committees, and other advisory bodies

A statewide formula is used to allocate available funding to ODOT regions. Each region then develops an Enhance program using the statewide application and the ACT(s).

2. Fix-It Program ODOT Combination of state-level advisory committees, region staff, and ACTs

These projects are generally identified using data programs including Oregon Transportation Management Systems (OTMS) for bridges, pavement, safety, traffic monitoring, congestion, and intermodal, which are used to identify and prioritize projects. Large culvert improvement, fish passage, and slides and rockfalls also use data to identify and prioritize projects, although they are not part of OTMS.

4. State and Local Programs

ODOT; MPOs Regulations, legislation and agreements

These programs are a result of either federal or state regulations or legislation; OTC direction; or in-place agreements. Some examples are Recreation Trails, Transportation Growth Management and Congestion Mitigation.

5.Statewide Competitive Programs

ODOT Combination of statewide advisory committees and ACTs

There may be separate competitive processes for certain types of projects such as Federal Lands Access Programs. Some of the funding for these programs may be reserved in a bucket from which later awards are made.

Page 13: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

9  

6. Public Transit Program (Statewide)

ODOT/FTA Various local entities There are many transit funding programs used in the STIP; large transit projects may be listed individually, but most transit projects are funded out of buckets that contain the funding for one or more transit projects. Applications for these funds are solicited from transit service providers after the STIP has been approved. A STIP amendment is then used to document individual awards that are funded out of that program’s bucket.

7. Metropolitan Transportation Improvement Program (MTIP)

MPOs MPO Policy Committees (ODOT participates)

In MPO areas with over 200,000 residents, the MPOs receive an allocation and develop their own MTIP. In metropolitan areas with less than 200,000 residents, the MTIP is coordinated through the ODOT region and funding for Modernization projects comes out of the region’s Modernization program allocation.

8. Federal and state discretionary projects

ODOT, Oregon’s Congressional Delegation, and Oregon’s legislature

OTC Discretionary projects are special set- asides approved by the U.S. Congress and the President, or the legislature and the Governor; approved funds are designated for specific projects.

9. Tribal Transportation Program

Federal Lands Highways, U.S. DOT

Tribal Councils TTP is a federally administered program with its projects listed in the STIP. Tribes also may apply for state programs, such as Enhance.

What is an MPO? An MPO is a federally-designated transportation planning body for an urbanized area with a resident population over 50,000. MPOs have important roles in transportation planning and the STIP. A significant portion of the state’s transportation investment is in urban areas where transportation system improvements are planned and programmed by MPOs. The MPO is responsible for developing the long-range Regional Transportation Plan (RTP) for the area. Oregon currently has 10 MPOs. The MPOs and the jurisdictions and agencies operating within them are listed in Table 3 below.3

                                                            3 MPOs can cross state borders and there are a few Oregon jurisdictions that are part of Washington MPOs. The City of Rainier and Columbia County are in the Longview/Kelso MPO and the City of

MPOs have two important responsibilities. They develop long-range plans for the metropolitan area that are parallel in scope and scale to a transportation system plan, but must adhere to strict federal rules about fiscal limitations on planned improvements and, in some areas, address special air quality regulations. Second, the MPOs decide on system investment priorities by program- ming the projects to fund in the next four years, creating a Metropolitan Transportation Improvement Program (MTIP).                                                                                               

Milton-Freewater is also a part of the Walla Walla MPO. 4 According to the state’s Transportation Planning Rule (Oregon Administrative Rule Chapter 660, Di-vision 12 [OAR 660-012]), cities with populations of 2,500 or more and counties with populations of 25,000 or more are required to prepare TSPs. OAR 660-012 provides guidelines for the preparation of TSPs.

 

Page 14: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

10  

By federal law, large MPOs called Transportation Management Areas (TMAs), whose resident population exceeds 200,000, receive a share of the state’s federal transportation allocation based on a formula. Three Oregon MPOs qualify as TMAs: Eugene/Springfield, Portland Metro, and Salem/Keizer. These areas decide on their own how to spend their federal allocation and publish the projects in their MTIP. ODOT participates in the development of these regional MTIPs. Some of the projects in these MTIPs are included at ODOT’s request, such as pavement preservation or bridge repair projects on state highways that are located in the MPO. Smaller MPOs, whose resident population is between 50,000 and 200,000, fund their MTIP projects using a combination of federal and

state funds that are available for use throughout the state. Albany, Bend, Corvallis, Grants Pass, and Medford fall into this category of MPO. ODOT uses a formula to distribute federal transportation allocation funds to ODOT regions based on factors such as population, registered vehicles and vehicle miles traveled, freight tonnage, and fuel tax revenue. The ODOT region and the MPO then work cooperatively to develop an MTIP for the urban area using part of the al- location for that region (i.e. Bend’s MTIP is funded from the Region 4 allocation while Medford’s MTIP is funded from the Region 3 allocation). There are also two bi-state MPOs, including Walla Walla Valley and Longview-Kelso-Rainier, the STIP incorporates those projects within the State of Oregon.

Table 3 – Metropolitan Planning Organizations in Oregon

MPO Jurisdictions/Agencies

Albany Area Linn and Benton counties, and the cities of Albany, Jefferson, Mil- lersburg, and Tangent, Cascades West Council of Governments (COG)

Bend City of Bend, Deschutes County

Central Lane Lane County, Lane Transit, cities of Eugene, Springfield and Coburg, Lane (COG)

Corvallis Area Benton County, cities of Corvallis, Philomath and Adair Village, Cas- cades West COG

Middle Rogue Jackson and Josephine counties, and the cities of Grants Pass, Rogue River, and Gold Hill and the Rogue Valley COG

Metro Metro, Clackamas, Multnomah and Washington counties, all incorpo- rated cities in Portland Metro area, Tri-Met, SMART

Rogue Valley Jackson County, cities of Ashland, Central Point, Eagle Point, Medford, Phoenix and Talent, Rogue Valley Transportation District, Rogue Valley COG

Salem-Keizer Area Marion and Polk counties, cities of Salem, Keizer and Turner, Salem Transit District, Mid-Willamette Valley COG

Walla Walla Valley Bi-state MPO for the urbanized areas of Walla Walla and College Place, WA & Milton-Freewater, OR

Longview-Kelso- Rainier

Bi-state MPO for the urbanized areas of Longview and Kelso, WA and the city of Rainier, OR

Page 15: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

11  

STIP DEVELOPMENT STEPS STIP Development Timeframe Historically, the STIP has been updated every other year; however the two previous STIP programs (2015-2018 and 2018-2021) have been 3-year cycles. Therefore the STIP is updated every two years with working beginning prior to that. For example, the 2018-2021 STIP update began in January 2014. STIP timelines can be confusing. One way to keep the cycles straight is to remember that the early part of the STIP development process is focused on funding targets and program goals while the later part of the STIP cycle is focused on which projects should be approved. Even though timelines overlap, there is only one approved STIP in place at any given time.

STIP Development Process Steps In general, the STIP development process involves the following sequence. Note that this sequence does not spell out the planning steps that precede STIP development. These preceding steps are extremely important for positioning projects to be considered for funding approval; they are also complex and must be completed before a project can be included in the STIP.

Before the STIP process begins:

The OTC may update policy documents and related plans like the Oregon Trans- portation Plan, Oregon Bicycle and Pe- destrian Plan, and Oregon Highway Plan, that establish policies, investment priorities, and/or performance criteria are established for state transportation facilities.

MPOs prepare long-range RTPs that identify needed system improvements; STIP projects in metropolitan areas need to be consistent with adopted RTPs.

Local governments may prepare or up-

date long-range (usually 20-25 year) TSPs that identify system improvement needs; STIP projects need to be consistent with adopted TSPs.4

Tribes and federal land management agencies prepare long range plans for the road systems they manage.

ODOT regions work with local govern- ments to identify problem locations in highway corridors that may lead to facility plans and refinement plans that identify engineering solutions.

Management systems that help define conditions, collectively known as the Oregon Transportation Management Systems, have been developed for some programs that warrant putting a project on a “watch” list. Conditions may include things like pavement wear, safety problems (determined by crash records), traffic counts at intersections, or bridge ratings; field inspections refine information about asset conditions.

ODOT updates any rules or proposal procedures for STIP programs in consul- tation with OTC and other stakeholders.

During the STIP development process, the following steps generally occur:

Setting Goals and Funding Levels ODOT divisions assess overall transpor-

tation system needs for highway, public transit, and multi-modal systems.

The Economic & Financial Analysis Unit of ODOT prepares a revenue forecast for the STIP from various funding sources.

Based on federal and state revenue fore- casts, a series of scenarios for the Fix- It/Enhance process was developed.

The OTC meets to review policy and fiscal issues and approve funding levels for the programs that are funded through the STIP.

The modal advisory committees, including the Oregon Freight Advisory Committee,

Page 16: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

12  

Oregon Bicycle Pedestrian Advisory Committee and the Public Transit Advisory Committee provide guidance to the STIP Stakeholder Committee regarding cross-modal criteria and modal attributes.

The Active Transportation Section of ODOT informs program managers and regions about funding targets for the var- ious programs funded through the STIP through equity splits.

Selecting STIP Projects Regions work with ACTs, MPOs, and

others to make sure all understand the proposal process to be used for En- hance.

Program managers review management system data and other data/information and identify likely projects for Fix-It.

Enhance proposals are completed by ODOT and local jurisdictions and sub- mitted to ODOT Regions.

ODOT Regions conduct basic eligibility review and forward eligible proposals to ACTs for consideration.

ACTs and MPOs review and prioritize Enhance project proposals, forming their “150%” list that is shared with the OTC and statewide review committees.

ODOT region staff scope the 150% list projects and verify cost estimates.

Program managers make preliminary Fix-It project recommendations based on management system ratings and field in- spections and scoping.

Information from scoping of Enhance projects and likely Fix-It projects are provided to ACTs and MPOs.

ACTs and MPOs use the new infor- mation to develop their recommended “100%” project lists for STIP Enhance, considering opportunities to leverage Enhance projects with Fix-It.

Region management staff hold meetings to look for ways to combine projects to achieve economies of scale and schedule and develop a preliminary program.

MPOs develop draft MTIP programs and

pass project information to Region STIP Coordinators.

Region STIP Coordinators assign project key numbers and work with Program and Funding Services on funding eligibility and budget effects for the draft STIP.

Draft STIP Public Review and Reporting The draft STIP document is prepared

and made available for public review and comment.

ODOT regions review the draft STIP with ACTs, MPOs, and other stakehold- ers; including, non-metropolitan officials, Tribes, Federal Land Management agencies, and Federal Lands Highway.

Regions schedule and conduct public hearings on the draft STIP.

ACTs, MPOs, transit districts, and other stakeholders and the public submit comments on the draft STIP.

Region Local Government Liaisons, planners, and technical staff compile public and stakeholder comments about the draft STIP, document responses, and forward to statewide program managers, modal advisory committees, and other participants.

The draft STIP includes a description of consultation with non-metropolitan local officials and interested parties as described in the Local Consultation Survey, and referenced in the ODOT Public Involvement Policy (May 8, 2009).

STIP Adoption and Approval Regions and program managers may

make adjustments to projects based on public review and comment.

ODOT prepares the final STIP. Technical studies regarding conformity of

the final STIP with federal air quality rules are performed.

The OTC reviews the final STIP, con- siders comments received through the public review process, and adopts the STIP.

MPOs adopt their final MTIP; MTIPs are

Page 17: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

13

added to the STIP. FHWA and FTA review the STIP for

compliance with federal rules and ap-prove the STIP for implementation.

After the STIP is approved, it can be amended to add or cancel a project, or to change the scope, timing, or funding of a project.

Draft STIP Air Quality Reporting Air quality provisions of the Clean Air Act (CAA), as amended, and FAST Act are intended to ensure that integrated transportation and air quality planning occurs in areas designated by the US Environmental Protection Agency (EPA) as non-attainment or maintenance areas for criteria air pollutants. Conformity with the air quality State Implementation Plan (SIP) must be demonstrated for metropolitan TIPs, the STIP and amendments to those documents prior to adoption of the STIP.

PROGRAMS FUNDED THROUGH THE STIP OTC and ODOT revised the STIP funding program structure beginning with the 2015-2018 STIP. As a result, the STIP is no longer developed as a collection of small programs tied to specific pools of funding dedicated to specific transportation modes or specialty programs. Instead, the STIP is divided into broader categories, including, but not limited to Enhance and Fix-It.

The Enhance and Fix-It funding structure continues in the 2018-2021 STIP, and enables ODOT to take care of existing transportation assets while still providing a measure of funding to enhance the state and local transportation system, in a truly multimodal way. With limited funds available, ODOT needs to identify the most effective projects based on community and state values, rather than those that fit best into prescribed programs. Enhance and Fix-It combine

several smaller programs that are described in state and federal rule and law, such as FAST Act, the federal transportation authorization act.

This section offers more information about Enhance and Fix-It and also includes descriptions of other programs in the STIP that are selected separately from the two main categories of projects. Enhance and Fix-It include projects selected by ODOT and its stakeholders and are typically funded with state and federal FHWA funds. Some federal programs, namely those funded through the Federal Transit Administration (FTA) and the Federal Railroad Administration (FRA) are not yet included in Enhance and Fix-It; or are selected by other agencies directly and then amended into the STIP. Other smaller programs that also remain separate from the Enhance and Fix-It programs include the Congestion Mitigation Air Quality (CMAQ) program, because only certain jurisdictions are eligible to receive funding; or the Immediate Opportunity Fund (IOF) because the program is designed to respond quickly outside the overall STIP development process.

Enhance The Enhance program combines several sources of funding for investments into a single proposal process. This helps to meet the expectation of ODOT to identify and fund the best multimodal transportation solutions needed to move people and goods through the transportation system.

Proposers must coordinate with ODOT region staff and are encouraged to coordinate with other local jurisdictions in development of Enhance proposals to identify opportunities to leverage investments.

Each region works with their ACT to review and prioritize the proposals, including ODOT projects on the state system. ACTs then

Page 18: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

14  

forward the recommended project proposals for OTC approval. After selection, ODOT applies the appropriate funding to the project. A complete guide describing the Enhance proposal process is available online: https://www.oregon.gov/ODOT/TD/STIP/Apply/Guide_for_Completing_Enhance_Proposal.pdf Eligible projects must be consistent with state and local plans; local proposers are required to provide match funds; and projects must benefit the state’s multimodal transportation system (either on or off the state system). Project activities that are eligible for the Enhance category funds include:  

Bicycle and/or Pedestrian facilities on or off the highway right-of-way

Public Transportation (capital projects only, not ongoing operations), Transit Fleet replacements in which title in NOT held by ODOT

Safe Routes to School (infrastructure projects)

Scenic Byways (construction projects) Transportation Alternatives as defined by

the Transportation Alternatives Data Exchange (TrADE)

Transportation Demand Management Transportation Options

 

Fix-It The Fix-It program includes all the capital funding categories that maintain or fix ODOT’s portion of the transportation sys- tem. It is important to note that the capital funding categories do not include the non- capital maintenance and operations pro- grams because these are not included in the STIP. Noncapital maintenance/operations and other agency funding is addressed by the OTC via budget decisions separate from the STIP. The need for a Fix-It project is usually identified by using a data management system that helps analyze what is reaching its useful

life, where crashes are occurring, and what might be cost effective approaches to address the issue. The initial list of eligible Fix-It projects is then shared with ACTs and MPOs to enable their input and coordination between projects in a similar area, including Enhance proposals. The final list of Fix-It projects is approved by the OTC.  Project activities eligible for the Fix-It category of funds include primarily repair and preservation activities and operations and safety activities Fix-It includes repair and preservation for: Bicycle and pedestrian facilities on state

routes only Bridges (state owned) Culverts Highway Pavement Salmon (Fish Passage) Site Mitigation and Repair Stormwater Retrofit

 

Fix-It also includes safety and operations ac- tivities including: High Risk Rural Roads Illumination, signs and signals Landslides and Rockfalls Intelligent Transportation Systems Rail-Highway Crossings Roadway safety improvements identified

such as those identified by the safety management system (Safety Priority Index System sites, etc.

Transportation Demand Management Work Zone Safety

 

Page 19: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

15

Congestion Mitigation and Air Quality Improvement The Congestion Mitigation and Air Quality Improvement (CMAQ) program is a flexible source of Federal funding for transportation projects and programs to help states and local jurisdictions meet the requirements of the Clean Air ACT (CAA). These funds assist areas in nonattainment or maintenance for ozone, carbon monoxide, and/or particulate matter.

While Federal statutes only require that Oregon expend CMAQ funds for projects eligible under the program and in areas with recognized air quality issues; the OTC has elected to make the CMAQ program a local program, distributing funds to eligible local governments by formula. Population, pollutant levels, and highway vehicle emis- sions in the designated areas are factors in the formula. The determination of whether an area is eligible for CMAQ funds ultimately rests with FHWA.

There are nine areas in Oregon that are currently eligible for CMAQ funding: Eugene-Springfield, Grants Pass, Klamath Falls, La Grande, Lakeview, Medford-Ashland, Oakridge, Salem-Keizer and Portland Metro. FHWA establishes general project eligibility criteria and guidance for CMAQ projects, and a CMAQ Committee establishes the distribution methodology for Oregon’s CMAQ program. Committee members represent the League of Oregon Cities, Association of Oregon Counties, Metro (Portland Metropolitan Area), Rogue Valley Council of Governments (Medford-Ashland), Grants Pass, Oregon Department of Environmental Quality, FHWA (in an advisory role only), and ODOT. The highest priority for CMAQ funds are transportation projects and programs identified as transportation control measures (TCMs) in approved State Implementation Plans (SIPs).

For more information on the CMAQ pro- gram, call 503-986-3880, or go online:

https://www.fhwa.dot.gov/fastact/factsheets/cm aqfs.cfm.

Federal Programs There are several federal programs that provide funding for transportation projects serving Federal and Indian lands.

Federal Lands Access Program The Federal Lands Access Program (FLAP) provides federal funding to improve transportation facilities that provide access to, are adjacent to, or are located within Federal lands. The Access Program supplements State and local resources for public roads, transit systems and other transportation facilities, with an emphasis on high-use recreation sites and economic generators. The State program funding allocation formula depends on road mileage, number of bridges, land area, and visitation. The local road jurisdiction (ODOT or an Oregon county) and the U.S. Forest Service must be co-applicants for these projects. Ten percent of the annual funding is dedicated to “enhancement” projects like trailhead amenities and interpretive signage.

In Oregon, there is a Tri-Agency Committee that decides which FLAP projects to fund. The committee includes voting members from the Western Federal Lands Highway Division of the Federal Highway Administration, the U.S. Forest Service Region Office, and ODOT, and non-voting advisors from the Association of Oregon Counties and the FHWA Oregon Division office. Proposals for FLAP projects are solicited every two to four years and are evaluated based on criteria and a point system developed by the Tri-Agency Committee.

Tribal Transportation Program The Tribal Transportation Program (TTP) provides federal funding for transportation projects on Indian roads or public roads within or providing access to Indian reservations. A prime objective of the TTP is to contribute to the economic development, self-determination, and employment of Indians and

Page 20: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

16  

Native Americans.

Tribal governments in Oregon prepare a two-year Transportation Improvement Pro- gram (TIP) for selecting projects that go into the STIP. The Tribal Transportation TIP is updated annually. A federal formula estab- lishes funding allocations by federal regions; Oregon is in a region that also includes Alaska, Idaho, and Washington. The for- mula is based in part on the inventory of needs for each tribal area and tribal popula- tion. Tribal governments in Oregon are re- presented on ACTs. For the Draft STIP, no projects have been submitted by Tribal governments in Oregon. Federal Lands Transportation Program The Federal Lands Transportation Program (FLTP) was established to improve the transportation infrastructure owned and maintained by various Federal Land Management Agencies; including, the National Park Service, Fish and Wildlife Service, USDA Forest Service, Bureau of Land Management, US Army Corps of Engineers, Bureau of Reclamation, and Independent Federal Agencies with natural resource and land management responsibilities. The FLTP replaced the Park Roads and Parkways, and Refuge Roads components of the Federal Lands Highway Program (FLHP). Fund allocations are determined by the Office of the Secretary of Transportation based on a performance management model. Immediate Opportunity Fund The Immediate Opportunity Fund (IOF) supports economic development in Oregon by constructing and improving streets and roads that are needed to serve site specific economic development projects. It is managed on a case-by-case basis in cooperation with the Oregon Business Development Department.

IOF usage is discretionary, and it can only be tapped when other sources of financial support are unavailable or insufficient. It is restricted to potential economic development projects that require a quick response and commitment of funds to assist in locating or retaining businesses that provide primary industry jobs in a community. Project applicants are expected to provide a match of at least 50 percent of the total funds requested. Funding is reserved for cases where an actual transportation problem exists, and where a location decision hinges on an immediate commitment of road construction resources. For example, a new industrial park has commitments from new businesses to locate there and needs improved highway access. For more information on the IOF, call 503-986-3880. Public Transit Oregon’s STIP includes federally funded transit projects in urbanized and rural areas of Oregon. Programs include support to communities for general public transit (including fixed guideway passenger rail and bus rapid transit), transportation for seniors and people with disabilities, mass transit vehicle replacement, intercity bus service, planning, training and technical assistance, and travel options programs. Generally, only federally funded projects are programmed in the STIP.  

ODOT’s Public Transit Division ad- ministers state and federal grant programs that are used to pay for operating local trans- it districts, local government transit services, and private transit organizations that provide services to residents and visitors of the State of Oregon. ODOT coordinates federal funding distribu- tion to Oregon’s ten MPOs for public transportation planning and operations in

Page 21: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

17

urban areas. FTA administers and awards direct grants for designated urban transit providers in an MPO area.

To meet financial plan timelines set by FTA, ODOT shows the level of funding for the various non-urban public transportation programs in the Statewide section of the STIP. Individual grant awards are approved using the STIP amendment process. Details of grant awards to non-urban service providers can be obtained by contacting ODOT’s Public Transit Division. Grant awards to service providers in urban areas are generally listed in the STIP by MPO area.

Table 4 lists the various federal transit programs that are funded in the STIP.

For more information, contact ODOT Public Transit Division at 503-986-3300 or go online: https://www.oregon.gov/ODOT/PT/

Page 22: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

18  

Table 4 – Federal Transit Administration (FTA) Programs

Program Name Funding Source Purpose

Surface Transportation Program (STP)

FHWA Transfers to eligible FTA programs for capital purchases.

Mass Transit Vehicle Replacement FHWA Vehicle replacements for urban transit agencies.

Metropolitan and Statewide Transportation Planning

FTA - Section 5303 and 5304

Provides basis for making short and long range public transportation decisions.

Urbanized Area Formula FTA - Section 5307 and 5340

Supports public transportation capital, planning, job access and reverse commute projects, as well as operating expenses in certain circumstances for Urbanized Areas.

Bus and Bus Facilities Formula FTA - Section 5339 Capital purchases of transit vehicles and vehicle related facilities for small urban and rural transit providers.

Enhanced Mobility of Seniors and Individuals with Disabilities

FTA - Section 5310 Capital and operations support benefiting elderly and people with disabilities.

Rural Areas Formula FTA - Section 5311 Transit services in rural areas. This program includes intercity service and technical assistance.

Safety Authority FTA – Section 5329 Establish and enforce a new comprehensive framework to oversee the safety of public transportation throughout the United States as it pertains to heavy rail, light rail, buses, ferries, and streetcars.

State of Good Repair FTA – Section 5337 Dedicated to repairing and up- grading the nation’s rail transit systems along with high-intensity motor bus systems that use high-occupancy vehicle lanes, including bus rapid transit (BRT).

Asset Management FTA – Section 5326 Implement a strategic approach for assessing needs and prioritizing investments for bringing the nation’s public transit systems into a state of good repair.

Public Transportation Emergency Relief

FTA – Section 5324 Assistance to states and public transportation systems for protecting, repairing, and/or replacing equipment and facilities that may suffer or have suffered serious damage as a result of an emergency, including natural disasters.

Page 23: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

19  

Table 5: 2018-2021 STIP Allocations Table 5 summarizes the STIP Program Funding Allocations for the three years (2019-2021) of the 2018-2021 STIP program. This includes both the STIP program levels and the Off-the-Top Allocations.  

 

Overall STIP Funding Allocations by Program 2019 2020 2021 Total

Federal Funded Programs (Off the Top)MPO Planning 4,195,317$ 4,195,317$ 4,195,317$ 12,585,950$ State Planning and Research 25,505,602$ 25,505,602$ 25,505,602$ 76,516,806$ Workforce Development/On Job Training 1,050,000$ 1,050,000$ 1,050,000$ 3,150,000$ Congestion Mitigation and Air Quality Improvement 18,496,568$ 18,496,568$ 18,496,568$ 55,489,705$ Public Transit (OTN & Innov) 12,500,000$ 12,500,000$ 12,500,000$ 37,500,000$ Mass Transit 2,000,000$ 2,000,000$ 2,000,000$ 6,000,000$ Recreational Trails (to State Parks) 1,463,092$ 1,463,092$ 1,463,092$ 4,389,277$ Transportation Growth Management (TDD) 4,275,000$ 4,275,000$ 4,275,000$ 12,825,000$ Safe Routes to School Education 500,000$ 500,000$ 500,000$ 1,500,000$ Surface Transportation Program to large MPO's 37,005,718$ 37,005,718$ 37,005,718$ 111,017,154$ Transportation Alternatives Program to large MPO's 1,829,626$ 1,829,626$ 1,829,626$ 5,488,877$ Active Transportation Discretionary 1,400,000$ 1,400,000$ 1,400,000$ 4,200,000$ Local Bridge 28,205,022$ 28,205,022$ 28,205,022$ 84,615,066$ STP Allocation to Cities, MPOs & Counties 29,308,484$ 29,308,484$ 29,308,484$ 87,925,451$ Local Tech Assistance Program (LTAP) 350,000$ 350,000$ 350,000$ 1,050,000$ TOC/IR Labor 6,500,000$ 6,500,000$ 6,500,000$ 19,500,000$ 511 System Operations 200,000$ 200,000$ 200,000$ 600,000$ ICAP Highway & Planning 28,000,000$ 28,000,000$ 28,000,000$ 84,000,000$ Transportation Options - Individualized Marketing 500,000$ 500,000$ 500,000$ 1,500,000$

Total Federal Off the Top 203,284,429$ 203,284,429$ 203,284,429$ 609,853,286$

State Funded Programs (Off the Top)Immediate Opportunity Fund 3,500,000$ 3,500,000$ 3,500,000$ 10,500,000$ Rail-Highway Crossings - State 700,000$ 700,000$ 700,000$ 2,100,000$ State Match Funds for Fed Off Top Funds 7,484,920$ 7,484,920$ 7,484,920$ 22,454,761$

Total State Off the Top 11,684,920$ 11,684,920$ 11,684,920$ 35,054,761$

Grand Total Off the Top 214,969,349$ 214,969,349$ 214,969,349$ 644,908,047$

State Highway System Leverage Funds 16,666,667$ 16,666,667$ 16,666,667$ 50,000,000$ Enhance Non-Highway 11,666,667$ 11,666,667$ 11,666,667$ 35,000,000$ Strategic Investments 8,333,333$ 8,333,333$ 8,333,333$ 25,000,000$ National Highway Freight Program 16,333,333$ 16,333,333$ 16,333,333$ 49,000,000$ Active Transportation Leverage Opportunities 2,000,000$ 2,000,000$ 2,000,000$ 6,000,000$ Seismic Resilience 11,666,667$ 11,666,667$ 11,666,667$ 35,000,000$ Bus Replacements 5,000,000$ 5,000,000$ 5,000,000$ 15,000,000$ ADA Curb Ramps 2,000,000$ 2,000,000$ 2,000,000$ 6,000,000$

Grand Total Non-Fix-It 73,666,667$ 73,666,667$ 73,666,667$ 221,000,000$

Federal Fix-It Totals 265,951,695$ 265,901,695$ 265,901,695$ 797,755,085$

State Funded Fix-It Totals 20,547,823$ 20,547,823$ 20,547,823$ 61,643,468$

Grand Total Fix-It 286,499,518$ 286,449,518$ 286,449,518$ 814,857,085$

OFF THE TOP

NON-FIX-IT

FIX-IT

Page 24: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

20  

FEDERAL DISCRETIONARY FUNDING

Federal discretionary funding is a process for securing federal funding for specific state and local projects. The term earmark means that money is written into the federal budget for one and only one purpose. Earmarks often involve large modernization projects, but Oregon and other states have secured earmarks for bridge and public transit projects as well. Earmarks usually do not cover all of a project’s cost, and will require matching funds along with additional funds to fully fund the project. ODOT coordinates with the Oregon Congressional Delegation on a set of earmark priorities for which the state will pledge its resources as matching funds, to be submitted for consideration during the federal budget process. PUBLIC INVOLVEMENT AND GOVERNMENT INVOLVEMENT ODOT is committed to providing opportunity for broad stakeholder participation and feedback. Federal and state regulations, policy and procedures establish standards for public involvement throughout STIP development. The federal regulations stipulate that public involvement must be proactive, must provide opportunities for early and ongoing involvement, and must continue throughout the transportation planning and programming process. The state must comply with the requirements set out in Title VI of the federal Civil Rights Act4, and the Executive Order5 pertaining to Environmental Justice. The state must provide:

                                                            4 Code of Federal Regulations. 49 CFR 21. November 2016. http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title49/49cfr21_main_02.tpl 5 Executive Order 12898. February 1994. https://www.archives.gov/files/federal-register/executive-orders/pdf/12898.pdf 

A process for demonstrating explicit consideration and response to public input during the planning and program development process; and

A process for seeking out and considering the needs of those traditionally underserved by existing transportation systems, such as low-income and minority households, which may face challenges accessing employment and other amenities.

The ODOT Public Involvement Policy6 establishes the policy and core implementation actions to assist in meeting state and federal public participation requirements for STIP development: The Department will provide a 45-day

public review period for the draft STIP, and a 45-day public review period for a major revision of the approved STIP;

The Department will provide statewide opportunities for public comment on the draft STIP by scheduling at least two public meetings in each of ODOT’s five regions prior to adoption of the program by the OTC; and

The Department will consider all public comments on the draft STIP prior to adoption of the program by the OTC.

 

Public review comments are also welcome at any time through the ODOT website: https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP Local Governments Federal rules for planning include several specific requirements. ODOT meets many of these requirements through the ACT process, as well as, other advisory committees described below. Federal agencies, tribal governments, and local officials, including MPO representatives, are members of the ACT in their area.

                                                            6 Oregon Transportation Commission. 2008 Public Involvement Policy. May 2009. https://www.oregon.gov/ODOT/COMM/docs/otcpolicy11_pip.pdf. 

Page 25: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

21  

Federal requirements for Metropolitan and Statewide Planning (23 CFR 450.200 – 23 CFR 450.300) state that:  

1. MPOs shall be involved on a cooperation basis for parts of the STIP affecting metropolitan planning areas;

2. Indian Tribal Governments and the Secretary of the Interior shall be involved on a consultation basis for portions of the STIP affecting areas of the state under the jurisdiction of an In- dian Tribal Government;

3. Federal lands managing agencies shall be involved on a consultation basis for the portions of the program affecting areas of the state under their jurisdiction; and

4. Affected local officials with responsibility for transportation shall be involved on a consultation basis for the portion of the STIP in non-metropolitan areas of the state.

 

Area Commissions on Transportation An Area Commission on Transportation (ACT) is an OTC-approved body composed of local transportation representatives, local elected officials, business people, and in some locales, members of the public, all representing the area. Each ACT develops its own charter and rules in accordance with ODOT’s Policy on Formation and Operation of ACTs, which specifies expectations, minimum membership, and public notice procedures for meetings, as ACT meetings are subject to public meeting requirements. ACTs provide a critical communication link between ODOT and local governments, the business community, and the public. ACTs propose and comment on policy set by the OTC, propose and endorse programs and projects, and provide an avenue to the OTC for citizens with transportation concerns. Information about Oregon’s ACTs can be found on ODOT’s website at: http://www.oregon.gov/ODOT/COMM/pages/act_main.aspx. (See also Figure 1.)

 

Outreach to the Public Outreach activities include focused discussions with transportation stakeholders, community groups and civic clubs, city and county public works officials and staff, and councils of governments (COGs). These are part of each ODOT region’s public involvement activities. These meetings provide the public with opportunities to learn about and comment on ODOT’s programs, goals, and challenges. Ongoing feedback from this interaction provides ODOT management with important guidance as the STIP is developed. As ODOT strives to meet the transportation needs of the state with limited resources, these improved communication processes are critical for identifying issues and needs, prioritizing solutions, and implementing programs and projects.  

Regional Solutions Team and Regional Partnerships The Regional Solutions Team (RST) was established to focus state agencies on working together at the local level to increase economic opportunity and help local governments and business and property owners bring industrial sites to “shovel-ready” status. The RST emphasizes multi-agency coordination on projects of local and statewide significance. The RST has regional coordinators deployed around the state to help Oregon communities and businesses succeed. The RST plays a role in the development of transportation plans and projects related to economic development initiatives, including state system improvements and MTIP projects that are funded through the STIP. Frequently, RST members also are members of an ACT.  

Oregon Freight Advisory Committee In 2001, the Oregon Legislature formalized the Oregon Freight Advisory Committee (OFAC) through the passage of House Bill

Page 26: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

22  

3364 (now ORS 366.212). OFAC is an appointed body to advise the ODOT Director and the OTC on issues, policies and programs that impact multimodal freight mobility in Oregon. This includes identifying high-priority freight mobility projects for consideration in the STIP.

During 2018-2021 STIP development, OFAC provided guidance to the STIP Stakeholder Committee in developing the cross-modal criteria and modal attributes for the Enhance process. Further information about the Oregon Freight Advisory Committee is available at: http://www.oregon.gov/ODOT/TD/TP/pages/ofac.aspx . Oregon Bicycle and Pedestrian Advisory Committee The Oregon Bicycle Advisory Committee (OBAC) was formed by ORS 366.112, a bill passed in 1973 by the legislature. In 1995, the OTC officially recognized the OBAC's role in pedestrian issues; the committee became the Oregon Bicycle and Pedestrian Advisory Committee (OBPAC). OBPAC is an eight-member committee, appointed by the governor. It acts as a liaison between the public and ODOT and advises ODOT in the regulation of bicycle and pedestrian traffic and the establishment of bikeways and walkways. For the 2018-2021 STIP, the OBPAC provided guidance to the STIP Stakeholder Committee in developing the cross-modal criteria and modal attributes for the Enhance process.  

Further information about OBPAC is available here: http://www.oregon.gov/ODOT/HWY/BIKEPED/pages/obpac.aspx. Public Transit Advisory Committee The Public Transit Advisory Committee (PTAC) was established by the OTC in 2000. PTAC provides input regarding significant transportation issues to the OTC and ODOT

Rail and Public transit Division; including policy and program level recommendations. PTAC consists of 21 rotating members, filled by transportation provider organizations and affiliate groups. For the 2018-2021 STIP, PTAC provided guidance to the STIP Stakeholder Committee in developing the cross-modal criteria and modal attributes for the Enhance process.

For further information on the PTAC, see: https://www.oregon.gov/ODOT/PT/Pages/stakeholders/ptac.aspx. STIP Stakeholder Committee The STIP Stakeholder Committee was established in 2001 by the OTC to advise policies and procedures related to the development of the STIP. The 2018-2021 STIP Stakeholder Committee convened in 2014 and represented diverse transportation interests including freight, private business, public transit, local governments, and state agencies. The STIP Stakeholder Committee provides recommendations for improving STIP development and selection of key transportation system investments. In particular, the 2018-2021 STIP Stakeholder Committee defined cross-modal criteria and modal attributes for the Enhance proposal process. For further information on the STIP Stakeholder Committee, see: https://www.oregon.gov/ODOT/TD/STIP/Pages/STIP_SC.aspx.

Page 27: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

DRAFT 2018-2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM  

23  

Page 28: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO

109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW

159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

BAKER Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00

Fund2 ZS30 $300,000.00Match

BAKER Name: I-84: N HUNTINGTON INTERCHANGE BRIDGE Key: 20536Description: Deck overlay, repair expansion joints. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Page 1 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 29: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

345.81 to 345.85 0.04 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $146,850.00 $832,150.00 $979,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $146,850.00 832,150.00 $979,000.00

Fund1 Z001 $135,425.00 Z001 $767,409.00Match $11,425.00 $64,741.00

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: MARYS RIVER-CRYSTAL LAKE MULTIUSE PATH (CORVALLIS) Key: 18753Description: DESIGN AND CONSTRUCT A SHARED USE PATH Region: 2MPO: Corvallis Area MPO Work Type: BIKPED

Applicant: CITY OF CORVALLIS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $126,000.00 $201,000.00 $464,700.00 $791,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $126,000.00 $201,000.00 464,700.00 $791,700.00

Fund1 M30E $113,060.00 M300 $180,357.00 M30

0 $416,975.00

Match $12,940.00 $20,643.00 $47,725.00

Location(s)

Mileposts Length Route Highway ACT County(s)

8.53 to 10.25 1.72 US-20 ALBANY/CORVALLIS CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS TO ALBANY TRAIL: SCENIC DR. - SPRINGHILL Key: 18850Description: COMPLETE NEPA AND ROW PURCHASE, CONSTRUCT OFF-HIGHWAY MULTIUSE PATH Region: 2MPO: Albany Area MPO Work Type: BIKPED Applicant: BENTON COUNTY Status: Construction Scheduled to Begin

Page 2 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 30: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $326,428.00 $225,702.00 $2,166,000.00 $2,718,130.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $326,428.00 $225,702.00 2,166,001.00 $2,718,131.00

Fund1 Z302 $292,904.00 M240 $202,522.00 M240 $1,789,024.00

Match $33,524.00 $23,180.00 $204,762.00

Fund2 OTH0

Match $172,215.00

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS TRANSIT - PREVENTIVE MAINTENANCE 2018 Key: 19308Description: SECTION 5307 TRANSIT OPERATIONS Region: 2MPO: Corvallis Area MPO Work Type: TR-CAP

Applicant: CITY OF CORVALLIS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,583.00 $295,583.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $295,583.00 $295,583.00

Fund1 FF91 $236,466.00

Match $59,117.00

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS TRANSIT - ANNUAL OPERATION 2018 Key: 19322Description: SECTION 5307 TRANSIT OPERATIONS Region: 2MPO: Corvallis Area MPO Work Type: TR-CAP Applicant: CITY OF CORVALLIS Status: Non-Construction Project

Page 3 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 31: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,901,750.00 $2,901,750.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,901,750.00 $2,901,750.00

Fund1 FF90 $1,450,875.00

Match $1,450,875.00

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS TRANSIT - ADA COMPLIANCE 2018 Key: 19325Description: CORVALLIS TRANSIT SYSTEM FOR COMPLIANCE OF ADA REQUIREMENTS Region: 2MPO: Corvallis Area MPO Work Type: TR-CAP Applicant: CITY OF CORVALLIS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $36,453.00 $36,453.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $36,453.00 $36,453.00

Fund1 FF91 $29,162.00Match $7,291.00

Page 4 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 32: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: WALNUT BLVD: HIGHLAND-JACK LONDON (CORVALLIS) Key: 19369Description: Grind existing surfacing and inlay the travel lanes. (Overlay, grind and inlay) Region: 2MPO: Corvallis Area MPO Work Type: PRESRV Applicant: CITY OF CORVALLIS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $531,400.00 $531,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 531,347.00 $531,347.00

Fund1 M231 $476,772.00

Match $54,575.00

Page 5 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 33: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: HARRISON BLVD: KINGS BLVD-29TH ST (CORVALLIS) Key: 19370Description: Grind existing surfacing and inlay the travel lanes. (Overlay, grind and inlay) Region: 2MPO: Corvallis Area MPO Work Type: PRESRV Applicant: CITY OF CORVALLIS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $170,200.00 $170,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 170,183.00 $170,183.00

Fund1 M231 $152,703.00

Match $17,480.00

Page 6 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 34: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT POLKMID-WILLAMETTE VALLEY ACT YAMHILL

CASCADES WEST ACT BENTON

BENTON Name: REGION 2 (CENTRAL) LOCAL RD ROADWAY DEPARTURE Key: 19796Description: Install roadway departure countermeasures throughout Areas 3 and 4 Region: 2MPO: Albany Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $218,365.00 $318,365.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 218,365.00 $318,365.00

Fund1 MS30 $100,000.00 MS3

0 $218,365.00

Match

Page 7 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 35: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

83.30 to 84.00 0.70 OR-99W PACIFIC HWY WEST CASCADES WEST ACT BENTON

BENTON Name: OR99W: CORVALLIS STORMWATER SYSTEM Key: 20071Description: The stormwater system in collapses/plugs often during the winter. Replace with new drainage conforming to

current standards which will require prescribed access points. Region: 2

MPO: Corvallis Area MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $150,000.00 $1,750,000.00 $2,300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $400,000.00 $150,000.00 1,750,000.00 $2,300,000.00

Fund1 Z240 $358,920.00 Z240 $134,595.00 Z240 $1,570,275.00

Match $41,080.00 $15,405.00 $179,725.00

Page 8 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 36: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.95 to 79.77 15.82 OR-99W PACIFIC HWY WEST CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, POLK

BENTON Name: OR99W: MONMOUTH-NE ELLIOT CIRCLE RD Key: 20124Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay + Localized ACPR (Asphalt/Concrete

Pavement Repair)) Region: 2

MPO: Corvallis Area MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $340,000.00 $8,774,487.00 $9,114,487.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $340,000.00 8,774,487.00 $9,114,487.00

Fund1 Z240 $305,082.00 Z240 $7,873,347.00

Match $34,918.00 $901,140.00

Page 9 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 37: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: 9TH ST @ SPRUCE ST INTERSECTION IMPRV (CORVALLIS) Key: 20173Description: Channelized Left Turn Lane with Raised Median on 9th at Spruce Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: CITY OF CORVALLIS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $38,300.00 $124,900.00 $163,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $38,300.00 124,900.00 $163,200.00

Fund1 MS30 $35,320.00 MS3

0 $115,183.00

Match $2,980.00 $9,717.00

Page 10 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 38: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINCOLN, POLK

BENTON Name: REGION 2 (SOUTH) CURVE WARNING UPGRADES Key: 20193Description: Install chevrons and updated curve warning signs at various locations throughout Area 4 Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,207.00 $1,497,193.00 $1,579,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $82,207.00 1,497,193.00 $1,579,400.00

Fund1 MS30 $75,811.00 MS3

0 $1,380,711.00

Match $6,396.00 $116,482.00

Page 11 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 39: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.21 to 2.92 0.71 US-20 ALBANY/CORVALLIS CASCADES WEST ACT BENTON81.19 to 84.96 3.77 OR-99W PACIFIC HIGHWAY WEST CASCADES WEST ACT BENTON

81.77 to 81.77 OR-99W PACIFIC HIGHWAY WEST CASCADES WEST ACT BENTON

BENTON Name: CITY OF CORVALLIS SIGNAL ENHANCEMENTS Key: 20197Description: Signal enhancements on various signals on US20 and OR99W Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $106,300.00 $1,076,600.00 $1,182,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $106,300.00 1,076,600.00 $1,182,900.00

Fund1 MS30 $98,030.00 MS3

0 $992,841.00

Match $8,270.00 $83,759.00

Page 12 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 40: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.95 to 3.95 US-20 ALBANY/CORVALLIS CASCADES WEST ACT BENTON

BENTON Name: US20 @ MERLOY AVE. MP 3.95 Key: 20207Description: Install left turn on major road approach Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: BENTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $531,300.00 $246,200.00 $27,400.00 $1,432,800.00 $2,237,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $531,300.00 $246,200.00 $27,400.00 1,432,800.00 $2,237,700.00

Fund1 MS30 $489,965.00 MS30 $227,046.00 MS3

0 $25,268.00 MS30 $1,321,328.00

Match $41,335.00 $19,154.00 $2,132.00 $111,472.00

Page 13 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 41: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CHAPEL DRIVE BIKEWAY IMPROVEMENT (PHILOMATH) Key: 20234Description: Add 6 foot bike lanes on both sides of road; add raised tabletop intersection at 19th Street and Chapel Drive

with planted medians with turn pockets; a designated pedestrian and school crossing with road striping and signs will be added at intersection

Region: 2

MPO: Non-MPO Work Type: BIKPED Applicant: BENTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $184,700.00 $131,300.00 $998,000.00 $1,314,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $184,700.00 $131,300.00 998,000.00 $1,314,000.00

Fund1 Z240 $165,731.00 Z240 $117,815.00 Z240 $895,505.00

Match $18,969.00 $13,485.00 $102,495.00

Page 14 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 42: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.40 to 3.95 0.55 US-20 ALBANY/CORVALLIS CASCADES WEST ACT BENTON

BENTON Name: US20: MP 3.95 CORVALLIS Key: 20243Description: Install Left Turn Lane at Merloy Avenue Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,700.00 $246,200.00 $27,400.00 $1,531,000.00 $1,949,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $144,700.00 $246,200.00 $27,400.00 1,531,000.00 $1,949,300.00

Fund1 Z240 $129,839.00 Z240 $220,915.00 Z240 $24,586.00 Z240 $1,373,766.00

Match $14,861.00 $25,285.00 $2,814.00 $157,234.00

Page 15 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 43: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.01 to 0.07 0.06 CASCADES WEST ACT BENTON

BENTON Name: HUBBARD ROAD: LONG TOM RIVER BRIDGE Key: 20307Description: Replace existing structure with a pre-stressed concrete girder bridge on same alignment. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: BENTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $754,000.00 $387,800.00 $4,300.00 $4,973,800.00 $6,119,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $754,000.00 $387,800.00 $4,300.00 4,973,800.00 $6,119,900.00

Fund1 Z233 $676,564.00 Z233 $347,973.00 Z233 $3,858.00 Z233 $4,462,991.00

Match $77,436.00 $39,827.00 $442.00 $510,809.00

Page 16 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 44: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

10.34 to 10.55 0.21 US-20 ALBANY/CORVALLIS CASCADES WEST ACT BENTON

BENTON Name: US20: WILLAMETTE R (ELLSWORTH ST) BRIDGE Key: 20428Description: Vertical clearance. Region: 2MPO: Albany Area MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $736,000.00 $5,097,300.00 $5,833,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $736,000.00 5,097,300.00 $5,833,300.00

Fund1 Z001 $660,413.00 Z001 $4,573,807.00

Match $75,587.00 $523,493.00

Page 17 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 45: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

BENTON Name: ALBANY AREA MPO PLANNING SFY20 Key: 20598Description: Albany area MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 18 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 46: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

BENTON Name: ALBANY AREA MPO PLANNING SFY21 Key: 20599Description: Albany area MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 19 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 47: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

BENTON Name: ALBANY AREA MPO PLANNING SFY22 Key: 20600Description: Albany area MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 20 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 48: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS AREA MPO PLANNING SFY20 Key: 20601Description: Corvallis area MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Corvallis Area MPO Work Type: PLANNG Applicant: CAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $190,026.00 $190,026.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $190,025.00 $190,025.00

Fund1 Z450 $128,744.00

Match $14,735.00Fund2 Z77D $41,766.00

Match $4,780.00

Page 21 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 49: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS AREA MPO PLANNING SFY21 Key: 20602Description: Corvallis area MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Corvallis Area MPO Work Type: PLANNG Applicant: CAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $190,026.00 $190,026.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $190,025.00 $190,025.00

Fund1 Z450 $128,744.00

Match $14,735.00Fund2 Z77D $41,766.00

Match $4,780.00

Page 22 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 50: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT BENTON

BENTON Name: CORVALLIS AREA MPO PLANNING SFY22 Key: 20603Description: Corvallis area MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Corvallis Area MPO Work Type: PLANNG Applicant: CAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $190,026.00 $190,026.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $190,025.00 $190,025.00

Fund1 Z450 $128,744.00

Match $14,735.00

Fund2 Z77D $41,766.00Match $4,780.00

Page 23 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 51: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: CLACKAMAS COUNTY REGIONAL FREIGHT ITS PROJECT Key: 18001Description: System enhancements to reduce freight delays in congested areas. Region: 1MPO: Portland Metro MPO Work Type: OP-ITS Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $347,199.00 $1,699,120.00 $204,879.00 $2,251,198.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2017 2018 2014

Total $347,199.00 1,699,120.00 $204,879.00 $2,251,198.00

Fund1 M230 $185,920.00 M23

0 $954,459.00 M230 $89,621.00

Match $21,279.00 $109,242.00 $10,258.00Fund2 L230 $125,622.00 L230 $570,161.00 L23E $51,098.00

Match $14,378.00 $65,258.00 $5,848.00

Fund3 L230 $43,119.00Match $4,935.00

Footnote: $2,020,000 Fed Urban STP

Page 24 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 52: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

17.52 to 17.58 0.06 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: US26: SE 282ND AVE (BORING RD) OXING Key: 18583Description: Increase the clearance on US26 under the SE 282nd Ave (Boring Rd) Structure (Bridge no. 09381) and perform

joint and deck work on the structure. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,095,000.00 $608,000.00 $4,648,000.00 $6,351,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $1,095,001.00 $608,000.00 4,648,000.00 $6,351,001.00

Fund1 M001 $982,544.00 M240 $545,558.00 M24

0 $4,170,650.00

Match $112,457.00 $62,442.00 $477,350.00

Page 25 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 53: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

12.60 to 12.65 0.05 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR99E RAILROAD TUNNEL ILLUMINATION AND ITS Key: 18759Description: Upgrade the illumination systems of the roadway and pedestrian tunnels that pass under the railroad. Install a

Variable Message Sign (VMS) south of the tunnel. Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $453,000.00 $1,487,000.00 $1,940,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $453,000.00 1,487,000.00 $1,940,000.00

Fund1 Z240 $406,477.00 M240 $1,334,285.00

Match $46,523.00 $152,715.00

Footnote: $1,940,000 Total R1 Ops funding

Page 26 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 54: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.93 to 7.94 0.01 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR212: N DEEP CREEK CULVERT Key: 18764Description: Replace Culvert. Region: 1MPO: Portland Metro MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 1,000,000.00 $1,000,000.00

Fund1 M240 $897,300.00

Match $102,700.00

Footnote: This project will be combined into K18772 OR212: SE Richey Rd - US26

Page 27 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 55: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

12.62 to 12.87 0.25 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS13.15 to 13.36 0.25 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

13.82 to 14.06 0.24 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR99E: ROCKFALL MITIGATION MP12.62 - MP14.06 Key: 18769Description: Inspect and repair mesh. Scale slope behind mesh removing loose rock and vegetation. Rock bolting as needed

and clear catchment area / roadside ditch Region: 1

MPO: Portland Metro MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $216,000.00 $1,673,000.00 $1,889,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $216,000.00 1,673,000.00 $1,889,000.00

Fund1 ACP0 $193,817.00 L24E $1,501,183.00Match $22,183.00 $171,817.00

Footnote: $1,889,000 Total R1 Operations funding

Page 28 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 56: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.85 to 8.87 2.02 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR212: SE RICHEY RD - US26 Key: 18772Description: Multi-lift paving of the highway in conjunction with targeted deeper pavement repairs within the project

limits. Missing or non-compliant ADA sidewalk ramps will be brought up to standard. Drainage and storm water treatment improvements may be required.

Region: 1

MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $269,000.00 $160,000.00 $2,237,000.00 $2,666,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $269,000.00 $160,000.00 2,237,000.00 $2,666,000.00

Fund1 L05E $241,374.00 M001 $143,568.00 M001 $2,007,260.00

Match $27,626.00 $16,432.00 $229,740.00

Footnote: $2,666,000 Total R1 Preservation funds.

Page 29 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 57: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.47 to 11.89 0.42 OR-211 WOODBURN/ESTACADA REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR211: OR213 - S ONA WAY (MOLALLA) Key: 18811Description: Construct a 6ft shoulder and sidewalk on the north side of OR211. Remove ditches. Install inlets and storm

pipe. Relocation of utilities and replace culvert and guardrail at Bear Creek. Region: 1

MPO: Non-MPO Work Type: BIKPED , ENHANC Applicant: CITY OF MOLALLA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $264,743.00 $139,204.00 $30,000.00 $1,678,616.00 $2,112,563.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $264,717.00 $139,204.00 $30,000.00 1,678,616.00 $2,112,537.00

Fund1 M2E1 $228,950.00 M240 $80,417.00 OTH

0M24

0 $1,365,940.00

Match $35,767.00 $9,204.00 $30,000.00 $156,338.00

Fund2 OTH0 OTH0

Match $49,583.00 $156,338.00

Footnote: $1,683,911 Fed Enhance funds

Page 30 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 58: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

24.60 to 25.50 0.90 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: US26: TEN EYCK RD/WOLF DR - VISTA LOOP (SANDY) Key: 18823Description: Construct sidewalks and widen pavement for bike lanes. Install street lighting and landscaping. Region: 1MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF SANDY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $273,687.00 $400,000.00 $1,573,702.00 $2,247,389.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $273,687.00 $400,000.00 1,573,702.00 $2,247,389.00

Fund1 M002 $245,579.00 M240 $341,573.00 M24

0 $1,343,835.00

Match $28,108.00 $39,095.00 $153,808.00

Fund2 OTH0 OTH0

Match $19,332.00 $76,059.00

Footnote: $1,919,119 Federal MTEP funds awarded.

Page 31 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 59: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: JENNINGS AVE: OR99E TO OATFIELD RD Key: 19276Description: Bike and pedestrian improvements along Jennings Ave from OR 99E (McLoughlin Blvd) to Oatfield Rd. The

improvements include constructing a curb tight sidewalk on the north side of the road and constructing bike lanes on both sides of the road.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $650,000.00 $450,000.00 $2,690,362.00 $3,790,362.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2018

Total $650,000.00 $450,000.00 2,690,362.00 $3,790,362.00

Fund1 M230 $496,844.00 M230 $285,611.00 L230 $1,295,425.00

Match $56,866.00 $32,689.00 $148,267.00

Fund2 L23E $86,401.00 L230 $118,174.00 M230 $1,118,637.00

Match $9,889.00 $13,526.00 $128,033.00

Footnote: $3,401,092 Federal Urban STP award

Page 32 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 60: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: SE 129TH AVENUE - BIKE LANE AND SIDEWALK PROJECT Key: 19280Description: Sidewalk and add bike lanes Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF HAPPY VALLEY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $895,000.00 $100,000.00 $2,806,000.00 $3,801,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $895,008.00 $100,000.00 2,806,000.00 $3,801,008.00

Fund1 M301 $435,613.00 M301 $89,730.00 M23

0 $1,738,727.00

Match $49,858.00 $10,270.00 $199,005.00

Fund2 M3E1 $364,647.00 M30

1 $474,104.00

Match $41,736.00 $54,263.00

Fund3 35B0 $2,830.00 OTH0

Match $324.00 $339,901.00

Footnote: $1,366,918 Federal TAP-Urban and $1,738,727 STP-Urban award

Page 33 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 61: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT 2018 Key: 19307Description: 5307 Funds for Preventative Maintenance, Associated Improvements and Bus Fleet Replacement FY18 Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: SMART Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $625,000.00 $625,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $625,000.00 $625,000.00

Fund1 FF91 $500,000.00

Match $125,000.00

Footnote: $500,000.00 Federal 5307 Funds

Page 34 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 62: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: 5307 FY18 ASSOCIATED TRANSIT IMPROVEMENTS (1%) Key: 19312Description: 1% Of Sec 5307 Appropriations For Transit Amenities Improvements Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: SMART Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,250.00 $6,250.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $6,250.00 $6,250.00

Fund1 FF91 $5,000.00

Match $1,250.00

Footnote: $5,000 Federal 5307 funds

Page 35 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 63: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: 5310 FY18 - SENIOR & DISABLED Key: 19316Description: Services & Facility Improvements for Elderly & Disabled Customers FY18 Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: SMART Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $45,693.00 $45,693.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $45,693.00 $45,693.00

Fund1 F160 $36,554.00

Match $9,139.00

Footnote: $41,000 Federal 5310 funds (89.73 match)

Page 36 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 64: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: 5339 FY18 - BUS AND BUS FACILITIES (CAPITAL) Key: 19321Description: Bus and Bus Facility Upgrades (FY18) Region: 1MPO: Portland Metro MPO Work Type: TRANST Applicant: SMART Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $87,500.00 $87,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $87,500.00 $87,500.00

Fund1 FF30 $70,000.00

Match $17,500.00

Footnote: $70,000 Federal 5339 award

Page 37 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 65: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH

CLACKAMAS Name: PORTLAND TO MILWAUKIE LIGHT RAIL (FY18) Key: 19350Description: This project extends light rail from PSU in downtown Portland to Milwaukie and north Clackamas County. It

includes a multi-modal bridge carrying light rail, streetcar, buses, bicycles and pedestrians. Region: 1

MPO: Portland Metro MPO Work Type: TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000,000.00 $200,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $200,000,000.00 $200,000,000.00

Fund1 FF31 $100,000,000.00

Match $100,000,000.00

Footnote: $100,000,000 Federal 5309 Funds

Page 38 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 66: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: SUNRISE SYSTEM: INDUSTRIAL AREA FREIGHT ACCESS Key: 19354Description: Funding for a new two-lane state highway to provide freight access to the Clackamas Industrial Area and a

multiuse path connecting to the I-205 multiuse path Region: 1

MPO: Portland Metro MPO Work Type: MODERN Applicant: CLACKAMAS COUNTY Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $9,213,195.00 $9,213,195.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $9,213,195.00 $9,213,195.00

Fund1 M230 $8,267,000.00

Match $946,195.00

Page 39 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 67: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.30 to 6.85 6.82 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR212: ROCK CREEK - RICHEY RD Key: 19355Description: Repave roadway and upgrade ADA to current standards Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $29,853.00 $4,376,306.00 $4,906,159.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018 2019

Total $937,631.00 $29,853.00 4,376,306.00 $5,343,790.00

Fund1 L050 $448,650.00 Z001 $26,787.00 Z001 $3,926,859.00

Match $51,350.00 $3,066.00 $449,447.00Fund2 Z001 $392,686.00

Match $44,945.00

Footnote: $5,343,790 Total R1 Preservation funds

Page 40 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 68: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.20 to 8.19 2.99 OR-212 CLACKAMAS REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR212: UPRR STRUCTURE - ROCK CREEK Key: 19356Description: Repave roadway (1R) and upgrade ADA to current standards. Three inch inlay between fog lines (six inches

beyond). Region: 1

MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $750,000.00 $69,656.00 $4,037,419.00 $4,857,075.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018 2019

Total $1,153,742.00 $69,656.00 4,037,419.00 $5,260,817.00

Fund1 L050 $672,975.00 Z001 $62,502.00 Z001 $3,622,776.00

Match $77,025.00 $7,154.00 $414,643.00Fund2 Z001 $362,278.00

Match $41,464.00

Footnote: $ 5,260,817 Total R1 Preservation funds

Page 41 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 69: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.49 to 3.02 0.53 OR-217 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON2.42 to 2.42 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR217/OR224: BRIDGE RAIL RETROFIT Key: 19918Description: Bridge rail retrofit bridges 16134, 16143, 09623 Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $325,000.00 $1,627,000.00 $1,952,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $325,001.00 1,627,000.00 $1,952,001.00

Fund1 Z240 $291,623.00 Z240 $1,459,907.00

Match $33,378.00 $167,093.00

Page 42 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 70: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

30.40 to 32.50 2.10 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: US26: WEBBER - E CHERRYVILLE Key: 20210

Description: Repave roadway, upgrade ADA to current standards, and upgrade guardrail/signs as needed. Region: 1

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $569,598.00 $3,797,314.00 $4,366,912.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $569,598.00 3,797,314.00 $4,366,912.00

Fund1 Z001 $511,100.00 Z001 $3,407,330.00

Match $58,498.00 $389,984.00

Page 43 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 71: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

42.54 to 44.10 1.56 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: US26: ZIGZAG - RHODODENDRON Key: 20211

Description: Repave roadway, upgrade ADA to current standards, and upgrade guardrail/signs as needed. Region: 1

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $215,019.00 $9,951.00 $1,433,459.00 $1,658,429.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $215,019.00 $9,951.00 1,433,459.00 $1,658,429.00

Fund1 Z001 $192,937.00 Z001 $8,929.00 Z001 $1,286,243.00

Match $22,082.00 $1,022.00 $147,216.00

Page 44 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 72: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

57.20 to 61.70 4.50 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR35: US26 - WHITE RIVER Key: 20213

Description: Design for roadway repaving, ADA upgrades, signs, and guardrail replacement as needed. Region: 1MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $421,980.00 $421,980.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $421,980.00 $421,980.00

Fund1 Z001 $378,643.00

Match $43,337.00

Page 45 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 73: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.10 to 1.30 0.20 REGION 1 ACT CLACKAMAS

CLACKAMAS Name: CANBY MARQUAM HWY: BEAR CREEK BRIDGE Key: 20316Description: Replace existing bridge with a new single-span pre-cast, pre-stressed concrete beam structure. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $523,900.00 $50,800.00 $5,600.00 $1,733,500.00 $2,313,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $523,900.00 $50,800.00 $5,600.00 1,733,500.00 $2,313,800.00

Fund1 Z001 $470,095.00 Z001 $45,583.00 Z001 $5,025.00 Z001 $1,555,470.00

Match $53,805.00 $5,217.00 $575.00 $178,030.00

Page 46 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 74: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

8.02 to 9.02 1.00 OR-43 OSWEGO HIGHWAY REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR43 MULTIMODAL TRANSPORTATION PROJECT Key: 20329

Description: Construct a new cycle track and sidewalk along OR-43 from Arbor Dr to Hidden Springs Rd and construct about 7,500 sq ft. of new road extending Hidden Springs Rd to Old River Rd.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF WEST LINN Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $841,248.00 $439,779.00 $4,837,175.00 $6,118,202.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $841,248.00 $439,778.00 4,837,175.00 $6,118,201.00

Fund1 Z240 $722,362.00 Z240 $377,638.00 OTH0

Match $82,678.00 $43,222.00 $4,837,175.00

Fund2 OTH0 OTH0

Match $36,208.00 $18,918.00

Footnote: $1,100,000 Federal MTEP Award

Page 47 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 75: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: SYSTEMIC SIGNALS AND ILLUMINATION (CLACKAMAS) Key: 20336Description: Safety projects at various locations. Work may include illumination, intersection work, bike and pedestrian

improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,600.00 $19,500.00 $2,900.00 $900,900.00 $1,098,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $175,600.00 $19,500.00 $2,900.00 900,900.00 $1,098,900.00

Fund1 ZS30 $161,938.00 ZS30 $17,983.00 ZS30 $2,674.00 ZS30 $830,810.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $13,662.00 $1,517.00 $226.00 $70,090.00

Footnote: $ 1,013,405 Federal ARTS award

Page 48 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 76: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.80 to 11.81 0.01 OR-211 WOODBURN/ESTACADA REGION 1 ACT CLACKAMAS15.71 to 15.73 0.02 OR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

CLACKAMAS Name: EAST SYSTEMIC SIGNALS AND ILLUMINATION (MOLALLA) Key: 20337Description: Install illumination, advance intersection warning signs with street names, transverse rumble strips on

approaches, and increase triangle sight distances at the intersections of OR-213 at Toliver and OR-211 at Ona Way.

Region: 1

MPO: Non-MPO Work Type: SAFETY Applicant: CITY OF MOLALLA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $43,700.00 $2,900.00 $82,100.00 $128,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $43,700.00 $2,900.00 82,100.00 $128,700.00

Fund1 ZS30 $40,300.00 ZS30 $2,674.00 ZS30 $75,713.00

Match

Fund2 OTH0

OTH0

OTH0

Match $3,400.00 $226.00 $6,387.00

Footnote: $ 118,687 Federal ARTS award

Page 49 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 77: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMASOR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

CLACKAMAS Name: EAST SYSTEMIC SIGNALS AND ILLUMINATION (ODOT) Key: 20339Description: Projects at locations in east jurisdictions of Portland. Work may include illumination, intersection work,

bike/pedestrian improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $549,400.00 $66,900.00 $2,559,700.00 $3,176,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $549,400.00 $66,900.00 2,559,700.00 $3,176,000.00

Fund1 ZS30 $549,400.00 ZS30 $66,900.00 ZS30 $2,559,700.00Match

Footnote: $ 3,176,000 Total ARTS funding

Page 50 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 78: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, HOOD RIVER, MULTNOMAH, WASHINGTON

CLACKAMAS Name: RUMBLE STRIPS (ODOT) Key: 20341Description: Install centerline rumble strips and install shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205, I-405,

OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224, HWY-173 (Timberline), OR-212, OR-281, and OR-282.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,600.00 $950,854.00 $1,101,454.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $150,600.00 950,854.00 $1,101,454.00

Fund1 ZS30 $150,600.00 ZS30 $950,854.00

Match

Footnote: $ 1,101,454 Total ARTS funding

Page 51 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 79: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

57.70 to 5.78 51.92 US-26 MT HOOD REGION 1 ACT CLACKAMAS

CLACKAMAS Name: US26: MIDDLE FORK SALMON RIVER CULVERT Key: 20362Description: Design and construction for rehabilitation or replacement of culvert. Region: 1MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $90,000.00 $210,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $90,000.00 210,000.00 $300,000.00

Fund1 Z240 $80,757.00 M240 $188,433.00

Match $9,243.00 $21,567.00

Footnote: $300,000 Total Culvert Funding

Page 52 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 80: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS

CLACKAMAS Name: RURAL INTERSECTION AND CURVE WARNING (CLACKAMAS) Key: 20398Description: Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at

various rural intersections, roadway departures and curves throughout Clackamas County. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $278,500.00 $2,900.00 $1,488,769.00 $1,770,169.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $278,500.00 $2,900.00 1,488,769.00 $1,770,169.00

Fund1 ZS30 $256,833.00 ZS30 $2,674.00 ZS30 $1,372,943.00

Match

Fund2 OTH0

OTH0

OTH0

Match $21,667.00 $226.00 $115,826.00

Footnote: $ 1,632,450 Federal ARTS award

Page 53 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 81: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

CLACKAMAS Name: RURAL INTERSECTION AND CURVE WARNING (ODOT) Key: 20400Description: Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at

various rural intersections, roadway departures and curves throughout Region 1. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $83,300.00 $551,585.00 $634,885.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $83,300.00 551,585.00 $634,885.00

Fund1 ZS30 $83,300.00 ZS30 $551,585.00

Match

Footnote: $ 634,885 Total ARTS allocation

Page 54 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 82: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

283.21 to 288.50 5.29 I-5 PACIFIC HIGHWAY REGION 1 ACT CLACKAMAS, WASHINGTON

CLACKAMAS Name: I-5: I-205 INTERCHANGE - WILLAMETTE RIVER Key: 20411Description: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $650,577.00 $6,505,774.00 $7,156,351.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $650,577.00 6,505,774.00 $7,156,351.00

Fund1 Z001 $599,962.00 Z001 $5,999,625.00

Match $50,615.00 $506,149.00

Footnote: $ 7,156,351 Total IM allocation

Page 55 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 83: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.40 to 2.50 0.10 OR-99E CLACKAMAS REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR224 AT LAKE/HARMONY Key: 20454Description: Replace overhead flasher with ground mounted advance flashers. Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $55,128.00 $53,950.00 $109,078.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2021

Total $55,128.00 53,950.00 $109,078.00

Fund1 Z240 $49,466.00 Z240 $48,409.00

Match $5,662.00 $5,541.00

Footnote: $ 109,078 Total Operations allocation

Page 56 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 84: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.13 to 11.27 0.14 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR99E: CLACKAMAS RIVER (MCLOUGHLIN) BRIDGE Key: 20472Description: Design shelf ready plans to paint structure. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 Z001 $224,325.00

Match $25,675.00

Page 57 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 85: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

8.70 to 8.90 0.20 I-205 EAST PORTLAND FREEWAY REGION 1 ACT CLACKAMAS11.20 to 11.40 0.20 OR-43 OSWEGO HIGHWAY REGION 1 ACT CLACKAMAS

CLACKAMAS Name: I-205 AT OR43 Key: 20475Description: Design for full illumination rebuild Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $143,044.00 $143,044.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $143,044.00 $143,044.00

Fund1 Z240 $128,353.00

Match $14,691.00

Footnote: $ 143,044 Total Operations allocation for design only.

Page 58 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 86: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH

CLACKAMAS Name: CLACKAMAS AND PORTLAND TRAFFIC SEPARATORS Key: 20476Description: Install traffic separators in various locations in Portland with associated striping, illumination, and

signal coordination work. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND, CLACKAMAS COUNTY, ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $302,100.00 $11,200.00 $583,200.00 $896,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $302,100.00 $11,200.00 583,200.00 $896,500.00

Fund1 ZS30 $286,726.00 ZS30 $11,200.00 ZS30 $557,013.00

Match

Fund2 OTH0

OTH0

Match $15,374.00 $26,187.00

Footnote: $ 854,939 Federal Safety funds, $2,902 Clackamas County share and $38,659 City of Portland share.

