Page 1: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,
Page 2: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 2 of 49

TTRF60730a/effective date: September 15th, 2009

Content SUMMARY ....................................................................................................................................................... 1

CONTENT ............................................................................................................................................................ 2

1.GENERAL INFORMATION ....................................................................................................................... 5 1.1 Description of Equipment Under Test (EUT) ........................................................................................... 5 1.2 Description of Client ................................................................................................................................ 5 1.3 Description of Test Facility ...................................................................................................................... 5

2.TEST SPECIFICATIONS ............................................................................................................................ 6 2.1 Standards .................................................................................................................................................. 6 2.2 Mode of operation during the test / Test peripherals used ........................................................................ 6 2.3 EMC test frame work ............................................................................................................................... 6

EMISSION TEST ................................................................................................................................................ 10

3. MAINS AND LOAD TERMINAL CONTINUOUS DISTURBANCE VOLTAGE ..................................................... 10 3.1 Terminal Voltage Limits ........................................................................................................................ 10 3.2 Block Diagram of Test Setup ................................................................................................................. 11 3.3 Test Setup and Test Procedure ............................................................................................................... 12 3.4 Test Protocol ........................................................................................................................................... 13 3.5 Measurement Uncertainty ....................................................................................................................... 15 3.6 Additions, Deviations and Exclusions from Standards ........................................................................... 15

4. MAINS TERMINAL DISCONTINUOUS DISTURBANCE VOLTAGE .................................................................. 16 4.1 Block Diagram of Test Setup ................................................................................................................. 16 4.2 Test Set-up and Test Procedure .............................................................................................................. 16 4.3 Test Protocol ........................................................................................................................................... 17 4.4 Measurement Uncertainty ....................................................................................................................... 17

5. RADIATED EMISSION .................................................................................................................................... 18 5.1 Radiated emission limit from frequency range 30MHz – 1000MHz ...................................................... 18 5.2 Block diagram and test set up ................................................................................................................. 18 5.3 Test Protocol ........................................................................................................................................... 19 5.4 Measurement uncertainty ....................................................................................................................... 19 5.5 Additions, Deviations and Exclusions from Standards ........................................................................... 20

6. HARMONICS ................................................................................................................................................. 21 6.1 Block Diagram of Test Setup ................................................................................................................. 21 6.2 Test Setup and Test Procedure ............................................................................................................... 21 6.3 Test Protocol ........................................................................................................................................... 21 6.4 Measurement Uncertainty ....................................................................................................................... 21 6.5 Additions, Deviations and Exclusions from Standards ........................................................................... 21

7. VOLTAGE FLUCTUATIONS-FLICKER ........................................................................................................... 22 7.1 Block Diagram of Test Setup ................................................................................................................. 22 7.2 Test Setup and Test Procedure ............................................................................................................... 22

7.2.1 Definition ......................................................................................................................................... 22 7.2.2 Test condition .................................................................................................................................. 22

7.3 Test Protocol ........................................................................................................................................... 23 7.4 Measurement Uncertainty ....................................................................................................................... 23 7.5 Additions, deviations and exclusions from standards ............................................................................. 23

IMMUNITY TEST ............................................................................................................................................... 24

8. ELECTROSTATIC DISCHARGE (ESD) .......................................................................................................... 25 8.1 Severity Level and Performance Criterion ............................................................................................. 25

8.1.1 Test level ......................................................................................................................................... 25 8.1.2 Performance Criterion ......................................................................................................................... 25 8.2 Block Diagram of Test Setup ................................................................................................................. 26

Page 3: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 3 of 49

TTRF60730a/effective date: September 15th, 2009

8.3 Test Setup and Test Procedure ............................................................................................................... 26 8.4 Test Protocol ........................................................................................................................................... 27 8.5 Measurement Uncertainty ....................................................................................................................... 27 8.6 Additions, Deviations and Exclusions from Standards ........................................................................... 27

9. ELECTROMAGNETIC FIELD SUSCEPTIBILITY .............................................................................................. 28 9.1 Severity Level and Performance Criterion ............................................................................................. 28

9.1.1 Test level ......................................................................................................................................... 28 9.1.2 Performance Criterion ..................................................................................................................... 28

9.2 Block diagram of test setup .................................................................................................................... 29 9.3 Test Setup and Test Procedure ............................................................................................................... 29 9.4 Test Protocol ........................................................................................................................................... 30 9.5 Measurement Uncertainty ....................................................................................................................... 30 9.6 Additions, deviations and exclusions from standards ............................................................................. 30

10. ELECTRIC FAST TRANSIENT/BURST IMMUNITY TEST ............................................................................. 31 10.1 Severity Level and Performance Criterion ........................................................................................... 31

10.1.1 Test level ....................................................................................................................................... 31 10.1.2 Performance Criterion ................................................................................................................... 31

10.2 Block Diagram of Test Setup ............................................................................................................... 32 10.3 Test Setup and Test Procedure ............................................................................................................. 32 10.4 Test Protocol ......................................................................................................................................... 33 10.5 Measurement Uncertainty ..................................................................................................................... 33 10.6 Additions, Deviations and Exclusions from Standards ......................................................................... 33

