29
2010 TEAM PURPLE HydroAsia face-to-face meeting Opening presentation

2010 TEAM PURPLE

  • Upload
    nishi

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

2010 TEAM PURPLE. HydroAsia face-to-face meeting Opening presentation. Team presentation. Purple team members. Team presentation. Sebastien BARRIERE. From university of Nice Sophia- Antipolis Major : Hydrology, hydraulics Hobby : Football, music Contact : [email protected]. - PowerPoint PPT Presentation

Citation preview

Page 1: 2010 TEAM PURPLE

2010 TEAM PURPLEHydroAsia face-to-face meeting

Opening presentation

Page 2: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Team presentationPurple team members

Page 3: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From university of Nice Sophia-Antipolis

Major: Hydrology, hydraulics

Hobby: Football, music

Contact : [email protected]

Team presentationSebastien BARRIERE

Page 4: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From university of Nice Sophia-Antipolis

Major: Hydrology, hydraulics

Hobby: sport, travel

Contact : [email protected]

Team presentationSebastien LYONNET

Page 5: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From Kyoto University

Major: urban hydrology, river water and ground water analysis.

Hobby: Baseball, travel, archery

Contact: [email protected]

Team presentation

Hiroyuki TORII

Page 6: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From Chuo University

Major: Civil engineering

Hobby: tennis, table tennis, travel

Contact: [email protected]

Team presentationQIAN CHAOCHAO

Page 7: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From University of Incheon

Major: Hydrology, hydraulics

Hobby: Basketball

Contact: [email protected]

Team presentationKIM SEJIN

Page 8: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Ahn tuan

From Beijing University of Technology

Major: civil engineering

Hobby: music

Contact: [email protected]

Team presentationWENG YAO-YAO

Page 9: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Ahn tuan

From National University of Singapore

Major: civil engineering

Hobby: Travel, music

Contact: [email protected]

Team presentationDAO AHN TUAN

Page 10: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

From Chuo University

Major: Civil engineering

Hobby: tennis, table tennis, travel

Contact: [email protected]

Team presentationQIAN CHAOCHAO

Page 11: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Ahn tuan

From University of Incheon

Major: Hydrology, hydraulics

Hobby: Baseball, football

Contact: [email protected]

Team presentationJANG DONG WOO

Page 12: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Workplan

Page 13: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Location of the study area

Page 14: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

ArcGIS: catchment modelTriangular Irregular Network

•Contour•Manholes

Raster

Building and road layers

Digital Elevation Model

Page 15: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

DATA-MANHOLE

Page 16: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

DATA-COUNTOUR

Page 17: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

TIN CREATION

Page 18: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

DEM

Page 19: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Real Precipitation Treatment (1) Ord

er Date [day, month, year]Precipitati

on[mm/

event]1 15th July 2006 ~ 19th July 2006 291.52 25th July 2006 ~ 30th July 2006 241.53 11th July 2006 ~ 13th July 2006 1584 14th July 2004 ~ 17th July 2004 150.55 27th July 2005 ~ 28th July 2005 127.7

We organized precipitation data ( Incheon; 2004 ~ 2007) and summarized rainfall events.

We picked up the heaviest amount rainfall event and the highest rainfall intensity event.

Hydrology Study(1)

Order Date [day, month, year]

Max Intensity

[mm/event]

1 27th July 2005 ~ 28th July 2005 47.52 25th July 2006 ~ 30th July 2006 37.53 11th July 2006 ~ 13th July 2006 34.64 12th Sep 2005 ~ 13th Sep 2005 32.55 26th June 2005 ~ 27th June 2005 30.5

Table1 : Top5 events of the biggest amount per 1 event.

Table2 : Top5 events of the highest rainfall intensity.

Page 20: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

We made both the heaviest rainfall event and the highest rainfall intensity event hyetographs.

22(27

th) 24

02(28

th) 04 06 08 10 12 14 16 180.0 5.0

10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0

Hyetograph (27th~28th July 2005)

date[hour(day)]

prec

ipit

atio

n[m

m]

04(1

5th) 10 16 22

04(1

6th) 10 16 22

04(1

7th) 10 16 22

04(1

8th) 10 16 22

04(1

9th)

0.0 5.0

10.0 15.0 20.0 25.0 30.0

Hyetograph (15th ~ 19th July 2006)

date[hour(day)]pr

ecip

itat

ion[

mm

]

Real Precipitation Treatment (2)

Hydrology Study(1)

Page 21: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

1st step: Intensity‐Duration‐Frequency Estimates• Design flows established from: Rainfall intensities for storms of particular duration and return period. 

Probability Rainfall Analysis

0 200 400 600 800 1000 12000

20

40

60

80

100

120

140

160

IDF curves

100 years50 years10 years

Duration (min)

Inte

nsity

(mm

/h)

Page 22: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Probability Rainfall Analysis (2)

15 45 75 105 135 165 195 225 255 285 315 3450

5

10

15

20

25

30

35

40Hyetograph, 6h storm - 100 years return

period

100 years50 years10 years

2nd step: Develop design hyetograph from IDF curve - We made a 6h storm -by using the alternative block method.

Input rainfall data into Mouse boundary conditions.

Hydrology Study(2)

Page 23: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

DHI MIKEProcess Flowchart

MIKE ZERO

DEM

MIKE 21Simulating the surface flow Simulating the sewer network flow

MOUSE

MIKE FLOOD

Coupling MOUSE with MIKE21

Results

Page 24: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

DHI MIKE 21 Process Flowchart

  DEM:Boundaries Conditions:

Simulation period

MIKE 21Simulating the surface flow

・ buildings・ roads・manholes・…・ sea level・ pump operations・…  Rainfall

Page 25: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

MIKE MOUSE

Rainfall

data &

water level

MOUSE

Sewer Network

Boundaries

conditions

Simulation

Period

Simulation of the Sewer

Network flow

Page 26: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Project studyAnalysis of flood damage reduction by green area increase

Page 27: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Analysis of flood damage reduction by green area increase

Green areas allows: ◦ water drainage : runoff decrease

Depression shape: additional water storage during rainfall◦ Relieves sewer system discharge◦ Slows down the water flow, narrows flood peak

Increases well-being and quality of life of the city's inhabitants, environmental friendly

Project subject

Page 28: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Determine the location of these green areas◦ Nature of soil and landuse?◦ Size?◦ Dimensions?◦ Number?

Use of ArcGIS to determine potential locations

Run the calibrated model again with new catchment characteristics and subsequently choose best solution...

Targets, next steps

Page 29: 2010 TEAM PURPLE

2010 team Purple2010 team Purple

Thank you for your attention