207

1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would
Page 2: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering i

Preface

I would like to thank my family and friends for all their support and

understanding during this process. Thanks to the University of Gävle for

affording me the opportunity to study my Masters of Science in Energy

Engineering. I hope this research helps those in their quest for a sustainable

futureofthisplanet.

Page 3: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering ii

Abstract

Shifting the loaddemandofacommercialofficespace toutiliseoffpeak tariffs

wouldleadtocostsavingsaspowerischeaperatthistime.Toachievethisshift,

chemicalenergystoragewasconsideredusingLeadAcidbatteries,Lithium-ion

batteriesandAdvanceLeadAcidbatteries.Theoutputofthesestoragetypesis

electricity.

Currentcostsofstoragedonotsupporttheoptionofreducingpeakdemandby

addingchemicalstorage,aselectricityfromthegridischeaperoverthestorage

project life. A levelised cost analysis was completed and lithium-ion batteries

provedtobetheoutrightbestchoice forchemicalstorage incommercialoffice

spaces.

Town buildings were analysed and assessed for energy savings in order to

reduceoverall loaddemand. Incorporating chemical storage as a viableoption

was assessed based on cost. Heating, Cooling and lighting proved to be the

highest load demands in the buildings. Cost savings in buildings can be better

metbyincreasingtheefficiencyinbuildings,ratherthanbyreducingthecostby

shiftingthepurchaseofelectricityfrompeaktooff-peaktariffs.

Moresuitableoptionstochemicalenergystoragewouldbetoreplacestandard

lights with energy efficient variations, installing an air heat pump to heat the

spaceandicethermalstoragetocoolthespace.Theuseofasolarthermosyphon

willmeetthedemandforheatedwater.

Solar energy generation was assessed as an alternative as off-peak electricity

storedusingchemicalstorageprovedtobetoocostly.A50kWsystemwouldbe

suitably sized when peak sun hours were above the local areas average. Net

meteringcouldbeusedtooffsetcostsduringthewintermonths,whenthepeak

sunhoursfallbelowtheaverage.

“ChemicalEnergyStorage”,“Commercial”,“EnergyStorage”,“LoadDemandShift”,“50kWSolarSystem”

Page 4: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering iii

TableofContents

Preface....................................................................................................................................i

Abstract.................................................................................................................................ii

ListofFigures......................................................................................................................v

ListofTables......................................................................................................................vi

Introduction........................................................................................................................1Background..................................................................................................................................1Aims................................................................................................................................................3Approach.......................................................................................................................................4

LiteratureReviewandTheory......................................................................................5FeasibilityAnalysisProcedure..........................................................................................................5CommercialEnergyConsumption...................................................................................................6EnergyEfficientBuilding.....................................................................................................................9EnergyStorage.......................................................................................................................................10EnergyStorageSystemSetup..........................................................................................................13EnergyStorageTypesExplored.....................................................................................................14EnergyStorageandRenewableEnergyGeneration.............................................................19Lazard’sLevelizedCostofStorageAnalysis.............................................................................22RenewableEnergyGeneration.......................................................................................................24

Methodology.....................................................................................................................31

CaseStudyBuilding.......................................................................................................33SummaryofSelectedASRAELevelIIEnergyAuditReport.......................................35TownBuildings......................................................................................................................................36ExistingEnergyUsage........................................................................................................................37BuildingSystemUpgrades................................................................................................................38

Analysis..............................................................................................................................43ProposedChemicalStorageSolutions..............................................................................44ReducingEnergyDemandandOtherStorageOptions...............................................47Lighting.....................................................................................................................................................47HVAC..........................................................................................................................................................48BuildingEnvelope................................................................................................................................49

RenewableSolution................................................................................................................49TheoreticalPotential...........................................................................................................................50AvailabilityofLand-Geographicalpotential...........................................................................50AvailabilityofResource-TechnicalPotential.........................................................................51

Page 5: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering iv

EconomicPotential-Affordability/Viability............................................................................51MarketforEnergy–GovernmentSupportandNetMetering...........................................51

SolarEnergyGeneration..............................................................................................50

Discussion.........................................................................................................................54

ConclusionandRecommendations..........................................................................57Conclusion.................................................................................................................................57Recommendations..................................................................................................................58

References........................................................................................................................59

Appendix1........................................................................................................................66LevelIIASHRAEEnergyAuditreport...............................................................................66

Page 6: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering v

ListofFigures

Figure1:Typicalenergyuseonthegrid...................................................................................2

Figure2:Aggregate(Community)ElectricityConsumptiononawarmCalifornia

Day...................................................................................................................................................7

Figure3:Typicalenergyuseincommercialofficebuilding.............................................8

Figure4:Frontofmeterenergystorage................................................................................11

Figure5:Behindmeterenergystorage..................................................................................12

Figure6:EnergyStorageSystemSetup.................................................................................13

Figure7:CentralisedThermalCoolingsystem...................................................................15

Figure8:SealedLeadAcidBatteryConstruction...............................................................17

Figure9:IllustrationoftheChargingandDischarginginalithium-ionbattery..18

Figure10:Tesla'sPowerwalltechnicalspecifications....................................................18

Figure11:The"DuckCurve"illustratessteeprampingneedsandovergeneration

risksonaspringdayinCalifornia...................................................................................20

Figure12:PassiveSolarDesigninbuildings.......................................................................25

Figure13:DiagramofsiliconPVcell.......................................................................................25

Figure14:Solarwaterheater.....................................................................................................26

Figure15:Micro-WindTurbineArrayPowersIntel’sHeadquarters.......................27

Figure16:TheBahrainWorldTradeCentre.......................................................................28

Figure17:TheStrataBuildinginLondon.............................................................................28

Figure18:BiomassBoiler............................................................................................................29

Figure19:Illustrationoftheoperationofanairsourceheatpump.........................30

Figure20: Satellite imageof area fromGooglemaps showing the layoutof the

townbuildings.........................................................................................................................35

Figure21:RecommendationrelatedtoPVsolarinstallations.....................................40

Figure22:ChangingtoenergyefficientLEDs.....................................................................47

Page 7: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering vi

ListofTables

Table1:ExcerptofFindingsandImplementationPlanforTownHallbuilding..36

Table2:ExistingEnergyUsage..................................................................................................37

Table3:CapitalImprovementsMeasuresfor2010..........................................................38

Table4:RenewableEnergyOpportunities...........................................................................39

Table 5: SummarisedHVAC and howwater EnergyUsageData from the audit

report...........................................................................................................................................41

Table6:SummarisedLightingEnergyUsageDatafromtheauditreport..............42

Table7:SummarisedResultsofAdjustedEnergyAudit................................................43

Table8:LCOSAssumptionsforbatterytypes(Lazard,2017).....................................44

Table9:LevelizedCostofStorageKeyAssumptions.......................................................45

Table10:LevelizedCostofStorageComparison–Batteries($/kW-year)............45

Table11:CostofCapital–Batteries($/kWh).....................................................................46

Table12:RequiredEnergyandPowerfortheSolarSystem........................................52

Page 8: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

1

Introduction

Background

Energydemand is continuously increasingowing to the increase inpopulation

andtheincreaseinapplicances,toolsandequipmentdependantonelectrityto

operate(ShivaramaKrishnaandSathishKumar,2015).Thecostofenergyalso

increaseseveryyear.Businessesandmunicipalitiesneedtoreduceenergycosts

inordertoremaineconomicallyfeasible.Increasinglocalrenewablegeneration

and reducing the costof energybought from thegrid are someof theways in

whichthesecostincreasescanbemitigated.Moreefficientsystemsresultinless

energyrequired,soupgradingcurrenthardwarewithbetterefficiencieslowers

theenergydemandofthesystem.Thiswillreducetheoperatingcost.Renewable

energysystemscangenerateelectricitywith lowermonthlycosts,albeitwitha

bigger capital up front cost. Reducing the cost of energy could be achieved by

shifting the demand from peak to off peak energy usage (Jensen and Greiner,

2014).Storinglowcostoff-peakenergytouseduringpeakhoursisonewayto

reduceoperatingcosts.

Global commitment to curbing carbon emissions and phasing out nuclear

technology has led to a rise in demand for renewable energy to meet the

demandsofelectricityproduction(Babonneauetal.,2012).Therequirementfor

storagesolutionsinfutureenergymarketsforcommercialbuildingslieswiththe

need to reach and sustain peak loads during occupation. A number of storage

technologiescanbedeployed,withcostandspacebothbeingimportantfactors

incitiesaswellasintoday’scurrenteconomicclimate.Currentlybuildingenergy

costsaving is focusedonincreasingtheefficienciesofappliancesandbuildings

inordertoreducetheconsumptionofelectricity.Findingcreativewaystosave

costsaswellasreduceenergyfromthegridisimportanttobusinesses.

Page 9: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 2

As renewable technology matures and is incorporated into daily generation

wherepossible, theability to storeenergy from thegridduringoffpeak times

would alsobebeneficial.Much like thehydroelectric storageused all over the

world, where water is pumped and stored during off peak tariffs times. The

wateristhenallowedtofallthroughtheturbineduringpeakhourstogenerate

theadditionalelectricityrequiredduringpeaktimestosupplementthegrid.This

isreferredtoaspeakshaving,showninfigure1below.

(IMF,2018)

Figure1:Typicalenergyuseonthegrid

Utilisingonsitestorageandapplyingtheabovecurvetoabuildingwouldallow

the building, in front of themeter, to controlwhen energy is bought from the

grid. Storing off peak energy to utilise during peak hours reduces the overall

demand on the grid during peak times, thus reducing the cost of energy. This

effectively shifts some of the demand from peak demand to off-peak demand

resulting in more evenly distributed demand for electricity. Effective use of

energy storage could result in demandbeing satisfied by stored energy rather

thandirectlyfromthegrid.

Page 10: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

3

A feasibility studywill be conducted into the possible energy storage systems

that are available for an energy efficient commercial office space. The caoital

investiment for the system will be compared for the system with the overall

energy cost savings. Thiswill demonstrate the viability of installing an energy

storage system in the case study building. Other areas that will be explored

include highlighting challenges to adopting energy storage systems and the

positivesandnegativesassociatedwithimplementingandadoptingthechange.

Overall, the grid system energy balance could be controlled with timetabled

storage to ensure usage coincides with grid power generation. Final

recommendationsforfuturestudyandorimplementationwillbeincluded.

Aims

To explore the various types of chemical energy storage systems available to

commercialbuildingsinordertoreducetheircostsbyshiftingtheirdemandto

off-peaksupply.Thisresults inpurchasingtheoff-peakpoweratreducedtariff

rates.

To show the potential that exists to reduce the demand on the grid through

renewablegenerationofenergyanditsassociatedstorage.Theseonsitestorage

facilitiescouldchangethelandscapeonthedemandsideofpowergeneration.

Tocompleteacostanalysisoftheproposedsystemandcomparethesystemcost

totheestimatedsavingsonenergypurchasedfromthegrid.

Tofindisanyrenewableenergygenerationwouldbesuitableforthecasestudy.

Page 11: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 4

Approach

To initially conduct research into current commercial building energy usage

patterns. Then, to identify storage technologies, which are viable options for

commercialuse.

This will be followed by an analysis of a building as a case study and the

completionofacostanalysisof theproposedsystem.Thereafter,assessing the

viabilityofenergystorageasanoptionforreducingenergycostsinacommercial

building.

Identify if anyother renewableenergyoptionsareavailable for thecase study

building.

Page 12: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

5

LiteratureReviewandTheory

FeasibilityAnalysisProcedure

In order to assess the feasibility of the proposed solution, a feasibility study

needstobeconducted.Aprofessionalsuitableforthetaskinquestionconducts

the feasibility study. This professional is required to assist in identifying the

various applicable technologies available (Scottish Community Projects Fund,

2009).

Oncethesetechnologieshavebeenidentified,aninvestigationintotheoptimum

solutionisconductedconsideringthevariousrequirements.Cost,sustainability

and achievability are all considered in determining the viability of the project

(ScottishCommunityProjectsFund,2009).

In 2008 the Korea Development Institute released edition 5 of the General

GuidelinesforthePreliminaryFeasibilityStudies.Theseguidelinesaretoactasa

manual for conducting a variety of preliminary feasibility studies (Korea

DevelopmentInstitute,2008).

These guidelines outline the considerations required for an analysis of the

economicfeasibility:

Namely, the guidelines for an analysis of economic feasibility should be

workedoutincludingthebasicmethodologyofacost-benefitanalysis(e.g.

setting of an appropriate social discount rate) as well as demand

estimation, benefit calculation, and cost calculation; the guidelines for

analysis of financial feasibility need to be devised; and the possibilities to

induceprivateinvestmentneedtobestudied.

(KoreaDevelopmentInstitute,2008)

Page 13: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 6

Thepurposeof this report is tohighlight thevarious storageoptionsavailable

forcommercialbuildingapplications.Onlysolutionsthatarebotheconomically

viable and operationally suitable for the task will be considered in the cost

analysis.

CommercialEnergyConsumption

Energyconsumptioninnowayreflectsenergygeneration.Inthatenergysupply

from renewable sources is not dependant on the supply like fossil fuel

generation. Renewable energy can only generate energy when the source is

available and this cannot be controlled. Solar energy only generates power

betweensunriseandsunset;windpowerrequireswindflowinordertogenerate

power,andwhenthereisnowaterwiththepotentialtofall,hydroelectricpower

generationisnotpossible.

Fossil fuels, and some renewables like biomass, generate energy from fuel are

thusdependentonfuelsupplythatcanbecontrolled.Dependingonthefueland

typeofgeneration,thiscouldresultinbeingabletomanipulatethesupplytosuit

the demand. Coal generated power is based on peak demand, and cannot be

varied to suit lesser demansdue to the nature of the operation of a coal fired

boiler.

Through out the day the demand on the grid fluctuates as energy use varies.

Figure 2 below illustrates how energy demand varies across different sectors:

Industrial;Commercial:Residential,andAgricultureandOther.Thesesectorsall

directlycontributedirectlytothetotaldemandonthegrid.

Page 14: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

7

(Mpoeruk.com,2018)

Figure2:Aggregate(Community)ElectricityConsumptiononawarmCaliforniaDay.

Figure2above,showsthetotal loadprofile forahotday inCalifornia in1999.

The lines show the distribution throughout the day over a 24-hour period for

each sector. The orange line depicts the commercial sector and this will be

discussedfurther.

Duringtheearlymorninghours,from00:00until06:00,thedemandislowand

fairly constant. The likely cause of low demand during this time being that

commercial spaces only operate security lighting andminimal heating, cooling

andventilation(HVAC)atthistime,asthebuildingiseitherunoccupiedoronly

hasminimaloccupancy.

Thepeakdemandforpower inthecommercialsectorbegins from06:00when

theenergyconsumptionforcommercialspacesbeginstoriseconsiderably.This

canbeattributedtothebuildingteamsstartingtheHVACandlightinginareasin

preparation for the early starters to begin theirworking day. From 14:00 the

demandbeginstosubsideastheexteriortemperaturesbegintosubsideasless

coolingisrequired.

Page 15: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 8

CommercialspacesoperateinavarietyofwaysoutlinedbyElsadigbelow:

Commercial buildings include a wide variety of building types such as

offices, hospitals, schools, police stations, places of worship, warehouses,

hotels, libraries, shoppingmalls, etc. These different commercial activities

all have unique energy needs but, as a whole, commercial buildings use

morethanhalftheirenergyforheatingandlighting.

Elsadig(2005)

Figure3belowillustratestheenergyuseincommercialbuildings.Itcanbeseen

that typically the biggest energy consumptionwithin a commercial building is

HVACat41%,followedbylightingat36%.Whenconsideringthedemandcurve

fromFigure2withthetypicalenergyusagesshowninFigure3,thecorrelation

betweentimeofdayanddemandonthegridcanbeassumed.Themethodsused

incurrentbuildingdesigntohelpmitigatethisdemandontheHVACsystemwill

bediscussedbelowinthesectionEnergyEfficientBuildings.

(Greenwisestratergies.com,2018)

Figure3:Typicalenergyuseincommercialofficebuilding

Page 16: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

9

EnergyEfficientBuildings

The bestmethod to reduce energy consumption from the grid is to create an

energy efficient environment to reduce the load demand or to generate

additionalelectricityonsite.Therearemultipletechniquesandtechnologiesthat

havebeendesignedtoreducetheenergydemandofacommercialofficespace.

These different techniques and technologies relate to the building design and

constructionmaterials.Equipmentutilisedinthecommercialspaceincreasesthe

demand,andsuch,energyefficientequipmentshouldbeusedwherepossible.

Allequipmentshouldonlybeswitchedonduringuse.

AshighlightedinFigure3,thismakesup4%oftheenergyusage.Thehabitsof

the occupants also contributes to energy consumption as ultimately their

behaviour can lead to overuse of appliances for comfort and ease. Instead of

increasing the heat, employees should be encouraged to wear a jersey. `they

shouldalsobeencouragedtoturnoffthelightsorequipmentinroomsthatare

unoccupied(SpataruandGauthier,2013).

Thedifferenttechniquesandtechnologiesemployedarelistedbelow:

• Updatingolderbuilding’sdesignandmaterialswherepossible

• UtilisingnaturalLight

• IncorporatingnaturalVentilation

• EnergyEfficientequipment

• Windowglazing

• Centrallycontrolledheating

• Centrallycontrolledcooler

• Adjusting the indoor air temperature closer to outdoor air

temperature(withlittlecompromisetooccupantscomfortlevels)

• Energyefficientlighting

• Insulation

• Askingoccupantstoadjusttheirhabitsforenergyconsumption

• Localisingenergygeneration

Page 17: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 10

EnergyStorage

Energystoragecouldhelpinreducingoverallenergycostsofacommercialoffice

space. Providing energy storage in a building can be achieved through large

banks of batteries. Effective energy storage has been the subject of intensive

researchandinvestmentsincetheadventofelectricity.Energystoragewasfirst

developedlessthan40yearsagoasameanstocreateportableenergysources,

namelybatteries(Whittingham,2012).

Batterieshavebeenusedinapplicationswhenconnectingtothegridforpower

isinconvenient.Batteriescanbefoundinportableelectronics,toysandremotes.

These smaller alkaline batteries are considered to be chemical energy storage

devices. Alkaline batteries are required to be replaced once the battery fully

discharges.

Lithium-ionbatteries aredesigned tobe rechargeable.Thesebattery typesare

instrumentalinthedesignoflaptops,smartphonesandtablets(Fletcher,2013).

Whittingham (2011) talks about high-tech industries requiring uninterrupted

power.Thisisachievedthroughtheuseofleadacidbatteries.

Energystoragecanbeincorporatedintotheenergysystemofthelocaliseduser,

inthiscasethecommercialbuilding,orattheenergysupplier,aptlynamedthe

grid. It is common to define storage as either front of themeter (Figure 4) or

behind themeter (Figure5),which isused toreduce theelectricitydemandat

theuserside.

A front ofmeter energy storage system in current use today is theTesla 100-

megawatt lithium-ionbattery in Jamestown, SouthAustralia. Itwasbuilt in60

days after ElonMuskmade a bet (BBCNews, 2018). Themain purpose of the

battery in Jamestown is tosupportandstabilise thealreadyexistingelectricity

gridoftheregion.

TechnologyusedinthebatteryfarmwasbasedonthetechnologyTeslausesto

power their electric cars (BBC News, 2018). Tesla’s line of distributed energy

Page 18: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

11

products are designed to reduce the demands placed on the infrastructure

designfordistributionandtransmissionofenergy(Tesla,2018).Tesla’s(2018)

storage allows for flexible ramping, frequency regulation and emergency back

up.