Page 59 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 87: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

15.70 to 15.72 0.02 OR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR213 AT MP 15.71 (TOLIVER RD) Key: 20478Description: Design roundabout at intersection of OR-213 and Toliver road. Region: 1MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $700,000.00 $700,000.00

Fund1 ZS30 $700,000.00

Match

Footnote: $ 700,000 Total Safety allocation

Page 60 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 88: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.60 to 5.60 OR-213 CASCADE NORTH REGION 1 ACT MULTNOMAH9.52 to 9.52 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

2.07 to 2.07 US-26 MT HOOD REGION 1 ACT MULTNOMAH7.38 to 7.38 US-26 MT HOOD REGION 1 ACT MULTNOMAH

CLACKAMAS Name: REGION 1 BIKE PED CROSSINGS Key: 20479Description: Bike and pedestrian improvements at select locations on 82nd Ave (OR-213), McLoughlin (OR-99E) and on

Powell (US-26). Includes RRFBs, medians, illumination, crosswalks, tree trimming/removal, ADA upgrades, and other safety improvements.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $281,600.00 $74,000.00 $793,400.00 $1,149,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $281,600.00 $74,000.00 793,400.00 $1,149,000.00

Fund1 ZS30 $281,600.00 ZS30 $74,000.00 ZS30 $793,400.00

Match

Footnote: $1,149,000 Total Safety allocation

Page 61 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 89: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

9.31 to 13.80 4.49 I-205 EAST PORTLAND FREEWAY REGION 1 ACT CLACKAMAS

CLACKAMAS Name: I-205: ABERNATHY BRIDGE - SE 82ND DR Key: 20508Description: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $532,112.00 $994.00 $5,136,294.00 $5,669,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $532,112.00 $994.00 5,136,294.00 $5,669,400.00

Fund1 Z001 $490,714.00 Z001 $917.00 Z001 $4,736,690.00

Match $41,398.00 $77.00 $399,604.00

Footnote: $ 5,669,400 Total allocation

Page 62 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 90: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.87 to 11.14 4.27 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

CLACKAMAS Name: OR99E: PARK AVE TO CLACKAMAS RIVER BRIDGE Key: 20520Description: Enhance pedestrian crossing at OR-99E at Hull. Other work includes grinding and striping of buffered bike

lanes north of Roethe Rd and filling sidewalk gaps along the corridor as feasible. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $750,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2020

Total $250,000.00 750,000.00 $1,000,000.00

Fund1 Z240 $224,325.00 Z240 $672,975.00

Match $25,675.00 $77,025.00

Footnote: $ 1,000,000 Total AT Leverage allocation

Page 63 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 91: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

CLACKAMAS Name: PORTLAND METRO PLANNING SFY20 Key: 20595Description: Portland Metro MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 64 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 92: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

CLACKAMAS Name: PORTLAND METRO PLANNING SFY21 Key: 20596Description: Portland Metro MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 65 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 93: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

CLACKAMAS Name: PORTLAND METRO PLANNING SFY22 Key: 20597Description: Portland Metro MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 66 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 94: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

34.80 to 34.70 0.10 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101 @ ASBURY CREEK Key: 18271Description: REPLACE FAILING CULVERT WITH NEW BRIDGE STRUCTURE Region: 2MPO: Non-MPO Work Type: BRIDGE , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $150,000.00 $150,000.00 $3,645,000.00 $4,445,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2013 2019 2019 2020

Total $500,000.00 $150,000.00 $150,000.00 3,645,001.00 $4,445,001.00

Fund1 L05E $448,650.00 M240 $134,595.00 Z240 $134,595.00 Z240 $3,270,659.00

Match $51,350.00 $15,405.00 $15,405.00 $374,342.00

Page 67 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 95: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 0.01 NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: 9TH ST: WATERFRONT BRIDGE REPLACEMENT Key: 18429Description: REPLACE BRIGE #21227 Region: 2MPO: Non-MPO Work Type: BRSF Applicant: CITY OF ASTORIA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $338,000.00 $56,000.00 $6,000.00 $1,235,000.00 $1,635,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $338,000.00 $56,000.00 $6,000.00 1,235,001.00 $1,635,001.00

Fund1 M2E3 $303,287.00 M233 $50,249.00 Z233 $5,384.00 M23

3 $1,108,166.00

Match $34,713.00 $5,751.00 $616.00 $126,835.00

Page 68 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 96: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.02 0.02 NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: 10TH ST: WATERFRONT BRIDGE REPLACEMENT Key: 18430Description: REPLACE BRIDGE #21228 Region: 2MPO: Non-MPO Work Type: BRSF Applicant: CITY OF ASTORIA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $369,000.00 $56,000.00 $6,000.00 $1,406,000.00 $1,837,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $369,000.00 $56,000.00 $6,000.00 1,406,000.00 $1,837,000.00

Fund1 M2E3 $331,104.00 M233 $50,249.00 Z233 $5,384.00 M23

3 $1,261,604.00

Match $37,896.00 $5,751.00 $616.00 $144,396.00

Page 69 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 97: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.78 to 3.04 1.26 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101:COLUMBIA R(ASTORIA-MEGLER) DECK TRUSS PAINT Key: 18597Description: PAINT DECK TRUSSES; BR #07949C; ODOT IS LEAD FOR JOINT PROJ W/ WSDOT; ODOT SHARE IS 50% Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $318,000.00 $24,000,000.00 $24,318,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2019

Total $318,000.00 24,000,000.00 $24,318,000.00

Fund1 M240 $142,671.00 OTH

0 $10,767,600.00

Match $16,329.00 $1,232,400.00

Fund2 OTH0 Z001 $10,767,600.00

Match $159,000.00 $1,232,400.00

Page 70 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 98: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.28 to 2.40 2.12 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: COLUMBIA R (ASTORIA-MEGLER) BR REPAIRS Key: 18601Description: BRIDGE REPAIRS; BR #07949B; ODOT IS LEAD FOR JOINT PROJ W/ WSDOT; ODOT SHARE IS 50% Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $270,000.00 $2,852,000.00 $3,122,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2018

Total $270,001.00 2,852,000.00 $3,122,001.00

Fund1 M001 $121,136.00 M24

0 $1,279,550.00

Match $13,865.00 $146,450.00

Fund2 OTH0

OTH0

Match $135,000.00 $1,426,000.00

Page 71 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 99: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.51 to 5.31 0.80 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: YOUNGS BAY (NEW YOUNGS BAY) BRIDGE REPAIR Key: 18602Description: CATHODIC PROTECTION; DECK OVERLAY; BR #08306 Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $173,000.00 $12,263,000.00 $12,436,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2018

Total $173,000.00 12,263,000.00 $12,436,000.00

Fund1 M030 $155,233.00 M00

1 $11,003,590.00

Match $17,767.00 $1,259,410.00

Page 72 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 100: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

22.48 to 25.26 2.78 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: DOOLEY BRIDGE - JCT US 26 Key: 18608Description: Re-pave this section of US101. The scope is to perform an inlay, with some localized leveling to improve the

ride. Region: 2

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $120,000.00 $2,280,000.00 $2,400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $120,000.00 2,280,000.00 $2,400,000.00

Fund1 M0E1 $107,676.00 M24

0 $2,045,844.00

Match $12,324.00 $234,156.00

Page 73 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 101: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.32 to 11.32 0.01 OR-53 NECANICUM NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: OR53 @ MP 11.32 DRAINAGE IMPROVEMENTS Key: 18645Description: REPLACE CULVERT Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $45,000.00 $15,000.00 $410,000.00 $470,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2018

Total $45,001.00 $15,001.00 410,000.00 $470,002.00

Fund1 M240 $40,379.00 M240 $13,460.00 M24

0 $367,893.00

Match $4,622.00 $1,541.00 $42,107.00

Page 74 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 102: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

21.32 to 21.61 0.29 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: AVE G - S HOLLADAY DR, SECTION (SEASIDE) Key: 18733Description: CONSTRUCT NEW CENTER TURN LANE ON US101 Region: 2MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $305,000.00 $26,000.00 $111,000.00 $3,207,600.00 $3,649,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $305,001.00 $26,000.00 $111,000.00 3,207,600.00 $3,649,601.00

Fund1 M240 $273,677.00 M240 $23,330.00 M24

0 $99,600.00 M240 $2,878,179.00

Match $31,324.00 $2,670.00 $11,400.00 $329,421.00

Page 75 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 103: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

13.48 to 13.76 0.28 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: SUNSET BEACH LN-CULLABY LAKE LN, J-TURN Key: 18734Description: CONSTRUCT J-TURN TO ALLOW U-TURNS ON US101 NORTH OF GEARHART Region: 2MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $76,000.00 $130,000.00 $6,000.00 $336,400.00 $548,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $76,000.00 $130,000.00 $6,000.00 336,400.00 $548,400.00

Fund1 M240 $68,195.00 M240 $116,649.00 M24

0 $5,384.00 M240 $301,852.00

Match $7,805.00 $13,351.00 $616.00 $34,548.00

Page 76 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 104: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.00 to 1.50 0.50 OR-202 NEHALEM NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: OR202: H.S. TO HANOVER, SIDEWALKS (ASTORIA) Key: 18735Description: NEW SIDEWALK AND BIKE LANE. PHASE 1 FROM H.S. TO HANOVER ST (0.4 MILES) Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF ASTORIA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $108,000.00 $11,000.00 $2,131,000.00 $2,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $250,000.00 $108,000.00 $11,000.00 2,131,000.00 $2,500,000.00

Fund1 M240 $224,325.00 M240 $96,908.00 M24

0 $9,870.00 M240 $1,912,146.00

Match $25,675.00 $11,092.00 $1,130.00 $218,854.00

Page 77 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 105: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT CLATSOPNORTH WEST OREGON ACT TILLAMOOK

CLATSOP Name: REGION 2 (NORTH) LOCAL RD ROADWAY DEPARTURE Key: 19751Description: Install roadway departure countermeasures throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $131,200.00 $231,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 131,200.00 $231,200.00

Fund1 MS30 $100,000.00 MS3

0 $131,200.00

Match

Page 78 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 106: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.60 to 6.60 OR-202 NEHALEM NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: OR202 @ MP 6.6 (BAKANEN SLIDE) Key: 20069Description: Highway constantly slides at this location. Frequent maintenance needed. This project will install a buttress at

the toe of the slide and improve the drainage in order to mitigate slide movement and stabilize the highway. Region: 2

MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $850,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $150,000.00 850,000.00 $1,000,000.00

Fund1 Z240 $134,595.00 Z240 $762,705.00

Match $15,405.00 $87,295.00

Page 79 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 107: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.70 to 4.86 0.16 US-101B WARRENTON-ASTORIA NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101B: LEWIS & CLARK RIVER BRIDGE Key: 20107Description: Design shelf ready plans for: deck replacement (including deck removal). Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $141,000.00 $141,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $141,000.00 $141,000.00

Fund1 Z001 $126,519.00

Match $14,481.00

Page 80 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 108: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

28.69 to 28.72 0.03 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: ECOLA CREEK BRIDGE Key: 20113Description: Design shelf ready plans to replace bridge due to deteriorated timber substructure. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $400,000.00 $400,000.00

Fund1 Z001 $358,920.00

Match $41,080.00

Page 81 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 109: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.61 to 4.63 0.02 OR-104 FORT STEVENS NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: OR104: SKIPANON RIVER BRIDGE Key: 20117Description: Design shelf ready plans for repairs and painting to preserve the steel elements. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $150,000.00 $150,000.00

Fund1 Z001 $134,595.00

Match $15,405.00

Page 82 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 110: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.31 to 6.83 1.52 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: YOUNGS BAY BRIDGE-NEPTUNE DR Key: 20125Description: Grind existing surfacing and inlay the travel lanes. (Inlay / Overlay) Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $212,500.00 $27,400.00 $2,266,980.00 $2,506,880.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $212,500.00 $27,400.00 2,266,980.00 $2,506,880.00

Fund1 Z240 $190,676.00 Z240 $24,586.00 Z240 $2,034,161.00

Match $21,824.00 $2,814.00 $232,819.00

Page 83 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 111: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

28.70 to 35.68 6.98 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101: ECOLA CREEK-ARCH CAPE TUNNE Key: 20128Description: Grind existing surfacing and inlay the travel lanes. (Multi-Lift paving) Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $394,900.00 $29,100.00 $6,349,921.00 $6,773,921.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $394,900.00 $29,100.00 6,349,921.00 $6,773,921.00

Fund1 Z240 $354,344.00 Z240 $26,111.00 Z240 $5,697,784.00

Match $40,556.00 $2,989.00 $652,137.00

Page 84 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 112: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

19.76 to 99.29 79.53 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT CLATSOP, COLUMBIA3.80 to 3.96 0.16 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: REGION 2 (NORTH) SIGNAL IMPROVEMENTS PART 2 Key: 20136Description: Scappoose, St Helens, Clatskanie, Rainier, Columbia, Astoria: Reflectorized signal backplates & Countdown ped

timers at all signals. Install intersection lighting at US30&33rd St in Astoria. Install coordination and communication in Scappoose and St Helen

Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $109,400.00 $33,900.00 $569,600.00 $712,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $109,400.00 $33,900.00 569,600.00 $712,900.00

Fund1 MS30 $100,889.00 MS3

0 $31,263.00 MS30 $525,285.00

Match $8,511.00 $2,637.00 $44,315.00

Page 85 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 113: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

98.39 to 98.39 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US30 @ 8TH ST. (ASTORIA) Key: 20177Description: Install Rectangular Rapid Flashing Beacon Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $109,400.00 $22,600.00 $59,500.00 $204,100.00 $395,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $109,400.00 $22,600.00 $59,500.00 204,100.00 $395,600.00

Fund1 MS30 $100,889.00 MS30 $20,842.00 MS3

0 $54,871.00 MS30 $188,221.00

Match $8,511.00 $1,758.00 $4,629.00 $15,879.00

Page 86 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 114: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH WEST OREGON ACT CLATSOP, COLUMBIA, TILLAMOOK, WASHINGTON

CLATSOP Name: REGION 2 (NORTH) CURVE WARNING UPGRADES Key: 20189Description: Install chevrons and updated curve warning signs throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $105,923.00 $1,625,677.00 $1,731,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $105,923.00 1,625,677.00 $1,731,600.00

Fund1 MS30 $97,682.00 MS3

0 $1,499,199.00

Match $8,241.00 $126,478.00

Page 87 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 115: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

9.48 to 9.48 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: US101 @ PERKINS LANE INTERSECTION IMPROVEMENTS Key: 20203Description: Install median U-turn treatment. Install left turn lane west leg (Fort Stevens Rd). Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $448,900.00 $98,500.00 $1,595,000.00 $2,142,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $448,900.00 $98,500.00 1,595,000.00 $2,142,400.00

Fund1 MS30 $413,976.00 MS30 $90,837.00 MS3

0 $1,470,909.00

Match $34,924.00 $7,663.00 $124,091.00

Page 88 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 116: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 167.51 US-101 OREGON COAST HIGHWAYCASCADES WEST ACT, MID-

WILLAMETTE VALLEY ACT, NORTH WEST OREGON ACT

CLATSOP, LINCOLN, TILLAMOOK

CLATSOP Name: US101: CURVE WARNING UPGRADES Key: 20222Description: Install chevrons and updated curve warning signs at various locations Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $71,995.00 $1,311,205.00 $1,383,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $71,995.00 1,311,205.00 $1,383,200.00

Fund1 MS30 $66,394.00 MS3

0 $1,209,193.00

Match $5,601.00 $102,012.00

Page 89 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 117: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.35 to 1.47 1.12 OR-202 NEHALEM MID-WILLAMETTE VALLEY ACT CLATSOP

CLATSOP Name: OR202: DRESDIN ST. TO 4TH. ST. (ASTORIA) Key: 20230Description: Sidewalk and designated bike lane construction along the north side of Hwy 202 from (1) Dresden St. to the

DMV driveway and from (2) Hanover St. to 4th St. Region: 2

MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF ASTORIA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $10,000.00 $1,362,000.00 $1,672,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020

Total $300,000.00 $10,000.00 1,362,000.00 $1,672,000.00

Fund1 Z240 $269,190.00 Z240 $8,973.00 Z240 $1,222,037.00

Match $30,810.00 $1,027.00 $139,868.00

Fund2 OTH0

Match $95.00

Page 90 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 118: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

10.80 to 10.83 0.03 NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: YOUNGS RIVER LOOP ROAD: KLASKANINE RIVER BRIDGE Key: 20305Description: Replace substructure with new steel piling trestle bents, deck wearing surface, approaches and approach rail. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: CLATSOP COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $209,900.00 $45,100.00 $1,539,900.00 $1,794,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $209,900.00 $45,100.00 1,539,900.00 $1,794,900.00

Fund1 Z233 $188,343.00 Z233 $40,468.00 Z233 $1,381,752.00

Match $21,557.00 $4,632.00 $158,148.00

Page 91 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 119: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

27.85 to 27.85 OR-26 SUNSET NORTH WEST OREGON ACT CLATSOP

CLATSOP Name: OR26: ROCK CREEK (MP 27.85) Key: 20416Description: Replace culvert Region: 2MPO: Non-MPO Work Type: CULVRT , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $20,000.00 $3,230,000.00 $3,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $350,000.00 $20,000.00 3,230,000.00 $3,600,000.00

Fund1 Z240 $314,055.00 Z240 $17,946.00 Z240 $2,898,279.00

Match $35,945.00 $2,054.00 $331,721.00

Page 92 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 120: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

25.70 to 27.12 1.42 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: US30: OLD PORTLAND ROAD TO MILLARD Key: 17702Description: INTERSECTION IMPROVEMENTS Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $581,000.00 $52,000.00 $4,905,000.00 $5,538,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2012 2017 2018

Total $581,000.00 $52,000.00 4,905,001.00 $5,538,001.00

Fund1 LS30 $535,798.00 LS30 $47,954.00 M240 $4,401,257.00

Match $45,202.00 $4,046.00 $503,744.00

Page 93 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 121: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: US30 @ WALNUT ST. PARK-N-RIDE (SCAPPOOSE) Key: 18739Description: PURCHASE LAND, DESIGN, AND BUILD PARK & RIDE Region: 2MPO: Non-MPO Work Type: TRANST Applicant: COLUMBIA COUNTY RIDER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $703,000.00 $780,800.00 $1,558,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $75,001.00 $703,000.00 780,800.00 $1,558,801.00

Fund1 M240 $67,298.00 M240 $630,802.00 M24

0 $700,612.00

Match $7,703.00 $72,198.00 $80,188.00

Page 94 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 122: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: GABLE RD: US30-COLUMBIA BLVD, SIDEWALK (ST HELENS) Key: 18740Description: ST. HELENS SIDEWALK/BIKE LANE IMPROVEMENTS. PHASE 1: GABLE RD, US30 TO COLUMBIA (0.7 MI) Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: COLUMBIA COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $486,000.00 $216,000.00 $2,434,101.00 $3,136,101.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $486,000.00 $216,000.00 2,433,858.00 $3,135,858.00

Fund1 M240 $436,088.00 M240 $193,817.00 M24

0 $2,184,119.00

Match $49,912.00 $22,183.00 $249,739.00

Page 95 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 123: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: A STREET RAIL SAFETY IMPROVEMENTS (RAINIER) Key: 19462Description: MAJOR RAIL AND CROSSING IMPROVEMENTS ON A STREET IN RAINIER Region: 2MPO: Non-MPO Work Type: RAIL Applicant: CITY OF RAINIER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $160,000.00 $6,621,330.00 $7,781,330.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $1,000,000.00 $160,000.00 6,621,330.00 $7,781,330.00

Fund1 OTH0 LS40 $100,000.00 CO13 $2,756,264.00

Match $401,000.00 $689,066.00Fund2 CO13 $240,000.00 OTH0 LS40 $1,601,000.00

Match $60,000.00 $60,000.00

Fund3 MS40 $299,000.00 OTH

0Match $1,575,000.00

Footnote: Genesee & Wyoming paying match on Connect Oregon grant

Page 96 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 124: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.63 to 45.63 US-26 SUNSET NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: US26 @ MENDENHALL CREEK MP 45.63 Key: 20092Description: Replace culvert with single span bridge with concrete deck and remove culvert Region: 2MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $345,000.00 $20,000.00 $3,240,000.00 $3,605,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $345,001.00 $20,000.00 3,240,000.00 $3,605,001.00

Fund1 Z240 $309,569.00 Z240 $17,946.00 Z240 $2,907,252.00

Match $35,432.00 $2,054.00 $332,748.00

Page 97 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 125: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

65.16 to 65.16 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: US30 @ GRAHAM CREEK MP 65.16 Key: 20094Description: Replace existing culvert with new box culvert Region: 2MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $170,000.00 $30,000.00 $1,475,000.00 $1,675,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $170,000.00 $30,000.00 1,475,001.00 $1,675,001.00

Fund1 Z240 $152,541.00 Z240 $26,919.00 Z240 $1,323,518.00

Match $17,459.00 $3,081.00 $151,483.00

Page 98 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 126: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

19.76 to 99.29 79.53 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT CLATSOP, COLUMBIA3.80 to 3.96 0.16 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT CLATSOP

COLUMBIA Name: REGION 2 (NORTH) SIGNAL IMPROVEMENTS PART 2 Key: 20136Description: Scappoose, St Helens, Clatskanie, Rainier, Columbia, Astoria: Reflectorized signal backplates & Countdown ped

timers at all signals. Install intersection lighting at US30&33rd St in Astoria. Install coordination and communication in Scappoose and St Helen

Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $109,400.00 $33,900.00 $569,600.00 $712,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $109,400.00 $33,900.00 569,600.00 $712,900.00

Fund1 MS30 $100,889.00 MS3

0 $31,263.00 MS30 $525,285.00

Match $8,511.00 $2,637.00 $44,315.00

Page 99 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 127: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT COLUMBIANORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: COLUMBIA COUNTY ROADWAY DEPARTURE TREATMENTS Key: 20164Description: Remove fixed objects, install chevrons and updated curve warning signs and install delineation on Apiary Rd

and Scapposse-Vernonia Hwy. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: COLUMBIA COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $109,400.00 $1,051,100.00 $1,160,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $109,400.00 1,051,100.00 $1,160,500.00

Fund1 MS30 $100,889.00 MS3

0 $969,324.00

Match $8,511.00 $81,776.00

Page 100 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 128: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH WEST OREGON ACT CLATSOP, COLUMBIA, TILLAMOOK, WASHINGTON

COLUMBIA Name: REGION 2 (NORTH) CURVE WARNING UPGRADES Key: 20189Description: Install chevrons and updated curve warning signs throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $105,923.00 $1,625,677.00 $1,731,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $105,923.00 1,625,677.00 $1,731,600.00

Fund1 MS30 $97,682.00 MS3

0 $1,499,199.00

Match $8,241.00 $126,478.00

Page 101 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 129: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.11 to 2.27 0.16 NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: SCAPPOOSE-VERNONIA RD: E. FORK NEHALEM RIV BRIDGE Key: 20315Description: Replace the current bridge with a modern single span pre-stressed concrete structure on the existing

alignment with improved setback from the active stream channel. Region: 2

MPO: Non-MPO Work Type: BRIDGE Applicant: COLUMBIA COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $352,000.00 $112,800.00 $2,757,800.00 $3,222,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $352,000.00 $112,800.00 2,757,800.00 $3,222,600.00

Fund1 Z001 $315,850.00 Z001 $101,215.00 Z001 $2,474,574.00

Match $36,150.00 $11,585.00 $283,226.00

Page 102 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 130: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

61.26 to 61.30 0.04 OR-47 NEHALEM NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: OR47: NEHALEM RIVER BRIDGE Key: 20423Description: Paint structure; remove pack rust; heat straighten portal; replace rivets and bolts. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $188,500.00 $33,900.00 $1,463,800.00 $1,686,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $188,500.00 $33,900.00 1,463,800.00 $1,686,200.00

Fund1 Z001 $169,141.00 Z001 $30,418.00 Z001 $1,313,468.00

Match $19,359.00 $3,482.00 $150,332.00

Page 103 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 131: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

61.20 to 61.22 0.02 US-30 LOWER COLUMBIA RIVER NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: US30: CLATSKANIE RIVER BRIDGE Key: 20424Description: Provide scour protection. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $198,025.00 $51,043.00 $250,932.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $198,025.00 $51,043.00 250,932.00 $500,000.00

Fund1 Z001 $177,688.00 Z001 $45,801.00 Z001 $225,161.00

Match $20,337.00 $5,242.00 $25,771.00

Page 104 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 132: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: RAINIER/LONGVIEW MPO PLANNING SFY20 Key: 20619Description: Rainier/Longview MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future

through the MPO process. Region: 2

MPO: Rainier/Longview Work Type: PLANNG Applicant: RAINIER/LONGVIEW MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,223.00 $2,223.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,222.00 $2,222.00

Fund1 Z450 $1,506.00

Match $172.00Fund2 Z77D $488.00

Match $56.00

Page 105 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 133: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: RAINIER/LONGVIEW MPO PLANNING SFY21 Key: 20620Description: Rainier/Longview MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future

through the MPO process. Region: 2

MPO: Rainier/Longview Work Type: PLANNG Applicant: RAINIER/LONGVIEW MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,223.00 $2,223.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,222.00 $2,222.00

Fund1 Z450 $1,506.00

Match $172.00Fund2 Z77D $488.00

Match $56.00

Page 106 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 134: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT COLUMBIA

COLUMBIA Name: RAINIER/LONGVIEW MPO PLANNING SFY22 Key: 20621Description: Rainier/Longview MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future

through the MPO process. Region: 2

MPO: Rainier/Longview Work Type: PLANNG Applicant: RAINIER/LONGVIEW MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,223.00 $2,223.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,222.00 $2,222.00

Fund1 Z450 $1,506.00

Match $172.00Fund2 Z77D $488.00

Match $56.00

Page 107 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 135: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.40 to 8.40 4.00 OR-542 POWERS SOUTH WEST OREGON ACT COOS

COOS Name: POWERS-AGNESS HWY: BURMA SLIDE SEC (MP4.4-8.4) Key: 13933Description: SLIDE STABILIZATION Region: 3MPO: Non-MPO Work Type: MODERN , OP-SLD Applicant: OTHER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,455,000.00 $500,000.00 $17,600,000.00 $19,555,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2014 2018

Total $1,505,000.00 $34,750.00 17,600,000.00 $19,139,750.00

Fund1 G200 $1,128,782.00 S010 $34,750.00 F150 $17,600,000.00

Match $107,968.00Fund2 F150 $199,197.00

Match $19,053.00

Fund3 M240 $44,865.00

Match $5,135.00

Page 108 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 136: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.87 to 1.87 OR-242 POWERS SOUTH WEST OREGON ACT COOS

COOS Name: OR542: RHODA CREEK CULVERT REPLACEMENT Key: 18260Description: Replace existing culvert with 17ft pipe. Region: 3MPO: Non-MPO Work Type: CULVRT , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $170,000.00 $1,575,000.00 $1,745,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2013 2019

Total $121,417.00 1,575,001.00 $1,696,418.00

Fund1 L25E $63,797.00 Z240 $1,413,248.00

Match $7,620.00 $161,753.00

Fund2 M2E2 $44,865.00

Match $5,135.00

Page 109 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 137: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

233.48 to 234.50 1.02 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: MCCULLOUGH BRIDGE(COOS BAY) PAINTING Key: 18914Description: BRIDGE PAINTING, BRIDGE 01823 Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $811,000.00 $30,000,000.00 $30,811,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $811,000.00 30,000,000.00 $30,811,000.00

Fund1 M001 $727,710.00 M00

1 $26,919,000.00

Match $83,290.00 $3,081,000.00

Page 110 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 138: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

239.35 to 240.10 0.01 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: BAY AREA SIDEWALKS/FLANAGAN RD SIGNAL Key: 19243Description: UPGRADE EXISTING SIDEWALK, REPLACE SIGNAL POLES AND HARDWARE AT FLANAGAN RD., UPGRADE

ILLUMINATION Region: 3

MPO: Non-MPO Work Type: BIKPED , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $84,100.00 $190,000.00 $5,000.00 $1,505,500.00 $1,784,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018 2018

Total $324,100.00 $190,000.00 $5,000.00 1,505,500.00 $2,024,600.00

Fund1 S080 $204,100.00 S080 $138,000.00 S080 $3,000.00 S080 $948,900.00

Match

Fund2 M240 $107,676.00 M240 $46,660.00 M24

0 $1,795.00 M240 $499,437.00

Match $12,324.00 $5,340.00 $205.00 $57,163.00

Page 111 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 139: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH WEST OREGON ACT COOS

COOS Name: REGION 3 FLAP MATCH BUCKET Key: 19593Description: FUNDING BUCKET FOR MATCH REQUIREMENTS ON FLAP PROJECT K13933 Region: 3MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $981,847.00 $981,847.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $981,847.00 $981,847.00

Fund1 S010 $981,847.00

Match

Page 112 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 140: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

210.00 to 243.90 33.90 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: CULVERT & FISH PASSAGE UPGRADES, PHASE 2 Key: 19739Description: REPLACE APPROXIMATELY 12 CULVERTS & REPAIR APPROXIMATELY 30 SMALL CULVERTS Region: 3MPO: Non-MPO Work Type: CULVRT , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000.00 $1,500,000.00 $1,510,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $10,000.00 1,500,000.00 $1,510,000.00

Fund1 M240 $8,973.00 M24

0 $1,345,950.00

Match $1,027.00 $154,050.00

Footnote: Region 3 Pilot Project. PE & RW Phase in KN19199-OR 38: Fish Passage, Culvert Repairs & Replacement

Page 113 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 141: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

259.58 to 259.72 0.14 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: COQUILLE RIVER (BULLARDS) BRIDGE Key: 19975Description: Bridge rail replacement for bridges #07020 Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $252,000.00 $1,357,000.00 $1,609,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $252,000.00 1,357,000.00 $1,609,000.00

Fund1 Z232 $226,120.00 M240 $1,217,636.00

Match $25,880.00 $139,364.00

Page 114 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 142: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

202.70 to 202.74 0.04 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT DOUGLAS223.17 to 223.25 0.08 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: TAHKENITCH CREEK & TENMILE CREEK BRIDGES Key: 20097Description: Design shelf ready plans for bridge rail on Tahkenitch Creek & Tenmile Creek Bridges and patch concrete

girders on Tahkenitch Creek Bridge. Region: 3

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $303,000.00 $303,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $303,000.00 $303,000.00

Fund1 Z001 $271,882.00

Match $31,118.00

Page 115 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 143: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

35.57 to 35.57 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT COOS

COOS Name: OR42: FRENCHIE CREEK CULVERT Key: 20132Description: Design work to prepare for replacement of a culvert on Hwy 42, MP 35.57 Region: 3MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $269,000.00 $269,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $269,000.00 $269,000.00

Fund1 M240 $241,374.00

Match $27,626.00

Page 116 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 144: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

12.04 to 12.04 OR-542 POWERS SOUTH WEST OREGON ACT COOS

COOS Name: OR542: LONG TOM CREEK CULVERT Key: 20134Description: Design and property acquisition in preparation to replace the culvert with a bridge. The project will also

address the large head cut at the culvert. Region: 3

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Land Purchase

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $247,000.00 $34,000.00 $281,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $247,000.00 $34,000.00 $281,000.00

Fund1 M240 $221,633.00 M240 $30,508.00

Match $25,367.00 $3,492.00

Page 117 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 145: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

9.68 to 15.20 5.52 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT COOS

COOS Name: OR42: CEDAR POINT RD - FINLEY LP (COQUILLE) Key: 20147Description: Grind out the existing pavement & replace with new asphalt. Replace ADA ramps. Reconstruct the roadway at

mile point 10.10 to improve drainage. Level the pavement at the bridge approaches between mile point 10.40 and 10.70 and upgrade culverts.

Region: 3

MPO: Non-MPO Work Type: OPERAT , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $611,000.00 $33,000.00 $1,000.00 $9,112,567.00 $9,757,567.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $611,000.00 $33,000.00 $1,000.00 9,112,567.00 $9,757,567.00

Fund1 M240 $548,250.00 M240 $29,611.00 M24

0 $897.00 M240 $8,176,706.00

Match $62,750.00 $3,389.00 $103.00 $935,861.00

Page 118 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 146: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.20 to 6.31 3.14 OR-241 COOS RIVER SOUTH WEST OREGON ACT COOS

COOS Name: OR241: COOS RIVER HWY CULVERTS Key: 20150Description: Replace culverts and tidegates. Region: 3MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $238,000.00 $176,000.00 $1,000.00 $2,106,000.00 $2,521,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $238,000.00 $176,000.00 $1,000.00 2,106,000.00 $2,521,000.00

Fund1 M240 $213,557.00 M240 $157,925.00 M24

0 $897.00 M240 $1,889,714.00

Match $24,443.00 $18,075.00 $103.00 $216,286.00

Page 119 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 147: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH WEST OREGON ACT COOS, CURRY

COOS Name: US101/OR38: HAZARD WARNING SIGN UPGRADES Key: 20153Description: Replace existing hazard warning system with LED-based variable message (VMS) system. Region: 3MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $2,372,227.00 $2,622,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $250,000.00 2,372,227.00 $2,622,227.00

Fund1 M240 $224,325.00 M24

0 $2,128,599.00

Match $25,675.00 $243,628.00

Page 120 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 148: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.70 to 1.90 0.20 OR-540 CAPE ARAGO SOUTH WEST OREGON ACT COOS

COOS Name: OR540: BORADWAY @ NEWMARK REALIGN (NORTH BEND) Key: 20219Description: Upgrade signal poles and hardware, convert the 4-Lane roadway to 3-lane roadway with center turn lane,

install bike lanes Region: 3

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $322,000.00 $554,000.00 $115,000.00 $1,366,000.00 $2,357,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2021

Total $322,000.00 $554,000.00 $115,000.00 1,366,000.00 $2,357,000.00

Fund1 MS30 $322,000.00 MS30 $554,000.00 MS3

0 $115,000.00 MS30 $1,366,000.00

Match

Page 121 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 149: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

238.92 to 238.97 0.05 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

COOS Name: US101: JOHNSON AVE. INTERSECTIONS (COOS BAY) Key: 20246Description: Improve signal phasing and coordination at the two US101/Johnson Ave intersections Region: 3MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $229,000.00 $84,000.00 $1,000.00 $881,000.00 $1,195,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $229,000.00 $84,000.00 $1,000.00 881,000.00 $1,195,000.00

Fund1 MS30 $229,000.00 MS30 $84,000.00 MS3

0 $1,000.00 MS30 $881,000.00

Match

Page 122 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 150: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 SOUTH WEST OREGON ACT COOS

COOS Name: RIVERSIDE DRIVE: FERRY CREEK BRIDGE Key: 20369Description: Replace current bridge with a new single span pre-stressed concrete structure that meets the current

standards on abutments behind existing abutments. Region: 3

MPO: Non-MPO Work Type: BRIDGE Applicant: CITY OF BANDON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $452,131.00 $11,257.00 $663,062.00 $1,897,826.00 $3,024,276.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2018 2020

Total $452,131.00 $11,257.00 $663,062.00 1,897,826.00 $3,024,276.00

Fund1 Z001 $405,697.00 Z001 $10,101.00 Z001 $594,966.00 Z001 $1,702,919.00

Match $46,434.00 $1,156.00 $68,096.00 $194,907.00

Page 123 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 151: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.87 to 1.87 OR-540 POWERS SOUTH WEST OREGON ACT COOS

COOS Name: OR542: RHODA CREEK CULVERT REPLACEMENT Key: 20407Description: Replace existing culvert Region: 3MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,575,000.00 $1,575,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,575,001.00 $1,575,001.00

Fund1 M240 $1,413,248.00

Match $161,753.00

Page 124 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 152: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.05 to 0.10 0.05 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT COOS

COOS Name: OR42: BRIDGE OVER US101 Key: 20467Description: Replace bridge on same general alignment. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $364,000.00 $1,000.00 $1,000.00 $2,800,000.00 $3,166,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $364,000.00 $1,000.00 $1,000.00 2,800,000.00 $3,166,000.00

Fund1 Z001 $326,617.00 Z001 $897.00 Z001 $897.00 Z001 $2,512,440.00

Match $37,383.00 $103.00 $103.00 $287,560.00

Page 125 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 153: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT CROOK

CROOK Name: 9TH ST EXTENSION: MAIN ST @ 10TH ST (PRINEVILLE) Key: 16333Description: TRAFFIC SIGNAL AND ADA RAMPS Region: 4MPO: Non-MPO Work Type: SPPROG

Applicant: CITY OF PRINEVILLE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $495,000.00 $53,000.00 $157,000.00 $705,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2010 2015 2018

Total $285,000.00 $53,000.00 157,000.00 $495,000.00

Fund1 LY60 $285,000.00 LY60 $53,000.00 LY60 $157,000.00

Match

Page 126 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 154: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

14.80 to 16.50 1.70 OR-126 OCHOCO HWY CENTRAL OREGON ACT CROOK

CROOK Name: FFO-OR126 @ TOM MCCALL ROAD(PRINEVILLE) Key: 18728Description: ROUNDABOUT Region: 4MPO: Non-MPO Work Type: BIKPED , MODERN , TR-CAP , TRANST Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $300,000.00 $90,000.00 $3,710,000.00 $4,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $400,000.00 $300,000.00 $90,000.00 3,710,000.00 $4,500,000.00

Fund1 M2E1 $358,920.00 M240 $269,190.00 M24

0 $80,757.00 M240 $1,940,142.00

Match $41,080.00 $30,810.00 $9,243.00 $222,058.00

Fund2 OTH0

Match $1,047,800.00

Fund3 S010 $500,000.00Match

Page 127 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 155: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.24 to 19.38 1.14 US-26 OCHOCO HWY CENTRAL OREGON ACT CROOK

CROOK Name: US26: MEADOW LAKES-KNOWLEDGE ST. ADA (PRINEVILLE) Key: 19254Description: CONSTRUCT ADA RAMP Region: 4MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $35,000.00 $20,000.00 $210,000.00 $315,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $50,000.00 $35,000.00 $20,000.00 210,000.00 $315,000.00

Fund1 S080 $50,000.00 S080 $35,000.00 S080 $20,000.00 S080 $210,000.00

Match

Page 128 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 156: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT CROOK, DESCHUTES

CROOK Name: ARTS DESCHUTES COUNTY PHASE 2 AND CROOK COUNTY Key: 20075Description: CURVE SIGNS, DELINEATORS, INTERSECTION SIGNS, ILLUMINATION AND CLEAR ZONE Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: CROOK COUNTY, DESCHUTES COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $191,360.00 $759,640.00 $951,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $191,360.00 759,640.00 $951,000.00

Fund1 MS30 $176,472.00 MS3

0 $700,540.00

Match

Fund2 OTH0

OTH0

Match $14,888.00 $59,100.00

Page 129 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 157: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.90 to 19.80 0.90 US-26 OCHOCO HWY CENTRAL OREGON ACT CROOK

CROOK Name: US26: HARWOOD AVE - COMBS FLAT RD (PRINEVILLE) Key: 20268Description: SIGN, SIGNAL, AND SIDEWALK/CROSSWALK IMPROVEMENTS Region: 4MPO: Non-MPO Work Type: BIKPED , OP-SSI , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $225,000.00 $35,000.00 $20,000.00 $1,168,200.00 $1,448,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020 2020 2021

Total $225,001.00 $35,001.00 $20,000.00 1,168,200.00 $1,448,202.00

Fund1 M240 $157,028.00 M240 $31,406.00 M24

0 $17,946.00 MS30 $425,000.00

Match $17,973.00 $3,595.00 $2,054.00

Fund2 MS30 $50,000.00 M24

0 $378,302.00

Match $43,298.00

Fund3 S080 $321,600.00Match

Page 130 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 158: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT CROOK

CROOK Name: PRINEVILLE RAILS TO TRAILS Key: 20269Description: BIKE AND PEDESTRIAN PATH ALONG OCHOCO ABANDONED RAIL LINE Region: 4MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF PRINEVILLE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $240,000.00 $390,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $150,000.00 240,000.00 $390,000.00

Fund1 M240 $134,595.00 M24

0 $214,405.00

Match $15,405.00 $24,540.00

Fund2 OTH0

Match $1,055.00

Page 131 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 159: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.60 to 1.61 0.01 CENTRAL OREGON ACT CROOK

CROOK Name: WEIGAND RD BR OVER IRRIGATION DITCH (POWELL BUTTE) Key: 20377Description: Replace existing bridge with a new bridge with approach guard rail. Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: CROOK COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $186,780.00 $57,810.00 $786,940.00 $1,031,530.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $186,780.00 $57,810.00 786,940.00 $1,031,530.00

Fund1 Z233 $167,598.00 Z233 $51,873.00 Z233 $706,121.00

Match $19,182.00 $5,937.00 $80,819.00

Page 132 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 160: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 CENTRAL OREGON ACT CROOK

CROOK Name: ELM STREET: OCHOCO CREEK BRIDGE Key: 20379Description: Replace bridge. Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: CITY OF PRINEVILLE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $445,135.00 $25,329.00 $1,882,116.00 $2,352,580.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $445,135.00 $25,329.00 1,882,116.00 $2,352,580.00

Fund1 Z001 $399,420.00 Z001 $22,728.00 Z001 $1,688,823.00

Match $45,715.00 $2,601.00 $193,293.00

Page 133 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 161: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

295.00 to 301.45 4.00 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

CURRY Name: US101: SIXES - PORT ORFORD PAVING Key: 18870Description: Overlay, rail replacement, bridge #00901C & 00928A. Upgrade ADA Ramps Region: 3MPO: Non-MPO Work Type: BRIDGE , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $3,121,000.00 $3,221,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $260,000.00 3,121,000.00 $3,381,000.00

Fund1 M001 $233,298.00 M00

1 $2,800,473.00

Match $26,702.00 $320,527.00

Page 134 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 162: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

50.00 to 50.00 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT DOUGLAS334.30 to 334.30 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

CURRY Name: OR42 MP 50/US101: ANDERSON ROCK Key: 20131Description: Design and property acquisition in preparation for the installation of rock fall screening and safety barrier. Region: 3MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Land Purchase

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $135,000.00 $2,000.00 $137,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $135,001.00 $2,000.00 $137,001.00

Fund1 M240 $121,136.00 M240 $1,795.00

Match $13,865.00 $205.00

Page 135 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 163: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH WEST OREGON ACT COOS, CURRY

CURRY Name: US101/OR38: HAZARD WARNING SIGN UPGRADES Key: 20153Description: Replace existing hazard warning system with LED-based variable message (VMS) system. Region: 3MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $2,372,227.00 $2,622,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $250,000.00 2,372,227.00 $2,622,227.00

Fund1 M240 $224,325.00 M24

0 $2,128,599.00

Match $25,675.00 $243,628.00

Page 136 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 164: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH WEST OREGON ACT CURRY

CURRY Name: CURRY COUNTY TRANSIT VEHICLE REPLACEMENT Key: 20172Description: Purchase replacement vehicles (2 Bus & 1 Van) Region: 3MPO: Non-MPO Work Type: TRANST Applicant: CURRY COUNTY Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $312,047.00 $312,047.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $312,047.00 $312,047.00

Fund1 M240 $280,000.00

Match $32,047.00

Page 137 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 165: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

355.86 to 356.30 0.44 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

CURRY Name: US101: PARKVIEW DR - EAST ST SIDEWALK (BROOKINGS) Key: 20261Description: Construct a 6' bike lane and 6' sidewalk along the east side of US101 Region: 3MPO: Non-MPO Work Type: MODERN , SAFETY Applicant: CITY OF BROOKINGS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $344,000.00 $184,000.00 $1,000.00 $1,267,000.00 $1,796,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $344,000.00 $184,000.00 $1,000.00 1,267,000.00 $1,796,000.00

Fund1 M240 $275,200.00 M240 $147,200.00 M24

0 $800.00 M240 $1,013,600.00

Match $68,800.00 $36,800.00 $200.00 $253,400.00

Page 138 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 166: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

8.90 to 9.10 0.20 SOUTH WEST OREGON ACT CURRY

CURRY Name: FLORAS CREEK ROAD BRIDGE Key: 20370Description: Replace current bridge with new single-span bridge on alignment to the south of the existing bridge. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: CURRY COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $467,049.00 $45,028.00 $1,877,651.00 $2,389,728.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $467,049.00 $45,028.00 1,877,651.00 $2,389,728.00

Fund1 Z001 $419,083.00 Z001 $40,404.00 Z001 $1,684,816.00

Match $47,966.00 $4,624.00 $192,835.00

Page 139 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 167: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

327.51 to 327.88 0.37 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

CURRY Name: US101: ROGUE RIVER (GOLD BEACH) BRIDGE Key: 20466Description: Repair, strengthen and overlay the deck. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $380,000.00 $3,210,000.00 $3,590,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $380,000.00 3,210,000.00 $3,590,000.00

Fund1 Z001 $340,974.00 Z001 $2,880,333.00

Match $39,026.00 $329,667.00

Page 140 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 168: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

299.96 to 300.05 0.09 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

CURRY Name: US101: GARRISON SLOUGH BRIDGE Key: 20468Description: Place cathodic protection (corrosion control). Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $238,000.00 $2,000,000.00 $2,238,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $238,000.00 2,000,000.00 $2,238,000.00

Fund1 Z001 $213,557.00 Z001 $1,794,600.00

Match $24,443.00 $205,400.00

Page 141 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 169: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

164.20 to 165.26 1.06 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US97 @ WICKIUP JCT. (LA PINE) Key: 09679Description: REALIGN US97 & CONST AN OXING @ WICKIUP JCT LAPINE. REALIGN BURGESS RD & CONNECT WITH US97 Region: 4MPO: Non-MPO Work Type: MODERN , SAFETY Applicant: ODOT Status: Under Construction

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,717,166.00 $1,800,000.00 $155,000.00 $17,000,000.00 $10,000.00 $20,682,166.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2006 2012 2015 2016 2018

Total $1,707,166.00 $800,000.00 $155,001.00 13,670,926.00 $10,000.00 $16,343,093.00

Fund1 LY60 $990,000.00 LS5E $800,000.00 L05E $130,109.00 ACP0 $6,502,049.00 S010 $10,000.00

Match $14,892.00 $744,189.00Fund2 LS5E $490,000.00 LS50 $9,000.00 LS5E $1,491,765.00

Match $1,000.00 $748,122.00

Fund3 S010 $150,666.00 MS40 $1,496,702.00

Match

Fund4 OTH0

M0E1 $1,172,013.00

Match $76,500.00 $134,142.00

Fund5 MS50 $528,050.00

Match

Fund6 LS5R $458,462.00

MatchFund7 LS50 $212,086.00

MatchFund8 LS4E $159,746.00

MatchFund9 H260 $21,176.00

Match $2,424.00

Location(s)

DESCHUTES Name: FFO-US97: SUNRIVER INTERCHANGE - OR31 Key: 18679Description: PAVEMENT PRESERVATION, UPGRADE SIGNS AND GUARDRAILS, RUMBLE STRIPS AND DURABLE STRIPING,

SIDEWALKS, UPGRADE CURB RAMPS TO ADA STANDARDS Region: 4

MPO: Non-MPO Work Type: BIKPED , PRESRV , SAFETY , TRANST

Applicant: ODOT Status: Construction Scheduled to Begin

Page 142 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 170: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Mileposts Length Route Highway ACT County(s)

153.70 to 169.80 16.10 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $700,000.00 $5,000.00 $9,415,756.00 $10,470,756.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2016 2017 2018

Total $409,999.00 $700,000.00 $5,000.00 9,415,756.00 $10,530,755.00

Fund1 L20E $244,107.00 Z001 $628,110.00 MS30 $5,000.00 M00

1 $6,845,502.00

Match $27,939.00 $71,890.00 $783,498.00

Fund2 MS30 $60,000.00 MS3

0 $771,000.00

MatchFund3 Q050 $49,914.00 Q240 $500,000.00

Match $5,713.00 $57,227.00

Fund4 H050 $20,033.00 M240 $384,519.00

Match $2,293.00 $44,010.00

Fund5 OTH0

Match $30,000.00

Page 143 of 994"Draft STIP_11.2016.27.v1" Projects

Draft Updated as of 11/28/2016

Page 171: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

88.00 to 100.00 12.00 US-20 SANTIAM CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US20: JACK LAKE RD - PINE ST (SISTERS) Key: 18681Description: 1R PAVEMENT INLAY (FULL WD), RUMBLE STRIPS, DURABLE MARKINGS & ENHANCED SIGNING Region: 4MPO: Non-MPO Work Type: PRESRV , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $5,000.00 $5,000.00 $2,934,000.00 $3,094,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $150,000.00 $5,000.00 $5,001.00 2,934,000.00 $3,094,001.00

Fund1 M2E2 $134,595.00 S010 $5,000.00 M00

1 $4,487.00 M001 $2,531,283.00

Match $15,405.00 $514.00 $289,717.00

Fund2 MS30 $113,000.00

Match

Page 144 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 172: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.00 to 12.44 7.44 US-20 CENTRAL OREGON CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US20: POWELL BUTTE HWY - HORSE RIDGE FRONTAGE RD Key: 18686Description: Grind out existing surfacing and inlay/overlay new asphalt. Add rails on Central Oregon Canal Bridge. Region: 4MPO: Non-MPO Work Type: BRIDGE , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $225,000.00 $35,000.00 $5,000.00 $3,343,270.00 $3,608,270.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018 2018

Total $225,001.00 $35,000.00 $5,000.00 3,343,270.00 $3,608,271.00

Fund1 M0E1 $201,893.00 S010 $35,000.00 M00

1 $4,487.00 M001 $2,989,804.00

Match $23,108.00 $513.00 $342,196.00Fund2 L240 $10,113.00

Match $1,157.00

Page 145 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 173: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: ALL ROADS TRANSPORTATION SAFETY (DESCHUTES COUNTY) Key: 19799Description: CURVE WARNING SIGNS, POST MOUNTED DELINEATION UPGRADES AND CENTERLINE RUMBLE STRIPS Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: DESCHUTES COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $191,000.00 $769,746.00 $960,746.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $191,000.00 769,746.00 $960,746.00

Fund1 MS30 $176,140.00 MS3

0 $709,860.00

Match

Fund2 OTH0

OTH0

Match $14,860.00 $59,886.00

Page 146 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 174: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: ALL ROADS TRANSPORTATION SAFETY (CITY OF BEND) Key: 19806Description: SIGN UPGRADES, ILLUMINATION, SIGNAL IMPROVEMENTS Region: 4MPO: Bend MPO Work Type: SAFETY Applicant: CITY OF BEND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $243,960.00 $964,040.00 $1,208,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $243,960.00 964,040.00 $1,208,000.00

Fund1 MS30 $224,980.00 MS3

0 $889,038.00

Match

Fund2 OTH0

OTH0

Match $18,980.00 $75,002.00

Page 147 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 175: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

15.10 to 18.20 3.10 US-20 MCKENZIE-BEND CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US20: DESCHUTES RIVER BRIDGE - ROBAL RD (BEND) Key: 20011Description: PAVEMENT PRESERVATION (GRIND OUT EXISTING SURFACE AND INLAY/OVERLAY NEW ASPHALT IN TRAVEL

LANES), LIGHTING, SIGNS, FLASHING BEACON AND RURAL MEDIAN ACCELERATION LANE AT OLD REDMOND-BEND HWY

Region: 4

MPO: Bend MPO Work Type: PRESRV , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $50,000.00 $50,000.00 $2,621,000.00 $3,071,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020 2020

Total $350,000.00 $50,000.00 $50,000.00 2,621,000.00 $3,071,000.00

Fund1 M240 $314,055.00 S010 $50,000.00 M24

0 $44,865.00 M240 $1,390,815.00

Match $35,945.00 $5,135.00 $159,185.00

Fund2 MS30 $1,071,000.00

Match

Page 148 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 176: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

132.67 to 141.12 8.45 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US97: BOWERY LANE - ROMAINE VILLAGE WAY Key: 20013Description: PAVEMENT PRESERVATION (GRIND OUT PAVEMENT AND INLAY NEW ASPHALT IN TRAVEL LANES) Region: 4MPO: Bend MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $50,000.00 $50,000.00 $4,000,000.00 $4,350,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020 2020

Total $250,000.00 $50,000.00 $50,000.00 4,000,000.00 $4,350,000.00

Fund1 M240 $224,325.00 S010 $50,000.00 M24

0 $44,865.00 M240 $3,589,200.00

Match $25,675.00 $5,135.00 $410,800.00

Page 149 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 177: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: ALL ROADS TRANSPORTATION SAFETY (BEND, PHASE 2) Key: 20073Description: SAFETY IMPROVEMENTS INCLUDING: CURVE & INTERSECTION SIGNS, DELINEATORS, ILLUMINATION AND

CLEAR ZONE Region: 4

MPO: Bend MPO Work Type: SAFETY Applicant: CITY OF BEND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $138,200.00 $562,800.00 $701,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $138,200.00 562,800.00 $701,000.00

Fund1 MS30 $117,533.00 MS3

0 $519,014.00

Match $9,915.00

Fund2 OTH0

OTH0

Match $10,752.00 $43,786.00

Page 150 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 178: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT CROOK, DESCHUTES

DESCHUTES Name: ARTS DESCHUTES COUNTY PHASE 2 AND CROOK COUNTY Key: 20075Description: CURVE SIGNS, DELINEATORS, INTERSECTION SIGNS, ILLUMINATION AND CLEAR ZONE Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: CROOK COUNTY, DESCHUTES COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $191,360.00 $759,640.00 $951,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $191,360.00 759,640.00 $951,000.00

Fund1 MS30 $176,472.00 MS3

0 $700,540.00

Match

Fund2 OTH0

OTH0

Match $14,888.00 $59,100.00

Page 151 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 179: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

67.14 to 124.00 56.86 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT, LOWER JOHN DAY ACT DESCHUTES, JEFFERSON, WASCO

0.00 to 68.60 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN, WASCO

DESCHUTES Name: US97 ROCKFALL Key: 20095Description: UNSTABLE SLOPES EVALUATION AND ROCKFALL REMEDIATION Region: 4MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $884,000.00 $300,000.00 $3,791,444.00 $4,975,444.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020 2021

Total $884,000.00 $300,000.00 3,791,444.00 $4,975,444.00

Fund1 M240 $793,213.00 S010 $300,000.00 M24

0 $3,402,063.00

Match $90,787.00 $389,381.00

Page 152 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 180: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.22 to 4.35 4.13 OR-126 OCHOCO HWY CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: OR126: REDMOND - POWELL BUTTE Key: 20167Description: DESIGN SHELF READY PLANS FOR PAVEMENT OVERLAY OF NEW ASPHALT Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $300,000.00 $300,000.00

Fund1 M240 $269,190.00

Match $30,810.00

Page 153 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 181: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

99.53 to 99.94 0.41 US-20 SANTIAM CENTRAL OREGON ACT DESCHUTES92.05 to 92.29 0.24 US-20 MCKENZIE CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US20: N PINE STREET - BARCLAY DRIVE (SISTERS) Key: 20264Description: MULTI-USE TRAIL Region: 4MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF SISTERS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $134,500.00 $134,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 134,500.00 $134,500.00

Fund1 M240 $120,687.00

Match $13,813.00

Footnote: Design completed under project Key 16239.

Page 154 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 182: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

124.40 to 133.39 8.99 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US97: REDMOND - BEND Key: 20357Description: SPEED FEEDBACK SIGNS, PAVEMENT MARKINGS, LIGHTING, SIGNING AND STRIPING ENHANCEMENTS Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $513,000.00 $100,000.00 $4,115,000.00 $4,728,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2019

Total $513,000.00 $100,000.00 4,115,000.00 $4,728,000.00

Fund1 LS30 $513,000.00 LS30 $100,000.00 MS30 $4,115,000.00

Match

Page 155 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 183: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.76 to 6.78 0.02 CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: SISEMORE RD: TUMALO IRR CANAL (COUCH LATERAL) BR Key: 20371Description: Remove and replace asphalt wearing surface and base materials, patch spalling, repair drain pipes and new

guardrails. Region: 4

MPO: Non-MPO Work Type: BRIDGE Applicant: DESCHUTES COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $422,760.00 $22,514.00 $990,005.00 $1,435,279.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $422,760.00 $22,514.00 990,005.00 $1,435,279.00

Fund1 Z233 $379,343.00 Z233 $20,202.00 Z233 $888,331.00

Match $43,417.00 $2,312.00 $101,674.00

Page 156 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 184: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.39 to 1.41 0.01 CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: ARCHIE BRIGGS RD (DESCHUTES RIVER) BRIDGES Key: 20378Description: Design shelf ready plans for replacement of bridge #s 17C05 & 17C040. Region: 4MPO: Bend MPO Work Type: BRIDGE Applicant: CITY OF BEND Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $809,340.00 $809,340.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $809,340.00 $809,340.00

Fund1 Z001 $726,221.00

Match $83,119.00

Page 157 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 185: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.80 to 20.99 2.19 US-20 MCKENZIE-BEND CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: US20: EMPIRE - GREENWOOD (3RD ST, BEND) Key: 20391Description: pavement preservation, ADA upgrades, sidewalks, bike lanes, pedestrian crossing, sign and signal upgrades Region: 4MPO: Bend MPO Work Type: OP-SSI , PRESRV , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,646,011.00 $2,057,000.00 $898,700.00 $8,130,028.00 $13,731,739.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2019 2020

Total $2,646,011.00 $2,057,000.00 $898,700.00 8,130,028.00 $13,731,739.00

Fund1 M240 $2,374,266.00 S010 $2,057,000.00 M24

0 $806,404.00 Z240 $5,739,605.00

Match $271,745.00 $92,296.00 $656,923.00Fund2 S080 $1,100,000.00

Match

Fund3 ZS30 $633,500.00Match

Page 158 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 186: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

138.08 to 139.98 1.90 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES85.16 to 85.81 0.65 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO

0.51 to 0.51 US-197 THE DALLES-CALIFORNIA HWY LOWER JOHN DAY ACT WASCO99.99 to 100.01 0.02 US-20 SANTIAM CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: REGION 4 ITS Key: 20551Description: VIDEO CAMERAS AND COMMUNICATION INFRASTRUCTURE, REPLACE ILLUMINATIONS WITH LED'S, VMS Region: 4MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $230,000.00 $10,000.00 $10,000.00 $1,074,000.00 $1,324,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $230,000.00 $10,000.00 $10,000.00 1,074,000.00 $1,324,000.00

Fund1 M240 $206,379.00 S010 $10,000.00 M24

0 $8,973.00 M240 $963,700.00

Match $23,621.00 $1,027.00 $110,300.00

Page 159 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 187: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: BEND MPO PLANNING SFY20 Key: 20613Description: Bend MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through the MPO

process. Region: 4

MPO: Bend MPO Work Type: PLANNG Applicant: BEND MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,364.00 $223,364.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $223,364.00 $223,364.00

Fund1 Z450 $151,331.00

Match $17,321.00Fund2 Z77D $49,093.00

Match $5,619.00

Page 160 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 188: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: BEND MPO PLANNING SFY21 Key: 20614Description: Bend MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through the MPO

process. Region: 4

MPO: Bend MPO Work Type: PLANNG Applicant: BEND MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,364.00 $223,364.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $223,364.00 $223,364.00

Fund1 Z450 $151,331.00

Match $17,321.00Fund2 Z77D $49,093.00

Match $5,619.00

Page 161 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 189: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT DESCHUTES

DESCHUTES Name: BEND MPO PLANNING SFY22 Key: 20615Description: Bend MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through the MPO

process. Region: 4

MPO: Bend MPO Work Type: PLANNG Applicant: BEND MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,364.00 $223,364.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $223,364.00 $223,364.00

Fund1 Z450 $151,331.00

Match $17,321.00Fund2 Z77D $49,093.00

Match $5,619.00

Page 162 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 190: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

124.47 to 124.61 0.14 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: S. UMPQUA RIVER (VETS) BRIDGE REPAIRS Key: 18585Description: SEISMIC; DECK OVERLAY; JOINTS; BEARINGS;STEELREPAIRS; PAINT; BR #07404 Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $446,000.00 $12,996,000.00 $13,442,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $446,000.00 12,996,000.00 $13,442,000.00

Fund1 M0E1 $411,301.00 M00

1 $11,661,311.00

Match $34,699.00 $1,334,689.00

Page 163 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 191: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

72.50 to 72.54 0.04 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR42: LOWER LOOKINGGLASS CREEK BRIDGE REPAIR Key: 18586Description: BRIDGE RAIL; DECK OVERLAY; BR #00805C Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $70,000.00 $369,000.00 $439,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $70,000.00 369,000.00 $439,000.00

Fund1 M24E $62,811.00 M24

0 $331,104.00

Match $7,189.00 $37,896.00

Page 164 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 192: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 5.90 5.90 OR-38 UMPQUA SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR 38: US 101-DEAN CREEK PAVING & PED IMPROVEMENTS Key: 18869Description: GRIND/INLAY, PEDESTRIAN IMPROVEMENTS, SIGNAL UPGRADES, ROAD DIET AND OTHER SAFETY

IMPROVEMENTS Region: 3

MPO: Non-MPO Work Type: BIKPED , ENHANC , MODERN , OPERAT , PRESRV , SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $275,000.00 $543,000.00 $11,000.00 $6,105,000.00 $6,934,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2016 2018 2018

Total $503,000.00 $543,000.00 $11,000.00 6,105,000.00 $7,162,000.00

Fund1 M232 $278,163.00 L05E $487,234.00 M24

0 $8,973.00 M001 $2,481,932.00

Match $31,837.00 $55,766.00 $1,027.00 $284,068.00

Fund2 M2E2 $100,000.00 MS3

0 $1,000.00 M240 $2,343,228.00

Match $268,193.00

Fund3 MS30 $68,000.00 MS3

0 $527,000.00

Match

Fund4 S080 $25,000.00 S080 $200,000.00Match

Fund5 OTH0

Match $579.00

Location(s)

Mileposts Length Route Highway ACT County(s)

16.70 to 16.80 0.10 OR-38 UMPQUA SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR38: SCOTTSBURG BRIDGE, E. APPROACH REALIGNMENT Key: 18901Description: HORIZONTAL CURVE ADJUSTMENT, REALIGNMENT OF BRIDGE RAIL, CONSTRUCTION OF RETAINING WALL;

BRIDGE #01318 Region: 3

MPO: Non-MPO Work Type: OP-SSI , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $240,000.00 $130,000.00 $2,200,000.00 $2,570,000.00

Page 165 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 193: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Year 2015 2018

Total $300,000.00 2,200,000.00 $2,500,000.00

Fund1 L24E $250,974.00 M24E $1,974,060.00

Match $28,725.00 $225,940.00

Fund2 M24E $18,216.00

Match $2,085.00

Location(s)

Mileposts Length Route Highway ACT County(s)

112.57 to 117.74 5.70 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5:ROBERTS MTN-S UMPQUA R PAVING & CLIMBING LANES Key: 18967Description: GRIND/INLAY AND CONSTRUCT SOUTH BOUND CLIMBING LANE Region: 3MPO: Non-MPO Work Type: MODERN , PR-IM , PRESRV

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $662,000.00 $52,000.00 $18,113,016.00 $18,827,016.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $2,062,000.00 $52,000.00 18,113,016.00 $20,227,016.00

Fund1 M24E $1,717,136.00 S010 $52,000.00 M24

0 $6,714,538.00

Match $144,864.00 $566,462.00

Fund2 M0E1 $184,440.00 Z460 $6,455,400.00

Match $15,560.00 $544,600.00

Fund3 M001 $3,533,885.00

Match $298,131.00

DOUGLAS Name: I-5:N UMPQUA RIVER & CORP(WINCHESTER SB) BR REPAIR Key: 19657Description: Replace clip angles due to cracking, bridge #07663A Region: 3MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Page 166 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 194: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

128.76 to 129.08 0.32 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $2,150,000.00 $2,400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $250,000.00 2,150,000.00 $2,400,000.00

Fund1 B3A0 $250,000.00 B3A0 $2,150,000.00Match

Location(s)

Mileposts Length Route Highway ACT County(s)

26.60 to 56.87 20.73 OR-38 UMPQUA SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR38: SAWYER RAPIDS TO I-5 CHIP SEAL Key: 19795Description: CHIP SEAL PROJECT Region: 3MPO: Non-MPO Work Type: PRESRV

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $80,277.00 $1,355,000.00 $1,435,277.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $80,277.00 1,355,001.00 $1,435,278.00

Fund1 M0E1 $72,033.00 M24

0 $1,215,842.00

Match $8,244.00 $139,159.00

Location(s)

Mileposts Length Route Highway ACT County(s)

7.52 to 8.79 2.36 OR-38 UMPQUA SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR38: HOAGLAND CR AND UNNAMED CR CULVERTS Key: 19810Description: 2 LARGE CULVERT REPLACEMENTS Region: 3MPO: Non-MPO Work Type: CULVRT , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Page 167 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 195: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $30,000.00 $2,600,000.00 $2,630,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $30,000.00 2,600,000.00 $2,630,000.00

Fund1 M240 $26,919.00 M24

0 $2,332,980.00

Match $3,081.00 $267,020.00

Footnote: R3 Culvert Pilot Project. PE & RW Funded from K19199.