11. SURGE IMMUNITY TEST ............................................................................................................................. 34 11.1 Severity Level and Performance Criterion ........................................................................................... 34

11.1.1 Test level ....................................................................................................................................... 34 11.1.2 Performance Criterion ................................................................................................................... 34

11.2 Block Diagram of Test Setup ............................................................................................................... 35 11.3 Test Setup and Test Procedure ............................................................................................................. 35 11.4 Test Protocol ......................................................................................................................................... 36 11.5 Measurement Uncertainty ..................................................................................................................... 36 11.6 Additions, Deviations and Exclusions from Standards ......................................................................... 36

12. IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS ......................... 37 12.1 Severity Level and Performance Criterion ........................................................................................... 37

12.1.1 Test level ....................................................................................................................................... 37 12.1.2 Performance Criterion ................................................................................................................... 37

12.2 Diagram of Test Setup .......................................................................................................................... 38 Block Diagram for a.c./d.c input power line ........................................................................................... 38

12.3 Test Setup and Test Procedure ............................................................................................................. 39 12.4 Test Protocol ......................................................................................................................................... 40 12.5 Measurement Uncertainty ..................................................................................................................... 40 12.6 Additions, Deviations and Exclusions from Standards ......................................................................... 40

13. VOLTAGE DIPS, SHORT INTERRUPTIONS AND VOLTAGE VARIATIONS IMMUNITY TEST ........................ 41 13.1 Severity Level and Performance Criterion ........................................................................................... 41

13.1.1 Test level ....................................................................................................................................... 41 For product with Type 1 action ................................................................................................................ 41 For product with Type 2 action ................................................................................................................ 41

13.1.2 Performance Criterion ................................................................................................................... 41 13.2 Block diagram of test setup .................................................................................................................. 42 13.3 Test Setup and Test Procedure ............................................................................................................. 42 13.4 Test Protocol ......................................................................................................................................... 43 For product with Type 1 action ................................................................................................................ 43 For product with Type 2 action ................................................................................................................ 43 13.5 Measurement Uncertainty ..................................................................................................................... 43 13.6 Additions, deviations and exclusions from standards ........................................................................... 43

Page 4: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 4 of 49

TTRF60730a/effective date: September 15th, 2009

14. POWER FREQUENCY MAGNETIC FIELD .................................................................................................... 44 14.1 Severity Level and Performance Criterion ........................................................................................... 44

14.1.1 Test level ....................................................................................................................................... 44 14.1.2 Performance Criterion ................................................................................................................... 44

14.2 Diagram of Test Setup .......................................................................................................................... 45 14.3 Test Setup and Test Procedure ............................................................................................................. 45 14.4 Test Protocol ......................................................................................................................................... 46 14.5 Additions, Deviations and Exclusions from Standards ......................................................................... 46

APPENDIX I : PHOTOGRAPH OF EUT .............................................................................................................. 47

Page 5: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,
Page 6: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 6 of 49

TTRF60730a/effective date: September 15th, 2009

2.TEST SPECIFICATIONS 2.1 Standards EN 60730-2-7:2010: Automatic electrical controls for household and similar use –Particular requirements for timers and time switches EN 60730-1:2011: Automatic electrical controls for household and similar use –General requirements 2.2 Mode of operation during the test / Test peripherals used

Within this test report, EUT was tested under all available operation mode and tested under its rating voltage and frequency. Other voltage and frequency is specified if used. 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart

Type 1 action Type 2 action

Free standing controls,

independently mounted and/or

in-line cord controls

Free standing controls,

independently mounted and/or

in-line cord controls

Final apparatus for final use

Free standing controls,

independently mounted and/or

in-line cord controls

Required test according to Annex H.26 of

EN 60730-1 & EN 60730-2-7

Applicable test level 2 and 3

of EN 61000-4-x

Final apparatus for final use

Required test according to Annex H.26 of

EN 60730-1 & EN 60730-2-7

Applicable test level 2

of EN 61000-4-x

Final apparatus for final use

Required test according to Annex ZF of EN 60730-1

Applicable test Annex ZF.2 of EN 60730-1

Page 7: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 7 of 49

TTRF60730a/effective date: September 15th, 2009

2.3 Instrument list

Selected Instrument EC no. Model Valid until date

Shielded room EC 2838 GB88 2014-1-11

EMI test receiver EC 2107 ESCS 30 2013-10-20

A.M.N. EC 3119 ESH2-Z5 2013-1-8

A.M.N. EC 3394 ENV 216 2013-8-10

Absorbing clamp EC 2108 MDS 21 2013-1-11

Voltage probe EC 3405 ESH2-Z3 2013-1-11

Voltage probe EC 4888 TK9420 2013-6-14

Tri-loop EC 3384 HXYZ 9170 2013-6-18

Click meter EC 2253 CL55C 2013-8-19

ISN EC 3754 FCC-TLISN-T2-02 2013-1-8

ISN EC 3755 FCC-TLISN-T4-02 2013-1-8

ISN EC 3756 FCC-TLISN-T8-02 2013-1-8

Current probe EC 3221 EZ-17 2013-1-11

Attenuator EC 3043-9 68-6-44 2013-1-8

Harmonic/Flicker sys. EC 2110 5001ix/PACS-1 2013-1-9

Shielded room EC 2839 GB88 2014-1-11

ESD Gun EC 2956 ditto 2013-5-20

ESD Gun EC 4792-4 TESEQ 2013-2-12

Motorise Variac EC 2957 MV 2616 Not required

Immunity system EC 2958 UCS500M6 2013-2-26

Capacitive clamp EC 2959 HFK Not required

Immunity system EC 2961 TSS500M4 2013-1-11

Signal generator EC 2338 SML 01 2013-4-15

Power amplifier EC 3043-1 75A250 2013-8-16

Attenuator EC 3043-3 ATT6/75 2013-1-8

CDN EC 2113-1 M216 2013-8-03

CDN EC 2113-2 M316 2013-8-03

CDN EC 3043-2 T2 2013-1-8

CDN EC 3043-4 T4 2013-1-8

CDN EC 4792-6 CDN M1/16A 2013-2-13

CDN EC 4792-7 CDN M1/16A 2013-2-13

CDN EC 4792-10 CDN M1/32A 2013-2-13

CDN EC 4792-12 CDN M3N/16A 2013-2-13

CDN EC 4792-13 CDN M3N/32A 2013-2-13

Page 8: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 8 of 49

TTRF60730a/effective date: September 15th, 2009

CDN EC 4792-15 CDN T8-RJ45 2013-2-13

EM clamp EC 3043-6 EM 101 2013-10-20

Fully anechoic chamber EC 3047 - 2013-5-11

Signal generator EC 3044-1 SMR20 2013-8-16

Log-periodical antenna EC 3044-7 AT1080 2013-5-21

Power amplifier EC 3044-2 150W1000 2013-8-16

DDC EC 3044-5 DC6180A 2013-8-03

Horn antenna EC 3044-8 AT4002 2013-5-21

Power amplifier EC 3044-4 25S1G4 2013-8-16

DDC EC 3044-6 DC7144A 2013-1-8

Power sensor EC 3043-7 PH 2000 2013-10-18

Power meter EC 3043-8 PM 2002 2013-10-18

Field meter EC 3044-9 FM5004 2013-4-9

Field sensor EC 3044-3 FP6001 2013-4-9

Semi anechoic chamber EC 3048 - 2013-5-11

EMI test receiver EC 3045 ESIB26 2013-10-20

Broadband antenna EC 4206 CBL 6112D 2013-5-15

Horn antenna EC 3049 HF906 2013-5-12

Horn antenna EC 4792-1 3117 2014-4-16

Horn antenna EC 4792-3 HAP18-26W 2014-4-9

Pre-amplifier EC 3222 pre-amp 18 2014-4-9

Pre-amplifier EC 4792-2 TPA0118-40 2013-4-11

DDC EC 3043-5 DC2600 2013-1-8

Oscilloscope EC 3515 DPO 4504 2013-1-11

TV generator EC 3555 TG39 2013-4-15

Lum. Meter EC 2451 TES 1332 2013-6-4

Page 9: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 9 of 49

TTRF60730a/effective date: September 15th, 2009

2.4.Test Summary This report applies to tested sample only. This report shall not be reproduced in part without written approval of Intertek Testing Service Shanghai.

TEST ITEM RESULT NOTE Mains and load terminal continuous disturbance voltage

Pass

Radiated emission Pass Harmonics NA Voltage fluctuation-Flicker NA Electrostatic Discharge (ESD) Pass RF electromagnetic field susceptibility Pass Electric Fast Transient /Burst (EFT/B) Pass Surge Pass Injected Current Pass Voltage dips, interruption and variation Pass Power-frequency magnetic field NA Notes: 1: NA =Not Applicable

Page 10: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 10 of 49

TTRF60730a/effective date: September 15th, 2009

Emission Test

3. Mains and Load Terminal Continuous Disturbance Voltage Test result: PASS

3.1 Terminal Voltage Limits 3.1.1. Limits at mains terminals (According to CISPR 22 Class B)

Frequency range (MHz)

Limits dB(v) Quasi-peak Average

0.15 ~ 0.5 66 ~ 56 * 56 ~ 46 * 0.5 ~ 5 56 46 5 ~ 30 60 50

Note : 1. * means the limit decreasing linearly with the logarithm of the frequency in the range 0.15MHz to 0.5MHz 2. If the limit for the measurement with the average detector is met when using a receiver with a quasi-peak detector, the equipment under test shall be deemed to meet both limits and the measurement using the receiver with an average detector need not be carried out.

3.1.2Limits at load terminals According to CISPR 14-1 Clause: discontinuous interference

Page 11: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 11 of 49

TTRF60730a/effective date: September 15th, 2009

3.2 Block Diagram of Test Setup

At mains terminal

For table top equipment, wooden support is 0.8m height table

For floor standing equipment, wooden support is 0.1m height rack.