Theuseoffrontofthemeterenergystorageresultsin(seeFigure4):

• Gridcongestionrelief

• Frequencycontrol

• Voltagecontrol

• Renewabletimeshifting

• Rampcontrol

• Renewable energy smoothing (the duck curve – discussed in Energy

StorageandRenewableEnergyGeneration)

(Apricum-TheCleantechAdvisory,2018)

(Apricum-TheCleantechAdvisory,2018)

Figure4:Frontofthemeterenergystorage.

Page 19: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 12

Theuseofbehindthemeterenergystorageresultsin(seeFigure5):

• Demandshiftingincludingdemandresponse

• Demandchargereduction

• BackupPowerwhenthegridfails

• Uninterruptedpowersupply

• Frequencycontrol

• Voltagecontrol

• Energyconsumptionoptimisation

• Reduceenergycosts(shiftusetooff-peakpower).

(Apricum-TheCleantechAdvisory,2018)

Figure5:Behindthemeterenergystorage.

Page 20: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

13

Therearevariousenergystoragetechnologiesthatareeithercurrentlyavailable

orintheprocessofbeingdeveloped.Thesevariousenergystoragetypesinclude:

• MechanicalEnergyStorage

• ThermalEnergyStorage

• ElectricalEnergyStorage

• ChemicalEnergyStorage

EnergyStorageSystemSetup

Figure6belowshowsthebasicsetupofanenergystoragesystem.

• BOS–Balanceofsystem

o Container

o MonitorsandControls

o ThermalManagementandfiresuppression

• PCS–PowerConversionSystem

• EMS–EnergyManagementSystem

• EPC–EngineeringandProcurement&Construction

(Baxter,2017)

Figure6:EnergyStorageSystemSetup

11

Economic: Equipment Cost

StorageModule

(SM)

Balance of System(BOS)

Power Conversion

System (PCS)

Energy Management System (EMS)

Engineering Procurement &

Construction (EPC)Racking Frame /

Cabinet Container Bi-directional Inverter Application Library Project Management

Local Protection (Breakers)

Electrical Distribution & Control

Electrical Protection Economic Optimization Engineering Studies /

Permitting

Rack Management System Communication Connection to

TransformerDistributed Asset

IntegrationSite Preparation /

Construction

Battery Management System

HVAC / Thermal Management

Data Logging Foundation / Mounting

Battery Module Fire Suppression Commissioning

SM BOSPCS

BESS

SM Storage ModuleRack Level System (DC)

BESS Battery Energy Storage SystemContainerized System (DC)

ESS Energy Storage SystemComplete Storage System (AC)

EMS

EPC

ESS

Page 21: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 14

EnergyStorageTypesExplored

The typesofenergystorage technologiesavailable for commercialbuildings to

incorporatewithinabuilding’senergysystemareoutlinedbelow.

MechanicalEnergyStorage

Compressedairenergystorageusesenergygeneratedtocompressair.Typically

a utility-scaled storage system requires a large cavity in order to store the

compressed air. Energy generated at off-peak time/excess renewable energy

(dependingonscale)isusedtothecompresstheair.(Sharma,KumarandJoshi,

2010)

Pumped-StorageHydroelectricityusesthesameprincipleasthecompressedair

storage,but insteadof compressingair, offpeakpower isused topumpwater

fromareservoiratalowelevationtooneatahigherelevation.Whenpoweris

needed,thewater isreleased.Thistooisautility-scaledstorageoption.This is

the largest implemented storage technology in the United States. (Sharma,

KumarandJoshi,2010)

Flywheel energy storage involves a mass rotating about its axis. This mass is

rotated using electricity during off peak demand and is stored as kinetic

potentialenergy.Whenloadisrequiredtobedeliveredtothegrid,theflywheel

is rotated and the kinetic energy from the flywheel is transferred from the

flywheel to the grid. This technology has a promising future for application

wherecurrentleadacidbatteriesarepresentlyused,suchasinmotorvehicles.

(Sharma,KumarandJoshi,2010)

ThermalEnergyStorage

SolarEnergyStorageusesenergyfromthesuntoheatwater.Whentheliquidis

cool it ispumpedduringdaylighttimetothesolarcollectorwhere it isheated.

Thisheatedwater isthenstoredinan insulatedtank.Theheatedwatercanbe

usedashotwatersupplyor in theHVACsystemtoheat thebuilding. (Sharma,

KumarandJoshi,2010)

Page 22: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

15

Molten-Salt/SiliconeTechnologyutilisesrenewableelectricityofelectricityfrom

thegridatoff-peakdemand times.Theelectricity isused toheat amedium to

hightemperatures.Eithersaltorsiliconeisheatedtoitsmeltedpoint.Thestored

heatcanbeusedtogenerateelectricityusingsteamturbines.Thiselectricity is

then fedback to thegrid.Thesesystemscanbe “charged”and“discharged”an

infinite number of times. This system can be used in a solar mirror and salt

reservoirwhere thesun isdirectedwithmirrors toa receiver inorder toheat

themediumessentiallycreatinga24-hoursolargeneration.(Lewis,2018)

Ice-BasedStorageAirConditioning(Figure7)utilisesicethermalenergystorage

(ITES)andactsasaphasechangestoragedevice.ITESuseselectricitytocoola

mediumlikechilledwater,iceoreutecticsaltsduringoff-peaktariffs.Thecooled

mediumisthenusedinaheatexchangertoremoveheatfromtherefrigeranton

theloadsideoftheair-conditioner.ITESreducestheenergyconsumptionbyup

to 11.83% (Sanaye and Hekmatian, 2016). In addition to this, shifting the

electricity consumption from on peak to off peak times, thereby reducing the

costofconsumptionbyupto32.65%(countrydependent).ITESisanimportant

optionwhenthecoolingdemandinabuildingishigh,suchasinareaswherethe

outdoortemperatureiswarmallyearround.(SanayeandHekmatian,2016)(Treehuger.2018)

Figure7:CentralisedThermalCoolingsystem.

Page 23: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 16

ChemicalEnergyStorage

FlowBatteriesarerechargeable.Thisenergyisprovidedbythefunctionalityof

incorporating two chemical components separated by amembrane. There is a

positivelychargedsolutionandanegativelychargedsolution.Electricitycharges

thebatteriesbyforcingoxidationatthepositiveelectrodeandreductionatthe

negativeelectrode.Thecurrentisreversedwhenaloadisplacedonthesystem

creatingelectricity that canbeused locallyor sent to thegrid.Very large flow

batteries can bemade, as the size of the battery depends upon the size of the

tanks in which the chemical solutions are kept. The electrolytes used are

however, expensive. Due to their cost, other alternatives are better suited to

commercial use, but these types of batteries arewell suited to in-front-of-the-

meter storage as they can be made to store large amounts of electricity.

(Energystorage.org,2018)

Lead-Acid Batteries (Figure 8) are rechargeable and are considered to be the

cheapest type of battery considered. These batteries are heavy, which is why

theyarenotusedinelectriccars.Thesebatteriesalsotakestrainwhentheyare

fullydischarged, and this leads to a loss in capacity. Longevity canbe ensured

through preventing full battery discharge. There are a limited number of life

cyclesinlead-acidbatteries;deep-cyclebatterieshavemitigatedthisissue.(May,

DavidsonandMonahov,2018)

To increase the life span and efficiency of these batteries, ultra-capacitors are

includedinthebatterydesign.Thesebatteriesareanattractiveoptionbecause

of their lifecycleandbecausetheyarecosteffective.Thefunctionalityof these

batteries is reducedwhennot fully chargedbetween cycles.When considering

the intermittent generation in renewables the reduced functionality could be

problematic.(May,DavidsonandMonahov,2018)

Page 24: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

17

(Upsbatterycenter,2018)

Figure8:SealedLeadAcidBatteryConstruction

Advanceleadbatteriesaresimilarbutprovidebetterperformancethanstandard

lead-acid batteries. Cost reduction is expected, as the technology is being

developedfurther.Originalequipmentmanufacturers(OEM)lookingtousethis

class of storage typically use advanced lead batteries to replace acid-lead

batteries in larger commercial systems not typically serviced by lead-acid.

(Lazard,2018)

Lithium-Ion batteries (Figure 9) are rechargeable andmuch lighter than lead-

acidbatteries.Thelithiumionsmovebetweentheelectrodesduringchargeand

discharge.Duetolithium’shighreactivity,largeamountsofenergycanbestored

within the atomic bonds. This results in very high energy density. Lithium-ion

batteriesdonotneedtobecompletelydischargedtobeginrecharging.

Lithium-ionbatteriesareabletowithstandmultiplechargeanddischargecycles.

Unfortunately, these batteries degrade continuously and they are sensitive to

hightemperaturesastheseacceleratethedegradation.LikeLeadAcidbatteries,

Lithium-ion batteries cannot be fully discharged. These batteries require a

protectioncircuit,whichlimitstheirpeakpower,reducingoverheatingconcerns

(Zubietal.,2018)

Page 25: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 18

(ThermoFisherScientificInc.,2018)

Figure9:IllustrationoftheChargingandDischarginginalithium-ionbattery.

Tesla’s powerwall (Figure 10) has been developed to 100% depth discharge

(Tesla,2018).

(Tesla,2018)

Figure10:Tesla'sPowerwalltechnicalspecifications.

Page 26: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

19

EnergyStorageandRenewableEnergyGeneration

Renewable energy generation can be used in conjunctionwith energy storage.

Designinganenergystoragesystemtoonlyuseenergyfromthegrid,atoffpeak

hours,doesnotguaranteecleanenergyasenergyfromthegridcanbegenerated

byvarioustypesofpowergeneration,potentiallyincludingfossilfuels.Insome

countries,sustainableenergyconsumptionisnotalegalgovernmentpolicyand

assuch,localrenewablegenerationwouldhelpreducethedemandonthegridin

anenvironmentalconsiderateapproach.

Renewable energies are notoriously intermittent resources as there is an

imbalance of power production from renewable energy that peaks in the late

afternoon.

PV generators can generate power only in the day-time. Therefore, it creates

unbalance of a load demand between day and night times. Therefore, power

managementisavitalissueforPVsgenerationsbasedsmartgrid.

(Howladeretal.,2018)

Thehabits of energy users do not necessarily coincidewith renewable energy

generationastheyoftencreatesituationswheredemandexceedssupplyandthe

demandmustbesupplementedbyotherenergysources.Whensupplyexceeds

demand, energy storage becomes attractive to reduce energy wasted. Energy

storage is therefore important to incorporate into a commercial building

generating renewablepower inorder to store this generatedenergywhen the

demanddropsoffinthelateafternoon.

TheCaliforniaIndependentSystemOperator(CAISO)illustratedtheduckcurve

shown below. The curve has been aptly named the “duck curve” due to its

distinctive shape. The duck curve (Figure 11) represents the challenges of

integratingrenewableenergysourcesintothepowergrid.

During the day-time, high penetration of PVs changes the load curve, and it

becomesduckshapethatisknownasduckcurve.

(Howladeretal.,2018)

Page 27: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 20

The duck curve in figure 11 shown below illustrates the effect that the

integrationofsolarenergygenerationhasontheenergydemandofthelocalgrid

on a typical spring day in California. 2012 and 2013 curves show the actual

demandwith2014to2020curvesshowingtheexpecteddemand.Itcanbeseen

that solar energy generation during the peak sun hours supplements the grid

with a substantial amount of MW generation, creating a dip during the usual

peakhours.

From 3pm onwards, there is a rise inMW required, as solar generation is no

longer operating in its optimal conditions as the sun’s position results in less

electricitybeingproduced.This createsa shift in thedemand.This troughand

peak result in the distinctive “duck” curve shape. Asmore solar generation is

addedtothegrid,thereisapotentialriskofoversupply.Thisoversupplyshould

be stored in order to cover the shifted demand; smoothing the curve and

reducingtheduckcurveeffect.

(CaliforniaIndependentSystemOperator,2018)

Figure11:The"DuckCurve"illustratessteeprampingneedsandovergenerationrisksonaspring

dayinCalifornia.

Page 28: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

21

Solarenergygenerationisdependantonthesun’sorientationandelevation.The

solar panels are orientated in order to harness themaximum amount of solar

radiationavailablefromthesunonanygivenday.Solargenerationbeginsafter

thesunrises,showntobearound6AMonfigure12above.After6PMgeneration

beginstoreduceasthesunorientationchangestoapositionfarfromthepanels’

orientation.Solarenergygenerationreachesitsmaximumgenerationwhenthe

sun’s orientation matches the solar panels’ orientation. This can be mitigated

through tracking systems that adjust the panelswith the sun tomaximise the

solargeneration.

The demand on the grid after 6PM is still prominent after solar generation

ceases.Owingto thisdemandaftergeneration,solargenerationcanbeusedto

supplementthegrid’scurrentgenerationbutnottocompletelysustainthegrid.

Inordertocompletelydependonsolargeneration,solargenerationat itspeak

shouldexceedthedemandwiththeexcessenergybeingstoredforuseaftersolar

generationceases.

This same idea can be applied to commercial office spaces. If there is local

renewableenergygeneration,therecouldbeareductioninthedemandduring

peak times, reducing theoverallcostofenergypurchased fromthegrid.There

aremanyrenewableenergytechnologiesavailableforcommercialbuildinguses.

Page 29: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 22

Lazard’sLevelizedCostofStorageAnalysis

In2015,Lazardlaunchedantheircostanalysistochartenergystoragecostand

performance over time (Lazard, 2017). In 2017, Lazard released their third

report.Lazarddescribetheirreportasableto:

Provide a clear methodology for comparing the cost and

performanceofcommerciallyavailableenergystoragetechnologies

foraselectedsubsetofillustrativeusecases.

(Lazard,2017)

Levelized Cost of Storage (LCOS) Analysis is a report that can be utilised to

conduct comparisons between various energy storage technologies. Utilising

current cost andperformance to generatepotential project returnsbymarket.

The LCOS analysis is focused primarily on providing empirically robust

indications of actual costs associated with some of the leading storage

technologiescurrentlyonthemarket,notaccountingfortechnologiescurrently

indevelopment(Lazard,2017).

AccordingtoLazardtheirreport(Lazard,2017):

• Aggregates cost and operational survey data from original

equipment manufacturers and energy storage developers, after

validation from additional Industry participants/energy storage

users �

• Analyzes,basedontheinstalledcost,whatrevenueisrequiredover

the indicated project life to achieve certain levelized returns for

varioustechnologies,designedforaselectedsubsetofidentifieduse

cases

• Surveys currently available, pecuniary revenue streams associated

witheachusecaseacrossselectedgeographies �

Page 30: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

23

AccordingtoLazardtheirreportdoesnot(Lazard,2017):

• Profile all potentially viable energy storage technologies and use

cases

• Identify and quantify all potential types of benefits provided by

energystorageforpowergridsorconsumers

Scope and limitationswithin the report are such thatmechanical, thermal and

gravity storage technologies are excluded. This exclusion satisfies the scope of

this report as chemical energy storage serves to be the most versatile for

installationinwidespreadapplications.

Lazard noted that continued decreasing cost trends among commercially

deployed technologies;with lithium-ion providing themost economic solution

acrossallusescases(Lazard,2017).Flowbatteries,however,offeredthelowest

costsforalongerduration(Lazard,2017).Forcommercialapplication,Lazard’s

report identified threestorage technologies thatcouldbeaddedtoabuilding’s

energysystem:

• Lithium-Ion

• Lead-Acid

• Flow Batteries were identified for larger applications like microgrid,

distributionandpeakerreplacements.

Lazarddefinestheoperationparameterforenergystorageinacommercialcase

asfollows(Lazard,2017):

ProjectLife:10Years

Powerratingofsystem:125kW

Totalbatteryenergycontent:250kWhofcapacity

100%Depthofbatterydischargecycleperday:1

Operationsdaysperyear:250

Usablestoredenergyabletobedispatched:62.5MWhAnnually

Page 31: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 24

RenewableEnergyGeneration

Renewableenergysourcesareconstantlyindemandduetocleanenergypolicy

changes. Environmental impacts of fossil fuels are driving the requirement for

renewable energy sector expansion. Types of renewable energy technologies

availableforcommercialbuildingstoincorporateinthebuilding’senergysystem

are outlined below. Renewable energy and energy storage systems can be

combinedtodecentralisethesystemfromthegrid(Singh,ChenandChoi,2017).

Solar

Yang,HeandYe(2014)speaksofthreetypesofsolarenergyutilization:

• “Light-gatheringutilization”

• “Photovoltaicutilization”

• “Solarenergyphoto-thermalutilization”

“Light-gathering utilization” (Yang, He and Ye, 2014) describes passive solar

design. This relates to utilising natural lightwithin the building to reduce the

quantityofelectricitypowered lighting.Usingwindowplacements,skylightsor

light tunnels. Figure 8 shows how incorporating natural lighting into initial

designconsiderationscanhelpreducethedemandonabuilding’senergysupply

for lighting which Figure 2 showed to be the second biggest contributor to a

buildingsenergydemand.

Natural lightutilization shown in the figurebelow is installed to allownatural

light toenterabuildingspace.Heat transfer ismitigatedbywayofdesignand

material selection.A translucentmaterial,usuallyglassandutilisinganairgap

betweenpanelscreatesaninsulatinglayer.Thisiscalledglazinganditisusedin

ordertoreduceheattransferthroughthepassivelightunit.Theglazingresults

inlimitingtheheatlossfromthebuildingduringthewinter.

Theglazingactstoabsorbtheheatformsolarradiationandtransferthisheatto

the cooler side, which is not desired in summer months. During the summer

months,havingaunitthatcanbeopenedminimizestheheatingeffect.

Page 32: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

25

(http://theclimatechief.com/albany-skylights/,2018)

Figure12:PassiveSolarDesigninbuildings.

“Photovoltaic utilization” (Yang,He andYe, 2014) describes solar photovoltaic

(PV)cells.PVcellscreateelectricityfromsolarradiation.Constructedusingthin

layers of highly purified silicon, which is a semi-conducting material. These

silicone layers are then impregnated with impurities, creating additional

electronsandholeswithinthesiliconelatticeofthelayers(Figure9).Electrical

chargesaregeneratedwhen these layersareexposed to light.Therearemetal

conductor strips to conduct the electricity from the PV cell to the external

electricalsupply.

(http://www.alternative-energy-tutorials.com/solar-power/photovoltaics.html,2018)

Figure13:DiagramofsiliconPVcell.

Page 33: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 26

“Solar energy photo-thermal utilization” describes energy from solar radiation

that heats theworking fluid,water. Water temperatures reach approximately

500C–550C.Incommercialbuildingapplication,thisheatedwatercanbeusedin

underfloorheating,hotwaterinbathroomtapsanddishwashersifthebuilding

callsforthem.Thiswatercouldbeusedinacentralheatingsystem,butduring

the winter months this would need to be supplemented with a boiler or

immersion heater (Yang, He and Ye, 2014). Figure 10 below shows a sole

thermosyphon.

(Anon,2018)

Figure14:Solarwaterheater.

Page 34: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

27

Wind

Windpowerdoesnotgeneratewindpowerpermanentlyasitdependsonwind

flow,whichisinconsistent.Theimage(Figure11)belowshowstheroofatIntel’s

headquarters. Based in Santa Clara, California this is the largestmicro-turbine

array in the US as of 2015. Installed as a “proof of concept”, there are 58

turbines, which can be expected to generate approximately 65kWh Luleva,

2018).

Otherbuildingsthroughouttheworldhavestartedtoincorporatewindintothe

building’sdesign.Figure12showstheBahrainWorldTradeCentreandFigure

13 shows the Strata Tower in London. The latter two buildings incorporating

renewableenergywithinthearchitectureofthebuilding,addingaestheticvalue,

toavoidbeingreferredtoaseyesores.

(Luleva,2018)

Figure15:Micro-WindTurbineArrayPowersIntel’sHeadquarters.