Location(s)

Mileposts Length Route Highway ACT County(s)

44.50 to 44.90 0.40 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: OR42: COUNTY LINE SLIDE RETAINING WALL Key: 19938Description: Construct a retaining wall at that location to stabilize the slide area above the highway. Complete 2.5"

grind/inlay paving between mile point 44.50 and 45.90 Region: 3

MPO: Non-MPO Work Type: EM-REL Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $5,000.00 $4,500,000.00 $4,755,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $400,001.00 $250,000.00 $5,000.00 4,500,000.00 $5,155,001.00

Fund1 Z232 $160,655.00 0980 $250,000.00 0980 $5,000.00 0980 $4,500,000.00Match $18,388.00

Fund2 H200 $99,426.00Match $11,380.00

Fund3 L20E $98,839.00Match $11,313.00

DOUGLAS Name: US101: TAHKENITCH CREEK & TENMILE CREEK BRIDGES Key: 20097Description: Design shelf ready plans for bridge rail on Tahkenitch Creek & Tenmile Creek Bridges and patch concrete

girders on Tahkenitch Creek Bridge. Region: 3

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Page 168 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 196: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

202.70 to 202.74 0.04 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT DOUGLAS223.17 to 223.25 0.08 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT COOS

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $303,000.00 $303,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $303,000.00 $303,000.00

Fund1 Z001 $271,882.00

Match $31,118.00

Location(s)

Mileposts Length Route Highway ACT County(s)

101.49 to 101.60 0.11 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS101.49 to 101.60 0.11 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

101.32 to 101.60 0.28 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: S UMPQUA RIVER (FORDS) & YOKUM RD BRIDGES Key: 20101Description: Repair the deck expansion joints and repair and overlay the deck. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $220,000.00 $2,582,000.00 $2,802,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $220,000.00 2,582,000.00 $2,802,000.00

Fund1 Z001 $202,884.00 Z001 $2,381,120.00Match $17,116.00 $200,880.00

DOUGLAS Name: I-5: ELKHEAD-RICE HILL (NB LANES) Key: 20105Description: Design shelf ready project to: Remove existing pavement in the northbound lanes and replace with new

asphalt. Region: 3

MPO: Non-MPO Work Type: PRESRV

Applicant: ODOT Status: Final Plans Scheduled to Begin

Page 169 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 197: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

147.78 to 154.88 7.10 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $300,000.00 $300,000.00

Fund1 M240 $269,190.00

Match $30,810.00

Location(s)

Mileposts Length Route Highway ACT County(s)

117.70 to 125.40 7.70 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: GARDEN VALLEY BLVD - ROBERTS CREEK Key: 20106Description: design shelf ready plans to: Remove existing pavement and replace with new asphalt. Region: 3MPO: Non-MPO Work Type: PRESRV

Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $700,000.00 $700,000.00

Fund1 M240 $628,110.00

Match $71,890.00

DOUGLAS Name: OR42 MP 50/US101: ANDERSON ROCK Key: 20131Description: Design and property acquisition in preparation for the installation of rock fall screening and safety barrier. Region: 3MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Land Purchase

Page 170 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 198: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

50.00 to 50.00 OR-42 COOS BAY-ROSEBURG SOUTH WEST OREGON ACT DOUGLAS334.30 to 334.30 US-101 OREGON COAST HIGHWAY SOUTH WEST OREGON ACT CURRY

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $135,000.00 $2,000.00 $137,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $135,001.00 $2,000.00 $137,001.00

Fund1 M240 $121,136.00 M240 $1,795.00

Match $13,865.00 $205.00

Location(s)

Mileposts Length Route Highway ACT County(s)

124.00 to 124.00 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: EXIT 124 SIGNAL UPGRADES & BELLOWS ST REALIGN Key: 20148Description: Replace signal poles and hardware at the northbound and southbound ramp terminals. Add turn lanes and

realign Bellows St. and the southbound off-ramp. Region: 3

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $180,000.00 $34,000.00 $1,596,000.00 $1,810,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $180,000.00 $34,000.00 1,596,000.00 $1,810,000.00

Fund1 M240 $161,514.00 M240 $30,508.00 M24

0 $1,432,091.00

Match $18,486.00 $3,492.00 $163,909.00

DOUGLAS Name: OR138E: DOG CREEK CULVERT Key: 20154Description: Install spiral liner in existing culvert Region: 3MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Page 171 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 199: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.25 to 45.25 OR-138 NORTH UMPQUA SOUTH WEST OREGON ACT DOUGLAS

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $62,000.00 $221,000.00 $283,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $62,000.00 221,000.00 $283,000.00

Fund1 M240 $55,633.00 M24

0 $198,303.00

Match $6,367.00 $22,697.00

Location(s)

Mileposts Length Route Highway ACT County(s)

40.00 to 168.00 128.00 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: SMALL CULVERT UPGRADES Key: 20159Description: Repair or replace culverts in poor or critical condition based on current condition assessment. Region: 3MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $1,186,000.00 $1,386,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $200,000.00 1,186,000.00 $1,386,000.00

Fund1 M240 $179,460.00 M24

0 $1,064,198.00

Match $20,540.00 $121,802.00

DOUGLAS Name: DOUGLAS COUNTY WARNING SIGN UPGRADES Key: 20248Description: Install curve signs, chevrons and flashing beacon on North Bank Road. Install Curve signs and chevrons on

Glenbrook Loop/Riddle Bypass Rd/Sixth Ave., Tiller Trail Highway and Garden Valley Rd. Region: 3

MPO: Non-MPO Work Type: SAFETY Applicant: DOUGLAS COUNTY Status: Construction Scheduled to Begin

Page 172 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 200: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH WEST OREGON ACT DOUGLAS

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $1,000.00 $330,000.00 $398,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019

Total $67,000.00 $1,000.00 330,000.00 $398,000.00

Fund1 MS30 $61,787.00 MS30 $922.00 MS3

0 $304,326.00

Match

Fund2 OTH0 OTH0 OTH

0Match $5,213.00 $78.00 $25,674.00

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: ROSEBURG PEDESTRIAN UPGRADES Key: 20250Description: Install rapid flasher on Stephens St @ Roseland; Countdown ped signals on Stephens St @ Edenbower,

Newton Creek and Stewart Parkway and on Harvard Av @ Stewart Pkwy, Keady Ct, Centennial Dr, Umpqua St. Region: 3

MPO: Non-MPO Work Type: SAFETY

Applicant: CITY OF ROSEBURG Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $2,000.00 $400,000.00 $502,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019

Total $100,000.00 $2,000.00 400,000.00 $502,000.00

Fund1 MS30 $92,222.00 MS30 $1,844.00 MS3

0 $368,880.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $7,778.00 $156.00 $31,120.00

Page 173 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 201: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.39 to 7.41 0.02 SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: UPPER OLALLA ROAD: BERRY CREEK BRIDGE Key: 20358Description: Replace current bridge with a new single-span bridge on the same alignment. Region: 3MPO: Non-MPO Work Type: BRIDGE

Applicant: DOUGLAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $604,887.00 $32,814.00 $2,456,342.00 $3,094,043.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $604,887.00 $32,814.00 2,456,342.00 $3,094,043.00

Fund1 Z233 $542,765.00 Z233 $29,444.00 Z233 $2,204,076.00

Match $62,122.00 $3,370.00 $252,266.00

Location(s)

Mileposts Length Route Highway ACT County(s)

1.15 to SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: SOUP CREEK ROAD: SOUP CREEK BRIDGE Key: 20365Description: Replace existing timber bridge with a new pre-cast concrete bridge. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: DOUGLAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $233,764.00 $13,126.00 $580,347.00 $827,237.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $233,764.00 $13,126.00 580,347.00 $827,237.00

Fund1 Z233 $209,756.00 Z233 $11,778.00 Z233 $520,745.00Match $24,008.00 $1,348.00 $59,602.00

Page 174 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 202: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.07 to 0.09 0.02 SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: DANCER ROAD: DANCER CREEK BRIDGE Key: 20368Description: Replace current four-span timber bridge with a new concrete bridge with fewer spans on the same alignment. Region: 3MPO: Non-MPO Work Type: BRIDGE

Applicant: DOUGLAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $564,160.00 $33,771.00 $2,248,408.00 $2,846,339.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $564,160.00 $33,771.00 2,248,409.00 $2,846,340.00

Fund1 Z233 $506,221.00 Z233 $30,303.00 Z233 $2,017,497.00

Match $57,939.00 $3,468.00 $230,912.00

Location(s)

Mileposts Length Route Highway ACT County(s)

128.77 to 129.08 0.31 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: N UMPQUA RIVER & CORP (WINCHESTER) BRIDGE Key: 20464Description: Remove rust, repair cracks and replace rivets and bolts as needed; paint the steel trusses. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $993,000.00 $8,366,000.00 $9,359,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $993,000.00 8,366,000.00 $9,359,000.00

Fund1 Z001 $915,745.00 Z001 $7,715,125.00Match $77,255.00 $650,875.00

Page 175 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 203: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

125.00 to 136.50 11.50 I-5 PACIFIC HIGHWAY SOUTH WEST OREGON ACT DOUGLAS

DOUGLAS Name: I-5: SUTHERLIN - GARDEN VALLEY BLVD Key: 20588Description: Grind out existing pavement, install new asphalt. Remove concrete at abandoned Weigh-in-Motion site in the

southbound lanes at MP 130.62. Upgrade culverts in poor or critical condition. Region: 3

MPO: Non-MPO Work Type: OPERAT , PRESRV

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $20,228,000.00 $21,228,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $1,000,000.00 20,228,000.00 $21,228,000.00

Fund1 M001 $922,200.00 M00

1 $17,386,237.00

Match $77,800.00 $1,466,763.00

Fund2 M240 $1,268,025.00

Match $106,975.00

Page 176 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 204: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

114.45 to 114.75 0.30 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM

GILLIAM Name: I-84: JOHN DAY RIVER BRIDGE DECK OVERLAY Key: 18587Description: DECK OVERLAY; JOINTS; BR #00108B Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $241,000.00 $2,241,000.00 $2,482,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $241,000.00 2,241,000.00 $2,482,000.00

Fund1 Z001 $222,250.00 M001 $2,010,849.00

Match $18,750.00 $230,151.00

Page 177 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 205: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, SHERMAN, WASCO

GILLIAM Name: I-84: DURABLE MARKINGS Key: 18657Description: DURABLE MARKINGS FOR R4 IM PROJECTS ON I-84 Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $382,000.00 $382,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $382,000.00 $382,000.00

Fund1 M240 $342,769.00

Match $39,231.00

Page 178 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 206: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.34 to 157.87 94.53 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, HOOD RIVER, MORROW, SHERMAN, WASCO

GILLIAM Name: I-84: COLUMBIA RIVER HIGHWAY Key: 20003Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTE Region: 4MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,000.00 $522,000.00 $697,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $175,001.00 522,000.00 $697,001.00

Fund1 M240 $157,028.00 M24

0 $468,391.00

Match $17,973.00 $53,609.00

Page 179 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 207: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

37.97 to 38.06 0.09 OR-19 JOHN DAY HIGHWAY LOWER JOHN DAY ACT GILLIAM

GILLIAM Name: CONDON PEDESTRIAN ACCESS Key: 20179Description: REPLACE AND CONSTRUCT NEW SIDEWALKS AND CROSSWALKS INCLUDING ADA COMPLIANT CURB RAMPS Region: 4MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF CONDON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $130,000.00 $40,000.00 $375,000.00 $545,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $130,000.00 $40,000.00 375,000.00 $545,000.00

Fund1 M240 $116,649.00 M240 $35,892.00 M24

0 $292,459.00

Match $13,351.00 $4,108.00 $33,473.00

Fund2 OTH0

Match $49,068.00

Page 180 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 208: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

125.50 to 137.79 12.29 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM

GILLIAM Name: I-84: SWANSON CANYON - ARLINGTON Key: 20274Description: REMOVE EXISTING SURFACING AND INLAY NEW ASPHALT Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $13,539,000.00 $13,939,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $400,000.00 13,539,000.00 $13,939,000.00

Fund1 H010 $358,920.00 H010 $12,485,666.00

Match $41,080.00 $1,053,334.00

Page 181 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 209: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 LOWER JOHN DAY ACT GILLIAM

GILLIAM Name: LONE ROCK ROAD (LONE ROCK CREEK) BRIDGE Key: 20372Description: Replace existing structure with concrete slab structure, with concrete and panels. Install guardrail to meet

standards and widen road approaches. Region: 4

MPO: Non-MPO Work Type: BRIDGE Applicant: GILLIAM COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $285,618.00 $46,248.00 $1,203,364.00 $1,535,230.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $285,618.00 $46,248.00 1,203,364.00 $1,535,230.00

Fund1 Z233 $256,285.00 Z233 $41,498.00 Z233 $1,079,779.00

Match $29,333.00 $4,750.00 $123,585.00

Page 182 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 210: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.50 to 6.10 1.60 US-395 JOHN DAY HIGHWAY SOUTH EAST OREGON ACT GRANT

GRANT Name: US395: SIDEWALKS IMPROVEMENTS (JOHN DAY) Key: 18918Description: SIDEWALK IMPROVEMENTS Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF JOHN DAY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,970.00 $30,000.00 $19,000.00 $640,000.00 $839,970.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $150,970.00 $30,000.00 $19,000.00 640,000.00 $839,970.00

Fund1 Z300 $135,465.00 M240 $26,919.00 M240 $17,049.00 M24

0 $574,272.00

Match $15,505.00 $3,081.00 $1,951.00 $65,728.00

Page 183 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 211: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.50 to 4.50 US-395 JOHN DAY-BURNS SOUTH EAST OREGON ACT GRANT6.10 to 6.10 US-395 CENTRAL OREGON SOUTH EAST OREGON ACT GRANT

GRANT Name: US395: CANYON CR. FLOOD MITIGATION Key: 18991Description: FLOOD MITIGATION Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $310,000.00 $15,000.00 $2,064,000.00 $2,389,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2016 2018

Total $310,000.00 $15,001.00 2,064,000.00 $2,389,001.00

Fund1 L05E $278,163.00 L240 $13,460.00 L240 $1,852,027.00

Match $31,837.00 $1,541.00 $211,973.00

Page 184 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 212: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

164.12 to 164.12 US-26 JOHN DAY HIGHWAY SOUTH EAST OREGON ACT GRANT

GRANT Name: US 26: LITTLE PINE CREEK CULVERT Key: 19004Description: REPLACE CULVERT Region: 5MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $80,000.00 $500,000.00 $580,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $80,000.00 500,000.00 $580,000.00

Fund1 M240 $71,784.00 Z001 $448,650.00

Match $8,216.00 $51,350.00

Page 185 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 213: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

164.12 to 164.12 US-26 JOHN DAY HIGHWAY SOUTH EAST OREGON ACT GRANT

GRANT Name: US-26: LITTLE PINE CREEK CULVERT REPLACEMENT Key: 20308Description: Replace existing RCBC (Reinforced Concrete Box Culvert) with a single cell, RCBC. Region: 5MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $425,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $75,001.00 425,001.00 $500,002.00

Fund1 Z240 $67,298.00 Z240 $381,353.00

Match $7,703.00 $43,648.00

Page 186 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 214: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT GRANT, UMATILLA

GRANT Name: UMATILLA-GRANT COUNTY SAFETY IMPROVEMENTS Key: 20545Description: Grant: Update curve warning signs Middle Fork River Rd. Umatilla: Intersection of Pumpkin Ctr Rd & NE 4th

ST/Sagebrush Rd enhanced intersection signing & markings. Intersection Westland Rd & Bridge Road engce intersection sign & markings. River Rd MP3

Region: 5

MPO: Non-MPO Work Type: SAFETY Applicant: GRANT COUNTY, UMATILLA COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $176,180.00 $10,000.00 $10,000.00 $978,356.00 $1,174,536.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $176,181.00 $10,000.00 $10,000.00 978,356.00 $1,174,537.00

Fund1 ZS30 $162,474.00 ZS30 $9,222.00 ZS30 $9,222.00 ZS30 $902,240.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0Match $13,707.00 $778.00 $778.00 $76,116.00

Page 187 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 215: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

US-20, US-395 CENTRAL OREGON SOUTH EAST OREGON ACT HARNEY

HARNEY Name: US20/US395: BURNS PEDESTRIAN IMPROVEMENTS Key: 18920Description: SIDEWALKS, FLASHING BEACON AND BUS SHELTER Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF BURNS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $182,557.00 $41,000.00 $10,000.00 $781,000.00 $1,014,557.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $182,538.00 $40,996.00 $10,000.00 780,922.00 $1,014,456.00

Fund1 M3E3 $163,808.00 M303 $36,785.00 M30

3 $8,973.00 M303 $700,713.00

Match $18,730.00 $4,211.00 $1,027.00 $80,209.00

Page 188 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 216: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 7.00 7.00 SOUTH EAST OREGON ACT HARNEY, MALHEUR

HARNEY Name: JUNTURA CUT-OFF ROAD RECONSTRUCTION PROJECT Key: 19933Description: REDESIGN AND RECONSTRUCTION OF THE JUNTURA CUT-OFF ROAD Region: 5MPO: Non-MPO Work Type: MODERN Applicant: HARNEY COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $100,000.00 $5,941,070.00 $430,000.00 $6,721,070.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018 2017

Total $250,000.00 $100,000.00 5,941,070.00 $430,000.00 $6,721,070.00

Fund1 Z240 $224,325.00 F150 $89,730.00 SLF0 $2,000,000.00 Z240 $215,801.00

Match $25,675.00 $10,270.00 $24,699.00Fund2 F150 $1,534,832.00 F150 $170,038.00

Match $175,668.00 $19,462.00

Fund3 OTH0

Match $1,230,570.00

Fund4 S600 $1,000,000.00Match

Page 189 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 217: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

123.00 to 243.00 120.00 US-20 CENTRAL OREGON SOUTH EAST OREGON ACT HARNEY, MALHEUR

HARNEY Name: US-20: CULVERT, STREAM, & ROADSIDE DRAINAGE Key: 20355Description: Replace culvert, rehabilitate culvert, repair/replace end treatment, repair scour problems, repair roadway

embankment, fill void(s) along culvert underneath pavement. Region: 5

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $153,000.00 $870,000.00 $1,023,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $153,000.00 870,000.00 $1,023,000.00

Fund1 Z240 $137,287.00 Z240 $780,651.00

Match $15,713.00 $89,349.00

Page 190 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 218: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

64.40 to 76.45 12.05 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT HOOD RIVER, WASCO

HOOD RIVERName: I-84: HOOD RIVER - ROWENA Key: 18710Description: SINGLE LIFT INLAY (TRAVEL LANES), STORM DRAINAGE IMPROVEMENTS AND SIGN UPGRADES Region: 4MPO: Non-MPO Work Type: PR-IM , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $130,000.00 $7,530,000.00 $7,660,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $150,000.00 7,530,000.00 $7,680,000.00

Fund1 M0E1 $134,595.00 M00

1 $6,756,669.00

Match $15,405.00 $773,331.00

Page 191 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 219: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-281 ODELL REGION 1 ACT HOOD RIVER

HOOD RIVERName: AGA RD: S EAGLE CREEK LOOP - DAVIS DR Key: 18828Description: Install a 6-foot wide sidewalk with curb and gutter along the west side of AGA Road. Install flashing lights and

gates at railroad crossing. Construct necessary drainage and water improvements. Replace existing culvert at Rock Creek

Region: 1

MPO: Non-MPO Work Type: BIKPED Applicant: HOOD RIVER COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $231,701.00 $100,000.00 $1,332,297.00 $1,663,998.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $231,701.00 $100,000.00 1,329,506.00 $1,661,207.00

Fund1 M240 $207,419.00 M240 $89,520.00 M24

0 $1,189,877.00

Match $24,282.00 $10,246.00 $136,506.00

Fund2 OTH0 OTH0

Match $234.00 $3,123.00

Footnote: $1,489,605 Federal MTEP award.

Page 192 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 220: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.28 to 2.42 0.14 OR-281 HOOD RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: OR281:GUIGNARD,ORCHARD & COUNTRY CLUB: BARRETT DR Key: 18830Description: Improve roadway widening and changes to grades and super elevation to better accommodate directional

freight turning movements at 3 intersections. Region: 1

MPO: Non-MPO Work Type: MODERN Applicant: HOOD RIVER COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $394,777.00 $399,653.00 $2,269,965.00 $3,064,395.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $394,777.00 $399,653.00 2,269,965.00 $3,064,395.00

Fund1 M2E1 $354,233.00 M240 $358,562.00 M24

0 $2,036,574.00

Match $40,544.00 $41,039.00 $233,095.00

Fund2 OTH0 OTH0

Match $52.00 $296.00

Footnote: $2,749,323 Fed MTEP award

Page 193 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 221: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.85 to 0.85 OR-281 HOOD RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: OR281: INDIAN CREEK Key: 19401Description: Culvert replacement Region: 1MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $107,250.00 $242,750.00 $350,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2018

Total $107,250.00 242,750.00 $350,000.00

Fund1 LZ2E $96,235.00 Z240 $217,820.00

Match $11,015.00 $24,930.00

Footnote: $350,000 Total allocation

Page 194 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 222: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

64.11 to 64.19 0.08 I-84 COLUMBIA RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: I-84: HOOD RIVER BRIDGE DECK REPLACEMENT Key: 19653Description: Deck replacement; bridge #02444 & 02444A Region: 1MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $493,000.00 $5,971,905.00 $6,464,905.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $493,000.00 5,971,905.00 $6,464,905.00

Fund1 M0E1 $454,645.00 M00

1 $5,507,291.00

Match $38,355.00 $464,614.00

Footnote: $6,464,905 Total HBP funds

Page 195 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 223: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.34 to 157.87 94.53 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, HOOD RIVER, MORROW, SHERMAN, WASCO

HOOD RIVERName: I-84: COLUMBIA RIVER HIGHWAY Key: 20003Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTE Region: 4MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,000.00 $522,000.00 $697,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $175,001.00 522,000.00 $697,001.00

Fund1 M240 $157,028.00 M24

0 $468,391.00

Match $17,973.00 $53,609.00

Page 196 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 224: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

68.23 to 73.71 5.48 US-26 MT HOOD REGION 1 ACT HOOD RIVER

HOOD RIVERName: OR35: ROBIN HOOD BRIDGE - POLALLIE CREEK Key: 20212Description: Design roadway repaving (3R) and guardrail replacement. Region: 1MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $486,896.00 $486,896.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $486,896.00 $486,896.00

Fund1 Z001 $436,892.00

Match $50,004.00

Page 197 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 225: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT HOOD RIVER

HOOD RIVERName: MAY STREET ELEVATED SIDEWALK REPLACEMENT Key: 20331

Description: Construct a 6 ft. sidewalk, and a 5 ft. bike lane on May Street between 13th Street and 17th Street to address a deteriorating elevated sidewalk, subsiding sidewalk and street, lack of ADA compliant intersections and no bike lane.

Region: 1

MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF HOOD RIVER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $329,356.00 $30,000.00 $1,317,424.00 $1,676,780.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $329,356.00 $30,000.00 1,317,424.00 $1,676,780.00

Fund1 Z240 $295,531.00 Z240 $26,919.00 Z240 $1,182,125.00

Match $33,825.00 $3,081.00 $135,299.00

Footnote: $ 1,504,575 Federal MTEP award

Page 198 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 226: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, HOOD RIVER, MULTNOMAH, WASHINGTON

HOOD RIVERName: RUMBLE STRIPS (ODOT) Key: 20341Description: Install centerline rumble strips and install shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205, I-405,

OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224, HWY-173 (Timberline), OR-212, OR-281, and OR-282.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,600.00 $950,854.00 $1,101,454.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $150,600.00 950,854.00 $1,101,454.00

Fund1 ZS30 $150,600.00 ZS30 $950,854.00

Match

Footnote: $ 1,101,454 Total ARTS funding

Page 199 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 227: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.66 to 63.81 0.15 OR-35 MT HOOD REGION 1 ACT HOOD RIVER

HOOD RIVERName: OR35 AT MP 63.72 Key: 20452Description: Scale slope and install draped mesh to control slope raveling. Region: 1MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $25,614.00 $710,778.00 $736,392.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $25,614.00 710,778.00 $736,392.00

Fund1 Z240 $22,983.00 Z240 $637,781.00

Match $2,631.00 $72,997.00

Footnote: $ 736,392 Total Operations allocation

Page 200 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 228: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

72.26 to 72.30 0.04 OR-35 MT HOOD REGION 1 ACT HOOD RIVER

HOOD RIVERName: OR35 AT MP 72.3 Key: 20453Description: Scale slope and install rockfall fence. Region: 1MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $14,834.00 $413,710.00 $428,544.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $14,834.00 413,710.00 $428,544.00

Fund1 Z240 $13,311.00 Z240 $371,222.00

Match $1,523.00 $42,488.00

Footnote: $ 428,544 Total Operations allocation

Page 201 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 229: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

46.33 to 46.37 0.04 I-84 COLUMBIA RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: I-84: NW FOREST LANE OVER I-84 Key: 20485Description: Increase vertical clearance by 4 inches. Region: 1MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $261,000.00 $1,170,123.00 $1,431,123.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $261,000.00 1,170,123.00 $1,431,123.00

Fund1 Z001 $240,694.00 Z001 $1,079,087.00

Match $20,306.00 $91,036.00

Page 202 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 230: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

49.43 to 49.45 0.02 HISTORIC COLUMBIA RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: US-30 (CASCADE) AT MP 49.3 Key: 20519Description: Install traffic signal and upgrade ADA Region: 1MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $548,603.00 $1,391,508.00 $1,940,111.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $548,603.00 1,391,508.00 $1,940,111.00

Fund1 OTH0 Z240 $750,000.00

Match $548,603.00 $85,841.00

Fund2 OTH0

Match $555,667.00

Footnote: $ 750,000 Total Operations allocation

Page 203 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 231: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

47.91 to 48.00 0.09 I-84 COLUMBIA RIVER REGION 1 ACT HOOD RIVER

HOOD RIVERName: I-84 FARLEY SLIDE Key: 20524Description: Additional funding for K18762 to stabilize the landslide using drainage, earth anchors and/or shear piles. Region: 1MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $700,000.00 $700,000.00

Fund1 Z240 $645,540.00

Match $54,460.00

Footnote: $700,000 Total additional R1 Operations funding for K18762

Page 204 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 232: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 11.45 11.45 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5:CALIFORNIA STATE LINE - ASHLAND PAVING Key: 18873Description: Diamond grind to remove ruts in the pavement on I-5 from MP 0 to MP 11.45 Region: 3MPO: Rogue Valley MPO Work Type: BRIDGE , PR-IM , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $696,000.00 $5,000.00 $5,000.00 $14,159,985.00 $14,865,985.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $696,000.00 $5,000.00 $5,000.00 14,159,985.00 $14,865,985.00

Fund1 M0E1 $641,851.00 S010 $5,000.00 S010 $5,000.00 M00

1 $12,705,755.00

Match $54,149.00 $1,454,230.00

Page 205 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 233: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.70 to 18.10 0.04 OR-99 ROGUE VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR99: LAUREL STREET SIGNAL UPGRADE Key: 18897Description: UPGRADE TRAFFIC SIGNAL Region: 3MPO: Rogue Valley MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,000.00 $7,000.00 $6,000.00 $528,000.00 $620,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $79,000.00 $7,000.00 $6,000.00 528,000.00 $620,000.00

Fund1 L24E $70,887.00 S010 $7,000.00 S010 $6,000.00 M240 $473,774.00

Match $8,113.00 $54,226.00

Page 206 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 234: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.90 to 6.00 1.00 OR-273 SISKIYOU ROGUE VALLEY ACT JACKSON

JACKSON Name: OR273: PREACHER LANDSLIDE(MP 5.90-6.00) Key: 18899Description: BUTTRESS LANDSLIDE AT UPPER ROAD SECTION Region: 3MPO: Non-MPO Work Type: OP-SLD , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,000.00 $225,000.00 $5,000.00 $1,800,000.00 $2,278,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2016 2017 2018

Total $248,000.00 $201,290.00 $5,000.00 1,800,000.00 $2,254,290.00

Fund1 M030 $222,530.00 Z240 $180,618.00 S010 $5,000.00 M24

0 $1,615,140.00

Match $25,470.00 $20,672.00 $184,860.00

Footnote: 20% PROJECT

Page 207 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 235: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.00 to 12.00 0.20 OR-66 GREEN SPRINGS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR66: HARLEY LANDSLIDE (MP 11.80-12.00) Key: 18906Description: SHEAR KEY BUTTRESS SWITCH CATCH AT CENTERLINEOF ROAD, REBUILD ROAD SECTION Region: 3MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $66,000.00 $10,000.00 $5,000.00 $637,000.00 $718,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $66,000.00 $10,000.00 $5,000.00 637,000.00 $718,000.00

Fund1 M240 $59,222.00 S010 $10,000.00 S010 $5,000.00 M24

0 $571,580.00

Match $6,778.00 $65,420.00

Page 208 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 236: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: LINN ROAD: OR62 TO BUCHANNAN (EAGLE POINT) Key: 18973Description: WIDEN ROAD, ADD BIKE AND PED FACILITIES WITH ILLUMINATION Region: 3MPO: Rogue Valley MPO Work Type: MODERN Applicant: CITY OF EAGLE POINT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $140,000.00 $16,000.00 $11,000.00 $1,931,000.00 $2,098,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $140,000.00 $16,000.00 $11,000.00 1,931,000.00 $2,098,000.00

Fund1 M240 $125,622.00 M240 $14,357.00 M24

0 $9,870.00 M240 $1,732,152.00

Match $14,378.00 $1,643.00 $1,130.00 $198,252.00

Fund2 OTH0

Match $596.00

Page 209 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 237: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-140 LAKE OF THE WOODS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR 140: EXIT 35 BLACKWELL ROAD Key: 18975Description: ADD CENTER TURN LANE, WIDE SHOULDERS, ADD BIKE PATH Region: 3MPO: Rogue Valley MPO Work Type: MODERN Applicant: JACKSON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $410,000.00 $276,000.00 $109,000.00 $4,980,000.00 $5,775,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2017 2017 2018

Total $410,001.00 $276,000.00 $109,000.00 4,980,000.00 $5,775,001.00

Fund1 M232 $192,937.00 M240 $247,655.00 M24

0 $97,806.00 M240 $4,468,554.00

Match $22,083.00 $28,345.00 $11,194.00 $511,446.00Fund2 L24E $168,923.00

Match $19,334.00

Fund3 H240 $6,033.00Match $691.00

Page 210 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 238: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: STEVENS RD-EAST MAIN ST TO ROBERT TRENT JONES BLVD Key: 19230Description: ADD BIKE LANES AND SIDEWALKS Region: 3MPO: Rogue Valley MPO Work Type: CMAQ Applicant: CITY OF EAGLE POINT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $309,914.00 $11,145.00 $2,394,355.00 $2,715,414.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $309,913.00 $11,145.00 2,394,355.00 $2,715,413.00

Fund1 M40E $208,564.00 L400 $10,000.00 L400 $1,088,916.00

Match $23,871.00 $1,145.00 $124,631.00Fund2 L20E $69,521.00 L200 $1,026,565.00

Match $7,957.00 $117,495.00

Fund3 OTH0

Match $36,748.00

Page 211 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 239: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: FOOTHILL RD: HILLCREST TO MCANDREWS Key: 19231Description: WIDEN TO 5 LANES, CURB GUTTER, SIDEWALK AND BIKE LANES Region: 3MPO: Rogue Valley MPO Work Type: CMAQ Applicant: CITY OF MEDFORD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $800,000.00 $600,000.00 $40,000.00 $11,662,600.00 $13,102,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $800,000.00 $600,000.00 $40,000.00 11,662,601.00 $13,102,601.00

Fund1 OTH0 OTH0 OTH

0OTH

0

Match $616,000.00 $384,000.00 $25,600.00 $8,733,637.00

Fund2 M400 $165,103.00 L400 $193,817.00 L400 $12,921.00 L400 $2,628,159.00

Match $18,897.00 $22,183.00 $1,479.00 $300,805.00

Page 212 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 240: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: WASHINGTON STREET EXTENSION Key: 19365Description: EXTEND WASHINGTON STREET TO TOLMAN CREEK ROAD CONSISTENT WITH THE IAMP EXIT 14 ACCESS Region: 3MPO: Rogue Valley MPO Work Type: MODERN Applicant: CITY OF ASHLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $105,000.00 $950,000.00 $1,055,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $105,000.00 950,000.00 $1,055,000.00

Fund1 OTH0

OTH0

Match $105,000.00 $950,000.00

Page 213 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 241: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: 2018 URBAN OPERATION SUPPORT Key: 19385Description: OPERATION SUPPORT Region: 3MPO: Rogue Valley MPO Work Type: TR-OPS Applicant: RVTD Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,200,000.00 $5,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $5,200,000.00 $5,200,000.00

Fund1 FF90 $2,600,000.00

Match $2,600,000.00

Page 214 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 242: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: 2018 CAPITALIZATION OF MAINTENANCE (MPO STP XFER) Key: 19388Description: Vehicle & Facility Maintenance/Transit Improvements Region: 3MPO: Rogue Valley MPO Work Type: TR-CAP Applicant: RVTD Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,063,903.00 $1,063,903.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,063,797.00 $1,063,797.00

Fund1 M240 $954,534.00

Match $109,263.00

Page 215 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 243: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: COLUMBUS AVENUE EXTENSION Key: 19397Description: NEW ROAD SECTION AND URBAN UPGRADER, 5 LANE MAJOR ARTERIAL Region: 3MPO: Rogue Valley MPO Work Type: MODERN Applicant: CITY OF MEDFORD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,000,000.00 $4,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 4,000,000.00 $4,000,000.00

Fund1 OTH0

Match $4,000,000.00

Footnote: Design phase completed in K13350.

Page 216 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 244: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

27.58 to 27.58 0.05 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: BARNETT ROAD OVERPASS DECK OVERLAY Key: 19538Description: Deck overlay, bridge #08676B Region: 3MPO: Rogue Valley MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $113,600.00 $646,000.00 $759,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2018

Total $113,600.00 646,000.00 $759,600.00

Fund1 M24E $104,762.00 M24

0 $579,656.00

Match $8,838.00 $66,344.00

Page 217 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 245: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

28.36 to 28.96 0.60 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: MEDFORD VIADUCT DECK OVERLAY Key: 19540Description: Deck overlay, bridge #08332 Region: 3MPO: Rogue Valley MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $1,500,000.00 $1,650,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $150,000.00 1,500,000.00 $1,650,000.00

Fund1 M0E1 $138,330.00 M00

1 $1,345,950.00

Match $11,670.00 $154,050.00

Page 218 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 246: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

19.08 to 19.10 0.02 OR-99 ROGUE VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR99: ASHLAND CREEK BRIDGE (SB) REHABILITATION Key: 19656Description: Repair concrete deterioration, bridge #0M274 Region: 3MPO: Rogue Valley MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $76,900.00 $80,000.00 $403,560.00 $560,460.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $176,900.00 $80,000.00 403,560.00 $660,460.00

Fund1 M001 $158,732.00 M001 $71,784.00 M00

1 $362,114.00

Match $18,168.00 $8,216.00 $41,446.00

Page 219 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 247: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

33.00 to 33.00 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: EXIT 33 OFF RAMP IMPROVEMENTS Key: 19789Description: CONSTRUCT ADDITIONAL RIGHT TURN LANE ON THE NORTH BOUND OFF RAMP Region: 3MPO: Rogue Valley MPO Work Type: MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $122,000.00 $10,000.00 $5,000.00 $830,000.00 $967,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $122,000.00 $10,000.00 $5,001.00 830,000.00 $967,001.00

Fund1 M240 $109,471.00 M240 $8,973.00 M24

0 $4,487.00 OTH0

Match $12,529.00 $1,027.00 $514.00 $500,000.00

Fund2 M240 $296,109.00

Match $33,891.00

Page 220 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 248: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

46.90 to 46.90 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT KLAMATH21.10 to 21.10 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT JACKSON

27.10 to 27.10 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT JACKSON

JACKSON Name: OR140 LAKE OF THE WOODS Key: 20025Description: REMOVE ROADSIDE HAZARDS FROM DRIVERS CLEAR ZONE Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $95,000.00 $10,000.00 $413,000.00 $518,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $95,000.00 $10,000.00 413,000.00 $518,000.00

Fund1 MS30 $95,000.00 S010 $10,000.00 MS3

0 $413,000.00

Match

Page 221 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 249: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: TDM RIDESHARE IN 2019 Key: 20049Description: Rogue Valley Transit District transportation options strategies, programs, and investments enhance traveler

opportunities and choices to bike, walk, take transit, share rides, and telecommute. Region: 3

MPO: Rogue Valley MPO Work Type: TDM Applicant: RVTD Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,000.00 $144,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $144,000.00 $144,000.00

Fund1 M240 $129,211.00

Match $14,789.00

Page 222 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 250: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: TDM RIDESHARE IN 2020 Key: 20051Description: Rogue Valley Transit District transportation options strategies, programs, and investments enhance traveler

opportunities and choices to bike, walk, take transit, share rides, and telecommute. Region: 3

MPO: Rogue Valley MPO Work Type: TDM Applicant: RVTD Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,000.00 $144,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $144,000.00 $144,000.00

Fund1 M240 $129,211.00

Match $14,789.00

Page 223 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 251: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: TDM RIDESHARE IN 2021 Key: 20052Description: Rogue Valley Transit District transportation options strategies, programs, and investments enhance traveler

opportunities and choices to bike, walk, take transit, share rides, and telecommute. Region: 3

MPO: Rogue Valley MPO Work Type: TDM Applicant: RVTD Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,000.00 $144,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $144,000.00 $144,000.00

Fund1 M240 $129,211.00

Match $14,789.00

Page 224 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 252: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-1.16 to 0.00 OR-140 LAKE OF THE WOODS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR140: AVENUE G - OR62 Key: 20100Description: Design shelf ready project and prepare to: Repair failed road base areas, provide new wearing surface,

striping, and pavement markers. Region: 3

MPO: Rogue Valley MPO Work Type: PRESRV Applicant: ODOT Status: Utility Relocation

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $120,000.00 $5,000.00 $5,000.00 $130,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020

Total $120,000.00 $5,001.00 $5,001.00 $130,002.00

Fund1 M240 $107,676.00 M240 $4,487.00 M24

0 $4,487.00

Match $12,324.00 $514.00 $514.00

Page 225 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 253: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 40.00 40.00 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: CALIFORNIA - GOLD HILL Key: 20133Description: Design work in preparation of the repair or replacement of culverts and addressing scour and road

embankment problems near culverts. Region: 3

MPO: Rogue Valley MPO Work Type: CULVRT Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $334,663.00 $334,663.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $334,663.00 $334,663.00

Fund1 M240 $300,293.00

Match $34,370.00

Page 226 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 254: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-6.70 to -1.16 OR-140 LAKE OF THE WOODS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR140: BEAR CREEK - AGATE RD. Key: 20135Description: Grind out the existing pavement and replace with new asphalt between MP -6.70-1.16 Region: 3MPO: Rogue Valley MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $249,000.00 $5,000.00 $10,000.00 $4,658,000.00 $4,922,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $249,000.00 $5,001.00 $10,000.00 4,658,000.00 $4,922,001.00

Fund1 M240 $223,428.00 M240 $4,487.00 M24

0 $8,973.00 M240 $4,179,623.00

Match $25,572.00 $514.00 $1,027.00 $478,377.00

Page 227 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 255: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.00 to 11.00 OR-99 ROGUE VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR99: BIRCH ST TO COLEMAN CK. CULVERT (PHOENIX) Key: 20162Description: Replace culvert, Add sidewalks, bike lanes, pedestrian crossings. Install Transit Signal Prioritization on OR-99

Ashland to Central Point. Region: 3

MPO: Non-MPO Work Type: FISH , MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $698,870.00 $1,539,650.00 $464,900.00 $4,987,580.00 $7,691,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019 2020

Total $698,870.00 $1,539,650.00 $464,900.00 4,987,580.00 $7,691,000.00

Fund1 M240 $627,096.00 M240 $1,381,528.00 M24

0 $417,155.00 M240 $3,721,732.00

Match $71,774.00 $158,122.00 $47,745.00 $1,265,848.00

Page 228 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 256: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.00 to 12.00 7.00 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: SISKIYOU PASS VARIABLE ADVISORY SPEED SIGNS Key: 20170Description: Install weather responsive variable speed system for I-5 Siskiyou mountain pass. Region: 3MPO: Non-MPO Work Type: OP-SSI , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $617,000.00 $11,000.00 $5,958,000.00 $6,586,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $617,000.00 $11,000.00 5,958,000.00 $6,586,000.00

Fund1 M240 $401,093.00 M24

0 $9,870.00 M240 $3,895,179.00

Match $45,907.00 $1,130.00 $445,821.00

Fund2 MS30 $170,000.00 MS3

0 $1,617,000.00

Match

Page 229 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 257: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.42 to 1.64 1.22 OR-99 ROGUE VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR99: I-5 TO SCENIC AVE Key: 20185Description: Convert 4-Lane Roadway to 3-Lane Roadway with Center Turn Lane, Add Traffic Signal Region: 3MPO: Rogue Valley MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $373,000.00 $11,000.00 $2,878,000.00 $3,262,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $373,000.00 $11,000.00 2,878,000.00 $3,262,000.00

Fund1 MS30 $373,000.00 MS30 $11,000.00 MS3

0 $2,878,000.00

Match

Page 230 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 258: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-99 ROGUE VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR99: ASHLAND PEDESTRIAN UPGRADES Key: 20186Description: Add street lighting at Lithia/3rd and Siskiyou/Morton. Install traffic signal @ Main Street/Water. Add

pedestrian signs and RRFB @ Siskiyou/Tolman Creek Rd. Region: 3

MPO: Rogue Valley MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $116,000.00 $71,000.00 $55,000.00 $870,000.00 $1,112,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $116,000.00 $71,000.00 $55,000.00 870,000.00 $1,112,000.00

Fund1 MS30 $116,000.00 MS30 $71,000.00 MS3

0 $55,000.00 MS30 $870,000.00

Match

Page 231 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 259: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.68 to 1.68 OR-140 LAKE OF THE WOODS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR140: ATLANTIC AVE. INTERSECTION IMPROVEMENTS Key: 20192Description: Construct a roundabout and raised median to improve safety Region: 3MPO: Rogue Valley MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $249,000.00 $34,000.00 $58,000.00 $1,867,000.00 $2,208,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $249,000.00 $34,000.00 $58,000.00 1,867,000.00 $2,208,000.00

Fund1 MS30 $249,000.00 MS30 $34,000.00 MS3

0 $58,000.00 MS30 $1,867,000.00

Match

Page 232 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 260: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-234 SAMS VALLEY ROGUE VALLEY ACT JACKSON

JACKSON Name: OR234: GOLD HILL-SAMS VALLEY INTERSECTION Key: 20196Description: Increase Sight Distance, Improve/Add Pavement Markings and Signs, Provide Flashing Beacons, Install Lighting

and Increase Sight Distance Region: 3

MPO: Middle Rogue MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $74,000.00 $2,000.00 $23,000.00 $575,000.00 $674,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020 2021

Total $74,000.00 $2,000.00 $23,000.00 575,000.00 $674,000.00

Fund1 MS30 $74,000.00 MS30 $2,000.00 MS3

0 $23,000.00 MS30 $575,000.00

Match

Page 233 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 261: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.90 to 4.90 OR-238 LAKE OF THE WOODS ROGUE VALLEY ACT JACKSON

JACKSON Name: OR238: @ W. MAIN ST. ROUNDABOUT Key: 20218Description: Install roundabout and associated medians Region: 3MPO: Rogue Valley MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $425,000.00 $54,000.00 $25,000.00 $3,296,000.00 $3,800,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $425,000.00 $54,000.00 $25,000.00 3,296,000.00 $3,800,000.00

Fund1 MS30 $425,000.00 MS30 $54,000.00 MS3

0 $25,000.00 MS30 $3,296,000.00

Match

Page 234 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 262: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: FREEMAN RD @ PINE ST. INTERSECTION (CENTRAL POINT) Key: 20249Description: Improve drainage and install raised island, enhance striping to include bike lane . Region: 3MPO: Rogue Valley MPO Work Type: SAFETY Applicant: CITY OF CENTRAL POINT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $21,000.00 $5,000.00 $95,000.00 $121,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019

Total $21,000.00 $5,000.00 95,000.00 $121,000.00

Fund1 MS30 $19,366.00 MS3

0 $4,611.00 MS30 $87,609.00

Match

Fund2 OTH0

OTH0

OTH0

Match $1,634.00 $389.00 $7,391.00

Page 235 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 263: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: W. VALLEY VIEW RD SAFETY IMPROVEMENTS (TALENT) Key: 20254Description: Road diet on West Valley View from Hwy 99 to approximately 0.46 miles to the east. Remove existing asphalt

and repave and restripe, as well as bike and pedestrian upgrades. Region: 3

MPO: Non-MPO Work Type: SAFETY Applicant: CITY OF TALENT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $60,000.00 $43,000.00 $434,000.00 $537,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019

Total $60,000.00 $43,000.00 434,000.00 $537,000.00

Fund1 MS30 $55,332.00 MS30 $39,655.00 MS3

0 $400,235.00

Match $4,668.00 $3,345.00 $33,765.00

Page 236 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 264: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.86 to 1.87 0.01 ROGUE VALLEY ACT JACKSON

JACKSON Name: ELDER MILL ROAD: TRAIL CREEK BRIDGE Key: 20359Description: Replace bridge. Region: 3MPO: Non-MPO Work Type: BRIDGE Applicant: JACKSON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $371,672.00 $32,814.00 $1,473,758.00 $1,878,244.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $371,672.00 $32,814.00 1,473,758.00 $1,878,244.00

Fund1 Z233 $333,501.00 Z233 $29,444.00 Z233 $1,322,403.00

Match $38,171.00 $3,370.00 $151,355.00

Page 237 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 265: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.54 to 45.69 0.15 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JACKSON

JACKSON Name: I-5: NB ROGUE RIVER (HOMESTEAD) BRIDGE Key: 20470Description: Repair the deck expansion joints and repair and overlay the deck. Repair the concrete girders. Region: 3MPO: Middle Rogue MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $166,000.00 $10,000.00 $10,000.00 $1,141,000.00 $1,327,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $166,000.00 $10,000.00 $10,000.00 1,141,000.00 $1,327,000.00

Fund1 Z001 $153,085.00 Z001 $9,222.00 Z001 $9,222.00 Z001 $1,052,230.00

Match $12,915.00 $778.00 $778.00 $88,770.00

Page 238 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 266: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JACKSON Name: GRANTS PASS MPO PLANNING SFY20 Key: 20607Description: Middle Rogue MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 239 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 267: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JACKSON Name: GRANTS PASS MPO PLANNING SFY21 Key: 20608Description: Middle Rogue MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 240 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 268: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JACKSON Name: GRANTS PASS MPO PLANNING SFY22 Key: 20609Description: Middle Rogue MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 241 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 269: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: ROGUE VALLEY MPO PLANNING SFY20 Key: 20610Description: Rogue Valley MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Rogue Valley MPO Work Type: PLANNG Applicant: ROGUE VALLEY MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $411,723.00 $411,723.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $411,723.00 $411,723.00

Fund1 Z450 $278,946.00

Match $31,927.00Fund2 Z77D $90,493.00

Match $10,357.00

Page 242 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 270: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: ROGUE VALLEY MPO PLANNING SFY21 Key: 20611Description: Rogue Valley MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Rogue Valley MPO Work Type: PLANNG Applicant: ROGUE VALLEY MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $411,723.00 $411,723.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $411,723.00 $411,723.00

Fund1 Z450 $278,946.00

Match $31,927.00Fund2 Z77D $90,493.00

Match $10,357.00

Page 243 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 271: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON

JACKSON Name: ROGUE VALLEY MPO PLANNING SFY22 Key: 20612Description: Rogue Valley MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Rogue Valley MPO Work Type: PLANNG Applicant: ROGUE VALLEY MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $411,723.00 $411,723.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $411,723.00 $411,723.00

Fund1 Z450 $278,946.00

Match $31,927.00Fund2 Z77D $90,493.00

Match $10,357.00

Page 244 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 272: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

97.19 to 112.82 5.71 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT JEFFERSON

JEFFERSON Name: US97: FORD LANE - PETER S. OGDEN STATE PARK Key: 18682Description: GRIND OUT EXISTING SURFACE AND INLAY NEW PAVEMENT IN TRAVEL LANES, RUMBLE STRIPS, DURABLE

MARKINGS, BRIDGE DECK OVERLAY ON REX T BARBER BRIDGE, SIGN UPGRADES Region: 4

MPO: Non-MPO Work Type: BRIDGE , PRESRV , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $57,000.00 $60,000.00 $5,000.00 $4,978,000.00 $5,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018 2018 2018

Total $250,000.00 $60,000.00 $5,001.00 4,978,000.00 $5,293,001.00

Fund1 M232 $224,325.00 S010 $60,000.00 M24

0 $4,487.00 M001 $2,624,378.00

Match $25,675.00 $514.00 $300,372.00

Fund2 M240 $1,615,140.00

Match $184,860.00

Fund3 MS30 $250,838.00

Match

Fund4 OTH0

Match $2,412.00

Location(s)

Mileposts Length Route Highway ACT County(s)

103.20 to 105.20 2.00 US-26 WARM SPRINGS CENTRAL OREGON ACT JEFFERSON

JEFFERSON Name: US26: WARM SPRINGS SAFETY CORRIDOR Key: 19640Description: GRIND OUT EXISTING SURFACE AND INLAY NEW ASPHALT, ROADSIDE AND BIKE/PED SAFETY IMPROVEMENTS,

ROCKFALL MITIGATION, MULTI-USE TRAIL Region: 4

MPO: Non-MPO Work Type: BIKPED , OP-SLD , PRESRV , SAFETY Applicant: OTHER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $125,000.00 $100,000.00 $20,000.00 $7,120,000.00 $7,365,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Page 245 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 273: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Year 2015 2017 2018 2019

Total $450,001.00 $100,000.00 $20,000.00 7,120,000.00 $7,690,001.00

Fund1 M240 $291,623.00 M240 $80,757.00 M24

0 $17,946.00 M240 $5,062,567.00

Match $33,378.00 $9,243.00 $2,054.00 $579,433.00

Fund2 GF01 $125,000.00 GF01 $10,000.00 GF01 $1,365,000.00Match

Fund3 MS30 $113,000.00

Match

Location(s)

Mileposts Length Route Highway ACT County(s)

65.79 to 114.73 48.94 US-26 WARM SPRINGS CENTRAL OREGON ACT, LOWER JOHN DAY ACT JEFFERSON, WASCO

JEFFERSON Name: US26: CLEAR LAKE RD - NW DOGWOOD LANE Key: 20002Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTES Region: 4MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $155,000.00 $600,000.00 $755,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $155,001.00 600,000.00 $755,001.00

Fund1 M240 $139,082.00 M24

0 $538,380.00

Match $15,919.00 $61,620.00

Page 246 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 274: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

74.95 to 92.08 17.13 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT JEFFERSON

JEFFERSON Name: US97: WILLOWDALE - MADRAS Key: 20010Description: PAVEMENT PRESERVATION (GRIND OUT EXISTING SURFACE AND INLAY/OVERLAY NEW ASPHALT) AND SIGN

UPGRADES Region: 4

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $9,213,000.00 $9,363,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $150,000.00 9,213,001.00 $9,363,001.00

Fund1 M240 $134,595.00 M24

0 $8,232,728.00

Match $15,405.00 $942,273.00

Fund2 MS30 $38,000.00

Match

Page 247 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 275: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

67.14 to 124.00 56.86 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT, LOWER JOHN DAY ACT DESCHUTES, JEFFERSON, WASCO

0.00 to 68.60 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN, WASCO

JEFFERSON Name: US97 ROCKFALL Key: 20095Description: UNSTABLE SLOPES EVALUATION AND ROCKFALL REMEDIATION Region: 4MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $884,000.00 $300,000.00 $3,791,444.00 $4,975,444.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020 2021

Total $884,000.00 $300,000.00 3,791,444.00 $4,975,444.00

Fund1 M240 $793,213.00 S010 $300,000.00 M24

0 $3,402,063.00

Match $90,787.00 $389,381.00

Page 248 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 276: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

74.50 to 88.19 13.69 US-20 SANTIAM CASCADES WEST ACT JEFFERSON, LINN

JEFFERSON Name: US20: SANTIAM JUNCTION-JACK LAKE RD. Key: 20126Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay) Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $236,400.00 $7,168,372.00 $7,404,772.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $236,400.00 7,168,372.00 $7,404,772.00

Fund1 Z240 $212,122.00 Z240 $6,432,180.00

Match $24,278.00 $736,192.00

Page 249 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 277: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.45 to 2.55 0.10 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: I-5: EXIT 58 6TH & MORGAN INTERSECTION IMPROVEMENT Key: 17477Description: TRAFFIC SIGNAL & ADA IMPROVEMENTS, ADDITIONAL SIGNAGE, REPAVE-RESTRIP INTERSECTION Region: 3MPO: Middle Rogue MPO Work Type: MODERN , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $28,000.00 $10,000.00 $1,312,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018 2018

Total $150,000.00 $28,000.00 $10,000.00 1,312,000.00 $1,500,000.00

Fund1 LS3E $150,000.00 LS30 $25,822.00 LS30 $9,222.00 LS30 $1,209,926.00

Match $2,178.00 $778.00 $102,074.00

Page 250 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 278: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: ALLEN CREEK ROAD IMPROVEMENTS Key: 18235Description: ALLEN CREEK RD FROM W HARBECK TO DENTON WILL BE UPGRADED TO CITY ARTERIAL STANDARDS Region: 3MPO: Middle Rogue MPO Work Type: CMAQ , MODERN Applicant: CITY OF GRANTS PASS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $442,000.00 $700,000.00 $150,000.00 $2,795,000.00 $4,087,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2013 2017 2017 2018

Total $775,000.00 $700,000.00 $150,000.00 2,795,000.00 $4,420,000.00

Fund1 M400 $492,618.00 L400 $628,110.00 L400 $134,595.00 L400 $1,504,772.00

Match $56,382.00 $71,890.00 $15,405.00 $172,228.00

Fund2 M240 $202,790.00 L240 $649,645.00

Match $23,210.00 $74,355.00

Fund3 OTH0

Match $394,000.00

Footnote: CONSTRUCTION WILL BE FUNDED IN THE 15-18 STIP

Page 251 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 279: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

49.70 to 58.18 9.11 I-5 PACIFIC HIGHWAY ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: I-5: N. GRANTS PASS-EVANS CREEK PAVING Key: 18875Description: Grind and repave North and Southbound lanes of I-5 from MP 49.09 to MP 58.18 Region: 3MPO: Middle Rogue MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $412,000.00 $5,000.00 $5,000.00 $7,634,000.00 $8,056,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $412,000.00 $5,000.00 $5,000.00 7,634,000.00 $8,056,000.00

Fund1 M0E1 $379,946.00 S010 $5,000.00 S010 $5,000.00 M00

1 $6,849,988.00

Match $32,054.00 $784,012.00

Page 252 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 280: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JOSEPHINEROGUE VALLEY ACT JOSEPHINE

ROGUE VALLEY ACT JOSEPHINE1.20 to 1.20 US-199 REDWOOD ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: GRANTS PASS SIGNAL & PEDESTRIAN UPGRADES Key: 19960Description: CONSTRUCT LEFT TURN LANE, SIGNAL IMPROVEMENTS, RAISED MEDIAN, INSTALL CROSSWALKS, & RAMP

UPGRADES Region: 3

MPO: Middle Rogue MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $275,000.00 $225,000.00 $180,000.00 $1,984,000.00 $2,664,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $275,000.00 $225,000.00 $180,000.00 1,984,000.00 $2,664,000.00

Fund1 MS30 $253,605.00 MS30 $207,495.00 MS3

0 $165,996.00 MS30 $1,829,645.00

Match $21,395.00 $17,505.00 $14,004.00 $154,355.00

Page 253 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 281: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-0.69 to 6.92 OR-199, OR-99 REDWOOD ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: OR199/OR99: APPLEGATE RIVER Key: 20104Description: Grind out the existing pavement and replace with new asphalt. Region: 3MPO: Middle Rogue MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $371,000.00 $40,000.00 $10,000.00 $6,939,000.00 $7,360,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $371,000.00 $40,000.00 $10,000.00 6,939,000.00 $7,360,000.00

Fund1 M240 $332,898.00 M240 $35,892.00 M24

0 $8,973.00 M240 $6,226,365.00

Match $38,102.00 $4,108.00 $1,027.00 $712,635.00

Page 254 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 282: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

26.64 to 26.91 0.27 US-199 REDWOOD ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: US199: MP 25 TO KERBY SHOULDER WIDENING Key: 20191Description: Widen highway shoulders Region: 3MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $66,000.00 $5,000.00 $500,000.00 $571,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $66,000.00 $5,000.00 500,000.00 $571,000.00

Fund1 MS30 $66,000.00 MS30 $5,000.00 MS3

0 $500,000.00

Match

Page 255 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 283: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: JOSEPHINE COUNTY SAFETY IMPROVEMENTS Key: 20194Description: Install centerline rumble strips, curve warning signs and chevrons, recessed pavement markers, and replace

striping, Install curve warning signs and chevrons Region: 3

MPO: Middle Rogue MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $89,000.00 $2,000.00 $3,000.00 $733,000.00 $827,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $89,000.00 $2,000.00 $3,000.00 733,000.00 $827,000.00

Fund1 MS30 $89,000.00 MS30 $2,000.00 MS3

0 $3,000.00 MS30 $733,000.00

Match

Page 256 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 284: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH WEST OREGON ACT JOSEPHINE

JOSEPHINE Name: AZALEA DR. @ ROBERTSON BRIDGE RD. Key: 20253Description: Improve intersection sight distance and warning signs; install flashing pedestrian crossing lights. Region: 3MPO: Non-MPO Work Type: SAFETY Applicant: DOUGLAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $22,000.00 $1,000.00 $163,000.00 $186,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019

Total $22,000.00 $1,000.00 163,000.00 $186,000.00

Fund1 MS30 $20,288.00 MS30 $922.00 MS3

0 $150,319.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $1,712.00 $78.00 $12,681.00

Page 257 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 285: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JOSEPHINE

JOSEPHINE Name: JOSEPHINE COMMUNITY TRANSIT STATION PHASE 1 Key: 20412Description: Transit Station site work Region: 3MPO: Non-MPO Work Type: TRANST Applicant: TRANSIT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,940.00 $700,940.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $700,940.00 $700,940.00

Fund1 M240 $589,000.00

Match $111,940.00

Page 258 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 286: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JOSEPHINE Name: GRANTS PASS MPO PLANNING SFY20 Key: 20607Description: Middle Rogue MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 259 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 287: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JOSEPHINE Name: GRANTS PASS MPO PLANNING SFY21 Key: 20608Description: Middle Rogue MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 260 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 288: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

ROGUE VALLEY ACT JACKSON, JOSEPHINE

JOSEPHINE Name: GRANTS PASS MPO PLANNING SFY22 Key: 20609Description: Middle Rogue MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 3

MPO: Middle Rogue MPO Work Type: PLANNG Applicant: MIDDLE ROGUE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $248,367.00 $248,367.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $248,367.00 $248,367.00

Fund1 Z450 $168,271.00

Match $19,259.00Fund2 Z77D $54,589.00

Match $6,248.00

Page 261 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 289: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 6.28 6.28 OR-39 KLAMATH FALLS-MALIN SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR39: KLAMATH FALLS/LAKEVIEW JCT - MATNEY RD Key: 18683Description: REMOVE EXISTING SURFACING AND OVERLAY NEW ASPHALT, RUMBLE STRIPS, DURABLE MARKINGS & EXTEND

SIDEWALK Region: 4

MPO: Non-MPO Work Type: PRESRV , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $50,000.00 $10,000.00 $3,110,000.00 $3,370,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $200,000.00 $50,000.00 $10,000.00 3,110,000.00 $3,370,000.00

Fund1 M2E2 $179,460.00 S010 $50,000.00 M00

1 $8,973.00 M001 $2,718,281.00

Match $20,540.00 $1,027.00 $311,119.00

Fund2 MS30 $74,329.00

Match $6,271.00

Page 262 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 290: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.00 to 4.00 1.00 OR-140 SOUTH KLAMATH FALLS SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR140: BRETT WAY EXTENSION (K FALLS) Key: 18731Description: SAFETY INTERSECTION IMPROVEMENTS AND EXTENSION OF BRETT WAY Region: 4MPO: Non-MPO Work Type: MODERN , SAFETY Applicant: CITY OF KLAMATH FALLS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $405,000.00 $200,000.00 $25,000.00 $3,953,000.00 $4,583,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018 2018

Total $960,001.00 $200,000.00 $25,000.00 3,953,000.00 $5,138,001.00

Fund1 ZS32 $525,000.00 M240 $178,313.00 M240 $22,289.00 M24

0 $3,142,771.00

Match $20,409.00 $2,551.00 $359,704.00

Fund2 M002 $356,627.00 OTH0 OTH

0MS3

0 $428,000.00

Match $40,818.00 $1,278.00 $160.00

Fund3 OTH0

OTH0

Match $32,556.00 $22,525.00

Fund4 S010 $5,000.00Match

Page 263 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 291: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

22.22 to 22.24 0.02 OR-140 KLAMATH FALLS - LAKEVIEW SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR140: BUCK CREEK BRIDGE REPLACEMENT Key: 19208Description: REPLACE BRIDGE #03853 Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $195,000.00 $40,000.00 $8,000.00 $1,259,000.00 $1,502,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2017 2017 2018

Total $195,001.00 $40,000.00 $8,000.00 1,259,000.00 $1,502,001.00

Fund1 LZ2E $174,974.00 M240 $35,892.00 M240 $7,178.00 M24

0 $1,129,701.00

Match $20,027.00 $4,108.00 $822.00 $129,299.00

Page 264 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 292: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.72 to 4.25 1.53 OR-39 KLAMATH FALLS - LAKEVIEW SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: HWY39: SOUTH 6TH STREET SIDEWALK PRESERVATION Key: 19261Description: REPLACE SIDEWALKS, APPROACHES AND DETERIORATED CURBS WHERE NEEDED. ADD 2 PEDESTRIAN

CROSSINGS. Region: 4

MPO: Non-MPO Work Type: BIKPED , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $50,000.00 $50,000.00 $1,061,000.00 $1,261,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018 2018

Total $100,000.00 $50,000.00 $50,000.00 1,061,000.00 $1,261,000.00

Fund1 S080 $100,000.00 S080 $50,000.00 S080 $50,000.00 S080 $900,000.00

Match

Fund2 MS30 $161,000.00

Match

Page 265 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 293: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

275.33 to 275.43 0.10 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97: LINK RIVER BRIDGE NB CONN Key: 19658Description: Deck overlay and rail, bridge #08347A Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $1,887,945.00 $1,987,945.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $100,000.00 1,887,945.00 $1,987,945.00

Fund1 M0E1 $89,730.00 L240 $823,672.00

Match $10,270.00 $94,273.00

Fund2 M001 $807,570.00

Match $92,430.00

Fund3 M240 $62,811.00

Match $7,189.00

Page 266 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 294: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

181.00 to 184.00 2.00 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH203.00 to 203.80 0.80 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

211.00 to 212.00 1.00 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: FFO - US97: PASSING LANES Key: 19784Description: PASSING LANES, GRIND AND INLAY AND ROADWAY CROSS-SLOPE ADJUSTMENT Region: 4MPO: Non-MPO Work Type: MODERN , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $50,000.00 $10,000.00 $9,130,000.00 $9,440,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018 2018

Total $250,000.00 $50,000.00 $10,000.00 9,130,000.00 $9,440,000.00

Fund1 M240 $224,325.00 S010 $50,000.00 M24

0 $8,973.00 M240 $5,734,644.00

Match $25,675.00 $1,027.00 $656,356.00

Fund2 M001 $2,457,705.00

Match $281,295.00

Page 267 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 295: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

57.00 to 59.00 2.00 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR140: KLAMATH COUNTY BOAT MARINA – LAKESHORE DR. Key: 19788Description: WIDEN ROADWAY, INSTALL GUARDRAIL, PAVEMENT MARKINGS, RUMBLE STRIPS, VIEWING AREA AND KIOSK

FOR THE VOLCANIC LEGACY Region: 4

MPO: Non-MPO Work Type: MODERN , SAFETY , SPPROG Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,105,609.00 $11,676,557.00 $13,782,166.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $2,105,609.00 11,676,557.00 $13,782,166.00

Fund1 G20E $1,889,363.00 G20E $10,477,375.00

Match $216,246.00 $1,199,182.00

Page 268 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 296: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

247.80 to 257.50 9.70 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97: N. CHILOQUIN INTERCHANGE - MODOC POINT Key: 20022Description: PAVEMENT PRESERVATION: GRIND OUT EXISTING SURFACE AND INLAY/OVERLAY NEW ASPHALT Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $376,200.00 $10,000.00 $5,000.00 $6,088,800.00 $6,480,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019 2019

Total $376,200.00 $10,000.00 $5,001.00 6,088,800.00 $6,480,001.00

Fund1 M240 $337,564.00 S010 $10,000.00 M24

0 $4,487.00 M240 $5,463,480.00

Match $38,636.00 $514.00 $625,320.00

Page 269 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 297: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

280.51 to 291.73 11.22 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97: MIDLAND HWY - CALIFORNIA STATE LINE Key: 20023Description: PAVEMENT PRESERVATION: GRIND OUT EXISTING SURFACE AND INLAY NEW ASPHALT IN TRAVEL LANES Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $313,200.00 $10,000.00 $5,000.00 $5,071,800.00 $5,400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019 2019

Total $313,200.00 $10,000.00 $5,001.00 5,071,800.00 $5,400,001.00

Fund1 M240 $281,034.00 S010 $10,000.00 M24

0 $4,487.00 M240 $4,550,926.00

Match $32,166.00 $514.00 $520,874.00

Page 270 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 298: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

46.90 to 46.90 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT KLAMATH21.10 to 21.10 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT JACKSON

27.10 to 27.10 OR-140 LAKE OF THE WOODS SOUTH CENTRAL OREGON ACT JACKSON

KLAMATH Name: OR140 LAKE OF THE WOODS Key: 20025Description: REMOVE ROADSIDE HAZARDS FROM DRIVERS CLEAR ZONE Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $95,000.00 $10,000.00 $413,000.00 $518,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $95,000.00 $10,000.00 413,000.00 $518,000.00

Fund1 MS30 $95,000.00 S010 $10,000.00 MS3

0 $413,000.00

Match

Page 271 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 299: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-3.93 to -4.46 OR-39 KLAMATH FALLS-MALIN SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR39 @ WASHBURN WAY Key: 20029Description: NEW SIGNAL CABINET INCLUDING RACK AND SWITCH. FIBER OPTIC CONNECTION AT WASHBURN WAY AND

OR39 Region: 4

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $10,000.00 $5,000.00 $110,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019 2019

Total $75,001.00 $10,000.00 $5,001.00 110,000.00 $200,002.00

Fund1 M240 $67,298.00 S010 $10,000.00 M24

0 $4,487.00 M240 $98,703.00

Match $7,703.00 $514.00 $11,297.00

Page 272 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 300: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-4.97 to -4.97 OR-39 KLAMATH FALLS-MALIN SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR39 @ ESPLANADE (KLAMATH FALLS) Key: 20103Description: DESIGN SHELF READY PLANS FOR TRAFFIC SIGNAL REPLACEMENT Region: 4MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Land Purchase

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $290,157.00 $200,000.00 $490,157.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2021

Total $290,157.00 $200,000.00 $490,157.00

Fund1 M240 $260,358.00 S010 $200,000.00

Match $29,799.00

Page 273 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 301: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

240.55 to 247.80 7.25 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97: SPRING CREEK HILL - N CHILOQUIN INTERCHANGE Key: 20151Description: SHELF READY PLANS TO INLAY/OVERLAY NEW ASPHALT Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $388,800.00 $388,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $388,800.00 $388,800.00

Fund1 M240 $348,870.00

Match $39,930.00

Page 274 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 302: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

277.11 to 277.11 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97 @ OR140 IAMP Key: 20171Description: SHELF READY PLANS FOR NEW SIGNAL AND INTERSECTION IMPROVEMENTS AT SOUTH BOUND OFF RAMP OF

US97 @ OR140 Region: 4

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $100,000.00 $100,000.00

Fund1 M240 $89,730.00

Match $10,270.00

Page 275 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 303: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, LANE COUNTY ACT KLAMATH, LANE, LINN

KLAMATH Name: REGION 2 (CENTRAL & SOUTH) CURVE WARNING UPGRADES Key: 20195Description: Preliminary engineering for chevrons and updated curve warning signs at various locations throughout Areas 4

and 5.. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,675.00 $79,675.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $79,675.00 $79,675.00

Fund1 MS30 $73,476.00

Match $6,199.00

Page 276 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 304: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

58.94 to 58.94 OR-66 GREEN SPRINGS SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OR66 @ DELAP PIT ROAD (KLAMATH FALLS) Key: 20256Description: SAFETY IMPROVEMENTS INCLUDING ROAD RELOCATION, ILLUMINATION Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,000.00 $500,000.00 $522,000.00 $1,245,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $223,000.00 $500,000.00 522,000.00 $1,245,000.00

Fund1 MS30 $223,000.00 S010 $500,000.00 MS3

0 $522,000.00

Match

Page 277 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 305: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: OC&E STATE TRAIL Key: 20265Description: PEDESTRIAN BRIDGE OVER OR140 Region: 4MPO: Non-MPO Work Type: BIKPED Applicant: OREGON PARKS & REC DEPARTMENT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $80,000.00 $972,343.00 $1,052,343.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2021

Total $80,000.00 972,343.00 $1,052,343.00

Fund1 M240 $71,784.00 M24

0 $489,263.00

Match $8,216.00 $55,998.00

Fund2 OTH0

Match $427,082.00

Page 278 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 306: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: ALL ROADS TRANSPORTATION SAFETY (KLAMATH COUNTY) Key: 20353Description: CURVE SIGNS, DELINEATORS, INTERSECTIONS SIGNS, SYSTEMIC SIGNAL UPGRADES AND RUMBLE STRIPS Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: CITY OF KLAMATH FALLS, KLAMATH COUNTY, ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $275,515.00 $10,000.00 $1,093,485.00 $1,379,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $275,515.00 $10,000.00 1,093,485.00 $1,379,000.00

Fund1 MS30 $258,804.00 MS30 $9,393.00 MS3

0 $1,027,162.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $16,711.00 $607.00 $66,323.00

Page 279 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 307: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

247.53 to 252.55 5.02 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH272.97 to 278.81 5.84 US-97 THE DALLES-CALIFORNIA HWY SOUTH CENTRAL OREGON ACT KLAMATH

KLAMATH Name: US97: OR58 - CALIFORNIA BORDER Key: 20535Description: Bridge replacement, retrofit and rehab for seismic resiliency. Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $15,000,000.00 $20,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $5,000,000.00 15,000,000.00 $20,000,000.00

Fund1 Z240 $4,486,500.00 Z240 $13,459,500.00

Match $513,500.00 $1,540,500.00

Page 280 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 308: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

152.10 to 152.60 0.50 US-395 FREMONT SOUTH CENTRAL OREGON ACT LAKE

LAKE Name: US395: COGSWELL CREEK & CROOKED CREEK CULVERTS Key: 19943Description: REPLACE DOUBLE BOX CULVERT WITH SINGLE SPAN CULVERT Region: 4MPO: Non-MPO Work Type: CULVRT , FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $45,000.00 $10,000.00 $1,278,000.00 $1,683,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2018 2019

Total $350,000.00 $45,001.00 $10,000.00 1,278,000.00 $1,683,001.00

Fund1 M240 $314,055.00 M240 $40,379.00 M24

0 $8,973.00 M240 $1,146,749.00

Match $35,945.00 $4,622.00 $1,027.00 $131,251.00

Page 281 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 309: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: CMAQ - OAKRIDGE (2013) Key: 16976Description: CMAQ ALLOCATION FOR FY13 Region: 2MPO: Non-MPO Work Type: CMAQ Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $65,000.00 $65,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 65,001.00 $65,001.00

Fund1 L400 $58,325.00

Match $6,676.00

Page 282 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 310: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: OAKRIDGE-WESTFIR RIDE CENTER Key: 17177Description: TRAIL BUILDING, SIGNING, INFORMATIONAL KIOSKSAND RESTROOMS Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF OAKRIDGE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $234,000.00 $165,932.00 $399,932.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2010 2018

Total $249,177.00 165,932.00 $415,109.00

Fund1 56C0 $249,177.00 56C0 $165,932.00

Match

Footnote: EARMARK AMOUNT EQUALS $399,932

Page 283 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 311: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.10 OR-200 TERRITORIAL LANE COUNTY ACT LANE

LANE Name: OR200: MP30.8 & MP34.9 SLIDES Key: 18641Description: REPAIR SLIDES AT TWO LOCATIONS Region: 2MPO: Non-MPO Work Type: OP-SLD , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $159,000.00 $22,000.00 $17,000.00 $1,402,000.00 $1,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2017 2018 2018

Total $298,000.00 $22,000.00 $17,000.00 1,402,000.00 $1,739,000.00

Fund1 L25E $142,671.00 M240 $19,741.00 M240 $15,254.00 M24

0 $1,258,015.00

Match $16,329.00 $2,259.00 $1,746.00 $143,985.00

Fund2 M240 $124,725.00

Match $14,275.00

Page 284 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 312: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

9.00 to 9.00 OR-126 MCKENZIE LANE COUNTY ACT LANE

LANE Name: OR126E @ MP9 SLIDE REPAIR Key: 18644Description: SLIDE CORRECTION Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $130,000.00 $16,000.00 $6,000.00 $598,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $130,000.00 $16,000.00 $6,000.00 598,000.00 $750,000.00

Fund1 M03E $116,649.00 M240 $14,357.00 M24

0 $5,384.00 M240 $536,585.00

Match $13,351.00 $1,643.00 $616.00 $61,415.00

Page 285 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 313: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: AMAZON ACTIVE CORRIDOR: MARTIN STREET -33RD ST. Key: 18856Description: CONSTRUCT EXTENDED AMAZON MULTIUSE PATH TO SOUTH EUGENE WITH ENHANCED SAFTEY FEATURES Region: 2MPO: Central Lane MPO Work Type: BIKPED Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $202,992.00 $1,536,783.00 $1,739,775.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2018

Total $175,808.00 1,536,784.00 $1,712,592.00

Fund1 M300 $94,707.00 M30

0 $1,378,956.00

Match $10,840.00 $157,828.00Fund2 L22E $29,443.00

Match $3,370.00

Fund3 M30E $27,909.00

Match $3,194.00

Fund4 L220 $5,693.00Match $652.00

Page 286 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 314: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: OR126: MUNSEL CREEK-SIUSLAW ESTUARY TRAIL Key: 18858Description: COMPLETE CONSTRUCTION OF MULTIUSE PATH, INCLUDING TRAILHEAD AND PARKING AREAS Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF FLORENCE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $141,000.00 $16,000.00 $1,484,400.00 $1,641,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $140,995.00 $15,999.00 1,484,351.00 $1,641,345.00

Fund1 OTH0 OTH0 OTH

0

Match $94,133.00 $10,682.00 $991,005.00

Fund2 M240 $42,049.00 M240 $4,771.00 M24

0 $442,674.00

Match $4,813.00 $546.00 $50,672.00

Page 287 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 315: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: BUS SUPPORT EQUIPMENT AND FACILITIES - 2018 Key: 19270Description: Equipment purchases and facilities improvements in support of transit operations Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,100,000.00 $1,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,100,000.00 $1,100,000.00

Fund1 FF91 $880,000.00

Match $220,000.00

Page 288 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 316: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: PASSENGER BOARDING IMPROVEMENTS - 2018 Key: 19273Description: New shelter placements at new locations, high vandalism locations & ADA improvements Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $100,000.00 $100,000.00

Fund1 FF91 $80,000.00

Match $20,000.00

Page 289 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 317: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: ENERGY STORAGE SYSTEM REPLACEMENT 2018 (LTD) Key: 19373Description: Replace energy storage systems on hybrid busses Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $325,000.00 $325,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $325,000.00 $325,000.00

Fund1 FF91 $260,000.00

Match $65,000.00

Page 290 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 318: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: PREVENTIVE MAINTENANCE 2018 (LTD) Key: 19377Description: Preventive maintenance Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,250,000.00 $5,250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $5,250,000.00 $5,250,000.00