At load terminals

Note: : power line : means the test setup while available

50Ω terminated

A.M.N. Supply voltage A.M.N. EMI receiver

EUT Accessories

Wooden support

Page 12: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 12 of 49

TTRF60730a/effective date: September 15th, 2009

3.3 Test Setup and Test Procedure

The EUT was set to achieve the maximum emission level. The mains terminal disturbance voltage was measured with the EUT in a shielded

room. The EUT was connected to AC power source through an Artificial Mains Network

which provide a 50 linear impedance The load/control terminal disturbance voltage was measured with passive voltage probe. The bandwidth of test receiver ESCS 30 was set at 9kHz. The frequency range from 150kHz to 30MHz was checked. Amplitude measurements were performed with a quasi-peak detector and, if necessary, with an average detector.

For Table top

The EUT was placed on a 0.8m high non-metallic table above a metallic plane, The wall of shielded room used as Ground Reference Plane (GRP)

For Floor standing

The EUT was placed on a 0.1m high non-metallic support above a metallic plane, The wall of shielded room used as Ground Reference Plane (GRP)

For Both Table Top and Floor Standing

The EUT keeps a distance of at least 0.8m from any other of the metallic surface.

The Artificial Mains Network is situated at a distance of 0.8m from the EUT. During the test, mains lead of EUT excess 0.8m was folded back and forth parallel

to the lead so as to form a horizontal bundle with a length between 0.3m and 0.4m.

For load terminal EMI receiver compliance to CISPR 16-1-1 with time domain function used during measurement. EUT arrangement was follow CISPR 14-1 clause 5.2. Operation conditions were follow CISPR 14-1 clause 7.

Page 13: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 13 of 49

TTRF60730a/effective date: September 15th, 2009

3.4 Test Protocol Temperature : 24C Relative Humidity : 42% For mains terminal: Pass Waveform

L line :

Frequency

(MHz)

Quasi-peak

Disturbance level Permitted limit

dB(uV) dB(uV)

Average

Disturbance level Permitted limit

dB(uV) dB(uV)

0.15 * 66.0 * 56.0 0.50 * 56.0 * 46.0 1.00 * 56.0 * 46.0 2.00 * 56.0 * 46.0 3.00 * 56.0 * 46.0 4.00 * 56.0 * 46.0 5.00 * 56.0 * 46.0 10.00 * 60.0 * 50.0 30.00 * 60.0 * 50.0

Note: * means the emission level 20dB lower than the relevant limit.

Page 14: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 14 of 49

TTRF60730a/effective date: September 15th, 2009

N Line :

Frequency

(MHz)

Quasi-peak

Disturbance level Permitted limit

dB(uV) dB(uV)

Average

Disturbance level Permitted limit

dB(uV) dB(uV)

0.15 * 66.0 * 56.0 0.50 * 56.0 * 46.0 1.00 * 56.0 * 46.0 2.00 * 56.0 * 46.0 3.00 * 56.0 * 46.0 4.00 * 56.0 * 46.0 5.00 * 56.0 * 46.0 10.00 * 60.0 * 50.0 30.00 * 60.0 * 50.0

Note: * means the emission level 20dB lower than the relevant limit.

Page 15: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 15 of 49

TTRF60730a/effective date: September 15th, 2009

3.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured

value during the operation of the EUT. Measurement uncertainty at mains terminal: 3.70dB

The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

3.6 Additions, Deviations and Exclusions from Standards

None.

Page 16: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 16 of 49

TTRF60730a/effective date: September 15th, 2009

4. Mains Terminal Discontinuous Disturbance Voltage

Test result: NA 4.1 Block Diagram of Test Setup 4.2 Test Set-up and Test Procedure Measurement was performed in shielded room. EMI receiver compliance to CISPR 16-1-1 with time domain function used during measurement. EUT arrangement was follow EN 55014-1 clause 5.2. Operation conditions were follow EN 55014-1 clause 7.

15MHz, 0.5MHz, 1.4MHz and 30MHz were spot checked, and upper quartile methods used during measurement. The final judgment of test result was according to figure 9 of EN 55014-1.

EMI receiver with Time domain/Click meter

AMN EUT

Page 17: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 17 of 49

TTRF60730a/effective date: September 15th, 2009

4.3 Test Protocol

Temperature : C Relative Humidity : %

Frequency (MHz)

0.15

0.5

1.4

30.0

Permitted limit for continuous interference

(dBµV)

66.0

56.0

56.0

60.0

Counted click/switch operation number

Observed time (min)

Click duration (ms)

Click rate N

Factor

Permitted limits for clicks

(dBµv)

Counted clicks exceeding the

limits

Test result

Any other descriptions:

4.4 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of mains lead and auxiliary lead: 2.73dB The measurement uncertainty is given with a confidence of 95%, k=2 The measurement uncertainty is traceable to internal procedure TI-036.