(https://www.amusingplanet.com/2015/11/the-bahrain-world-trade-center-has.html#modal-one,2018)

Page 35: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 28

Figure16:TheBahrainWorldTradeCentre.

(http://www.sciencephoto.com/media/686654/view/strata-tower-london-uk,2018)

Figure17:TheStrataBuildinginLondon.

Page 36: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

29

Biomass

Utilisingbiomassincommercialapplicationcallsfortheuseofabiomassboiler

(Figure18below).Biomassboilerscanreplacecurrentboilerswheretheyexist,

orcansupplementabuilding’sheatingsupplyespeciallywhennotconnectedto

themainsgasgrid.Boilersrequirespacefortheboileritselfandforfuelstorage

(BoilersandEades,2018).

Biomass is cheaper than oil or liquid petroleum gas. Biomass pellets are not

subject to thepricehikes experiencedby fossil fuels.Theseboilers are carbon

neutralandallowforreductionincarbontax.Itmitigatestherequirementtobe

connectedtoautilitiesservice(BoilersandEades,2018).

Biomassboilersaremoreexpensivethanstandardboilers.Spacecanbeanissue

asthepelletsneedtobestored,andtheboilerhoused.Exhaustextractionmust

also be considered.Where large amounts of heat are required, these kinds of

boilers could help reduce costs and the carbon footprint (Boilers and Eades,

2018).(http://www.ees-renewables.co.uk/biomass-boilers/,2018)

Figure18:BiomassBoiler.

Page 37: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 30

Heatpumps

Heatpumps(figure19),muchlikeboilers,areusedinbuildingswithoutmains

gas supplies. One of themain positives is not requiring fuel. This negates the

requirement of space for the fuel stores. Heat pumps can be used for air

conditioningandhavelowrunningcostsbyapproximately25%.Heatpumpscan

be up to 300-400% more efficient than standard electric heating

(Renewableenergyhub.co.uk,2018).

(https://www.dimplex.co.uk/professional/heat-pumps,2018)

Figure19:Illustrationoftheoperationofanairsourceheatpump.

Page 38: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

31

Methodology

Initially, toconductresearch intocurrentcommercialbuildingenergyusageas

wellasthevarioustechniquesthatcanbeusedtoreduceenergyconsumption.

Theseareexploredandconsideredfortheapplicationsinvestigated.

A building with an ASHRAE Level II Energy Audit available is required for

assessment. The recommendations from the reportwill be noted. A feasibility

studywillbeconductedofthepossiblechemicalstoragesystemsavailableforan

energyefficientcommercialofficespace.Additionalrecommendationsregarding

storagewillbeexplored,alongwithpotentialonsitegenerationandalternative

storageoptions.

Theauditreportusedwasforagroupoftownbuildings,andnotforahigh-rise

building,asaLevelIIreportonahigh-risebuildingcouldnotbeattained.

Once the buildings have been investigated, chemical storage options available

will be considered and a LCOS assessed in order to assess the viability of the

possible engineering solution. Currently, commercial buildings’ energy cost

saving is focusedon increasing the efficienciesof appliances and thebuildings

themselves. Other cost saving techniques utilise off-peak electricity like Ice

storage.Thishasbeenwellresearchedpreviouslyandiscurrentlyutilisedtoday.

Thepotentialofon-site renewablegenerationhasbeenconsideredbefore,and

willbeadvisedforfutureendeavours.

Capital investment for the systemwill be compared to the overall energy cost

savings and a cost analysis completed. This will demonstrate the viability of

installinganenergystoragesysteminthecasestudybuilding.Anassessmentof

thecostrelatedtosuchaninvestmentandtheassociatedreturnoninvestment

andestimatedrepaymenttimewillbeincluded

Page 39: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 32

Other areas to explorewill include highlighting challenges to adopting energy

storage systems and the pros and cons associated with implementing and

adoptingthechange.

Results are then discussed and recommended potential for further works are

thenadvisedforfuturestudies,researchandinvestigations.

Page 40: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

33

CaseStudy

AbuildingwithanASHRAELevelIIEnergyAuditwillbeusedforthepurposeof

analysis.

AbriefintroductionintotheASHRAEEnergyAuditReportsisrequired.Baechler,

Strecker and Shafer (2011)drafted a guide for energy audits prepared for the

U.S. Department of Energy. The excerpt below from their report summarises

theirpurposeinthecurrentenergyfocusedclimate.

Energy audits are a powerful tool for uncovering operational and

equipment improvements that will save energy, reduce energy costs, and

leadtohigherperformance.

(Baechler,StreckerandShafer,2011)

How energy audits are conducted, their focus and the general procedure is

outlinedbelow:

The audit typically begins with a review of historical and current utility

data and benchmarking of your building’s energy use against similar

buildings. This sets the stage for an onsite inspection of the physical

building. Themain outcome of an energy audit is a list of recommended

energy efficiency measures (EEMs), their associated energy savings

potential,andanassessmentofwhetherEEMinstallationcostsareagood

financialinvestment.

(Baechler,StreckerandShafer,2011)

Therearethreetypesofauditreportsavailable:

• LevelI–SiteAssessmentorPreliminaryAudits

• LevelII–EnergySurveyandEngineeringAnalysisAudits

• LevelIII–DetailedAnalysisofCapital-IntensiveModificationAudits

(Baechler,StreckerandShafer,2011)

Page 41: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 34

AnASRAELevelIEnergyAuditReportisthemostbasiclevelofanenergyaudit

requiringabriefvisit tosite.Basicchangesto thebuildingsenergysystemare

explored to highlight opportunities for energy savings. These preliminary

findings in a Level I report reveal possible changes that are either no-cost

changesorlowcostchanges(Baechler,StreckerandShafer,2011).

Recommendations following the Level I audit include the following (RS&H,

2011):

• Replacementofenergyefficientlighting

• SettingtheHVACsystemtoAutofromalwayson

• Replacedoorseals

• Implementingan“energyawareness”programmeforemployees

• Implementingarecyclingprogram

• etc.

These are all no-cost changes like implementing an “energy awareness”

programmeforemployeesrequirestimeandtraining,butwithouttheneedfor

intensivecapitalinvestment.Low-costchangesincludereplacingdoorsealsand

substituting aportionof lighting for energy efficient alternatives.This level of

report lacks the depth required to assess the possibility of adding energy

storagetothiscommercialspace.

An ASRAE Level II Energy Audit Report has wider breadth and depth in

comparisontoaLevelIenergyauditreport.Amorecomprehensivesitevisitis

conducted. This level of report includes the same basic findings as a Level I

energy audit would reveal while also including recommendations of energy

efficientmeasures(EEM)consistentwiththefinancialplanforthesite.Potential

capital-intensiveenergysavingopportunitieswillthenbeexplored.Athorough

analysis is conducted of the current building characteristics, including energy

usage in the building and the associated energy costs. (Baechler, Strecker and

Shafer,2011)

Page 42: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

35

AnASRAELevelIIEnergyAuditReportwillbeanalysedandtheselectedreport

hasbeenincludedinAppendix1forreference.

AnASRAELevelIIIEnergyAuditReportisreferredtoasan“investmentgrade”

analysis.Thistypeofaudithasadditionalfinancialanalysisforallmajorcapital

investmentrecommendations.LevelIIIalsoincludesmonitoring,datacollection

and engineering analysis. Unfortunately, audits of this type were not freely

availableandevencontactingvariousEnergyAudit firmsprovedfruitless.Due

totheselimitations,forthepurposesofthisfeasibilitystudy,anASRAELevelII

EnergyAuditReportwillbeanalysed.

SummaryofSelectedASRAELevelIIEnergyAuditReport

Address: TownBuildings - TownofMadisonNewHampshire 1923VillageRd,

Madison,NH.

Figure20:SatelliteimageofareafromGooglemapsshowingthelayoutofthetownbuildings.

Page 43: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 36

TownBuildings

TheAuditdealtwithallthetownbuildings,whichinclude:

• FireStation

• TransferStation

• TownHall

• Library

• HistoricalBuilding

• HighwayGarage

• MadisonGarage

• Allbuildings–PowerGeneration

Table1belowshowsanexcerpt fromthefindingsandan implementationplan

summary table from the result of the audit showing themultiple changes that

canbeimplementedinthesebuildings.

Table1:ExcerptofFindingsandImplementationPlanforTownHallbuilding

ID Building Finding Recommendation Package Priority

14 Town Hall Chimney effect in stairwell Weatherize front Stair

well 2 2

15 Town Hall Zoning Problem Install Third zone on

First Floor 4 3

16 Town Hall Non Programmable Stat Install Programmable

T-Stats 1 1

18 Town Hall Front Corner show leakage Weatherize Front

Corner 2 2

19 Town Hall

Lighting is older inefficient technology

Lighting/Lighting Control Upgrade 2 1

(ArbogastEnergyAuditing,2010)

Page 44: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

37

ExistingEnergyUsage

Table2showstheexistingenergyusageinthetownbuildings.

Table2:ExistingEnergyUsage.

Building Base Line

Building(s)

Ext. Electric Usage (KWh/yr)

Average Electrical Demand (KW)

Propane Usage (Gal)

Fuel Oil Usage (Gal)

Ext. Utility Cost ($)

Ext. EUI (kBtu/Sf)

Ext. CUI ($/Sf)

Ext. CO2 Emission

(Tons)

18/1/09 –

31/7/10TownHall 29220 8.98 0 1024 $6812.72 79 $2.22 20.21

18/1/09 –

31/7/10Library 13255 15.75 891 0 $4592.81 50 $1.83 9.58

18/1/09 –

31/7/10

Fire

Station15984 0.00 0 1189 $4835.15 69 $1.53 17.44

18/1/09 –

31/7/10

Hwy

Garage9790 0.00 0 1839 $2919.49 120 $1.22 21.96

18/1/09 –

31/7/10

Madison

Garage12509 5.54 0 1514 $5826.91 60 $1.39 19.57

18/1/09 –

31/7/10

Transfer

Station2155 0.00 272 0 $1049.77 142 $4.65 2.29

18/1/09 –

31/7/10

Historical

building86 0.00 0 0 $146.82 0 $0.04 0.03

18/1/09 –

31/7/10Total-All 82999 30.28 1163 5566

$26

183.6759.82 $1.84 91.08

(ArbogastEnergyAuditing,2010)

Page 45: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 38

BuildingSystemUpgrades

The report calls for upgrades according to table 3 below. Table 3 is a

summarised extract from the audit report showing suggested capital

improvementmeasures.Thesemeasuresare sortedby typeof change.Table3

showsthatthebiggestreductioninenergyduetoacapitalchangewouldbefrom

installing an economiser. It is to be assumed that with regards to the capital

investments listed in table3, priceshave changed since2010when the report

waswritten.

Table3:CapitalImprovementsMeasuresfor2010

Energy Conversion Project Title

Electric Energy Avoided (KWh)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Estimated Installation Cost

Simple Payback

Add Economizer 5483.02 0 0 0 1.84 $11 396.30 51.37

Add Heat Recovery unit 2368.08 0 169.13 71.78 2.93 $11 851.85 46.81

Lighting/Lighting Control Upgrade

37361.96 275.8 169.13 71.78 14.67 $12 343.51 297.86

Controls Upgrade 0 0 67.96 127.46 1.43 $1 514.80 11.1

Weatherize 0 0 599.05 0 6.08 $8 030.57 37.3

Boiler Upgrade 0 0 187.2 192.91 3.01 $20 370.38 45.14

Waste Oil Heater 0 0 1200 0 0 $13 864.20 4.81

Table 4, following page, shows the recommended Renewable Energy

Opportunities for the town buildings. Solar thermal water heater was solely

recommendedforcapitalexpenditure.In2010therenewableoptionsweremore

limited,lessefficientandexpensivecomparedtothoseavailablein2018.Energy

storagewasespeciallyexpensive,withLazardLevelizedcostofstorageanalysis

releasedin2017shows(Lazard,2017).

Page 46: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

39

Table4:RenewableEnergyOpportunities

Renewable Type

Electric Energy Avoided (KWh)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Total Estimated Installation Cost

Simple Payback

Thermal Solar - Library 0 0 0 96.92 0.56 $5,061.73 22.22

PV Solar 0 0 0 0 0 $0.00 0 Thermal Solar except Library 0 0 0 0 0 $0.00 0

Wind energy 0 0 0 0 0 $0.00 0 Combine Heat and Power 0 0 0 0 0 $0.00 0

District Heating 0 0 0 0 0 $0.00 0

Bio Energy 0 0 0 0 0 $0.00 0 (ArbogastEnergyAuditing,2010)

Figure16showstherecommendationsfromtheaudit(seeAppendix1)related

to incorporatingsolargenerationontheroofofoneof thebuildings.Theaudit

was focused on cost savings related to increasing the energy efficiencies and

reducing consumption, resulting in energy savings. Storage and generation on

site was not advised, the recommendation below extracted from this report

pertainingtosolarPVinstallation:

“AsPVsolar technology improvesandthepriceof thepanelsdecreasethe

Town should have buildings re-evaluated for the application of PV Solar”

(ArbogastEnergyAuditing,2010)

Since 2010, the improvements to solar generation includeprice reduction and

efficiencyincreases.Generatedsolarpowerwouldnotbesubstantialenoughto

oversupplythebuilding.Duetotheavailableroofspacetoincorporatewindand

solar power generation onto the roof structure, this generation would only

reduce the peak demand from the grid. It can therefore be determined that

energy storage fromrenewablegenerationat this site,wouldnot causepower

overproduction and storage would not be required. However on weekends

wheredemandforpowerissignificantlyreduced,renewableoptionscouldstore

power.

Page 47: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 40

(ArbogastEnergyAuditing,2010)

Figure21:RecommendationrelatedtoPVsolarinstallations.

DETAILED FINDINGS Finding # 53 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

PV solar is an on-site renewable energy which would reduce the town's purchased electrical energy.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

As PV solar technology improves and the price of the panels decrease the Town should have buildings reevaluated for the application of PV Solar

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: PV Solar

Building: All Buildings

When evaluating PV solar application for the Town of Madison building I did not find a fit. The best candidate would be the library however the payback period would be excessive. The main reason the Town of Madison buildings do not have a good fit with PV solar is the lack of south facing roofs that do not have shading.

Page 48: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

41

Table5belowshowstheenergyusagedatafigurestakenfromtheenergyaudit

report.Theyhavebeensummarisedforease.

Table5:SummarisedHVACandhowwaterEnergyUsageDatafromtheauditreport

Building Heating

demand

%

Heating

MW

Cooling

demand

%

Cooling

MW

Fans

demand

%

Fans

kW

Hot

water

demand

%

Hot

water

kW

Fire

Station75.3 48.77 0 0 4.2 2.72 2.7 1.74

Transfer

Station81.7 7.66 5.4 0.51 1.1 0.13 4.6 0.43

Library 65.4 24.15 5.2 1.92 0 0 1.2 0.44

Town

Hall59.0 42.01 15.5 11.03 2.2 1.57 2.3 1.63

Historical

Building0 0 0 0 0 0 0 0

Highway

Garage88.5 75.47 0 0 0.4 0.34 0.5 0.42

Madison

Garage83.8 62.62 0 0 0.4 0.29 0.6 0.44

Total 60.89 260.70 3.15 13.46 1.17 5.03 1.20 5.13

HVACandhotwaterusageinthetownbuildingscombinedaccountsfor66.4%of

thetotalenergyusage.

TheTownHallusageismuchhigherforcoolingasthisisofficespace.HVACand

hotwaterusageinthetownbuildingscombinedaccountsfor71.3%ofthetotal

energyusagewhencoolingisincluded.

The natural ventilation in some of these buildings is adequate and as such no

coolingisrequired.Notablythesearebuildingsinwhichvehiclesarehoused;the

garagedoorsarelargeandnotedtobeleftopenattimes.Thehistoricalbuilding

is an anomaly butmay be related to preserving the historical artefact. This is

howeveralmostimpossibleinhigh-risebuildingsduetowindfactorandsafety.

Page 49: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 42

Table6:SummarisedLightingEnergyUsageDatafromtheauditreport

Building Lighting of total

demand%

LightingkW

FireStation 5.9 3.82

TransferStation 5.6 0.52

Library 23.1 8.53

TownHall 11.7 8.33

HistoricalBuilding 91.3 78.39

HighwayGarage 8.5 7.249

MadisonGarage 9.7 7.249

AgainstBuildings

Total

26.64 114.10

AsyoucanseefromTable6above,thehistoricalbuildingisanoutlierthatskews

the data. The Historical building accounts for 91.3% of the energy usage

dedicatedtolighting.Table6showsthatlightingaccountsfor26.64%ofthetotal

energy usage. This allows this system to represent similar groups of buildings

and multipurpose office spaces where some offices like laboratories and

shoppingareasdemandmorelighting.

Page 50: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

43

Analysis

Basedontheenergyauditreportfromthiscasestudy,thebiggestconsumersof

electricityinthebuildingarethelightingandHVACsystems.

Table7:SummarisedResultsofAdjustedEnergyAudit

System MW %ofTotalDemand

Heating 260.70 54.73

Cooling 69.08 14.50

Ventilation(Fans) 5.03 1.05

HotWater 5.13 1.08

Lighting 114.10 26.64

Other 9.26 2

Total 463.3 100

Ensuring thebuilding is energy efficient,wouldbe achievedby addressing the

following:

• Updatingolderbuilding’sdesignandmaterialswherepossible

• UtilisingnaturalLight

• IncorporatingnaturalVentilation

• EnergyEfficientequipment

• Windowglazing

• Centrallycontrolledheating

• Centrallycontrolledcooler

• Adjust the indoor air temperature by one or two degrees closer to

outdoorairtemperature(withlittlecompromisetooccupantscomfort

Energyefficientlighting(calculationbelow)

• Insulation

• Askoccupantstoadjusttheirhabitsforenergyconsumptionpurposes

Page 51: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 44

ProposedChemicalStorageSolutions

Chemicalstorageoptionsconsidered:

• Lead-AcidBattery

• Lithium-IonBattery

• AdvancedLeadBattery

Chemicalstorageallowspowertobestoredfromthegridduringoff-peaktariffs.

Thisreducestherequirementofelectricityduringpeaktariffsthusreducingthe

costofelectricityforthebuilding.

LevelizedCostofStorage

TheWorldEnergyCouncilreport(2016)explainsLCOSthefollowingway.LCOS

allows for comparisons between various storage options in terms of easily

comparablevalues.AveragecostrelatedtoproducedversusstoredkWh.

Assuming:

TheWeightedAverageCapitalCost(WACC)is10.6%.

Therearenochangesinparametersorpricesovertheprojectslifetime

Debt–20%

Interest–8%

Equity–12%costofequity

Table8:LCOSAssumptionsforbatterytypes(Lazard,2017)

Property Units Lithium-Ion Lead-Acid AdvanceLead

PowerRating kW 125 125 125

Duration Hours 2 2 2

UsableEnergy kWh 250 250 250

100%DODcycles/per 1 1 1

Operatingdaysperyear 250 250 250

ProjectLife Years 10 10 10

Page 52: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

45

LCOS LevelizedCostofEnergy[$/kwh]

I0 InvestmentCosts[$]

At AnnualCostsperyear

Mel Producedelectricityineachyear[kWh]

n TechnicalLifetime

t Yearoftechnicallifetime(1,…,n)

i DiscountrateWACC

!!"#= !0+

!!(1+!)!

!!−1

!!"(1+!)!

!!−1 (WorldEnergyCouncil,2016)

Lazard’s (2017) report shows the following results for their LCOS for the

consideredtypesofstorageforcommercialapplications.

