2011 2015201420132012 2016 2017ACTIVITY
J A J OJ A J O J A J OJ A J O J A J OJ A J O J A
Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017
Remove M11/13; CleanupM11/13 front-end,septum,1AQ9
MESON HALL CLEAN-UP: MILESTONES
Activities at TRIUMF
Activities Elsewhere(KEK, RCNP, CERN, Acsion)
* Joint RCNP/TRIUMF/Acsion effort
Remove BL1B, Core M13 block
Shielding
UCN APPARATUS:Spallation Target *UCN Source
BEAMLINE:KickerSeptumDipoleBeamline (incl quads, PS, etc…)
Design & Review Order/Fabricate/Deliver Install
Test
Test
Install
Install
Order/Mod
Order/Fabricate
Design
Design Order/Fabricate InstallTest
InstallDesign/Prototype/Fabricate
Design/Fabricate InstallUnInstall
Procure shielding blocksDesign Install
COMMISSION @ TRIUMFBeamline Commissioning
HELIUM LIQUEFIER:
Upgrade He Liquefier
He Liquefier SystemProcure
UCN Source Commissioning
Install/Test & Run @ RCNP
Procure/Install
Install
2011 2015201420132012 2016 2017ACTIVITY
J A J OJ A J O J A J OJ A J O J A J OJ A J O J A
Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017
Remove M11/13; CleanupM11/13 front-end,septum,1AQ9
MESON HALL CLEAN-UP: MILESTONES
Activities at TRIUMF
Activities Elsewhere(KEK, RCNP, CERN, Acsion)
* Joint RCNP/TRIUMF/Acsion effort
Remove BL1B, Core M13 block
Shielding
UCN APPARATUS:Spallation Target *UCN Source
BEAMLINE:Kicker
SeptumDipoleBeamline (incl quads, PS, etc…)
Design & Review Order/Fabricate/Deliver Install
Test
Test
Install
Install
Order/Mod
Order/Fabricate
Design
Design Order/Fabricate InstallTest
InstallDesign/Prototype/Fabricate
Design/Fabricate InstallUnInstall
Procure shielding blocksDesign Install
COMMISSION @ TRIUMFBeamline Commissioning
HELIUM LIQUEFIER:
Upgrade He Liquefier
He Liquefier SystemProcure
UCN Source Commissioning
Install/Test & Run @ RCNP
Procure/Install
Install
Kicker Ceramic Beamtube InstallDesign/Order Fabricate
Install
2011 2015201420132012 2016 2017ACTIVITY
J A J OJ A J O J A J OJ A J O J A J OJ A J O J A
Schedule( 2010-2016 )UCN BL1U KICKER2011 2015201420132012 2016 2017
Remove M11/13; CleanupM11/13 front-end,septum,1AQ9
MESON HALL CLEAN-UP: MILESTONES
Activities at TRIUMF
Activities Elsewhere(KEK, RCNP, CERN, Acsion)
Remove BL1B, Core M13 block
KICKER:Kicker Design & Review Order/Fabricate/Deliver Install
Design & Out for quotes (8)
Bid Time & Place Order (29)
Vendor final design & Fabr. (324)
Acceptance tests & Receive (60)
Unpack & Test (19)
Ceramic Beamtube & Stands
Finalize design & Order (71)
Fabricate/Assemble (136)
Prepare to Install (15)
Design & Review (117)
Design/Order Fabricate Install
Install
2011 2015201420132012 2016 2017ACTIVITY
J A J OJ A J O J A J OJ A J O J A J OJ A J O J A
Schedule( 2010-2016 )UCN BL1U SEPTUM2011 2015201420132012 2016 2017
Remove M11/13; CleanupM11/13 front-end,septum,1AQ9
MESON HALL CLEAN-UP: MILESTONES
Activities at TRIUMF
Activities Elsewhere(KEK, RCNP, CERN, Acsion)
Remove BL1B, Core M13 block
SEPTUM:
Septum Test InstallOrder/ModDesign
Review & Finalize design (129)
Place Order (15)
Fabricate Septum Mods (80)
Receive & Assemble Septum (110)
Map & Test Septum (60)
Vacuum Box & StandReview & Finalize design (45)
Place Order (15)
Fabricate (95)
Assemble (20)
Prepare to Install (10)
Prepare to Install (40)
2011 2015201420132012 2016 2017ACTIVITY
J A J OJ A J O J A J OJ A J O J A J OJ A J O J A
Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017
Remove M11/13; CleanupM11/13 front-end,septum,1AQ9
MESON HALL CLEAN-UP: MILESTONES
Activities at TRIUMF
Activities Elsewhere(KEK, RCNP, CERN, Acsion)
* Joint RCNP/TRIUMF/Acsion effort
Remove BL1B, Core M13 block
Shielding
UCN APPARATUS:Spallation Target *UCN Source
BEAMLINE:Kicker
SeptumDipoleBeamline (incl quads, PS, etc…)
Design & Review Order/Fabricate/Deliver Install
Test
Test
Install
Install
Order/Mod
Order/Fabricate
Design
Design Order/Fabricate InstallTest
InstallDesign/Prototype/Fabricate
Design/Fabricate InstallUnInstall
Procure shielding blocksDesign Install
COMMISSION @ TRIUMFBeamline Commissioning
HELIUM LIQUEFIER:
Upgrade He Liquefier
He Liquefier SystemProcure
UCN Source Commissioning
Install/Test & Run @ RCNP
Procure/Install
Install
Kicker Ceramic Beamtube InstallDesign/Order Fabricate
Install
List of Major Milestones2012 – Dec UCN Source & Spallation Target installation at RCNP.
UCN/nEDM prototyping & commissioning begins.
2014 – Apr Kicker (or Kicker Ceramic Beamtube) Installation completed.
2014 – Aug UCN/nEDM RCNP phase completed.Uninstall & transport to TRIUMF.
2014 – Dec Meson Hall Clean-up completed.
2015 – Apr UCN Source & Spallation Target received at TRIUMF.Installation of Target & Source.
2016 – Mar UCN Beamline (BL1U) Installation completed.
2016 – Mar Commission UCN Facility using low intensity beam.