Page 18: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 18 of 49

TTRF60730a/effective date: September 15th, 2009

5. Radiated emission Test result: Pass

The product contains no processing devices operating at frequencies greater than 9 kHz, therefore, test of this item is not required. 5.1 Radiated emission limit from frequency range 30MHz – 1000MHz

Frequency (MHz) Permitted limit in dBV/m (Quasi-peak)

of Measurement Distance 3m

Permitted limit in dBV/m (Quasi-peak)

of Measurement Distance 10m

30-230 40 30 230-1000 47 37

Note: 1. For the measurement distance other than 3m and 10m, the limit is varied

according to 20dB/10 decades. 2. The gray rows are selected items.

5.2 Block diagram and test set up

The measurement was applied in a semi-anechoic chamber. Measurement was performed according to CISPR 22. The bandwidth setting on R&S Test Receiver ESI26 was 120kHz. The frequency range from 30MHz to 1000MHz was checked.

AE

Antenna mast

Turn Table

Test receiver

EUT

Page 19: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 19 of 49

TTRF60730a/effective date: September 15th, 2009

5.3 Test Protocol

Temperature: 24C Relative humidity: 42% Waveform

Horizontal

Vertical

0

10

20

30

40

50

60

70

80

Level [dBµV/m]

30M 50M 70M 100M 200M 300M 500M 700M 1G Frequency [Hz]

MES TEE-8-V_pre LIM EN55022F_QP

0

10

20

30

40

50

60

70

80

Level [dBµV/m]

30M 50M 70M 100M 200M 300M 500M 700M 1G Frequency [Hz]

MES TEE-8-H_pre LIM EN55022F_QP

Page 20: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 20 of 49

TTRF60730a/effective date: September 15th, 2009

Polarization

Frequency (MHz)

Emission level (dBV/m)

Limits (dBV/m)

Margin (dBV/m)

Horizontal

33.89 * 40.0 *

66.93 * 40.0 *

117.47 * 40.0 *

150.81 * 40.0 *

1000.00 * 47.0 *

Vertical

33.89 * 40.0 *

38.12 * 40.0 *

45.55 * 40.0 *

122.85 * 40.0 *

152.46 * 40.0 *

Note: * means margin >10dB.

5.4 Measurement uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT.

Measurement uncertainty of radiated emission is: 4.71dB The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

5.5 Additions, Deviations and Exclusions from Standards

None

Page 21: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 21 of 49

TTRF60730a/effective date: September 15th, 2009

6. Harmonics

Test result: NA

6.1 Block Diagram of Test Setup 6.2 Test Setup and Test Procedure

Harmonics of the fundamental current were measured up to 40 order harmonics using a

digital power meter with an analogue output and frequency analyser which was integrated in the harmonic & flicker test system. The measurements were carried out under steady conditions .

Measuring instrumentation according to IEC 61000-4-7:1991

This product is not defined as lighting equipment, and has rated power less than 75W, therefore, no limit apply according to EN 61000-3-2

This product has no means to generate harmonics exceeding the limits and is therefore deemed to comply with the standard without any measurement. 6.3 Test Protocol

Temperature : C Relative Humidity : %

6.4 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT.

Measurement uncertainty of harmonic test is: 5.00 % The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

6.5 Additions, Deviations and Exclusions from Standards

None

Harmonic & flicker test system EUT

Page 22: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 22 of 49

TTRF60730a/effective date: September 15th, 2009

7. Voltage Fluctuations-Flicker Test result NA

7.1 Block Diagram of Test Setup

7.2 Test Setup and Test Procedure

7.2.1 Definition

Flicker: impression of unsteadiness of visual sensation induced by a lighting stimulus whose luminance or spectral distribution fluctuates with time.

Pst: Short-term flicker indicator The flicker severity evaluated over a

short period (in minutes); Pst=1 is the conventional threshold of irritability Plt: long-term flicker indicator; the flicker severity evaluated over a long

period (a few hours)Using successive Pst values. dc: the relative steady-state voltage change dmax: the maximum relative voltage change d(t): the value during a voltage change

7.2.2 Test condition

The EUT was set to produce the most unfavourable sequence of voltage changes.

According to EN61000-3-3:2008, Tests need not be made on equipment which is unlikely to produce significant voltage fluctuations or flicker.

Harmonic & flicker test system

EUT

Page 23: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 23 of 49

TTRF60730a/effective date: September 15th, 2009

7.3 Test Protocol

The tested object operated under the operating condition specified in EN61000-3-3 The following limits apply

-- “Plt” shall not exceed 0.65. -- “Pst” shall not exceed 1.0. -- “dc” shall not exceed 3.3%. -- d(t) shall not exceed 3.3% for more than 500ms. -- “dmax” shall not exceed:

4% without additional conditions, 6% switched manually or automatically more than twice per day 7% attended whilst in use or switched automatically for no more than

twice per day or attended while in use for manual switch, dmax is measured in accordance with Annex B of

standard, average dmax is calculated from 24 times measurement.

Temperature : C Relative Humidity : %

7.4 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT.