Fund1 FF91 $4,200,000.00

Match $1,050,000.00

Page 291 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 319: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: LTD ACCESSIBLE SERVICES VEHICLES 2018 Key: 19381Description: Federal 5310 funds to purchase approximately five gasoline fueled Accessible Services vehicles per year Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $312,500.00 $312,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $312,500.00 $312,500.00

Fund1 F160 $250,000.00

Match $62,500.00

Page 292 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 320: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

54.10 to 54.30 0.20 OR-58 WILLAMETTE LANE COUNTY ACT LANE

LANE Name: OR58 ROCK FALL REMEDIATION (MP 54.2) Key: 19391Description: Rock fall remediation Region: 2MPO: Non-MPO Work Type: OP-SLD , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $2,000,000.00 $2,150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $150,000.00 2,000,000.00 $2,150,000.00

Fund1 M001 $134,595.00 M24

0 $1,794,600.00

Match $15,405.00 $205,400.00

Page 293 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 321: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: LTD VAN POOL CONTRACTING - 2018 Key: 19395Description: Capital cost of contracting for van pool Region: 2MPO: Central Lane MPO Work Type: TR-CAP Applicant: LANE TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $102,125.00 $102,125.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $102,125.00 $102,125.00

Fund1 FF91 $81,700.00

Match $20,425.00

Page 294 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 322: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

190.22 to 190.84 0.62 US-101 OREGON COAST HIGHWAY LANE COUNTY ACT LANE

LANE Name: US101: OR126 JCT - SIUSLAW RIVER BRIDGE (FLORENCE) Key: 19496Description: Pavement preservation and ADA upgrades Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $30,000.00 $1,220,000.00 $1,450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $199,999.00 $30,000.00 1,220,000.00 $1,449,999.00

Fund1 LT2E $128,693.00 M240 $26,919.00 M240 $1,094,706.00

Match $32,173.00 $3,081.00 $125,294.00Fund2 H050 $14,673.00

Match $1,679.00

Fund3 Q050 $12,865.00Match $1,472.00

Fund4 L050 $7,577.00Match $867.00

Page 295 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 323: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

27.27 to 51.70 24.43 OR-126 FLORENCE-EUGENE LANE COUNTY ACT LANE

LANE Name: OR126: EUGENE TO FLORENCE SAFETY IMPROVEMENT Key: 19661Description: Make safety improvements to include widening shoulders, add shoulder rumble strips, add passing lane Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $2,000,000.00 $4,000,000.00 $7,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $466,200.00 $2,000,000.00 4,000,000.00 $6,466,200.00

Fund1 MS3E $466,200.00 GF01 $2,000,000.00 GF01 $4,000,000.00

Match

Page 296 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 324: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

17.35 to 52.69 5.34 OR-126 FLORENCE-EUGENE LANE COUNTY ACT LANE0.00 to 3.10 3.10 OR-126 BELTLINE LANE COUNTY ACT LANE

LANE Name: OR126: CORNERSTONE DR. TO W. 11TH ST. Key: 19743Description: 3R preservation, miscellaneous safety improvements Region: 2MPO: Central Lane MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $338,000.00 $135,000.00 $6,000.00 $7,946,503.00 $8,425,503.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $338,000.00 $135,001.00 $6,000.00 7,946,503.00 $8,425,504.00

Fund1 M0E1 $303,287.00 M240 $121,136.00 M24

0 $5,384.00 M240 $7,130,397.00

Match $34,713.00 $13,865.00 $616.00 $816,106.00

Page 297 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 325: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: LANE COUNTY FIXED OBJECT REMOVAL Key: 19754Description: Remove fixed objects Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $158,004.00 $258,004.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 158,004.00 $258,004.00

Fund1 MS30 $100,000.00 MS3

0 $158,004.00

Match

Page 298 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 326: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: COBURG LOOP PATH, PHASE 4 Key: 19757Description: Construct shared-use path south from S. Coburg Industrial Way to Selby Way Region: 2MPO: Central Lane MPO Work Type: BIKPED Applicant: CITY OF COBURG Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $499,877.00 $699,877.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $200,000.00 499,877.00 $699,877.00

Fund1 M230 $179,460.00 M23

0 $448,540.00

Match $20,540.00 $51,337.00

Page 299 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 327: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: SOUTH WILLAMETTE STREET ENHANCEMENT (EUGENE) Key: 19773Description: Pavement preservation, ADA improvements, streetscape/bike/pedestrian enhancements Region: 2MPO: Central Lane MPO Work Type: PRESRV Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $278,614.00 $1,950,295.00 $2,228,909.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $278,614.00 1,950,295.00 $2,228,909.00

Fund1 M230 $250,000.00 M23

0 $1,750,000.00

Match $28,614.00 $200,295.00

Page 300 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 328: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANELANE COUNTY ACT LANE

LANE COUNTY ACT LANE

LANE Name: LANE COUNTY LOCAL ROAD ROADWAY DEPARTURES Key: 19797Description: Install roadway departure countermeasures to include centerline rumble strips and profiled fog lines at

various locations Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $581,395.00 $681,395.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 581,395.00 $681,395.00

Fund1 MS30 $100,000.00 MS3

0 $581,395.00

Match

Page 301 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 329: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: PRAIRIE RD/E ENID RD PRES/SIDEWALK REHAB Key: 19914Description: Pavement preservation, sidewalk rehabilitation Region: 2MPO: Central Lane MPO Work Type: PRESRV Applicant: LANE COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,814.00 $1,351,597.00 $1,496,411.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $144,814.00 1,351,597.00 $1,496,411.00

Fund1 M230 $129,942.00 M23

0 $1,212,788.00

Match $14,872.00 $138,809.00

Page 302 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 330: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: SPRINGFIELD TRAFFIC SYSTEMS MODERNIZATION Key: 19919Description: 1st phase of project replacing signal cabinets, controllers, communication systems--upgrading the components

of existing traffic signals Region: 2

MPO: Central Lane MPO Work Type: OPERAT Applicant: CITY OF SPRINGFIELD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $16,717.00 $261,897.00 $278,614.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $16,717.00 261,897.00 $278,614.00

Fund1 M230 $15,000.00 M23

0 $235,000.00

Match $1,717.00 $26,897.00

Page 303 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 331: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: STP-U ALLOCATION FFY19 - EUGENE Key: 20033Description: Surface Transportation Program (STP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: OPERAT Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,167,521.00 $5,167,521.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $5,167,520.00 $5,167,520.00

Fund1 Z230 $4,636,816.00

Match $530,704.00

Page 304 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 332: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: STP-U ALLOCATION FFY20 - EUGENE Key: 20034Description: Surface Transportation Program (STP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: OPERAT Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,167,521.00 $5,167,521.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $5,167,520.00 $5,167,520.00

Fund1 Z230 $4,636,816.00

Match $530,704.00

Page 305 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 333: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: STP-U ALLOCATION FFY21 - EUGENE Key: 20035Description: Surface Transportation Program (STP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: OPERAT Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,167,521.00 $5,167,521.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $5,167,520.00 $5,167,520.00

Fund1 Z230 $4,636,816.00

Match $530,704.00

Page 306 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 334: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: TAP ALLOCATION FFY19 - EUGENE Key: 20042Description: Transportation Alternatives Program (TAP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: BIKPED Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $255,491.00 $255,491.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $255,491.00 $255,491.00

Fund1 Z301 $229,252.00

Match $26,239.00

Page 307 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 335: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: TAP ALLOCATION FFY20 - EUGENE Key: 20043Description: Transportation Alternatives Program (TAP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: BIKPED Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $255,491.00 $255,491.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $255,491.00 $255,491.00

Fund1 Z301 $229,252.00

Match $26,239.00

Page 308 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 336: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: TAP ALLOCATION FFY21 - EUGENE Key: 20044Description: Transportation Alternatives Program (TAP) funding set aside for the Eugene TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Central Lane MPO Work Type: BIKPED Applicant: CENTRAL LANE MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $255,491.00 $255,491.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $255,491.00 $255,491.00

Fund1 Z301 $229,252.00

Match $26,239.00

Page 309 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 337: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.58 to 6.58 OR-569 BELTLINE LANE COUNTY ACT LANE5.62 to 5.62 OR-569 BELTLINE LANE COUNTY ACT LANE

3.10 to 3.10 OR-569 BELTLINE LANE COUNTY ACT LANE0.08 to 0.08 I-105 EUGENE-SPRINGFIELD LANE COUNTY ACT LANE

LANE Name: EUGENE-SPRINGFIELD SENSORS/CAMERAS PHASE 2 Key: 20078Description: Install cameras and traffic sensors connected to the NWTOC for operations and traffic data for planning:

OR569 at OR99W, Barger, W. 11th and I-105 at 6th (OR99W). Region: 2

MPO: Central Lane MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $1,000,000.00 $1,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $100,000.00 1,000,000.00 $1,100,000.00

Fund1 Z240 $89,730.00 Z240 $897,300.00

Match $10,270.00 $102,700.00

Page 310 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 338: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

40.00 to 55.00 15.00 OR-18 WILLAMETTE LANE COUNTY ACT LANE

LANE Name: OR58: FIX IT CORRIDOR CULVERTS Key: 20102Description: Repair or replace culverts based on condition and funding level Region: 2MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,260,000.00 $7,140,000.00 $8,400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $1,260,000.00 7,140,000.00 $8,400,000.00

Fund1 Z240 $1,130,598.00 Z240 $6,406,722.00

Match $129,402.00 $733,278.00

Page 311 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 339: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.01 to 7.11 0.10 OR-569 BELTLINE LANE COUNTY ACT LANE

LANE Name: OR569 OVER UPRR & NORTHWEST EXPRESSWAY Key: 20116Description: Design shelf ready plans for: Rail replacement, joint replacement and a concrete deck overlay. Region: 2MPO: Central Lane MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 Z001 $224,325.00

Match $25,675.00

Page 312 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 340: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

10.54 to 10.57 0.03 OR-36 MAPLETON-JUNCTION CITY LANE COUNTY ACT LANE

LANE Name: OR36: INDIAN CREEK BRIDGE Key: 20118Description: Design shelf ready plans for: Deck overlay, concrete patching, rail retrofit. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $150,000.00 $150,000.00

Fund1 Z001 $134,595.00

Match $15,405.00

Page 313 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 341: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.10 to 12.25 9.15 OR-569 BELTLINE LANE COUNTY ACT LANE

LANE Name: OR569: TERRY ST-PACIFIC HWY Key: 20121Description: Grind existing surfacing and inlay the travel lanes. Region: 2MPO: Central Lane MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $306,200.00 $9,227,115.00 $9,533,315.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $306,200.00 9,227,115.00 $9,533,315.00

Fund1 Z240 $274,753.00 Z240 $8,279,490.00

Match $31,447.00 $947,625.00

Page 314 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 342: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCASCADES WEST ACT, LANE

COUNTY ACT, MID-WILLAMETTE VALLEY ACT

LANE, LINN, MARION, YAMHILL

LANE Name: REGION 2 (CENTRAL AND SOUTH) RURAL SIGNAL IMPROV Key: 20137Description: Install reflectorized signal backplates, countdown pedestrian timers, and advanced dilemma zone protection

at various signal locations throughout Areas 4 and 5. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $677,900.00 $744,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $67,000.00 677,900.00 $744,900.00

Fund1 MS30 $61,787.00 MS3

0 $625,159.00

Match $5,213.00 $52,741.00

Page 315 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 343: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: RIVER RD @ RIVER AVE (EUGENE) Key: 20143Description: Install a raised median (traffic separators to protect designated left turn lanes) Region: 2MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $54,700.00 $5,600.00 $100,300.00 $160,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $54,700.00 $5,600.00 100,300.00 $160,600.00

Fund1 MS30 $50,444.00 MS3

0 $5,164.00 MS30 $92,497.00

Match $4,256.00 $436.00 $7,803.00

Page 316 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 344: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.98 to 7.88 4.90 OR-126B MCKENZIE LANE COUNTY ACT LANE

LANE Name: OR126B @ MP 2.98 TO 7.88 Key: 20144Description: Provide a raised median Region: 2MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF SPRINGFIELD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $401,600.00 $4,600.00 $174,300.00 $3,508,900.00 $4,089,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $401,600.00 $4,600.00 $174,300.00 3,508,900.00 $4,089,400.00

Fund1 MS30 $370,356.00 MS30 $4,242.00 MS3

0 $160,739.00 MS30 $3,235,908.00

Match $31,244.00 $358.00 $13,561.00 $272,992.00

Page 317 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 345: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: 13TH AVE: LINCOLN ST. TO ALDER ST. (EUGENE) Key: 20165Description: Safety projects at various locations. Work includes illumination, intersection work, bike/pedestrian

improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements.

Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $341,000.00 $28,200.00 $69,400.00 $3,322,600.00 $3,761,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $341,000.00 $28,200.00 $69,400.00 3,322,600.00 $3,761,200.00

Fund1 MS30 $314,470.00 MS30 $26,006.00 MS3

0 $64,001.00 MS30 $3,064,102.00

Match $26,530.00 $2,194.00 $5,399.00 $258,498.00

Page 318 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 346: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: GATEWAY ST. @ KRUSE WAY INT IMPRV (SPRINGFIELD) Key: 20174Description: Install rectangular rapid flashing beacon with median. Install any type of median barrier (traffic separators to

protect designated left turn lanes) Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF SPRINGFIELD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,900.00 $4,500.00 $13,900.00 $192,000.00 $231,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2021

Total $20,900.00 $4,500.00 $13,900.00 192,000.00 $231,300.00

Fund1 MS30 $19,274.00 MS30 $4,150.00 MS3

0 $12,819.00 MS30 $177,062.00

Match $1,626.00 $350.00 $1,081.00 $14,938.00

Page 319 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 347: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, LANE COUNTY ACT KLAMATH, LANE, LINN

LANE Name: REGION 2 (CENTRAL & SOUTH) CURVE WARNING UPGRADES Key: 20195Description: Preliminary engineering for chevrons and updated curve warning signs at various locations throughout Areas 4

and 5.. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,675.00 $79,675.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $79,675.00 $79,675.00

Fund1 MS30 $73,476.00

Match $6,199.00

Page 320 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 348: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: RIVER RD. @ IRVING RD. (CITY OF EUGENE) Key: 20206Description: Improve Signal Hardware. Left Turn Lane on Both Major Road Approaches: Urban, Signalized Intersection

(Irving Legs). Install Urban Green Bike Lanes at Conflict Points Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $212,500.00 $131,300.00 $85,200.00 $1,644,700.00 $2,073,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $212,501.00 $131,300.00 $85,200.00 1,644,700.00 $2,073,701.00

Fund1 MS30 $195,968.00 MS30 $121,085.00 MS3

0 $78,571.00 MS30 $1,516,742.00

Match $16,533.00 $10,215.00 $6,629.00 $127,958.00

Page 321 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 349: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.03 to 6.03 OR-126B MCKENZIE LANE COUNTY ACT LANE

LANE Name: OR126B @ 54TH ST. (SPRINGFIELD) Key: 20209Description: Upgrade permissive left turn to protected/permissive. Install no pedestrian phase with flashing yellow left turn

arrow. Install lighting at intersection. Install left turn lane on 54th St approaches. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF SPRINGFIELD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $212,500.00 $4,400.00 $54,700.00 $1,369,700.00 $1,641,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $212,501.00 $4,400.00 $54,700.00 1,369,700.00 $1,641,301.00

Fund1 MS30 $195,968.00 MS30 $4,058.00 MS3

0 $50,444.00 MS30 $1,263,137.00

Match $16,533.00 $342.00 $4,256.00 $106,563.00

Page 322 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 350: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

118.35 to 121.14 2.79 OR-99W PACIFIC HIGHWAY WEST LANE COUNTY ACT LANE2.35 to 4.24 1.89 OR-126 FLORENCE-EUGENE LANE COUNTY ACT LANE

LANE COUNTY ACT LANE1.80 to 1.90 0.10 I-105 EUGENE-SPRINGFIELD LANE COUNTY ACT LANE

LANE Name: CITY OF EUGENE SIGNAL ENHANCEMENTS Key: 20216Description: Signal enhancements at various locations throughout City of Eugene Region: 2MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $265,700.00 $27,400.00 $65,700.00 $1,030,100.00 $1,388,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $265,700.00 $27,400.00 $65,700.00 1,030,100.00 $1,388,900.00

Fund1 MS30 $245,029.00 MS30 $25,268.00 MS3

0 $60,589.00 MS30 $949,958.00

Match $20,671.00 $2,132.00 $5,111.00 $80,142.00

Page 323 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 351: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.26 to 0.64 0.38 OR-528 SPRINGFIELD LANE COUNTY ACT LANE9.05 to 9.05 OR-126 EUGENE-SPRINGFIELD LANE COUNTY ACT LANE

1.50 to 2.20 0.70 OR-126 MCKENZIE LANE COUNTY ACT LANE

LANE Name: CITY OF SPRINGFIELD SIGNAL ENHANCEMENTS Key: 20221Description: Various signal enhancements at a variety of locations Region: 2MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $143,200.00 $4,400.00 $959,800.00 $1,107,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $143,200.00 $4,400.00 959,800.00 $1,107,400.00

Fund1 MS30 $132,059.00 MS30 $4,058.00 MS3

0 $885,128.00

Match $11,141.00 $342.00 $74,672.00

Page 324 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 352: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

14.37 to 41.07 26.70 OR-126 FLORENCE-EUGENE LANE COUNTY ACT LANE0.60 to 42.08 41.48 OR-200 TERRITORIAL LANE COUNTY ACT LANE

0.00 to 51.59 OR-36 MAPLETON-JUNCTION CITY LANE COUNTY ACT LANE

LANE Name: WEST LANE COUNTY CURVE WARNING UPGRADES Key: 20223Description: Install chevrons and updated curve warning signs at various locations on OR126W, OR200 and OR36 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $51,760.00 $942,640.00 $994,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $51,760.00 942,640.00 $994,400.00

Fund1 MS30 $47,733.00 MS3

0 $869,303.00

Match $4,027.00 $73,337.00

Page 325 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 353: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: FILLING THE GAPS - SRTS (SPRINGFIELD) Key: 20236Description: Cover the community notification, engineering, and construction costs necessary to produce completed

sidewalk projects across Springfield for the Safe Routes to School (SRTS) program. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: CITY OF SPRINGFIELD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,100.00 $21,900.00 $393,000.00 $638,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $223,100.00 $21,900.00 393,000.00 $638,000.00

Fund1 Z240 $200,188.00 Z240 $19,651.00 Z240 $207,622.00

Match $22,912.00 $2,249.00 $23,763.00

Fund2 OTH0

Match $161,615.00

Page 326 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 354: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

121.14 to 121.14 OR-99W PACIFIC HWY WEST LANE COUNTY ACT LANE

LANE Name: ROOSEVELT PATH/OR99 PATH CONNECTION (EUGENE) Key: 20237Description: Connect the existing Roosevelt Path to the HWY 99 Path which is currently under construction. Region: 2MPO: Central Lane MPO Work Type: BIKPED Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $153,991.00 $627,456.00 $781,447.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $153,991.00 627,456.00 $781,447.00

Fund1 Z240 $138,176.00 Z240 $563,016.00

Match $15,815.00 $64,440.00

Page 327 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 355: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.70 to 19.40 0.70 OR-200 TERRITORIAL LANE COUNTY ACT LANE

LANE Name: OR200: ELMIRA - VENETA MULTI USE PATH Key: 20238Description: Design a separated path between Veneta and Elmira for pedestrians and cyclists Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF VENETA Status: Land Purchase

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $544,400.00 $10,900.00 $555,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $544,400.00 $10,900.00 $555,300.00

Fund1 Z240 $488,490.00 Z240 $9,781.00

Match $55,910.00 $1,119.00

Page 328 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 356: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.02 to 0.24 0.22 OR-126 FLORENCE-EUGENE LANE COUNTY ACT LANE190.22 to 190.84 0.62 US-101 OREGON COAST HIGHWAY LANE COUNTY ACT LANE

LANE Name: OR126/US101: SPRUCE ST - SIUSLAW RIV BR (FLORENCE) Key: 20239Description: Connect Bay Street Old Town area to US 101 portion of Old Town providing bicycle improvements; ped scaled

lighting and sidewalk improvements Region: 2

MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF FLORENCE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $50,000.00 $750,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $200,000.00 $50,000.00 750,000.00 $1,000,000.00

Fund1 Z240 $179,460.00 Z240 $44,865.00 Z240 $525,675.00

Match $20,540.00 $5,135.00 $60,166.00

Fund2 OTH0

Match $164,159.00

Page 329 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 357: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

14.33 to 14.10 0.23 OR-99 GOSHEN-DIVIDE LANE COUNTY ACT LANE

LANE Name: OR99: URBAN UPGRADE (COTTAGE GROVE) Key: 20242Description: Upgrade sidewalks, parking, bike facilities, and ADA compliance to enable future or concurrent pavement

preservation project Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $402,200.00 $859,000.00 $1,231,100.00 $2,492,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $402,200.00 $859,000.00 1,231,100.00 $2,492,300.00

Fund1 Z240 $360,894.00 Z240 $770,781.00 Z240 $1,104,666.00

Match $41,306.00 $88,219.00 $126,434.00

Page 330 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 358: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

112.70 to 117.04 4.34 OR-99W PACIFIC HIGHWAY WEST LANE COUNTY ACT LANE

LANE Name: OR99: EUGENE - JUNCTION CITY SAFETY BARRIER Key: 20244Description: Install median safety cable barrier Region: 2MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $1,259,478.00 $1,509,478.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $250,000.00 1,259,478.00 $1,509,478.00

Fund1 Z240 $224,325.00 Z240 $1,130,130.00

Match $25,675.00 $129,348.00

Page 331 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 359: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

32.06 to 37.77 5.71 OR-200 TERRITORIAL LANE COUNTY ACT LANE

LANE Name: OR200: TERRITORIAL HWY FINAL DESIGN Key: 20245Description: Complete design work already underway to improve the section of Territorial Highway between Gillespie

Corners and Lorane. The project will widen the pavement to allow for bicycles and pedestrians, etc. and realign curves

Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,000,000.00 $1,000,000.00

Fund1 Z240 $897,300.00

Match $102,700.00

Footnote: Planning work completed under K18245.

Page 332 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 360: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.43 to 0.58 0.15 LANE COUNTY ACT LANE

LANE Name: COBURG RD: WILLAMETTE RIVER (FERRY STREET) BRIDGE Key: 20294Description: Cleaning, prep and spot paint; concrete overlay and other repairs per inspection report. Region: 2MPO: Central Lane MPO Work Type: BRIDGE Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $359,700.00 $10,900.00 $22,900.00 $1,613,900.00 $2,007,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2018

Total $359,700.00 $10,900.00 $22,900.00 1,613,900.00 $2,007,400.00

Fund1 Z001 $322,759.00 Z001 $9,781.00 Z001 $20,548.00 Z001 $1,448,152.00

Match $36,941.00 $1,119.00 $2,352.00 $165,748.00

Page 333 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 361: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.23 to 0.43 0.20 LANE COUNTY ACT LANE

LANE Name: COBURG RD: UPRR VIADUCT/4-6-7 AVE (FERRY STREET) Key: 20297Description: Deck sealing, crack repairs to girder top/deck interface, epoxy injection cracks, repair spalling. Region: 2MPO: Central Lane MPO Work Type: BRIDGE Applicant: CITY OF EUGENE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $599,200.00 $10,900.00 $16,700.00 $3,151,800.00 $3,778,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2018

Total $599,200.00 $10,900.00 $16,700.00 3,151,800.00 $3,778,600.00

Fund1 Z001 $537,662.00 Z001 $9,781.00 Z001 $14,985.00 Z001 $2,828,110.00

Match $61,538.00 $1,119.00 $1,715.00 $323,690.00

Page 334 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 362: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.10 to 0.13 0.03 LANE COUNTY ACT LANE

LANE Name: BATTLE CREEK ROAD: COYOTE CREEK BRIDGE Key: 20302Description: Replace roof. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LANE COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $87,000.00 $197,000.00 $284,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $87,000.00 197,000.00 $284,000.00

Fund1 Z233 $78,065.00 Z233 $176,768.00

Match $8,935.00 $20,232.00

Page 335 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 363: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

14.33 to 14.33 OR-99 GOSHEN-DIVIDE LANE COUNTY ACT LANE

LANE Name: OR99 @ WOODSON (COTTAGE GROVE) Key: 20408Description: Replace all signal equip. Add 4th signalized leg or remove private access. ADA upgrades. Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $1,200,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $300,000.00 1,200,000.00 $1,500,000.00

Fund1 Z240 $269,190.00 Z240 $1,076,760.00

Match $30,810.00 $123,240.00

Page 336 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 364: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

175.00 to 175.05 0.05 US-101 OREGON COAST HIGHWAY LANE COUNTY ACT LANE

LANE Name: US101: BIG CREEK BRIDGE Key: 20421Description: Replace bridge rail. Repair concrete cracking. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $54,700.00 $618,800.00 $673,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $54,700.00 618,800.00 $673,500.00

Fund1 Z001 $49,082.00 Z001 $555,249.00

Match $5,618.00 $63,551.00

Page 337 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 365: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

174.72 to 174.77 0.05 I-5 PACIFIC HIGHWAY LANE COUNTY ACT LANE

LANE Name: I-5 CONN OVER CORP Key: 20429Description: Rehab deck and rail. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $197,000.00 $1,438,600.00 $1,635,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $197,000.00 1,438,600.00 $1,635,600.00

Fund1 Z001 $181,673.00 Z001 $1,326,677.00

Match $15,327.00 $111,923.00

Page 338 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 366: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.23 to 1.44 0.21 OR-126 MCKENZIE LANE COUNTY ACT LANE

LANE Name: OR126: WILLAMETTE RIVER WB BRIDGE Key: 20433Description: Paint structure. Region: 2MPO: Central Lane MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $888,000.00 $6,504,826.00 $7,392,826.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $888,000.00 6,504,826.00 $7,392,826.00

Fund1 Z001 $796,802.00 Z001 $5,836,780.00

Match $91,198.00 $668,046.00

Page 339 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 367: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.61 to 0.66 0.05 I-105 EUGENE-SPRINGFIELD LANE COUNTY ACT LANE

LANE Name: I-105 OVER FUTURE OR126 BRIDGE Key: 20446Description: Deck overlay; retrofit bridge rail; replace expansion joints. Region: 2MPO: Central Lane MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $290,688.00 $11,930.00 $2,266,182.00 $2,568,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $290,688.00 $11,930.00 2,266,182.00 $2,568,800.00

Fund1 Z001 $268,072.00 Z001 $11,002.00 Z001 $2,089,873.00

Match $22,616.00 $928.00 $176,309.00

Page 340 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 368: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.30 to 6.50 6.20 OR-58 WILLAMETTE LANE COUNTY ACT LANE

LANE Name: OR58: GOSHEN-PHEASANT LANE Key: 20504Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay + Localized ACPR (Asphalt/Concrete

Pavement Repair)) Region: 2

MPO: Central Lane MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $2,730,606.00 $3,130,606.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2019

Total $400,000.00 2,730,606.00 $3,130,606.00

Fund1 Z240 $358,920.00 Z240 $2,450,173.00

Match $41,080.00 $280,433.00

Page 341 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 369: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

33.19 to 42.90 9.71 OR-58 WILLAMETTE LANE COUNTY ACT LANE2.42 to 2.50 0.08 OR-58 WILLAMETTE LANE COUNTY ACT LANE

LANE Name: OR58: US-97 TO I-5 Key: 20543Description: Bridge replacement, retrofit and rehab for seismic resiliency. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,350,000.00 $10,900.00 $16,704,722.00 $21,065,622.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $4,350,000.00 $10,900.00 16,704,722.00 $21,065,622.00

Fund1 Z240 $3,903,255.00 Z240 $9,781.00 Z240 $14,989,147.00

Match $446,745.00 $1,119.00 $1,715,575.00

Page 342 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 370: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: CENTRAL LANE MPO PLANNING SFY20 Key: 20604Description: Central Lane MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Central Lane MPO Work Type: PLANNG Applicant: CENTRAL LANE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $732,878.00 $732,878.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $732,878.00 $732,878.00

Fund1 Z450 $496,532.00

Match $56,830.00Fund2 Z77D $161,080.00

Match $18,436.00

Page 343 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 371: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: CENTRAL LANE MPO PLANNING SFY21 Key: 20605Description: Central Lane MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Central Lane MPO Work Type: PLANNG Applicant: CENTRAL LANE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $732,878.00 $732,878.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $732,878.00 $732,878.00

Fund1 Z450 $496,532.00

Match $56,830.00Fund2 Z77D $161,080.00

Match $18,436.00

Page 344 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 372: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LANE COUNTY ACT LANE

LANE Name: CENTRAL LANE MPO PLANNING SFY22 Key: 20606Description: Central Lane MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Central Lane MPO Work Type: PLANNG Applicant: CENTRAL LANE MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $732,878.00 $732,878.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $732,878.00 $732,878.00

Fund1 Z450 $496,532.00

Match $56,830.00Fund2 Z77D $161,080.00

Match $18,436.00

Page 345 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 373: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.50 to 7.50 0.01 US-20 CORVALLIS-NEWPORT CASCADES WEST ACT LINCOLN

LINCOLN Name: US20: TOLEDO EXIT SLIDE REPAIR AND DRAINAGE IMPROV Key: 18639Description: REPLACE CULVERT AND REPAIR SLIDE Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $1,500,000.00 $1,650,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $150,000.00 1,500,000.00 $1,650,000.00

Fund1 L20E $72,465.00 M240 $1,345,950.00

Match $8,294.00 $154,050.00Fund2 Z232 $62,130.00

Match $7,111.00

Page 346 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 374: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

156.27 to 156.55 0.28 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: SW WAZIYATA ST. - SW MAPLE ST. (WALDPORT) Key: 18754Description: RECONFIGURE US-101 CROSS-SECTION AND CONSTRUCT ADJACENT MULTIUSE PATH (BRIDGEVIEW TRAIL) Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF WALDPORT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $37,000.00 $206,800.00 $243,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $37,000.00 206,800.00 $243,800.00

Fund1 M240 $33,200.00 M24

0 $185,562.00

Match $3,800.00 $21,238.00

Page 347 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 375: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

142.00 to 143.00 1.00 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: SE 32ND STREET - SE 35TH STREET (NEWPORT) Key: 18848Description: REBUILD AND SIGNALIZE 35TH VS, WITH BIKE LANES, SIDEWALKS, AND LOCAL CIRCULATION IMPVS. Region: 2MPO: Non-MPO Work Type: MODERN Applicant: CITY OF NEWPORT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $316,000.00 $54,000.00 $3,142,700.00 $3,512,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $900,000.00 $54,000.00 3,142,700.00 $4,096,700.00

Fund1 Z231 $524,023.00 M240 $48,454.00 M240 $1,646,199.00

Match $59,977.00 $5,546.00 $188,415.00

Fund2 M231 $283,547.00 OTH

0

Match $32,453.00 $1,308,086.00

Page 348 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 376: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

111.78 to 112.77 0.99 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: NE WEST DEVILS LAKE ROAD - LOGAN ROAD Key: 18851Description: CONSTRUCT BICYCLE AND PEDESTRIAN FACILITIES AND IMPROVED CROSSWALKS Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF LINCOLN CITY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $254,000.00 $2,797,500.00 $3,051,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $253,982.00 2,797,500.00 $3,051,482.00

Fund1 M240 $151,303.00 M24

0 $2,510,197.00

Match $17,300.00 $287,303.00

Fund2 OTH0

Match $85,379.00

Page 349 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 377: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

133.00 to 133.50 0.50 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: MOOLAK CR & JOHNSON CREEK SLIDES Key: 19393Description: Slide mitigation Region: 2MPO: Non-MPO Work Type: OP-SLD , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $1,350,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $150,000.00 1,350,000.00 $1,500,000.00

Fund1 M240 $134,595.00 M24

0 $1,211,355.00

Match $15,405.00 $138,645.00

Page 350 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 378: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

141.33 to 142.07 0.74 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: YAQUINA BAY BRIDGE (NEWPORT) PAINTING Key: 19654Description: Paint structure; place cathodic protection (spray coating); install electrical control cabinet; repair cracked steel

members Region: 2

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $11,286,600.00 $11,386,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2020

Total $2,312,000.00 11,286,600.00 $13,598,600.00

Fund1 Z001 $1,984,828.00 Z001 $10,127,466.00

Match $227,172.00 $1,159,134.00Fund2 H200 $89,730.00

Match $10,270.00

Fund3 L050Match

Page 351 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 379: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

16.29 to 21.60 5.31 US-20 CORVALLIS-NEWPORT CASCADES WEST ACT LINCOLN

LINCOLN Name: US20 PME: UPRR-EDDYVILLE PHASE 7 Key: 19682Description: Re-plant native vegetation in areas where ground was disturbed and temporary erosion control measures

taken. Region: 2

MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $750,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $750,000.00 $750,000.00

Fund1 M240 $672,975.00

Match $77,025.00

Page 352 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 380: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

135.60 to 135.62 2.62 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: LANDSLIDE REPAIR MP 135.6 Key: 20067Description: Constant slide movement occurs and needs to be patched frequently at this location (Moolack slide). This

project will provide realignment and a geo/drainage improvement to reduce the movement in the section of highway.

Region: 2

MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $82,100.00 $1,500,000.00 $2,082,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $500,000.00 $82,100.00 1,500,000.00 $2,082,100.00

Fund1 M240 $448,650.00 M240 $73,668.00 M24

0 $1,345,950.00

Match $51,350.00 $8,432.00 $154,050.00

Page 353 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 381: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

141.37 to 141.99 0.62 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: YAQUINA BAY BRIDGE Key: 20109Description: Design shelf ready plans for Cathodic protection (corrosion control) - South end. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $475,000.00 $475,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $475,001.00 $475,001.00

Fund1 Z001 $426,218.00

Match $48,783.00

Page 354 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 382: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

127.58 to 127.64 0.06 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: DEPOE BAY BRIDGE Key: 20110Description: Design shelf ready plans for Cathodic protection (corrosion control). Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $300,000.00 $300,000.00

Fund1 Z001 $269,190.00

Match $30,810.00

Page 355 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 383: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.03 to 7.10 0.07 OR-34 ALSEA CASCADES WEST ACT LINCOLN

LINCOLN Name: OR34: ALSEA RIVER BRIDGE Key: 20112Description: Design shelf ready plans to: pressure wash steel girders, floor beams and connections; remove pack rusts &

calk; repair fracture critical cut in floor beams; add two rail transitions, and paint structure. Region: 2

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 Z001 $224,325.00

Match $25,675.00

Page 356 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 384: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

23.07 to 23.14 0.07 OR-229 SILETZ CASCADES WEST ACT LINCOLN

LINCOLN Name: OR229: SILETZ RIVER (FULLER) BRIDGE Key: 20114Description: Design shelf ready plans to: Paint structure; remove pack rust; rehab bearings. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 Z001 $224,325.00

Match $25,675.00

Page 357 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 385: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

20.63 to 20.69 0.06 OR-229 SILETZ CASCADES WEST ACT LINCOLN

LINCOLN Name: OR229: SILETZ RIVER (OJALLA) BRIDGE Key: 20115Description: Design shelf ready plans to: Paint structure; remove pack rust. Replace rivets and bolts. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 Z001 $224,325.00

Match $25,675.00

Page 358 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 386: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-18, OR-214, OR-219, OR-22, OR-

99W

HILLSBORO/SILVERTON, PACIFIC HIGHWAY WEST, SALMON RIVER,

WILLAMINA-SHERIDANMID-WILLAMETTE VALLEY ACT LINCOLN, MARION, POLK,

TILLAMOOK

LINCOLN Name: REGION 2 (CENTRAL & S) CURVE WARNING UPGRADES Key: 20190Description: Install chevrons and updated curve warning signs at various locations throughout Area 3 Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $97,340.00 $1,772,760.00 $1,870,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $97,340.00 1,772,760.00 $1,870,100.00

Fund1 MS30 $89,767.00 MS3

0 $1,634,839.00

Match $7,573.00 $137,921.00

Page 359 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 387: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINCOLN, POLK

LINCOLN Name: REGION 2 (SOUTH) CURVE WARNING UPGRADES Key: 20193Description: Install chevrons and updated curve warning signs at various locations throughout Area 4 Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,207.00 $1,497,193.00 $1,579,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $82,207.00 1,497,193.00 $1,579,400.00

Fund1 MS30 $75,811.00 MS3

0 $1,380,711.00

Match $6,396.00 $116,482.00

Page 360 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 388: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

112.35 to 142.22 29.87 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN0.52 to 0.52 US-20 CORVALLIS-NEWPORT CASCADES WEST ACT LINCOLN

LINCOLN Name: REGION 2 (CENTRAL) SIGNAL IMPROVEMENTS (PART 2) Key: 20199Description: Newport, Lincoln City, Depoe Bay: Reflectorized signal backplates & Countdown pedestrian timers at all

signals. Adaptive signal timing at all signals in Newport on US101. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: CITY OF NEWPORT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,100.00 $533,300.00 $615,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $82,100.00 533,300.00 $615,400.00

Fund1 MS30 $75,713.00 MS3

0 $491,809.00

Match $6,387.00 $41,491.00

Page 361 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 389: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.50 to 4.60 0.10 US-20 CORVALLIS-NEWPORT CASCADES WEST ACT LINCOLN

LINCOLN Name: US20: MP 4.60 ROADSIDE IMPROVEMENTS Key: 20202Description: Install new guardrail. Widen shoulder by 3 feet. Provide safety edge at shoulder. Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $148,800.00 $318,100.00 $466,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $148,800.00 318,100.00 $466,900.00

Fund1 MS30 $137,223.00 MS3

0 $293,352.00

Match $11,577.00 $24,748.00

Page 362 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 390: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 167.51 US-101 OREGON COAST HIGHWAYCASCADES WEST ACT, MID-

WILLAMETTE VALLEY ACT, NORTH WEST OREGON ACT

CLATSOP, LINCOLN, TILLAMOOK

LINCOLN Name: US101: CURVE WARNING UPGRADES Key: 20222Description: Install chevrons and updated curve warning signs at various locations Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $71,995.00 $1,311,205.00 $1,383,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $71,995.00 1,311,205.00 $1,383,200.00

Fund1 MS30 $66,394.00 MS3

0 $1,209,193.00

Match $5,601.00 $102,012.00

Page 363 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 391: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

138.00 to 139.00 1.00 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: NW 25TH ST. - NE 36TH ST. (NEWPORT) Key: 20235Description: Design for installation of curb and sidewalk along the east side of US 101. Pedestrian ramps will be put in

place at street intersections, guardrail will be replaced, and drainage structures installed. Region: 2

MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF NEWPORT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $581,500.00 $581,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $581,500.00 $581,500.00

Fund1 Z240 $521,780.00

Match $59,720.00

Page 364 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 392: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

127.67 to 127.94 0.27 US-101 OREGON COAST HIGHWAY CASCADES WEST ACT LINCOLN

LINCOLN Name: US101: URBAN UPGRADE (DEPOE BAY) Key: 20241Description: Upgrade sidewalks, parking, bike facilities, and ADA compliance to enable future or concurrent pavement

preservation project Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $204,388.00 $385,596.00 $195,774.00 $978,164.00 $1,763,922.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $204,388.00 $385,596.00 $195,774.00 978,164.00 $1,763,922.00

Fund1 Z240 $183,397.00 Z240 $345,995.00 Z240 $175,668.00 Z240 $877,707.00

Match $20,991.00 $39,601.00 $20,106.00 $100,457.00

Page 365 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 393: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.13 to 0.14 0.01 CASCADES WEST ACT LINCOLN

LINCOLN Name: N. WOLKAU ROAD: NORTH BEAVER CREEK BRIDGE Key: 20309Description: Replace existing structure with single span pre-stressed concrete beam bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LINCOLN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $264,600.00 $37,200.00 $4,300.00 $730,300.00 $1,036,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $264,600.00 $37,200.00 $4,300.00 730,300.00 $1,036,400.00

Fund1 Z233 $237,426.00 Z233 $33,380.00 Z233 $3,858.00 Z233 $655,298.00

Match $27,174.00 $3,820.00 $442.00 $75,002.00

Page 366 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 394: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.05 to 1.06 0.01 CASCADES WEST ACT LINCOLN

LINCOLN Name: NE WEST DEVILS LAKE ROAD BRIDGE Key: 20317Description: Replace existing structure with single span pre-cast pre-stressed concrete structure on approximate same

alignment. Region: 2

MPO: Non-MPO Work Type: BRIDGE Applicant: LINCOLN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $312,100.00 $26,600.00 $4,300.00 $987,500.00 $1,330,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $312,100.00 $26,600.00 $4,300.00 987,500.00 $1,330,500.00

Fund1 Z001 $280,047.00 Z001 $23,868.00 Z001 $3,858.00 Z001 $886,084.00

Match $32,053.00 $2,732.00 $442.00 $101,416.00

Page 367 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 395: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

216.14 to 234.71 18.57 I-5 PACIFIC HIGHWAY CASCADES WEST ACT LINN

LINN Name: I-5: N. ALBANY - HALSEY Key: 18709Description: 1R DIAMOND GRIND & PATCH CONCRETE PRESERVATION Region: 2MPO: Albany Area MPO Work Type: BRIDGE , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $15,000,000.00 $15,300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $300,000.00 15,000,000.00 $15,300,000.00

Fund1 M001 $276,660.00 M24

0 $13,459,500.00

Match $23,340.00 $1,540,500.00

Page 368 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 396: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

30.40 to 31.40 1.00 US-20 SANTIAM CASCADES WEST ACT LINN

LINN Name: US20: 54TH AVE - RIGGS HILL RD. (SWEET HOME) Key: 18853Description: CONSTRUCT MULTIUSE PATH WITH RAISED, PLANTED MEDIAN AND ONE-WAY LANE WITH PARKING Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF SWEET HOME Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $252,000.00 $1,548,500.00 $1,800,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $252,000.00 1,548,383.00 $1,800,383.00

Fund1 M240 $226,120.00 M24

0 $1,050,728.00

Match $25,880.00 $120,274.00

Fund2 OTH0

Match $377,381.00

Page 369 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 397: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

55.40 to 55.50 0.10 US-20 SANTIAM CASCADES WEST ACT LINN

LINN Name: US20: LOWER SUNKEN GRADE SLIDE REPAIR (MP 55.4) Key: 19726Description: Provide a permanent fix to the slide area Region: 2MPO: Non-MPO Work Type: SPPROG Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $615,278.00 $3,937,850.00 $4,553,128.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $615,278.00 3,937,850.00 $4,553,128.00

Fund1 G20E $552,089.00 G20E $3,533,433.00

Match $63,189.00 $404,417.00

Footnote: Linn County is paying $200k of required match.

Page 370 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 398: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

214.53 to 214.53 I-5 PACIFIC HIGHWAY CASCADES WEST ACT LINN261.88 to 261.88 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

280.70 to 280.70 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

LINN Name: I-5: VMS REPLACEMENT Key: 20068Description: Existing VMS boards were manufactured by US Traffic which is no longer in business. We can no longer

maintain them. Replace with new Daktronics signs. Three locations: Lake Creek Dr, Perkins Rd, and Arndt Rd. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $675,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $75,001.00 675,001.00 $750,002.00

Fund1 M240 $67,298.00 M24

0 $605,678.00

Match $7,703.00 $69,323.00

Footnote: project is in both the Salem/Keizer Area MPO & the Albany Area MPO

Page 371 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 399: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

72.00 to 72.00 OR-22 NORTH SANTIAM MID-WILLAMETTE VALLEY ACT LINN81.00 to 81.00 OR-22 NORTH SANTIAM MID-WILLAMETTE VALLEY ACT LINN

LINN Name: OR22: ROCKFALL REMIDIATION MP 72 & 81 Key: 20072Description: Install rock screening. Needed due to frequent instances of rocks in roadway Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $4,500.00 $500,000.00 $604,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $100,000.00 $4,500.00 500,000.00 $604,500.00

Fund1 Z240 $89,730.00 Z240 $4,038.00 Z240 $448,650.00

Match $10,270.00 $462.00 $51,350.00

Page 372 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 400: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

52.39 to 52.39 US-20 SANTIAM CASCADES WEST ACT LINN

LINN Name: US20: SNOW ZONE SIGN REPLACEMENT Key: 20081Description: Replace existing drum sign with new sign Region: 2MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $40,000.00 $40,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $40,000.00 $40,000.00

Fund1 Z240 $35,892.00

Match $4,108.00

Page 373 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 401: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

43.60 to 43.60 US-20 SANTIAM CASCADES WEST ACT LINN

LINN Name: US20: SNOW ZONE DRUM SIGN REPLACEMENT Key: 20091Description: Replace existing drum sign with new sign. Region: 2MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $40,000.00 $40,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $40,000.00 $40,000.00

Fund1 Z240 $35,892.00

Match $4,108.00

Page 374 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 402: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

74.50 to 88.19 13.69 US-20 SANTIAM CASCADES WEST ACT JEFFERSON, LINN

LINN Name: US20: SANTIAM JUNCTION-JACK LAKE RD. Key: 20126Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay) Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $236,400.00 $7,168,372.00 $7,404,772.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $236,400.00 7,168,372.00 $7,404,772.00

Fund1 Z240 $212,122.00 Z240 $6,432,180.00

Match $24,278.00 $736,192.00

Page 375 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 403: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCASCADES WEST ACT, LANE

COUNTY ACT, MID-WILLAMETTE VALLEY ACT

LANE, LINN, MARION, YAMHILL

LINN Name: REGION 2 (CENTRAL AND SOUTH) RURAL SIGNAL IMPROV Key: 20137Description: Install reflectorized signal backplates, countdown pedestrian timers, and advanced dilemma zone protection

at various signal locations throughout Areas 4 and 5. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $677,900.00 $744,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $67,000.00 677,900.00 $744,900.00

Fund1 MS30 $61,787.00 MS3

0 $625,159.00

Match $5,213.00 $52,741.00

Page 376 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 404: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.46 to 6.55 0.09 US-20 SANTIAM CASCADES WEST ACT LINN

LINN Name: US20 @ KNOX BUTTE/OR226 Key: 20140Description: Increase Triangle Sight Distance. Increase Distance to Rural Roadside Obstacle from 3 ft. (1m) to 16 ft. (5m).

Improve Intersection Warning: Stop Ahead Pavement Markings, Stop Ahead Signs, Larger Signs, Additional Stop Signs...

Region: 2

MPO: Albany Area MPO Work Type: SAFETY Applicant: LINN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $131,300.00 $84,600.00 $305,300.00 $521,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $131,300.00 $84,600.00 305,300.00 $521,200.00

Fund1 MS30 $121,085.00 MS30 $78,018.00 MS3

0 $281,548.00

Match $10,215.00 $6,582.00 $23,752.00

Page 377 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 405: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.42 to 0.42 OR-99E ALBANY-JUNCTION CITY CASCADES WEST ACT LINN

LINN Name: OR99E @ AIRPORT RD. (ALBANY) Key: 20183Description: Left Turn Lane on Single Major Road Approach, Urban, Signalized Intersection (NB Airport Rd). Install Actuated

Advance Warning Dilemma Zone Protection System at High Speed Signals (Microwave Detection). Region: 2

MPO: Albany Area MPO Work Type: SAFETY Applicant: CITY OF ALBANY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $234,600.00 $87,200.00 $81,000.00 $1,004,500.00 $1,407,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $234,600.00 $87,200.00 $81,000.00 1,004,500.00 $1,407,300.00

Fund1 MS30 $216,348.00 MS30 $80,416.00 MS3

0 $74,698.00 MS30 $926,350.00

Match $18,252.00 $6,784.00 $6,302.00 $78,150.00

Page 378 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 406: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.29 to 0.49 0.20 US-20 SANTIAM CASCADES WEST ACT LINN1.45 to 1.45 OR-99E ALBANY-JUNCTION CITY CASCADES WEST ACT LINN

LINN Name: US20: GEARY ST. TO WAVERLY ST. (ALBANY) Key: 20184Description: Install lighting at intersection at Waverly, install raised medians (traffic separators) on US-20 between Waverly

and Clay. Install advance guide signs (possibly sign bridge) on OR99E. Region: 2

MPO: Albany Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $219,100.00 $39,500.00 $22,300.00 $972,500.00 $1,253,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2021

Total $219,100.00 $39,500.00 $22,300.00 972,501.00 $1,253,401.00

Fund1 MS30 $202,054.00 MS30 $36,427.00 MS3

0 $20,565.00 MS30 $896,840.00

Match $17,046.00 $3,073.00 $1,735.00 $75,661.00

Page 379 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 407: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.70 to 5.20 0.50 US-20 ALBANY/CORVALLIS CASCADES WEST ACT LINN5.63 to 5.63 US-20 ALBANY/CORVALLIS CASCADES WEST ACT LINN

LINN Name: US20: GARLAND NURSERY-GRANGER AVE. Key: 20188Description: Widen shoulder by 3 feet. Install edgeline striping / Install rural median acceleration lane. Install left turn lane

on major road approach. Install buffered right turn lane. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,012,300.00 $146,700.00 $56,400.00 $2,795,200.00 $4,010,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $1,012,300.00 $146,700.00 $56,400.00 2,795,200.00 $4,010,600.00

Fund1 MS30 $933,543.00 MS30 $135,287.00 MS3

0 $52,012.00 MS30 $2,577,733.00

Match $78,757.00 $11,413.00 $4,388.00 $217,467.00

Page 380 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 408: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, LANE COUNTY ACT KLAMATH, LANE, LINN

LINN Name: REGION 2 (CENTRAL & SOUTH) CURVE WARNING UPGRADES Key: 20195Description: Preliminary engineering for chevrons and updated curve warning signs at various locations throughout Areas 4

and 5.. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,675.00 $79,675.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $79,675.00 $79,675.00

Fund1 MS30 $73,476.00

Match $6,199.00

Page 381 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 409: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.42 to 7.90 7.48 OR-99E ALBANY-JUNCTION CITY CASCADES WEST ACT LINN0.49 to 1.87 1.38 US-20 SANTIAM CASCADES WEST ACT LINN

12.80 to 27.70 14.90 US-20 SANTIAM CASCADES WEST ACT LINNCASCADES WEST ACT LINN

LINN Name: REGION 2 (CENTRAL) URBAN SIGNAL ENHANCEMENTS Key: 20215Description: Provide signal enhancements in various locations on OR-99E and US20 in Area 4 Region: 2MPO: Albany Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $261,100.00 $1,830,000.00 $2,091,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $261,100.00 1,830,000.00 $2,091,100.00

Fund1 MS30 $240,786.00 MS3

0 $1,687,626.00

Match $20,314.00 $142,374.00

Page 382 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 410: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.65 to 0.66 0.01 CASCADES WEST ACT LINN

LINN Name: FOLSOM ROAD: MILL CREEK BRIDGE Key: 20306Description: Replace existing bridge with a single span pre-stressed concrete bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LINN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $260,600.00 $68,000.00 $4,300.00 $923,900.00 $1,256,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $260,600.00 $68,000.00 $4,300.00 923,900.00 $1,256,800.00

Fund1 Z233 $233,836.00 Z233 $61,016.00 Z233 $3,858.00 Z233 $829,015.00

Match $26,764.00 $6,984.00 $442.00 $94,885.00

Page 383 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 411: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.14 to 0.16 0.02 CASCADES WEST ACT LINN

LINN Name: POWERLINE ROAD: MUDDY CREEK BRIDGE Key: 20311Description: Replace existing bridge with a single span pre-stressed concrete bridge on driven steel piling. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LINN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $478,300.00 $74,400.00 $4,300.00 $1,957,200.00 $2,514,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $478,300.00 $74,400.00 $4,300.00 1,957,200.00 $2,514,200.00

Fund1 Z233 $429,179.00 Z233 $66,759.00 Z233 $3,858.00 Z233 $1,756,196.00

Match $49,121.00 $7,641.00 $442.00 $201,004.00

Page 384 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 412: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.70 to 0.74 0.04 CASCADES WEST ACT LINN

LINN Name: RICHARDSON GAP ROAD: THOMAS CRK/SHIMANEK BRIDGE Key: 20314Description: Design shelf ready plans to replace roof, patch siding, truss epoxy repaired, new exterior paint and fumigate. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LINN COUNTY Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $557,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $557,227.00 $557,227.00

Fund1 Z001 $500,000.00

Match $57,227.00

Page 385 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 413: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.85 to 4.95 0.10 CASCADES WEST ACT LINN

LINN Name: BERLIN RD: HAMILTON CREEK BRIDGE Key: 20318Description: Replace existing structure with a single span pre-stressed concrete beam bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: LINN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $574,000.00 $106,300.00 $4,300.00 $2,420,500.00 $3,105,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $574,000.00 $106,300.00 $4,300.00 2,420,500.00 $3,105,100.00

Fund1 Z001 $515,050.00 Z001 $95,383.00 Z001 $3,858.00 Z001 $2,171,915.00

Match $58,950.00 $10,917.00 $442.00 $248,585.00

Page 386 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 414: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

28.89 to 29.30 0.41 OR-99E ALBANY-JUNCTION CITY LANE COUNTY ACT LINN

LINN Name: OR99E: WILLAMETTE R (HARRISBURG) BRIDGE Key: 20425Description: Replace steel bracing; paint bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $373,200.00 $3,235,400.00 $3,608,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $373,200.00 3,235,400.00 $3,608,600.00

Fund1 Z001 $334,872.00 Z001 $2,903,124.00

Match $38,328.00 $332,276.00

Page 387 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 415: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

LINN Name: ALBANY AREA MPO PLANNING SFY20 Key: 20598Description: Albany area MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 388 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 416: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

LINN Name: ALBANY AREA MPO PLANNING SFY21 Key: 20599Description: Albany area MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 389 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 417: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINN

LINN Name: ALBANY AREA MPO PLANNING SFY22 Key: 20600Description: Albany area MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through

the MPO process. Region: 2

MPO: Albany Area MPO Work Type: PLANNG Applicant: AAMPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $183,358.00 $183,358.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $183,358.00 $183,358.00

Fund1 Z450 $124,227.00

Match $14,218.00

Fund2 Z77D $40,300.00Match $4,613.00

Page 390 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 418: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: SE 2ND STREET: SE 14TH AVE-E IDAHO AVE Key: 18900Description: CITY STREET REHABILITATION reconstructing road and subbase and new sidewalks Region: 5MPO: Non-MPO Work Type: MODERN Applicant: CITY OF ONTARIO Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $75,000.00 $17,000.00 $3,147,058.00 $3,439,058.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $200,000.00 $75,000.00 $16,999.00 3,147,058.00 $3,439,057.00

Fund1 M240 $168,280.00 M240 $63,105.00 M24

0 $14,304.00 M240 $2,647,811.00

Match $19,260.00 $7,223.00 $1,636.00 $303,054.00

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $12,460.00 $4,672.00 $1,059.00 $196,193.00

Page 391 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 419: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: VALE SCHOOL BUS ROUTE Key: 18921Description: SIDEWALK CONSTRUCTION AND REPAIR Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF VALE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $63,000.00 $55,000.00 $26,000.00 $247,297.00 $391,297.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $63,000.00 $55,000.00 $26,000.00 247,297.00 $391,297.00

Fund1 M240 $50,724.00 M240 $44,283.00 M24

0 $20,934.00 M240 $199,111.00

Match $5,806.00 $5,068.00 $2,396.00 $22,789.00

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $6,470.00 $5,649.00 $2,670.00 $25,397.00

Page 392 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 420: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

261.67 to 261.67 US-20 CENTRAL OREGON SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: US20/US26: OWYHEE WASTE WAY CULVERT REPAIR Key: 18998Description: REPLACE FAILING CULVERT Region: 5MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $45,000.00 $20,000.00 $10,000.00 $225,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $45,001.00 $20,000.00 $10,000.00 225,001.00 $300,002.00

Fund1 L24E $40,379.00 L240 $17,946.00 L240 $8,973.00 L240 $201,893.00

Match $4,622.00 $2,054.00 $1,027.00 $23,108.00

Page 393 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 421: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

377.91 to 378.11 0.20 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: I-84: SNAKE RIVER BRIDGES DECK REPAIRS Key: 19660Description: Deck repairs; bridge #08107E & 08107W. Joint project with IDOT; ODOT is lead. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $1,400,000.00 $1,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $200,000.00 1,400,000.00 $1,600,000.00

Fund1 OTH0

M240 $645,540.00

Match $100,000.00 $54,460.00

Fund2 Z232 $92,220.00 OTH0

Match $7,780.00 $700,000.00

Page 394 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 422: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00Fund2 ZS30 $300,000.00

Match

MALHEUR Name: JUNTURA CUT-OFF ROAD RECONSTRUCTION PROJECT Key: 19933Description: REDESIGN AND RECONSTRUCTION OF THE JUNTURA CUT-OFF ROAD Region: 5MPO: Non-MPO Work Type: MODERN

Applicant: HARNEY COUNTY Status: Construction Scheduled to Begin

Page 395 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 423: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 7.00 7.00 SOUTH EAST OREGON ACT HARNEY, MALHEUR

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $100,000.00 $5,941,070.00 $430,000.00 $6,721,070.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018 2017

Total $250,000.00 $100,000.00 5,941,070.00 $430,000.00 $6,721,070.00

Fund1 Z240 $224,325.00 F150 $89,730.00 SLF0 $2,000,000.00 Z240 $215,801.00Match $25,675.00 $10,270.00 $24,699.00

Fund2 F150 $1,534,832.00 F150 $170,038.00Match $175,668.00 $19,462.00

Fund3 OTH0

Match $1,230,570.00Fund4 S600 $1,000,000.00

Match

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: MALHEUR COUNTY SAFETY IMPROVEMENTS Key: 20263Description: Safety project to add advance warning to a signal, adding advance warning on two curves and construct a

roundabout at Cairo Junction to address hotspot safety in Malheur County on I-84, US95, US26, and OR201. Region: 5

MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $281,000.00 $1,592,000.00 $1,873,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $281,000.00 1,592,000.00 $1,873,000.00

Fund1 ZS30 $259,138.00 ZS30 $1,468,142.00Match

Fund2 OTH0

OTH0

Match $21,862.00 $123,858.00

Page 396 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 424: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

123.00 to 243.00 120.00 US-20 CENTRAL OREGON SOUTH EAST OREGON ACT HARNEY, MALHEUR

MALHEUR Name: US-20: CULVERT, STREAM, & ROADSIDE DRAINAGE Key: 20355Description: Replace culvert, rehabilitate culvert, repair/replace end treatment, repair scour problems, repair roadway

embankment, fill void(s) along culvert underneath pavement. Region: 5

MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $153,000.00 $870,000.00 $1,023,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $153,000.00 870,000.00 $1,023,000.00

Fund1 Z240 $137,287.00 Z240 $780,651.00

Match $15,713.00 $89,349.00

Location(s)

Mileposts Length Route Highway ACT County(s)

21.24 to 21.37 0.13 OR-52 PAYETTE SPUR SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: OR52: SNAKE RIVER (PAYETTE) BRIDGE Key: 20505Description: Deck overlay; replace expansion joints. Idaho taking the lead and paying 50% of the costs. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $128,250.00 $726,750.00 $855,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $128,250.00 726,750.00 $855,000.00

Fund1 OTH0

OTH0

Match $64,125.00 $363,375.00

Fund2 Z001 $57,539.00 Z001 $326,056.00Match $6,586.00 $37,319.00

Page 397 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 425: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.12 to 0.52 0.40 SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: CITY OF VALE SRTS PHASE 2 (VALE) Key: 20506Description: Construct new walk, curb, gutter between Viking & cottage St. Completes previous project. Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF VALE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $131,572.00 $106,988.00 $492,397.00 $730,957.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018

Total $131,572.00 $106,988.00 492,397.00 $730,957.00

Fund1 Z240 $118,060.00 Z240 $96,000.00 Z240 $441,828.00

Match $13,512.00 $10,988.00 $50,569.00

Location(s)

Mileposts Length Route Highway ACT County(s)

1.37 to 2.18 0.81 SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: SE 5TH ST - EAST LANE SIDEWALKS (ONTARIO) Key: 20510Description: Construct a sidewalk with ADA compliant ramps along south side of Division St from SE 5th to East Lane St.

Includes concrete walks, ramps, guardrail, guardrail terminals and retaining wall. Region: 5

MPO: Non-MPO Work Type: BIKPED

Applicant: CITY OF ONTARIO Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $181,351.00 $44,578.00 $781,575.00 $1,007,504.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $181,351.00 $44,578.00 781,575.00 $1,007,504.00

Fund1 Z240 $162,726.00 Z240 $40,000.00 Z240 $701,307.00Match $18,625.00 $4,578.00 $80,268.00

Page 398 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 426: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.25 to 14.10 13.85 SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: LYTLE BLVD (MALHEUR COUNTY) SAFETY IMPROVEMENTS Key: 20523Description: Install post mounted delineators and provide advisory speeds for curve warning signs to match the horizontal

alignment of the roadway on Lytle Boulevard. Region: 5

MPO: Non-MPO Work Type: SAFETY

Applicant: MALHEUR COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $11,100.00 $62,900.00 $74,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019

Total $11,100.00 62,900.00 $74,000.00

Fund1 ZS30 $10,236.00 ZS30 $58,006.00

Match

Fund2 OTH0

OTH0

Match $864.00 $4,894.00

Page 399 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 427: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

28.31 to 18.48 9.83 US-30 OLDS FERRY-ONTARIO SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: US30: SNAKE RIVER (ONTARIO) BRIDGE Key: 20538Description: Deck overlay, repair concrete girders. Idaho paying 50% of total costs. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $238,500.00 $1,351,500.00 $1,590,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $238,500.00 1,351,500.00 $1,590,000.00

Fund1 OTH0

OTH0

Match $119,250.00 $675,750.00Fund2 Z001 $107,003.00 Z001 $606,350.00

Match $12,247.00 $69,400.00

Page 400 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 428: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

351.97 to 352.75 0.78 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

MALHEUR Name: 1-84 : EB CHAIN UP AREA @ FAREWELL BEND Key: 20550Description: Construct an eastbound winter truck chaining area for improved chain law compliance and safety. Includes

paved chain up area and illumination. Region: 5

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $101,400.00 $20,000.00 $554,600.00 $676,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $101,400.00 $20,000.00 554,600.00 $676,000.00

Fund1 Z001 $93,511.00 Z001 $18,444.00 Z001 $511,452.00

Match $7,889.00 $1,556.00 $43,148.00

Page 401 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 429: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: WHEATLAND RD:RIVER RD-N CITY LIMIT Key: 17979Description: Design to add bike lanes, curbs, and sidewalks along Wheatland Rd. from River Rd. to the north city limits. Region: 2MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: CITY OF KEIZER Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $94,109.00 $94,109.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $94,109.00 $94,109.00

Fund1 L230 $84,444.00

Match $9,665.00

Page 402 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 430: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.76 to 3.78 0.02 MID-WILLAMETTE VALLEY ACT MARION

MARION Name: JEFFERSON-MARION HWY: MARION CR BR REPLACEMENT Key: 18409Description: REPLACE BRIDGE #47C12 Region: 2MPO: Non-MPO Work Type: BRSO Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $515,000.00 $56,000.00 $2,117,000.00 $2,688,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $573,944.00 $56,000.00 2,117,000.00 $2,746,944.00

Fund1 M2E2 $515,000.00 M240 $50,249.00 M24

0 $1,899,584.00

Match $58,944.00 $5,751.00 $217,416.00

Page 403 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 431: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.26 to 3.28 0.02 MID-WILLAMETTE VALLEY ACT MARION

MARION Name: SILVERTON RD: LITTLE PUDDING RIVER BR REPLACEMENT Key: 18410Description: REPLACE BRIDGE #00962A Region: 2MPO: Salem/Keizer Area MPO Work Type: BRSO Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,040,000.00 $111,000.00 $6,000.00 $5,124,000.00 $6,281,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $1,158,917.00 $111,000.00 $6,000.00 5,124,000.00 $6,399,917.00

Fund1 M240 $1,040,000.00 M240 $99,600.00 M24

0 $5,384.00 M240 $4,597,765.00

Match $118,917.00 $11,400.00 $616.00 $526,235.00

Page 404 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 432: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

47.68 to 47.70 0.02 OR-22 NORTH SANTIAM MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR22: TUMBLE CREEK BRIDGE REPAIR Key: 18568Description: DECK OVERLAY; BRIDGE RAIL; BR #07295 Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $156,000.00 $32,000.00 $1,126,000.00 $1,314,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $156,000.00 $32,000.00 1,126,000.00 $1,314,000.00

Fund1 L1CE $139,979.00 M240 $28,714.00 M240 $1,010,360.00

Match $16,021.00 $3,286.00 $115,640.00

Page 405 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 433: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

254.72 to 254.76 0.04 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION256.24 to 256.32 0.08 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

256.53 to 256.55 0.02 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION257.51 to 257.55 0.04 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: I-5: SALEM AREA BRIDGE END PANEL RAISING Key: 18574Description: Raise end panels;BR#17319, 17320, 17487,18267 Region: 2MPO: Salem/Keizer Area MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $466,000.00 $3,786,000.00 $4,252,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $466,000.00 3,786,000.00 $4,252,000.00

Fund1 L1CE $429,745.00 M001 $3,397,178.00

Match $36,255.00 $388,822.00

Page 406 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 434: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.48 to 3.49 0.01 OR-551 WILSONVILLE-HUBBARD MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR551 @ EHLEN ROAD Key: 18664Description: INSTALL LTLS ON EHLEN (SIG. INTERSECT.) & RESTRICT COUNTY RD ACCESS TO EHLEN NEAR SIGNA Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $284,000.00 $2,163,000.00 $4,538,000.00 $6,985,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $284,000.00 $2,163,000.00 4,538,000.00 $6,985,000.00

Fund1 MS30 $284,000.00 MS30 $1,994,719.00 MS3

0 $4,184,944.00

Match $168,281.00 $353,056.00

Page 407 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 435: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

39.23 to 40.20 0.97 OR-214 SILVER CREEK FALLS MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR214: SMITH ST.-PIONEER DR SIDEWALK & BIKE LANES Key: 18745Description: CONSTRUCT SIDEWALKS AND BIKE LANES Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF SILVERTON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $198,000.00 $1,992,847.00 $2,190,847.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $198,000.00 1,992,847.00 $2,190,847.00

Fund1 M240 $177,665.00 M24

0 $1,788,182.00

Match $20,335.00 $204,665.00

Page 408 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 436: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: HAYESVILLE DR NE HAPPY DR-FUHRER ST BIKE/PED IMPVS Key: 18750Description: WIDEN ROADWAY WITH SHOULDERS, CURBS, SIDEWALKS, LANDSCAPING, LIGHTING AND PEDESTRIAN

AMENITIES Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $406,000.00 $109,000.00 $2,148,600.00 $2,663,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $406,001.00 $109,000.00 2,148,600.00 $2,663,601.00

Fund1 M30E $254,591.00 M240 $97,806.00 M24

0 $1,523,491.00

Match $29,139.00 $11,194.00 $174,370.00

Fund2 M301 $56,858.00 L230 $300,000.00

Match $6,508.00 $34,336.00

Fund3 M3E1 $52,855.00 OTH

0Match $6,050.00 $116,403.00

Footnote: STP-U funds limited to $300,000

Page 409 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 437: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: BROWN RD NE: SAN FRANCISCO-SUNNYVIEW (SALEM) Key: 19234Description: Add bike lanes, curbs, sidewalks, left turn lane Region: 2MPO: Salem/Keizer Area MPO Work Type: BP-FLX Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $507,800.00 $211,300.00 $2,339,600.00 $3,058,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $507,800.00 $211,300.00 2,339,600.00 $3,058,700.00

Fund1 M301 $219,188.00 M230 $106,300.00 M23

0 $1,914,600.00

Match $25,087.00 $12,167.00 $219,135.00

Fund2 OTH0 OTH0 OTH

0

Match $220,494.00 $92,833.00 $205,865.00

Fund3 M230 $38,612.00

Match $4,419.00

Footnote: STP-U funds limited to $2,059,512; TAP-U funds limited to $219,188.