Table9:LevelizedCostofStorageKeyAssumptions

LCOSValue Units Lithium-Ion Lead-Acid AdvanceLead

Life Years 10 5 10

Total Initial Installed

Cost

$/kWh $804–$900 $556–

$606

$800–$946

ChargingCost $/MWh $106 $106 $106

Efficiency % 86% 72% 82%

(Lazard,2017)

Table10:LevelizedCostofStorageComparison–Batteries($/kW-year)

StorageType LCOS2018Estimate

($/kW-year)

LCOSMin2017

($/kW-year)

LCOSMax2017

($/kW-year)

Lithium-Ion $426 $445 $493

Lead-Acid $529 $577

AdvancedLead $475 $554

(Lazard,2017)

Page 53: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 46

ThefiguresfortheLCOSinclude:

• CapitalCosts

• OperationsandMaintenance(O&M)Costs

• ChargingCosts

• Taxes

• Other

Table11:CostofCapital–Batteries($/kWh)

StorageType LCOS2018

Estimate($/kWh)

LCOSMin2017

($/kWh)

LCOSMax2017

($/kWh)

Lithium-Ion $576 $643 $720

Lead-Acid $445 $485

AdvancedLead $640 $757

(Lazard,2017)

CapitalCost improvements foreach consideredcommercial storageoptionsby

Lazard are indicated. Advanced Lead batteries show enhanced performance

from standard Acid-Lead batteries. This creates competition for Lithium-Ion

battery variants in small tomedium sized commercial systems. Lead, however

continuestobethelow-costoptionwhenconsideringlowcyclerequirements.In

thisapplication,lowcyclingoptionsarenotpossibleforconsiderationowingto

the fact that storage for this application requires daily discharging and

recharging.

Lithium-Ion capital cost continues to decline at large system integration. The

increased life cycle of Lithium-ion batteriesmakes themmore attractive as an

option as theywouldnot require replacement asoften, in comparison toLead

Acid battery variants. This is why the LCOS figures for lithium show it to be

superiortotheleadbatteries,albeitatahighercapitalcostinitially.

Page 54: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

47

ReducingEnergyDemandandOtherStorageOptions

Lighting

Lightingaccountsfor26.64%ofallenergyconsumedinthebuildings.According

to theFigure17below,changingastandard60Wlightbulb toenergyefficient

bulbwiththesamelumensreducesthe loadbyupto83%.Theaveragesaving

acrossthebulbvariantsshownbelowis80%.

(https://www.ovoenergy.com/guides/energy-guides/energy-saving-light-bulbs.html,2018)

Figure22:ChangingtoenergyefficientLEDs.

Assumingallbulbsarechangedtoenergyefficientvariants,asavingof80%can

beachieved.Thelightingloadcanbereducedby137.9kW.

Thecostofthebulbsasnotedintheauditreport:$12343.51

Costsavingovertime:$1497.69peryear

Page 55: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 48

HVAC

ThermalStorage

Air-conditioning in buildings is a high-energy process, and reducing load

demand from the grid is important. Tarsitano, Ciancio and Coppi (2017)

investigatedtheapplicationofair-conditionerspoweredbysolarcollectors.This

formofstoragewouldbebettersuitedtocommercialbuildings.Icestorageisan

option,buttheseunitsrequiresubstantialspacetohousethetanks.Thisspace

could be more efficiently utilised for reducing more intensive energy load

demandsonthesystem,likeaheatpump.

Duetothelowerdemandincooling(14.50%)vsheating(54.73%),thiswouldbe

the secondary investmentneededwith the reduction inheatingdemandbeing

the prime focus. In warmer climates this would be reversed, with air-

conditioninghavingalargerpowerloadthan14.50%

EnergyDemandReduction

Loaddemand for cooling is far surpassedby loaddemand forheating.Heating

mustthereforebeaddressedtolowertheoperatingcostsofthebuilding.Energy

efficientheatpumpsorsolarthermalheatersmustbeconsidered.

Airsouceheatpumpscansupply100%oftheproperties’heatingneedsandcan

function in temperatures as low as -200C.Madison,NH,USA has a range from

lows in January of -120C, so having an air sourced heat pump would be

satisfactorywith thepotentialofhavingelectricheatersonstandbyshould the

temperaturedropbelow-200C.Thepumpsrelyonelectricity fromthegrid(or

locally generated electricity) and require no fuel like oil or LPG (Airflow

Southwest,2018).

Airsourceheatpumpsareupto3timesmoreefficientthanstandardoilboilers.

Carbonemissionsarereducedbyup to27%peryearcompared tooilheating.

Air sourceheatpumps canbe solar thermalwaterheating types for increased

savingsoncost(AirflowSouthwest,2018).

Page 56: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

49

A recommendation for a pellet fuelled centralised heating system for all the

buildingstoreplacethecurrentandout-datedoilheatingsystem.Usingbiofuels

lowerscarbonemissionsandismorecosteffectivewhencomparedtoanewoil

fuelboilerandapelletboilersystem.

BuildingEnvelope

Reducing the heating demand in the Town buildings is important to lower

demand.Insulationisveryimportanttoensurethebuildingenvelopefunctions

asintendedasabarrierlimitingthe“leak”ofheatedorcooledairintooroutof

the building. By reducing this leak means less work is required by the HVAC

system to maintain the internal temperature. The following can be done to

minimizetheleaks:

• Replace/repairdoorseals

• Resealskylightsandwindows

• Caulk and seal all pipes and flue penetrations through ceilings and

exteriorwalls

• Re-caulkalljoints(walls,ceilingsandfoundations)

RenewableSolution

Using today’s technologies, byprovidinga fully renewable solution to the case

studyabovewouldrequirethesitetobefullyassessedforpotentialrenewable

options.NewHampshire is22ndbest state forsolarpowergenerationand25th

bestregardingwindgeneration(TurbineGenerator,2018).

Sharma et al. discusses the uncertainty in estimating renewable energy

utilisation potential for solar thermal generation in India. The same

considerations can be applied to the case study Town of Madison, NH Town

Buildings.

Page 57: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 50

RenewableEnergyGeneration

PotentialforRenewableEnergy

Another option to reduce demand in the compound is to add local renewable

energygeneration.Thiswouldreduceoreliminatethedemandonthelocalgrid.

Sharmaetal(2016)statesthevaryingtypesofpotentialestimatesforrenewable

energyutilizationinclude:

• Theoreticalpotential

• Geographicalpotential

• TechnicalPotential

• Economicpotential

• Marketpotential

The above listed utilization potentials can be investigated for different

renewableenergyoptionsinaregion.Windandsolarpowerwillbeassedforthe

region.Eachpotentialwillbeaddressedandthesubsequentresultsanalysedin

ordertoensurethebestavailablerenewableoptionisselectedfortheregion.

TheoreticalPotential

Theoreticalpotentialisestimatedconsideringboththephysicalconstraintsand

energy content of the resource. The physical constraints include natural and

climatic parameters, including the factors that would affect the theoretical

assessmentofthesite(Sharmaetal.,2016).Solarandwindarecomparable.

AvailabilityofLand-Geographicalpotential

Sharma et. al. (2016) discusses solar power generally having a large footprint

andrequires largesectionof land.There is largeportionofunused land in the

areathatcouldbeusedforsolargeneration.

Page 58: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

51

AvailabilityofResource-TechnicalPotential

Sharmaet.al. (2016)describes theamountofavailableenergydependsonthe

amountofresourceavailable:

• Durationofenergyavailability,isStoragerequired?Isitpredictable?

• Intensityoftheenergygenerated

• Angleofinclination

• Radiation

• Intensity

• Timeoftheyear(Seasonal)

MadisonNewHamsphirehasanaverageof5.3hoursperdayofpeaksunhours

inthesummer,and3.66inthewinter,thisresultsinanaveragepeaksunhours

of 4.61hours per day on a fixed solar panel. (TurbineGenerator, 2018). Local

average annualwind speeds of 0.06miles per hour (TurbineGenerator, 2018).

Bothhaveavailability.

EconomicPotential–AffordabilityandViability

The total energy savings, inorder for theproposedsolution tobeviable,must

offsetthehighoutlayincapitaltofundtherenewableproject.Solarsystemstend

tohavea20-30yearlifecycle.Solarpowerismoreeconomical.

MarketforEnergy–GovernmentSupportandNetMetering

Policy changes allow for renewable tax relief in many markets driving the

affordability for many renewable installations. Net metering of surplus

generatedelectricitycanbesoldbacktothegridforfullretailcredit(Eidetal.,

2014).Surpluswouldbesold in thesummerwhenpeaksunhoursareat their

maximum, and the credits used during low generation times, like the winter

whenthepeaksunhoursareattheirminimum,tosupplementthesupplyatzero

costtotheuser.

ConsideringtheaboveandinthecaseforMadison,NH:Solarpowergeneration

willbeconsideredduetothepeaksunhoursandcapitalcostofthesystem.

Page 59: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 52

SolarGenerationSystemSize

Tocalculatethesizeofthesystem:

Theenergyrequiredannually,recordedaskWh/yr, is translatedintokWh/day

bydividingby365daysinayear.ThekWh/dayisthendividedbytheaverage

peaksunhoursperdayfortheregiontofindthekWrequiredinthesystem.

The average peak sun hours is important when sizing a solar system. This

averagetakesintoaccountthevariancesintheefficiencyofconvertingsunlight

intoenergy.Factorsaffectingtheefficientcyinclude:

• Timeoftheyear

• Angleofthesun

• Angleofthepanels(fixed)

• Variedcloudcover

MadisonNewHamsphirehasanaverageof5.3hoursperdayofpeaksunhours

inthesummer,and3.66inthewinter.Thisresultsinanaveragepeaksunhours

of4.61hoursperdayonafixedsolarpanel(TurbineGenerator,2018).

Table12:RequiredEnergyandPowerfortheSolarSystem

Building

Ext. Electric Usage (kWh/yr)

Ext.ElectricUsage(kWh/day)

RequiredkWsystem

CostofElectricityperyear(USD)

TownHall 29220 80.055 17.365 $5158.93

Library 13255 36.315 7.877 $2340.23

FireStation 15984 43.792 9.499 $2822.05

HwyGarage 9790 26.822 5.818 $1728.47

MadisonGarage 12509 34.271 7.434 $2208.52

TransferStation 2155 5.904 1.281 $380.48

Historicalbuilding 86 0.236 0.051 $15.18

Total-All 82999 227.395 49.326 $14653.87

Page 60: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

53

Table 12 shows the required system size for the townbuildings in 49.326kW,

thustheproposedsystemshouldbesizedtogenerate50kW.

Thesystemshallconsistsofthefollowing:

• SolarPanels

• ChargeController

• Battery(sizedependingonstoragevsnetmetering)

• Inverter

(Albadietal.,2014)

Decisiondata.org has a total cost estimate for a 50kW commercial solar

generation system if the system was bought outright. Below is the cost and

savings estimates (savings through tax credits and estimated energy cost

savings)fora50kWsysteminMadisonNewHampshire.Savings

Commercial50kWsystem

Estimatedsystemcost:$193,500

(-)Federaltaxcredit:30%withnomaximum

Finalcostaftertaxcredits:$135,450

Est.energysavingsperyear:$14,093

Timetorecovercosts:9years7months

30-yearsavings:$287,344 (Decisiondata.org,2018)

DecisionOrg.comadvocatessolarsystemsinMadison,NewHampshirewiththe

followingpositives:

• 30%federalincentive(Federaltaxcredit)

• Highgridelectricitycosts(17.65cperkWhfortheTownbuildings)

• Netmeteringallowssurplusofelectricity.

Page 61: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 54

Discussion

The aim of this report was to explore the various types of chemical energy

storagesystemsavailabletocommercialbuildingsinordertoreducetheircosts

by shifting their demand to off-peak supply. Shifting the demand to off-peak

tariffs leadstooverallreductioninenergycosts.Thisfeasibilitystudyexplored

theseoptionsforacasestudybuilding

LeadAcidbatteriescontinuetobealow-costoptionwhenconsideringlowcycle

requirements. Using chemical storage to shift the timing of electrical demand

requiresdailydischargingandrecharging.AdvanceLeadAcidbatteriesmaybe

analternative,butthecostofadvanceleadacidbatteriesissimilartoalithium-

ionbatteries.

Lithium-Ion capital cost continues to decline at large system integration. The

increased life cycle of lithium ion batteriesmakes themmore attractive as an

option as they would not require replacement as often as Lead Acid battery

variants.This iswhytheLCOS figures for lithium-ionshowit tobesuperior to

theLeadAcidbatteries,despiteahighercapitalcostforinstallation.

Currentcostsofstoragedonotsupporttheoptionofreducingpeakdemandby

adding chemical storage to commercial office spaces. Due to electricity being

cheaperduringpeaktimescomparedtotheprojectcostforthelifecycleofthe

Lithium-ionbatterystorage.TheLCOSshowstorageisnotyetrequiredtopeak

tariffshifting.

Thereisapotentialtoreducethedemandonthegridthroughrenewableenergy

generationand its associated storage.Currentlyonhigh-rise commercialoffice

spaces, there isnotenoughspaceon theroof forwindandsolargeneration to

meettheloaddemand.

Page 62: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

55

Itisalsoimportanttorealisethat,solarpowerisgeneratedwhiletheofficeisin

useandwouldbefarbettersuitedtodirectlypoweringthebuildingwithoutthe

lossofefficienciesthroughstorageforlateruse.Windpowercouldbeusedand

generated throughout the day, for direct generation anduse alongside storage

duringtheevening.

Withoutlocalgeneration,chemicalstoragereliesonthegrid.Storagetechnology

is better suited to alleviate the effects of the duck curve where electricity

generationoccurs.NavigantResearch (2018) refers toenergy storageasbeing

themostversatiletechnologythatexiststoday,andthatisafairstatement.Itcan

beusedtoshiftdemand,storeoversupplyforlateruseandstoreoff-peakfossil

fuel generated power to supplement the grid during peak loading much like

storedhydroelectricpowerandstoredcompressedair currentlywork.This is

howTesla’sbatteryinJamestown,Australiacurrentlyfitsintothegrid.Behind-

the-meter storagemakesa farbigger impact in reducing theeffectof theduck

curve in renewable energy and reducing amounts of fossil fuels consumed to

reach demand, having a more sustainable impact upon environmental factors

alongsidethis.

The costingwas analysed using Lazard’s Levelised Cost of Storage analysis in

conjunctionwithabuildingcasestudy.ALevel IIASHRAEEnergyAuditreport

(Appendix 1) was used to assess the building’s optimisation with regard to

energy efficiency. Lighting and heating requirements were the largest load

demands within this building, lighting accounting for 26.64% and HVAC

accountingfor71.3%(Figure2).

Anotheraimcalledforexplorationofvariousenergystoragetypesavailablefor

useincommercialbuildings.Energyefficientlightingandairsourceheatpumps

makeafarbiggerimpactatcommercialpropertylevelatthisstage.Changinga

standard60Wlightbulbtoenergyefficientbulbwiththesamelumensreduces

theloadbyanaveragesavingof80%.Whileairsourceheatpumpsareupto3

times more efficient than standard oil boiler, which could impact the HVAC

demandbeingreducedfromthecurrent71.3%(Figure2).

Page 63: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 56

Thermalenergystoragewouldmakean impact inwarmerclimatesbyutilising

ice storage for cooling, andutilising a solar thermosyphon to supplement load

demand for heated water. Ice storage is an option, but these units require

substantialspacetohousethetanks.Althoughanoptionamoreeffectiveuseof

thisspacewouldbetoreducethemoreintensiveenergyloaddemandsthatare

placeduponthissystem.

SolargenerationisacompletelyviablesolutionfortheTownofMadison’sTown

Building. With the project’s repayment time being a meagre 9 years and 7

months and the PV system’s life span 30 years. This results in a saving of

approximately$287,344fora50kWsystem.Thisisasignificantsumofsavings

fortheTownBuildings.Abiggersystemwouldallowenergycreditstobeusedin

thewinterwhensolargenerationislower.

Anadditional consideration:Havingabiomassboiler systemwouldreduce the

demandonthesolarsystemduringthewintermonthswhensolargenerationis

reducedduetodaylighthoursandreducedsolarintensityduetotheangleofthe

sun.Surplusheatingwouldbestoredinaninsulatedthermalstoragetankready

for supply. Thiswould lower the electrical demand from the solar array. This

doesrequireanadditionalsystemtobeinstalledincreasingcosts.

Subsequentlyitcanbeseenthatalthoughchemicalenergystoragecanbeusedto

shift demand, this is not as beneficial as installing a solar power generating

systemwouldbeforbothcostsavingandtheenvironment.

Page 64: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

57

ConclusionandRecommendations

Conclusion

Therearebetter-suitedchangestothebuildingthanaddingchemicalstorageto

shift the load to off-peak tariffs. Currently lighting and heating requirements

were the largest load demands within the building as shown in Figure 2.

Chemicalstorageoptionsthatwereconsideredhadanoutputofelectricity.

Thecurrentcostofstoragedoesnotsupporttheoptionofreducingpeakdemand

by adding chemical storage, as electricity from the grid is cheaper over the

storageproject life. Shouldstoragestillbeconsidered, lithium-ionshows tobe

superior to the lead-acid batteries. This is due lifespan and cycling of the

batteries. Although this would reduce overall energy costs, the return on

investmentwouldnotbeseen.

Currentlyonhigh-risecommercialofficespaces,limitedroofspacepreventsany

renewable sources frombeingable to fullymeet the loaddemand.Despitenot

fullyfulfillingdemandareductionintherelianceonthegridcouldbeachieved.

SolargenerationisaviablesolutiontotheenergydemandattheMadisonTown

BuildinginNewHampshireUSAbenefitbothfinanciallyandenvironmentally.

Page 65: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 58

Recommendations

These recommendations are based upon research and findings carried out as

part of this feasibility study. Having completed the LCOS and looking at all

availableoptions.

Reducing loads for lightingmust be done in order to reap any other rewards

regarding supply. Average savings of 80% of demand can be expected when

changingtomoreefficientbulbs,reducingenergyconsumptionofthebuilding.If

thefollowingrecommendationsaretobeimplemented,savingscanbeexpected.

Install a 50 kW Solar power generating system for the town buildings in

Madison,NewHamspire.

Page 66: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

59

References

Aggregate(Community)ElectricityConsumption.(1999).[image]Availableat:

https://www.mpoweruk.com/electricity_demand.htm[Accessed6Jul.2018].

AirflowSouthwest.(2018).HeatPumps.[online]Availableat:

http://airflowsouthwest.co.uk/heat-pumps/[Accessed1Jul.2018].

Albadi,M.,Abri,R.,Masoud,M.,Saidi,K.,Busaidi,A.,Lawati,A.,Ajmi,K.andFarsi,

I. (2014). Design of a 50 kW solar PV rooftop system.International Journal of

SmartGridandCleanEnergy.

Anon, (2018). [image] Available at: http://solex.in/solar-water-heater.aspx

[Accessed30Jul.2018].

Apricum - The Cleantech Advisory. (2018).The MENA region – the next hot

marketforenergystorage?-Apricum-TheCleantechAdvisory.[online]Available

at: https://www.apricum-group.com/the-mena-region-the-next-hot-market-for-

energy-storage/[Accessed29Jun.2018].

ArbogastEnergyAuditing.(2010).ASHRAELevelIIAuditTownBuildingsTownof

MadisonNewHampshire1923VillageRdMadison,NH.

Babonneau,F.,Haurie,A.,Tarel,G.andThénié,J.(2012).AssessingtheFutureof

Renewable and Smart Grid Technologies in Regional Energy Systems.Swiss

JournalofEconomicsandStatistics,148(2),pp.229-273.

Baechler,M.,Strecker,C.andShafer,J.(2011).AGuidetoEnergyAudits.Richland,

Washington:PacificNorthwestNationalLaboratory.