Measurement uncertainty of voltage fluctuation and flicker is: 12.00% The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

7.5 Additions, deviations and exclusions from standards None

Page 24: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 24 of 49

TTRF60730a/effective date: September 15th, 2009

Immunity Test Compliance criteria As specified in Annex H.26 & ZF.3 of EN 60730-1 & H 26 EN60730-2-7. Basic EMC standard for immunity test IEC 61000-4-2: 1995/+A1:1998/+A2:2000: Electromagnetic Compatibility (EMC) – Part 4- 2: testing and measurement techniques – electrostatic discharge immunity test IEC 61000-4-3: 2006/+A1:2007: Electromagnetic Compatibility (EMC) – Part 4- 3: testing and measurement techniques – radiated, radio frequency, electromagnetic field immunity test IEC61000-4-4: 2004: Electromagnetic Compatibility (EMC) – Part 4- 4: testing and measurement techniques – electric fast transient/burst immunity test IEC 61000-4-5: 2005: Electromagnetic Compatibility (EMC) – Part 4- 5: testing and measurement techniques – section 5: surge immunity test IEC 61000-4-6: 2003/+A1:2004/+A2:2006: Electromagnetic Compatibility (EMC) – Part 4- 6: testing and measurement techniques – section 6: immunity to conducted disturbance, induced by radio frequency field IEC 61000-4-8:1993 /+A1:2001: Electromagnetic compatibility (EMC) — Part 4-8: Testing and measurement techniques —Power frequency magnetic field immunity test. IEC61000-4-11: 2004: Electromagnetic Compatibility (EMC) – Part 4- 11: testing and measurement techniques –voltage dips, short interruption and voltage variations immunity test

Page 25: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 25 of 49

TTRF60730a/effective date: September 15th, 2009

8. Electrostatic Discharge (ESD) Test result Pass

8.1 Severity Level and Performance Criterion

8.1.1 Test level

1a – Contact discharge

1b – Air discharge

Level

Test voltage kV

Level Test voltage kV

1 2 1 2

2 4 2 4

3 6 3 8

4 8 4 15

X Special X Special

Notes: 1.“X” is an open level. The level has to be specified in the dedicated equipment specification. If higher voltages than those shown are specified, special test equipment may be needed. 2. The gray rows were the selected test level. 8.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 26: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 26 of 49

TTRF60730a/effective date: September 15th, 2009

8.2 Block Diagram of Test Setup

Note: HCP means Horizontal Coupling Plane,

VCP means Vertical Coupling Plane GRP means Ground Reference Plane Wooden support is a 0.8m height table

8.3 Test Setup and Test Procedure

For product with Type I action: As specified in Annex ZF.6.2 of EN 60730-1 & H

26.11 of EN60730-2-7

For product with Type 2 action: As specified in Annex H.26.11 of EN 60730-1 & H 26.11 of EN60730-2-7

ESD simulator

EUT ESD gun

VCP

HCP

Insulate Support

GRP

470k Resistor

Page 27: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 27 of 49

TTRF60730a/effective date: September 15th, 2009

8.4 Test Protocol

Temperature : 24C Relative Humidity: 42% Direct discharge was applied at the following selected points:

Test point

#

Test level [kV]

Air/ Contact

Polarity (+/-)

Pass/ Fail

Comment

A 2/4 Contact +/- Pass all touchable screws of enclosure

B 2/4 Contact +/- Pass Accessible metal parts of the EUT

C 2/4/8 Air +/- Pass Air gap of the switch, button

D 2/4/8 Air +/- Pass The air in-taking opening E 2/4/8 Air +/- Pass Slots around the EUT

Indirect contact discharges were applied to the VCP and the HCP at the following selected points:

Point Description Point Result HCP f 0,1m from the front of the EUT Edge of centre,coner on HCP Pass

HCP b 0,1m from the back of the EUT Edge of centre,coner on HCP Pass

HCP r 0,1m from the right side of the EUT Edge of centre,coner on HCP Pass

HCP l 0,1m from the left side of the EUT Edge of centre,coner on HCP Pass

VCP f 0,1m from the front of the EUT Edge of centre,coner on VCP Pass

VCP b 0,1m from the back of the EUT Edge of centre,coner on VCP Pass

VCP r 0,1m from the right of the EUT Edge of centre,coner on VCP Pass

VCP l 0,1m from the left of the EUT Edge of centre,coner on VCP Pass

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

8.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of ESD test is: 7.00 % The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

8.6 Additions, Deviations and Exclusions from Standards None

Page 28: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 28 of 49

TTRF60730a/effective date: September 15th, 2009

9. Electromagnetic field susceptibility

Test result Pass 9.1 Severity Level and Performance Criterion

9.1.1 Test level

Level Test field strength V/m

1

1

2

3

3

10

X

Special

Note: 1. X is an open test level, this level may be given in the product specification. 2. The gray row is the selected test level.