Page 410 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 438: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MID-VALLEY REGIONAL TDM/RIDESHARE (#19) Key: 19242Description: Combined TDM and Rideshare Program for 2018 Region: 2MPO: Salem/Keizer Area MPO Work Type: OP-TDM Applicant: SALEM-KEIZER TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $337,977.00 $337,977.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $337,943.00 $337,943.00

Fund1 M230 $216,996.00

Match $2,614.00

Fund2 M240 $106,191.00

Match $12,142.00

Page 411 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 439: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: TRANSIT URBAN (5307) FORMULA PROGRAM 2018 SKT Key: 19256Description: Transit Prev Maint, Fuel ADA, TE, Capital Region: 2MPO: Salem/Keizer Area MPO Work Type: TR-CAP Applicant: SALEM-KEIZER TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,200,000.00 $5,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $5,200,000.00 $5,200,000.00

Fund1 FF91 $4,160,000.00

Match $1,040,000.00

Page 412 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 440: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: TRANSIT URBAN (5307) FORMULA OPERATING 2018 SKT Key: 19257Description: Transit Operating Expenses Region: 2MPO: Salem/Keizer Area MPO Work Type: TR-OPS Applicant: SALEM-KEIZER TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,660,000.00 $4,660,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $4,660,000.00 $4,660,000.00

Fund1 FF90 $2,330,000.00

Match $2,330,000.00

Page 413 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 441: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: TRANSIT URBAN (5310) FORMULA PROGRAM 2018 SKT Key: 19258Description: Transit Enhanced Mobility Seniors & Persons with Disabilities Region: 2MPO: Salem/Keizer Area MPO Work Type: TR-OPS Applicant: SALEM-KEIZER TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $312,500.00 $312,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $312,500.00 $312,500.00

Fund1 F160 $250,000.00

Match $62,500.00

Page 414 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 442: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: TRANSIT URBAN (5339) FORMULA PROGRAM 2018 SKT Key: 19259Description: Transit Bus and Bus Facilities Region: 2MPO: Salem/Keizer Area MPO Work Type: TR-CAP Applicant: SALEM-KEIZER TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $937,500.00 $937,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $937,500.00 $937,500.00

Fund1 F390 $750,000.00

Match $187,500.00

Page 415 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 443: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: SKATS MPO SUPPORT (2018) Key: 19264Description: Funding for SKATS regional planning activities for 2018 Region: 2MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SALEM-KEIZER MPO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $954,697.00 $954,697.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $954,697.00 $954,697.00

Fund1 M230 $856,650.00

Match $98,047.00

Page 416 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 444: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARIONMID-WILLAMETTE VALLEY ACT MARION

MID-WILLAMETTE VALLEY ACT MARIONMID-WILLAMETTE VALLEY ACT MARION

MID-WILLAMETTE VALLEY ACT MARIONMID-WILLAMETTE VALLEY ACT MARION

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MARION COUNTY LCAL ROAD ROADWAY DEPARTURE Key: 19753Description: Install roadway departure countermeasures in various locations to include centerline rumble strips and

profiled fog lines Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $125,178.00 $834,579.00 $959,757.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $125,178.00 834,579.00 $959,757.00

Fund1 MS30 $125,178.00 MS3

0 $834,579.00

Match

Page 417 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 445: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

259.10 to 271.50 12.40 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: I-5: WOODBURN - SALEM Key: 19831Description: Grind existing surface and inlay the travel lanes. (1R paving project. Single lift inlay to replace open graded

ACP wearing course in travel lanes.) Region: 2

MPO: Salem/Keizer Area MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $469,800.00 $11,698,450.00 $12,168,250.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2019

Total $469,800.00 11,698,450.00 $12,168,250.00

Fund1 M001 $433,250.00 Z240 $10,497,019.00

Match $36,550.00 $1,201,431.00

Page 418 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 446: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

248.41 to 251.53 3.12 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: I-5: KUEBLER BLVD TO DELANEY RD WIDENING Key: 19929Description: PE & RW to add a third lane both NB and SB between the Kuebler Interchange and the Delaney Interchange. Region: 2MPO: Salem/Keizer Area MPO Work Type: MODERN Applicant: ODOT Status: Land Purchase

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,996,000.00 $9,504,000.00 $14,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $4,996,000.00 $9,504,000.00 $14,500,000.00

Fund1 Z460 $4,607,311.00 Z460 $8,764,589.00

Match $388,689.00 $739,411.00

Page 419 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 447: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

36.80 to 36.80 OR-22 NORTH SANTIAM MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR22: BAD BANKS CREEK CULVERT Key: 19936Description: Replace Culvert (#06761) Region: 2MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $30,000.00 $1,770,000.00 $500,000.00 $2,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2020 2017

Total $300,000.00 $30,000.00 1,770,000.00 $500,000.00 $2,600,000.00

Fund1 M240 $269,190.00 Z240 $26,919.00 Z240 $1,588,221.00 M24

0 $448,650.00

Match $30,810.00 $3,081.00 $181,779.00 $51,350.00

Page 420 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 448: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: STP-U ALLOCATION FFY19 - SALEM Key: 20030Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 421 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 449: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: STP-U ALLOCATION FFY20 - SALEM Key: 20031Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 422 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 450: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: STP-U ALLOCATION FFY21 - SALEM Key: 20032Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 423 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 451: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: TAP ALLOCATION FFY19 - SALEM Key: 20039Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 424 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 452: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: TAP ALLOCATION FFY20 - SALEM Key: 20040Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 425 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 453: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: TAP ALLOCATION FFY21 - SALEM Key: 20041Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 426 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 454: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

214.53 to 214.53 I-5 PACIFIC HIGHWAY CASCADES WEST ACT LINN261.88 to 261.88 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

280.70 to 280.70 I-5 PACIFIC HIGHWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: I-5: VMS REPLACEMENT Key: 20068Description: Existing VMS boards were manufactured by US Traffic which is no longer in business. We can no longer

maintain them. Replace with new Daktronics signs. Three locations: Lake Creek Dr, Perkins Rd, and Arndt Rd. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $675,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $75,001.00 675,001.00 $750,002.00

Fund1 M240 $67,298.00 M24

0 $605,678.00

Match $7,703.00 $69,323.00

Footnote: project is in both the Salem/Keizer Area MPO & the Albany Area MPO

Page 427 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 455: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

31.70 to 32.87 1.17 OR-99E PACIFIC HWY EAST MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR99E: ENHANCED PEDESTRIAN CROSSWALKS (WOODBURN) Key: 20093Description: Install Raised Median with Marked Crosswalk (5 crosswalks, 1 study) Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,500.00 $467,500.00 $550,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2019

Total $82,501.00 467,501.00 $550,002.00

Fund1 MS30 $76,082.00 MS3

0 $431,129.00

Match $6,419.00 $36,372.00

Page 428 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 456: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

27.09 to 30.65 3.56 OR-99E PACIFIC HWY EAST MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR99E: OR551-DIMMICK LANE Key: 20123Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay + Localized ACPR (Asphalt/Concrete

Pavement Repair)) Region: 2

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $138,300.00 $2,164,288.00 $2,302,588.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $138,300.00 2,164,288.00 $2,302,588.00

Fund1 Z240 $124,097.00 Z240 $1,942,016.00

Match $14,203.00 $222,272.00

Page 429 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 457: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCASCADES WEST ACT, LANE

COUNTY ACT, MID-WILLAMETTE VALLEY ACT

LANE, LINN, MARION, YAMHILL

MARION Name: REGION 2 (CENTRAL AND SOUTH) RURAL SIGNAL IMPROV Key: 20137Description: Install reflectorized signal backplates, countdown pedestrian timers, and advanced dilemma zone protection

at various signal locations throughout Areas 4 and 5. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $677,900.00 $744,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $67,000.00 677,900.00 $744,900.00

Fund1 MS30 $61,787.00 MS3

0 $625,159.00

Match $5,213.00 $52,741.00

Page 430 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 458: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.59 to 7.59 OR-211 WOODBURN/ESTACADA MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR211 @ CANBY MARQUAM HWY Key: 20142Description: Upgrade intersection warning signs. Evaluate for concrete splitter island. Install flashing beacons on stop

signs. Install actuated flashing beacons triggered by approaching vehicles. Install lighting at intersection. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: CLACKAMAS COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $139,300.00 $7,000.00 $15,000.00 $506,500.00 $667,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $139,300.00 $7,000.00 $15,000.00 506,500.00 $667,800.00

Fund1 MS30 $128,462.00 MS30 $6,455.00 MS3

0 $13,833.00 MS30 $467,094.00

Match $10,838.00 $545.00 $1,167.00 $39,406.00

Page 431 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 459: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 5.34 MID-WILLAMETTE VALLEY ACT MARION0.00 to 4.00 MID-WILLAMETTE VALLEY ACT MARION

0.00 to 5.69 MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MARION COUNTY CURVE WARNING SIGNS Key: 20163Description: Install chevrons and updated curve warning signs on local roads in Marion County. Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $84,600.00 $202,500.00 $287,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $84,600.00 202,501.00 $287,101.00

Fund1 MS30 $78,018.00 MS3

0 $186,746.00

Match $6,582.00 $15,755.00

Page 432 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 460: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: COMMERCIAL ST: OXFORD ST SE-WINDING WAY SE (SALEM) Key: 20169Description: Buffered bike lanes in each direction on Commercial (regular bike lanes exist); segment illumination; RRFB's

near Triangle Dr SE & Waldo Ave SE Region: 2

MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $240,800.00 $1,667,400.00 $1,908,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $240,800.00 1,667,400.00 $1,908,200.00

Fund1 MS30 $222,066.00 MS3

0 $1,537,676.00

Match $18,734.00 $129,724.00

Page 433 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 461: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: KALE ST. @ CORDON RD (SALEM) Key: 20175Description: Install left turn lane on major road approach Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,100.00 $11,300.00 $33,900.00 $437,000.00 $564,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $82,100.00 $11,300.00 $33,900.00 437,000.00 $564,300.00

Fund1 MS30 $75,713.00 MS30 $10,421.00 MS3

0 $31,263.00 MS30 $403,001.00

Match $6,387.00 $879.00 $2,637.00 $33,999.00

Page 434 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 462: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: KUEBLER BLVD SE @ TURNER RD. SE Key: 20176Description: Install; Right Turn Lane on Single Major Road Approaches: Signalized Intersection (SB only); Actuated Advance

Warning Dilemma Zone Protection System at High Speed Signals; Flashing Beacons as Advance Warning at Intersections

Region: 2

MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,300.00 $33,900.00 $521,900.00 $635,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $79,300.00 $33,900.00 521,900.00 $635,100.00

Fund1 MS30 $73,130.00 MS3

0 $31,263.00 MS30 $481,296.00

Match $6,170.00 $2,637.00 $40,604.00

Page 435 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 463: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: CITY OF SALEM 12TH ST. NE SIGNAL IMPROVEMENTS Key: 20181Description: Replace Permissive Left Turns to Protected/Permissive 12th @ Marion. Install Coordination or Adaptive Signal

Timing of Urban Traffic Signals on 12th; improve Signal Hardware between Mission and Capitol. Region: 2

MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $54,700.00 $454,800.00 $509,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $54,700.00 454,800.00 $509,500.00

Fund1 MS30 $50,444.00 MS3

0 $419,417.00

Match $4,256.00 $35,383.00

Page 436 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 464: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT MARION

MARION Name: CORDON RD. @ HAYESVILLE DR. (SALEM) Key: 20182Description: Install left turn on major road approach Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,100.00 $11,300.00 $33,900.00 $482,400.00 $609,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $82,100.00 $11,300.00 $33,900.00 482,400.00 $609,700.00

Fund1 MS30 $75,713.00 MS30 $10,421.00 MS3

0 $31,263.00 MS30 $444,869.00

Match $6,387.00 $879.00 $2,637.00 $37,531.00

Page 437 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 465: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.54 to 6.77 5.23 OR-99EB SALEM PARKWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: CITY OF SALEM SIGNAL ENHANCEMENTS (UNIT 3) Key: 20187Description: Multiple signal enhancements at various locations on OR99E and OR22 Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $246,300.00 $668,500.00 $914,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $246,300.00 668,500.00 $914,800.00

Fund1 MS30 $227,138.00 MS3

0 $616,491.00

Match $19,162.00 $52,009.00

Page 438 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 466: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-18, OR-214, OR-219, OR-22, OR-

99W

HILLSBORO/SILVERTON, PACIFIC HIGHWAY WEST, SALMON RIVER,

WILLAMINA-SHERIDANMID-WILLAMETTE VALLEY ACT LINCOLN, MARION, POLK,

TILLAMOOK

MARION Name: REGION 2 (CENTRAL & S) CURVE WARNING UPGRADES Key: 20190Description: Install chevrons and updated curve warning signs at various locations throughout Area 3 Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $97,340.00 $1,772,760.00 $1,870,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $97,340.00 1,772,760.00 $1,870,100.00

Fund1 MS30 $89,767.00 MS3

0 $1,634,839.00

Match $7,573.00 $137,921.00

Page 439 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 467: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MARION COUNTY INTERSECTION IMPROVEMENTS Key: 20198Description: Intersection warning improvements on Ehlen Rd. NE and Silverton Rd. Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $112,800.00 $542,500.00 $655,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $112,800.00 542,501.00 $655,301.00

Fund1 MS30 $104,024.00 MS3

0 $500,294.00

Match $8,776.00 $42,207.00

Page 440 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 468: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MARION COUNTY CENTERLINE RUMBLE STRIPS Key: 20200Description: Install centerline rumble strips. Cordon Rd between Caplinger Rd and Hazelgreen Rd. Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $56,400.00 $156,100.00 $212,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $56,400.00 156,100.00 $212,500.00

Fund1 MS30 $52,012.00 MS3

0 $143,955.00

Match $4,388.00 $12,145.00

Page 441 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 469: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: BROADWAY ST. @ PINE ST. (SALEM) Key: 20204Description: Signal improvements & convert 4 lane roadway to 3 lane roadway with center turn lane, requires overlay. Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $292,200.00 $273,600.00 $27,400.00 $831,000.00 $1,424,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $292,200.00 $273,600.00 $27,400.00 831,000.00 $1,424,200.00

Fund1 MS30 $269,467.00 MS30 $252,314.00 MS3

0 $25,268.00 MS30 $766,348.00

Match $22,733.00 $21,286.00 $2,132.00 $64,652.00

Page 442 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 470: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.54 to 6.20 4.66 OR-99EB SALEM PARKWAY MID-WILLAMETTE VALLEY ACT MARION1.55 to 6.77 5.22 OR-22 SALEM PARKWAY MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MISSION ST. ADAPTIVE SIGNAL TIMING (SALEM) Key: 20214Description: Install Coordination or Adaptive Signal Timing of Urban Traffic Signals Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $212,500.00 $1,039,500.00 $1,252,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $212,501.00 1,039,500.00 $1,252,001.00

Fund1 MS30 $195,968.00 MS3

0 $958,627.00

Match $16,533.00 $80,873.00

Page 443 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 471: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: CITY OF SALEM SIGNAL ENHANCEMENTS UNIT 1 Key: 20217Description: Install signal enhancements at various locations throughout City of Salem Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $491,000.00 $54,700.00 $21,900.00 $932,400.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $491,000.00 $54,700.00 $21,900.00 932,400.00 $1,500,000.00

Fund1 MS30 $452,800.00 MS30 $50,444.00 MS3

0 $20,196.00 MS30 $859,859.00

Match $38,200.00 $4,256.00 $1,704.00 $72,541.00

Page 444 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 472: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: CITY OF SALEM LOCAL RD SIGNAL ENHANCEMENTS UNIT 2 Key: 20220Description: Signal enhancements on a variety of local roads in Salem and Keizer Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $135,200.00 $10,900.00 $1,360,700.00 $1,506,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $135,200.00 $10,900.00 1,360,700.00 $1,506,800.00

Fund1 MS30 $124,681.00 MS30 $10,052.00 MS3

0 $1,254,838.00

Match $10,519.00 $848.00 $105,862.00

Page 445 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 473: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: SALEM MULTI-MODAL SAFETY CROSSINGS Key: 20231Description: Design and construction of multi-modal (bike/pedestrian) crossings at five locations throughout the City of

Salem. Region: 2

MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: CITY OF SALEM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $89,500.00 $476,700.00 $566,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $89,500.00 476,700.00 $566,200.00

Fund1 Z240 $80,308.00 Z240 $427,743.00

Match $9,192.00 $48,957.00

Page 446 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 474: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION

MARION Name: HAYESVILLE DR. BICYCLE AND PEDESTRIAN IMPROVEMENTS Key: 20232Description: Widening the paved shoulder to accommodate designated bike lanes, and completing sidewalks on both sides

of Hayesville Dr from Portland Rd to west of Happy Dr. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $276,600.00 $167,400.00 $2,506,000.00 $2,950,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $276,600.00 $167,400.00 2,506,000.00 $2,950,000.00

Fund1 Z240 $248,193.00 Z240 $150,208.00 Z240 $2,248,634.00

Match $28,407.00 $17,192.00 $257,366.00

Page 447 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 475: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.42 MID-WILLAMETTE VALLEY ACT MARION

MARION Name: RIVER RD S: WILLAMETTE RIVER (INDEPENDENCE) BRIDGE Key: 20296Description: Scour repairs; install approach rail; concrete spalling. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $313,900.00 $28,200.00 $2,508,700.00 $2,850,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $313,900.00 $28,200.00 2,508,700.00 $2,850,800.00

Fund1 Z001 $281,662.00 Z001 $25,304.00 Z001 $2,251,057.00

Match $32,238.00 $2,896.00 $257,643.00

Page 448 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 476: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.64 to 1.66 0.02 MID-WILLAMETTE VALLEY ACT MARION

MARION Name: MERIDIAN ROAD NE: ABIQUA CREEK BRIDGE Key: 20313Description: Rehab bridge by constructing scour repair at abutments and piers. Widen to install new approach rails. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: MARION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $230,700.00 $56,400.00 $1,615,100.00 $1,902,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $230,700.00 $56,400.00 1,615,100.00 $1,902,200.00

Fund1 Z001 $207,007.00 Z001 $50,608.00 Z001 $1,449,229.00

Match $23,693.00 $5,792.00 $165,871.00

Page 449 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 477: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.16 to 11.83 6.67 OR-22 NORTH SANTIAM MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR22: JOSEPH ST. - GOLF CLUB RD. Key: 20418Description: Design the grinding and inlay of existing surfaces in travel lanes. Region: 2MPO: Salem/Keizer Area MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $665,630.00 $665,630.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $665,630.00 $665,630.00

Fund1 Z240 $597,270.00

Match $68,360.00

Page 450 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 478: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

23.65 to 23.93 0.28 OR-219 HILLSBORO/SILVERTON MID-WILLAMETTE VALLEY ACT MARION

MARION Name: OR219: WILLAMETTE RIVER OFLOW BRIDGES Key: 20444Description: Design shelf ready plans to replace bridges 08157 & 08158. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $609,651.00 $609,651.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $609,651.00 $609,651.00

Fund1 Z001 $547,040.00

Match $62,611.00

Page 451 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 479: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: SALEM-KEIZER AREA MPO PLANNING SFY20 Key: 20489Description: SKATS MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,306,305.00 $1,306,305.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,306,306.00 $1,306,306.00

Fund1 Z230 $527,000.00

Match $60,318.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 452 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 480: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: SALEM-KEIZER AREA MPO PLANNING SFY21 Key: 20490Description: SKATS MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,341,967.00 $1,341,967.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,341,968.00 $1,341,968.00

Fund1 Z230 $559,000.00

Match $63,980.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 453 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 481: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

MARION Name: SALEM-KEIZER AREA MPO PLANNING SFY22 Key: 20491Description: SKATS MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,379,859.00 $1,379,859.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,379,860.00 $1,379,860.00

Fund1 Z230 $593,000.00

Match $67,872.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 454 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 482: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT MORROW

MORROW Name: LAUREL LANE INTERSECTION (BOARDMAN) Key: 18915Description: WIDEN TURN RADIUS FOR SAFETY AND MOBILITY Region: 5MPO: Non-MPO Work Type: MODERN Applicant: MORROW COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $85,000.00 $18,000.00 $371,000.00 $474,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018

Total $85,000.00 $18,000.00 371,000.00 $474,000.00

Fund1 M240 $40,446.00 M240 $8,565.00 M24

0 $176,536.00

Match $4,629.00 $980.00 $20,205.00

Fund2 OTH0 OTH0 OTH

0

Match $39,925.00 $8,455.00 $174,259.00

Page 455 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 483: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

MORROW Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00Fund2 ZS30 $300,000.00

Match

MORROW Name: I-84: COLUMBIA RIVER HIGHWAY Key: 20003Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTE Region: 4MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Page 456 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 484: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.34 to 157.87 94.53 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, HOOD RIVER, MORROW, SHERMAN, WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,000.00 $522,000.00 $697,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $175,001.00 522,000.00 $697,001.00

Fund1 M240 $157,028.00 M24

0 $468,391.00

Match $17,973.00 $53,609.00

Location(s)

Mileposts Length Route Highway ACT County(s)

195.00 to 307.00 112.00 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

161.64 to 161.64 US-730 COLUMBIA RIVER NORTH EAST OREGON ACT MORROW

MORROW Name: I-84/US-730: CULVERT, STREAM & ROADSIDE DRAINAGE Key: 20322Description: Replace culvert, rehabilitate culverts, repair/replace end treatment, repair scour problems, repair roadway

embankment, fill void(s) along culvert underneath pavement. Region: 5

MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $153,000.00 $870,000.00 $1,023,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $153,000.00 870,000.00 $1,023,000.00

Fund1 Z001 $141,097.00 Z001 $802,314.00

Match $11,903.00 $67,686.00

Page 457 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 485: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.04 to 0.64 0.60 NORTH EAST OREGON ACT MORROW

MORROW Name: DIVISION STREET SAFETY IMPROVEMENTS (IRRIGON) Key: 20493Description: Construct a 10 foot wide ACP (Asphalt, Concrete, Pavement) multimodal shared-use pathway with ADA ramps

along west side of Division St from US730 to Wyoming Ave north to Irrigon Elementary School. Include RRFB @ junction of Division and US730.

Region: 5

MPO: Non-MPO Work Type: BIKPED

Applicant: CITY OF IRRIGON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $218,041.00 $44,578.00 $44,578.00 $1,418,255.00 $1,725,452.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2019

Total $218,041.00 $44,578.00 $44,578.00 1,418,255.00 $1,725,452.00

Fund1 Z240 $195,648.00 Z240 $40,000.00 Z240 $40,000.00 Z240 $816,909.00

Match $22,393.00 $4,578.00 $4,578.00 $93,499.00

Fund2 OTH0

Match $507,847.00

Page 458 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 486: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: 40 MILE LOOP: BLUE LAKE PARK - SUNDIAL RD Key: 17270Description: Reconstruct 1.7 miles of mixed use trail. Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: PORT OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $730,614.00 $460,000.00 $2,233,459.00 $3,424,073.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $730,614.00 $460,000.00 2,233,459.00 $3,424,073.00

Fund1 Z230 $655,580.00 L230 $412,758.00 L230 $1,254,083.00

Match $75,034.00 $47,242.00 $143,535.00

Fund2 M230 $750,000.00

Match $85,841.00

Footnote: $3,072,421 Federal STP-U

Page 459 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 487: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

302.00 to 308.00 6.00 I-5 PACIFIC HIGHWAY METROC, REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5: INTERSTATE BRIDGE - HASSALO ST Key: 17516Description: Pavement rehabilitation 2 - 4 inch grind/inlay, guardrail & sign installation/replacement. Reinforced concrete

pavement repair as necessary. Replace asphaltic plug joints on the Eliot School Viaduct. ADA ramps, inlet and manhole adjustments. Traffic loops

Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $961,671.00 $120,000.00 $16,277,000.00 $468,329.00 $17,827,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2011 2016 2018 2017

Total $961,671.00 $120,000.00 16,277,000.00 $468,329.00 $17,827,000.00

Fund1 M240 $379,643.00 ACP0 $110,664.00 M24

0 $14,109,660.00 M240 $431,893.00

Match $32,028.00 $9,336.00 $1,190,340.00 $36,436.00

Fund2 H010 $276,660.00 M001 $900,989.00

Match $23,340.00 $76,011.00

Fund3 M001 $230,550.00

Match $19,450.00

Footnote: Includes paving on bridge number 08995C

Page 460 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 488: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

306.85 to 306.87 0.02 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5: N DENVER AVE NB TUNNEL ILLUMINATION Key: 18760Description: Upgrade the illumination system by replacing the electrical system including the replacement of the existing

obsolete fixtures to current standard. Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $246,000.00 $321,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $75,000.00 246,000.00 $321,000.00

Fund1 L010 $69,165.00 M240 $226,861.00

Match $5,835.00 $19,139.00

Footnote: $321,000 total R1 Operations funding

Page 461 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 489: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.97 to 2.47 0.50 US-26 MT HOOD REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US26 (POWELL BLVD): SE 20TH - SE 34TH Key: 18795Description: Signal upgrades with left turn phasing, countdown pedestrian signals. Remove trees to improve sight distance.

Improve signing and illumination. Install rapid flash beacons and median pedestrian refuges. Improve existing islands and improve ADA access.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $494,200.00 $400,000.00 $2,863,455.00 $3,757,655.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2015 2018

Total $494,200.00 $400,000.00 2,863,455.00 $3,757,655.00

Fund1 MS30 $455,751.00 MS30 $368,880.00 MS3

0 $2,317,908.00

Match $38,449.00 $31,120.00 $195,547.00

Fund2 M240 $314,055.00

Match $35,945.00

Footnote: $3,407,655 total R1 Safety and $350,000 MTEP funds

Page 462 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 490: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR REGION 1 ACT MULTNOMAH

MULTNOMAH Name: CONNECTED CULLY Key: 18814Description: Construct sidewalks and bike connections in the Cully Neighborhood Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $230,905.00 $899,735.00 $2,206,732.00 $3,337,372.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $230,905.00 $899,735.00 2,206,732.00 $3,337,372.00

Fund1 M301 $207,191.00 M240 $807,332.00 M24

0 $1,980,101.00

Match $23,714.00 $92,403.00 $226,631.00

Footnote: $2,994,624 Fed Enhance funds

Page 463 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 491: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.26 to 2.69 0.43 I-405 STADIUM FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: DOWNTOWN I-405 PED SAFETY & OPERATIONAL IMPROVEMTS Key: 18818Description: BIKE, PEDESTRIAN AND OPERATIONAL IMPROVEMENTS Region: 1MPO: Portland Metro MPO Work Type: ENHANC , SAFETY Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $655,001.00 $1,585,000.00 $2,240,001.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $655,001.00 1,585,001.00 $2,240,002.00

Fund1 M040 $587,732.00 M24

0 $1,422,221.00

Match $67,269.00 $162,780.00

Footnote: $2,009,953 MTEP Fed Funding.

Page 464 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 492: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR REGION 1 ACT MULTNOMAH

MULTNOMAH Name: ST JOHNS TRUCK STRATEGY PHASE II Key: 18819Description: Freight mobility, bicycle and pedestrian safety improvements to N Lombard, N Fessenden/St Louis and N

Portland Rd/Columbia corridors. Region: 1

MPO: Portland Metro MPO Work Type: MODERN , SAFETY Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $817,747.00 $87,300.00 $2,440,943.00 $3,345,990.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $817,747.00 $87,300.00 2,440,943.00 $3,345,990.00

Fund1 M040 $733,764.00 M240 $78,334.00 M24

0 $2,190,258.00

Match $83,983.00 $8,966.00 $250,685.00

Footnote: $3,002,357 MTEP Fed funds

Page 465 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 493: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: WILLAMETTE GREENWAY TRAIL: COLUMBIA BLVD BRIDGE Key: 18832Description: Construct a bicycle and pedestrian bridge over Columbia Boulevard and an extension of the Willamette

Greenway Trail from the existing termini in Chimney Park to the south end of the landfill bridge over the south Columbia Slough

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: PORTLAND METRO Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $20,000.00 $2,092,381.00 $2,612,381.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $500,000.00 $20,000.00 2,092,381.00 $2,612,381.00

Fund1 M3E1 $257,415.00 OTH0 M24

0 $1,131,861.00

Match $29,462.00 $20,000.00 $129,547.00

Fund2 M23E $191,235.00 OTH

0

Match $21,888.00 $830,973.00

Footnote: $1,580,511 MTEP Award.

Page 466 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 494: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: NE 238TH DR: NE HALSEY ST - NE GLISAN ST Key: 18833Description: Widen travel lanes and add bicycle and pedestrian facilities. Region: 1MPO: Portland Metro MPO Work Type: MODERN Applicant: MULTNOMAH COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,114,454.00 $746,961.00 $6,560,529.00 $8,421,944.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,114,454.00 $746,961.00 6,560,529.00 $8,421,944.00

Fund1 LZ2E $676,872.00 M240 $669,449.00 M240 $5,879,738.00

Match $77,471.00 $76,621.00 $672,962.00

Fund2 M23E $207,106.00 OTH0 OTH

0

Match $23,704.00 $891.00 $7,829.00

Fund3 LZ1E $116,022.00Match $13,279.00

Footnote: $1,000,000 Federal STP Urban and $6,549,187 Federal MTEP awarded.

Page 467 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 495: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: NE COLUMBIA BLVD: CULLY BLVD & ALDERWOOD RD Key: 18837Description: Install or replace a signal and construct a taper on Columbia Blvd's east leg at Alderwood for future side-by-

side left-turn lanes between Cully and Alderwood. Construct sidewalks at the Columbia/Alderwood intersection and on N side to Cully.

Region: 1

MPO: Portland Metro MPO Work Type: MODERN Applicant: PORT OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,562,966.00 $321,190.00 $3,643,378.00 $5,527,534.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,562,966.00 $321,190.00 3,643,378.00 $5,527,534.00

Fund1 M240 $1,402,449.00 M240 $288,204.00 M24

0 $3,269,203.00

Match $160,517.00 $32,986.00 $374,175.00

Footnote: $4,538,856 MTEP Federal award

Page 468 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 496: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.97 to 12.10 10.13 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

MULTNOMAH Name: OR99W: CORRIDOR SAFETY & ACCESS TO TRANSIT Key: 18838Description: Sidewalk infill, enhanced pedestrian crossings, bus shelters and pads, bike and pedestrian facilities, retaining

walls and drainage improvements, transit priority signals Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: TRIMET Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $691,529.00 $147,354.00 $2,766,116.00 $3,604,999.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $691,529.00 $147,354.00 2,766,116.00 $3,604,999.00

Fund1 M240 $620,509.00 M240 $132,221.00 M24

0 $2,482,036.00

Match $71,020.00 $15,133.00 $284,080.00

Footnote: $3,234,766 Federal MTEP award.

Page 469 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 497: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SE 242ND/HOGAN: NE BURNSIDE - E POWELL (GRESHAM) Key: 19120Description: Widen SE Hogan Road to provide increased access for economic development and freight mobility. The

project includes signals, bicycle and pedestrian improvements to provide safer and improved access for all road users.

Region: 1

MPO: Portland Metro MPO Work Type: MODERN Applicant: CITY OF GRESHAM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $650,000.00 $2,550,000.00 $3,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $300,000.00 $650,000.00 2,550,000.00 $3,500,000.00

Fund1 ACP0 $150,000.00 L240 $325,000.00 OTH0

Match $17,168.00 $37,198.00 $1,407,683.00

Fund2 OTH0 OTH0 L240 $1,025,001.00

Match $132,832.00 $287,802.00 $117,316.00

Footnote: $1,500,000 Federal R1 funding award

Page 470 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 498: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

22.65 to 23.25 0.60 I-205 EAST PORTLAND FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5 & I-205 SHARED USE PATHS Key: 19265Description: Repave sections, install ADA ramps, drainage and address tree roots with structure. Repave transition to

existing structure near I-84WB to I-205 to correct settlement. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $595,000.00 $645,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2018

Total $150,000.00 595,001.00 $745,001.00

Fund1 LZ2E $89,730.00 M240 $533,894.00

Match $10,270.00 $61,107.00Fund2 L24E $44,865.00

Match $5,135.00

Footnote: $745,000 Total Bike-Ped funding award

Page 471 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 499: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SANDY BLVD: NE 181ST AVE - EAST GRESHAM CITY LIMIT Key: 19279Description: Construction of multimodal, freight access and mobility facilities Region: 1MPO: Portland Metro MPO Work Type: MODERN Applicant: CITY OF GRESHAM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $664,605.00 $998,273.00 $2,330,324.00 $3,993,202.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $664,605.00 $998,273.00 2,330,324.00 $3,993,202.00

Fund1 M23E $596,350.00 M230 $895,750.00 M23

0 $2,091,000.00

Match $68,255.00 $102,523.00 $239,324.00

Footnote: $3,583,100 Federal Urban STP award

Page 472 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 500: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: EAST PORTLAND ACCESS TO EMPLOYMENT AND EDUCATION Key: 19297Description: Sidewalks crossings bus stops bike facilities and other safety facilities Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,704,646.00 $65,425.00 $4,099,760.00 $5,869,831.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $1,704,646.00 $65,425.00 4,099,760.00 $5,869,831.00

Fund1 M230 $1,529,579.00 M230 $58,706.00 M23

0 $3,678,715.00

Match $175,067.00 $6,719.00 $421,045.00

Footnote: $5,267,000 Federal STP-Urban award

Page 473 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 501: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.78 to 5.25 0.47 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH

MULTNOMAH Name: OR99W: SW 26TH WAY-SW 19TH AVE (PORTLAND) Key: 19298Description: This project will build missing gaps in the sidewalks and bike lanes and make enhancements to existing

intersections Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $445,782.00 $111,445.00 $1,442,104.00 $1,999,331.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $445,782.00 $111,445.00 1,442,104.00 $1,999,331.00

Fund1 M230 $400,000.00 M230 $100,000.00 M23

0 $1,294,000.00

Match $45,782.00 $11,445.00 $148,104.00

Footnote: $1,794,000 Federal STP-Urban award

Page 474 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 502: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: PORTLAND CENTRAL CITY SAFETY PROJECT - PHASE 2 Key: 19299Description: Develop a strategy that identifies multimodal safety projects and prioritizes investments Region: 1MPO: Portland Metro MPO Work Type: CMAQ Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $949,515.00 $722,167.00 $111,445.00 $4,346,372.00 $6,129,499.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $949,515.00 $722,167.00 $111,445.00 4,346,372.00 $6,129,499.00

Fund1 M40E $651,337.00 M40

0 $648,000.00 M400 $100,000.00 M400 $3,900,000.00

Match $74,548.00 $74,167.00 $11,445.00 $446,372.00Fund2 Z400 $135,443.00

Match $15,502.00

Fund3 M400 $52,457.00

Match $6,004.00

Fund4 L40E $12,233.00Match $1,400.00

Fund5 L400 $530.00Match $61.00

Footnote: $5,500,000 Federal CMAQ award

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH

MULTNOMAH Name: PORTLAND TO MILWAUKIE LIGHT RAIL (FY18) Key: 19350Description: This project extends light rail from PSU in downtown Portland to Milwaukie and north Clackamas County. It

includes a multi-modal bridge carrying light rail, streetcar, buses, bicycles and pedestrians. Region: 1

MPO: Portland Metro MPO Work Type: TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000,000.00 $200,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Page 475 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 503: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Year 2018

Total $200,000,000.00 $200,000,000.00

Fund1 FF31 $100,000,000.00Match $100,000,000.00

Footnote: $100,000,000 Federal 5309 Funds

Location(s)

Mileposts Length Route Highway ACT County(s)

0.09 to 0.39 0.30 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

0.05 to 0.41 0.36 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-84/I-5: BANFIELD INTERCHANGE Key: 19531Description: Concrete deck overlay & bridge rail retrofit; bridges #08588A & 08588C Region: 1MPO: Portland Metro MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,100,000.00 $5,470,000.00 $6,570,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $1,100,000.00 5,470,000.00 $6,570,000.00

Fund1 M040 $1,014,420.00 M00

1 $5,044,434.00

Match $85,580.00 $425,566.00

Footnote: $6,570,000 Total HBR funds

Page 476 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 504: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.61 to 3.07 0.46 I-405 STADIUM FREEWAY REGION 1 ACT MULTNOMAH1.03 to 1.45 0.42 OR-99E PACIFIC HIGHWAY EAST REGION 1 ACT MULTNOMAH

3.65 to 3.98 0.33 I-405 STADIUM FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-405: FREMONT BRIDGE Key: 19533Description: Replace modular joints; bridges 09268B,09268N,09268S,08958B,08958D,08958I Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $4,250,000.00 $5,750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $1,500,000.00 4,250,000.00 $5,750,000.00

Fund1 Z001 $1,345,950.00 M001 $3,919,350.00

Match $154,050.00 $330,650.00

Footnote: $5,750,000 Total HBR funds

Page 477 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 505: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

308.00 to 308.65 0.65 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5: INTERSTATE BR (NB) TRUNNION SHAFT REPLACEMENT Key: 19651Description: Replace trunnion shaft; bridge #01377A. ODOT is lead on project with WSDOT paying 50% of total. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,398,000.00 $10,749,136.00 $12,147,136.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2019

Total $2,568,000.00 10,749,136.00 $13,317,136.00

Fund1 OTH0

OTH0 $4,822,600.00

Match $1,284,000.00 $551,968.00Fund2 Z030 $640,468.00 Z001 $4,956,427.00

Match $54,032.00 $418,141.00

Fund3 Z001 $528,958.00Match $60,542.00

Page 478 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 506: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

300.28 to 300.48 0.20 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5: MARQUAM BR ELECTRIC & LIGHTING SYSTEM REPLACE Key: 19652Description: Replace electrical & lighting system; bridge #08328 Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $243,550.00 $1,604,526.00 $1,848,076.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $243,550.00 1,604,526.00 $1,848,076.00

Fund1 Z001 $224,602.00 M001 $1,479,694.00

Match $18,948.00 $124,832.00

Footnote: $1,848,076 Total HBP funding

Page 479 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 507: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.21 to 7.90 0.69 US-26 MT HOOD REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US26 (POWELL BLVD): SE 122ND AVE - SE 136TH AVE Key: 19690Description: Construct sidewalks, storm water facility, buffered or separated bike lane, center turn lane/median and 2x11-

foot travel lanes. Mid-block pedestrian crossings and lighting improvements are included. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,000,000.00 $4,300,000.00 $200,000.00 $12,500,000.00 $20,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018 2018

Total $3,000,000.00 $4,300,000.00 $200,000.00 12,500,000.00 $20,000,000.00

Fund1 ACP0 $3,000,000.00 GF01 $4,300,000.00 GF01 $200,000.00 GF01 $9,500,000.00

Match

Fund2 M230 $3,000,000.00

Match

Footnote: $17,000,000 Total HB5005 funds and $3,000,000 Federal STP-Urban funds

Page 480 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 508: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

17.36 to 17.38 0.02 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-84: GRAHAM ROAD BRIDGE REPLACEMENTS Key: 19763Description: Replace bridges #07046 & 07046A Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,400,000.00 $11,994,714.00 $15,394,714.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $3,400,000.00 11,994,714.00 $15,394,714.00

Fund1 Z001 $2,766,600.00 Z001 $7,838,700.00

Match $233,400.00 $661,300.00Fund2 B4A0 $400,000.00 B4A0 $3,494,714.00

Match

Footnote: $11,500,000 Total Bridge and $3,894,714 JTA funds

Page 481 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 509: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: NE KANE DRIVE AT KELLY CREEK CULVERT Key: 19787Description: Remove existing temporary culvert. Install new culvert storm water system and repair roadway. Work includes

upstream restoration and downstream pond mitigation. Region: 1

MPO: Portland Metro MPO Work Type: EM-REL Applicant: CITY OF GRESHAM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,193,000.00 $275,000.00 $4,307,000.00 $5,775,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,193,000.00 $275,001.00 4,307,000.00 $5,775,001.00

Fund1 M9V0 $1,070,479.00 M9V0 $246,758.00 M9V

0 $3,864,671.00

Match $122,521.00 $28,243.00 $442,329.00

Footnote: $5,181,908 Federal ER funds

Page 482 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 510: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SE 122ND AVE: JOHNSON CREEK BRIDGE REPLACEMENT Key: 19794Description: Emergency replacement of bridge #51C20. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $600,000.00 $20,000.00 $2,180,000.00 $2,800,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $600,000.00 $20,000.00 2,180,000.00 $2,800,000.00

Fund1 Z233 $538,380.00 ACO0 $17,946.00 ACO0 $1,956,114.00

Match $61,620.00 $2,054.00 $223,886.00

Footnote: $2,512,440 Fed HBP funds

Page 483 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 511: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.92 to 6.46 2.54 US-30 LOWER COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US30: KITTRIDGE - ST JOHNS Key: 20208Description: Repave roadway, upgrade ADA ramps to current standards, improve access management, and address

drainage as needed. Pave Bridge Avenue. Region: 1

MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,653,917.00 $179,116.00 $70,000.00 $6,615,671.00 $8,518,704.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $1,653,917.00 $179,116.00 $70,000.00 6,615,671.00 $8,518,704.00

Fund1 Z001 $1,484,060.00 Z001 $160,721.00 Z240 $62,811.00 Z001 $5,936,242.00

Match $169,857.00 $18,395.00 $7,189.00 $679,429.00

Footnote: $8,518,704.00 Total Preservation funds

Page 484 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 512: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

13.83 to 41.16 27.33 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH41.16 to 41.34 0.18 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-84: FAIRVIEW - MARINE DRIVE

& TOOTH ROCK TUNNEL Key: 20298

Description: Repave a section of I-84 between Fairview and Marine Dr, repaves the Tooth Rock tunnel and installs a full signal upgrade (including ADA) at NE 238th Ave.

Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $401,930.00 $2,488.00 $4,387,730.00 $4,792,148.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $401,930.00 $2,488.00 4,387,730.00 $4,792,148.00

Fund1 Z001 $263,703.00 Z240 $2,232.00 Z001 $3,778,971.00

Match $22,247.00 $256.00 $318,807.00Fund2 Z240 $104,069.00 Z240 $260,174.00

Match $11,911.00 $29,778.00

Footnote: $ 4,792,148 Total funding

Page 485 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 513: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: CITY OF GRESHAM SAFETY PROJECT Key: 20303Description: Intersection improvements, upgrade to ADA, utility relocation, signal work, medians, traffic separators,

striping, signing, warnings, and other safety improvements. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF GRESHAM Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $398,900.00 $170,000.00 $10,000.00 $1,188,900.00 $1,767,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $398,900.00 $170,000.00 $10,000.00 1,188,900.00 $1,767,800.00

Fund1 ZS30 $367,866.00 ZS30 $156,774.00 ZS30 $9,222.00 ZS30 $1,096,404.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $31,034.00 $13,226.00 $778.00 $92,496.00

Footnote: $1,630,265 Federal Award

Page 486 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 514: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: CITY OF PORTLAND SAFETY PROJECT Key: 20304Description: Work may include intersection improvements, upgrade to ADA, utility relocation, signal work, medians, traffic

seperators, striping, signing, warnings, and other safety improvements. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $258,600.00 $36,000.00 $2,304,800.00 $2,599,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $258,600.00 $36,000.00 2,304,800.00 $2,599,400.00

Fund1 Z001 $238,481.00 ZS30 $33,199.00 ZS30 $2,125,487.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $20,119.00 $2,801.00 $179,313.00

Footnote: $2,397,167 Federal award

Page 487 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 515: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.60 REGION 1 ACT MULTNOMAH

MULTNOMAH Name: STARK STREET MULTIMODAL CONNECTIONS Key: 20330

Description: Close the existing east-west gap in bicycle and pedestrian travel by constructing sidewalks and bike lanes on the north side and part of the south side of SE Stark Street between SW 257th Ave and S Troutdale Rd.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: MULTNOMAH COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $428,582.00 $400,000.00 $3,285,795.00 $4,114,377.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $428,583.00 $400,001.00 3,285,795.00 $4,114,379.00

Fund1 Z240 $328,582.00 Z240 $306,669.00 Z240 $2,519,127.00

Match $37,608.00 $35,100.00 $288,325.00

Fund2 OTH0 OTH0 OTH

0

Match $62,393.00 $58,232.00 $478,343.00

Footnote: $ 3,154,377 Federal MTEP award

Page 488 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 516: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-205 UNDERCROSSING (SULLIVAN'S GULCH) Key: 20332Description: Provide safe access across I-205 for bicyclists and pedestrians by improving local street corridors on the west

side of I-205 and constructing an east-west bicycle and pedestrian undercrossing. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $899,642.00 $107,900.00 $2,369,384.00 $3,376,926.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $899,642.00 $107,900.00 2,369,384.00 $3,376,926.00

Fund1 Z240 $448,224.00 Z240 $53,758.00 Z240 $1,180,486.00

Match $51,301.00 $6,153.00 $135,112.00

Fund2 OTH0 OTH0 OTH

0

Match $400,117.00 $47,989.00 $1,053,786.00

Footnote: $ 1,682,468 Federal MTEP funds

Page 489 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 517: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SEVENTIES NEIGHBORHOOD GREENWAY Key: 20333

Description: Traffic calming and way-finding elements on local streets, some paving, crossing improvements, and multi-use path through Rose City Golf Course to address a gap in north-south bicycle and pedestrian facilities near 82nd avenue.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $986,875.00 $100,000.00 $3,923,831.00 $5,010,706.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2020

Total $986,875.00 $100,000.00 3,923,831.00 $5,010,706.00

Fund1 OTH0 OTH0 OTH

0

Match $547,884.00 $55,517.00 $2,178,396.00Fund2 Z240 $393,907.00 Z240 $39,915.00 Z240 $1,566,179.00

Match $45,084.00 $4,568.00 $179,256.00

Footnote: $ 2,000,000 Federal MTEP award

Page 490 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 518: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SYSTEMIC SIGNAL AND ILLUMINATION (PORTLAND) Key: 20334Description: Illumination, intersection work, bike and pedestrian improvements, ADA upgrades, signal work, signs,

warnings, striping, medians, utility relocation, and other safety improvements. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $611,200.00 $140,500.00 $18,100.00 $2,070,654.00 $2,840,454.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $611,200.00 $140,500.00 $18,100.00 2,070,654.00 $2,840,454.00

Fund1 ZS30 $563,649.00 ZS30 $129,569.00 ZS30 $16,692.00 ZS30 $1,909,557.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $47,551.00 $10,931.00 $1,408.00 $161,097.00

Footnote: $2,619,467 Federal ARTS Award

Page 491 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 519: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: CENTRAL SYSTEMIC SIGNALS AND ILLUMINATION (ODOT) Key: 20335Description: Illumination, intersection work, bike and pedestrian improvements, ADA upgrades, signal work, signs,

warnings, striping, medians, utility relocation, and other safety improvements at various locations. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $645,300.00 $246,000.00 $2,549,500.00 $3,440,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $645,300.00 $246,000.00 2,549,500.00 $3,440,800.00

Fund1 ZS30 $645,300.00 ZS30 $246,000.00 ZS30 $2,549,500.00

Match

Footnote: $ 3,440,800 Total ARTS allocation

Page 492 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 520: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

2.50 to 3.50 1.00 REGION 1 ACT MULTNOMAH

MULTNOMAH Name: EAST SYSTEMIC SIGNALS AND ILLUMINATION (MULTNOMAH) Key: 20338Description: Illumination, intersection work, bike and pedestrian improvements, ADA upgrades, signal work, signs,

warnings, striping, medians, utility relocation, and other safety improvements at various locations. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: MULTNOMAH COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $43,172.00 $293,428.00 $336,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $43,172.00 293,428.00 $336,600.00

Fund1 ZS30 $39,813.00 ZS30 $270,599.00

Match

Fund2 OTH0

OTH0

Match $3,359.00 $22,829.00

Footnote: $ 310,413 Federal ARTS award

Page 493 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 521: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH, WASHINGTON

MULTNOMAH Name: RUMBLE STRIPS AND CONFLICT MARKINGS (COP/WASH CO) Key: 20340Description: Install centerline rumble strips, green conflict markings and/or profile edge line pavement markings at various

locations in Portland. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND, WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $57,100.00 $637,500.00 $694,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $57,100.00 637,501.00 $694,601.00

Fund1 ZS30 $52,658.00 ZS30 $587,903.00

Match

Fund2 OTH0

OTH0

Match $4,442.00 $49,598.00

Footnote: $ 640,560 Federal ARTS award

Page 494 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 522: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, HOOD RIVER, MULTNOMAH, WASHINGTON

MULTNOMAH Name: RUMBLE STRIPS (ODOT) Key: 20341Description: Install centerline rumble strips and install shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205, I-405,

OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224, HWY-173 (Timberline), OR-212, OR-281, and OR-282.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,600.00 $950,854.00 $1,101,454.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $150,600.00 950,854.00 $1,101,454.00

Fund1 ZS30 $150,600.00 ZS30 $950,854.00

Match

Footnote: $ 1,101,454 Total ARTS funding

Page 495 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 523: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

20.67 to 36.76 16.09 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-84 CORRIDOR CULVERTS: MP 20.67 - 36.76 Key: 20363Description: Rehabilitation and replacement of culverts Region: 1MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $257,400.00 $1,458,600.00 $1,716,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $257,400.00 1,458,600.00 $1,716,000.00

Fund1 Z240 $237,374.00 Z240 $1,345,121.00

Match $20,026.00 $113,479.00

Footnote: $ 1,716,000 Total Culvert funding

Page 496 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 524: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-0.07 to 0.07 REGION 1 ACT MULTNOMAH

MULTNOMAH Name: MORRISON STREET: WILLAMETTE RIVER (MORRISON) BR Key: 20382Description: Remove existing lead-based paint and apply new protective paint. Remove current debris from bridge

bearings, paint. Add a maintenance access catwalk for the fixed river spans. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: MULTNOMAH COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $197,540.00 $19,357,432.00 $19,554,972.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $197,540.00 19,357,432.00 $19,554,972.00

Fund1 Z001 $177,253.00 Z001 $17,369,424.00

Match $20,287.00 $1,988,008.00

Page 497 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 525: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.01 to 0.02 0.01 REGION 1 ACT MULTNOMAH

MULTNOMAH Name: LATOURELL ROAD: LATOURELL CREEK BRIDGE Key: 20383Description: Replace existing timber bridge. Region: 1MPO: Non-MPO Work Type: BRIDGE Applicant: MULTNOMAH COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $348,385.00 $28,905.00 $927,062.00 $1,304,352.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $348,385.00 $28,905.00 927,062.00 $1,304,352.00

Fund1 Z233 $312,606.00 Z233 $25,936.00 Z233 $831,853.00

Match $35,779.00 $2,969.00 $95,209.00

Page 498 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 526: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-0.03 to 0.05 REGION 1 ACT MULTNOMAH

MULTNOMAH Name: NW THURMAN ST OVER MACLEAY PARK Key: 20384Description: Design shelf ready plans to paint the bridge trusses and bents. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: CITY OF PORTLAND Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $530,950.00 $530,950.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $530,950.00 $530,950.00

Fund1 Z001 $476,421.00

Match $54,529.00

Page 499 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 527: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: FULL SIGNAL UPGRADE (PORTLAND) Key: 20389Description: Signals rebuild and upgrades at various locations in Portland. Work includes rebuild and installation of signals,

warning systems, striping, lane adjustments, ADA upgrades, traffic separators, and other safety improvements as needed.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $925,400.00 $61,000.00 $62,000.00 $2,720,100.00 $3,768,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019 2021

Total $925,400.00 $61,000.00 $62,000.00 2,720,100.00 $3,768,500.00

Fund1 ZS30 $853,404.00 ZS30 $56,254.00 ZS30 $57,176.00 ZS30 $2,508,476.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $71,996.00 $4,746.00 $4,824.00 $211,624.00

Footnote: $ 3,475,311 Federal ARTS award

Page 500 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 528: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.96 to 1.98 0.02 US-30 LOWER COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US-30 AT NW NICOLAI ST Key: 20390Description: Full signal rebuild. Work includes queue warning system, dilemma zone protection, and additional through

head on northbound approach; new signal heads; reflective back plates; and replace existing southbound signs with 45 degree right signs

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $235,200.00 $691,300.00 $926,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $235,200.00 691,300.00 $926,500.00

Fund1 ZS30 $235,200.00 ZS30 $691,300.00

Match

Footnote: $ 926,500 Total ARTS funds

Page 501 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 529: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

MULTNOMAH Name: RURAL INTERSECTION AND CURVE WARNING (ODOT) Key: 20400Description: Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at

various rural intersections, roadway departures and curves throughout Region 1. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $83,300.00 $551,585.00 $634,885.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $83,300.00 551,585.00 $634,885.00

Fund1 ZS30 $83,300.00 ZS30 $551,585.00Match

Footnote: $ 634,885 Total ARTS allocation

Page 502 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 530: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.90 to 12.52 5.62 I-84 COLUMBIA RIVER REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-84: EAST PORTLAND FWY - NE 181ST AVE Key: 20410Description: Design shelf ready plans to: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $500,000.00 $500,000.00

Fund1 Z001 $461,100.00

Match $38,900.00

Footnote: $ 500,000 Total IM allocation

Page 503 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 531: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.32 to 4.59 1.27 US-30BY NORTHEAST PORTLAND REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US30BY (LOMBARD) SAFETY EXTENSION Key: 20413Description: Road diet between MP 3.50 and N Wilbur. Signal upgrades at Fiske, Woolsey, Chautauqua, Wabash,

Peninsular, and Greeley. Remove half signal at Drummond. Install RRFB with pedestrian island near Drummond. ADA improvements and access management as needed.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED , OP-SSI , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,582,496.00 $200,386.00 $19,950.00 $4,629,206.00 $6,432,038.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019 2020

Total $1,582,496.00 $200,386.00 $19,950.00 4,629,206.00 $6,432,038.00

Fund1 Z240 $1,023,905.00 Z240 $111,612.00 ZS30 $10,000.00 Z240 $2,989,540.00

Match $117,191.00 $12,774.00 $342,166.00Fund2 ZS30 $441,400.00 ZS30 $76,000.00 Z240 $8,928.00 ZS30 $1,297,500.00

Match $1,022.00

Footnote: $ 6,432,038 Total allocation

Page 504 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 532: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.00 to 5.02 0.02 US-30BY NORTHEAST PORTLAND REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US30BY (LOMBARD) AT FENWICK Key: 20415Description: Full signal upgrade, ADA improvements, and access management. Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,112.00 $74,631.00 $4,975.00 $843,178.00 $1,217,896.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $295,112.00 $74,631.00 $4,975.00 843,178.00 $1,217,896.00

Fund1 Z240 $264,804.00 Z240 $66,966.00 Z240 $4,464.00 Z240 $756,584.00

Match $30,308.00 $7,665.00 $511.00 $86,594.00

Footnote: $ 1,217,896 Total Operations Allocation

Page 505 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 533: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

303.27 to 308.63 5.36 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5: MP 303.27 - MP 308.63 Key: 20430Description: Install variable speed advisory signs on I-5 northbound and southbound from the Fremont Bridge to Marine

Drive Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,386,500.00 $6,413,000.00 $7,799,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $1,386,500.00 6,413,000.00 $7,799,500.00

Fund1 ZS30 $1,386,500.00 ZS30 $6,413,000.00

Match

Footnote: $ 7,799,500 Total ARTS allocation

Page 506 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 534: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: NE HALSEY ST AT NE 47TH AVE Key: 20431Description: Design partial signal rebuild to add left turn phasing, lenses, signal heads, reflectorized backplates, and ADA

ramp upgrades Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $117,000.00 $117,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $117,000.00 $117,000.00

Fund1 ZS30 $107,897.00

Match

Fund2 OTH0

Match $9,103.00

Footnote: $ 107,897 Federal ARTS award

Page 507 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 535: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.47 to 10.29 2.82 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

MULTNOMAH Name: OR99W: I-5 - MCDONALD ST Key: 20435Description: Repave roadway, upgrade ADA ramps to current standards, improve access management, and address

drainage as needed. Includes full signal upgrade at Johnson/Main. Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,922,919.00 $1,099,575.00 $7,397,640.00 $10,420,134.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $1,922,919.00 $1,099,575.00 7,397,640.00 $10,420,134.00

Fund1 Z001 $1,494,572.00 Z001 $937,539.00 Z001 $5,978,289.00

Match $171,060.00 $107,306.00 $684,242.00Fund2 Z240 $230,864.00 Z240 $49,109.00 Z240 $659,613.00

Match $26,423.00 $5,621.00 $75,496.00

Footnote: $ 10,420,134 Total Allocation

Page 508 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 536: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.47 to 10.29 2.82 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

MULTNOMAH Name: OR99W: I-5 - MCDONALD BIKE PED INFILL Key: 20437Description: Fill in sidewalk and bike lane gaps along OR99W in conjunction with the pavement preservation project

planned in the area. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $986,000.00 $986,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 986,000.00 $986,000.00

Fund1 Z240 $884,738.00

Match $101,262.00

Footnote: $ 986,000 Total AT Leverage allocation

Page 509 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 537: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH

MULTNOMAH Name: OR99W (BARBUR BLVD) AT SW CAPITOL HWY Key: 20438Description: Prohibit NB left turns from OR99W onto I-5 ramp and redirect traffic flow through jug handle; Install EB right

turn lane and new signal at Taylors Ferry; Address median gaps and striping; Add/improve signage; Install reflectorized backplates

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $720,100.00 $139,000.00 $2,116,600.00 $2,975,700.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $720,100.00 $139,000.00 2,116,600.00 $2,975,700.00

Fund1 ZS30 $720,100.00 ZS30 $139,000.00 ZS30 $2,116,600.00

Match

Footnote: $ 2,975,700 Total ARTS allocation

Page 510 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 538: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

4.08 to 7.55 3.47 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH

MULTNOMAH Name: OR99W (BARBUR BLVD): MP 4.08 TO MP 7.55 Key: 20441Description: Install illumination at 60th Ave, 64th Ave, and I-5 southbound ramp; Install reflectorized backplates and

supplemental signal head at Terwilliger Blvd, Bertha Blvd, Capitol Hill Rd, 19th Ave, 24th Ave, I-5 southbound ramp, 60th Ave, and 64th Ave

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $52,700.00 $11,500.00 $365,200.00 $429,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $52,700.00 $11,500.00 365,200.00 $429,400.00

Fund1 ZS30 $52,700.00 ZS30 $11,500.00 ZS30 $365,200.00

Match

Footnote: $ 429,400 Total ARTS allocation

Page 511 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 539: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH

MULTNOMAH Name: CLACKAMAS AND PORTLAND TRAFFIC SEPARATORS Key: 20476Description: Install traffic separators in various locations in Portland with associated striping, illumination, and

signal coordination work. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF PORTLAND, CLACKAMAS COUNTY, ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $302,100.00 $11,200.00 $583,200.00 $896,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $302,100.00 $11,200.00 583,200.00 $896,500.00

Fund1 ZS30 $286,726.00 ZS30 $11,200.00 ZS30 $557,013.00

Match

Fund2 OTH0

OTH0

Match $15,374.00 $26,187.00

Footnote: $ 854,939 Federal Safety funds, $2,902 Clackamas County share and $38,659 City of Portland share.

Page 512 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 540: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.60 to 5.60 OR-213 CASCADE NORTH REGION 1 ACT MULTNOMAH9.52 to 9.52 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

2.07 to 2.07 US-26 MT HOOD REGION 1 ACT MULTNOMAH7.38 to 7.38 US-26 MT HOOD REGION 1 ACT MULTNOMAH

MULTNOMAH Name: REGION 1 BIKE PED CROSSINGS Key: 20479Description: Bike and pedestrian improvements at select locations on 82nd Ave (OR-213), McLoughlin (OR-99E) and on

Powell (US-26). Includes RRFBs, medians, illumination, crosswalks, tree trimming/removal, ADA upgrades, and other safety improvements.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $281,600.00 $74,000.00 $793,400.00 $1,149,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $281,600.00 $74,000.00 793,400.00 $1,149,000.00

Fund1 ZS30 $281,600.00 ZS30 $74,000.00 ZS30 $793,400.00

Match

Footnote: $1,149,000 Total Safety allocation

Page 513 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 541: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

19.61 to 19.61 I-205 EAST PORTLAND FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-205 NORTHBOUND EXIT RAMP AT SE DIVISION ST Key: 20480Description: Safety improvements on NB I-205 exit ramp at SE Division street. Work may include lane adjustments, ramp

widening, safety islands, signal work, illumination, signing, and ADA improvements as necessary Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $490,000.00 $30,000.00 $7,000.00 $1,778,000.00 $2,305,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2021

Total $490,000.00 $30,000.00 $7,000.00 1,778,000.00 $2,305,000.00

Fund1 ZS30 $490,000.00 ZS30 $30,000.00 ZS30 $7,000.00 ZS30 $1,778,000.00

Match

Footnote: $ 2,305,000 Total Safety allocation

Page 514 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 542: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.12 to 3.53 0.41 I-405 STADIUM FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-405: WILLAMETTE RIVER (FREMONT) BRIDGE Key: 20481Description: Paint bridge approaches; other section as funding allows. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $940,358.00 $31,714,533.00 $32,654,891.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $940,358.00 31,714,533.00 $32,654,891.00

Fund1 Z001 $867,198.00 Z001 $29,247,142.00

Match $73,160.00 $2,467,391.00

Page 515 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 543: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.47 to 1.67 0.20 I-405 STADIUM FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-405 NB TO US26 WB OVER I-405 CONNECTION BRIDGE Key: 20482Description: Deck overlay to seal the cracks and provide additional cover for the reinforcement. Rail retrofit. Address

leaking joints. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $156,000.00 $1,392,226.00 $1,548,226.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $156,000.00 1,392,226.00 $1,548,226.00

Fund1 Z001 $143,863.00 Z001 $1,283,911.00

Match $12,137.00 $108,315.00

Page 516 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 544: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

20.10 to 23.70 3.60 I-205 EAST PORTLAND FREEWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-205: DIVISION ST - KILLINGSWORTH ST Key: 20483Description: Construct a NB Auxiliary lane on I-205 from the I-84 EB to I-205 NB off ramp at Killingsworth St and a SB

Auxiliary lane on I-205 from I-84 EB to I-205 SB on ramp to the existing Auxiliary lane at Division / Powell St Region: 1

MPO: Portland Metro MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $15,000,000.00 $15,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 15,000,000.00 $15,000,000.00

Fund1 Z001 $13,833,000.00

Match $1,167,000.00

Footnote: $15,000,000 Total HighwayLeverage allocation.