Baxter,R.(2017).EnergyStorageProjectFinancing.

Page 67: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 60

BBCNews. (2018).Teslamega-battery inAustraliaactivated. [online] Available

at: https://www.bbc.com/news/world-australia-42190358 [Accessed 28 May.

2018].

Boilers, P. and Eades, B. (2018).TheProsandConsofBiomassBoilers. [online]

Energymyway.co.uk.Availableat:

https://www.energymyway.co.uk/news/biomass-boilers-pros-and-cons/

[Accessed31May.2018].

California Independent System Operator (2018).What the duck curve tells us

aboutmanagingagreengrid.[online]Availableat:

https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.

pdf[Accessed30Jun.2018].

Decisiondata.org.(2018).SolarPanelsinMadison,NH:SolarCompanies,Cost,and

Installation|DecisionData.[online]Availableat:https://decisiondata.org/solar-

by-city/madison-nh/[Accessed6Sep.2018].

Eid,C.,RenesesGuillén,J.,FríasMarín,P.andHakvoort,R.(2014).Theeconomic

effectofelectricitynet-meteringwithsolarPV:Consequences fornetworkcost

recovery,crosssubsidiesandpolicyobjectives.

Elsadig,A. (2005).EnergyEfficiencyinCommercialBuildings.Masterof Science.

UniversityofStrathclyde.

Energystorage.org. (2018).FlowBatteries |EnergyStorageAssociation. [online]

Availableat:

http://energystorage.org/energy-storage/storage-technology-

comparisons/flow-batteries[Accessed1Jul.2018].

Energystorage.org. (2018).Energy Storage Technologies | Energy Storage

Association.[online]Availableat:

Page 68: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

61

http://energystorage.org/energy-storage/energy-storage-technologies

[Accessed25Jul.2018].

Fletcher,S.(2013).Bottledlightning.NewYork:Farrar,StrausandGiroux.

Greenwisestrategies.com.(2018).CommercialBuildingEnergyAudits|Greenwise

Strategies. [online]Available at: http://greenwisestrategies.com/energy-audits-

engineering/commercial-building-energy-audits[Accessed22Jul.2018].

Howlader,H.,Sediqi,M.,Ibrahimi,A.andSenjyu,T.(2018).OptimalThermalUnit

Commitment for Solving Duck Curve Problem by Introducing CSP, PSH and

DemandResponse.IEEEAccess,6,pp.4834-4844.

http://www.alternative-energy-tutorials.com/solar-power/photovoltaics.html.

(2018).[image].

https://www.amusingplanet.com/2015/11/the-bahrain-world-trade-center-

has.html#modal-one.(2018).[image].

https://www.dimplex.co.uk/professional/heat-pumps(2018).[image]. http://www.ees-renewables.co.uk/biomass-boilers/.(2018).[image].

https://www.imf.org/external/pubs/ft/fandd/2015/12/jamal.htm(2018).[image].

https://www.ovoenergy.com/guides/energy-guides/energy-saving-light-

bulbs.html.(2018).[image].

http://www.sciencephoto.com/media/686654/view/strata-tower-london-uk.

(2018).[image].

http://theclimatechief.com/albany-skylights/.(2018).[image].

Page 69: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 62

https://www.thermofisher.com/content/dam/tfs/ATG/CMD/cmd-documents/sci-res/pub/comm/env/AR-Lithium-Ion-Battery-Degradation-RandD-Mag-042214.pdf(2018).[image].

https://www.treehugger.com/renewable-energy/zero-energy-buildings-should-

make-nice-ice.html(2018).[image].

https://www.upsbatterycenter.com/blog/sealed-lead-acid-batteries-the-basics/(2018).[image]

Jensen, T. and Greiner, M. (2014). Emergence of a phase transition for the

required amount of storage in highly renewable electricity systems. The

European Physical Journal Special Topics, 223(12), pp.2475-2481.

Korea Development Institute – Public and Private Infrastructure Investment

ManagementCenter(2008).GeneralGuidelinesforPreliminaryFeasibilityStudies

(fifthedition).Korea.

Lazard (2017).Lazard’s Levelized Cost of Storage Analysis – Version 3. [online]

Available at: https://www.lazard.com/media/450338/lazard-levelized-cost-of-

storage-version-30.pdf[Accessed28May.2018].

Lewis,D.(2018).Salt,siliconorgraphite:energystoragegoesbeyondlithiumion

batteries. [online] the Guardian. Available at:

https://www.theguardian.com/sustainable-business/2017/apr/06/salt-silicon-

or-graphite-energy-storage-goes-beyond-lithium-ion-batteries [Accessed 1 Jul.

2018].

Luleva, M. (2018).Micro-Wind Turbine Array Powers Intel’s Headquarters.

[image] Available at: https://www.greenoptimistic.com/intel-micro-wind-

turbine/#.W15gvFMvzHp[Accessed30Jun.2018].

Luleva, M. (2018).Micro-WindTurbineArrayPowers Intel'sHeadquarters - The

Green Optimistic. [online] The Green Optimistic. Available at:

Page 70: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

63

https://www.greenoptimistic.com/intel-micro-wind-turbine/#.W15gvFMvzHp

[Accessed30Jun.2018].

May, G., Davidson, A. andMonahov, B. (2018). Leadbatteries for utility energy

storage:Areview.JournalofEnergyStorage,15,pp.145-157.

(May,DavidsonandMonahov,2018)

McKenna, E., Doylend, N. and Doylend, M. (2014). END-USE DEMAND IN

COMMERCIAL OFFICE BUILDINGS: CASE-STUDY AND MODELLING

RECOMMENDATIONS.Proceedings of the 5th BauSim International Building

Performance Simulation Association Conference - Human-centred building(s),

Aachen,Germany,pp.pp.67-74.

Mpoweruk.com.(2018).ElectricityDemand.[online]Availableat:

https://www.mpoweruk.com/electricity_demand.htm[Accessed29Jun.2018].

NavigantResearch(2018).OptimizingFossilFuelGenerationwithEnergyStorage.

Renewableenergyhub.co.uk. (2018).Heat Pumps for Commercial use | The

RenewableEnergyHub.[online]Availableat:

https://www.renewableenergyhub.co.uk/heat-pumps-information/commercial-

heat-pumps.html[Accessed31Jun.2018].

RS&H(2011).AGuidetoEnergyAudits.Richland,Washington:PacificNorthwest

NationalLaboratory.

Sanaye,S.andHekmatian,M.(2016).Icethermalenergystorage(ITES)forair-

conditioning application in full and partial load operatingmodes.International

JournalofRefrigeration,66,pp.181-197.

Scottish Community Projects Fund (2009). Feasibility Studies:Aguide toGood

Parctice.Edinburgh.

Page 71: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 64

Sharma,S.,Kumar,V.andJoshi,R.(2010).AnOverviewonEnergyStorageOptions

forRenewableEnergySystems.

Sharma, C., Sharma, A.K.,Mullick, S.C. andKandpal, T.C. (2016). Uncertainty in

estimatingrenewableenergyutilisationpotential:acaseofsolarthermalpower

generationinIndia.InternationalJournalofAmbientEnergy,38(8),pp.765–773.

Shivarama Krishna, K. and Sathish Kumar, K. (2015).A review on hybrid

renewableenergysystems.

Singh,P.,Chen,Z.andChoi,Y.(2017).Hydraulicdesignandperformanceanalysis

on a small pump-turbine system for ocean renewable energy storage

system.JournalofMechanicalScienceandTechnology,31(11),pp.5089-5097.

Spataru, C. and Gauthier, S. (2013). How to monitor people ‘smartly’ to help

reducingenergyconsumptioninbuildings?.ArchitecturalEngineeringandDesign

Management,10(1-2),pp.60-78.

Spooner, C. (2018).Energy StorageNot atTippingPoint: Thoughts onWhyand

When.[online]Power-eng.com.Availableat:

https://www.power-eng.com/articles/2018/04/energy-storage-not-at-tipping-

Tarsitano, A., Ciancio, V. and Coppi, M. (2017). Air-conditioning in residential

buildings through absorption systems powered by solar collectors.Energy

Procedia,126,pp.147-154.

Tesla.com.(2018).UtilitiesTeslaUK.[online]

Availableat:https://www.tesla.com/en_GB/utilities[Accessed28Jul.2018].

TurbineGenerator. (2018).PeakSunHours for SolarPanels inNewHampshire |

TurbineGenerator.org.[online]Availableat:

https://www.turbinegenerator.org/solar/new-hampshire/ [Accessed 6 Sept.

2018].

Page 72: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering

65

Whittingham, M. (2012). History, Evolution, and Future Status of Energy

Storage.ProceedingsoftheIEEE,100(SpecialCentennialIssue),pp.1518-1534.

World Energy Council (2016).E-storage: Shifting from cost to valueWind and

solarapplications.

Yang, L., He, B. and Ye, M. (2014). The application of solar technologies in

building energy efficiency: BISE design in solar-powered residential

buildings.TechnologyinSociety,38,pp.111-118.

Zubi, G., Dufo-López, R., Carvalho,M. and Pasaoglu, G. (2018). The lithium-ion

battery: State of the art and future perspectives.Renewable and Sustainable

EnergyReviews,89,pp.292-308.

Page 73: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

UniversityofGävle MasterofScience–EnergyEngineering 66

Appendix1

LevelIIASHRAEEnergyAuditreport

Page 74: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Auditing for Commercial, Government, & Industrial"Lower Your Building's Costs & Save Thousands of $"

ASHRAE Level II Audit

Town BuildingsMember of U.S. Green Building Council Town of Madison New Hampshire

1923 Village Rd

Madison, NHLEED Accredited Professional

Utility History Period Evaluated8/1/2008 7/31/2010

Building TypeMuncipal Buildings

Energy Audit Date:Infrared Thermography Certification 10/8/2010

Energy Audit Preformed by:Elmer Arbogast

Member of

Certifications from AEE

Certified Energy Manager Certified Energy Auditor Certified Sustainable DevelopmentProfessional

Member of ASHRAE

Arbogast Energy Auditing

Page 75: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

) Executive Summary ------------------------Page 3 to 4) Findings and Implementation Plan Summary Table ------------------------Page 5 to 5) Recommendation, Cost and Savings Summary Tables ------------------------Page 6 to 7) Electric Usage, Electric Cost and Total Utility Cost by Buildi ------------------------Page 8 to 8) Fuel Usage, Fuel Cost and Total Utility Cost by Building ------------------------Page 9 to 9) Energy Audit Town Hall ------------------------Page 10 to 33

ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Library ------------------------Page 34 to 51ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Fire Station ------------------------Page 52 to 69ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Hwy Garage ------------------------Page 70 to 86ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Madison Garage ------------------------Page 87 to 103ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Historical Building ------------------------Page 104 to 110ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Energy Audit Transfer Station Trailer ------------------------Page 111 to 126ObservationsEnergy Usage ProfileMeter Data and Utility History SummaryEnergy BenchmarkingFindings, Recommendations & Implementation

) Appendixes ------------------------Page 127 to 134

Table of Contents

Page 76: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Executive Summary

) A breakdown of energy use within each building is to be provided. A Level II energy analysis identifies and provides the savings and cost analysis of all practical measures that meet the owner’s constraints and economic criteria, along with a discussion of any effect on operation and maintenance procedures. It also provides a listing of potential capital-intensive improvements that require more thorough data collections and analysis, along with an initial judgment of potential costs and savings.

)

)

)

)

Definition of an ASHRAE Level II Audit

Existing Energy Performance of Your Building

Potential Energy Performance of Your Building

Process and Parameters used to evaluate ECMs

The Town of Madison buildings are performing very well as far as energy usage is concerned. The contributing factors in this performance is a good energy awareness by the town employees, the town's residences and the town's Selectmen. The two best performing buildings are the library and the Madison garage with an energy usage index(EUI) of 50 and 60. A high performing building is one with an EUI of 58 or less. Two other buildings the fire station and the town hall have EUI of 69 and 79. It should be noted that the Madison garage has under gone insulation improvements that reduced the EUI from 100 to 60. The Hwy garage and transfer station trailer both have EUI over 100. Since the Hwy garage burns waste oil it has a low fuel cost even with it high usage. The historical building has an EUI of less than 1 due to it's very

All buildings have potential for improving their energy usage. The recommendations which I am making will reduce the electrical usage by 30,080 KWH, Electrical Demand by 14 KW per month, Fuel oil usage by 2,704 gallons and Propane usage by 617 gallons for an estimated investment of $127,839. Please note that during the energy audit the fire station was converted from fuel oil to propane, therefore the town will see an increase in propane usage while seeing a decrease in fuel oil usage. Removing the historical building from evaluation if all recommendations were implemented would reduce the buildings average EUI from 75 to 40.5.

Each recommendation energy savings were estimated using energy savings calculation and data collected. An estimated installation cost was completed for each recommendation, for all major components and equipment an actual cost was obtained. The labor and remaining material was estimated using RSMeans cost data. Each recommendations were then given a priority with the recommendation with payback of 5 years or less or recommendations with life safety components were given the highest priority.

The then the savings each building was totalized and evaluated against the buildings energy usage index(EUI) and the buildings benchmarking to ensure the energy savings are achievable.

Page 77: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Executive Summary - Page 2

)

) The town has several approaches on how the town can have these recommendations

)

)

) The third approach is the one recommended by Arbogast Energy Auditing, which is to have a construction management company manage the project. The estimates in this report are based on Arbogast Energy Auditing providing this service, however the town should be able to find other companies which provide this service at similar cost. This approach reduces the work load required by the town while having a similar flexibility and input on design. It also gives the town one project manager who is responsible for the project, but will require the town issuing multi contracts. This approach also allows the town to use PSNH's Municipal Smart Start Program. Arbogast Energy Auditing and some other providers of this service can bring other financing options to the table which may reduce the overall cost of the project and financing.

Next Step

The Town of Madison should consider PSNH's Municipal Smart Start Program. PSNH's municipal customers have the opportunity to install energy saving measures with no up front costs - through our Smart Start Program. Payment for services and products are made over time with the savings obtained from lower energy costs. In addition to the recommendations listed in this report the town should also have all town owned outside lighting evaluated and included in

The first is to implement each recommendation separately, this gives the town the most flexibility and evaluation of the recommendations. However this also requires the most work by the town employees and Selectmen. This approach will give the selectmen a way closely evaluate the cost of the recommendation, it would however require the Town to take on project management responsibility.

The second is to implement all recommendations at once from a contractor who provide this comprehensive appoach. This approach reduces the town's work load by having one project manager for the project and having to issue only one contract for the project. This approach would allow the town to us the PSNH Municipal Smart Start program. These contractors will also bring other financing options to the table which may reduce the overall cost of the project and financing. This approach the town does loss some of the flexibility on who will do the work and can lead to limitation on town input on design. This option also will allow the town to receive a guaranteed savings contract from an energy retrofit service company (ERSCO). This option will ensure that if the savings are not met then the town will receive a check for the difference. There is fee for this service which in general ranges from 5 to 10% of the contractor price. The estimated price does not include this fee and therefore would be need to be added to evaluate return on investment(ROI)

Page 78: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Finding ID Number Building Finding Recommendation Package Priority Notes

1 Fire Station Space is Air Condition with no economizer Add Economizer 2 32 Fire Station Outside air level below ASHRAE 62.1 Add Heat Recovery unit 2 3 F-13 Fire Station Several Hole in Hard Ceiling above Suspended Repair holes in ceiling 1 14 Fire Station Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 15 Fire Station Vending Machine w/o Vending Mizer Vending Mizer and Delamping 1 16 Fire Station Non Programmable Stat Install Programmable T-Stats 1 17 Fire Station Door seal show air leak from Thermal Scan Door Weather Stripping 1 28 Fire Station Vehicle Garage w/o CO & CO2 monitoring CO and CO2 Alarm 4 19 Fire Station No Vehicle exhaust extraction system Vehicle Exhaust Extraction system 4 1

10 Transfer Station Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 111 Transfer Station Controls need to be improved Controls Upgrade 2 112 Transfer Station Electric operating when Propane heat is on Permanently Shut off electric heat 1 113 Transfer Station Domestic hot water heater on when not occupied Timer on domestic hot water heater 1 214 Town Hall Chimney effect in stairwell Weatherize front Stair well 2 215 Town Hall Zoning Problem Install Third zone on First Floor 4 316 Town Hall Non Programmable Stat Install Programmable T-Stats 1 117 Town Hall East wall has excess solar gain Install Solarize Window Blinds 1 118 Town Hall Front Corner show leakage Weatherize Front Corner 2 219 Town Hall Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 120 Town Hall Space is Air Condition with no economizer Add Economizer 2 321 Town Hall No Boiler Reset Control Upgrade - Boiler 2 222 Town Hall Outside air level below ASHRAE 62.1 Add Heat Recovery unit 2 3 F-123 Town Hall More Efficient boiler available Boiler Upgrade 2 324 Town Hall Door seal show air leak from Thermal Scan Door Weather Stripping 1 125 Town Hall Domestic hot water heater on when not occupied Timer on domestic hot water heater 1 226 Town Hall 2 Refrigerators in Police back room Remove less efficient refrigerator 3 127 Library Non Programmable Stat Install Programmable T-Stats 1 128 Library No Boiler Reset Controls Upgrade - Boiler Controller 2 229 Library Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 130 Library Outside air level below ASHRAE 62.1 Add Heat Recovery unit 2 3 F-131 Library Potential of UV damage to books Install Solarize Window Blinds 1 132 Library More Efficient boiler available Boiler Upgrade 2 333 Library Building would benefit from Thermal Solar Thermal Solar 2 334 Library Door seal show air leak from Thermal Scan Door Weather Stripping 1 135 Library Domestic hot water heater on when not occupied Timer on domestic hot water heater 1 236 Historical Building Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 137 Hwy Garage Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 138 Hwy Garage Non Programmable Stat Install Programmable T-Stat 1 139 Hwy Garage Thermal Scan show sagging Insulation Weatherization- Insulation Repair 2 240 Hwy Garage Vehicle Garage w/o CO & CO2 monitoring CO and CO2 Alarm 2 141 Hwy Garage Door seal show air leak from Thermal Scan Door Weather Stripping 1 142 Hwy Garage Electric Demand High in August Replace Bean Cooker w/ Propane 1 143 Hwy Garage No Vehicle exhaust extraction system Vehicle Exhaust Extraction system 4 144 Madison Garage Lighting is older inefficient technology Lighting/Lighting Control Upgrade 2 145 Madison Garage Non Programmable Stat Install Programmable T-Stat 1 146 Madison Garage Wet insulation during winter Weatherization - Vapor Seal Repair 2 147 Madison Garage Domestic hot water heater on when not occupied Timer on domestic hot water heater 1 248 Madison Garage Thermal Scan Show need to insulate walls Weatherization - Insulation of Walls 2 349 Madison Garage Vehicle Garage w/o CO & CO2 monitoring CO and CO2 Alarm 2 150 Madison Garage Door seal show air leak from Thermal Scan Door Weather Stripping 1 151 Madison Garage Waste Oil available for Heat Waste Oil Heater 2 352 Madison Garage No Vehicle exhaust extraction system Vehicle Exhaust Extraction system 4 153 All Buildings PV Solar 2 4

54 All Buildings - except Library Thermal Solar 2 455 All Buildings Wind energy 2 456 All Buildings Combine Heat and Power 2 457 All Buildings District Heating 2 458 All Buildings Bio Energy 2 459 All Buildings Yearly Energy Review 3 1

General NotesG-1

G-2Finding NotesF-1

Package identification 1 - Lower Cost Operational and Maintenance, 2 - Capital Improvement Measure, 3 - Energy Management Improvement Opportunity,4 - non energy savings measurePriority ratings 1 - high priority, 2 - Medium priority, 3 - Low Priority, 4-Information Only