9.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1

Page 29: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 29 of 49

TTRF60730a/effective date: September 15th, 2009

9.2 Block diagram of test setup

9.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.7 of EN 60730-1

For product with Type 2 action: As specified in Annex H.26.12.3 of EN 60730-1

Antenna mast

Power meter Field monitor

Table

Amplifier Signal generator

EUT

Field probe

Optical fiber

AE

Page 30: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 30 of 49

TTRF60730a/effective date: September 15th, 2009

9.4 Test Protocol

Temperature : 24C Relative Humidity: 42%

Test no.:

Frequency (MHz)

Polarization Test level V/m

Exposed location

Result Comment

1 80-1000 & 1400-2000

H & V 3 All sides Pass -

2 2000 - 2700 H & V 1 All sides Pass

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

9.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of radiated susceptibility test is: 4.65dB The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

9.6 Additions, deviations and exclusions from standards None

Page 31: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 31 of 49

TTRF60730a/effective date: September 15th, 2009

10. Electric Fast Transient/Burst Immunity Test

Test result PASS 10.1 Severity Level and Performance Criterion

10.1.1 Test level

Open circuit output test voltage(+/-10%) and repetition rate of the impulses (+/- 20%)

Level On power supply port PE On I/O (input & output)

signal, data and control ports Voltage peak

kV Repetition rate

kHz Voltage peak

kV Repetition rate

kHz 1 0.5 5 0.25 5

2 1 5 0.5 5

3 2 5 1 5

4 4 2.5 2 5

X Special Special Special Special

Notes : 1. “X” is a an open level. The level has to be specified in the dedicated

equipment specification. 2. The gray rows were the selected test level.

10.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 32: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 32 of 49

TTRF60730a/effective date: September 15th, 2009

10.2 Block Diagram of Test Setup

10.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.5 of EN 60730-1 &

H26.9 of EN60730-2-7

For product with Type 2 action: As specified in Annex H.26.9 of EN 60730-1 & H26.9 of EN60730-2-7

Grounding cable

GRP

GRP Grounding cable

0.1m high Insulating support

EUT & AE EFT/B Generator

Page 33: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 33 of 49

TTRF60730a/effective date: September 15th, 2009

10.4 Test Protocol

Temperature : 24C Relative Humidity: 42%

Test No. #

Level [kV]

Polarity +/-

Line for test Pass/ Fail

Comment

1 1 +/- L Pass

2 1 +/- N Pass

3 1 +/- PE Pass

4 1 +/- L-N Pass

5 1 +/- L-PE Pass

6 1 +/- N-PE Pass

7 1 +/- L,N,PE Pass

8 0.5 +/- DC -

9 0.5 +/- I/O -

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

10.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of EFT test at main terminal is: 18.00% Measurement uncertainty of EFT test at signal/telecom terminal is: 18.00% The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

10.6 Additions, Deviations and Exclusions from Standards None

Page 34: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 34 of 49

TTRF60730a/effective date: September 15th, 2009

11. Surge Immunity Test

Test result PASS 11.1 Severity Level and Performance Criterion

11.1.1 Test level

Level Open-Circuit test voltage +/-10%

kV 1 0.5

2 1.0

3 2.0

4 4.0

X* Special

Notes: 1.”X” is an open class. This level can be specified in the product Specification 2. The gray rows are the selected level. Class 2 is applied to Phase to Phase (L-N) Class 3 is applied to Phase to PE (L-PE),(N-PE)

11.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 35: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 35 of 49

TTRF60730a/effective date: September 15th, 2009

11.2 Block Diagram of Test Setup

11.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.4 of EN 60730-1 & H26.8 of EN60730-2-7

For product with Type 2 action: As specified in Annex H.26.8 of EN 60730-1 & H26.8 of EN60730-2-7

GRP

EUT & AE

Surge Generator

Insulating support

Page 36: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 36 of 49

TTRF60730a/effective date: September 15th, 2009

11.4 Test Protocol

Temperature : 24C Relative Humidity: 42%

Test No. #

Level [kV]

Polarity +/-

Line for test Pass/ Fail

1 0.5 +/- a.c. Mains (line to line) Pass

2 1 +/- a.c. Mains (line to earth) Pass

3 X +/- X NA

Notes: “NA” means not applicable. “X” is for other available lines.

Observation: All the functions were operated as normal during and after test.

Conclusion: The EUT met the requirements

11.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of surge test at main terminal is: 19.00% The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

11.6 Additions, Deviations and Exclusions from Standards None

Page 37: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 37 of 49

TTRF60730a/effective date: September 15th, 2009

12. Immunity to Conducted Disturbances, Induced by Radio-frequency Fields

Test result Pass 12.1 Severity Level and Performance Criterion

12.1.1 Test level

Frequency range 150kHz – 230MHz

Level Voltage level (e.m.f.)

U0 [dB(uV)] U0 (V) 1 120 1

2 130 3

3 140 10

X Special Special

Notes: 1. “X” is an open level

2. The gray row is the selected test level.

12.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 38: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 38 of 49

TTRF60730a/effective date: September 15th, 2009

12.2 Diagram of Test Setup 12.2.1 Block Diagram for a.c./d.c input power line

Block Diagram for a.c./d.c input power line

12.2.2 Block Diagram for output a.c./d.c. power line or signal/control lines

Unshielded line

3cm high Insulating support

10cm high Insulating support

CDN

RF Generator with amplifier

GRP EUT

6dB Attenuator

a.c./d.c. power supply EUT power input line

10cm high insulating support

3cm high insulating support

RF Generator with amplifier

GRP EUT

6dB Attenuator Clamp

AE

Unshielded line

Page 39: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 39 of 49

TTRF60730a/effective date: September 15th, 2009

Shielded line

12.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.6.1 of EN 60730-1.