Page 517 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 545: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

296.51 to 296.59 0.08 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: SW MULTNOMAH BLVD OVER I-5 Key: 20484Description: Place a structural overlay on the deck, replace or repair leaking joints, and retrofit the bridge rails to meet

safety standards. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $213,000.00 $1,358,000.00 $1,571,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $213,000.00 1,358,000.00 $1,571,000.00

Fund1 Z001 $196,429.00 Z001 $1,252,348.00

Match $16,571.00 $105,652.00

Page 518 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 546: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

296.03 to 296.06 0.03 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH

MULTNOMAH Name: I-5 OVER 26TH AVENUE BRIDGE Key: 20486Description: Replace bridge. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,047,369.00 $250,000.00 $29,053,631.00 $34,351,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $5,047,369.00 $250,000.00 29,053,631.00 $34,351,000.00

Fund1 Z001 $4,654,684.00 Z001 $230,550.00 Z001 $26,793,259.00

Match $392,685.00 $19,450.00 $2,260,372.00

Page 519 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 547: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-3.84 to -3.88 OR-99E PACIFIC HWY EAST REGION 1 ACT MULTNOMAH

MULTNOMAH Name: OR99E OVER UPRR AT BALDWIN STREET BRIDGE Key: 20487Description: Address the structural and safety issues. Replace rail and expansion joints, patch and seal spalls and cracks,

and other measures for seismic retrofitting. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $558,826.00 $153,252.00 $2,671,229.00 $3,383,307.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $558,826.00 $153,252.00 2,671,229.00 $3,383,307.00

Fund1 Z001 $501,435.00 Z001 $137,513.00 Z001 $2,396,894.00

Match $57,391.00 $15,739.00 $274,335.00

Page 520 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 548: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

288.50 to 294.21 5.71 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH, WASHINGTON

MULTNOMAH Name: I-5: TIGARD INTERCHANGE - I-205 INTERCHANGE Key: 20498Description: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $724,276.00 $33,073.00 $7,242,651.00 $8,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018

Total $724,276.00 $33,073.00 7,242,651.00 $8,000,000.00

Fund1 Z001 $667,927.00 Z001 $30,500.00 Z001 $6,679,173.00

Match $56,349.00 $2,573.00 $563,478.00

Footnote: $8,000,000 Total IM funds

Page 521 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 549: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.64 to 1.65 0.01 OR-213 CASCADE NORTH REGION 1 ACT MULTNOMAH

MULTNOMAH Name: OR213 (82ND AVE) AT MADISON HIGH SCHOOL Key: 20507Description: Replace signal, rebuild and restripe existing crosswalk, add crosswalks and close a driveway. Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $215,000.00 $149,500.00 $11,000.00 $745,000.00 $1,120,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $215,001.00 $149,500.00 $11,000.00 745,001.00 $1,120,502.00

Fund1 Z240 $192,920.00 Z240 $134,146.00 Z240 $9,870.00 Z240 $668,489.00

Match $22,081.00 $15,354.00 $1,130.00 $76,512.00

Footnote: $ 1,120,500 Total Operations allocation

Page 522 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 550: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.29 to 0.52 0.23 US-30 NORTHEAST PORTLAND REGION 1 ACT MULTNOMAH

MULTNOMAH Name: US30 AT BRIDGE AVE RAMPS Key: 20522Description: Design for tree hazard removal and pinned mesh installation. Region: 1MPO: Portland Metro MPO Work Type: OP-SLD Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $657,504.00 $657,504.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $657,504.00 $657,504.00

Fund1 Z240 $589,978.00

Match $67,526.00

Footnote: $ 657,504 Total Operations allocation

Page 523 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 551: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

MULTNOMAH Name: PORTLAND METRO PLANNING SFY20 Key: 20595Description: Portland Metro MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 524 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 552: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

MULTNOMAH Name: PORTLAND METRO PLANNING SFY21 Key: 20596Description: Portland Metro MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 525 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 553: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

MULTNOMAH Name: PORTLAND METRO PLANNING SFY22 Key: 20597Description: Portland Metro MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 526 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 554: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

60.03 to 60.03 0.01 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR99W @ CLOW CORNER RD Key: 16120Description: CHANNELIZE TURNING MOVEMENTS Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $218,000.00 $98,000.00 $89,000.00 $2,835,000.00 $3,240,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2013 2018 2018 2018

Total $370,000.00 $98,000.00 $89,000.00 2,835,000.00 $3,392,000.00

Fund1 LS3E $201,040.00 MS30 $98,000.00 LS30 $82,076.00 LS30 $2,835,000.00

Match $16,960.00 $6,924.00

Fund2 MS3E $152,000.00

Match

Page 527 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 555: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

22.14 to 22.14 OR-22 WILLAMINA-SALEM MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR22: DOAKS FERRY RD - RIGGS AVE (SALEM) Key: 18322Description: ACCESS CONTROL AT DOAKS FERRY RD @ HWY 22 PLUS OTHER INTERSECTION CHANGES Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: POLK COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00 $5,000.00 $352,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2018

Total $100,000.00 $100,000.00 $5,001.00 352,227.00 $557,228.00

Fund1 L230 $89,730.00 L230 $89,730.00 L230 $4,487.00 L230 $316,053.00

Match $10,270.00 $10,270.00 $514.00 $36,174.00

Footnote: STP-U FUNDS LIMITED TO $500,000

Page 528 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 556: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

49.74 to 51.07 0.10 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR99W: ASH SWALE & PLUM CREEK BRIDGE REPLACEMENTS Key: 18584Description: REPLACE BRIDGES #00403A & 00417 Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $618,000.00 $166,000.00 $143,000.00 $5,965,000.00 $6,892,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $618,000.00 $166,000.00 $143,000.00 5,965,001.00 $6,892,001.00

Fund1 Z232 $554,531.00 M240 $148,952.00 M240 $128,314.00 M24

0 $5,352,395.00

Match $63,469.00 $17,048.00 $14,686.00 $612,606.00

Page 529 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 557: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.20 to 1.20 0.01 OR-22 WILLAMINA-SALEM MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR22: CULVERT (MP 01.20) Key: 18640Description: REPLACE CULVERT Region: 2MPO: Non-MPO Work Type: OP-SLD , OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $450,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $50,000.00 450,000.00 $500,000.00

Fund1 M24E $44,865.00 M24

0 $403,785.00

Match $5,135.00 $46,215.00

Page 530 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 558: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

27.75 to 27.75 0.01 OR-18 SALMON RIVER MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR18: CULVERT (MP 27.75) Key: 18646Description: REHAB OF CULVERT Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $675,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $75,001.00 675,001.00 $750,002.00

Fund1 M240 $67,298.00 M24

0 $605,678.00

Match $7,703.00 $69,323.00

Page 531 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 559: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.33 to 20.78 2.45 OR-221 SALEM-DAYTON MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR221(SALEM) SIGNAL/PED CROSSING IMPROVEMENTS Key: 18666Description: UPGRADE SIGNALS WITH NEW FEATURES FOR CONSPICUITY, TURNING AND PED PROTECT. ADD PED BEACON Region: 2MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $425,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $75,000.00 425,000.00 $500,000.00

Fund1 S080 $75,000.00 S080 $425,000.00

Match

Page 532 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 560: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.23 to 0.49 0.26 OR-51 MONMOUTH-INDEPENDENCE MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR51: HEFFLEY STREET-MAIN STREET EAST (MONMOUTH) Key: 18742Description: CONSTRUCT TURN LANES, BIKE LANES, SIDEWALK AND LANDSCAPE BUFFERS Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF MONMOUTH Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $121,000.00 $50,000.00 $10,000.00 $1,272,400.00 $1,453,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $120,988.00 $49,995.00 $9,999.00 1,272,273.00 $1,453,255.00

Fund1 M240 $108,573.00 M240 $44,865.00 M24

0 $8,973.00 M240 $1,141,725.00

Match $12,415.00 $5,130.00 $1,026.00 $130,548.00

Page 533 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 561: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT POLK

POLK Name: GODSEY RD: SE MILLER AVENUE - CLOW CORNER Key: 18747Description: CONSTRUCT SIDEWALKS AND BIKE LANES Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF DALLAS Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $217,000.00 $1,454,682.00 $1,671,682.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $217,000.00 1,454,536.00 $1,671,536.00

Fund1 M240 $194,714.00 M24

0 $1,305,286.00

Match $22,286.00 $149,250.00

Page 534 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 562: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

52.82 to 52.82 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR99W: ASH SWALE CREEK CULVERT Key: 19459Description: Culvert Replacement Region: 2MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $393,525.00 $2,623,500.00 $3,017,025.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $393,525.00 2,623,500.00 $3,017,025.00

Fund1 L25E $269,936.00 M240 $2,354,067.00

Match $30,895.00 $269,433.00Fund2 L250 $83,062.00

Match $9,507.00

Fund3 H250 $112.00Match $13.00

Page 535 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 563: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT POLKMID-WILLAMETTE VALLEY ACT YAMHILL

CASCADES WEST ACT BENTON

POLK Name: REGION 2 (CENTRAL) LOCAL RD ROADWAY DEPARTURE Key: 19796Description: Install roadway departure countermeasures throughout Areas 3 and 4 Region: 2MPO: Albany Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $218,365.00 $318,365.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 218,365.00 $318,365.00

Fund1 MS30 $100,000.00 MS3

0 $218,365.00

Match

Page 536 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 564: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.07 to 3.40 0.33 OR-223 KINGS VALLEY MID-WILLAMETTE VALLEY ACT POLK2.14 to 2.35 0.21 OR-51 MONMOUTH-INDEPENDENCE MID-WILLAMETTE VALLEY ACT POLK

6.23 to 6.34 0.11 OR-51 INDEPENDENCE MID-WILLAMETTE VALLEY ACT POLK7.17 to 7.53 0.36 OR-194 MONMOUTH MID-WILLAMETTE VALLEY ACT POLK

7.00 to 7.18 0.18 OR-18B WILLAMINA-SHERIDAN MID-WILLAMETTE VALLEY ACT YAMHILL

POLK Name: DISTRICT 3 WEST ADA IMPROVEMENTS Key: 19962Description: Upgrade substandard ADA curb ramps Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $165,000.00 $280,500.00 $611,800.00 $1,057,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2019

Total $165,001.00 $280,500.00 611,800.00 $1,057,301.00

Fund1 M240 $148,055.00 M240 $251,693.00 M24

0 $548,968.00

Match $16,946.00 $28,807.00 $62,832.00

Page 537 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 565: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: STP-U ALLOCATION FFY19 - SALEM Key: 20030Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 538 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 566: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: STP-U ALLOCATION FFY20 - SALEM Key: 20031Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 539 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 567: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: STP-U ALLOCATION FFY21 - SALEM Key: 20032Description: Surface Transportation Program (STP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: OPERAT Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,944,818.00 $4,944,818.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $4,944,819.00 $4,944,819.00

Fund1 Z230 $4,436,986.00

Match $507,833.00

Page 540 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 568: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: TAP ALLOCATION FFY19 - SALEM Key: 20039Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 541 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 569: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: TAP ALLOCATION FFY20 - SALEM Key: 20040Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 542 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 570: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: TAP ALLOCATION FFY21 - SALEM Key: 20041Description: Transportation Alternatives Program (TAP) funding set aside for the Salem TMA to use on projects to be

determined through their project selection process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: BIKPED Applicant: SKATS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $244,480.00 $244,480.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $244,480.00 $244,480.00

Fund1 Z301 $219,372.00

Match $25,108.00

Page 543 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 571: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

20.31 to 20.46 0.15 OR-22 WILLAMINA-SALEM MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR22: INDEPENDENCE JUNCTION ILLUMINATION Key: 20070Description: Currently has old poles and direct-buried wire. Replace entire system with new poles and electrical. Region: 2MPO: Salem/Keizer Area MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $25,000.00 $250,000.00 $325,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $50,000.00 $25,001.00 250,000.00 $325,001.00

Fund1 Z240 $44,865.00 Z240 $22,433.00 Z240 $224,325.00

Match $5,135.00 $2,568.00 $25,675.00

Page 544 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 572: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

17.55 to 20.78 3.23 OR-221 SALEM-DAYTON MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR221: MICHIGAN CITY LN.-EDGEWATER ST (W. SALEM) Key: 20122Description: Grind existing surfacing and inlay the travel lanes and shoulders and update ADA ramps as applicable. ( Inlay +

Localized ACPR (Asphalt/Concrete Pavement Repair)) Region: 2

MPO: Salem/Keizer Area MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $331,900.00 $169,300.00 $4,805,566.00 $5,306,766.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $331,900.00 $169,300.00 4,805,566.00 $5,306,766.00

Fund1 Z240 $297,814.00 Z240 $151,913.00 Z240 $4,312,034.00

Match $34,086.00 $17,387.00 $493,532.00

Page 545 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 573: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.95 to 79.77 15.82 OR-99W PACIFIC HWY WEST CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, POLK

POLK Name: OR99W: MONMOUTH-NE ELLIOT CIRCLE RD Key: 20124Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay + Localized ACPR (Asphalt/Concrete

Pavement Repair)) Region: 2

MPO: Corvallis Area MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $340,000.00 $8,774,487.00 $9,114,487.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $340,000.00 8,774,487.00 $9,114,487.00

Fund1 Z240 $305,082.00 Z240 $7,873,347.00

Match $34,918.00 $901,140.00

Page 546 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 574: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

15.00 to 20.30 5.30 OR-22 WILLAMINA-SALEM MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR22: RICKREALL INTCH.-INDEPENDENCE HWY. Key: 20129Description: Grind existing surfacing and inlay the travel lanes. (Single Lift Inlay) Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $330,300.00 $5,160,657.00 $5,490,957.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $330,300.00 5,160,657.00 $5,490,957.00

Fund1 Z240 $296,378.00 Z240 $4,630,658.00

Match $33,922.00 $529,999.00

Page 547 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 575: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.10 to 3.10 MID-WILLAMETTE VALLEY ACT POLK

POLK Name: CLOW CORNER @ RIDDELL RD Key: 20139Description: Upgrade intersection warning signs. Evaluate for concrete splitter island with left side stop sign on minor leg

approaches. Install transverse rumbles on stop controlled minor approaches. Install red flashing beacons. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: POLK COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $31,900.00 $6,600.00 $208,800.00 $247,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $31,900.00 $6,600.00 208,800.00 $247,300.00

Fund1 MS30 $29,418.00 MS30 $6,087.00 MS3

0 $192,555.00

Match $2,482.00 $513.00 $16,245.00

Page 548 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 576: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

12.72 to 12.72 OR-22 WILLAMINA-SALEM MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR22 @ SMITHFIELD RD/KINGS VALLEY Key: 20141Description: Convert 4-Leg Intersection to Two 3-Leg Intersections Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $169,300.00 $116,200.00 $75,600.00 $940,400.00 $1,301,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $169,300.00 $116,200.00 $75,600.00 940,400.00 $1,301,500.00

Fund1 MS30 $156,128.00 MS30 $107,160.00 MS3

0 $69,718.00 MS30 $867,237.00

Match $13,172.00 $9,040.00 $5,882.00 $73,163.00

Page 549 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 577: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-18, OR-214, OR-219, OR-22, OR-

99W

HILLSBORO/SILVERTON, PACIFIC HIGHWAY WEST, SALMON RIVER,

WILLAMINA-SHERIDANMID-WILLAMETTE VALLEY ACT LINCOLN, MARION, POLK,

TILLAMOOK

POLK Name: REGION 2 (CENTRAL & S) CURVE WARNING UPGRADES Key: 20190Description: Install chevrons and updated curve warning signs at various locations throughout Area 3 Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $97,340.00 $1,772,760.00 $1,870,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $97,340.00 1,772,760.00 $1,870,100.00

Fund1 MS30 $89,767.00 MS3

0 $1,634,839.00

Match $7,573.00 $137,921.00

Page 550 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 578: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, MID-WILLAMETTE VALLEY ACT BENTON, LINCOLN, POLK

POLK Name: REGION 2 (SOUTH) CURVE WARNING UPGRADES Key: 20193Description: Install chevrons and updated curve warning signs at various locations throughout Area 4 Region: 2MPO: Corvallis Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $82,207.00 $1,497,193.00 $1,579,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $82,207.00 1,497,193.00 $1,579,400.00

Fund1 MS30 $75,811.00 MS3

0 $1,380,711.00

Match $6,396.00 $116,482.00

Page 551 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 579: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 MID-WILLAMETTE VALLEY ACT POLK

POLK Name: F STREET: SOUTH FORK ASH CREEK BRIDGE Key: 20354Description: Replace the existing structure with a new bridge Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: CITY OF INDEPENDENCE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $382,600.00 $1,946,900.00 $2,329,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $382,600.00 1,946,900.00 $2,329,500.00

Fund1 Z001 $343,307.00 Z001 $1,746,953.00

Match $39,293.00 $199,947.00

Page 552 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 580: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

68.10 to 68.16 0.06 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT POLK

POLK Name: OR99W: LUCKIAMUTE RIVER BRIDGE Key: 20426Description: Deck overlay; external post-tensioning, epoxy crack injection and concrete girder repair. Rail retrofit. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $149,571.00 $1,335,229.00 $1,484,800.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $149,571.00 1,335,229.00 $1,484,800.00

Fund1 Z001 $134,210.00 Z001 $1,198,101.00

Match $15,361.00 $137,128.00

Page 553 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 581: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: SALEM-KEIZER AREA MPO PLANNING SFY20 Key: 20489Description: SKATS MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,306,305.00 $1,306,305.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,306,306.00 $1,306,306.00

Fund1 Z230 $527,000.00

Match $60,318.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 554 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 582: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: SALEM-KEIZER AREA MPO PLANNING SFY21 Key: 20490Description: SKATS MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,341,967.00 $1,341,967.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,341,968.00 $1,341,968.00

Fund1 Z230 $559,000.00

Match $63,980.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 555 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 583: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT MARION, POLK

POLK Name: SALEM-KEIZER AREA MPO PLANNING SFY22 Key: 20491Description: SKATS MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future through the

MPO process. Region: 2

MPO: Salem/Keizer Area MPO Work Type: PLANNG Applicant: SKATS Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,379,859.00 $1,379,859.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,379,860.00 $1,379,860.00

Fund1 Z230 $593,000.00

Match $67,872.00Fund2 Z450 $487,121.00

Match $55,753.00

Fund3 Z77D $158,027.00Match $18,087.00

Page 556 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 584: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, SHERMAN, WASCO

SHERMAN Name: I-84: DURABLE MARKINGS Key: 18657Description: DURABLE MARKINGS FOR R4 IM PROJECTS ON I-84 Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $382,000.00 $382,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $382,000.00 $382,000.00

Fund1 M240 $342,769.00

Match $39,231.00

Page 557 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 585: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

US-97 THE DALLES-CALIFORNIA HWY LOWER JOHN DAY ACT, SOUTH CENTRAL OREGON ACT SHERMAN

SHERMAN Name: US97: SPANISH HOLLOW CREEK AND TROUT CREEK BRIDGES Key: 19075Description: SEISMIC RETROFIT AND REHABILITATION; REPLACEMENT OF 2 LANE SPANISH HOLLOW CRK BR #08855;

CLIMBING LANE EXTENSION Region: 4

MPO: Non-MPO Work Type: BRIDGE , MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,166,988.00 $25,000.00 $11,575,000.00 $12,766,988.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2016 2018

Total $1,566,988.00 $25,000.00 11,575,000.00 $13,166,988.00

Fund1 M232 $717,840.00 B4A0 $25,000.00 M23

2 $8,075,700.00

Match $82,160.00 $924,300.00

Fund2 B4A0 $400,000.00 B4A0 $2,575,000.00Match

Fund3 M2E2 $329,298.00

Match $37,690.00

Page 558 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 586: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

SHERMAN Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00Fund2 ZS30 $300,000.00

Match

SHERMAN Name: I-84: COLUMBIA RIVER HIGHWAY Key: 20003Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTE Region: 4MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Page 559 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 587: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

63.34 to 157.87 94.53 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, HOOD RIVER, MORROW, SHERMAN, WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,000.00 $522,000.00 $697,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $175,001.00 522,000.00 $697,001.00

Fund1 M240 $157,028.00 M24

0 $468,391.00

Match $17,973.00 $53,609.00

Location(s)

Mileposts Length Route Highway ACT County(s)

56.00 to 56.00 US-97 SHERMAN LOWER JOHN DAY ACT WASCO

109.50 to 109.50 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

0.20 to 0.20 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN

SHERMAN Name: LOWER JOHN DAY ITS PRIORITIES Key: 20024Description: SHANIKO ROAD WEATHER INFORMATION SYSTEM, RUFUS VARIABLE MESSAGE SIGN, US97 SB @ BIGGS

VARIABLE MESSAGE SIGN Region: 4

MPO: Non-MPO Work Type: OP-ITS

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $10,000.00 $5,000.00 $1,693,000.00 $2,008,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019 2021

Total $300,000.00 $10,000.00 $5,001.00 1,693,000.00 $2,008,001.00

Fund1 M240 $269,190.00 S010 $10,000.00 M24

0 $4,487.00 M240 $1,519,129.00

Match $30,810.00 $514.00 $173,871.00

SHERMAN Name: US97 ROCKFALL Key: 20095Description: UNSTABLE SLOPES EVALUATION AND ROCKFALL REMEDIATION Region: 4MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Page 560 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 588: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

67.14 to 124.00 56.86 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT, LOWER JOHN DAY ACT DESCHUTES, JEFFERSON, WASCO

0.00 to 68.60 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN, WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $884,000.00 $300,000.00 $3,791,444.00 $4,975,444.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020 2021

Total $884,000.00 $300,000.00 3,791,444.00 $4,975,444.00

Fund1 M240 $793,213.00 S010 $300,000.00 M24

0 $3,402,063.00

Match $90,787.00 $389,381.00

Location(s)

Mileposts Length Route Highway ACT County(s)

4.02 to 4.03 0.01 LOWER JOHN DAY ACT SHERMAN

SHERMAN Name: FINNEGAN ROAD (FINNEGAN CREEK) BRIDGE Key: 20373Description: Replace bridge. Region: 4MPO: Non-MPO Work Type: BRIDGE

Applicant: SHERMAN COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $193,424.00 $23,124.00 $814,933.00 $1,031,481.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $193,424.00 $23,124.00 814,933.00 $1,031,481.00

Fund1 Z233 $173,559.00 Z233 $20,749.00 Z233 $731,239.00

Match $19,865.00 $2,375.00 $83,694.00

STATEWIDE Name: 1R SAFETY FEATURES BUCKET (2018) Key: 18476Description: 1R safety features funding for Federal fiscal year 2018. Projects to be determined based on program needs. Region: 6MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Page 561 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 589: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,000,000.00 $6,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 6,000,000.00 $6,000,000.00

Fund1 M001 $5,383,800.00

Match $616,200.00

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: FISH PASSAGE RESERVE POOL 2018 Key: 18479Description: Fish passage program reserve funding for Federal fiscal year 2018. Projects to be determined based on

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: FISH

Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,572,600.00 $1,572,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 1,572,600.00 $1,572,600.00

Fund1 M240 $1,411,094.00

Match $161,506.00

STATEWIDE Name: CULVERT REPAIR AND SUPPLIES 2018 Key: 18488Description: Culvert repair and supplies funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Page 562 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 590: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 100,000.00 $100,000.00

Fund1 M240 $89,730.00

Match $10,270.00

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY SAFETY STATEWIDE QUICK FIX - 2018 Key: 18491Description: Highway safety statewide quick fix program funding for Federal fiscal year 2018. Projects to be determined

based on program requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 500,000.00 $500,000.00

Fund1 S010 $500,000.00

Match

STATEWIDE Name: TRANSIT INNOVATIVE PROJECTS FFY2018 Key: 18494Description: Transit innovative projects funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Non-Construction Project

Page 563 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 591: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $700,000.00 $700,000.00

Fund1 M240 $628,110.00

Match $71,890.00

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL TECHNOLOGY ASSISTANCE PROGRAM (LTAP) CY2018 Key: 18497Description: Operating Funds for the Oregon Technology Transfer (T2) Center Region: 6MPO: Non-MPO Work Type: PLANNG

Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $345,000.00 $345,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $345,000.00 $345,000.00

Fund1 OTH0

Match $159,000.00

Fund2 438E $75,000.00Match $75,000.00

Fund3 M550 $28,800.00

Match $7,200.00

Page 564 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 592: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRAFFIC SAFETY GRANT PROGRAM 2018 Key: 18501Description: Traffic safety grant program funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,000,000.00 $1,000,000.00

Fund1 TSP0 $1,000,000.00

Match

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRAFFIC SAFETY GRANT PROGRAM 2018 (SEC 164) Key: 18504Description: Traffic safety grant program funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $9,600,000.00 $9,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 9,600,000.00 $9,600,000.00

Fund1 MS32 $9,600,000.00

Match

Page 565 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 593: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: IMMEDIATE OPPORTUNITY FUND SFY 2018 Key: 18507Description: Immediate opportunity fund (IOF) funding for state fiscal year 2018. Projects to be determined by OTC based

on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: IOF Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,500,000.00 $3,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 3,500,000.00 $3,500,000.00

Fund1 S600 $3,500,000.00

Match

Page 566 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 594: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING AND RESEARCH PROGRAM FFY2018 Key: 18512Description: Part I work program conducts project development activities for planning, scoping of projects, data collection

and data analysis to design and operate an efficient transportation system. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,620,400.00 $20,620,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $20,620,400.00 $20,620,400.00

Fund1 M550

$12,320,000.00

Match $3,080,000.00

Fund2 M240 $4,684,265.00

Match $536,135.00

Page 567 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 595: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE OPERATIONS BUCKET 2018 Key: 18515Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,238,000.00 $1,238,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 1,238,000.00 $1,238,000.00

Fund1 M240 $1,110,857.00

Match $127,143.00

Page 568 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 596: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TRANSPORTATION NETWORK (5310) 2018 Key: 18518Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $13,500,000.00 $13,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $13,500,000.00 $13,500,000.00

Fund1 M240 $12,113,550.00

Match $1,386,450.00

Page 569 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 597: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY/RAIL CROSSING PROGRAM 2018 Key: 18524Description: Funding for the statewide rail crossing program for Federal fiscal year 2018. Projects to be selected based on

the program requirements and need. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,100,000.00 $2,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 2,100,000.00 $2,100,000.00

Fund1 MS40 $2,100,000.00

Match

Page 570 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 598: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY/RAIL GCPA 2018 Key: 18528Description: Funding for Rail crossings on highways. Projects to be determined at a later date based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 700,000.00 $700,000.00

Fund1 S010 $700,000.00

Match

Page 571 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 599: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL GOVERNMENT STP STATEWIDE BUCKET 2018 Key: 18532Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: SPPROG Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $22,284,000.00 $22,284,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 22,284,000.00 $22,284,000.00

Fund1 S010 $20,055,600.00

Match

Fund2 OTH0

Match $2,228,400.00

Page 572 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 600: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SPECIAL CITY ALLOTMENT PROGRAM 2018 Key: 18535Description: Surface Transportation Program (STP) funding to be dispersed to cities, per AOC & LOC agreement. Projects to

be determined by the local agencies. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 1,000,000.00 $1,000,000.00

Fund1 S010 $900,000.00

Match

Fund2 OTH0

Match $100,000.00

Page 573 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 601: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SPECIAL COUNTY ALLOTMENT PROGRAM 2018 Key: 18538Description: Surface Transportation Program (STP) funding to be dispersed to counties, per AOC & LOC agreement. Projects

to be determined by the local agencies. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $750,000.00 $750,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 750,000.00 $750,000.00

Fund1 S010 $750,000.00

Match

Page 574 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 602: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION DEMAND MANAGEMENT 2018 Key: 18541Description: Transportation demand management (TDM) program funding for Federal fiscal year 2018. Projects to be

determined based on program requirements. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $836,000.00 $836,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $836,000.00 $836,000.00

Fund1 M240 $750,143.00

Match $85,857.00

Page 575 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 603: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKZONE SAFETY PROGRAM 2018 Key: 18548Description: Workzone safety program funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,100,000.00 $2,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 2,100,000.00 $2,100,000.00

Fund1 M240 $1,884,330.00

Match $215,670.00

Page 576 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 604: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR INTERSTATE MAINTENANCE (MIM) 2018 Key: 18552Description: Major interstate maintenance funding for Federal fiscal year 2018. Projects to be determined based on

program requirements. Region: 6

MPO: Non-MPO Work Type: PR-MIM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $2,900,000.00 $3,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $100,000.00 2,900,000.00 $3,000,000.00

Fund1 S010 $100,000.00 S010 $2,900,000.00

Match

Page 577 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 605: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE OVERPASS SCREENING BUCKET - 2018 Key: 18590Description: Bridge overpass screening funding for Federal fiscal year 2018. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 1,500,000.00 $1,500,000.00

Fund1 M240 $1,345,950.00

Match $154,050.00

Page 578 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 606: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: FY 2018 BRIDGE PROGRAM RESERVE BUCKET Key: 18591Description: Bridge program reserve funding for Federal fiscal year 2018. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $67,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 67,000.00 $67,000.00

Fund1 M240 $60,119.00

Match $6,881.00

Page 579 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 607: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR BRIDGE MAINTENANCE BUCKET (BRIDGE PROG) 2018 Key: 18594Description: Major bridge maintenance funding for Federal fiscal year 2018. Projects to be determined based on program

requirements. Region: 6

MPO: Non-MPO Work Type: BR-MBM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $8,200,000.00 $8,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 8,200,000.00 $8,200,000.00

Fund1 S010 $8,200,000.00

Match

Page 580 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 608: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSIT URBAN GENERAL PUBLIC STP TRANSFER 2018 Key: 18927Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: TRANSIT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,229,000.00 $2,229,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,229,000.00 $2,229,000.00

Fund1 M240 $2,000,082.00

Match $228,918.00

Page 581 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 609: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-RURAL PROG (5339-MAP-21) 2018 Key: 18934Description: VEHICLE/FACILITIES REPLACEMENT AND EXPANSION Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: PUBLIC TRANSIT DIVISION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,500,000.00 $1,500,000.00

Fund1 FF30 $1,200,000.00

Match $300,000.00

Page 582 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 610: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-SM URBAN (5339-MAP-21) 2018 Key: 18935Description: VEHICLE/FACILITIES REPLACEMENT AND EXPANSION Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: PUBLIC TRANSIT DIVISION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $900,000.00 $900,000.00

Fund1 FF30 $720,000.00

Match $180,000.00

Page 583 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 611: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY RURAL PROG (5310) 2018 Key: 18940Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: TRANSIT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $1,050,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,050,000.00 $1,050,000.00

Fund1 F160 $840,000.00

Match $210,000.00

Page 584 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 612: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY SM URBAN PROG (5310) 2018 Key: 18941Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: TRANSIT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $900,000.00 $900,000.00

Fund1 F160 $720,000.00

Match $180,000.00

Page 585 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 613: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ADMINISTRATION & TECHNICAL ASSISTANCE (5311) 2018 Key: 18950Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,135,000.00 $1,135,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,135,000.00 $1,135,000.00

Fund1 F182 $1,135,000.00

Match

Page 586 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 614: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: INTERCITY PROGRAM (5311F) 2018 Key: 18951Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,128,000.00 $2,128,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,128,000.00 $2,128,000.00

Fund1 F184 $1,702,400.00

Match $425,600.00

Page 587 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 615: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NON URBANIZED AREA PROGRAM (5311) 2018 Key: 18952Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $15,175,000.00 $15,175,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $15,175,000.00 $15,175,000.00

Fund1 FF18 $8,510,140.00

Match $6,664,860.00

Page 588 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 616: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: RURAL TRANSIT ASSISTANCE PROGRAM (5311B) 2018 Key: 18953Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-OPS Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $181,000.00 $181,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $181,000.00 $181,000.00

Fund1 P180 $181,000.00

Match

Page 589 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 617: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: MPO PLANNING - TRANSIT (5303) 2018 Key: 18956Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,361,000.00 $1,361,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,361,000.00 $1,361,000.00

Fund1 M77D $1,088,800.00

Match $272,200.00

Page 590 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 618: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE TRANSIT PLANNING & RESEARCH (5304) 2018 Key: 18959Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-PLN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,000.00 $295,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $295,000.00 $295,000.00

Fund1 F260 $236,000.00

Match $59,000.00

Page 591 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 619: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS MANAGEMENT 2018 Key: 18962Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: TR-OPS Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $174,000.00 $174,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $174,000.00 $174,000.00

Fund1 M240 $156,130.00

Match $17,870.00

Page 592 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 620: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: PE FOR FIX-IT SHELF PROJECTS (2018) Key: 19080Description: PE FOR FIX-IT SHELF PROJECTS Region: 6MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $5,000,000.00 $5,000,000.00

Fund1 M240 $4,486,500.00

Match $513,500.00

Page 593 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 621: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2018 INTERSTATE SIGN REPLACEMENT Key: 19203Description: FUNDING TO REPLACE SIGNS ON INTERSTATE HIGHWAYS Region: 6MPO: Non-MPO Work Type: PR-IM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $1,800,000.00 $2,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $200,000.00 1,800,000.00 $2,000,000.00

Fund1 M001 $179,460.00 M00

1 $1,615,140.00

Match $20,540.00 $184,860.00

Page 594 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 622: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2018 FIX-IT ADA RESERVE Key: 19601Description: ADA Program reserve funding for Federal fiscal year 2018. Projects to be determined based on program

needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,000,000.00 $2,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,000,000.00 $2,000,000.00

Fund1 M240 $1,794,600.00

Match $205,400.00

Page 595 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 623: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: PLANNING INDIRECT COST ALLOCATION PLAN 2018 Key: 19608Description: INDIRECT RATE FOR QUALIFIED PROJECTS Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $11,189,737.00 $11,189,737.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $11,189,737.00 $11,189,737.00

Fund1 M240 $10,040,551.00

Match $1,149,186.00

Page 596 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 624: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY INDIRECT COST ALLOCATION PLAN (ICAP) 2018 Key: 19611Description: INDIRECT RATE FOR QUALIFIED HIGHWAY PROJECTS Region: 6MPO: Non-MPO Work Type: BRIDGE , OPERAT , PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $26,000,000.00 $26,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $26,000,000.00 $26,000,000.00

Fund1 M240 $23,329,800.00

Match $2,670,200.00

Page 597 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 625: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: FIX-IT CULVERT 2018 Key: 19646Description: Culvert program funding for Federal fiscal year 2018. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,000,000.00 $6,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $6,000,000.00 $6,000,000.00

Fund1 M240 $5,383,800.00

Match $616,200.00

Page 598 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 626: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY FEATURES FOR LOCAL ROADS AND STREETS 2018 Key: 19666Description: PROVIDE TRAFFIC SAFETY ENGINEERING/LAW ENFORCEMENT TRAINING TO LOCAL OFFICIALS Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $150,000.00 $150,000.00

Fund1 MS30 $138,330.00

Match $11,670.00

Page 599 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 627: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OSU ENGINEERING SAFETY SHORT COURSES FFY18 Key: 19669Description: Provide safety engineering training to transportation professionals and public officials. Funding is from

Federal fiscal year 2018. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $250,000.00 $250,000.00

Fund1 MS30 $230,550.00

Match $19,450.00

Page 600 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 628: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY CORRIDOR EDUCATION AND ENFORCEMENT 2018 Key: 19672Description: PROVIDE FUNDS FOR STATE & POLICE AGENCY ENFORCEMENT & EDUCATIONAL MATERIALS Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $100,000.00 $100,000.00

Fund1 MS30 $92,220.00

Match $7,780.00

Page 601 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 629: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKZONE ENFORCEMENT 2018 Key: 19731Description: Roadway Departure Implementation Plan, Enforcement Efforts Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $180,000.00 $180,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $180,000.00 $180,000.00

Fund1 MS30 $165,996.00

Match $14,004.00

Page 602 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 630: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TMA PLANNING (STP-U) FFY2018 Key: 19768Description: Funds will be distributed to MPOs to supplement planning work Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,427,040.00 $2,427,040.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,427,040.00 $2,427,040.00

Fund1 M230 $2,177,783.00

Match $249,257.00

Page 603 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 631: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: MPO PLANNING (PL FUNDS) FFY2018 Key: 19769Description: Funds will be distributed to MPOs to supplement planning work Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,640,560.00 $3,640,560.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $3,640,560.00 $3,640,560.00

Fund1 M450 $3,266,674.00

Match $373,886.00

Page 604 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 632: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING & RESEARCH (SPR PART2) FFY2018 Key: 19770Description: SPR Part 2 documents the research work for an effective transportation research and development program

to serve as a vital role in improving the efficiency and effectiveness of the transportation system. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,650,000.00 $3,650,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $3,650,001.00 $3,650,001.00

Fund1 M560 $2,516,000.00

Match $629,000.00

Fund2 M240 $453,137.00

Match $51,864.00

Page 605 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 633: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: ADA TRANSITION PROJECT Key: 19940Description: Design & Improve ADA ramps Statewide. Projects to be determined based on program requirements. Region: 6MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,000,000.00 $1,000,000.00 $3,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $2,000,000.00 1,000,000.00 $3,000,000.00

Fund1 S010 $2,000,000.00 Z240 $897,300.00

Match $102,700.00

Page 606 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 634: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFE ROUTES TO SCHOOLS - NON-INFRASTRUCTURE 2018 Key: 19958Description:

Safe Routes to School non-infrastructure funding for 2018. Projects will be selected based on requirements of funds.

Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $500,000.00 $500,000.00

Fund1 ZS30 $500,000.00

Match

Page 607 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 635: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKFORCE DEVELOPMENT/ON-THE-JOB TRAINING FFY19 Key: 19979Description: FFY 2019 funding for the OJT & Workforce Development program. Region: 6MPO: Non-MPO Work Type: SPPROG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $1,050,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,050,000.00 $1,050,000.00

Fund1 Z49J $1,050,000.00

Match

Page 608 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 636: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: CONGESTION MITIGATION & AIR QUALITY IMPROV FFY19 Key: 19980Description: CMAQ program funding for Federal fiscal year 2019. Projects to be selected based on program requirements. Region: 6MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,613,583.00 $20,613,583.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $20,613,583.00 $20,613,583.00

Fund1 Z401 $18,496,568.00

Match $2,117,015.00

Page 609 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 637: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: IMMEDIATE OPPORTUNITY FUNDS FFY 2019 Key: 19981Description: IOF program funding for Federal fiscal year 2019. Projects to be selected by the Oregon Transportation

Commission (OTC). Region: 6

MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,500,000.00 $3,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,500,000.00 $3,500,000.00

Fund1 S600 $3,500,000.00

Match

Page 610 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 638: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TRANSPORTATION NETWORK (5310) FFY19 Key: 19982Description: Statewide public transit capital funding for Federal fiscal year 2019. Funds will be transferred to FTA for

delivery. Projects and programs to be determined based on funding requirements. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,500,000.00 $10,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $10,500,000.00 $10,500,000.00

Fund1 Z240 $10,500,000.00

Match

Page 611 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 639: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: REC TRAIL PROJECTS (OR PARKS & REC DEPT) FFY 2019 Key: 19983Description: Pooled Funds - Projects to be determined at a later date by the Parks Commission Region: 6MPO: Non-MPO Work Type: BIKPED Applicant: OREGON PARKS & REC DEPARTMENT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,828,865.00 $1,828,865.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,828,865.00 $1,828,865.00

Fund1 Z940 $1,463,092.00

Match $365,773.00

Page 612 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 640: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ACTIVE TRANSPORTATION DISCRETIONARY PROJECTS Key: 19988Description: Pooled Funds - projects to be determined Region: 6MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,200,000.00 $4,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $4,200,000.00 $4,200,000.00

Fund1 Z240 $3,768,660.00

Match $431,340.00

Page 613 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 641: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TRANSPORTATION NETWORK (5310) FFY20 Key: 19990Description: Statewide public transit capital funding for Federal fiscal year 2020. Funds will be transferred to FTA for

delivery. Projects and programs to be determined based on funding requirements. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,500,000.00 $10,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $10,500,000.00 $10,500,000.00

Fund1 Z240 $10,500,000.00

Match

Page 614 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 642: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TRANSPORTATION NETWORK (5310) FFY21 Key: 19991Description: Statewide public transit capital funding for Federal fiscal year 2021. Funds will be transferred to FTA for

delivery. Projects and programs to be determined based on funding requirements. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,500,000.00 $10,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $10,500,000.00 $10,500,000.00

Fund1 Z240 $10,500,000.00

Match

Page 615 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 643: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: IMMEDIATE OPPORTUNITY FUNDS FFY 2020 Key: 19992Description: IOF program funding for Federal fiscal year 2020. Projects to be selected by the Oregon Transportation

Commission (OTC). Region: 6

MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,500,000.00 $3,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 3,500,000.00 $3,500,000.00

Fund1 S600 $3,500,000.00

Match

Page 616 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 644: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: IMMEDIATE OPPORTUNITY FUNDS FFY 2021 Key: 19993Description: IOF program funding for Federal fiscal year 2021. Projects to be selected by the Oregon Transportation

Commission (OTC). Region: 6

MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,500,000.00 $3,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,500,000.00 $3,500,000.00

Fund1 S600 $3,500,000.00

Match

Page 617 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 645: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: CONGESTION MITIGATION & AIR QUALITY IMPROV FFY20 Key: 19994Description: FFY 2020 FUNDING FOR CMAQ PROJECTS - PROJECTS TO BE DETERMINED Region: 6MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,613,583.00 $20,613,583.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $20,613,583.00 $20,613,583.00

Fund1 Z401 $18,496,568.00

Match $2,117,015.00

Page 618 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 646: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: CONGESTION MITIGATION & AIR QUALITY IMPROV FFY21 Key: 19995Description: FFY 2021 FUNDING FOR CMAQ PROJECTS - PROJECTS TO BE DETERMINED Region: 6MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,613,584.00 $20,613,584.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $20,613,584.00 $20,613,584.00

Fund1 Z401 $18,496,569.00

Match $2,117,015.00

Page 619 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 647: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKFORCE DEVELOPMENT/ON-THE-JOB TRAINING FFY20 Key: 19996Description: FFY 2020 funding for the OJT & Workforce Development program. Region: 6MPO: Non-MPO Work Type: SPPROG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $1,050,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,050,000.00 $1,050,000.00

Fund1 Z49J $1,050,000.00

Match

Page 620 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 648: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKFORCE DEVELOPMENT/ON-THE-JOB TRAINING FFY21 Key: 19997Description: FFY 2021 funding for the OJT & Workforce Development program. Region: 6MPO: Non-MPO Work Type: SPPROG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $1,050,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,050,000.00 $1,050,000.00

Fund1 Z49J $1,050,000.00

Match

Page 621 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 649: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: REC TRAIL PROJECTS (OR PARKS & REC DEPT) FFY 2020 Key: 20004Description: Oregon Parks and Recreation Department (OPRD) funding for their Recreational Trail program for Federal

fiscal year 2020. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: OREGON PARKS & REC DEPARTMENT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,828,865.00 $1,828,865.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,828,865.00 $1,828,865.00

Fund1 Z940 $1,463,092.00

Match $365,773.00

Page 622 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 650: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: REC TRAIL PROJECTS (OR PARKS & REC DEPT) FFY 2021 Key: 20006Description: Pooled Funds - Projects to be determined at a later date by the Parks Commission Region: 6MPO: Non-MPO Work Type: BIKPED Applicant: OREGON PARKS & REC DEPARTMENT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,828,865.00 $1,828,865.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,828,865.00 $1,828,865.00

Fund1 Z940 $1,463,092.00

Match $365,773.00

Page 623 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 651: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL BRIDGE PROGRAM FFY21 Key: 20015Description: Local bridge program funding for Federal fiscal year 2021. Projects to be selected by the Local Bridge

Committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,789,481.00 $6,789,481.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 6,789,481.00 $6,789,481.00

Fund1 Z233 $6,092,201.00

Match $697,280.00

Page 624 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 652: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATON GROWTH MANAGEMENT FFY19 Key: 20016Description: Pooled Funds - projects to be determined at a later date through the TGM application process Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,764,293.00 $4,764,293.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,764,293.00 $4,764,293.00

Fund1 Z240 $4,275,000.00

Match $489,293.00

Page 625 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 653: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATON GROWTH MANAGEMENT FFY20 Key: 20017Description: Pooled Funds - projects to be determined at a later date through the TGM application process Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,764,293.00 $4,764,293.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $4,764,293.00 $4,764,293.00

Fund1 Z240 $4,275,000.00

Match $489,293.00

Page 626 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 654: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATON GROWTH MANAGEMENT FFY21 Key: 20018Description: Pooled Funds - projects to be determined at a later date through the TGM application process Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,764,293.00 $4,764,293.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $4,764,293.00 $4,764,293.00

Fund1 Z240 $4,275,000.00

Match $489,293.00

Page 627 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 655: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FFY19 Key: 20019Description: Safe Routes to School non-infrastructure funding for 2019. Projects will be selected based on requirements of

funds. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $500,000.00 $500,000.00

Fund1 ZS30 $500,000.00

Match

Page 628 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 656: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FFY20 Key: 20020Description: Safe Routes to School non-infrastructure funding for 2020. Projects will be selected based on requirements of

funds. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $500,000.00 $500,000.00

Fund1 ZS30 $500,000.00

Match

Page 629 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 657: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FFY21 Key: 20021Description: Safe Routes to School non-infrastructure funding for 2021. Projects will be selected based on requirements of

funds. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $500,000.00 $500,000.00

Fund1 ZS30 $500,000.00

Match

Page 630 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 658: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ACTIVE TRANSPORTATION DISCRETIONARY FUNDS FFY19-21 Key: 20047Description: Active Transportation Discretionary Funds for Federal fiscal years 2019 through 2021. Projects to be selected

based on program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,200,000.00 $4,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,200,000.00 $4,200,000.00

Fund1 Z240 $3,768,660.00

Match $431,340.00

Page 631 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 659: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: RAIL-HIGHWAY CROSSINGS FUNDS FFY19 - GCPA Key: 20048Description: Funding for Rail crossings on highways. Projects to be determined at a later date based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT RAIL DIVISION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $700,000.00 $700,000.00

Fund1 S010 $700,000.00

Match

Page 632 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 660: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: RAIL-HIGHWAY CROSSINGS FUNDS FFY20 - GCPA Key: 20053Description: Funding for Rail crossings on highways. Projects to be determined at a later date based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT RAIL DIVISION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $700,000.00 $700,000.00

Fund1 S010 $700,000.00

Match

Page 633 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 661: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: RAIL-HIGHWAY CROSSINGS FUNDS FFY21 - GCPA Key: 20054Description: Funding for Rail crossings on highways. Projects to be determined at a later date based on program

requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT RAIL DIVISION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $700,000.00 $700,000.00

Fund1 S010 $700,000.00

Match

Page 634 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 662: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STP ALLOCATION TO CITIES & COUNTIES FFY19 Key: 20055Description: Surface Transportation Program (STP) funding to be dispersed to cities and counties, per AOC & LOC

agreement. Projects to be determined by the local agencies. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $32,662,971.00 $32,662,971.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $32,662,971.00 $32,662,971.00

Fund1 Z240 $29,308,484.00

Match $3,354,487.00

Page 635 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 663: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STP ALLOCATION TO CITIES & COUNTIES FFY20 Key: 20056Description: Surface Transportation Program (STP) funding to be dispersed to cities and counties, per AOC & LOC

agreement. Projects to be determined by the local agencies. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $32,662,971.00 $32,662,971.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $32,662,971.00 $32,662,971.00

Fund1 Z240 $29,308,484.00

Match $3,354,487.00

Page 636 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 664: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STP ALLOCATION TO CITIES & COUNTIES FFY21 Key: 20057Description: Surface Transportation Program (STP) funding to be dispersed to cities and counties, per AOC & LOC

agreement. Projects to be determined by the local agencies. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $32,662,970.00 $32,662,970.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $32,662,970.00 $32,662,970.00

Fund1 Z240 $29,308,483.00

Match $3,354,487.00

Page 637 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 665: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STRATEGIC INVESTMENTS FFY19 Key: 20058Description: Funding for ODOT strategic investments in Federal fiscal year 2019. Projects to be determined based on

agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $8,333,333.00 $8,333,333.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 8,333,333.00 $8,333,333.00

Fund1 Z240 $7,477,500.00

Match $855,833.00

Page 638 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 666: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STRATEGIC INVESTMENTS FFY20 Key: 20059Description: Funding for ODOT strategic investments in Federal fiscal year 2020. Projects to be determined based on

agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $8,333,333.00 $8,333,333.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 8,333,333.00 $8,333,333.00

Fund1 Z240 $7,477,500.00

Match $855,833.00

Page 639 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 667: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STRATEGIC INVESTMENTS FFY21 Key: 20060Description: Funding for ODOT strategic investments in Federal fiscal year 2021. Projects to be determined based on

agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $8,333,334.00 $8,333,334.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 8,333,334.00 $8,333,334.00

Fund1 Z240 $7,477,501.00

Match $855,833.00

Page 640 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 668: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NATIONAL HIGHWAY FREIGHT PROGRAM FFY19 Key: 20061Description: Funding for the national highway freight program in Federal fiscal year 2019. Projects to be determined based

on agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $16,333,333.00 $16,333,333.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 16,333,333.00 $16,333,333.00

Fund1 Z460 $14,655,900.00

Match $1,677,433.00

Page 641 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 669: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NATIONAL HIGHWAY FREIGHT PROGRAM FFY20 Key: 20062Description: Funding for the national highway freight program in Federal fiscal year 2020. Projects to be determined based

on agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $16,333,333.00 $16,333,333.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 16,333,333.00 $16,333,333.00

Fund1 Z460 $14,655,900.00

Match $1,677,433.00

Page 642 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 670: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NATIONAL HIGHWAY FREIGHT PROGRAM FFY21 Key: 20063Description: Funding for the national highway freight program in Federal fiscal year 2021. Projects to be determined based

on agency needs. Region: 6

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $16,333,334.00 $16,333,334.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 16,333,334.00 $16,333,334.00

Fund1 Z460 $14,655,901.00

Match $1,677,433.00

Page 643 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 671: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR BRIDGE MAINTENANCE FFY19 Key: 20077Description: Major bridge maintenance funding for Federal fiscal year 2019. Projects will be selected based on

requirements of the funds. Region: 6

MPO: Non-MPO Work Type: BR-MBM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 10,000,000.00 $10,000,000.00

Fund1 S010 $10,000,000.00

Match

Page 644 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 672: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR BRIDGE MAINTENANCE FFY20 Key: 20079Description: Major bridge maintenance funding for Federal fiscal year 2020. Projects will be selected based on

requirements of the funds. Region: 6

MPO: Non-MPO Work Type: BR-MBM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 10,000,000.00 $10,000,000.00

Fund1 S010 $10,000,000.00

Match

Page 645 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 673: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR BRIDGE MAINTENANCE FFY21 Key: 20080Description: Major bridge maintenance funding for Federal fiscal year 2021. Projects will be selected based on

requirements of the funds. Region: 6

MPO: Non-MPO Work Type: BR-MBM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 10,000,000.00 $10,000,000.00

Fund1 S010 $10,000,000.00

Match

Page 646 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 674: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE OVERPASS PROTECTIVE SCREENING FFY 2019 Key: 20082Description: Bridge Overpass Protective Screening funding for Federal fiscal year 2019. Projects to be determined based on

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-SCR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 647 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 675: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE OVERPASS PROTECTIVE SCREENING FFY 2020 Key: 20083Description: Bridge Overpass Protective Screening funding for Federal fiscal year 2020. Projects to be determined based on

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-SCR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 648 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 676: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE OVERPASS PROTECTIVE SCREENING FFY 2021 Key: 20084Description: Bridge Overpass Protective Screening funding for Federal fiscal year 2021. Projects to be determined based on

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-SCR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 649 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 677: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE RAIL RETROFIT FUNDS - FFY 2019 Key: 20085Description: Bridge rail retrofit program funding for Federal fiscal year 2019. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-RLR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 650 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 678: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE RAIL RETROFIT FUNDS - FFY 2020 Key: 20086Description: Bridge rail retrofit program funding for Federal fiscal year 2020. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-RLR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 651 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 679: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: BRIDGE RAIL RETROFIT FUNDS - FFY 2021 Key: 20087Description: Bridge rail retrofit program funding for Federal fiscal year 2021. Projects to be determined based on program

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BR-RLR Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,500,000.00 $1,500,000.00

Fund1 Z240 $1,345,950.00

Match $154,050.00

Page 652 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 680: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS REPLACEMENT PROGRAM FFY2019 Key: 20156Description: Federal fiscal year 2019 funding to improve public transportation fleet conditions statewide. Funds will be

flexed to FTA for delivery. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $5,000,000.00 $5,000,000.00

Fund1 Z240 $5,000,000.00

Match

Page 653 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 681: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS REPLACEMENT PROGRAM FFY2020 Key: 20157Description: Federal fiscal year 2020 funding to improve public transportation fleet conditions statewide. Funds will be

flexed to FTA for delivery. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $5,000,000.00 $5,000,000.00

Fund1 Z240 $5,000,000.00

Match

Page 654 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 682: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS REPLACEMENT PROGRAM FFY2021 Key: 20158Description: Federal fiscal year 2021 funding to improve public transportation fleet conditions statewide. Funds will be

flexed to FTA for delivery. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $5,000,000.00 $5,000,000.00

Fund1 Z240 $5,000,000.00

Match

Page 655 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 683: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ADA CURB RAMPS FFY2019-2021 Key: 20160Description: Funding for ADA Curb Ramp projects during Federal fiscal years 2019 through 2021. Projects to be

determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,000,000.00 $6,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 6,000,000.00 $6,000,000.00

Fund1 Z240 $5,383,800.00

Match $616,200.00

Page 656 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 684: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR CULVERT MAINTENANCE PROGRAM FFY19 Key: 20262Description: Funding for the Major Culvert Maintenance Program for Federal Fiscal Year 2021. Projects will be selected by

culvert committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CT-MCM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,000,000.00 $3,000,000.00 $6,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 3,000,000.00 $3,000,000.00

Fund1 S010 $3,000,000.00

Match

Page 657 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 685: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY INDIRECT COST ALLOCATION PLAN (ICAP) FFY19 Key: 20277Description: Indirect rate (11%) for qualified highway projects Region: 6MPO: Non-MPO Work Type: BRIDGE , OPERAT , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $22,289,090.00 $22,289,090.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 22,289,089.00 $22,289,089.00

Fund1 Z240 $20,000,000.00

Match $2,289,089.00

Page 658 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 686: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY INDIRECT COST ALLOCATION PLAN (ICAP) FFY20 Key: 20278Description: Indirect rate (11%) for qualified highway projects Region: 6MPO: Non-MPO Work Type: BRIDGE , OPERAT , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $22,289,090.00 $22,289,090.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 22,289,089.00 $22,289,089.00

Fund1 Z240 $20,000,000.00

Match $2,289,089.00

Page 659 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 687: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HIGHWAY INDIRECT COST ALLOCATION PLAN (ICAP) FFY21 Key: 20279Description: Indirect rate (11%) for qualified highway projects Region: 6MPO: Non-MPO Work Type: BRIDGE , OPERAT , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $22,289,090.00 $22,289,090.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 22,289,089.00 $22,289,089.00

Fund1 Z240 $20,000,000.00

Match $2,289,089.00

Page 660 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 688: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: PLANNING INDIRECT COST ALLOCATION PLAN FFY19 Key: 20280Description: Indirect rate (ICAP) (26%) for qualified planning activities Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $10,000,000.00 $10,000,000.00

Fund1 Z550 $8,000,000.00

Match $2,000,000.00

Page 661 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 689: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: PLANNING INDIRECT COST ALLOCATION PLAN FFY20 Key: 20281Description: Indirect rate (ICAP) (26%) for qualified planning activities Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $10,000,000.00 $10,000,000.00

Fund1 Z550 $8,000,000.00

Match $2,000,000.00

Page 662 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 690: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: PLANNING INDIRECT COST ALLOCATION PLAN FFY21 Key: 20282Description: Indirect rate (ICAP) (26%) for qualified planning activities Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $10,000,000.00 $10,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $10,000,000.00 $10,000,000.00

Fund1 Z550 $8,000,000.00

Match $2,000,000.00

Page 663 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 691: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE CULVERT PROGRAM FFY19 Key: 20284Description: Funding for the SW Culvert Program for Federal Fiscal Year 2019. Projects will be selected by culvert

committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,316,933.00 $3,316,933.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 3,316,933.00 $3,316,933.00

Fund1 Z240 $2,976,284.00

Match $340,649.00

Page 664 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 692: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE CULVERT PROGRAM FFY20 Key: 20285Description: Funding for the SW Culvert Program for Federal Fiscal Year 2020. Projects will be selected by culvert

committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,316,933.00 $3,316,933.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 3,316,933.00 $3,316,933.00

Fund1 Z240 $2,976,284.00

Match $340,649.00

Page 665 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 693: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE CULVERT PROGRAM FFY21 Key: 20286Description: Funding for the SW Culvert Program for Federal Fiscal Year 2021. Projects will be selected by culvert

committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,316,932.00 $3,316,932.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,316,932.00 $3,316,932.00

Fund1 Z240 $2,976,283.00

Match $340,649.00

Page 666 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 694: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: FISH PASSAGE PROGRAM FFY19 Key: 20287Description: Funding for the SW Fish Passage Program for Federal Fiscal Year 2019. Projects will be selected by fish passage

committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,589,464.00 $4,589,464.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 4,589,464.00 $4,589,464.00

Fund1 Z240 $4,118,126.00

Match $471,338.00

Page 667 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 695: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: FISH PASSAGE PROGRAM FFY20 Key: 20288Description: Funding for the SW Fish Passage Program for Federal Fiscal Year 2020. Projects will be selected by fish passage

committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,589,464.00 $4,589,464.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 4,589,464.00 $4,589,464.00

Fund1 Z240 $4,118,126.00

Match $471,338.00

Page 668 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 696: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: FISH PASSAGE PROGRAM FFY21 Key: 20289Description:

Funding for the SW Fish Passage Program for Federal Fiscal Year 2021. Projects will be selected by fish passage committee based on program requirements.

Region: 6

MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,989,463.00 $3,989,463.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,989,463.00 $3,989,463.00

Fund1 Z240 $3,579,745.00

Match $409,718.00

Page 669 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 697: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SITE MITIGATION AND REPAIR FFY19 Key: 20290Description: Federal Fiscal Year 2019 funding for environmental site mitigation and repair. Projects to be determined at a

later date based on program requirements. Region: 6

MPO: Non-MPO Work Type: ENVIRO Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $335,659.00 $335,659.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 335,659.00 $335,659.00

Fund1 S010 $335,659.00

Match

Page 670 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 698: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SITE MITIGATION AND REPAIR FFY20 Key: 20291Description: Federal Fiscal Year 2020 funding for environmental site mitigation and repair. Projects to be determined at a

later date based on program requirements. Region: 6

MPO: Non-MPO Work Type: ENVIRO Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $335,659.00 $335,659.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 335,659.00 $335,659.00

Fund1 S010 $335,659.00

Match

Page 671 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 699: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SITE MITIGATION AND REPAIR FFY21 Key: 20292Description: Federal Fiscal Year 2021 funding for environmental site mitigation and repair. Projects to be determined at a

later date based on program requirements. Region: 6

MPO: Non-MPO Work Type: ENVIRO Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $335,659.00 $335,659.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 335,659.00 $335,659.00

Fund1 S010 $335,659.00

Match

Page 672 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 700: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY QUICK FIX PROGRAM FFY19 Key: 20324Description: Quick Fix Safety Program funding for Federal fiscal year 2019. Projects will be selected at a later date based on

program requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $542,431.00 $542,431.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 542,431.00 $542,431.00

Fund1 ZS32 $542,431.00

Match

Page 673 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 701: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY QUICK FIX PROGRAM FFY20 Key: 20325Description: Quick Fix Safety Program funding for Federal fiscal year 2020. Projects will be selected at a later date based on

program requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $542,431.00 $542,431.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 542,431.00 $542,431.00

Fund1 ZS32 $542,431.00

Match

Page 674 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 702: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY QUICK FIX PROGRAM FFY21 Key: 20326Description: Quick Fix Safety Program funding for Federal fiscal year 2021. Projects will be selected at a later date based on

program requirements. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $542,431.00 $542,431.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 542,431.00 $542,431.00

Fund1 ZS32 $542,431.00

Match

Page 675 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 703: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY GUARDRAIL FUNDING FFY19-21 Key: 20327Description: Safety Guardrail funding for Federal fiscal years 2019-2021. Projects will be identified in the future based on

funding eligibility. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $19,527,515.00 $19,527,515.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 19,527,515.00 $19,527,515.00

Fund1 ZS32 $19,527,515.00

Match

Page 676 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 704: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INSTERSTATE MAINTENANCE PROGRAM FFY19 Key: 20343Description: Funding for the Statewide Interstate Maintenance program for Federal fiscal year 2019. Projects will be

determined based on program eligibility and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $25,849,440.00 $25,849,440.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 25,849,440.00 $25,849,440.00

Fund1 Z001 $23,838,354.00

Match $2,011,086.00

Page 677 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 705: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INTERSTATE MAINTENANCE PROGRAM FFY20 Key: 20344Description: Funding for the Statewide Interstate Maintenance program for Federal fiscal year 2020. Projects will be

selected based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $25,849,439.00 $25,849,439.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 25,849,439.00 $25,849,439.00

Fund1 Z001 $23,838,353.00

Match $2,011,086.00

Page 678 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 706: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INTERSTATE MAINTENANCE PROGRAM FFY21 Key: 20345Description: Funding for the statewide maintenance program for Federal fiscal year 2021. Projects will be determined

based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $25,849,439.00 $25,849,439.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 25,849,439.00 $25,849,439.00

Fund1 Z001 $23,838,353.00

Match $2,011,086.00

Page 679 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 707: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INTERSTATE SIGNS PROGRAM FFY19 Key: 20346Description: Funding for the statewide interstate signs program for Federal fiscal year 2019. Projects will be determined by

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,990,178.00 $1,990,178.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,990,178.00 $1,990,178.00

Fund1 Z240 $1,785,787.00

Match $204,391.00

Page 680 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 708: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INTERSTATE SIGNS PROGRAM FFY20 Key: 20347Description: Funding for the statewide interstate signs program for Federal fiscal year 2020. Projects will be determined by

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,990,178.00 $1,990,178.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,990,178.00 $1,990,178.00

Fund1 Z240 $1,785,787.00

Match $204,391.00

Page 681 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 709: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE INTERSTATE SIGN PROGRAM FFY21 Key: 20348Description: Funding for the statewide interstate signs program for Federal fiscal year 2021. Projects will be determined by

program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,990,177.00 $1,990,177.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,990,177.00 $1,990,177.00

Fund1 Z240 $1,785,786.00

Match $204,391.00

Page 682 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 710: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR INTERSTATE MAINTENANCE PROGRAM FFY19 Key: 20349Description: Funding for the statewide major interstate maintenance program for Federal fiscal year 2019. Projects will be

determined based on program requirements. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,985,267.00 $2,985,267.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 2,985,267.00 $2,985,267.00

Fund1 S010 $2,985,267.00

Match

Page 683 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 711: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR INTERSTATE MAINTENANCE PROGRAM FFY20 Key: 20350Description: Funding for the statewide major interstate maintenance program for Federal fiscal year 2020. Projects will be

determined based on program requirements. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,985,266.00 $2,985,266.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 2,985,266.00 $2,985,266.00

Fund1 S010 $2,985,266.00

Match

Page 684 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 712: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: MAJOR INTERSTATE MAINTENANCE PROGRAM FFY21 Key: 20351Description: Funding for the statewide major interstate maintenance program for Federal fiscal year 2021. Projects will be

determined based on program requirements. Region: 6

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,985,266.00 $2,985,266.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 2,985,266.00 $2,985,266.00

Fund1 S010 $2,985,266.00

Match

Page 685 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 713: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE RAIL CROSSING PROGRAM FFY19 Key: 20352Description: Funding for the statewide rail crossing program for Federal fiscal year 2019. Projects to be selected based on

the program requirements and need. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT RAIL DIVISION Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,390,408.00 $2,390,408.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 2,390,408.00 $2,390,408.00

Fund1 ZS40 $2,151,367.00

Match $239,041.00

Page 686 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 714: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE RAIL CROSSING PROGRAM FFY20 Key: 20360Description: Funding for the statewide rail crossing program for Federal fiscal year 2020. Projects to be selected based on

the program requirements and need. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,390,408.00 $2,390,408.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 2,390,408.00 $2,390,408.00

Fund1 ZS40 $2,151,367.00

Match $239,041.00

Page 687 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 715: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE RAIL CROSSING PROGRAM FFY21 Key: 20364Description: Funding for the statewide rail crossing program for Federal fiscal year 2021. Projects to be selected based on

the program requirements and need. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,390,408.00 $2,390,408.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 2,390,408.00 $2,390,408.00

Fund1 ZS40 $2,151,367.00

Match $239,041.00

Page 688 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 716: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: FIX-IT ADA FUNDING FFY19-21 Key: 20367Description: Fix-it Funding for additional ADA improvements statewide. Projects will be determined based on

requirements and needs. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,684,919.00 $6,684,919.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 6,684,919.00 $6,684,919.00

Fund1 Z240 $5,998,378.00

Match $686,541.00

Page 689 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 717: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE BIKE/PED (SWIP) PROGRAM FFY19 Key: 20385Description: Funding for the Bicycle/Pedestrian SWIP program for Federal fiscal year 2019. Projects to be determined

based on program eligibility. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,020,126.00 $4,020,126.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 4,020,126.00 $4,020,126.00

Fund1 S010 $4,020,126.00

Match

Page 690 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 718: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE BIKE/PED (SWIP) PROGRAM FFY20 Key: 20386Description: Funding for the Bicycle/Pedestrian SWIP program for Federal fiscal year 2020. Projects to be determined

based on program eligibility. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,020,125.00 $4,020,125.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 4,020,125.00 $4,020,125.00

Fund1 S010 $4,020,125.00

Match

Page 691 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 719: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE BIKE/PED (SWIP) PROGRAM FFY21 Key: 20387Description: Funding for the Bicycle/Pedestrian SWIP program for Federal fiscal year 2021. Projects to be determined

based on program eligibility. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,020,125.00 $4,020,125.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 4,020,125.00 $4,020,125.00

Fund1 S010 $4,020,125.00

Match

Page 692 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 720: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE ITS PROGRAM FFY19 Key: 20392Description: Funding for the statewide Intelligent Transportation Systems (ITS) program for Federal fiscal year 2019.

Projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,546,001.00 $1,546,001.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 1,546,001.00 $1,546,001.00

Fund1 Z240 $1,387,227.00

Match $158,774.00

Page 693 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 721: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE ITS PROGRAM FFY20 Key: 20393Description: Funding for the statewide Intelligent Transportation Systems (ITS) program for Federal fiscal year 2020.

Projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,546,000.00 $1,546,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,546,000.00 $1,546,000.00

Fund1 Z240 $1,387,226.00

Match $158,774.00

Page 694 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 722: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE ITS PROGRAM FFY21 Key: 20394Description: Funding for the statewide Intelligent Transportation Systems (ITS) program for Federal fiscal year 2021.

Projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,546,000.00 $1,546,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,546,000.00 $1,546,000.00

Fund1 Z240 $1,387,226.00

Match $158,774.00

Page 695 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 723: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE CULVERTS FFY19 Key: 20395Description: Funding for the agency priority program for statewide culvert projects for Federal fiscal year 2019. Projects to

be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 5,000,000.00 $5,000,000.00

Fund1 Z240 $4,486,500.00

Match $513,500.00

Page 696 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 724: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE CULVERTS FFY20 Key: 20396Description: Funding for the agency priority program for statewide culvert projects for Federal fiscal year 2020. Projects to

be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 5,000,000.00 $5,000,000.00

Fund1 Z240 $4,486,500.00

Match $513,500.00

Page 697 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 725: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE CULVERTS FFY21 Key: 20397Description: Funding for the agency priority program for statewide culvert projects for Federal fiscal year 2021. Projects to

be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,000,000.00 $5,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 5,000,000.00 $5,000,000.00

Fund1 Z240 $4,486,500.00

Match $513,500.00

Page 698 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 726: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE BIKE/PED FFY19 Key: 20401Description: Funding for the agency priority program for statewide bike/ped projects for Federal fiscal year 2019. Projects

to be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $995,089.00 $995,089.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 995,089.00 $995,089.00

Fund1 Z240 $892,893.00

Match $102,196.00

Page 699 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 727: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE BIKE/PED FFY20 Key: 20402Description: Funding for the agency priority program for statewide bike/ped projects for Federal fiscal year 2020. Projects

to be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $995,089.00 $995,089.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 995,089.00 $995,089.00

Fund1 Z240 $892,893.00

Match $102,196.00

Page 700 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 728: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE BIKE/PED FFY21 Key: 20403Description: Funding for the agency priority program for statewide bike/ped projects for Federal fiscal year 2021. Projects

to be selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $995,088.00 $995,088.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 995,088.00 $995,088.00

Fund1 Z240 $892,892.00

Match $102,196.00

Page 701 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 729: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE ADA FFY19 Key: 20404Description: Funding for the agency priority program for statewide ADA projects for Federal fiscal year 2019. Projects to be

selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,430,093.00 $3,430,093.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 3,430,093.00 $3,430,093.00

Fund1 Z240 $3,077,822.00

Match $352,271.00

Page 702 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 730: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE ADA FFY20 Key: 20405Description: Funding for the agency priority program for statewide ADA projects for Federal fiscal year 2020. Projects to be

selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,430,093.00 $3,430,093.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 3,430,093.00 $3,430,093.00

Fund1 Z240 $3,077,822.00

Match $352,271.00

Page 703 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 731: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: AGENCY PRIORITY PROGRAM - STATEWIDE ADA FFY21 Key: 20406Description: Funding for the agency priority program for statewide ADA projects for Federal fiscal year 2021. Projects to be

selected based on the program requirements. Region: 6

MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,430,092.00 $3,430,092.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,430,092.00 $3,430,092.00

Fund1 Z240 $3,077,822.00

Match $352,270.00

Page 704 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 732: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING AND RESEARCH (SPR PART 1) SFY20 Key: 20455Description: SPR Part I work program conducts project development activities for planning, scoping of projects, data

collection and data analysis to design and operate an efficient transportation system for state fiscal year 2020. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $24,376,000.00 $24,376,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $24,376,000.00 $24,376,000.00

Fund1 Z240 $14,416,306.00

Match $1,650,011.00Fund2 Z550 $6,647,746.00

Match $1,661,937.00

Page 705 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 733: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING AND RESEARCH (SPR PART 1) SFY21 Key: 20457Description: SPR Part I work program conducts project development activities for planning, scoping of projects, data

collection and data analysis to design and operate an efficient transportation system for state fiscal year 2021. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $24,376,000.00 $24,376,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $24,376,000.00 $24,376,000.00

Fund1 Z240 $14,416,306.00

Match $1,650,011.00Fund2 Z550 $6,647,746.00

Match $1,661,937.00

Page 706 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 734: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING AND RESEARCH (SPR PART 1) SFY22 Key: 20458Description: SPR Part I work program conducts project development activities for planning, scoping of projects, data

collection and data analysis to design and operate an efficient transportation system for state fiscal year 2022. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $24,376,000.00 $24,376,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $24,376,000.00 $24,376,000.00

Fund1 Z240 $14,416,306.00

Match $1,650,011.00Fund2 Z550 $6,647,746.00

Match $1,661,937.00

Page 707 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 735: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING & RESEARCH (SPR PART2) SFY20 Key: 20459Description: SPR Part 2 documents the research work for an effective transportation research and development program

to serve as a vital role in improving the efficiency and effectiveness of the transportation system for state fiscal year 2020.

Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,419,823.00 $4,419,823.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,419,823.00 $4,419,823.00

Fund1 Z560 $2,537,289.00

Match $634,322.00Fund2 Z240 $1,120,021.00

Match $128,191.00

Page 708 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 736: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING & RESEARCH (SPR PART2) SFY21 Key: 20462Description: SPR Part 2 documents the research work for an effective transportation research and development program

to serve as a vital role in improving the efficiency and effectiveness of the transportation system for state fiscal year 2021.

Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,419,823.00 $4,419,823.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $4,419,823.00 $4,419,823.00

Fund1 Z560 $2,537,289.00

Match $634,322.00Fund2 Z240 $1,120,021.00

Match $128,191.00

Page 709 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 737: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATE PLANNING & RESEARCH (SPR PART2) SFY22 Key: 20463Description: SPR Part 2 documents the research work for an effective transportation research and development program

to serve as a vital role in improving the efficiency and effectiveness of the transportation system for state fiscal year 2022.

Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,419,823.00 $4,419,823.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $4,419,823.00 $4,419,823.00

Fund1 Z560 $2,537,289.00

Match $634,322.00Fund2 Z240 $1,120,021.00

Match $128,191.00

Page 710 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 738: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE TRANSIT PLANNING & RESEARCH (5304) FFY19 Key: 20509Description: Statewide funding for transit planning & research activities during Federal fiscal year 2019. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,000.00 $295,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $295,000.00 $295,000.00

Fund1 F260 $236,000.00

Match $59,000.00

Page 711 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 739: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE TRANSIT PLANNING & RESEARCH (5304) FFY20 Key: 20511Description: Statewide funding for transit planning & research activities during Federal fiscal year 2020. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,000.00 $295,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $295,000.00 $295,000.00

Fund1 F260 $236,000.00

Match $59,000.00

Page 712 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 740: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: STATEWIDE TRANSIT PLANNING & RESEARCH (5304) FFY21 Key: 20512Description: Statewide funding for transit planning & research activities during Federal fiscal year 2021. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $295,000.00 $295,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $295,000.00 $295,000.00

Fund1 F260 $236,000.00

Match $59,000.00

Page 713 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 741: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY RURAL PROGRAM (5310) FFY19 Key: 20513Description: Enhanced mobility rural program funding for Federal fiscal year 2019. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $842,528.00 $842,528.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $842,528.00 $842,528.00

Fund1 F160 $756,000.00

Match $86,528.00

Page 714 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 742: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY RURAL PROGRAM (5310) FFY20 Key: 20514Description: Enhanced mobility rural program funding for Federal fiscal year 2020. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $842,528.00 $842,528.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $842,528.00 $842,528.00

Fund1 F160 $756,000.00

Match $86,528.00

Page 715 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 743: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY RURAL PROGRAM (5310) FFY21 Key: 20515Description: Enhanced mobility rural program funding for Federal fiscal year 2021. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $842,528.00 $842,528.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $842,528.00 $842,528.00

Fund1 F160 $756,000.00

Match $86,528.00

Page 716 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 744: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY SM URBAN PROGRAM (5310) FFY19 Key: 20516Description: Enhanced mobility small urban program funding for Federal fiscal year 2019. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $722,166.00 $722,166.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $722,166.00 $722,166.00

Fund1 F160 $648,000.00

Match $74,166.00

Page 717 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 745: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY SM URBAN PROGRAM (5310) FFY20 Key: 20517Description: Enhanced mobility small urban program funding for Federal fiscal year 2020. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $722,166.00 $722,166.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $722,166.00 $722,166.00

Fund1 F160 $648,000.00

Match $74,166.00

Page 718 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 746: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY SM URBAN PROGRAM (5310) FFY21 Key: 20518Description: Enhanced mobility small urban program funding for Federal fiscal year 2021. Program improves transportation

services to the special needs, seniors, and other transit-dependent populations in small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $722,166.00 $722,166.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $722,166.00 $722,166.00

Fund1 F160 $648,000.00

Match $74,166.00

Page 719 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 747: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY STATE PROGRAM ADMIN (5310) FFY19 Key: 20553Description: Funding for the ODOT administration of the Enhanced Mobility Program during Federal fiscal year 2019. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $156,000.00 $156,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $156,000.00 $156,000.00

Fund1 F162 $156,000.00

Match

Page 720 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 748: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY STATE PROGRAM ADMIN (5310) FFY20 Key: 20554Description: Funding for the ODOT administration of the Enhanced Mobility Program during Federal fiscal year 2020. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $156,000.00 $156,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $156,000.00 $156,000.00

Fund1 F162 $156,000.00

Match

Page 721 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 749: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ENHANCED MOBILITY STATE PROGRAM ADMIN (5310) FFY21 Key: 20555Description: Funding for the ODOT administration of the Enhanced Mobility Program during Federal fiscal year 2021. Region: 6MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $156,000.00 $156,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $156,000.00 $156,000.00

Fund1 F162 $156,000.00

Match

Page 722 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 750: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ADMINISTRATION & TECHNICAL ASSISTANCE (5311) FFY19 Key: 20556Description: Funding for the ODOT administration and technical assistance for the Rural Areas Program during Federal

fiscal year 2019. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,135,000.00 $1,135,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,135,000.00 $1,135,000.00

Fund1 F182 $1,135,000.00

Match

Page 723 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 751: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ADMINISTRATION & TECHNICAL ASSISTANCE (5311) FFY20 Key: 20557Description: Funding for the ODOT administration and technical assistance for the Rural Areas Program during Federal

fiscal year 2020. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,135,000.00 $1,135,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,135,000.00 $1,135,000.00

Fund1 F182 $1,135,000.00

Match

Page 724 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 752: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: ADMINISTRATION & TECHNICAL ASSISTANCE (5311) FFY21 Key: 20558Description: Funding for the ODOT administration and technical assistance for the Rural Areas Program during Federal

fiscal year 2021. Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,135,000.00 $1,135,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,135,000.00 $1,135,000.00

Fund1 F182 $1,135,000.00

Match

Page 725 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 753: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: INTERCITY PROGRAM (5311F) FFY19 Key: 20559Description: Intercity program funding for Federal fiscal year 2019. Program strengthens Oregon’s transit network by

focusing on longer distance transit that connects communities to one another. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,128,000.00 $2,128,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,128,000.00 $2,128,000.00

Fund1 F184 $1,702,400.00

Match $425,600.00

Page 726 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 754: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: INTERCITY PROGRAM (5311F) FFY20 Key: 20560Description: Intercity program funding for Federal fiscal year 2020. Program strengthens Oregon’s transit network by

focusing on longer distance transit that connects communities to one another. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,128,000.00 $2,128,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,128,000.00 $2,128,000.00

Fund1 F184 $1,702,400.00

Match $425,600.00

Page 727 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 755: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: INTERCITY PROGRAM (5311F) FFY21 Key: 20561Description: Intercity program funding for Federal fiscal year 2021. Program strengthens Oregon’s transit network by

focusing on longer distance transit that connects communities to one another. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,128,000.00 $2,128,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,128,000.00 $2,128,000.00

Fund1 F184 $1,702,400.00

Match $425,600.00

Page 728 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 756: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NON URBANIZED AREA PROGRAM (5311) FFY19 Key: 20562Description: Non urbanized area program funding for Federal fiscal year 2019. Program provides funding to communities

with populations below 50,000 for planning, capital, operating, and acquisition of public transportation services.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $15,175,000.00 $15,175,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $15,175,000.00 $15,175,000.00

Fund1 FF18 $8,510,140.00

Match $6,664,860.00

Page 729 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 757: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NON URBANIZED AREA PROGRAM (5311) FFY20 Key: 20563Description: Non urbanized area program funding for Federal fiscal year 2020. Program provides funding to communities

with populations below 50,000 for planning, capital, operating, and acquisition of public transportation services.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $15,175,000.00 $15,175,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $15,175,000.00 $15,175,000.00

Fund1 FF18 $8,510,140.00

Match $6,664,860.00

Page 730 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 758: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: NON URBANIZED AREA PROGRAM (5311) FFY21 Key: 20564Description: Non urbanized area program funding for Federal fiscal year 2021. Program provides funding to communities

with populations below 50,000 for planning, capital, operating, and acquisition of public transportation services.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $15,175,000.00 $15,175,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $15,175,000.00 $15,175,000.00

Fund1 FF18 $8,510,140.00

Match $6,664,860.00

Page 731 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 759: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: RURAL TRANSIT ASSISTANCE PROGRAM (5311B) FFY19 Key: 20565Description: Rural transit assistance program funding for Federal fiscal year 2019. Program provides assistance with

designing & implementing training & technical assistance projects & other support services in nonurbanized areas.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $181,000.00 $181,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $181,000.00 $181,000.00

Fund1 P180 $181,000.00

Match

Page 732 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 760: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: RURAL TRANSIT ASSISTANCE PROGRAM (5311B) FFY20 Key: 20566Description: Rural transit assistance program funding for Federal fiscal year 2020. Program provides assistance with

designing & implementing training & technical assistance projects & other support services in nonurbanized areas.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $181,000.00 $181,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $181,000.00 $181,000.00

Fund1 P180 $181,000.00

Match

Page 733 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 761: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: RURAL TRANSIT ASSISTANCE PROGRAM (5311B) FFY21 Key: 20567Description: Rural transit assistance program funding for Federal fiscal year 2021. Program provides assistance with

designing & implementing training & technical assistance projects & other support services in nonurbanized areas.