Space is occupied below the density level used by ASHRAE and therefore indoor air quality is acceptable

Findings and Implementation Plan Summary Table

Page 79: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Building Base Line Building(s)

Existing Electric Usage (KWH/yr)

Average Electrical Demand (KW)

Propane Usage (Gal)

Fuel Oil Usage (Gal)

Existing Utility Cost ($)

Existing EUI (kBtu/Sf)

Existing CUI ($/Sf)

Existing Building CO2 Emissions (Metric Tons)

8/01/2009 to 7/31/2010 Town Hall 29,220 8.98 0 1,024 $6,812.72 79 $2.22 20.218/01/2009 to 7/31/2010 Library 13,255 15.75 891 0 $4,592.81 50 $1.83 9.588/01/2009 to 7/31/2010 Fire Station 15,984 0.00 0 1,189 $4,835.15 69 $1.53 17.448/01/2009 to 7/31/2010 Hwy Garage* 9,790 0.00 0 1,839 $2,919.49 120 $1.22 21.968/01/2009 to 7/31/2010 Madison Garage 12,509 5.54 0 1,514 $5,826.91 60 $1.39 19.578/01/2009 to 7/31/2010 Transfer Station 2,155 0.00 272 0 $1,049.77 142 $4.65 2.298/01/2009 to 7/31/2010 Historical Building 86 0.00 0 0 $146.82 0 $0.04 0.038/01/2009 to 7/31/2010 Total All Buildings 82,999 30.28 1,163 5,566 $26,183.67 59.82 $1.84 91.08

Energy Goals will be set during Energy Planning Stage not included in this report

Building Base Line Building(s)

Electric Usage (KWH/yr)

Average Electrical Demand (KW)

Propane Usage (Gal)

Fuel Oil Usage (Oil)

Utility Cost ($)

EUI (kBtu/Sf) CUI ($/Sf)

Building CO2 Emissions (Metric Tons)

Short Term (1 -3 Years)Mid Term (3 - 5 Years)Long Term (5 to 10 Years)

Energy Conversion Project TitleBuilding(s) where Implemented

Finding Number

Electric Energy Avoided (KWH)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Estimated Installation Cost

Simple Payback

Repair holes in ceiling Fire Station 3 0.00 0.00 15.55 0.00 0.16 $148.15 3.97Vending Mizer and Delamping Fire Station 5 2312.64 0.08 0.00 0.00 0.78 $395.06 2.12Install Programmable T-Stats Fire Station 6 0.00 0.00 19.29 0.00 0.20 $88.64 1.92Install Programmable T-Stats Town Hall 16 0.00 0.00 48.21 0.00 0.49 $335.19 2.90Install Programmable T-Stats Library 27 0.00 0.00 0.00 64.29 0.37 $335.19 2.22Install Programmable T-Stat Hwy Garage 38 0.00 0.00 56.25 0.00 0.57 $88.64 0.66Install Programmable T-Stat Madison Garage 45 0.00 0.00 54.64 0.00 0.55 $88.64 0.68Door Weather Stripping Fire Station 7 0.00 0.00 68.89 0.00 0.70 $1,379.88 8.35Door Weather Stripping Town Hall 24 0.00 0.00 42.87 0.00 0.44 $779.26 7.57Door Weather Stripping Library 34 0.00 0.00 0.00 32.97 0.19 $779.26 10.06Door Weather Stripping Hwy Garage 41 0.00 0.00 29.68 0.00 0.30 $546.54 7.67Door Weather Stripping Madison Garage 50 0.00 0.00 59.35 0.00 0.60 $546.54 3.84Timer on domestic hot water heater Transfer Station 13 273.75 1.50 0.00 0.00 0.09 $139.38 3.39Timer on domestic hot water heater Madison Garage 47 273.75 1.50 0.00 0.00 0.09 $139.38 3.39Timer on domestic hot water heater Town Hall 25 730.00 4.00 0.00 0.01 0.25 $165.68 1.51Timer on domestic hot water heater Library 35 273.75 1.50 0.00 0.00 0.09 $139.38 3.39Install Solarize Window Blinds Town Hall 17 2290.68 0.00 85.81 0.00 1.64 $5,283.00 13.57Install Solarize Window Blinds Library 31 648.09 0.00 0.00 37.35 0.43 $2,533.00 18.13Replace Bean Cooker w/ Propane Hwy Garage 42 160.00 17.80 0.00 -6.67 0.02 $1,200.00 5.32

Energy Conversion Project TitleBuilding(s) where Implemented

Finding Number

Electric Energy Avoided (KWH)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Estimated Installation Cost

Simple Payback

Add Economizer Fire Station 1 1912.68 0.00 0.00 0.00 0.64 $3,798.77 24.80Add Economizer Town Hall 20 3570.34 0.00 0.00 0.00 1.20 $7,597.53 26.57Add Heat Recovery unit Fire Station 2 546.48 0.00 52.49 0.00 0.72 $2,962.96 17.46Add Heat Recovery unit Town Hall 22 1214.40 0.00 116.64 0.00 1.59 $5,925.93 15.71Add Heat Recovery unit Library 30 607.20 0.00 0.00 71.78 0.62 $2,962.96 13.64Lighting/Lighting Control Upgrade Fire Station 4 2057.59 39.84 0.00 0.00 0.69 $4,127.68 6.11Lighting/Lighting Control Upgrade Transfer Station 10 124.80 1.20 0.00 0.00 0.04 $91.29 3.60Lighting/Lighting Control Upgrade Town Hall 19 292.36 3.72 0.00 0.00 0.10 $96.30 1.35Lighting/Lighting Control Upgrade Library 29 991.36 8.59 0.00 0.00 0.33 $760.49 4.01Lighting/Lighting Control Upgrade Historical Building 36 70.28 21.08 0.00 0.00 0.02 $420.74 74.76

* Gallons at the highway garage includes purchased fuel oil and waste oil

Recommendation, Cost and Savings Summary Tables

Operation and Maintenance Measures

Goal Levels Energy Usage

Capital Improvement Measures

Existing Energy Usage

Page 80: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Lighting/Lighting Control Upgrade Hwy Garage 37 8454.69 47.46 0.00 0.00 2.84 $3,856.58 3.00Lighting/Lighting Control Upgrade Madison Garage 44 2764.35 16.01 0.00 0.00 0.93 $2,990.43 7.01CO and CO2 Alarm Fire Station 8 0.00 0.00 0.00 0.00 0.00 $8,839.51 0.00CO and CO2 Alarm Hwy Garage 40 0.00 0.00 0.00 0.00 0.00 $8,839.51 0.00CO and CO2 Alarm Madison Garage 49 0.00 0.00 0.00 0.00 0.00 $8,839.51 0.00Vehicle Exhaust Extraction system Fire Station 9 0.00 0.00 0.00 0.00 0.00 $0.00 0.00Vehicle Exhaust Extraction system Hwy Garage 43 0.00 0.00 0.00 0.00 0.00 $0.00 0.00Vehicle Exhaust Extraction system Madison Garage 52 0.00 0.00 0.00 0.00 0.00 $0.00 0.00Controls Upgrade Transfer Station 11 0.00 0.00 0.00 75.96 0.44 $87.65 0.49Control Upgrade - Boiler Town Hall 21 0.00 0.00 67.96 0.00 0.69 $555.56 3.41Controls Upgrade - Boiler Controller Library 28 0.00 0.00 0.00 51.50 0.30 $871.60 7.20Weatherize front Stair well Town Hall 14 0.00 0.00 69.13 0.00 0.70 $790.20 4.76Weatherize Front Corner Town Hall 18 0.00 0.00 3.75 0.00 0.04 $51.31 5.70Weatherization- Insulation Repair Hwy Garage 39 0.00 0.00 381.02 0.00 3.87 $3,717.21 4.06Weatherization - Vapor Seal Repair Madison Garage 46 0.00 0.00 81.65 0.00 0.83 $1.23 0.01Weatherization - Insulation of Walls Madison Garage 48 0.00 0.00 63.50 0.00 0.64 $3,470.62 22.77Boiler Upgrade Town Hall 23 0.00 0.00 187.20 0.00 1.90 $10,185.19 22.67Boiler Upgrade Library 32 0.00 0.00 0.00 192.91 1.11 $10,185.19 22.47Waste Oil Heater Madison Garage 51 0.00 0.00 1200.00 0.00 0.00 $13,864.20 4.81Install Third zone on First Floor Town Hall 15 0.00 0.00 0.00 0.00 0.00 $1,773.83 0.00* Economizer savings are based on the addition of air conditioning to the fire house and not existing condition

Energy Conversion Project TitleBuilding(s) where Implemented

Finding Number

Electric Energy Avoided (KWH)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Total Estimated Installation Cost

Simple Payback

Thermal Solar Library 33 0.00 0.00 0.00 96.92 0.56 $5,061.73 22.22PV Solar All Buildings 53 0.00 0.00 0.00 0.00 0.00 $0.00 0.00

Thermal SolarAll Buildings - except Library 54 0.00 0.00 0.00 0.00 0.00 $0.00 0.00

Wind energy All Buildings 55 0.00 0.00 0.00 0.00 0.00 $0.00 0.00Combine Heat and Power All Buildings 56 0.00 0.00 0.00 0.00 0.00 $0.00 0.00District Heating All Buildings 57 0.00 0.00 0.00 0.00 0.00 $0.00 0.00Bio Energy All Buildings 58 0.00 0.00 0.00 0.00 0.00 $0.00 0.00

Energy Conversion Project TitleBuilding(s) where Implemented

Finding Number

Electric Energy Avoided (KWH)

Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Total Estimated Installation Cost

Simple Payback

Permanently Shut off electric heat Transfer Station 12 216.00 1.50 0.00 0.00 0.07 $1.23 0.03Remove less efficient refrigerator Town Hall 26 294.34 0.17 0.00 0.00 0.10 $1.23 0.05Yearly Energy Review All Buildings 59

Total Electric Energy Avoided (KWH)

Total Electric Demand Reduced (KW)

Fuel Oil Usage Avoided (Gallons)

Propane Usage Avoided (Gallons)

Metric Tons of CO2 Reduced

Total Estimated Installation Cost

Simple Payback

30080 166 2704 617 29 127839 10.25Total Reduction:

Renewable Energy Opportunities

Energy Management Improvement Opportunities

Total Project Summary per Building

Page 81: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Electric Usage, Electric Cost and Total Utility Cost by Building

31%

16%

1%

15%

19%

14%4%

Electric Cost by Building

Madison Tall Hall Madison Library Historical Building Madison Garage

Fire Station Highway Garage Transfer Station Trailer

35%

16%

0%

15%

19%

12% 3%

Electric Usage by Building

Madison Tall Hall Madison Library Historical Building Madison Garage

Fire Station Highway Garage Transfer Station Trailer

27%

15%

1%

23%

18%

12% 4%

Total Utility Cost by Building

Madison Tall Hall Madison Library Historical Building Madison Garage

Fire Station Highway Garage Transfer Station Trailer

Page 82: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Fuel Usage, Fuel Cost and Total Utility Cost by Building

22%

13%

0%

33%

17%

10% 5%

Fuel Cost by Building

Madison Tall Hall Madison Library Historical Building Madison GarageFire Station Highway Garage Transfer Station Trailer

17%

13%

0%

24%12%

30%4%

Fuel Usage by Building

Madison Tall Hall Madison Library Historical Building Madison GarageFire Station Highway Garage Transfer Station Trailer

27%

15%

1%

23%

18%

12% 4%

Total Utility Cost by Building

Madison Tall Hall Madison Library Historical Building Madison Garage

Fire Station Highway Garage Transfer Station Trailer

Page 83: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Town Hall

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Overall the R-Value of this building is in acceptable range. Several areas where repair of sealing and insulation were noted and are listed in the recommendation. The largest heat lost in this building is due to the chimney effect created by the open stairwell to old bell tower. Sealing this stairwell from the occupied space and bell tower will result in reduce energy usage.

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The Building is a wood frame building that was built in 1904 and was remodeled in 1999. The remodeling in 1999 was to use the basement and first floor of building as a town hall and police station. The remaining of the building is used as storage. The orginal building has a bell tower which is not used and should be sealed off from occuipied space of the building.

The retrofit recommendation include lighting, HVAC improvements, window covering and building envelope improvement and sealing. High priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 13 recommendations are being made for this building.

This building does not have any on-site renewable energy fit which would have less than a 10 year payback. This building has low energy usage due to good efficiency of occupied space and building space being only 50% occupied. If usage of this building increases the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are addressed later in this report.

The major HVAC equipment was installed in 1999 and should have a life of 20 years. Equipment replacement should be investigated in 2014 which is 5 years prior to end of expected equipment life. Equipment appears in good working condition and are operating at rated efficiency.

Overall the Indoor air quality of this building is very good with C02 and particle counts well below acceptable levels. It should be noted that the current air handling system is not in compliance with ASHRAE 62.1 however the occupancy rate of this building is below the rate used by ASHRAE for this Standard. Therefore it is not recommended that ventilation rate is increased at this time.

The temperature in this space is controlled by manual thermostats and humidity is manually controlled. Programmable thermostats would ensure the building is set back during un-occupied periods. Low humidity is addressed by a manual floor mounted humidifier since this is adequate for this building use, it is recommended that humidity control stays the same. The air handlers are controlled by Honeywell HZ 311 controller and boilers are controlled by Taco relay controller, addition of boiler reset control will produce additional energy savings

Page 84: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 243 (Millions of BTU/hr)

Cooling 15.5%Heating 59.0%Pumps 0.6%Lighting 11.7%Fans 2.2%Domestic Hot Water 2.3%Plug Load (Include Computers) 8.8%

Total 100%

5%

64%

1%

23%

3% 1% 3%

Town HallENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Dehumidifier Domestic Hot Water Plug Load (Include Computers)

Page 85: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Fuel Oil Electric Fuel Oil

Utility Costs $4,269 $2,543 $4,549 $2,241Utility Usage 29,220 1,024 29,870 1,140$ Cost/Unit (kWh, Therm, Gal) $0.15 $2.48 $0.15 $1.97

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Fuel Oil

Change in Cost -6% 13%Change in Usage -2% -10%Change in $ Cost/Unit -4% 26%Change in Degree Day 29% -9%

Fuel Oil usage increased in proportional to heating degree days increase, noting no change in heating performance. Electrical usage decrease despite a increase in cooling degree days, noting that nice weather keep people out of the town hall

Meter Data and Utility History Summary

Current Year Previous Year

Town of Madison New HampshireTown Hall

8/01/2009 to 7/31/2010

Electric63%

Fuel Oil37%

Utility Cost Comparison Current Year

Page 86: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Town Hall

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Town Hall 29,220 1,024 3,068 79 145 0.76

Building Type

Site EUIEst Regional

Rating Building79 76% Town Hall

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Office Building

Page 87: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 14 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Avg. Wind Diversity Constant Interior Avg OA Temp Hours per year5.76 7 0.7 1.08 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

69.13 Gallons

Implementation Plan

$790.20

# Units

Labor and Material Cost/Unit Total Source

16 20.98 335.681 93.98 93.982 72.7 145.4

Vapor/Air barrier. - 6 mil plasticEntrance Door Jam Kit

Fiberglass Insulation - roll 13

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electric Demand Savings Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Existing insulation on the walls between the third floor and the stairwell should be removed. Then a layer of 6 mil plastic should be installed to cover all of the wall from the floor side. The plastic should be kept tight to the wall and studs. Then a R-13 insulation should be installed in all the stud cavities in the wall.

Estimated cost for this installation:

Description

Estimated Annual Electrical Savings

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Weatherize front Stair well

Building: Town Hall

The stairwell in the front of the building creates a "chimney effect" since it is not completely sealed from the open bell tower above. The stairwell walls at the third level should be insulated and have a vapor/air barrier installed. The doors to the second and third levels should be weatherized and keep shut when not in use. It is recommended that a sign to keep the door shut be made up and attached to each door.

Page 88: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Picture of Wall to be insulated in Town Hall

Page 89: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 15 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$1,773.83

# Units Total Source1 280 2801 71.8 71.81 185 1851 900 900

23% Equivalent of 10% Overhead and 10% Profit$1,773.83

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

Honeywell TH4110D1007Honeywell ZD damper

Ductwork

DescriptionHoneywell HZ311 controller

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The existing Honeywell zone controller should be upgraded to a HZ311, ductwork with a zone damper should be installed from the unit to the adminitrator office ductwork. The ductwork currently serving this office should be cap at the office wall and made to serve the selctmen office, kitchette and bathroom. A new programable Honeywell TH4110D should be installed in that office. The thermostat in the administrator office should be moved to the selectmen office.

Estimated cost for this installation:

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Third zone on First Floor

Building: Town Hall

The zoning on the first floor creates comfort issues, and a additional zone to control the administrator office should be installed. Minimal energy saving will be achieved

Page 90: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 16 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

48.21 Gallons

Implementation Plan

$335.19

# Units Total Source5 54.3 271.50 0 0

23% Equivalent of 10% Overhead and 10% Profit$335.19

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total

DescriptionHoneywell TH4110D1007

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Honeywell T4110D1007 will install in place of exiting Honeywell TH5110D non programmable stat. Stat should be program only to heat the building to 55 degrees during unoccupied time and heat up to 68 degrees 1 1/2 hours prior to occupied times.

Estimated cost for this installation:

Energy Saving = BTU/hr of Boiler * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

150000 36Based on reducing the runtime of the furnace by 1 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Programmable T-Stats

Building: Town Hall

A programmable T-Stat should be install to replace the existing 5 non programable thermostats

Page 91: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 17 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Area Existing SHGC

New SHGC

Hour/day Days per year

304 0.85 0.45 10 208

2290.68 KWH0.00 KW 0.00 Gallons

85.81 Gallons

Implementation Plan

$5,283.00

# Units Total Source7 569 39834 325 1300

0% Equivalent of 10% Overhead and 10% Profit$5,283.00

Recommend Work to be performed by – Town employee

Owner Action – order blinds

Total

DescriptionInflector system Vertical 48X96Inflector system Vertical 42X54

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install Solarize Inflector vertical blind system on seven large window in the office area of the first floor and the four larger windows facing east on the basement floor. These vertical blinds will allow the natural light to enter the space while relecting the radiation heat back the direction that is desired. Note that this recommendation has a high priority because it will also increase comfort as long as saving energy.

Estimated cost for this installation:

197.6

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Solarize Window Blinds

Building: Town Hall

The east side of the building gets excessive solar gain during the morning while the west side which is shaded loses heat through the windows. The comfort issuse are amphide because the east side has more office equpment producing heat. Therefore the installation of inflector window treatments would reduce the solar gain on the east side while reflecting back the radiation heat on the west side. In addition it would improve the comfort in the code enforcement office by reflecting back the heat into his office.

Energy Savings Cooling = Area X (Existing SHGC – New SHGC) X(Incident Total Irradiance) X Hours/Day X Days/Year

Incient Total Irradiance

Page 92: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 18 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Avg. Wind Diversity Constant Interior Avg OA Temp Hours per year0.3125 7 0.7 1.08 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons3.75 Gallons

Implementation Plan

$51.31

# Units

Labor and Material Cost/Unit Total Source

1 20.26 20.261 21.3 21.3

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Weatherize Front Corner

Building: Town Hall

There is a draft in the front north west corner of the building between the main buildng and the vestibule. It is recmmended that a backer rod be calked into that corner to seal corner.

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Caulk a backer rod in the northwest corner between the main building and vestibule area.Caulk Backer should be Caulk Backer Rod, Polyethylene Closed Cell Foam, Color Gray, Height 1/2 In., Width 1/2 In., Length

Estimated cost for this installation:

DescriptionBacker Rod

Calking

Page 93: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 19 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

292.36 KWH3.72 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$160.49

# Units Total Source5 26 130

23% Equivalent of 10% Overhead and 10% Profit$160.49

$96.30

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Town Hall

The town hall lighting was retrofited a few years ago. There are some incandesent spot light that should be upgraded to solid state lighting.