For product with Type 2 action: As specified in Annex H.26.12.2 of EN 60730-1.

10cm high insulating support

3cm high insulating support

RF Generator with amplifier

GRP EUT

6dB Attenuator

Ferrite ring core

AE

100Ω

Shielded line

Page 40: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 40 of 49

TTRF60730a/effective date: September 15th, 2009

12.4 Test Protocol

Temperature : 24C Relative Humidity: 42%

Test No.

Frequency (MHz)

Level V (e.m.f.)

Amplitude modulation

Injected point Result

1 0.15~80 3 1kHz 80%

a.c. Mains Pass

2

0.15~80 1 1kHz 80%

Signal lines -

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

12.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT.

Measurement uncertainty of injected current test at main terminal is 2.82dB. Measurement uncertainty of injected current test at unshielded signal terminal

is 2.82dB. Measurement uncertainty of injected current test at shielded signal terminal is under

consideration. The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

12.6 Additions, Deviations and Exclusions from Standards None

Page 41: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 41 of 49

TTRF60730a/effective date: September 15th, 2009

13. Voltage Dips, Short Interruptions and Voltage Variations Immunity Test

Test result Pass 13.1 Severity Level and Performance Criterion

13.1.1 Test level

For product with Type 1 action Test level

% UT

Voltage dip and short interruptions

% UT

Duration

(in periods) 0 100 0.5/1

250/300 40 60 10/12

70 30 25/30

For product with Type 2 action

Test level

% UT

Voltage dip and short interruptions

% UT

Duration

(in seconds) 0 100 0.5/60

1 cycle of supply waveform40 60 0.5

70 30 0.5

13.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 42: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 42 of 49

TTRF60730a/effective date: September 15th, 2009

13.2 Block diagram of test setup

13.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.9 of EN 60730-1 &

H26.5 of EN60730-2-7

For product with Type 2 action: As specified in Annex H.26.5 of EN 60730-1 & H26.5 of EN60730-2-7

GRP

EUT & AE

Voltage Dips Generator

Insulating support

Page 43: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 43 of 49

TTRF60730a/effective date: September 15th, 2009

13.4 Test Protocol

Temperature : 24C Relative Humidity: 42%

For product with Type 1 action

Test no.

Test level Voltage level in % of rated U

Duration (in periods)

Pass/ Fail

Comment

1 30% 70 25/30 Pass 2 60% 40 10/12 Pass 3 100% 0 250/300 Pass 4 100% 0 0.5/1 Pass

For product with Type 2 action

Test no.

Test level Voltage level in % of rated U

Duration (in seconds)

Pass/ Fail

Comment

1 30% 70 0.5 Pass 2 60% 40 0.5 Pass 3 100% 0 0.5/60 Pass 4 100% 0 1 cycle of

supply waveform

Pass

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

13.5 Measurement Uncertainty

The measurement uncertainty describes the overall uncertainty of the given measured value during the operation of the EUT. Measurement uncertainty of voltage dips and interruption test is: 11.00% The measurement uncertainty is given with a confidence of 95%, k=2. The measurement uncertainty is traceable to internal procedure TI-036.

13.6 Additions, deviations and exclusions from standards

None

Page 44: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 44 of 49

TTRF60730a/effective date: September 15th, 2009

14. Power Frequency Magnetic field

Test result: NA

There is no magnetic sensitive components contained in the EUT and magnetic field immunity test according to EN 61000-4-8 is therefore not required. 14.1 Severity Level and Performance Criterion

14.1.1 Test level

Level Magnetic field strength A/m

1 1 2 3 3 10 4 30 5 100

X Special

Note: 1. X is an open test level; this level may be given in the product specification. 2. The gray row is the selected test level.

14.1.2 Performance Criterion

As specified in Annex H.26 & ZF.3 of EN 60730-1.

Page 45: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 45 of 49

TTRF60730a/effective date: September 15th, 2009

14.2 Diagram of Test Setup

14.3 Test Setup and Test Procedure

For product with Type 1 action: As specified in Annex ZF.8 of EN 60730-1

Page 46: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 46 of 49

TTRF60730a/effective date: September 15th, 2009

14.4 Test Protocol

Temperature : C Relative Humidity : %

Test No. Level

A/m Axis Result Comment

1 3 X 2 3 Y 3 3 Z

Observation: All the functions were operated as normal during and after test. Conclusion: The EUT met the requirements

14.5 Additions, Deviations and Exclusions from Standards

None

Page 47: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 47 of 49

TTRF60730a/effective date: September 15th, 2009

Appendix I : Photograph of EUT

Page 48: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 48 of 49

TTRF60730a/effective date: September 15th, 2009

Page 49: Content · 2015. 4. 23. · 2.3 EMC test frame work Emission: Annex H.23 of EN 60730-1 & EN 60730-2-7 Immunity: See below chart Type 2 action Type 1 action Free standing controls,

Test report no. SH12111398-001 Page 49 of 49

TTRF60730a/effective date: September 15th, 2009