Region: 6

MPO: Non-MPO Work Type: TRANST Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $181,000.00 $181,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $181,000.00 $181,000.00

Fund1 P180 $181,000.00

Match

Page 734 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 762: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-RURAL PROG (5339) FFY19 Key: 20568Description: Rural bus & bus facilities program funding for Federal fiscal year 2019. Program provides replacement and

"right-sizing" of public transit vehicles for rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,500,000.00 $1,500,000.00

Fund1 FF30 $1,200,000.00

Match $300,000.00

Page 735 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 763: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-RURAL PROG (5339) FFY20 Key: 20569Description: Rural bus & bus facilities program funding for Federal fiscal year 2019. Program provides replacement and

"right-sizing" of public transit vehicles for rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,500,000.00 $1,500,000.00

Fund1 FF30 $1,200,000.00

Match $300,000.00

Page 736 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 764: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-RURAL PROG (5339) FFY21 Key: 20570Description: Rural bus & bus facilities program funding for Federal fiscal year 2021. Program provides replacement and

"right-sizing" of public transit vehicles for rural areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,500,000.00 $1,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,500,000.00 $1,500,000.00

Fund1 FF30 $1,200,000.00

Match $300,000.00

Page 737 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 765: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-SM URBAN PROG (5339) FFY19 Key: 20571Description: Rural bus & bus facilities program funding for Federal fiscal year 2019. Program provides replacement and

"right-sizing" of public transit vehicles for small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $900,000.00 $900,000.00

Fund1 FF30 $720,000.00

Match $180,000.00

Page 738 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 766: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-SM URBAN PROG (5339) FFY20 Key: 20572Description: Rural bus & bus facilities program funding for Federal fiscal year 2020. Program provides replacement and

"right-sizing" of public transit vehicles for small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $900,000.00 $900,000.00

Fund1 FF30 $720,000.00

Match $180,000.00

Page 739 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 767: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: BUS & BUS FACILITIES-SM URBAN PROG (5339) FFY21 Key: 20573Description: Rural bus & bus facilities program funding for Federal fiscal year 2021. Program provides replacement and

"right-sizing" of public transit vehicles for small urban areas. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $900,000.00 $900,000.00

Fund1 FF30 $720,000.00

Match $180,000.00

Page 740 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 768: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSIT URBAN GENERAL PUBLIC FFY19 Key: 20575Description: Urban transit general public program funding for Federal fiscal year 2019. Program provides vehicle

replacements for urbanized area public transportation service providers. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,229,000.00 $2,229,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,229,000.00 $2,229,000.00

Fund1 Z240 $2,000,082.00

Match $228,918.00

Page 741 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 769: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSIT URBAN GENERAL PUBLIC FFY20 Key: 20576Description: Urban transit general public program funding for Federal fiscal year 2019. Program provides vehicle

replacements for urbanized area public transportation service providers. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,229,000.00 $2,229,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,229,000.00 $2,229,000.00

Fund1 Z240 $2,000,082.00

Match $228,918.00

Page 742 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 770: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSIT URBAN GENERAL PUBLIC FFY21 Key: 20577Description: Urban transit general public program funding for Federal fiscal year 2021. Program provides vehicle

replacements for urbanized area public transportation service providers. Region: 6

MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT TRANSIT SECTION Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,229,000.00 $2,229,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,229,000.00 $2,229,000.00

Fund1 Z240 $2,000,082.00

Match $228,918.00

Page 743 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 771: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION DEMAND MANAGEMENT FFY19 Key: 20579Description: TDM program funding for Federal fiscal year 2019. Program marketing and promotional activities for

alternatives to driving. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $835,841.00 $835,841.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $835,841.00 $835,841.00

Fund1 Z240 $750,000.00

Match $85,841.00

Page 744 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 772: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION DEMAND MANAGEMENT FFY20 Key: 20580Description: TDM program funding for Federal fiscal year 2020. Program marketing and promotional activities for

alternatives to driving. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $835,841.00 $835,841.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $835,841.00 $835,841.00

Fund1 Z240 $750,000.00

Match $85,841.00

Page 745 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 773: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION DEMAND MANAGEMENT FFY21 Key: 20581Description: TDM program funding for Federal fiscal year 2021. Program marketing and promotional activities for

alternatives to driving. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $835,841.00 $835,841.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $835,841.00 $835,841.00

Fund1 Z240 $750,000.00

Match $85,841.00

Page 746 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 774: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION INNOVATIVE PROJECTS FFY19 Key: 20582Description: Transportation innovative projects funding for Federal fiscal year 2019. Program increases transportation

system capacity by improving and promoting alternatives to driving alone. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $700,000.00 $700,000.00

Fund1 Z240 $628,110.00

Match $71,890.00

Page 747 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 775: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION INNOVATIVE PROJECTS FFY20 Key: 20583Description: Transportation innovative projects funding for Federal fiscal year 2020. Program increases transportation

system capacity by improving and promoting alternatives to driving alone. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $700,000.00 $700,000.00

Fund1 Z240 $628,110.00

Match $71,890.00

Page 748 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 776: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION INNOVATIVE PROJECTS FFY21 Key: 20584Description: Transportation innovative projects funding for Federal fiscal year 2021. Program increases transportation

system capacity by improving and promoting alternatives to driving alone. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $700,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $700,000.00 $700,000.00

Fund1 Z240 $628,110.00

Match $71,890.00

Page 749 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 777: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS MANAGEMENT FFY19 Key: 20585Description: TO program funding for Federal fiscal year 2019. Program funds state administration for the Transportation

Options (TO) program. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $174,000.00 $174,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $174,000.00 $174,000.00

Fund1 Z240 $156,130.00

Match $17,870.00

Page 750 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 778: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS MANAGEMENT FFY20 Key: 20586Description: TO program funding for Federal fiscal year 2020. Program funds state administration for the Transportation

Options (TO) program. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $174,000.00 $174,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $174,000.00 $174,000.00

Fund1 Z240 $156,130.00

Match $17,870.00

Page 751 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 779: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS MANAGEMENT FFY21 Key: 20587Description: TO program funding for Federal fiscal year 2021. Program funds state administration for the Transportation

Options (TO) program. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $174,000.00 $174,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $174,000.00 $174,000.00

Fund1 Z240 $156,130.00

Match $17,870.00

Page 752 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 780: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: TOC AND INCIDENT RESPONSE OPERATIONS FFY19-21 Key: 20592Description: 2019-2021 biennial related funding for the Transportation Operation Center (TOC) and Incident Response (IR)

programs for operating costs and equipment purchases. Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $19,500,000.00 $19,500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $19,500,000.00 $19,500,000.00

Fund1 Z240 $17,497,350.00

Match $2,002,650.00

Page 753 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 781: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 511 SYSTEM OPERATIONS FFY19-21 Key: 20593Description: 2019-2021 biennial related funding for the 511 system operating cost. Region: 6MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $600,000.00 $600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $600,000.00 $600,000.00

Fund1 Z240 $538,380.00

Match $61,620.00

Page 754 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 782: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OTHER PUBLIC AGENCY BRIDGE INSPECTION FFY19 Key: 20622Description: Funding for other public agencies (non-Federal and non-local) bridge inspections for the Federal fiscal year

2019. Individual projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 755 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 783: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OTHER PUBLIC AGENCY BRIDGE INSPECTION FFY20 Key: 20623Description: Funding for other public agencies (non-Federal and non-local) bridge inspections for the Federal fiscal year

2020. Individual projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 756 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 784: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OTHER PUBLIC AGENCY BRIDGE INSPECTION FFY21 Key: 20624Description: Funding for other public agencies (non-Federal and non-local) bridge inspections for the Federal fiscal year

2021. Individual projects to be determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 757 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 785: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL AGENCY BRIDGE INSPECTION/LOAD RATING FFY19 Key: 20625Description: Local agency bridge inspection & load rating funding for Federal fiscal year 2019. Individual projects to be

determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,989,314.00 $1,989,314.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,989,314.00 $1,989,314.00

Fund1 Z240 $1,785,011.00

Match $204,303.00

Page 758 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 786: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL AGENCY BRIDGE INSPECTION/LOAD RATING FFY20 Key: 20626Description: Local agency bridge inspection & load rating funding for Federal fiscal year 2020. Individual projects to be

determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,989,314.00 $1,989,314.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,989,314.00 $1,989,314.00

Fund1 Z240 $1,785,011.00

Match $204,303.00

Page 759 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 787: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL AGENCY BRIDGE INSPECTION/LOAD RATING FFY21 Key: 20627Description: Local agency bridge inspection & load rating funding for Federal fiscal year 2021. Individual projects to be

determined based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,989,314.00 $1,989,314.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,989,314.00 $1,989,314.00

Fund1 Z240 $1,785,011.00

Match $204,303.00

Page 760 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 788: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATE BRIDGE INSPECTION & LOAD RATING FFY19 Key: 20628Description: State bridge inspection & load rating funding for Federal fiscal year 2019. Individual projects to be determined

based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,610,000.00 $5,610,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $5,610,000.00 $5,610,000.00

Fund1 Z240 $5,033,853.00

Match $576,147.00

Page 761 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 789: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATE BRIDGE INSPECTION & LOAD RATING FFY20 Key: 20629Description: State bridge inspection & load rating funding for Federal fiscal year 2020. Individual projects to be determined

based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,610,000.00 $5,610,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $5,610,000.00 $5,610,000.00

Fund1 Z240 $5,033,853.00

Match $576,147.00

Page 762 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 790: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: STATE BRIDGE INSPECTION & LOAD RATING FFY21 Key: 20630Description: State bridge inspection & load rating funding for Federal fiscal year 2021. Individual projects to be determined

based on program requirements and needs. Region: 6

MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $5,610,000.00 $5,610,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $5,610,000.00 $5,610,000.00

Fund1 Z240 $5,033,853.00

Match $576,147.00

Page 763 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 791: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TECHNOLOGY TRANSFER CENTER (T2 CENTER) 2019 Key: 20631Description: Provides information and training on transportation technology to local agencies. Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $450,000.00 $450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $450,000.00 $450,000.00

Fund1 Z438 $175,000.00

Match $175,000.00Fund2 Z240 $89,730.00

Match $10,270.00

Page 764 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 792: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TECHNOLOGY TRANSFER CENTER (T2 CENTER) 2020 Key: 20632Description: Provides information and training on transportation technology to local agencies. Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $450,000.00 $450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $450,000.00 $450,000.00

Fund1 Z438 $175,000.00

Match $175,000.00Fund2 Z240 $89,730.00

Match $10,270.00

Page 765 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 793: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OREGON TECHNOLOGY TRANSFER CENTER (T2 CENTER) 2021 Key: 20633Description: Provides information and training on transportation technology to local agencies. Region: 6MPO: Non-MPO Work Type: PLANNG Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $450,000.00 $450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $450,000.00 $450,000.00

Fund1 Z438 $175,000.00

Match $175,000.00Fund2 Z240 $89,730.00

Match $10,270.00

Page 766 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 794: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: FISH PASSAGE CULVERT RETROFITTING & SUPPLIES 19-21 Key: 20634Description: Fish passage culvert retrofit funding for Federal fiscal years 2019-2021. Projects to be determined based on

program requirements. Region: 6

MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $600,000.00 $600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total 600,000.00 $600,000.00

Fund1 S010 $600,000.00

Match

Page 767 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 795: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2018 TOCS MAINTENANCE Key: 20635Description: Implement 3 Transportation operation center system (TOCS) maintenance releases containing bug fixes &

minor software enhancements as well as system hotfixes used to resolve issues that prevent critical operational tasks from being executed.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 768 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 796: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2019 TOCS MAINTENANCE Key: 20636Description: Implement 3 Transportation operation center system (TOCS) maintenance releases containing bug fixes &

minor software enhancements as well as system hotfixes used to resolve issues that prevent critical operational tasks from being executed.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 769 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 797: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2020 TOCS MAINTENANCE Key: 20637Description: Implement 3 Transportation operation center system (TOCS) maintenance releases containing bug fixes &

minor software enhancements as well as system hotfixes used to resolve issues that prevent critical operational tasks from being executed.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 770 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 798: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2021 TOCS MAINTENANCE Key: 20638Description: mplement 3 Transportation operation center system (TOCS) maintenance releases containing bug fixes &

minor software enhancements as well as system hotfixes used to resolve issues that prevent critical operational tasks from being executed.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 771 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 799: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2018 ITS SERVER REPLACEMENT PROJECT Key: 20639Description: Replace existing ITS server infrastructure. These servers include TripCheck web application servers,

Transportation Operation Center application and device control servers, database servers, and other application, development and test system servers.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 772 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 800: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2019 ITS SERVER REPLACEMENT PROJECT Key: 20640Description: Replace existing ITS server infrastructure. These servers include TripCheck web application servers,

Transportation Operation Center application and device control servers, database servers, and other application, development and test system servers.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 773 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 801: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2020 ITS SERVER REPLACEMENT PROJECT Key: 20641Description: Replace existing ITS server infrastructure. These servers include TripCheck web application servers,

Transportation Operation Center application and device control servers, database servers, and other application, development and test system servers.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 774 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 802: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: 2021 ITS SERVER REPLACEMENT PROJECT Key: 20642Description: Replace existing ITS server infrastructure. These servers include TripCheck web application servers,

Transportation Operation Center application and device control servers, database servers, and other application, development and test system servers.

Region: 6

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT - ITS Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $150,000.00 $150,000.00

Fund1 Z240 $134,595.00

Match $15,405.00

Page 775 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 803: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OSU ENGINEERING SAFETY SHORT COURSES FFY19 Key: 20643Description: Provide safety engineering training to transportation professionals and public officials. Funding is from Federal

fiscal year 2019. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $250,000.00 $250,000.00

Fund1 ZS30 $250,000.00

Match

Page 776 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 804: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OSU ENGINEERING SAFETY SHORT COURSES FFY20 Key: 20644Description: Provide safety engineering training to transportation professionals and public officials. Funding is from Federal

fiscal year 2020. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $250,000.00 $250,000.00

Fund1 ZS30 $250,000.00

Match

Page 777 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 805: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OSU ENGINEERING SAFETY SHORT COURSES FFY21 Key: 20645Description: Provide safety engineering training to transportation professionals and public officials. Funding is from Federal

fiscal year 2021. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $250,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $250,000.00 $250,000.00

Fund1 ZS30 $250,000.00

Match

Page 778 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 806: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: HUMAN FACTORS ENGINEERING FFY19 Key: 20646Description: Provide safety engineering training to transportation professionals and public officials. Funding is from Federal

fiscal year 2019. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $50,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $50,000.00 $50,000.00

Fund1 ZS30 $50,000.00

Match

Page 779 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 807: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY FEATURES FOR LOCAL ROADS FFY19 Key: 20647Description: Provide traffic safety engineering/law enforcement training to local officials. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $150,000.00 $150,000.00

Fund1 ZS30 $150,000.00

Match

Page 780 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 808: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY FEATURES FOR LOCAL ROADS FFY20 Key: 20648Description: Provide traffic safety engineering/law enforcement training to local officials. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $150,000.00 $150,000.00

Fund1 ZS30 $150,000.00

Match

Page 781 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 809: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: SAFETY FEATURES FOR LOCAL ROADS FFY21 Key: 20649Description: Provide traffic safety engineering/law enforcement training to local officials. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $150,000.00 $150,000.00

Fund1 ZS30 $150,000.00

Match

Page 782 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 810: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL JURISDICTION ASSISTANCE FFY19 Key: 20650Description: Federal fiscal year 2019 funding to provide safety assistance to local jurisdictions. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $400,000.00 $400,000.00

Fund1 ZS30 $400,000.00

Match

Page 783 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 811: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL JURISDICTION ASSISTANCE FFY20 Key: 20651Description: Federal fiscal year 2020 funding to provide safety assistance to local jurisdictions. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $400,000.00 $400,000.00

Fund1 ZS30 $400,000.00

Match

Page 784 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 812: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL JURISDICTION ASSISTANCE FFY21 Key: 20652Description: Federal fiscal year 2021 funding to provide safety assistance to local jurisdictions. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $400,000.00 $400,000.00

Fund1 ZS30 $400,000.00

Match

Page 785 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 813: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKZONE EDUCATION FFY19 Key: 20653Description: Federal fiscal year 2019 funding for statewide workzone education program. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $200,000.00 $200,000.00

Fund1 ZS30 $200,000.00

Match

Page 786 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 814: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKZONE EDUCATION FFY20 Key: 20654Description: Federal fiscal year 2020 funding for statewide workzone education program. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $200,000.00 $200,000.00

Fund1 ZS30 $200,000.00

Match

Page 787 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 815: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: WORKZONE EDUCATION FFY21 Key: 20655Description: Federal fiscal year 2021 funding for statewide workzone education program. Region: 6MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $200,000.00 $200,000.00

Fund1 ZS30 $200,000.00

Match

Page 788 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 816: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: OSP WORKZONE ENFORCEMENT FFY19 Key: 20656Description: Roadway departure implementation plan and enforcement efforts by the Oregon State Police (OSP) during

Federal fiscal year 2019. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,000,000.00 $1,000,000.00

Fund1 Z240 $897,300.00

Match $102,700.00

Page 789 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 817: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS STATEWIDE STATEWIDE

STATEWIDE Name: OSP WORKZONE ENFORCEMENT FFY20 Key: 20657Description: Roadway departure implementation plan and enforcement efforts by the Oregon State Police (OSP) during

Federal fiscal year 2020. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,000,000.00 $1,000,000.00

Fund1 Z240 $897,300.00

Match $102,700.00

Page 790 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 818: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: OSP WORKZONE ENFORCEMENT FFY21 Key: 20658Description: Roadway departure implementation plan and enforcement efforts by the Oregon State Police (OSP) during

Federal fiscal year 2021. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,000,000.00 $1,000,000.00

Fund1 Z240 $897,300.00

Match $102,700.00

Page 791 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 819: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL POLICE WORKZONE ENFORCEMENT FFY19 Key: 20659Description: Roadway departure implementation plan and enforcement efforts by local Police forces during Federal fiscal

year 2019. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $684,000.00 $684,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $684,000.00 $684,000.00

Fund1 Z240 $613,753.00

Match $70,247.00

Page 792 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 820: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL POLICE WORKZONE ENFORCEMENT FFY20 Key: 20660Description: Roadway departure implementation plan and enforcement efforts by local Police forces during Federal fiscal

year 2020. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $684,000.00 $684,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $684,000.00 $684,000.00

Fund1 Z240 $613,753.00

Match $70,247.00

Page 793 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 821: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: LOCAL POLICE WORKZONE ENFORCEMENT FFY21 Key: 20661Description: Roadway departure implementation plan and enforcement efforts by local Police forces during Federal fiscal

year 2021. Region: 6

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $684,000.00 $684,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $684,000.00 $684,000.00

Fund1 Z240 $613,753.00

Match $70,247.00

Page 794 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 822: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS FFY19 Key: 20662Description: Transportation options strategies, programs, and investments enhance traveler opportunities and choices to

bike, walk, take transit, share rides, and telecommute. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $557,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $557,227.00 $557,227.00

Fund1 Z240 $500,000.00

Match $57,227.00

Page 795 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 823: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS FFY20 Key: 20663Description: Transportation options strategies, programs, and investments enhance traveler opportunities and choices to

bike, walk, take transit, share rides, and telecommute. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $557,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $557,227.00 $557,227.00

Fund1 Z240 $500,000.00

Match $57,227.00

Page 796 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 824: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE STATEWIDE

STATEWIDE Name: TRANSPORTATION OPTIONS FFY21 Key: 20664Description: Transportation options strategies, programs, and investments enhance traveler opportunities and choices to

bike, walk, take transit, share rides, and telecommute. Region: 6

MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $557,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $557,227.00 $557,227.00

Fund1 Z240 $500,000.00

Match $57,227.00

Page 797 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 825: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

82.91 to 82.93 0.02 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: US101: FARMER CREEK BRIDGE REPLACEMENT Key: 17525Description: Replace bridge #04659 Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $225,000.00 $36,400.00 $55,200.00 $3,153,400.00 $3,470,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2013 2017 2017 2018

Total $369,300.00 $36,400.00 $55,200.00 3,153,400.00 $3,614,300.00

Fund1 L1CE $331,373.00 L1CE $32,662.00 L1CE $49,531.00 M001 $2,100,938.00

Match $37,927.00 $3,738.00 $5,669.00 $240,462.00Fund2 L1CE $655,747.00

Match $75,053.00

Fund3 L240 $72,861.00Match $8,339.00

Page 798 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 826: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.80 to 0.82 0.02 NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: CEDAR CR RD: CEDAR CREEK BRIDGE REPLACEMENT Key: 18421Description: REPLACE BRIDGE #57C52A Region: 2MPO: Non-MPO Work Type: BRSF Applicant: TILLAMOOK COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $339,000.00 $54,000.00 $816,000.00 $1,209,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2018

Total $339,000.00 $54,000.00 816,000.00 $1,209,000.00

Fund1 M233 $304,185.00 M233 $48,454.00 M23

3 $732,197.00

Match $34,815.00 $5,546.00 $83,803.00

Page 799 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 827: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

81.05 to 81.05 0.01 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: US101 @ BEAVER SLIDE REPAIR Key: 18618Description: SLIDE REPAIR Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $80,000.00 $25,000.00 $720,000.00 $825,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $80,000.00 $25,001.00 720,000.00 $825,001.00

Fund1 L24E $71,784.00 M240 $22,433.00 M240 $646,056.00

Match $8,216.00 $2,568.00 $73,944.00

Page 800 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 828: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH WEST OREGON ACT CLATSOPNORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: REGION 2 (NORTH) LOCAL RD ROADWAY DEPARTURE Key: 19751Description: Install roadway departure countermeasures throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $131,200.00 $231,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 131,200.00 $231,200.00

Fund1 MS30 $100,000.00 MS3

0 $131,200.00

Match

Page 801 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 829: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

38.25 to 38.25 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK54.20 to 54.20 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: US101: ROCKFALL REMEDIATION TILLAMOOK COUNTY Key: 20066Description: Rock and debris fall onto the highway at these two locations. Look at tree removal, scaling, and/or rock

screening as possible solutions. Region: 2

MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $15,000.00 $25,000.00 $1,310,000.00 $1,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2021

Total $250,000.00 $15,001.00 $25,001.00 1,310,000.00 $1,600,002.00

Fund1 M240 $224,325.00 M240 $13,460.00 M24

0 $22,433.00 M240 $1,175,463.00

Match $25,675.00 $1,541.00 $2,568.00 $134,537.00

Page 802 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 830: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH WEST OREGON ACT CLATSOP, COLUMBIA, TILLAMOOK, WASHINGTON

TILLAMOOK Name: REGION 2 (NORTH) CURVE WARNING UPGRADES Key: 20189Description: Install chevrons and updated curve warning signs throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $105,923.00 $1,625,677.00 $1,731,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $105,923.00 1,625,677.00 $1,731,600.00

Fund1 MS30 $97,682.00 MS3

0 $1,499,199.00

Match $8,241.00 $126,478.00

Page 803 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 831: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-18, OR-214, OR-219, OR-22, OR-

99W

HILLSBORO/SILVERTON, PACIFIC HIGHWAY WEST, SALMON RIVER,

WILLAMINA-SHERIDANMID-WILLAMETTE VALLEY ACT LINCOLN, MARION, POLK,

TILLAMOOK

TILLAMOOK Name: REGION 2 (CENTRAL & S) CURVE WARNING UPGRADES Key: 20190Description: Install chevrons and updated curve warning signs at various locations throughout Area 3 Region: 2MPO: Salem/Keizer Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $97,340.00 $1,772,760.00 $1,870,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $97,340.00 1,772,760.00 $1,870,100.00

Fund1 MS30 $89,767.00 MS3

0 $1,634,839.00

Match $7,573.00 $137,921.00

Page 804 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 832: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 167.51 US-101 OREGON COAST HIGHWAYCASCADES WEST ACT, MID-

WILLAMETTE VALLEY ACT, NORTH WEST OREGON ACT

CLATSOP, LINCOLN, TILLAMOOK

TILLAMOOK Name: US101: CURVE WARNING UPGRADES Key: 20222Description: Install chevrons and updated curve warning signs at various locations Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $71,995.00 $1,311,205.00 $1,383,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $71,995.00 1,311,205.00 $1,383,200.00

Fund1 MS30 $66,394.00 MS3

0 $1,209,193.00

Match $5,601.00 $102,012.00

Page 805 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 833: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

54.83 to 55.94 1.11 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: US101: URBAN UPGRADE (GARIBALDI) Key: 20252Description: Upgrade sidewalks, parking, bike facilities, and ADA compliance to enable future or concurrent pavement

preservation project Region: 2

MPO: Non-MPO Work Type: BIKPED , SAFETY Applicant: CITY OF GARIBALDI Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $715,000.00 $650,000.00 $45,000.00 $5,239,767.00 $6,649,767.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $715,001.00 $650,000.00 $45,001.00 5,239,767.00 $6,649,769.00

Fund1 Z240 $641,570.00 Z240 $583,245.00 Z240 $40,379.00 Z240 $3,400,767.00

Match $73,431.00 $66,755.00 $4,622.00 $389,233.00

Fund2 M240 $1,159,887.00

Match $132,754.00

Fund3 OTH0

Match $157,126.00

Page 806 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 834: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.81 to 0.84 0.03 NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: CURL ROAD: KILCHIS RIVER BRIDGE Key: 20356Description: Design shelf ready plans to replace current structure with a concrete bridge on same alignment. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: TILLAMOOK COUNTY Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $557,227.00 $557,227.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $557,227.00 $557,227.00

Fund1 Z233 $500,000.00

Match $57,227.00

Page 807 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 835: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.75 to 5.82 0.07 OR-006 WILSON RIVER NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: OR6: WILSON RIVER (MILLS) BRIDGE Key: 20422Description: Paint structure; remove pack rust; heat straighten portal. Replace rivets and bolts. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $264,800.00 $11,300.00 $2,002,000.00 $2,278,100.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $264,800.00 $11,300.00 2,002,000.00 $2,278,100.00

Fund1 Z001 $237,605.00 Z001 $10,139.00 Z001 $1,796,395.00

Match $27,195.00 $1,161.00 $205,605.00

Page 808 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 836: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

67.95 to 68.01 0.06 US-101 OREGON COAST HIGHWAY NORTH WEST OREGON ACT TILLAMOOK

TILLAMOOK Name: US101: TRASK RIVER BRIDGE Key: 20448Description: Permanent scour repair. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $92,978.00 $38,455.00 $343,927.00 $475,360.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $92,978.00 $38,455.00 343,927.00 $475,360.00

Fund1 Z001 $83,429.00 Z001 $34,506.00 Z001 $308,606.00

Match $9,549.00 $3,949.00 $35,321.00

Page 809 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 837: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

182.22 to 183.43 1.21 US-730 COLUMBIA RIVER NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: 6TH ST: YERXA AVE - UMATILLA BRIDGE (UMATILLA) Key: 18113Description: Construct sidewalks and curb extensions along 6th St between Yerxa Ave and Umatilla River Bridge. RRFB @

Yerxa Ave for school crossing. Region: 5

MPO: Non-MPO Work Type: BIKPED , OP-SSI Applicant: CITY OF UMATILLA Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $130,000.00 $22,000.00 $3,710,655.00 $4,262,655.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2012 2018 2018 2019

Total $545,782.00 $130,000.00 $22,000.00 910,000.00 $1,607,782.00

Fund1 L20E $358,920.00 L24E $116,649.00 M240 $19,741.00 L24E $816,543.00

Match $41,080.00 $13,351.00 $2,259.00 $93,457.00Fund2 Z240 $130,810.00

Match $14,972.00

Page 810 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 838: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

225.84 to 237.99 12.15 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84 POVERTY FLATS - MEACHAM Key: 18845Description: DIAMOND GRIND AND PAVING PROJECT Region: 5MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $5,500,000.00 $5,800,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $300,000.00 5,500,000.00 $5,800,000.00

Fund1 L010 $276,660.00 L010 $5,072,100.00

Match $23,340.00 $427,900.00

Page 811 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 839: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

OR-207 LEXINGTON-ECHO NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: HWY 320 - THIELSEN STREET BIKE PED (ECHO) Key: 18878Description: CEMETARY RD TO MAIN ST BIKE/PED IMPROVEMENTS Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF ECHO Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $170,000.00 $20,000.00 $4,000.00 $736,623.00 $930,623.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $170,000.00 $20,000.00 $4,000.00 736,550.00 $930,550.00

Fund1 ACP0 $152,541.00 M240 $17,946.00 M240 $3,589.00 M24

0 $660,972.00

Match $17,459.00 $2,054.00 $411.00 $75,578.00

Page 812 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 840: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

188.00 to 313.80 125.80 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UMATILLA Name: I-84: NE OR SNOW ZONE SAFETY IMPROVEMENTS Key: 18994Description: Ramp gates, illumination, chain up areas, RWIS, variable speed signs and other snow zone improvements as

identified from MP 188-313.8 Region: 5

MPO: Non-MPO Work Type: OP-ITS , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $850,000.00 $100,000.00 $20,000.00 $6,728,000.00 $7,698,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $850,000.00 $100,000.00 $20,000.00 6,728,000.00 $7,698,000.00

Fund1 GF01 $550,000.00 GF01 $100,000.00 GF01 $20,000.00 MS30 $3,398,000.00

MatchFund2 Z240 $276,660.00 GF01 $3,330,000.00

Match $23,340.00

Page 813 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 841: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

UMATILLA Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00Fund2 ZS30 $300,000.00

Match

UMATILLA Name: I-82: BRIDGE END PANEL REPLACEMENTS Key: 19793Description: Replace end panels on bridges 16443, 16444, 16450, 16451 Region: 5MPO: Non-MPO Work Type: BRIDGE , PRESRV

Applicant: ODOT Status: Construction Scheduled to Begin

Page 814 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 842: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.67 to 1.87 0.20 I-82 MCNARY NORTH EAST OREGON ACT UMATILLA

10.18 to 10.24 0.06 I-82 MCNARY NORTH EAST OREGON ACT UMATILLA

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $681,335.00 $3,407,670.00 $4,089,005.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $681,335.00 3,407,670.00 $4,089,005.00

Fund1 M001 $628,327.00 M00

1 $3,142,553.00

Match $53,008.00 $265,117.00

Location(s)

Mileposts Length Route Highway ACT County(s)

64.76 to 178.70 113.94 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT VARIOUS

178.70 to 259.00 80.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UMATILLA Name: I84: TRAFFIC BARRIER UPGRADES Key: 19928Description: REPLACE SUB-STANDARD GUARDRAIL, ROADSIDE BARRIER, BRIDGE RAIL RETROFITS AND BRIDGE SCREENING Region: 4MPO: Non-MPO Work Type: BRIDGE , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $10,000.00 $3,891,500.00 $4,251,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $420,001.00 $10,000.00 3,891,500.00 $4,321,501.00

Fund1 Z240 $276,182.00 S010 $10,000.00 L240 $2,753,903.00

Match $23,300.00 $315,197.00

Fund2 M240 $62,811.00 L010 $758,417.00

Match $7,189.00 $63,983.00

Fund3 L010 $32,936.00Match $2,779.00

Fund4 L01E $13,652.00Match $1,152.00

Fund5 Q010Match

Page 815 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 843: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

50.00 to 90.77 40.77 US-395 PENDLETON-JOHN DAY NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US395 LONG CREEK-UKIAH SIGN UPGRADES Key: 20108Description: Replace deficient and worn out signs along US395B, starting at Long Creek to Ukiah to improve safety and

update signs to meet current MUTCD standards. Region: 5

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $60,000.00 $340,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $60,000.00 340,000.00 $400,000.00

Fund1 Z240 $53,838.00 Z240 $305,082.00Match $6,162.00 $34,918.00

Location(s)

Mileposts Length Route Highway ACT County(s)

216.00 to 252.00 36.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UMATILLA Name: I-84 PENDLTON-HILGARD VSL Key: 20224Description: Install weather based Variable Speed Limit (VSL) system between MP 216 and MP 252 on I-84. Region: 5MPO: Non-MPO Work Type: OP-ITS

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $578,000.00 $3,277,000.00 $3,855,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $578,000.00 3,277,000.00 $3,855,000.00

Fund1 Z240 $518,639.00 ZS30 $3,022,049.00

Match $59,361.00 $254,951.00

Page 816 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 844: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

216.00 to 272.00 56.00 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UMATILLA Name: I-84: PENDLETON-LA GRANDE SNOW ZONE IMPROVEMENTS Key: 20270Description: Install winter related ITS features, chain up expansions, illumination and possible highway advisory radio

system upgrades between Pendleton and MP 272. Region: 5

MPO: Non-MPO Work Type: OP-SSI

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $285,000.00 $1,615,000.00 $1,900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $285,000.00 1,615,000.00 $1,900,000.00

Fund1 Z001 $262,827.00 Z001 $1,489,353.00Match $22,173.00 $125,647.00

Location(s)

Mileposts Length Route Highway ACT County(s)

215.58 to 280.65 65.07 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT VARIOUS4.36 to 4.36 OR-331 UMATILLA MISSION NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84/ HWY-331: CORRIDOR DRUM SIGN UPGRADES Key: 20319Description: Upgrade existing Drum Signs; I-84 MP 215.58, 221, 226, 258.43, 263.57, 265.51, 280.65 and Hwy 331, MP 4.36 Region: 5MPO: Non-MPO Work Type: OP-ITS

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,259.00 $449,138.00 $528,397.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $79,259.00 449,138.00 $528,397.00

Fund1 Z001 $73,093.00 Z001 $414,195.00Match $6,166.00 $34,943.00

Page 817 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 845: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

198.53 to 198.53 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA273.40 to 273.40 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

39.70 to 39.70 US-395 PENDLETON-JOHN DAY NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84/US-395: ROAD WEATHER INFO SYSTEM UPGRADES Key: 20320Description: Upgrade existing Road Weather Info System (RWIS) sites. Replace and/or upgrade the existing RWIS ITS

components at each location using the existing facilities. Region: 5

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $107,550.00 $609,450.00 $717,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $107,550.00 609,450.00 $717,000.00

Fund1 Z001 $99,183.00 Z001 $562,035.00Match $8,367.00 $47,415.00

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.01 NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: FRANKLIN STREET: PINE CREEK BRIDGE Key: 20380Description: Replace existing structure with a pre-cast pre-stressed concrete slab structure. Taper concrete bridge rail from

ends of bridge and widen road approaches. Region: 5

MPO: Non-MPO Work Type: BRIDGE

Applicant: CITY OF WESTON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $177,800.00 $18,595.00 $609,878.00 $806,273.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $177,800.00 $18,595.00 609,878.00 $806,273.00

Fund1 Z233 $159,540.00 Z233 $16,685.00 Z233 $547,244.00Match $18,260.00 $1,910.00 $62,634.00

Page 818 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 846: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

6.03 to 12.52 6.49 US-395 UMATILLA-STANFIELD NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US395: SE 4TH - I-84 (HERMISTON) Key: 20461Description: Grind existing surfacing and inlay the travel lanes, bridge decks and shoulders and update ADA ramps as

applicable. Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $700,000.00 $165,000.00 $15,000.00 $6,568,600.00 $7,448,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020 2020

Total $700,000.00 $165,001.00 $15,001.00 6,568,600.00 $7,448,602.00

Fund1 Z240 $628,110.00 Z240 $148,055.00 Z240 $13,460.00 Z240 $5,894,005.00

Match $71,890.00 $16,946.00 $1,541.00 $674,595.00

Location(s)

Mileposts Length Route Highway ACT County(s)

195.15 to 195.18 0.03 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84 WB OVER NOLAN ROAD BRIDGE Key: 20492Description: Remove the existing end panel and approximately 260 linear feet of concrete pavement and asphalt

shoulders. Re-grade and place a new end panel with seal joints and continually reinforced concrete paving and asphalt shoulders.

Region: 5

MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $216,844.00 $2,500.00 $2,500.00 $1,133,430.00 $1,355,274.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2019

Total $216,844.00 $2,501.00 $2,501.00 1,133,430.00 $1,355,276.00

Fund1 Z001 $199,974.00 Z001 $2,306.00 Z001 $2,306.00 Z001 $1,045,249.00Match $16,870.00 $195.00 $195.00 $88,181.00

Page 819 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 847: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

199.01 to 199.06 0.05 US-395 COLUMBIA RIVER NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US730: JUNIPER CANYON CREEK BRIDGE Key: 20497Description: Stabilize footing to avoid additional settlement and damage. Region: 5MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $38,600.00 $218,250.00 $256,850.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $38,600.00 218,250.00 $256,850.00

Fund1 Z001 $34,636.00 Z001 $195,836.00Match $3,964.00 $22,414.00

Location(s)

Mileposts Length Route Highway ACT County(s)

1.00 to 1.50 0.50 NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: HIGHLAND AVE (HERMISTON) SAFETY IMPROVEMENTS Key: 20526Description: Install enhanced traffic control with stop ahead signs, larger sings, pavement markings and flashing beacons

between 1st Street and 7th Street in Hermiston. Region: 5

MPO: Non-MPO Work Type: SAFETY

Applicant: CITY OF HERMISTON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $17,825.00 $101,006.00 $118,831.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $17,825.00 101,005.00 $118,830.00

Fund1 ZS30 $16,438.00 ZS30 $93,147.00

Match

Fund2 OTH0

OTH0

Match $1,387.00 $7,858.00

Page 820 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 848: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-0.50 to 0.50 1.00 I-82 MCNARY NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-82 EB VARIABLE MESSAGE SIGN @ WA STATE LINE Key: 20527Description: Install a Variable Message Sign (VMS) in advance of the interchange of I-82 and US395/US730. Region: 5MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $2,500.00 $2,500.00 $420,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020 2021

Total $75,000.00 $2,501.00 $2,501.00 420,000.00 $500,002.00

Fund1 Z001 $69,165.00 Z001 $2,306.00 Z001 $2,306.00 Z001 $387,324.00Match $5,835.00 $195.00 $195.00 $32,676.00

Location(s)

Mileposts Length Route Highway ACT County(s)

1.16 to 2.74 1.58 US-395 UMATILLA-STANFIELD NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US395: JCT I-84 TO PENDLETON SOUTH CITY LIMITS Key: 20528Description: Shelf project to design a grind and inlay full width roadway. Construct new sidewalk ramps. Region: 5MPO: Non-MPO Work Type: BIKPED , PRESRV

Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $200,000.00 $200,000.00

Fund1 Z240 $179,460.00

Match $20,540.00

Page 821 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 849: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

238.00 to 248.50 10.50 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UMATILLA Name: I-84 PAVEMENT: MEACHAM-KAMELA Key: 20530Description: Design of the reconstruction of existing asphalt concrete pavement (ACP) in the B-lanes with continuously

reinforced concrete pavement (CRCP), overlay the ACP on the A-lanes and shoulders to match the CRCP pavement, and also Entrance & Exit ramps.

Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,000,000.00 $1,000,000.00

Fund1 Z001 $922,200.00Match $77,800.00

Location(s)

Mileposts Length Route Highway ACT County(s)

US-395 PENDLETON-JOHN DAY NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US395: SIGNAL UPGRADES (PENDLETON) Key: 20533Description: Replace deteriorated traffic signal poles at two locations each on Doran and Court Streets in Pendleton. If

funding allows, there is an operational and safety need to add a new signal on Emigrant at SW 13th. Region: 5

MPO: Non-MPO Work Type: OP-SSI

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $228,000.00 $40,000.00 $1,250,124.00 $1,518,124.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2020 2021

Total $228,000.00 $40,000.00 1,250,124.00 $1,518,124.00

Fund1 Z240 $204,584.00 Z240 $35,892.00 Z240 $1,121,736.00

Match $23,416.00 $4,108.00 $128,388.00

Page 822 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 850: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: US395/OR207/OR11: INTERSECTION SAFETY IMPROVEMENTS Key: 20534Description: Safety improvements to signalized and non-signalized highway intersections in Umatilla County at six

locations. Region: 5

MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $218,400.00 $20,000.00 $1,217,662.00 $1,456,062.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $218,400.00 $20,000.00 1,217,662.00 $1,456,062.00

Fund1 ZS30 $218,400.00 ZS30 $20,000.00 ZS30 $1,122,928.00Match $94,734.00

Location(s)

Mileposts Length Route Highway ACT County(s)

0.07 to 0.71 0.64 I-82 MCNARY NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-82: COLUMBIA RIVER (UMATILLA) WB BRIDGE Key: 20537Description: Paint structure. WSDOT is taking the lead and paying 50% of total. Region: 5MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,030,000.00 $18,270,000.00 $20,300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $2,030,000.00 18,270,000.00 $20,300,000.00

Fund1 OTH0

OTH0

Match $1,015,000.00 $9,135,000.00Fund2 Z001 $936,033.00 Z001 $8,424,297.00

Match $78,967.00 $710,703.00

Page 823 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 851: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

239.42 to 239.48 0.06 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84 FRONTAGE ROAD: MEACHAM CREEK & UPRR Key: 20539Description: Design shelf ready plans for bridge replacement. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $378,107.00 $378,107.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $378,107.00 $378,107.00

Fund1 Z001 $348,690.00Match $29,417.00

Location(s)

Mileposts Length Route Highway ACT County(s)

209.52 to 209.56 0.04 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84 EB OVER US395 (EMIGRANT AVE INTCHG) Key: 20540Description: Design shelf ready plans to: lower the roadway below the bridge and crack seal concrete (epoxy injection). Region: 5MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $75,000.00 $75,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $75,000.00 $75,000.00

Fund1 Z001 $69,165.00

Match $5,835.00

Page 824 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 852: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.18 to 1.23 0.05 OR-37 PENDLETON-COLD SPRINGS NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: OR37 OVER UPRR (COLD SPRINGS) Key: 20541Description: Design shelf ready plans for: deck overlay; spall repairs throughout; epoxy inject cracks, and joint replacement. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $76,000.00 $76,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $76,000.00 $76,000.00

Fund1 Z001 $68,195.00Match $7,805.00

Page 825 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 853: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT GRANT, UMATILLA

UMATILLA Name: UMATILLA-GRANT COUNTY SAFETY IMPROVEMENTS Key: 20545Description: Grant: Update curve warning signs Middle Fork River Rd. Umatilla: Intersection of Pumpkin Ctr Rd & NE 4th

ST/Sagebrush Rd enhanced intersection signing & markings. Intersection Westland Rd & Bridge Road engce intersection sign & markings. River Rd MP3

Region: 5

MPO: Non-MPO Work Type: SAFETY Applicant: GRANT COUNTY, UMATILLA COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $176,180.00 $10,000.00 $10,000.00 $978,356.00 $1,174,536.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $176,181.00 $10,000.00 $10,000.00 978,356.00 $1,174,537.00

Fund1 ZS30 $162,474.00 ZS30 $9,222.00 ZS30 $9,222.00 ZS30 $902,240.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0Match $13,707.00 $778.00 $778.00 $76,116.00

Page 826 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 854: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

188.04 to 203.65 15.61 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84: STANFIELD-PENDLETON PAVEMENT PRESERVATION Key: 20548Description: Provide engineering for a shelf ready overlay paving project to preserve payment on I-84 between Stanfield

and Pendleton. Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $500,000.00 $500,000.00

Fund1 Z001 $461,100.00

Match $38,900.00

Page 827 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 855: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: WALLA WALLA MILTON-FREEWATER MPO PLANNING SFY20 Key: 20616Description: Walla Walla Milton-Freewater MPO planning funds for Federal fiscal year 2019. Projects will be selected in the

future through the MPO process. Region: 5

MPO: Walla Walla Valley MPO Work Type: PLANNG Applicant: WALLA WALLA MILTON-FREEWATER MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $29,448.00 $29,448.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $29,449.00 $29,449.00

Fund1 Z450 $19,952.00

Match $2,284.00Fund2 Z77D $6,472.00

Match $741.00

Page 828 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 856: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: WALLA WALLA MILTON-FREEWATER MPO PLANNING SFY21 Key: 20617Description: Walla Walla Milton-Freewater MPO planning funds for Federal fiscal year 2020. Projects will be selected in the

future through the MPO process. Region: 5

MPO: Walla Walla Valley MPO Work Type: PLANNG Applicant: WALLA WALLA MILTON-FREEWATER MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $29,448.00 $29,448.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $29,449.00 $29,449.00

Fund1 Z450 $19,952.00

Match $2,284.00Fund2 Z77D $6,472.00

Match $741.00

Page 829 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 857: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: WALLA WALLA MILTON-FREEWATER MPO PLANNING SFY22 Key: 20618Description: Walla Walla Milton-Freewater MPO planning funds for Federal fiscal year 2021. Projects will be selected in the

future through the MPO process. Region: 5

MPO: Walla Walla Valley MPO Work Type: PLANNG Applicant: WALLA WALLA MILTON-FREEWATER MPO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $29,448.00 $29,448.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $29,449.00 $29,449.00

Fund1 Z450 $19,952.00

Match $2,284.00Fund2 Z77D $6,472.00

Match $741.00

Page 830 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 858: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

222.50 to 224.00 1.50 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA8.00 to 8.00 OR-204 WESTON-ELGIN NORTH EAST OREGON ACT UMATILLA

UMATILLA Name: I-84 & OR201 SNOW FENCES Key: 20667Description: Construct snow fences Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $600,000.00 $600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 600,000.00 $600,000.00

Fund1 Z001 $276,660.00

Match $23,340.00Fund2 Z240 $269,190.00

Match $30,810.00

Page 831 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 859: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

30.64 to 31.28 0.64 OR-82 WALLOWA LAKE HIGHWAY NORTH EAST OREGON ACT UNION

UNION Name: OR82: MINAM CURVE Key: 17047Description: CURVE CORRECTION Region: 5MPO: Non-MPO Work Type: ENHANC , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $11,000.00 $4,400,000.00 $4,611,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2010 2018

Total $200,000.00 $11,000.00 4,400,000.00 $4,611,000.00

Fund1 LZ1E $179,460.00 S010 $11,000.00 M240 $3,948,120.00

Match $20,540.00 $451,880.00

Page 832 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 860: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT UNION

UNION Name: HAEFER LANE: OR HWY 237 - CONKLIN STREET Key: 18911Description: CONSTRUCT MULTI-USE PATH Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF COVE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $76,000.00 $12,000.00 $26,000.00 $311,723.00 $425,723.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $76,000.00 $12,000.00 $26,000.00 311,723.00 $425,723.00

Fund1 ACP0 $68,195.00 M240 $10,768.00 M240 $23,330.00 M24

0 $279,709.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $7,805.00 $1,232.00 $2,670.00 $32,014.00

Footnote: WILL BE COMBINED WITH FULTON STREET PROJECT

Page 833 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 861: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

188.00 to 313.80 125.80 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UNION Name: I-84: NE OR SNOW ZONE SAFETY IMPROVEMENTS Key: 18994Description: Ramp gates, illumination, chain up areas, RWIS, variable speed signs and other snow zone improvements as

identified from MP 188-313.8 Region: 5

MPO: Non-MPO Work Type: OP-ITS , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $850,000.00 $100,000.00 $20,000.00 $6,728,000.00 $7,698,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2017 2018

Total $850,000.00 $100,000.00 $20,000.00 6,728,000.00 $7,698,000.00

Fund1 GF01 $550,000.00 GF01 $100,000.00 GF01 $20,000.00 MS30 $3,398,000.00

MatchFund2 Z240 $276,660.00 GF01 $3,330,000.00

Match $23,340.00

Page 834 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 862: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

31.03 to 31.04 0.01 OR-244 UKIAH-HILGARD NORTH EAST OREGON ACT UNION

UNION Name: MARLEY CREEK CULVERT Key: 19003Description: REPLACE CULVERT Region: 5MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $1,000,000.00 $1,150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2018

Total $150,000.00 1,000,000.00 $1,150,000.00

Fund1 M24E $134,595.00 Z001 $897,300.00

Match $15,405.00 $102,700.00

Page 835 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 863: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

64.76 to 178.70 113.94 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT VARIOUS178.70 to 259.00 80.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UNION Name: I84: TRAFFIC BARRIER UPGRADES Key: 19928Description: REPLACE SUB-STANDARD GUARDRAIL, ROADSIDE BARRIER, BRIDGE RAIL RETROFITS AND BRIDGE SCREENING Region: 4MPO: Non-MPO Work Type: BRIDGE , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $10,000.00 $3,891,500.00 $4,251,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $420,001.00 $10,000.00 3,891,500.00 $4,321,501.00

Fund1 Z240 $276,182.00 S010 $10,000.00 L240 $2,753,903.00

Match $23,300.00 $315,197.00

Fund2 M240 $62,811.00 L010 $758,417.00

Match $7,189.00 $63,983.00Fund3 L010 $32,936.00

Match $2,779.00Fund4 L01E $13,652.00

Match $1,152.00Fund5 Q010

Match

Page 836 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 864: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

216.00 to 252.00 36.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UNION Name: I-84 PENDLTON-HILGARD VSL Key: 20224Description: Install weather based Variable Speed Limit (VSL) system between MP 216 and MP 252 on I-84. Region: 5MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $578,000.00 $3,277,000.00 $3,855,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $578,000.00 3,277,000.00 $3,855,000.00

Fund1 Z240 $518,639.00 ZS30 $3,022,049.00

Match $59,361.00 $254,951.00

Page 837 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 865: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

216.00 to 272.00 56.00 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UNION Name: I-84: PENDLETON-LA GRANDE SNOW ZONE IMPROVEMENTS Key: 20270Description: Install winter related ITS features, chain up expansions, illumination and possible highway advisory radio

system upgrades between Pendleton and MP 272. Region: 5

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $285,000.00 $1,615,000.00 $1,900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $285,000.00 1,615,000.00 $1,900,000.00

Fund1 Z001 $262,827.00 Z001 $1,489,353.00

Match $22,173.00 $125,647.00

Page 838 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 866: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

270.39 to 272.10 1.71 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

UNION Name: I-84: LADD CANYON EB PCC PAVING Key: 20273Description: Reconstruct the existing continuously reinforced concrete pavement (CRCP) in the two eastbound lanes.

Construct 2" overlay of asphalt concrete pavement (ACP) on the shoulders, pave the entrance & exit ramps & construct rumble strips on shoulders.

Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $3,000,000.00 $3,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $200,000.00 3,000,000.00 $3,200,000.00

Fund1 Z001 $184,440.00 Z001 $2,766,600.00

Match $15,560.00 $233,400.00

Page 839 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 867: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

198.53 to 198.53 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA273.40 to 273.40 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

39.70 to 39.70 US-395 PENDLETON-JOHN DAY NORTH EAST OREGON ACT UMATILLA

UNION Name: I-84/US-395: ROAD WEATHER INFO SYSTEM UPGRADES Key: 20320Description: Upgrade existing Road Weather Info System (RWIS) sites. Replace and/or upgrade the existing RWIS ITS

components at each location using the existing facilities. Region: 5

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $107,550.00 $609,450.00 $717,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $107,550.00 609,450.00 $717,000.00

Fund1 Z001 $99,183.00 Z001 $562,035.00Match $8,367.00 $47,415.00

Page 840 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 868: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.41 to 0.44 0.03 NORTH EAST OREGON ACT UNION

UNION Name: COVE AVENUE @ ALBANY ST (LA GRANDE) Key: 20420Description: Install a RRFB (Rectangular Rapid Flashing Beacon) with associated signing at the intersection of Cove Avenue

and Albany Street in La Grande. Region: 5

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,909.00 $39,151.00 $46,060.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $6,909.00 39,151.00 $46,060.00

Fund1 ZS30 $6,371.00 ZS30 $36,105.00

Match

Fund2 OTH0

OTH0

Match $538.00 $3,046.00

Page 841 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 869: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

NORTH EAST OREGON ACT UNION

UNION Name: WASHINGTON AVE (LA GRANDE) SIGN SAFETY IMPROVEMENT Key: 20449Description: Increase visibility of traffic controls. Add enhanced traffic control including stop ahead signs at eight

intersections and replace 19 existing stop signs with solar flashing LED stop signs. Region: 5

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $26,250.00 $148,750.00 $175,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $26,250.00 148,750.00 $175,000.00

Fund1 ZS30 $24,208.00 ZS30 $137,177.00

Match

Fund2 OTH0

OTH0

Match $2,042.00 $11,573.00

Page 842 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 870: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.14 to 45.14 OR-244 UKIAH-HILGARD NORTH EAST OREGON ACT UNION

UNION Name: OR244: WHISKEY CREEK CULVERT REPLACEMENT Key: 20456Description: Replace culvert to improve Fish Passage. Region: 5MPO: Non-MPO Work Type: FISH Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $152,800.00 $8,000.00 $2,500.00 $791,700.00 $955,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018 2020

Total $152,800.00 $8,000.00 $2,500.00 791,700.00 $955,000.00

Fund1 Z240 $137,107.00 Z240 $7,178.00 Z240 $2,243.00 Z240 $710,392.00

Match $15,693.00 $822.00 $257.00 $81,308.00

Page 843 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 871: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

35.90 to 36.20 0.30 OR-244 UKIAH-HILGARD NORTH EAST OREGON ACT UNION

UNION Name: OR244: SLOPE REPAIR Key: 20460Description: Re-Align roadway and repair slope failure. Install new guardrail. Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $185,000.00 $15,000.00 $1,200,000.00 $1,400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $185,001.00 $15,001.00 1,200,000.00 $1,400,002.00

Fund1 Z240 $166,001.00 Z240 $13,460.00 Z240 $1,076,760.00

Match $19,000.00 $1,541.00 $123,240.00

Page 844 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 872: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

260.25 to 260.33 0.08 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

UNION Name: I-84: GRANDE RONDE RIVER (2ND ST) UNDERCROSSING BR Key: 20494Description: Place an overlay on the roadway, inject cracks, clean bearings, replace bridge railing, construct new sidewalks

and install new inlets. Region: 5

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $128,000.00 $2,500.00 $5,000.00 $663,918.00 $799,418.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020 2021

Total $128,000.00 $2,501.00 $5,000.00 663,918.00 $799,419.00

Fund1 Z001 $118,042.00 Z001 $2,306.00 Z001 $4,611.00 Z001 $612,265.00

Match $9,958.00 $195.00 $389.00 $51,653.00

Page 845 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 873: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

19.17 to 19.23 0.06 OR-82 WALLOWA LAKE HIGHWAY NORTH EAST OREGON ACT UNION

UNION Name: OR82: GRANDE RONDE RIVER (SOUTH ELGIN) BR Key: 20495Description: Remove and replace existing concrete overlay. Remove and replace existing bridge rail and curb. Region: 5MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $151,200.00 $794,200.00 $945,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $151,200.00 794,200.00 $945,400.00

Fund1 Z001 $135,672.00 Z001 $712,636.00

Match $15,528.00 $81,564.00

Page 846 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 874: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.22 to 1.42 1.20 NORTH EAST OREGON ACT UNION

UNION Name: COVE AVENUE (LA GRANDE) SAFETY IMPROVEMENTS Key: 20525Description: Install enhanced signing with stop ahead signs, larger signs and pavement markings on Cove Ave between

Willow and Walton. Stop Ahead Beacons are also included. Region: 5

MPO: Non-MPO Work Type: SAFETY Applicant: UNION COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $14,700.00 $83,300.00 $98,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018

Total $14,700.00 83,300.00 $98,000.00

Fund1 ZS30 $13,556.00 ZS30 $76,819.00

Match

Fund2 OTH0

OTH0

Match $1,144.00 $6,481.00

Page 847 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 875: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

238.00 to 248.50 10.50 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

UNION Name: I-84 PAVEMENT: MEACHAM-KAMELA Key: 20530Description: Design of the reconstruction of existing asphalt concrete pavement (ACP) in the B-lanes with continuously

reinforced concrete pavement (CRCP), overlay the ACP on the A-lanes and shoulders to match the CRCP pavement, and also Entrance & Exit ramps.

Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,000,000.00 $1,000,000.00

Fund1 Z001 $922,200.00

Match $77,800.00

Page 848 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 876: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

270.00 to 272.50 2.50 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

UNION Name: I-84 LADD CANYON EB CLIMBING LN PHASE 2 Key: 20546Description: Construction of an eastbound third lane in Ladd Canyon to be used as a truck climbing lanes to reduce winter

closures. Region: 5

MPO: Non-MPO Work Type: MODERN Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,000,000.00 $2,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 2,000,000.00 $2,000,000.00

Fund1 Z001 $1,844,400.00

Match $155,600.00

Page 849 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 877: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

270.00 to 272.50 2.50 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

UNION Name: I-84: LADD CANYON EB FREIGHT IMPROVEMENTS Key: 20547Description: Design an eastbound third lane in Ladd Canyon to be used as a truck climbing lane to reduce winter closures. Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $356,508.00 $356,508.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $356,508.00 $356,508.00

Fund1 Z001 $328,772.00

Match $27,736.00

Page 850 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 878: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

260.26 to 272.10 11.84 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT UNION

UNION Name: I-84: 2ND ST UXING - LADD CANYON PAVEMENT PRES Key: 20549Description: Construct a paving project to address rutting and poor pavement conditions in the freeway B lane between La

Grande and Ladd Canyon. Region: 5

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $2,925,750.00 $3,125,750.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $200,000.00 2,925,750.00 $3,125,750.00

Fund1 Z001 $184,440.00 Z001 $2,698,127.00

Match $15,560.00 $227,623.00

Page 851 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 879: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGIONAL ITS COMMUNICATIONS INFRASTRUCTURE (ODOT) Key: 18316Description: Complete gaps and deficiencies identified in the Regional ITS Communications Plan. Region: 1MPO: Portland Metro MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $591,000.00 $591,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 591,000.00 $591,000.00

Fund1 M230 $530,304.00

Match $60,696.00

Footnote: $530,000 Fed Urban STP

Page 852 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 880: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 ELECTRICAL IMPROVEMENTS - 2018 Key: 18625Description: REGIONWIDE ELECTRICAL IMPROVEMENTS, SIGNAL HEADS, LOOPS, ILLUMINATION, SIGNAL UPGRADES ETC Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $350,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $350,000.00 $350,000.00

Fund1 M240 $314,055.00

Match $35,945.00

Page 853 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 881: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 SIGNAL TECHNOLOGY UPGRADES - 2018 Key: 18628Description: REGION 2 SIGNAL TECHNOLOGY UPGRADES. PROJECTS TO BE SELECTED BASED ON REGION NEEDS. Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $100,000.00 $100,000.00

Fund1 M240 $89,730.00

Match $10,270.00

Page 854 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 882: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 PAVEMENT MARKERS - 2018 Key: 18631Description: PAVEMENT MARKERS THROUGHOUT REGION 2, PROJECTS TO BE SELECTED BASED ON REGION NEEDS. Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $200,000.00 $200,000.00

Fund1 M240 $179,460.00

Match $20,540.00

Page 855 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 883: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 ROCK FALL SCREENING (2018) Key: 18634Description: ROCK FALL SCREENING IMPROVEMENTS IN VARIOUS LOCATIONS THROUGHOUT REGION 2. PROJECTS TO BE

SELECTED BASED ON REGION NEEDS. Region: 2

MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $300,000.00 $300,000.00

Fund1 M240 $269,190.00

Match $30,810.00

Page 856 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 884: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS VARIOUS

VARIOUS Name: REGION 2 TDM/RIDESHARE (2018) Key: 18637Description: REGION OPERATIONS FUNDING TO BE USED FOR TDM/RIDESHARE FOR LOCAL TRANSIT DISTRICTS. Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $14,626.00 $14,626.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $14,626.00 $14,626.00

Fund1 M240 $13,124.00

Match $1,502.00

Page 857 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 885: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CASCADES WEST ACT, LANE COUNTY ACT VARIOUS

VARIOUS Name: REGION 2 SIGN REPLACEMENT - 2018 Key: 18642Description: Replace signs in various locations throughout Benton, Lane, Lincoln and Linn Counties in Region 2 Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $60,000.00 $440,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018 2018

Total $60,000.00 440,000.00 $500,000.00

Fund1 Z240 $53,838.00 M240 $394,812.00

Match $6,162.00 $45,188.00

Page 858 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 886: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 OPERATIONS PROJECT RESERVE (2018) Key: 18643Description: Region 2 reserve funding for operations in Federal fiscal year 2018. Projects to be determined based on region

needs. Region: 2

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $704,468.00 $704,468.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $704,468.00 $704,468.00

Fund1 M240 $632,119.00

Match $72,349.00

Page 859 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 887: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VARIOUS VARIOUS

VARIOUS Name: REGION 4 TDM PROGRAM (2018) Key: 18650Description: TRANSPORTATION DEMAND MANAGEMENT Region: 4MPO: Non-MPO Work Type: OP-TDM Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $123,000.00 $123,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $122,988.00 $122,988.00

Fund1 L240 $110,368.00

Match $12,620.00

Footnote: MATCH TO BE PAID BY LOCAL AGENCY

Page 860 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 888: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VARIOUS VARIOUS

VARIOUS Name: REGION 4 TRANSIT SUPPORT 2018 (STP TRANSFER) Key: 18653Description: SUPPORT TRANSIT ACTIVITIES IN REGION 4 Region: 4MPO: Non-MPO Work Type: TR-CAP Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $223,000.00 $223,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $222,978.00 $222,978.00

Fund1 L240 $200,098.00

Match $22,880.00

Footnote: MATCH TO BE PAID BY LOCAL AGENCY

Page 861 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 889: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: HIGH PRIORITY CULVERT REPLACEMENT Key: 18654Description: REPLACE FAILING CULVERTS IN REGION 4 Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $500,000.00 $500,000.00

Fund1 M240 $448,650.00

Match $51,350.00

Page 862 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 890: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 4 MATERIAL SOURCE DEVELOPMENT Key: 18655Description: DEVELOP MATERIAL SOURCES FOR STIP PROJECTS Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $500,000.00 $500,000.00

Fund1 S010 $500,000.00

Match

Page 863 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 891: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 2 SAFETY RESERVE (2018) Key: 18668Description: FUNDING FOR JURISDICTIONALLY BLIND SAFETY PROJECTS THROUGHOUT REGION 2. PROJECTS TO BE

SELECTED BASED ON PROGRAM REQUIREMENTS. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $7,687,000.00 $7,687,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 7,687,000.00 $7,687,000.00

Fund1 MS30 $7,088,951.00

Match $598,049.00

Page 864 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 892: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS ROGUE VALLEY ACT VARIOUS

VARIOUS Name: TDM RIDESHARE IN 2018 Key: 18894Description: TDM RIDESHARE PROGRAM FOR RVTD Region: 3MPO: Rogue Valley MPO Work Type: OP-TDM Applicant: ROGUE VALLEY MPO Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $144,000.00 $144,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $143,986.00 $143,986.00

Fund1 M240 $129,197.00

Match $14,789.00

Page 865 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 893: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

VAR VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGIONWIDE STRIPING BUCKET Key: 18904Description: Region 3 funding bucket for striping on interstate preservation projects. Projects to be determined based on

region needs. Region: 3

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $20,000.00 $63,200.00 $83,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $20,000.00 63,200.00 $83,200.00

Fund1 M240 $17,946.00 M24

0 $56,709.00

Match $2,054.00 $6,491.00

Page 866 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 894: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: ITS UPGRADES (2018) Key: 19006Description: REPLACE SOFTWARE IN CURRENT VSL SIGNS Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $400,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $100,000.00 400,000.00 $500,000.00

Fund1 M24E $89,730.00 M24

0 $358,920.00

Match $10,270.00 $41,080.00

Page 867 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 895: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS VARIOUS VARIOUS

VARIOUS Name: REGION 5 DURABLE STRIPING Key: 19007Description: PROVIDE DURABLE STRIPING AT VARIOUS LOCATIONS THROUGHOUT THE REGION Region: 5MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $400,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 400,000.00 $500,000.00

Fund1 M240 $89,730.00 M24

0 $358,920.00

Match $10,270.00 $41,080.00

Page 868 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 896: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 ADA IMPROVEMENTS 2018 Key: 19060Description: ADA Ramp Funding Program Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $242,400.00 $300,000.00 $542,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $242,400.00 300,000.00 $542,400.00

Fund1 M240 $217,506.00 M24

0 $269,190.00

Match $24,894.00 $30,810.00

Page 869 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 897: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCENTRAL OREGON ACT, LOWER JOHN DAY ACT, SOUTH CENTRAL

OREGON ACTVARIOUS

VARIOUS Name: REGION 4 CURVE WARNING SIGNS Key: 19124Description: Install curve warning signs in Region 4 Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $55,549.00 $2,515,549.00 $2,571,098.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2014 2018

Total $250,000.00 2,515,549.00 $2,765,549.00

Fund1 ZS32 $180,000.00 MS32 $1,515,549.00

Match $70,000.00

Fund2 MS30 $1,000,000.00

Match

Page 870 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 898: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGIONAL PLANNING (2018) Key: 19283Description: The MPO Planning program contributes to a broad range of activities within Metro that are linked to regional

policy making and local planning support Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Study

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,386,917.00 $1,386,917.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,386,917.00 $1,386,917.00

Fund1 M230 $1,244,481.00

Match $142,436.00

Footnote: $1,244,481 Federal STP-Urban

Page 871 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 899: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: TRANSIT ORIENTED DEVELOPMENT PROGRAM - 2018 Key: 19286Description: Work directly with developers and local jurisdictions to create vibrant downtowns main streets and station

areas by helping to change land use patterns near transit. Region: 1

MPO: Portland Metro MPO Work Type: OP-TDM Applicant: METRO Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,461,176.00 $3,461,176.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $3,461,176.00 $3,461,176.00

Fund1 M230 $3,105,713.00

Match $355,463.00

Footnote: $3,105,713.00 Federal STP-Urban

Page 872 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 900: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: TRANS SYSTEM MGMT & OPERATIONS PROGRAM (2018) Key: 19289Description: The Transportation System Management & Operations (TSMO) program coordinates both the planning and

implementation of the regions system management and operations strategies to enhance multi-modal mobility for people and goods.

Region: 1

MPO: Portland Metro MPO Work Type: OPERAT Applicant: METRO Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $802,812.00 $802,812.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $802,812.00 $802,812.00

Fund1 M230 $720,363.00

Match $82,449.00

Footnote: $720,363 Federal STP-Urban award

Page 873 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 901: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGIONAL TRAVEL OPTIONS PROGRAM (2018) Key: 19292Description: The Regional Travel Options (RTO) program implements strategies to help diversify trip choices reduce

pollution and improve mobility. Region: 1

MPO: Portland Metro MPO Work Type: OP-TDM Applicant: METRO Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,642,082.00 $2,642,082.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,642,082.00 $2,642,082.00

Fund1 M230 $2,370,740.00

Match $271,342.00

Footnote: $2,370,740 Federal STP Urban award

Page 874 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 902: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: CORRIDOR & SYSTEMS PLANNING (2018) Key: 19295Description: Corridors and Systems Planning Program for the integration of land use and transportation. Determines

regional system needs, functions, desired outcomes, performance measures and investment strategies. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Study

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $582,425.00 $582,425.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $582,425.00 $582,425.00

Fund1 M230 $522,610.00

Match $59,815.00

Footnote: $522,610 Federal STP-Urban award

Page 875 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 903: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: BUS PURCHASE (5339 FUNDS) Key: 19331Description: Bus Purchase Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $29,202,369.00 $29,202,369.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $29,202,369.00 $29,202,369.00

Fund1 OTH0

Match $25,000,000.00Fund2 FF30 $3,361,895.00

Match $840,474.00

Footnote: $3,361,895 Federal 5339 Funds

Page 876 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 904: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: FY18 BUS & RAIL PREVENTIVE MAINT (5307) Key: 19334Description: Capital Maintenance For Bus And Rail Region: 1MPO: Portland Metro MPO Work Type: TRANST Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $49,003,236.00 $49,003,236.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $49,003,236.00 $49,003,236.00

Fund1 FF91 $39,202,589.00

Match $9,800,647.00

Footnote: $39,202,589.00 Federal 5307 funds

Page 877 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 905: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: FY18 BUS & RAIL PREVENTIVE MAINT Key: 19341Description: Capital Maintenance For Bus and Rail Region: 1MPO: Portland Metro MPO Work Type: TRANST Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $61,559,455.00 $61,559,455.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $61,559,455.00 $61,559,455.00

Fund1 FF91 $25,887,564.00

Match $6,471,891.00

Fund2 OTH0

Match $29,200,000.00

Footnote: $25,887,564.00 Federal 4337 funds

Page 878 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 906: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: 2018 STATE OF GOOD REPAIR PROGRAM Key: 19344Description: Capital Maintenance For Bus and Rail Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $437,500.00 $437,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $437,500.00 $437,500.00

Fund1 FF91 $350,000.00

Match $87,500.00

Footnote: $350,000 Federal 5337 award

Page 879 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 907: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: 2018 TRIMET ENHANCE MOBILITY PROGRAM Key: 19347Description: Services & Facility Improvements In Excess Of ADA Require Region: 1MPO: Portland Metro MPO Work Type: TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,351,867.00 $2,351,867.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $2,351,867.00 $2,351,867.00

Fund1 F160 $1,881,494.00

Match $470,373.00

Page 880 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 908: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: HIGH CAPACITY TRANSIT BOND - 2018 Key: 19353Description: Funding for development and construction of the region's high capacity transit system. Region: 1MPO: Portland Metro MPO Work Type: CMAQ , TR-CAP Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $17,831,271.00 $17,831,271.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $17,831,271.00 $17,831,271.00

Fund1 M400 $11,000,000.00

Match $1,258,999.00

Fund2 M230 $5,000,000.00

Match $572,272.00

Footnote: $5,000,000 Federal STP-Urban and $11,000,000 Federal CMAQ funds

Page 881 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 909: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS ROGUE VALLEY ACT, SOUTH WEST OREGON ACT VARIOUS

VARIOUS Name: REGION 3 PRESERVATION PROJECT Key: 19446Description: Funding for Region 3 preservation projects. Projects to be determined based on program needs. Region: 3MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $6,316,000.00 $6,316,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total 6,316,000.00 $6,316,000.00

Fund1 M240 $5,667,347.00

Match $648,653.00

Footnote: 15-18 STIP Project: US199: Slate Creek-Cave Junction Project advanced to the 12-15 STIP. Target set aside for future Pres Project

Page 882 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 910: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

64.76 to 178.70 113.94 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT VARIOUS178.70 to 259.00 80.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA, UNION

VARIOUS Name: I84: TRAFFIC BARRIER UPGRADES Key: 19928Description: REPLACE SUB-STANDARD GUARDRAIL, ROADSIDE BARRIER, BRIDGE RAIL RETROFITS AND BRIDGE SCREENING Region: 4MPO: Non-MPO Work Type: BRIDGE , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $10,000.00 $3,891,500.00 $4,251,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $420,001.00 $10,000.00 3,891,500.00 $4,321,501.00

Fund1 Z240 $276,182.00 S010 $10,000.00 L240 $2,753,903.00

Match $23,300.00 $315,197.00

Fund2 M240 $62,811.00 L010 $758,417.00

Match $7,189.00 $63,983.00Fund3 L010 $32,936.00

Match $2,779.00Fund4 L01E $13,652.00

Match $1,152.00Fund5 Q010

Match

Page 883 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 911: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT, LOWER JOHN DAY ACT, SOUTH CENTRAL

OREGON ACTVARIOUS

VARIOUS Name: REGION 4 TRANSIT SUPPORT Key: 20005Description: SUPPORT TRANSIT ACTIVITIES IN REGION 4 Region: 4MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,031,837.00 $1,031,837.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,031,837.00 $1,031,837.00

Fund1 L240 $1,031,837.00

Match

Page 884 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 912: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT, LOWER JOHN DAY ACT VARIOUS

VARIOUS Name: REGION 4 ROCKFALL Key: 20007Description: UNSTABLE SLOPES EVALUATION AND ROCKFALL MITIGATION Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT - ITS Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $300,000.00 $300,000.00

Fund1 M240 $269,190.00

Match $30,810.00

Page 885 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 913: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT, LOWER JOHN DAY ACT, SOUTH CENTRAL

OREGON ACTVARIOUS

VARIOUS Name: REGION 4 MATERIAL SOURCE Key: 20008Description: MATERIAL SOURCE DEVELOPMENT Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $500,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $500,000.00 $500,000.00

Fund1 S010 $500,000.00

Match

Page 886 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 914: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT, LOWER JOHN DAY ACT, SOUTH CENTRAL

OREGON ACTVARIOUS

VARIOUS Name: REGION 4 SIGNAL UPGRADES Key: 20009Description: INSTALL ADA COMPLIANT CURB RAMPS AND PUSH BUTTONS AT TRAFFIC SIGNAL INTERSECTIONS.