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Please see attached detail lighting sheet and sketch for detail of work.

Total Prior to PSNH RebateTotal Post PSNH Rebate

Contractor Mark Up

Estimated cost for this installation:

Description9- Watt LED spot light

Page 94: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Replace Incandecent Floods with 9 Watt LED # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 3 75 300 67.5 0.225

Proposed: 3 9 300 8.1 0.027 59.4 0.198Proposed lighting controls:

2 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 3 100.8 2080 628.992 0.3024

Proposed: 3 100.8 2080 628.992 0.3024 0 0Proposed lighting controls:

3 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 100.8 2080 838.656 0.4032

Proposed: 4 100.8 2080 838.656 0.4032 0 0Proposed lighting controls:

4 Recommendation:

No Work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 11 832 18.304 0.022

Proposed: 2 11 832 18.304 0.022 0 0Proposed lighting controls:

5 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 3 100.8 2080 628.992 0.3024

Proposed: 3 100.8 2080 628.992 0.3024 0 0Proposed lighting controls:

6 Recommendation:

replace 65 Watt incandecent Floods with 9 watt LED # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 65 2080 270.4 0.13

Proposed: 2 9 2080 37.44 0.018 232.96 0.112Proposed lighting controls:

Lighting Audit Report Madison New Hampshire - Town Hall

Location:

Outdoor75 Watt Floods

9 watt LED floodNo work in this area

Location:

3 Blub F32T8/TK735

No WorkNo work in this area

Location:

Town Clerk

Hallway

No work in this areaNo work in this area

Location:

Rear Vestibule2- 11 Watt Incandescent

3 Blub F32T8/TK735

No work in this areaNo work in this area

Location:

Town Administrator3 Blub F32T8/TK735

No work in this areaNo work in this area

Location:

Kitchenette2 - 65 watt

9 watt LED floodNo work in this area

Page 95: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

7 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 100.8 2080 209.664 0.1008

Proposed: 1 100.8 2080 209.664 0.1008 0 0Proposed lighting controls:

8 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 3 100.8 2080 628.992 0.3024

Proposed: 3 100.8 2080 628.992 0.3024 0 0Proposed lighting controls:

9 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 100.8 2080 419.328 0.2016

Proposed: 2 100.8 2080 419.328 0.2016 0 0Proposed lighting controls:

10 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 11 2080 22.88 0.011

Proposed: 1 11 2080 22.88 0.011 0 0Proposed lighting controls:

11 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 100.8 2080 419.328 0.2016

Proposed: 2 100.8 2080 419.328 0.2016 0 0Proposed lighting controls:

12 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 67.2 2080 279.552 0.1344

Proposed: 2 67.2 2080 279.552 0.1344 0 0Proposed lighting controls:

Lighting Report - Town of Madison Town Hall - Page 2Location:

Bathroom3 Blub F32T8/TK735

No work in this areaNo work in this area

Location:

Office3 Blub F32T8/TK735

No work in this areaNo work in this area

Location:

Code Enforcement3 Blub F32T8/TK735

No work in this areaNone

Location:

Hallway - vestibule11 watt compact flouracent

None

Location:

Police Rear room3 Blub F32T8/TK735

No work in this areanone

Location:

Police Finger Printing2-F32TS SP35 U6

No work in this areaNone

Page 96: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

13 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 67.2 2080 559.104 0.2688

Proposed: 4 67.2 2080 559.104 0.2688 0 0

Proposed lighting controls:

14 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 67.2 2080 559.104 0.2688

Proposed: 4 67.2 2080 559.104 0.2688 0 0

Proposed lighting controls:

15 Recommendation:Lights should be removed

after installation of LED street light # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 8 67.2 2080 1118.21 0.5376

Proposed: 8 67.2 2080 1118.21 0.5376 0 0Proposed lighting controls:

16 Recommendation:

# of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 0 0 0 0 0

Proposed: 0 0 0 0 0 0 0Proposed lighting controls:

KW Rate: 12.82 0.08008Existing System Annual Monthly Annual $ Montly $

KWH: 6,669 $534

KW: 40.944 3.412 $524.90 $43.74

Proposed System Annual Monthly Annual $ Montly $

KWH: 6376.644 $511

KW: 37.224 3.102 $477.21 $39.77

Saved Annual Monthly Annual $ Montly $

KWH: 292.36 $23

KW: 3.72 0.31 $47.69 $3.97

Lighting Report - Town of Madison Town Hall - Page 3Location:

Police Office2-F32TS SP35 U6

No work in this area

None

Location:

Police Office/recp2-F32TS SP35 U6

No work in this area

None

Location:

Meeting Room2-F32TS SP35 U6

NoneNone

Location:

Lighting Cost/Payback AnalysisMadison New Hampshire - Town Hall

KWH Rate:

Page 97: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 20 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

CFM ConstantOA

EnthalpyInterior

EnthalpyHours per

day Days Per Year BTU/Ton KWH/Ton2800 13.8 15.5 26 4 24 12000 1.1

3570.34 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$7,597.53

# Units

Labor and Material Cost/Unit Total Source

2 480 $960.004 250 $1,000.004 161 $644.002 1200 $2,400.002 275 $550.002 300 $600.00

23% Equivalent of 10% Overhead and 10% ProfitTotal $7,597.53

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

ActuatorController and ProgrammingPower and Control Wiring LouverContractor Mark Up

Estimated cost for this installation:

DescriptionMixing Box Fabrication Damper

[[Energy Savings cooling = CFM / 13.8 X ( Interior EnthalpyAvg. - OA Enthalpy Cooling Season) X Hours per Day X Days/Year]/ 12000 Btu/ton]*1.1 KWH/ton

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Manufacturer does not sell a mixing box for this fan coil, therefore one will need to be built. Mixing air box should be constructed out of 22 ga sheet metal and have three opening equal to the return air opening of the furnace. One opening should be attached to the return of the fan coil, one to the return air duct and the other should be ducted to the outside. A louver with free air opening equal to the return air of the duct shall be installed in the outside wall of the building. Louver shall include screen to eliminate bugs from entering. A damper shall be installed at the connection to the outside air duct and the return air duct. These dampers shall be attached to a actuator which will be controlled by a stand alone air handler controller with economizer capability.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Add Economizer

Building: Town Hall

Install a mixed air box on back of the two air handlers serving the first floor and the busement along with economizer controls. This installation will reduce the amount of time the air conditioner will run and thus save energy.

Page 98: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 21 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

67.96 Gallons

Implementation Plan

$555.56

# Units Total Source1 450 4500 0 0

23% Equivalent of 10% Overhead and 10% Profit$555.56

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

See attached calculation sheet

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Control Upgrade - Boiler

Building: Town Hall

The esixiting TACO relay controller should be upgraded with a TACO add controller which will reset the water temperature

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install a TACO PC700 controller connected to existing TACO boiler relay controller.

Estimated cost for this installation:

Total Prior to PSNH Rebate

DescriptionTaco PC 700 controller

Contractor Mark Up

Page 99: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1.2 Boiler Temperature Reset

Baseline average boiler combustion efficiency is 80%Baseline average boiler jacket, Heat Exchanger and Piping loss is 10%The average boiler temperature is the temperature of the hot water produced

A. General Data for Baseline and Proposed Operation

B. Baseline Operation

1 Baseline annual boiler BC 1,024 Gallons Based on usage provided by Customer

2 Baseline average boiler tempera 205 deg F Based on Temp of Observed Operation3 Baseline ave boiler comb efficien 80.0% Verified4 Baseline average boiler jacket lo 10.0% Baxi Jacket Loss5 Baseline ave boiler overall efficie 70.0% = BBCE - BBJL6 Annual facility heating requireme 717 Gallons = BC x BBOE

C. Proposed Operation

1 Annual facility heating requireme 717 Gallons = BC x BBOE (same as baseline)2 Proposed Ave Boiler comb Eff(P 80% Lochinvar Published Efficiency3 Proposed average boiler temper 140 deg F Based Baxi Programming4 Average reduction in boiler temp 65 deg F = BT - PT5 Combustion efficiency improvem 1.8% = (PBCE-BBCE/BBCE) + BTR/36/100

6 Jacket loss reduction (JLR) 3.2% = BBJL x (1 - PT/BT)

7Condensing Boiler Jacket Size Reduction(CBJSR) 0.0%

Jacket Comparison of New to Existing Boilers

8 Proposed ave boiler overall effic 75.0%= BBCE + CEI - (BBJL - JLR)+(CBJSR*(BBJL-JLR)

9 Proposed boiler Condition (PC) 956 Gallons = AFHR/PBOE

see http://oee.nrcan.gc.ca/industrial/technical-info/'benchmarking/apma/chapter2.cfm?attr=24

Energy Savings Estimate for:Boiler Temperature Reset

Town HallMadison NH

Prepared by Elmer Arbogast10/8/2010

Page 100: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 22 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

CFM Constant

Avg. Discharge

TempAvg. OA

TempHours per

day Days Per Year BTU/Gallon 1000 1.08 70 28 4 72 140000

CFM ConstantOA

EnthalpyInterior

EnthalpyHours per

day Days Per Year BTU/Ton KWH/Ton1000 13.8 34 26 4 30 12000 1.1

1214.40 KWH0.00 KW 0.00 Gallons

116.64 Gallons

Implementation Plan

$5,925.93

# Units

Labor and Material Cost/Unit Total Source

2 1050 $2,100.002 900 $1,800.002 175 $350.002 275 $550.00

23% Equivalent of 10% Overhead and 10% ProfitTotal $5,925.93

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Drain PipingPower and Control Wiring Contractor Mark Up

Estimated cost for this installation:

DescriptionHeat Recovery Unit Ductwork and Diffuser

Energy Savings heating = CFM of Ventilation X 1.08 X (Avg. Unit Discharge Temperature – Avg. OA Temperature Heating Season) X Hours per Day X Days/YearEnergy Savings cooling = CFM of Ventilation / 13.8 X (Avg. OA Enthalpy Cooling Season - Avg. Unit Discharge Enthalpy) X Hours per Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

A Heat recovery unit equal to a Venmar HRV 600i should be installed in the space above the ceiling next to the fan coil on the first floor and in the boiler room on the lower level. The unit should be ducted into the offices on the first floor and into the meeting area and reception area of the police department on the lower level . Unit should be controlled by a time clock to run only when space is occupied.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Add Heat Recovery unit

Building: Town Hall

Install two 500 CFM heat recovery unit to supply air to the training area and office.

Page 101: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 23 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

187.20 Gallons

Implementation Plan

$10,185.19

# Units Total Source1 8250 82500 0 0

23% Equivalent of 10% Overhead and 10% Profit$10,185.19

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Boiler Upgrade

Building: Town Hall

The esixiting TACO relay controller should be upgraded with a TACO add controller which will reset the water temperature

See attached calculation sheet

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install a TACO PC700 controller connected to existing TACO boiler relay controller.

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

DescriptionBudarus

Page 102: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1.2 Boiler Temperature Reset

Baseline average boiler combustion efficiency is 80%Baseline average boiler jacket, Heat Exchanger and Piping loss is 10%The average boiler temperature is the temperature of the hot water produced

A. General Data for Baseline and Proposed Operation

B. Baseline Operation

1 Baseline annual boiler BC 1,024 Gallons Based on usage provided by Customer

2 Baseline average boiler temperature (BT) 205 deg F Based on Temp of Observed Operation3 Baseline ave boiler comb efficiency (BBCE) 80.0% Verified4 Baseline average boiler jacket loss (BBJL) 10.0% Baxi Jacket Loss5 Baseline ave boiler overall efficiency (BBOE) 70.0% = BBCE - BBJL6 Annual facility heating requirement (AFHR) 717 Gallons = BC x BBOE

C. Proposed Operation

1 Annual facility heating requirement (AFHR) 717 Gallons = BC x BBOE (same as baseline)2 Proposed Ave Boiler comb Eff(PBCE) 88% Lochinvar Published Efficiency3 Proposed average boiler temperature (PT) 140 deg F Based Baxi Programming4 Average reduction in boiler temperature (BTR) 65 deg F = BT - PT5 Combustion efficiency improvement (CEI) 11.8% = (PBCE-BBCE/BBCE) + BTR/36/100

6 Jacket loss reduction (JLR) 3.2% = BBJL x (1 - PT/BT)

7Condensing Boiler Jacket Size Reduction(CBJSR) 10.0%

Jacket Comparison of New to Existing Boilers

8 Proposed ave boiler overall efficiency (PBOE) 85.7%= BBCE + CEI - (BBJL - JLR)+(CBJSR*(BBJL-JLR)

9 Proposed boiler Condition (PC) 837 Gallons = AFHR/PBOE

see http://oee.nrcan.gc.ca/industrial/technical-info/'benchmarking/apma/chapter2.cfm?attr=24

Energy Savings Estimate for:Boiler Upgrade

Town HallMadison NH

Prepared by Elmer Arbogast10/8/2010

Page 103: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 24 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Area

Avg. Wind Speed

Diversity Factor

Constant Interior Temp

Avg OA Temp Hours per year

2.5 7 1 1.08 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

42.87 Gallons

Implementation Plan

$779.26

# Units Total Source0 71 00 108 00 93.5 00 65 06 72.7 436.26 32.5 195

23% Equivalent of 10% Overhead and 10% Profit$779.26

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Overhead Felt Entrance Door Jam Kit

Entrance Door Bottom Kit

Contractor Mark UpTotal

Estimated cost for this installation:

DescriptionOverhead - Top Seal Cap

Over Head - Perimeter SealOverhead - Bottom Seal

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Entire perimeter of the entrance doors should be sealed to eliminate heat loss, Sealing kits from American garage door supplies is in the appendix of this report.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Door Weather Stripping

Building: Town Hall

Over all the door weather striping is in poor condition at the town hall, weather stripping breaks down over time and with use. Therefore it is recommend that the door weather stripping at this building is set to a high priority at this time. For this type of building and use it is anticipated that the weather-stripping for these doors should be replaced every 8 to 10 years.

Page 104: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date 10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Town Hall

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:27:49 AMImage DateIR_1845.jpgImage Name0.95Emissivity0.0 °FReflected apparent

temperature3.2 ftObject Distance

Doors at town hall are leaking excessive heat.

Description

1 (1)

Page 105: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 25 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

730.00 KWH4.00 KW 0.01 Gallons0.00 Gallons

Implementation Plan

$165.68

# Units Total Source1 134.2 134.20 0 0

23% Equivalent of 10% Overhead and 10% Profit$165.68

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

DescriptionINTERMATIC Model # EI600WC

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Time Clock should be installed in the power wiring of the water heater and time clock set 1 hour prior to space being occupied and shut off 1/2 prior to space being unoccupied.

Estimated cost for this installation:

Energy Saving = KW of Water Heater * Reduce Runtime from time clock

Btu/hr Reduced Run Hours

4 182.5 Based on reducing the runtime of the water heater by 1/2 hour per day

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Timer on domestic hot water heater

Building: Town Hall

It was observed during the energy audit that the electric hot water heater was on when the space was not occupied. Installing a time clock will shut off the water heater when space is unoccupied but ensure hot water when needed.

Page 106: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 26 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Unit watt rateing

Hours of operation

168 8760

294.34 KWH0.17 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$1.23

# Units Total Source1 1 1

23% Equivalent of 10% Overhead and 10% Profit$1.23

Recommend Work to be performed by – Town Employees

Owner Action – Unplug refrigerator

Contractor Mark UpTotal Prior to PSNH Rebate

Diversity factor of compressor runtime

0.2

Estimated cost for this installation:

DescriptionRefrigerator removal

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Unplug White GE refrigerator

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Remove less efficient refrigerator

Building: Town Hall

In the police department rear room sits a white GE mini refrigerator which at the time of the audit was not being used but was plugged in. This unit uses more electric than larger refrigerator which site upon top of it. Therefore this GE refrigerator should be taken out of service.

Page 107: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Library

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Overall the R-Value of this building is in acceptable range. Several areas where repair of sealing were noted and are listed in the recommendations.

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The Building is a wood frame building that was built in 1994 and an addition was added in 2008. The building was built to be a library and was design for current use. Only issues noted with design of building is windows are not blocking UV light adequately resulting in potential fading of some books.

The retrofit recommendation include lighting, HVAC improvements, window covering and building envelope improvement and sealing. I am also recommending a comfort improvement recommendation of adding an additional zone to the first floor HVAC system. High priority recommendation all have a payback of less than 5 years or have health safety issues attached. A total of 10 recommendation are being made for this building.

This building does have a nice south facing roof where Thermal solar could be installed and would have less than a 10 year payback. Other onsite renewable are not recommended due to good efficiency of occupied space. If usage of this building increases the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are

The major HVAC equipment was installed in 1994 and should have a life of 20 years. Equipment replacement should be considered in 5 to 10 years as it approach the end of its service life. Equipment appears in good working condition and are operating at rated efficiency.

Overall the Indoor air quality of this building is very good with C02 and particle counts well below acceptable levels. It should be noted that since building does not have a central ventilating system is not in compliance with ASHRAE 62.1 however the occupancy rate of this building is below the rate used by ASHRAE for this Standard. Therefore it is recommended that heat recovery ventilation system be considered but at a low priority compared to other retrofits.

The temperature in this space is controlled by manual thermostats and humidity is manually controlled. Programmable thermostat would ensure the building is set back during un-occupied periods. High humidity is addressed by a manual floor mounted humidifier since this is adequate for this building use it is recommended that humidity control stays the same. Boiler has no centralized logic controller, the addition of boiler controller with reset control will produce additional energy

Page 108: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 126 (Millions of BTU/hr)

Cooling 5.2%Heating 64.2%Pumps 0.9%Lighting 23.1%Dehumidifier 2.4%Domestic Hot Water 1.2%Plug Load (Include Computers) 3.1%

Total 100%

5%

64%

1%

23%

3% 1% 3%

LibraryENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Dehumidifier Domestic Hot Water Plug Load (Include Computers)

Page 109: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Propane Electric Propane

Utility Costs $2,205 $1,527 $2,166 $2,427Utility Usage 13,255 776 13,045 891$ Cost/Unit (kWh, Therm, Gal) $0.17 $1.97 $0.17 $2.72

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Propane

Change in Cost 2% -37%Change in Usage 2% -13%Change in $ Cost/Unit 0% -28%Change in Degree Day 29% -9%

Propane usage decrease greatly in poportional to heating degree days increase, This was due to deliver not actual usage changes. Electrical usage had a slight increase with a large increase in cooling degree days, this can be partially contributed to this past summer was warmer but dryer than preivious summer

Meter Data and Utility History Summary

Town of Madison New HampshireLibrary

8/01/2009 to 7/31/2010Current Year Previous Year

Electric59%

Propane41%

Utility Cost Comparison Current Year

Page 110: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Library

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Library 13,255 891 2,509 50 87 0.90

Building Type

Site EUIEst Regional

Rating Building50 90% Library

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Library

Page 111: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 27 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW

64.29 Gallons0.00 Gallons

Implementation Plan

$335.19

# Units Total Source5 54.3 271.50 0 0

23% Equivalent of 10% Overhead and 10% Profit$335.19

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total

DescriptionHoneywell TH4110D1007

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Honeywell T4110D1007 will install in place of exiting Honeywell T87 non programmable stats. Stat should be program only to heat the building to 55 degrees during unoccupied time and heat up to 68 degrees 1 1/2 hour prior to schedule occupied times.

Estimated cost for this installation:

Energy Saving = BTU/hr of Boiler * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

130000 36Based on reducing the runtime of the furnace by 1 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Programmable T-Stats

Building: Library

A programmable T-Stat should be installed to replace the 5 existing non programable thermostats.