TRANSITION SIGNAL CONTROLLERS TO THE ADVANCED TRAFFIC CONTROLLER STANDARD Region: 4

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $250,000.00 $50,000.00 $400,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2019 2020

Total $300,000.00 $250,000.00 $50,000.00 400,000.00 $1,000,000.00

Fund1 M240 $269,190.00 S010 $250,000.00 M24

0 $44,865.00 M240 $358,920.00

Match $30,810.00 $5,135.00 $41,080.00

Page 887 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 915: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: STP-U ALLOCATION FFY19 - PORTLAND Key: 20026Description: Surface Transportation Program (STP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: OPERAT Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $31,128,849.00 $31,128,849.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $31,128,849.00 $31,128,849.00

Fund1 Z230 $27,931,916.00

Match $3,196,933.00

Page 888 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 916: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: STP-U ALLOCATION FFY20 - PORTLAND Key: 20027Description: Surface Transportation Program (STP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: OPERAT Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $31,128,849.00 $31,128,849.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $31,128,849.00 $31,128,849.00

Fund1 Z230 $27,931,916.00

Match $3,196,933.00

Page 889 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 917: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE VARIOUS

VARIOUS Name: STP-U ALLOCATION FFY21 - PORTLAND Key: 20028Description: Surface Transportation Program (STP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: OPERAT Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $31,128,849.00 $31,128,849.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $31,128,849.00 $31,128,849.00

Fund1 Z230 $27,931,916.00

Match $3,196,933.00

Page 890 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 918: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: TAP ALLOCATION FFY19 - PORTLAND Key: 20036Description: Transportation Alternatives Program (TAP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,539,063.00 $1,539,063.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,539,063.00 $1,539,063.00

Fund1 Z301 $1,381,001.00

Match $158,062.00

Page 891 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 919: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: TAP ALLOCATION FFY20 - PORTLAND Key: 20037Description: Transportation Alternatives Program (TAP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,539,064.00 $1,539,064.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $1,539,064.00 $1,539,064.00

Fund1 Z301 $1,381,002.00

Match $158,062.00

Page 892 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 920: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: TAP ALLOCATION FFY21 - PORTLAND Key: 20038Description: Transportation Alternatives Program (TAP) funding set aside for the Portland TMA to use on projects to be

determined through their project selection process. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: METRO Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,539,064.00 $1,539,064.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $1,539,064.00 $1,539,064.00

Fund1 Z301 $1,381,002.00

Match $158,062.00

Page 893 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 921: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CENTRAL OREGON ACT, SOUTH CENTRAL OREGON ACT VARIOUS

VARIOUS Name: REGION 4 ARTS Key: 20074Description: SAFETY IMPROVEMENTS INCLUDING: CURVE & INTERSECTION SIGNS, DELINEATORS, ILLUMINATION, MEDIAN

BARRIER, RIGHT TURN LANES AND RUMBLE STRIPS Region: 4

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $428,000.00 $20,000.00 $1,771,000.00 $2,219,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2020 2021

Total $428,000.00 $20,000.00 1,771,000.00 $2,219,000.00

Fund1 MS30 $428,000.00 S010 $20,000.00 MS3

0 $1,771,000.00

Match

Page 894 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 922: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 TDM/RIDESHARE (2019) Key: 20088Description: OPS FUNDS TO BE TRANSFERRED TO LOCAL TRANSIT DISTRICTS FOR TDM/RIDESHARE Region: 2MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $524,879.00 $524,879.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $524,879.00 $524,879.00

Fund1 Z240 $470,974.00

Match $53,905.00

Page 895 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 923: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 TDM/RIDESHARE (2020) Key: 20089Description: OPS FUNDS TO BE TRANSFERRED TO LOCAL TRANSIT DISTRICTS FOR TDM/RIDESHARE Region: 2MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $524,879.00 $524,879.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $524,879.00 $524,879.00

Fund1 Z240 $470,974.00

Match $53,905.00

Page 896 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 924: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 TDM/RIDESHARE (2021) Key: 20090Description: OPS FUNDS TO BE TRANSFERRED TO LOCAL TRANSIT DISTRICTS FOR TDM/RIDESHARE Region: 2MPO: Non-MPO Work Type: TDM Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $524,879.00 $524,879.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $524,879.00 $524,879.00

Fund1 Z240 $470,974.00

Match $53,905.00

Page 897 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 925: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS ROGUE VALLEY ACT, SOUTH WEST OREGON ACT VARIOUS

VARIOUS Name: REGION 3 VMS UPGRADES Key: 20166Description: Upgrade VMS signs at the following locations: I-5 - 28.0, 29.5, 36.0, and 105.0; OR 62 - 14.00; OR 138E - 99.00" Region: 3MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $261,000.00 $11,000.00 $1,921,000.00 $2,193,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $261,000.00 $11,000.00 1,921,000.00 $2,193,000.00

Fund1 M240 $234,195.00 M24

0 $9,870.00 M240 $1,723,713.00

Match $26,805.00 $1,130.00 $197,287.00

Page 898 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 926: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

CENTRAL OREGON ACT VARIOUS

VARIOUS Name: CASCADE EAST TRANSIT REGIONAL SHUTTLE BUS Key: 20168Description: COMMUNITY CONNECTOR SHUTTLE STOPS/SHELTERS Region: 4MPO: Non-MPO Work Type: TRANST Applicant: CENTRAL OR INTERGOV COUNCIL Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $265,300.00 $265,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $265,300.00 $265,300.00

Fund1 M240 $238,054.00

Match $27,246.00

Page 899 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 927: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 CENTERLINE RUMBLE STRIPS PART 6 Key: 20201Description: Install centerline rumble strips at various intervals on various highways throughout Region 2 Region: 2MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $331,100.00 $3,456,300.00 $3,787,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $331,100.00 3,456,300.00 $3,787,400.00

Fund1 MS30 $305,340.00 MS3

0 $3,187,400.00

Match $25,760.00 $268,900.00

Page 900 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 928: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: ALL ROADS TRANSPORTATION SAFETY PROJECTS FFY21 Key: 20225Description: Region 2 All Roads Transportation Safety (ARTS) projects for Federal fiscal year 2021. Projects to be

determined based on program committee selection process. Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $4,922,277.00 $4,922,277.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $4,922,277.00 $4,922,277.00

Fund1 MS30 $4,539,324.00

Match $382,953.00

Page 901 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 929: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGION 1 MISC HARDWARE AND SOFTWARE Key: 20226Description: Improve traffic monitoring and control systems throughout the Region Region: 1MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $497,545.00 $497,545.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $497,545.00 $497,545.00

Fund1 Z240 $446,447.00

Match $51,098.00

Page 902 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 930: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: INTERSTATE OPERATIONS IMPROVEMENTS Key: 20227Description: Funding for region-wide Interstate Operations improvements. Projects to be selected based on infrastructure

needs. Region: 1

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,990,180.00 $1,990,180.00 $3,980,360.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 1,990,180.00 $1,990,180.00

Fund1 Z240 $1,785,789.00

Match $204,391.00

Page 903 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 931: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGION 1 LEDS Key: 20228Description: Bucket for region-wide Light Emitting Diodes (LEDs) upgrades. Project to be determined based on region

needs. Region: 1

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $99,509.00 $99,509.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $99,509.00 $99,509.00

Fund1 Z240 $89,289.00

Match $10,220.00

Page 904 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 932: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGION 1 RAISED PAVEMENT MARKINGS Key: 20229

Description: Bucket for regionwide Raised Pavement Markings Region: 1

MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $99,509.00 $99,509.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $99,509.00 $99,509.00

Fund1 Z240 $89,289.00

Match $10,220.00

Page 905 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 933: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS SOUTH WEST OREGON ACT VARIOUS

VARIOUS Name: SOUTHERN OREGON WARNING SIGN UPGRADES Key: 20247Description: Install chevrons and curve warning signs on various highway segments. Region: 3MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $155,000.00 $1,000.00 $1,080,000.00 $1,236,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $155,000.00 $1,000.00 1,080,000.00 $1,236,000.00

Fund1 MS30 $155,000.00 MS30 $1,000.00 MS3

0 $1,080,000.00

Match

Page 906 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 934: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 ELECTRICAL IMPROVEMENTS - 2019 Key: 20255Description: REGIONWIDE ELECTRICAL IMPROVEMENTS, SIGNAL HEADS, LOOPS, ILLUMINATION, SIGNAL UPGRADES ETC Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,000,000.00 $1,000,000.00

Fund1 Z240 $897,300.00

Match $102,700.00

Page 907 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 935: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 SIGNAL TECHNOLOGY UPGRADES - 2019 Key: 20257Description: REGION 2 SIGNAL TECHNOLOGY UPGRADES Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $300,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $300,000.00 $300,000.00

Fund1 Z240 $269,190.00

Match $30,810.00

Page 908 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 936: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 SIGN REPLACEMENT - 2019 Key: 20258Description: Sign replacements throughout Region 2 Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $400,000.00 $400,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $400,000.00 $400,000.00

Fund1 Z240 $358,920.00

Match $41,080.00

Page 909 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 937: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 ROCK FALL SCREENING - 2019 Key: 20259Description: ROCK FALL SCREENING IMPROVEMENTS IN VARIOUS LOCATIONS THROUGHOUT REGION 2 Region: 2MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $900,000.00 $900,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $900,000.00 $900,000.00

Fund1 Z240 $807,570.00

Match $92,430.00

Page 910 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 938: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 DELINIATION - 2019 Key: 20260Description: DELINIATION IMPROVEMENTS IN VARIOUS LOCATIONS THROUGHOUT REGION 2 Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $274,708.00 $274,708.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $274,708.00 $274,708.00

Fund1 Z240 $246,495.00

Match $28,213.00

Page 911 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 939: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCENTRAL OREGON ACT, LOWER JOHN DAY ACT, SOUTH CENTRAL

OREGON ACTVARIOUS

VARIOUS Name: REGION 4 LOW VOLUME SIGN UPGRADES Key: 20271Description: RETRO-REFLECTIVITY SIGN UPGRADES Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $108,000.00 $431,649.00 $539,649.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020

Total $108,000.00 431,649.00 $539,649.00

Fund1 M240 $96,908.00 M24

0 $387,319.00

Match $11,092.00 $44,330.00

Page 912 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 940: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE VARIOUS

VARIOUS Name: MAJOR CULVERT MAINTENANCE PROGRAM FFY20 Key: 20275Description: Funding for the Major Culvert Maintenance Program for Federal Fiscal Year 2020. Projects will be selected by

culvert committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CT-MCM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,000,000.00 $3,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 3,000,000.00 $3,000,000.00

Fund1 S010 $3,000,000.00

Match

Page 913 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 941: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

STATEWIDE VARIOUS

VARIOUS Name: MAJOR CULVERT MAINTENANCE PROGRAM FFY21 Key: 20276Description: Funding for the Major Culvert Maintenance Program for Federal Fiscal Year 2021. Projects will be selected by

culvert committee based on program requirements. Region: 6

MPO: Non-MPO Work Type: CT-MCM Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,000,000.00 $3,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 3,000,000.00 $3,000,000.00

Fund1 S010 $3,000,000.00

Match

Page 914 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 942: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 INTERSECTION & SIDEWALK IMPROVEMENTS Key: 20293Description: Provide intersection and sidewalk improvements at various locations in Region 5. Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $550,000.00 $550,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 550,000.00 $550,000.00

Fund1 S080 $550,000.00

Match

Page 915 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 943: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 CULVERT REPAIR 2021 Key: 20295Description: Phase I to inventory/prioritize culverts in Region 5, Phase 2 to design repairs/replacements. 1st Xing Ladd,

Nelson Canyon, Fish Creek, Prairie Creek are the targeted culverts. Region: 5

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $200,000.00 $200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $200,000.00 $200,000.00

Fund1 Z240 $179,460.00

Match $20,540.00

Page 916 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 944: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: I-84: CORRIDOR VARIABLE MESSAGE SIGN UPGRADES Key: 20310Description: Upgrade existing Variable Message Signs (VMS) at the following mile points on the Interstate: Mission MP 214,

Poverty MP 226.4, La Grande MP 267.4 Baker MP 309. Region: 5

MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,500.00 $569,500.00 $670,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $100,500.00 569,500.00 $670,000.00

Fund1 Z001 $92,681.00 Z001 $525,193.00

Match $7,819.00 $44,307.00

Page 917 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 945: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

215.58 to 280.65 65.07 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT VARIOUS4.36 to 4.36 OR-331 UMATILLA MISSION NORTH EAST OREGON ACT UMATILLA

VARIOUS Name: I-84/ HWY-331: CORRIDOR DRUM SIGN UPGRADES Key: 20319Description: Upgrade existing Drum Signs; I-84 MP 215.58, 221, 226, 258.43, 263.57, 265.51, 280.65 and Hwy 331, MP 4.36 Region: 5MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $79,259.00 $449,138.00 $528,397.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $79,259.00 449,138.00 $528,397.00

Fund1 Z001 $73,093.00 Z001 $414,195.00

Match $6,166.00 $34,943.00

Page 918 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 946: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 PRIORITY ROUTE CULVERTS Key: 20321Description: Maintenance/Slip Lining of existing small diameter pipes or culverts that don't fit into the state Large Culvert

or Major Culvert Maintenance (MCM) programs. Projects to be determined based on Region priorities. Region: 5

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $350,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 350,000.00 $350,000.00

Fund1 Z240 $314,055.00

Match $35,945.00

Page 919 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 947: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

195.00 to 307.00 112.00 US-30 OLD OREGON TRAIL NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

161.64 to 161.64 US-730 COLUMBIA RIVER NORTH EAST OREGON ACT MORROW

VARIOUS Name: I-84/US-730: CULVERT, STREAM & ROADSIDE DRAINAGE Key: 20322Description: Replace culvert, rehabilitate culverts, repair/replace end treatment, repair scour problems, repair roadway

embankment, fill void(s) along culvert underneath pavement. Region: 5

MPO: Non-MPO Work Type: CULVRT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $153,000.00 $870,000.00 $1,023,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $153,000.00 870,000.00 $1,023,000.00

Fund1 Z001 $141,097.00 Z001 $802,314.00

Match $11,903.00 $67,686.00

Page 920 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 948: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS CENTRAL OREGON ACT VARIOUS

VARIOUS Name: R4 SAFETY 18-21 Key: 20361Description: SAFETY IMPROVEMENT BUCKET Region: 4MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $521,037.00 $521,037.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $521,037.00 $521,037.00

Fund1 MS30 $521,037.00

Match

Page 921 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 949: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 AGENCY PRIORITY (OPS) RESERVE Key: 20409Description: Pool for Operations projects Region: 2MPO: Non-MPO Work Type: OP-SSI Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,443,918.00 $1,443,918.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,443,918.00 $1,443,918.00

Fund1 Z240 $1,295,628.00

Match $148,290.00

Page 922 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 950: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: ROAD SAFETY AUDIT IMPLEMENTATION Key: 20414Description: Address unanticipated safety improvements as identified Region: 1MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $3,150,000.00 $3,150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $3,150,000.00 $3,150,000.00

Fund1 ZS30 $3,150,000.00

Match

Footnote: $3,150,000 Total allocation

Page 923 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 951: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 PRESERVATION PROJECT DEVELOPMENT (18-21) Key: 20419Description: Funding reserve for the development of shelf Preservation projects in region 2. Projects to be selected based

on region needs. Region: 2

MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,831,397.00 $1,831,397.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $1,831,397.00 $1,831,397.00

Fund1 Z240 $1,643,313.00

Match $188,084.00

Page 924 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 952: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT VARIOUS

VARIOUS Name: REGIONWIDE ITS IMPROVEMENTS AND UPGRADES Key: 20474Description: Install new or upgraded variable message signs (VMS), travel-time signs, network/communication technology,

and other intelligent transportation system (ITS) functionality at various locations in Region 1 Region: 1

MPO: Portland Metro MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $174,600.00 $1,571,400.00 $1,746,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $174,600.00 1,571,400.00 $1,746,000.00

Fund1 Z240 $156,669.00 Z240 $1,410,017.00

Match $17,931.00 $161,383.00

Footnote: $ 1,746,000 Total Operations Funding

Page 925 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 953: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS

CASCADES WEST ACT, LANE COUNTY ACT, MID-WILLAMETTE

VALLEY ACT, NORTH WEST OREGON ACT

VARIOUS

VARIOUS Name: REGION 2 PRESERVATION PROJECTS RESERVE Key: 20496Description: Region 2 funding reserve to be used on preservation projects. Projects to be selected based on region needs. Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $281,400.00 $281,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $281,400.00 $281,400.00

Fund1 Z240 $252,500.00

Match $28,900.00

Page 926 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 954: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 CHIPSEAL SHOULDER ENHANCEMENTS (2021) Key: 20529Description: Provide or improve bike and pedestrian facilities on pavement preservation projects. Region: 5MPO: Non-MPO Work Type: BIKPED Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,100,000.00 $1,100,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total 1,100,000.00 $1,100,000.00

Fund1 S080 $1,100,000.00

Match

Page 927 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 955: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 DURABLE STRIPING 2019 Key: 20532Description: Apply durable striping projects in Region at locations experiencing high wear or requiring special reflectivity

needs. Replacement is based on the Region 5 Durable Striping Plan. Region: 5

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $55,000.00 $445,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $55,001.00 445,001.00 $500,002.00

Fund1 Z240 $49,352.00 Z240 $399,299.00

Match $5,649.00 $45,702.00

Page 928 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 956: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH EAST OREGON ACT, SOUTH EAST OREGON ACT VARIOUS

VARIOUS Name: REGION 5 MATERIAL SOURCE DEVELOPMENT Key: 20542Description: Material source development includes: clearing RW, clear environmental, DOGAMI permits, material testing,

bid package development and contract management. Pleasant Valley (100K), Stagecoach Gulch (100K) and Dry Creek (80K)

Region: 5

MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $230,000.00 $280,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $50,000.00 230,000.00 $280,000.00

Fund1 S010 $50,000.00 S010 $230,000.00

Match

Page 929 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 957: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.81 to 45.85 0.04 OR-82 WALLOWA LAKE HIGHWAY NORTH EAST OREGON ACT WALLOWA

WALLOWA Name: OR82: WALLOWA RIVER (BEAR CREEK) BRIDGE Key: 20499Description: Replace sidewalk and bridge rail; replace the asphalt concrete wearing surface; add waterproof membrane;

repair columns; add riprap for strengthening. Region: 5

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $185,344.00 $10,000.00 $963,056.00 $1,158,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2021

Total $185,344.00 $10,000.00 963,056.00 $1,158,400.00

Fund1 Z001 $166,309.00 Z001 $8,973.00 Z001 $864,150.00

Match $19,035.00 $1,027.00 $98,906.00

Page 930 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 958: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

LOWER JOHN DAY ACT WASCO

WASCO Name: THE DALLES RIVERFRONT ACCESS Key: 15471Description: PEDESTRIAN IMPROVEMENTS FROM UNION TO LAUGHLIN Region: 4MPO: Non-MPO Work Type: BIKPED , SPPROG Applicant: CITY OF THE DALLES Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $250,000.00 $200,000.00 $1,359,217.00 $1,809,217.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2007 2018 2008 2018

Total $265,103.00 $200,000.00 1,359,217.00 $1,824,320.00

Fund1 LY20 $220,736.00 LY20 $179,460.00 LY20 $1,219,625.00

Match $20,540.00 $139,592.00

Fund2 OTH0

Match $44,367.00

Page 931 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 959: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, SHERMAN, WASCO

WASCO Name: I-84: DURABLE MARKINGS Key: 18657Description: DURABLE MARKINGS FOR R4 IM PROJECTS ON I-84 Region: 4MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $382,000.00 $382,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $382,000.00 $382,000.00

Fund1 M240 $342,769.00

Match $39,231.00

Page 932 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 960: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

64.40 to 76.45 12.05 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT HOOD RIVER, WASCO

WASCO Name: I-84: HOOD RIVER - ROWENA Key: 18710Description: SINGLE LIFT INLAY (TRAVEL LANES), STORM DRAINAGE IMPROVEMENTS AND SIGN UPGRADES Region: 4MPO: Non-MPO Work Type: PR-IM , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $130,000.00 $7,530,000.00 $7,660,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $150,000.00 7,530,000.00 $7,680,000.00

Fund1 M0E1 $134,595.00 M00

1 $6,756,669.00

Match $15,405.00 $773,331.00

Page 933 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 961: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

100.57 to 103.64 3.07 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO109.16 to 110.84 1.68 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

155.57 to 159.30 3.73 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT MORROW159.30 to 172.60 13.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW

207.00 to 209.90 2.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT MORROW229.30 to 239.70 10.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

249.20 to 250.14 0.94 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT UMATILLA

306.60 to 307.50 0.90 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER308.90 to 316.30 7.40 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

320.00 to 321.10 1.10 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER321.30 to 321.60 0.30 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

323.00 to 323.50 0.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER324.50 to 331.00 6.50 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

346.10 to 353.10 7.00 I-84 OLD OREGON TRAIL NORTH EAST OREGON ACT BAKER

356.40 to 360.30 3.90 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR360.60 to 362.70 2.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

362.65 to 362.80 0.15 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR370.80 to 377.90 7.10 I-84 OLD OREGON TRAIL SOUTH EAST OREGON ACT MALHEUR

WASCO Name: I-84: MEDIAN CABLE BARRIER Key: 19785Description: INSTALL MEDIAN CABLE BARRIER Region: 5MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,050,000.00 $50,000.00 $12,100,000.00 $13,200,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $1,050,000.00 $50,000.00 12,100,000.00 $13,200,000.00

Fund1 ZS32 $750,000.00 MS30 $46,110.00 MS3

0 $11,158,620.00

Match $3,890.00 $941,380.00Fund2 ZS30 $300,000.00

Match

WASCO Name: US26: CLEAR LAKE RD - NW DOGWOOD LANE Key: 20002Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTES Region: 4MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Page 934 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 962: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

65.79 to 114.73 48.94 US-26 WARM SPRINGS CENTRAL OREGON ACT, LOWER JOHN DAY ACT JEFFERSON, WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $155,000.00 $600,000.00 $755,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $155,001.00 600,000.00 $755,001.00

Fund1 M240 $139,082.00 M24

0 $538,380.00

Match $15,919.00 $61,620.00

Location(s)

Mileposts Length Route Highway ACT County(s)

63.34 to 157.87 94.53 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT GILLIAM, HOOD RIVER, MORROW, SHERMAN, WASCO

WASCO Name: I-84: COLUMBIA RIVER HIGHWAY Key: 20003Description: REPAIR OR REPLACE CRITICAL AND POOR CULVERTS ON PRIORITY ROUTE Region: 4MPO: Non-MPO Work Type: CULVRT

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $175,000.00 $522,000.00 $697,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $175,001.00 522,000.00 $697,001.00

Fund1 M240 $157,028.00 M24

0 $468,391.00

Match $17,973.00 $53,609.00

WASCO Name: US97: SHANIKO - US97/197 JCT Key: 20012Description: PAVEMENT PRESERVATION (GRIND OUT EXISTING SURFACE AND INLAY NEW ASPHALT) Region: 4MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Page 935 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 963: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

56.00 to 68.66 12.66 US-97 SHERMAN LOWER JOHN DAY ACT WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $5,845,000.00 $5,995,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $150,000.00 5,845,001.00 $5,995,001.00

Fund1 M240 $134,595.00 M24

0 $5,244,719.00

Match $15,405.00 $600,282.00

Location(s)

Mileposts Length Route Highway ACT County(s)

56.00 to 56.00 US-97 SHERMAN LOWER JOHN DAY ACT WASCO109.50 to 109.50 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT SHERMAN

0.20 to 0.20 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN

WASCO Name: LOWER JOHN DAY ITS PRIORITIES Key: 20024Description: SHANIKO ROAD WEATHER INFORMATION SYSTEM, RUFUS VARIABLE MESSAGE SIGN, US97 SB @ BIGGS

VARIABLE MESSAGE SIGN Region: 4

MPO: Non-MPO Work Type: OP-ITS

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $10,000.00 $5,000.00 $1,693,000.00 $2,008,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2019 2021

Total $300,000.00 $10,000.00 $5,001.00 1,693,000.00 $2,008,001.00

Fund1 M240 $269,190.00 S010 $10,000.00 M24

0 $4,487.00 M240 $1,519,129.00

Match $30,810.00 $514.00 $173,871.00

WASCO Name: US97 ROCKFALL Key: 20095Description: UNSTABLE SLOPES EVALUATION AND ROCKFALL REMEDIATION Region: 4MPO: Non-MPO Work Type: OP-SLD Applicant: ODOT Status: Construction Scheduled to Begin

Page 936 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 964: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

67.14 to 124.00 56.86 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT, LOWER JOHN DAY ACT DESCHUTES, JEFFERSON, WASCO

0.00 to 68.60 US-97 SHERMAN LOWER JOHN DAY ACT SHERMAN, WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $884,000.00 $300,000.00 $3,791,444.00 $4,975,444.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020 2021

Total $884,000.00 $300,000.00 3,791,444.00 $4,975,444.00

Fund1 M240 $793,213.00 S010 $300,000.00 M24

0 $3,402,063.00

Match $90,787.00 $389,381.00

Location(s)

Mileposts Length Route Highway ACT County(s)

69.07 to 69.08 0.01 US-26 WARM SPRINGS LOWER JOHN DAY ACT WASCO

WASCO Name: US26: CLEAR CREEK BRIDGE Key: 20119Description: Design shelf ready plans to replace bridge including scour countermeasures. Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $255,000.00 $255,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $255,001.00 $255,001.00

Fund1 Z001 $228,812.00Match $26,189.00

WASCO Name: ALL ROADS TRANSPORTATION SAFETY (WASCO COUNTY) Key: 20267Description: CURVE SIGNS, DELINEATION, STRIPING AND INTERSECTION SIGNS Region: 4MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT, WASCO COUNTY Status: Construction Scheduled to Begin

Page 937 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 965: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS LOWER JOHN DAY ACT WASCO

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $168,800.00 $10,000.00 $676,200.00 $855,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $168,800.00 $10,000.00 676,200.00 $855,000.00

Fund1 MS30 $161,212.00 MS30 $9,550.00 MS3

0 $645,803.00

Match

Fund2 OTH0 OTH0 OTH

0Match $7,588.00 $450.00 $30,397.00

Location(s)

Mileposts Length Route Highway ACT County(s)

57.28 to 57.85 0.57 US-30 HISTORIC COLUMBIA RIVER LOWER JOHN DAY ACT WASCO

WASCO Name: MAIN STREET (MOSIER) Key: 20272Description: BIKE LANES, SIDEWALKS AND CROSSWALKS Region: 4MPO: Non-MPO Work Type: BIKPED

Applicant: CITY OF MOSIER Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $300,000.00 $50,000.00 $205,500.00 $555,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $300,000.00 $50,000.00 205,500.00 $555,500.00

Fund1 M240 $269,190.00 M240 $44,865.00 M24

0 $181,445.00

Match $30,810.00 $5,135.00 $20,767.00

Fund2 OTH0

Match $3,288.00

Page 938 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 966: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.00 to 0.66 US-197 THE DALLES-CALIFORNIA HWY LOWER JOHN DAY ACT WASCO

WASCO Name: US197: COLUMBIA RIVER (THE DALLES) BRIDGE Key: 20442Description: Concrete deck replacement; new concrete bridge rail; add pedestrian access with sidewalk. WSDOT paying

50% of the total. Region: 4

MPO: Non-MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,850,000.00 $75,000.00 $33,985,130.00 $35,910,130.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $1,850,002.00 $75,000.00 33,985,130.00 $35,910,132.00

Fund1 OTH0 $830,003.00 OTH0 $33,649.00 OTH

0 $15,247,429.00

Match $94,998.00 $3,851.00 $1,745,136.00Fund2 Z001 $830,003.00 Z001 $33,649.00 Z001 $15,247,429.00

Match $94,998.00 $3,851.00 $1,745,136.00

Page 939 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 967: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

138.08 to 139.98 1.90 US-97 THE DALLES-CALIFORNIA HWY CENTRAL OREGON ACT DESCHUTES85.16 to 85.81 0.65 I-84 COLUMBIA RIVER LOWER JOHN DAY ACT WASCO

0.51 to 0.51 US-197 THE DALLES-CALIFORNIA HWY LOWER JOHN DAY ACT WASCO99.99 to 100.01 0.02 US-20 SANTIAM CENTRAL OREGON ACT DESCHUTES

WASCO Name: REGION 4 ITS Key: 20551Description: VIDEO CAMERAS AND COMMUNICATION INFRASTRUCTURE, REPLACE ILLUMINATIONS WITH LED'S, VMS Region: 4MPO: Non-MPO Work Type: OP-ITS Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $230,000.00 $10,000.00 $10,000.00 $1,074,000.00 $1,324,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $230,000.00 $10,000.00 $10,000.00 1,074,000.00 $1,324,000.00

Fund1 M240 $206,379.00 S010 $10,000.00 M24

0 $8,973.00 M240 $963,700.00

Match $23,621.00 $1,027.00 $110,300.00

Page 940 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 968: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: MAIN ST PH 2: RAIL CORRIDOR - SCOFFINS (TIGARD) Key: 17757Description: Green Street retrofit, pedestrian amenities and street lights. Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF TIGARD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $445,782.00 $167,168.00 $1,612,050.00 $2,225,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018 2018

Total $445,782.00 $167,168.00 1,612,050.00 $2,225,000.00

Fund1 L230 $400,000.00 L230 $150,000.00 OTH0

Match $45,782.00 $17,168.00 $849,291.00Fund2 L230 $684,424.00

Match $78,335.00

Footnote: $1,234,424 (Fed) Urban STIP

Page 941 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 969: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: CEDAR CREEK/TONQUIN TRAIL: OR99W - MURDOCK RD Key: 18026Description: Construct a trail to better accommodate pedestrian access. Region: 1MPO: Portland Metro MPO Work Type: CMAQ Applicant: CITY OF SHERWOOD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,058,156.00 $557,227.00 $3,614,709.00 $5,230,092.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $1,058,156.00 $557,227.00 3,614,709.00 $5,230,092.00

Fund1 M40E $949,483.00 M400 $500,000.00 M40

0 $3,243,478.00

Match $108,673.00 $57,227.00 $371,231.00

Footnote: $4,692,961 Federal CMQ Funds

Page 942 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 970: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.22 to 4.07 0.85 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8: SW HOCKEN AVE - SW SHORT ST Key: 18758Description: Design and construct streetscape, safety, and operational improvements on Canyon Rd in Beaverton between

SW Hocken Ave and SW Short St. Upgrade or replace signals, improve access for pedestrians, and provide streetscape enhancements.

Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI , SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $165,000.00 $635,000.00 $3,514,997.00 $4,314,997.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $1,499,999.00 $635,001.00 3,514,997.00 $5,649,997.00

Fund1 M230 $1,111,396.00 M230 $448,650.00 M23

0 $1,974,955.00

Match $127,204.00 $51,350.00 $226,042.00

Fund2 M240 $86,500.00 M240 $121,136.00 M24

0 $595,807.00

Match $9,900.00 $13,865.00 $68,193.00

Fund3 LZ20 $50,344.00 OTH0

Match $5,762.00 $650,000.00

Fund4 M03E $39,376.00

Match $4,507.00

Fund5 H240 $32,882.00Match $3,763.00

Fund6 Q760 $25,452.00

Match $2,913.00

Location(s)

Mileposts Length Route Highway ACT County(s)

13.21 to 13.30 0.09 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

10.01 to 10.12 0.11 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8 AT OR219 AND SE 44TH – SE 45TH AVE (HILLSBORO) Key: 18791Description: Signal replacement at OR219, add a striped island and candlesticks to the south leg of the intersection.

Replace pedestrian flashing beacon with RRFB or pedestrian hybrid beacon at 44th - 45th Ave. Add illumination, signing and ADA ramps.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Page 943 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 971: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,000.00 $11,500.00 $1,013,000.00 $1,174,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018 2018

Total $267,501.00 $11,500.00 1,013,000.00 $1,292,001.00

Fund1 MS3E $246,689.00 MS3E $10,605.00 MS3

0 $934,189.00

Match $20,812.00 $895.00 $78,811.00

Location(s)

Mileposts Length Route Highway ACT County(s)

1.50 to 16.67 15.17 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8: SW10TH - SW 110TH Key: 18794Description: Safety upgrades to install larger signal heads, reflective backboards, pedestrian countdown signals and left

turn phasing where feasible Region: 1

MPO: Portland Metro MPO Work Type: BIKPED , SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $437,500.00 $1,425,100.00 $1,862,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $437,500.00 1,425,100.00 $1,862,600.00

Fund1 ZS30 $437,500.00 MS30 $1,053,100.00

Match

Fund2 M240 $333,796.00

Match $38,204.00

WASHINGTONName: OR99W: SW BEEF BEND RD - SW DURHAM RD (KING CITY) Key: 18807Description: Install sidewalk on the west side of OR99W Region: 1MPO: Portland Metro MPO Work Type: BIKPED Applicant: CITY OF KING CITY Status: Construction Scheduled to Begin

Page 944 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 972: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

10.90 to 11.50 0.60 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $164,413.00 $30,000.00 $946,607.00 $1,141,020.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $164,413.00 $30,000.00 946,607.00 $1,141,020.00

Fund1 Z030 $133,787.00 M240 $26,919.00 M240 $753,133.00

Match $15,313.00 $3,081.00 $86,199.00

Fund2 OTH0

OTH0

Match $15,313.00 $107,275.00

Footnote: $913,839 Fed Enhance funds

Location(s)

Mileposts Length Route Highway ACT County(s)

1.97 to 12.10 10.13 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

WASHINGTONName: OR99W: CORRIDOR SAFETY & ACCESS TO TRANSIT Key: 18838Description: Sidewalk infill, enhanced pedestrian crossings, bus shelters and pads, bike and pedestrian facilities, retaining

walls and drainage improvements, transit priority signals Region: 1

MPO: Portland Metro MPO Work Type: SAFETY

Applicant: TRIMET Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $691,529.00 $147,354.00 $2,766,116.00 $3,604,999.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2018

Total $691,529.00 $147,354.00 2,766,116.00 $3,604,999.00

Fund1 M240 $620,509.00 M240 $132,221.00 M24

0 $2,482,036.00

Match $71,020.00 $15,133.00 $284,080.00

Footnote: $3,234,766 Federal MTEP award.

Page 945 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 973: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

1.14 to 7.80 6.66 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8: CORRIDOR SAFETY & ACCESS TO TRANSIT Key: 18839Description: Sidewalk infill and improvements, Signal priority, bus stop relocations, bus pads, ADA improvements and

enhanced pedestrian crossing. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: TRIMET Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $322,800.00 $1,291,200.00 $1,614,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2018

Total $322,800.00 1,291,200.00 $1,614,000.00

Fund1 M240 $289,648.00 M24

0 $1,158,594.00

Match $33,152.00 $132,606.00

Footnote: $1,448,242 MTEP Federal award

Location(s)

Mileposts Length Route Highway ACT County(s)

2.84 to 3.84 1.00 OR-217 BEAVERTON/TUALATIN REGION 1 ACT WASHINGTON

WASHINGTONName: OR141(SW HALL BLVD): SCHOLLS FERRY RD - HEMLOCK ST Key: 19267Description: Construct ADA ramps Region: 1MPO: Portland Metro MPO Work Type: BIKPED

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $310,000.00 $150,000.00 $126,707.00 $586,707.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2015 2017 2018

Total $310,000.00 $150,000.00 126,707.00 $586,707.00

Fund1 M030 $278,163.00 M240 $134,595.00 M24

0 $113,694.00

Match $31,837.00 $15,405.00 $13,013.00

Footnote: $568,707 Total Bike-Ped funding

Page 946 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 974: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: NORTH HILLSBORO JOB CONNECTOR SHUTTLE 2018 Key: 19712Description: Implement a new job connector shuttle service north and south of Hwy 26 supporting low and middle wage

workers transit needs within the North Hillsboro Industrial District Region: 1

MPO: Portland Metro MPO Work Type: TRANST Applicant: TRIMET Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $350,000.00 $350,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $350,000.00 $350,000.00

Fund1 FF91 $175,000.00Match $175,000.00

Footnote: $175,000 Federal 5307 funds

Location(s)

Mileposts Length Route Highway ACT County(s)

2.49 to 3.02 0.53 OR-217 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON

2.42 to 2.42 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

WASHINGTONName: OR217/OR224: BRIDGE RAIL RETROFIT Key: 19918Description: Bridge rail retrofit bridges 16134, 16143, 09623 Region: 1MPO: Portland Metro MPO Work Type: BRIDGE

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $325,000.00 $1,627,000.00 $1,952,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $325,001.00 1,627,000.00 $1,952,001.00

Fund1 Z240 $291,623.00 Z240 $1,459,907.00

Match $33,378.00 $167,093.00

Page 947 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 975: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYS NORTH WEST OREGON ACT CLATSOP, COLUMBIA, TILLAMOOK, WASHINGTON

WASHINGTONName: REGION 2 (NORTH) CURVE WARNING UPGRADES Key: 20189Description: Install chevrons and updated curve warning signs throughout Area 1 Region: 2MPO: Non-MPO Work Type: SAFETY

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $105,923.00 $1,625,677.00 $1,731,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $105,923.00 1,625,677.00 $1,731,600.00

Fund1 MS30 $97,682.00 MS3

0 $1,499,199.00

Match $8,241.00 $126,478.00

Location(s)

Mileposts Length Route Highway ACT County(s)

69.19 to 71.33 2.14 US-26 SUNSET REGION 1 ACT WASHINGTON

WASHINGTONName: US26: SYLVAN - OR217 Key: 20299Description: Repave mainline of roadway to improve pavement condition and extend service life. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,572.00 $3,011,440.00 $3,162,012.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $150,572.00 3,011,440.00 $3,162,012.00

Fund1 Z001 $135,108.00 Z001 $2,702,165.00Match $15,464.00 $309,275.00

Footnote: $ 3,162,012 Total R1 Preservation funds

Page 948 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 976: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

66.35 to 69.19 2.84 US-26 SUNSET REGION 1 ACT WASHINGTON

WASHINGTONName: US26: OR217 - CORNELL RD Key: 20300Description: Repave mainline of roadway to improve pavement condition and extend service life. Region: 1MPO: Portland Metro MPO Work Type: PRESRV

Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $241,436.00 $4,828,713.00 $5,070,149.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $241,436.00 4,828,713.00 $5,070,149.00

Fund1 Z001 $216,641.00 Z001 $4,332,804.00

Match $24,795.00 $495,909.00

Footnote: $5,070,149 Total R1 Preservation funding

Location(s)

Mileposts Length Route Highway ACT County(s)

66.35 to 71.33 4.98 US-26 SUNSET REGION 1 ACT WASHINGTON

WASHINGTONName: US26 RAMP IMPROVEMENTS Key: 20301Description: Project provides funds for ramp paving and ADA improvements on US26 pavement preservation projects. Region: 1MPO: Portland Metro MPO Work Type: MODERN Applicant: ODOT Status: Funding Pooled

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,000,000.00 $1,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $1,000,000.00 $1,000,000.00

Fund1 Z001 $897,300.00Match $102,700.00

Footnote: 1,000,000 Total Highway Leverage funds

Page 949 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 977: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

0.13 to 0.16 0.03 NORTH WEST OREGON ACT WASHINGTON

WASHINGTONName: MT. RICHMOND ROAD: TUALATIN RIVER BRIDGE Key: 20312Description: Replace the existing bridge with a single span concrete structure. Region: 2MPO: Non-MPO Work Type: BRIDGE

Applicant: WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $471,600.00 $45,100.00 $1,663,500.00 $2,180,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2020

Total $471,600.00 $45,100.00 1,663,500.00 $2,180,200.00

Fund1 Z233 $423,167.00 Z233 $40,468.00 Z233 $1,492,659.00

Match $48,433.00 $4,632.00 $170,841.00

Location(s)

Mileposts Length Route Highway ACT County(s)

3.20 to 10.80 7.60 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8 CORRIDOR SAFETY & ACCESS TO TRANSIT

II Key: 20328

Description: Improve safety and access to transit for pedestrians and cyclists along OR-8. Work includes: bike lane from SW 182nd Ave to SW 153rd Dr., pedestrian crossings, and separated walkway and bike lane across Rock Creek Bridge.

Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $618,817.00 $30,000.00 $3,094,085.00 $3,742,902.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $618,817.00 $30,000.00 3,094,085.00 $3,742,902.00

Fund1 Z240 $555,264.00 Z240 $26,919.00 Z240 $2,776,322.00

Match $63,553.00 $3,081.00 $317,763.00

Footnote: $ 3,358,506 Federal Enhance Award

Page 950 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 978: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT MULTNOMAH, WASHINGTON

WASHINGTONName: RUMBLE STRIPS AND CONFLICT MARKINGS (COP/WASH CO) Key: 20340Description: Install centerline rumble strips, green conflict markings and/or profile edge line pavement markings at various

locations in Portland. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY

Applicant: CITY OF PORTLAND, WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $57,100.00 $637,500.00 $694,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $57,100.00 637,501.00 $694,601.00

Fund1 ZS30 $52,658.00 ZS30 $587,903.00

Match

Fund2 OTH0

OTH0

Match $4,442.00 $49,598.00

Footnote: $ 640,560 Federal ARTS award

Page 951 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 979: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, HOOD RIVER, MULTNOMAH, WASHINGTON

WASHINGTONName: RUMBLE STRIPS (ODOT) Key: 20341Description: Install centerline rumble strips and install shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205, I-405,

OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224, HWY-173 (Timberline), OR-212, OR-281, and OR-282.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $150,600.00 $950,854.00 $1,101,454.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $150,600.00 950,854.00 $1,101,454.00

Fund1 ZS30 $150,600.00 ZS30 $950,854.00

Match

Footnote: $ 1,101,454 Total ARTS funding

Page 952 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 980: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: SYSTEMIC SIGNALS AND ILLUMINATION (BEAVERTON) Key: 20374Description: Safety projects at various locations. Work may include illumination, intersection work, bike and pedestrian

improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF BEAVERTON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $285,900.00 $35,000.00 $1,750,700.00 $2,071,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $285,900.00 $35,000.00 1,750,700.00 $2,071,600.00

Fund1 ZS30 $263,657.00 ZS30 $32,277.00 ZS30 $1,614,496.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $22,243.00 $2,723.00 $136,204.00

Footnote: $ 1,910,429.52 Federal ARTS Award

Page 953 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 981: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: WEST SYSTEMIC SIGNALS & ILLUMINATION (WASHINGTON) Key: 20375Description: Safety projects at various locations. Work may include illumination, intersection work, bike/pedestrian

improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $72,100.00 $24,100.00 $535,300.00 $631,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $72,100.00 $24,100.00 535,300.00 $631,500.00

Fund1 ZS30 $66,491.00 ZS30 $22,225.00 ZS30 $493,654.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $5,609.00 $1,875.00 $41,646.00

Footnote: $ 582,369 Federal ARTS award

Page 954 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 982: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: WEST SYSTEMIC SIGNALS AND ILLUMINATION (ODOT) Key: 20376Description: Safety projects at various locations throughout Region 1. Work includes illumination, intersection work,

bike/pedestrian improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $670,100.00 $147,900.00 $2,825,200.00 $3,643,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2020

Total $670,100.00 $147,900.00 2,825,200.00 $3,643,200.00

Fund1 ZS30 $670,100.00 ZS30 $147,900.00 ZS30 $2,825,200.00

Match

Footnote: $3,643,200 Total ARTS allocation

Page 955 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 983: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: SW FARMINGTON RD AT 170TH AVE Key: 20388Description: Full signal rebuild with reflective backplates and illumination. Other work includes dilemma zone protection

for east-west approaches, raised corner islands in NE and SW corners, channelized right turn lanes, ADA upgrades, and restripe crosswalks.

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $383,200.00 $18,000.00 $1,126,300.00 $1,527,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2019 2021

Total $383,200.00 $18,000.00 1,126,300.00 $1,527,500.00

Fund1 ZS30 $353,387.00 ZS30 $16,600.00 ZS30 $1,038,674.00

Match

Fund2 OTH0 OTH0 OTH

0

Match $29,813.00 $1,400.00 $87,626.00

Footnote: $ 1,408,661 Federal ARTS award

Page 956 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 984: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: RURAL INTERSECTION & CURVE WARNING (WASHINGTON) Key: 20399Description: Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at

various rural intersections, roadway departures and curves throughout Washington County. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: WASHINGTON COUNTY Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $34,000.00 $122,647.00 $156,647.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $34,000.00 122,647.00 $156,647.00

Fund1 ZS30 $31,355.00 ZS30 $113,105.00

Match

Fund2 OTH0

OTH0

Match $2,645.00 $9,542.00

Footnote: $ 144,460 Federal ARTS allocation

Page 957 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 985: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

WASHINGTONName: RURAL INTERSECTION AND CURVE WARNING (ODOT) Key: 20400Description: Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at

various rural intersections, roadway departures and curves throughout Region 1. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $83,300.00 $551,585.00 $634,885.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $83,300.00 551,585.00 $634,885.00

Fund1 ZS30 $83,300.00 ZS30 $551,585.00

Match

Footnote: $ 634,885 Total ARTS allocation

Page 958 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 986: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

283.21 to 288.50 5.29 I-5 PACIFIC HIGHWAY REGION 1 ACT CLACKAMAS, WASHINGTON

WASHINGTONName: I-5: I-205 INTERCHANGE - WILLAMETTE RIVER Key: 20411Description: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $650,577.00 $6,505,774.00 $7,156,351.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2021

Total $650,577.00 6,505,774.00 $7,156,351.00

Fund1 Z001 $599,962.00 Z001 $5,999,625.00

Match $50,615.00 $506,149.00

Footnote: $ 7,156,351 Total IM allocation

Page 959 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 987: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

8.01 to 8.03 0.02 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

WASHINGTONName: OR99W (PACIFIC HWY WEST) AT SW 72ND Key: 20432Description: Design partial signal rebuild, channelize 72nd right turn lane, illumination, ADA, and new crosswalk on SW leg

of intersection Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $136,500.00 $136,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $136,500.00 $136,500.00

Fund1 ZS30 $136,500.00

Match

Footnote: $ 136,500 Total ARTS allocation

Page 960 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 988: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT WASHINGTON

WASHINGTONName: SE WASHINGTON ST AT 10TH AVE (HILLSBORO) Key: 20434Description: Design partial signal rebuild, striping, signing, ADA, and pedestrian improvements Region: 1MPO: Portland Metro MPO Work Type: SAFETY Applicant: WASHINGTON COUNTY Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $97,500.00 $97,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $97,501.00 $97,501.00

Fund1 ZS30 $89,915.00

Match

Fund2 OTH0

Match $7,586.00

Footnote: $ 89,914 Federal ARTS allocation

Page 961 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 989: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.47 to 10.29 2.82 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

WASHINGTONName: OR99W: I-5 - MCDONALD ST Key: 20435Description: Repave roadway, upgrade ADA ramps to current standards, improve access management, and address

drainage as needed. Includes full signal upgrade at Johnson/Main. Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $1,922,919.00 $1,099,575.00 $7,397,640.00 $10,420,134.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $1,922,919.00 $1,099,575.00 7,397,640.00 $10,420,134.00

Fund1 Z001 $1,494,572.00 Z001 $937,539.00 Z001 $5,978,289.00

Match $171,060.00 $107,306.00 $684,242.00Fund2 Z240 $230,864.00 Z240 $49,109.00 Z240 $659,613.00

Match $26,423.00 $5,621.00 $75,496.00

Footnote: $ 10,420,134 Total Allocation

Page 962 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 990: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.45 to 11.47 0.02 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

WASHINGTONName: OR99W AT DURHAM RD Key: 20436Description: Signal Upgrade with ADA improvements Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $242,128.00 $34,828.00 $691,794.00 $968,750.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $242,128.00 $34,828.00 691,794.00 $968,750.00

Fund1 Z240 $217,261.00 Z240 $31,251.00 Z240 $620,747.00

Match $24,867.00 $3,577.00 $71,047.00

Footnote: $ 968,750 Total Allocation

Page 963 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 991: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.47 to 10.29 2.82 OR-99W PACIFIC HWY WEST REGION 1 ACT MULTNOMAH, WASHINGTON

WASHINGTONName: OR99W: I-5 - MCDONALD BIKE PED INFILL Key: 20437Description: Fill in sidewalk and bike lane gaps along OR99W in conjunction with the pavement preservation project

planned in the area. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $986,000.00 $986,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total 986,000.00 $986,000.00

Fund1 Z240 $884,738.00

Match $101,262.00

Footnote: $ 986,000 Total AT Leverage allocation

Page 964 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 992: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

8.01 to 11.50 3.49 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

WASHINGTONName: OR99W (BARBUR BLVD): MP 8.01 TO MP 11.50 Key: 20439Description: Install Illumination at 72nd Ave, Main & Johnson, McKenzie, School, Walnut, Frewing, Garrett, Park, Royalty

Parkway, and Durham Rd. Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: CITY OF TIGARD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $226,300.00 $137,500.00 $3,800.00 $809,400.00 $1,177,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020 2021

Total $226,300.00 $137,501.00 $3,800.00 809,400.00 $1,177,001.00

Fund1 ZS30 $208,694.00 ZS30 $126,803.00 ZS30 $3,504.00 ZS30 $746,429.00

Match

Fund2 OTH0 OTH0 OTH

0OTH

0

Match $17,606.00 $10,698.00 $296.00 $62,971.00

Footnote: $ 1,085,429 Federal ARTS award

Page 965 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 993: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.58 to 15.00 7.42 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

WASHINGTONName: OR99W (BARBUR BLVD): MP 7.58 TO MP 15.00 Key: 20440Description: Install illumination, reflectorized backplates, and supplemental signal heads at specific locations within the

project limits and replace urban permissive or protected/permissive left turns to protected left only at 68th and 69th Avenues

Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $245,500.00 $61,900.00 $1,142,600.00 $1,450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2021

Total $245,500.00 $61,900.00 1,142,600.00 $1,450,000.00

Fund1 ZS30 $245,500.00 ZS30 $61,900.00 ZS30 $1,142,600.00

Match

Footnote: $ 1,450,000 Total ARTS allocation

Page 966 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 994: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

82.65 to 82.66 0.01 OR-47 NEHALEM NORTH WEST OREGON ACT WASHINGTON

WASHINGTONName: OR47: W FORK DAIRY CREEK BRIDGE Key: 20447Description: Replace the deteriorated timber bridge with new bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $257,267.00 $78,136.00 $2,350,097.00 $2,685,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $257,267.00 $78,136.00 2,350,097.00 $2,685,500.00

Fund1 Z001 $230,846.00 Z001 $70,111.00 Z001 $2,108,742.00

Match $26,421.00 $8,025.00 $241,355.00

Page 967 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 995: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

288.40 to 288.90 0.50 I-5 PACIFIC HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: I-5 AT I-205 INTERCHANGE Key: 20450Description: Upgrade illumination towers up to amount of available budget and coordinate work with pavement

preservation project in area. Region: 1

MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $400,000.00 $500,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $100,000.00 400,000.00 $500,000.00

Fund1 Z001 $92,220.00 Z001 $368,880.00

Match $7,780.00 $31,120.00

Footnote: $ 500,000 Total Operations allocation

Page 968 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 996: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

11.70 to 11.75 0.05 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: OR8 AT RIVER ROAD Key: 20451Description: Full signal upgrade with illumination and ADA improvements. Region: 1MPO: Portland Metro MPO Work Type: OP-SSI Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $282,877.00 $91,548.00 $808,217.00 $1,182,642.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019 2020 2021

Total $282,877.00 $91,548.00 808,217.00 $1,182,642.00

Fund1 Z240 $253,826.00 Z240 $82,146.00 Z240 $725,213.00

Match $29,051.00 $9,402.00 $83,004.00

Footnote: $ 1,182,642 Total Operations allocation

Page 969 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 997: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.79 to 7.84 0.05 OR-99W PACIFIC HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: I-5: BARBUR BLVD NB CONNECTION BRIDGE Key: 20465Description: Paint structure; remove pack rust. Replace rivets and bolts. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $136,000.00 $1,533,975.00 $1,669,975.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019

Total $136,000.00 1,533,975.00 $1,669,975.00

Fund1 Z001 $125,419.00 Z001 $1,414,632.00

Match $10,581.00 $119,343.00

Page 970 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 998: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

12.04 to 12.13 0.09 OR-99W PACIFIC HWY WEST REGION 1 ACT WASHINGTON

WASHINGTONName: OR99W: TUALATIN RIVER BRIDGE Key: 20471Description: Design shelf ready plans to replace the current structural overlay. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $188,500.00 $188,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $188,500.00 $188,500.00

Fund1 Z001 $169,141.00

Match $19,359.00

Page 971 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 999: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

9.16 to 9.24 0.08 OR-210 SCHOLLS REGION 1 ACT WASHINGTON

WASHINGTONName: OR210 OVER OR217 Key: 20473Description: Deck overlay; replace joints; patch column spalls. Region: 1MPO: Portland Metro MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $240,000.00 $1,623,363.00 $1,863,363.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020 2021

Total $240,000.00 1,623,363.00 $1,863,363.00

Fund1 Z001 $215,352.00 Z001 $1,456,644.00

Match $24,648.00 $166,719.00

Page 972 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1000: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

7.16 to 7.18 0.02 OR-217 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON

WASHINGTONName: OR217 (BEAVERTON-TIGARD HWY) AT KRUSE WAY Key: 20477Description: Design for advance actuated beacons, partial signal rebuild to add needed additional heads at OR217 off ramp

and I-5 SB on ramp, pedestrian island improvements Region: 1

MPO: Portland Metro MPO Work Type: SAFETY Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $136,500.00 $136,500.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $136,500.00 $136,500.00

Fund1 ZS30 $136,500.00

Match

Footnote: $ 136,500 Total Safety allocation for design only.

Page 973 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1001: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

-0.01 to 0.01 REGION 1 ACT WASHINGTON

WASHINGTONName: NORTH DAKOTA STREET: FANNO CREEK BRIDGE Key: 20488Description: Construct a new single span bridge on the same alignment. Raise the vertical grade line to improve site

distance approaching the railroad crossing. Region: 1

MPO: Portland Metro MPO Work Type: BRIDGE Applicant: CITY OF TIGARD Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $533,775.00 $56,285.00 $3,326,890.00 $3,916,950.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $533,775.00 $56,285.00 3,326,890.00 $3,916,950.00

Fund1 Z001 $478,956.00 Z001 $50,505.00 Z001 $2,985,218.00

Match $54,819.00 $5,780.00 $341,672.00

Page 974 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1002: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

288.50 to 294.21 5.71 I-5 PACIFIC HIGHWAY REGION 1 ACT MULTNOMAH, WASHINGTON

WASHINGTONName: I-5: TIGARD INTERCHANGE - I-205 INTERCHANGE Key: 20498Description: Remove and replace asphalt surface to repair rutted pavement. Region: 1MPO: Portland Metro MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $724,276.00 $33,073.00 $7,242,651.00 $8,000,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2018

Total $724,276.00 $33,073.00 7,242,651.00 $8,000,000.00

Fund1 Z001 $667,927.00 Z001 $30,500.00 Z001 $6,679,173.00

Match $56,349.00 $2,573.00 $563,478.00

Footnote: $8,000,000 Total IM funds

Page 975 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1003: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

16.57 to 16.57 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

WASHINGTONName: CORNELIUS RAPID FLASHING BEACON (RRFB) PROJECT Key: 20521Description: Install a RRFB at the 12th Ave intersection with either Adair or Baseline Streets in Cornelius. Work includes an

engineering study and funds toward the construction of the RRFB at the determined location. Region: 1

MPO: Portland Metro MPO Work Type: BIKPED Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $50,000.00 $100,000.00 $150,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $50,000.00 100,000.00 $150,000.00

Fund1 Z240 $44,865.00 Z240 $89,730.00

Match $5,135.00 $10,270.00

Footnote: $ 150,000 Total AT Leverage allocation

Page 976 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1004: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

WASHINGTONName: PORTLAND METRO PLANNING SFY20 Key: 20595Description: Portland Metro MPO planning funds for Federal fiscal year 2019. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 977 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1005: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

WASHINGTONName: PORTLAND METRO PLANNING SFY21 Key: 20596Description: Portland Metro MPO planning funds for Federal fiscal year 2020. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 978 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1006: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

REGION 1 ACT CLACKAMAS, MULTNOMAH, WASHINGTON

WASHINGTONName: PORTLAND METRO PLANNING SFY22 Key: 20597Description: Portland Metro MPO planning funds for Federal fiscal year 2021. Projects will be selected in the future

through the MPO process. Region: 1

MPO: Portland Metro MPO Work Type: PLANNG Applicant: METRO Status: Planning

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $2,815,941.00 $2,815,941.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2021

Total $2,815,941.00 $2,815,941.00

Fund1 Z450 $1,907,827.00

Match $218,359.00

Fund2 Z77D $618,917.00Match $70,838.00

Page 979 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1007: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

65.02 to 65.04 0.02 US-26 OCHOCO HWY LOWER JOHN DAY ACT WHEELER

WHEELER Name: US26: BRIDGE CREEK BRIDGE Key: 20120Description: Design shelf ready plans for bridge replacement. Region: 4MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $255,000.00 $255,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2020

Total $255,001.00 $255,001.00

Fund1 Z001 $228,812.00

Match $26,189.00

Page 980 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1008: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

45.73 to 45.79 0.06 OR-18 SALMON RIVER MID-WILLAMETTE VALLEY ACT YAMHILL51.51 to 51.63 0.12 OR-18 SALMON RIVER MID-WILLAMETTE VALLEY ACT YAMHILL

50.10 to 52.71 2.61 OR-18 SALMON RIVER MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR18: YAMHILL RIVER - MCDOUGAL JUNCTION Key: 18567Description: DECK SEAL & OVERLAY; JOINTS; TIMBER REPAIR; SPOT PAINT; RAILS; BR# 08003 & 08492. PRESERVATION

INLAY/OVERLAY MP 50.10-52.71 Region: 2

MPO: Non-MPO Work Type: BRIDGE , PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $198,000.00 $22,000.00 $54,000.00 $5,784,000.00 $6,058,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2016 2017 2017 2018

Total $448,000.00 $22,000.00 $54,000.00 5,784,000.00 $6,308,000.00

Fund1 Z001 $224,325.00 M001 $19,741.00 M001 $48,454.00 M24

0 $3,768,660.00

Match $25,675.00 $2,259.00 $5,546.00 $431,340.00

Fund2 L1CE $177,665.00 M001 $1,421,323.00

Match $20,335.00 $162,677.00

Page 981 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1009: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

29.79 to 36.36 6.57 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR99W: MCDOUGALL JCT - MCDONALD WAY Key: 18611Description: 3R STRUCTURAL OVERLAY, INCL. MCDOUGALL JCT- RIVERSIDE DR & RIVERSIDE DR - OR18 Region: 2MPO: Non-MPO Work Type: PRESRV Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $377,000.00 $14,223,000.00 $14,600,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $377,000.00 14,223,000.00 $14,600,000.00

Fund1 M0E1 $338,282.00 M24

0 $12,762,298.00

Match $38,718.00 $1,460,702.00

Page 982 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1010: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

37.80 to 37.87 0.07 OR-47 TUALATIN VALLEY HIGHWAY MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR47: MAIN STREET - W. LINCOLN STREET Key: 18746Description: CONSTRUCT IMPROVED INTERSECTION ALIGNMENT, PEDESTRIAN CROSSING, SIDEWALKS AND BIKE LANES Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF CARLTON Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $402,000.00 $32,000.00 $111,000.00 $1,683,909.00 $2,228,909.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $401,960.00 $31,997.00 $110,989.00 1,683,741.00 $2,228,687.00

Fund1 M240 $360,715.00 M240 $28,714.00 M24

0 $99,600.00 M240 $1,510,972.00

Match $41,245.00 $3,283.00 $11,389.00 $172,769.00

Page 983 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1011: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

18.45 to 19.38 0.93 OR-219 HILLSBORO/SILVERTON MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR219: ALDERCREST - FOOTHILLS DRIVE Key: 18749Description: CONSTRUCT BIKE LANES, SIDEWALKS, CURBS, DRAINAGE AND LANDSCAPE BUFFERS Region: 2MPO: Non-MPO Work Type: BIKPED Applicant: CITY OF NEWBERG Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $519,000.00 $251,000.00 $11,000.00 $1,889,600.00 $2,670,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2017 2018

Total $519,000.00 $251,000.00 $11,000.00 1,889,600.00 $2,670,600.00

Fund1 M240 $465,699.00 M240 $225,222.00 M24

0 $9,870.00 M240 $1,695,538.00

Match $53,301.00 $25,778.00 $1,130.00 $194,062.00

Page 984 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1012: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT POLKMID-WILLAMETTE VALLEY ACT YAMHILL

CASCADES WEST ACT BENTON

YAMHILL Name: REGION 2 (CENTRAL) LOCAL RD ROADWAY DEPARTURE Key: 19796Description: Install roadway departure countermeasures throughout Areas 3 and 4 Region: 2MPO: Albany Area MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $100,000.00 $218,365.00 $318,365.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2018

Total $100,000.00 218,365.00 $318,365.00

Fund1 MS30 $100,000.00 MS3

0 $218,365.00

Match

Page 985 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1013: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

3.07 to 3.40 0.33 OR-223 KINGS VALLEY MID-WILLAMETTE VALLEY ACT POLK2.14 to 2.35 0.21 OR-51 MONMOUTH-INDEPENDENCE MID-WILLAMETTE VALLEY ACT POLK

6.23 to 6.34 0.11 OR-51 INDEPENDENCE MID-WILLAMETTE VALLEY ACT POLK7.17 to 7.53 0.36 OR-194 MONMOUTH MID-WILLAMETTE VALLEY ACT POLK

7.00 to 7.18 0.18 OR-18B WILLAMINA-SHERIDAN MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: DISTRICT 3 WEST ADA IMPROVEMENTS Key: 19962Description: Upgrade substandard ADA curb ramps Region: 2MPO: Non-MPO Work Type: OPERAT Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $165,000.00 $280,500.00 $611,800.00 $1,057,300.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2017 2017 2019

Total $165,001.00 $280,500.00 611,800.00 $1,057,301.00

Fund1 M240 $148,055.00 M240 $251,693.00 M24

0 $548,968.00

Match $16,946.00 $28,807.00 $62,832.00

Page 986 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1014: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

23.05 to 23.09 0.04 OR-219 HILLSBORO/SILVERTON MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR219: HESS CREEK BRIDGE Key: 20111Description: Design shelf ready plans to replace bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Final Plans Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $230,000.00 $230,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018

Total $230,000.00 $230,000.00

Fund1 Z001 $206,379.00

Match $23,621.00

Page 987 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1015: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

21.46 to 39.06 17.60 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: REGION 2 (CENTRAL) SIGNAL IMPROVEMENTS PART 2 Key: 20130Description: Install reflectorized signal backplates, countdown pedestrian timers, and advanced dilemma zone protection

at various signals in McMinnville, Newberg and Dundee Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: CITY OF MCMINNVILLE Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $65,700.00 $759,200.00 $824,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2021

Total $65,700.00 759,200.00 $824,900.00

Fund1 MS30 $60,589.00 MS3

0 $700,134.00

Match $5,111.00 $59,066.00

Page 988 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1016: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

Various VARIOUS HIGHWAYSCASCADES WEST ACT, LANE

COUNTY ACT, MID-WILLAMETTE VALLEY ACT

LANE, LINN, MARION, YAMHILL

YAMHILL Name: REGION 2 (CENTRAL AND SOUTH) RURAL SIGNAL IMPROV Key: 20137Description: Install reflectorized signal backplates, countdown pedestrian timers, and advanced dilemma zone protection

at various signal locations throughout Areas 4 and 5. Region: 2

MPO: Central Lane MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $67,000.00 $677,900.00 $744,900.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $67,000.00 677,900.00 $744,900.00

Fund1 MS30 $61,787.00 MS3

0 $625,159.00

Match $5,213.00 $52,741.00

Page 989 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1017: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

29.81 to 29.81 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR99W: SALMON RIVER HIGHWAY Key: 20138Description: Intersection improvements: Upgrade intersection warning signs; Evaluate for concrete splitter island with left

side stop sign on minor leg approaches; Install transverse rumbles on stop controlled minor approaches; Install actuated flashing beacons.

Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $54,700.00 $369,900.00 $424,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2020

Total $54,700.00 369,900.00 $424,600.00

Fund1 MS30 $50,444.00 MS3

0 $341,122.00

Match $4,256.00 $28,778.00

Page 990 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1018: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: YCTA BUS REPLACEMENT Key: 20233Description: Purchase six buses, three heavy duty buses (category A) and three medium duty buses (category B). Region: 2MPO: Non-MPO Work Type: TR-CAP Applicant: YAMHILL TRANSIT DISTRICT Status: Non-Construction Project

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $450,000.00 $450,000.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2019

Total $450,000.00 $450,000.00

Fund1 Z240 $403,785.00

Match $46,215.00

Page 991 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1019: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

37.80 to 37.10 0.70 OR-47 NEHALEM MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR47: URBAN UPGRADE (CARLTON) Key: 20240Description: Upgrade sidewalks, parking, bike facilities, and ADA compliance to enable future or concurrent pavement

preservation project Region: 2

MPO: Non-MPO Work Type: SAFETY Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $429,300.00 $141,000.00 $2,824,300.00 $3,394,600.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $429,300.00 $141,000.00 2,824,300.00 $3,394,600.00

Fund1 Z240 $385,211.00 Z240 $126,519.00 Z240 $2,534,244.00

Match $44,089.00 $14,481.00 $290,056.00

Page 992 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1020: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

34.93 to 35.00 0.07 OR-99W PACIFIC HWY WEST MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR99W: SB NORTH YAMHILL RIVER BRIDGE Key: 20427Description: Repairs and paint for the steel elements, repair of concrete spalls. The concrete should be removed and a

membrane or thin epoxy overlay installed prior to replacing concrete on the bridge. Rail retrofit. Region: 2

MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $566,500.00 $10,900.00 $5,057,800.00 $5,635,200.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2019 2020

Total $566,500.00 $10,900.00 5,057,800.00 $5,635,200.00

Fund1 Z001 $508,320.00 Z001 $9,781.00 Z001 $4,538,364.00

Match $58,180.00 $1,119.00 $519,436.00

Page 993 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016

Page 1021: 2018-2021 STIPprojects that are funded with federal dollars, most projects funded with state dollars, as well as, many local government funded projects. The STIP includes public funded

Location(s)

Mileposts Length Route Highway ACT County(s)

5.85 to 5.92 0.07 OR-153 BELLEVUE HOPEWELL MID-WILLAMETTE VALLEY ACT YAMHILL

YAMHILL Name: OR153: SALT CREEK (ASH SWALE) BRIDGE Key: 20445Description: Replace bridge. Region: 2MPO: Non-MPO Work Type: BRIDGE Applicant: ODOT Status: Construction Scheduled to Begin

Approved STIP AmountsPlanning Prelim. Engineering Right of Way Utility Relocation Construction Other STIP Total

Total $675,184.00 $163,714.00 $6,218,502.00 $7,057,400.00

Current Project EstimatePlanning Preliminary

EngineeringRight of Way Utility Relocation Construction other Estimate Total

Year 2018 2018 2019

Total $675,184.00 $163,714.00 6,218,502.00 $7,057,400.00

Fund1 Z001 $605,843.00 Z001 $146,901.00 Z001 $5,579,862.00

Match $69,341.00 $16,813.00 $638,640.00

Page 994 of 994"Draft STIP_11.2016.27.v1" 946 Projects

Draft Updated as of 11/28/2016