Page 112: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 28 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW

51.50 Gallons0.00 Gallons

Implementation Plan

$871.60

# Units Total Source1 450 4501 256 256

23% Equivalent of 10% Overhead and 10% Profit$871.60

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Controls Upgrade - Boiler Controller

Building: Library

The esixiting relays controlling the boiler should be ugraded to a TACO relay controller with a TACO add controller which will reset the water temperature

See attached calculation sheet

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install a TACO PC700 controller connected to existing TACO boiler relay controller.

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

DescriptionTaco PC 700 controller

Taco relay controller

Page 113: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1.2 Boiler Temperature Reset

Baseline average boiler combustion efficiency is 80%Baseline average boiler jacket, Heat Exchanger and Piping loss is 10%The average boiler temperature is the temperature of the hot water produced

A. General Data for Baseline and Proposed Operation

B. Baseline Operation

1 Baseline annual boiler BC 776 Gallons Based on usage provided by Customer

2 Baseline average boiler tempera 205 deg F Based on Temp of Observed Operation3 Baseline ave boiler comb efficien 80.0% Verified4 Baseline average boiler jacket lo 10.0% Baxi Jacket Loss5 Baseline ave boiler overall efficie 70.0% = BBCE - BBJL6 Annual facility heating requireme 543 Gallons = BC x BBOE

C. Proposed Operation

1 Annual facility heating requireme 543 Gallons = BC x BBOE (same as baseline)2 Proposed Ave Boiler comb Eff(P 80% Lochinvar Published Efficiency3 Proposed average boiler temper 140 deg F Based Baxi Programming4 Average reduction in boiler temp 65 deg F = BT - PT5 Combustion efficiency improvem 1.8% = (PBCE-BBCE/BBCE) + BTR/36/100

6 Jacket loss reduction (JLR) 3.2% = BBJL x (1 - PT/BT)

7Condensing Boiler Jacket Size Reduction(CBJSR) 0.0%

Jacket Comparison of New to Existing Boilers

8 Proposed ave boiler overall effic 75.0%= BBCE + CEI - (BBJL - JLR)+(CBJSR*(BBJL-JLR)

9 Proposed boiler Condition (PC) 724 Gallons = AFHR/PBOE

see http://oee.nrcan.gc.ca/industrial/technical-info/'benchmarking/apma/chapter2.cfm?attr=24

Energy Savings Estimate for:Boiler Temperature Reset

LibraryMadison NH

Prepared by Elmer Arbogast10/8/2010

Page 114: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 29 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

991.36 KWH8.59 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$760.49

# Units Total Source6 26 1561 460 460

23% Equivalent of 10% Overhead and 10% Profit$760.49$456.30

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Library

The Library lighting was retrofited a few years ago. There are some outdoor ights that should be upgraded to solid state lighting.

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Please see attached detail lighting sheet and sketch for detail of work.

Total Post PSNH Rebate

Solid State Wall Pack

Estimated cost for this installation:

Description9- Watt LED spot light

Contractor Mark UpTotal Prior to PSNH Rebate

Page 115: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Replace 400 watt Quartz with solid state lighting # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 400 2000 800 0.4

Proposed: 1 50 2000 100 0.05 700 0.35Proposed lighting controls:

2 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 30 100.8 728 2201.472 3.024

Proposed: 30 100.8 728 2201.472 3.024 0 0Proposed lighting controls:

3 Recommendation:

No work in this area # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 44 100.8 728 3228.8256 4.4352

Proposed: 44 100.8 728 3228.8256 4.4352 0 0Proposed lighting controls:

4 Recommendation:

Replace Incandecent flood with 9 watt solid state floods # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 75 300 90 0.3

Proposed: 4 9 300 10.8 0.036 79.2 0.264Proposed lighting controls:

5 Recommendation:

Replace Incandecent flood with 9 watt solid state floods # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 60 2080 124.8 0.06

Proposed: 1 9 2080 18.72 0.009 106.08 0.051Proposed lighting controls:

6 Recommendation:

Replace Incandecentwith 9 watt solid state # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 60 2080 124.8 0.06

Proposed: 1 9 2080 18.72 0.009 106.08 0.051Proposed lighting controls:

KW Rate: 12.82 0.08008

Lighting Audit Report Madison New Hampshire - Library

Location:

Outdoor400 watt quartz

9 watt LED flood

Location:

Basement2 Blub F32T8/TK735

No WorkNo work in this area

Location:

Upper level2 Blub F32T8/TK735

No work in this areaNo work in this area

Location:

60 watt

Outdoor floods75 Watt

No work in this areaNo work in this area

Location:

Upper rest room

Madison New Hampshire - Library

KWH Rate:

Lighting Cost/Payback Analysis

9 watt LED No work in this area

60 watt

9 watt LED No work in this area

Location:

Lower level restroom

Page 116: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Existing System Annual Monthly Annual $ Montly $

KWH: 6,570 $526

KW: 99.3504 8.2792 $1,273.67 $106.14

Proposed System Annual Monthly Annual $ Montly $

KWH: 5578.5376 $447

KW: 90.7584 7.5632 $1,163.52 $96.96

Saved Annual Monthly Annual $ Montly $

KWH: 991.36 $79

KW: 8.592 0.716 $110.15 $9.18

Page 117: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 30 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

CFM Constant

Avg. Discharge

TempAvg. OA

TempHours per

day Days Per Year BTU/Gallon 500 1.08 70 28 4 72 91000

CFM ConstantOA

EnthalpyInterior

EnthalpyHours per

day Days Per Year BTU/Ton KWH/Ton500 13.8 34 26 4 30 12000 1.1

607.20 KWH0.00 KW

71.78 Gallons0.00 Gallons

Implementation Plan

$2,962.96

# Units

Labor and Material Cost/Unit Total Source

1 1050 $1,050.001 900 $900.001 175 $175.001 275 $275.00

23% Equivalent of 10% Overhead and 10% ProfitTotal $2,962.96

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Drain PipingPower and Control Wiring Contractor Mark Up

Estimated cost for this installation:

DescriptionHeat Recovery Unit Ductwork and Diffuser

Energy Savings heating = CFM of Ventilation X 1.08 X (Avg. Unit Discharge Temperature – Avg. OA Temperature Heating Season) X Hours per Day X Days/YearEnergy Savings cooling = CFM of Ventilation / 13.8 X (Avg. OA Enthalpy Cooling Season - Avg. Unit Discharge Enthalpy) X Hours per Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

A Heat recovery unit equal to a Venmar HRV 600i should be installed in rear room on the lower level. The unit should be ducted the first floor and into the meeting area on the lower level . Unit should be controlled by a time clock to run only when space is occupied.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Add Heat Recovery unit

Building: Library

Install one 500 CFM heat recovery unit to supply air to the training area and office.

Page 118: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 31 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Area Existing SHGC

New SHGC

Hour/day Days per year

161.7 0.85 0.45 10 208

648.09 KWH0.00 KW

37.35 Gallons0.00 Gallons

Implementation Plan

$2,533.00

# Units Total Source9 125 11255 100 5004 77 3084 150 600

0% Equivalent of 10% Overhead and 10% Profit$2,533.00

Recommend Work to be performed by – Town employee

Owner Action – order blinds

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Solarize Window Blinds

Building: Library

This building has a lot of solar gain and therefore would benefit from solarize window blinds. Although energy saving is important in this application the elimnation of UV light which has the potential to damage books is the reason this finding has a high priority.

Energy Savings Cooling = Area X (Existing SHGC – New SHGC) X(Incident Total Irradiance) X Hours/Day X Days/Year

Incient Total Irradiance

105.105

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install Solarize Inflector vertical blind system on seven large window in the office area of the first floor and the four larger windows facing east on the basement floor. These vertical blinds will allow the natural light to enter the space while relecting the radiation heat back the direction that is desired. Note that this recommendation has a high priority because it will also increase comfort as long as saving energy.

Estimated cost for this installation:

DescriptionInflector system Roller shade 30x36Inflector system Roller shade 24x36

Contractor Mark UpTotal

Inflector system Roller shade 24x27Inflector system Roller shade 24x54

Page 119: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 32 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW

192.91 Gallons0.00 Gallons

Implementation Plan

$10,185.19

# Units Total Source1 8250 82500 0 0

23% Equivalent of 10% Overhead and 10% Profit$10,185.19

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Boiler Upgrade

Building: Library

The esixiting TACO relay controller should be upgraded with a TACO add controller which will reset the water temperature

See attached calculation sheet

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install a TACO PC700 controller connected to existing TACO boiler relay controller.

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

DescriptionLochinvar

Page 120: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1.2 Boiler Temperature Reset

Baseline average boiler combustion efficiency is 80%Baseline average boiler jacket, Heat Exchanger and Piping loss is 10%The average boiler temperature is the temperature of the hot water produced

A. General Data for Baseline and Proposed Operation

B. Baseline Operation

1 Baseline annual boiler BC 776 Gallons Based on usage provided by Customer

2 Baseline average boiler temperature (BT) 205 deg F Based on Temp of Observed Operation3 Baseline ave boiler comb efficiency (BBCE) 80.0% Verified4 Baseline average boiler jacket loss (BBJL) 10.0% Baxi Jacket Loss5 Baseline ave boiler overall efficiency (BBOE) 70.0% = BBCE - BBJL6 Annual facility heating requirement (AFHR) 543 Gallons = BC x BBOE

C. Proposed Operation

1 Annual facility heating requirement (AFHR) 543 Gallons = BC x BBOE (same as baseline)2 Proposed Ave Boiler comb Eff(PBCE) 94% Lochinvar Published Efficiency3 Proposed average boiler temperature (PT) 140 deg F Based Baxi Programming4 Average reduction in boiler temperature (BTR) 65 deg F = BT - PT5 Combustion efficiency improvement (CEI) 19.3% = (PBCE-BBCE/BBCE) + BTR/36/100

6 Jacket loss reduction (JLR) 3.2% = BBJL x (1 - PT/BT)

7Condensing Boiler Jacket Size Reduction(CBJSR) 10.0%

Jacket Comparison of New to Existing Boilers

8 Proposed ave boiler overall efficiency (PBOE) 93.2%= BBCE + CEI - (BBJL - JLR)+(CBJSR*(BBJL-JLR)

9 Proposed boiler Condition (PC) 583 Gallons = AFHR/PBOE

see http://oee.nrcan.gc.ca/industrial/technical-info/'benchmarking/apma/chapter2.cfm?attr=24

Energy Savings Estimate for:Boiler Upgrade

Town HallMadison NH

Prepared by Elmer Arbogast10/8/2010

Page 121: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 33 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Btu/day Diversity Factor

# of Units Weeks per year

Days per week

28000.00 1 1 36 7

0.00 KWH0.00 KW

96.92 Gallons0.00 Gallons

Implementation Plan

$5,061.73

# Units

Labor and Material Cost/Unit Total Source

1 2250 22501 1850 1850

23% Equivalent of 10% Overhead and 10% Profit$5,061.73

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Estimated cost for this installation:

DescriptionSun-Maxx 30

Contractor Mark UpTotal

Tank and controls

Energy Savings heating =Btu of Heating per day* Diversity Factor * Units * Weeks Per Year * Days Per week

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Install a themal solar collector model SunMaxx-30 Evacuated Tube or equalt on the south facing roof of the library. The installation shall include all pumps and piping ncessary to complete a working system including a storage tank, controls and conncection to existing system.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Thermal Solar

Building: Library

The library has a south facing roof that has the opertunity to install a solar hot water heater to help heat the space.

Page 122: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 34 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Area

Avg. Wind Speed

Diversity Factor

Constant Interior Temp

Avg OA Temp Hours per year

1.25 7 1 1.08 70 28 6048

0.00 KWH0.00 KW

32.97 Gallons0.00 Gallons

Implementation Plan

$779.26

# Units Total Source0 71 00 108 00 93.5 00 65 06 72.7 436.26 32.5 195

23% Equivalent of 10% Overhead and 10% Profit$779.26

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Overhead Felt Entrance Door Jam Kit

Entrance Door Bottom Kit

Contractor Mark UpTotal

Estimated cost for this installation:

DescriptionOverhead - Top Seal Cap

Over Head - Perimeter SealOverhead - Bottom Seal

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Entire perimeter of the entrance doors should be sealed to eliminate heat loss, Sealing kits from American garage door supplies is in the appendix of this report.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Door Weather Stripping

Building: Library

Over all the door weather striping is in fair condition at the town hall, weather stripping breaks down over time and with use. Therefore it is recommend that the door weather stripping at this building is set to a medium priority at this time. For this type of building and use it is anticipated that the weather-stripping for these doors should be replaced every 10 to 12 years.

Page 123: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date 10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NHAddress 317 Austin St #4 Site Address LibraryThermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:44:46 AMImage DateIR_1897.jpgImage Name0.95Emissivity0.0 °FReflected apparent

temperature3.2 ftObject Distance

Library doos are showing excessive heat loss

Description

1 (1)

Page 124: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 35 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

273.75 KWH1.50 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$139.38

# Units Total Source1 112.9 112.90 0 0

23% Equivalent of 10% Overhead and 10% Profit$139.38

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

DescriptionINTERMATIC Model # EI500WC

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Time Clock should be installed in the power wiring of the water heater and time clock set 1 hour prior to space being occupied and shut off 1/2 prior to space being unoccupied.

Estimated cost for this installation:

Energy Saving = KW of Water Heater * Reduce Runtime from time clock

Btu/hr Reduced Run Hours

1.5 182.5 Based on reducing the runtime of the water heater by 1/2 hour per day

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Timer on domestic hot water heater

Building: Library

It was observed during the energy audit that the electric hot water heater was on when the space was not occupied. Installing a time clock will shut off the water heater when space is unoccupied but ensure hot water when needed.

Page 125: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Fire Station

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

Overall the R-Value of this building is in acceptable range. Several areas where repair of sealing and insulation were noted and are listed in the recommendation.

The Building is a metal frame building was built in 1984 and is good condition. The building was built to be a fire station and the use of the building has not changed. At the time of the Audit the HVAC system was being updated to a more efficient propane fired system. Since this is not a full time fire station fuel usage is low per square footage compared to similar buildings used as full time

The retrofit recommendation include lighting, HVAC improvements, vending machine control and building envelope improvement and sealing. I am also recommending a CO and CO2 monitoring system be installed as a safety issues, it should be noted that this retrofit has the potential to increase energy cost. High priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 9 recommendation are being made for this building which have the potential to reduce the building.

This building does not have any on-site renewable energy fit which would have less than a 10 year payback. This is due mainly due to the low energy usage due to it part time status. If usage of this building increases the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are addressed later in this report.

The major HVAC equipment is being replace in 2010 and should have a life of 20 years. Since the equipment is new it is currently in good condition. At the time of the Audit the old oil fired unit was not removed, it should be removed and flue properly sealed.

Overall the Indoor air quality of this building is good. A couple of issues was noted during the Energy Audit. First the outside air connection for the new furnace serving the office and training room area was not connect and therefore compliance with ASHRAE 62.1 could not be confirmed. Second a major of the building is a garage area with out an exhaust extraction system and/or a CO or CO2 monitoring system. It is recommended that a exhaust extraction system and CO and CO2 monitoring system be installed.

The temperature in this space is controlled by manual thermostats and humidity is not controlled. Due to light usage a programmable thermostat with a timed override would ensure building is set back during un-occupied periods. Since humidity is not a concern with in this space due to climate and use it is recommended that humidity control stays the same.

Page 126: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 221 (Millions of BTU/hr)

Cooling 0.0%Heating 75.3%Pumps 0.0%Lighting 5.9%Fans 4.2%Domestic Hot Water 2.7%Plug Load (Include Computers) 11.9%

Total 100.0%

0%

75%

0%6%

4%3% 12%

Fire StationENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Fans Domestic Hot Water Plug Load (Include Computers)

Page 127: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Fuel Oil Electric Fuel Oil

Utility Costs $2,621 $1,905 $2,286 $2,550Utility Usage 15,984 775 13,086 1,189$ Cost/Unit (kWh, Therm, Gal) $0.16 $2.46 $0.17 $2.15

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Fuel Oil

Change in Cost 15% -25%Change in Usage 22% -35%Change in $ Cost/Unit -6% 15%Change in Degree Day 29% -9%

Fuel usage decreased greater than decrease in heating degree days. This most likely resulted in tank being left at a lower level due to planned retrofit. Electrical had a dramatic increase which most likely was a result of increase usage.

Meter Data and Utility History Summary

Town of Madison New HampshireFire Station

8/01/2009 to 7/31/2010Current Year Previous Year

Electric58%

Fuel Oil42%

Utility Cost Comparison Current Year

Page 128: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Fire Station

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Fire Station 15,984 1,189 3,168 70 105 0.74

Building Type

Site EUIEst Regional

Rating Building70 74% Fire Station

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Fire/Police Station

Page 129: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 1 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

CFM ConstantOA

EnthalpyInterior

EnthalpyHours per

day Days Per Year BTU/Ton KWH/Ton1200 13.8 15.5 26 4 30 12000 1.1

1912.68 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$3,798.77

# Units

Labor and Material Cost/Unit Total Source

1 480 $480.002 250 $500.002 161 $322.001 1200 $1,200.001 275 $275.001 300 $300.00

23% Equivalent of 10% Overhead and 10% ProfitTotal $3,798.77

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Power and Control Wiring

Contractor Mark Up

Louver

ActuatorController and Programming

Mixing Box FabricationDescription

[[Energy Savings cooling = CFM / 13.8 X ( Interior EnthalpyAvg. - OA Enthalpy Cooling Season) X Hours per Day X Days/Year]/ 12000 Btu/ton]*1.1 KWH/ton

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings

Finding Description:

Building:

Add Economizer

Fire Station

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Damper

Estimated Annual Fuel Oil Savings

Install a mixed air box on back of new furnace along with economizer controls. It should be noted that this will not save energy over existing condition since space is not air conditioned. However it will reduce the amount of time which an added air conditioner will run and thus save future energy.

Lennox does not sell a mixing box for this G61 Furnace, therefore one will need to be built. Mixing air box should be constructed out of 22 ga sheet metal and have three opening equal to the return air opening of the furnace. One opening should be attached to the return of the furnace, one to the return air duct and the other should be ducted to the outside. A louver with free air opening equal to the return air of the duct shall be installed in the outside wall of the building. Louver shall include screen to eliminate bugs from entering. A damper shall be installed at the connection to the outside air duct and the return air duct. These dampers shall be attached to a actuator which will be controlled by a stand alone air handler controller with economizer capability.

Estimated cost for this installation:

Page 130: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 2 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

CFM Constant

Avg. Discharge

TempAvg. OA

TempHours per

day Days Per Year BTU/Gallon 450 1.08 70 28 4 72 140000

CFM ConstantOA

EnthalpyInterior

EnthalpyHours per

day Days Per Year BTU/Ton KWH/Ton450 13.8 34 26 4 30 12000 1.1

546.48 KWH0.00 KW 0.00 Gallons

52.49 Gallons

Implementation Plan

$2,962.96

# Units

Labor and Material Cost/Unit Total Source

1 1050 $1,050.001 900 $900.001 175 $175.001 275 $275.00

23% Equivalent of 10% Overhead and 10% ProfitTotal $2,962.96

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Ductwork and Diffuser Drain PipingPower and Control Wiring

Energy Savings heating = CFM of Ventilation X 1.08 X (Avg. Unit Discharge Temperature – Avg. OA Temperature Heating Season) X Hours per Day X Days/YearEnergy Savings cooling = CFM of Ventilation / 13.8 X (Avg. OA Enthalpy Cooling Season - Avg. Unit Discharge Enthalpy) X Hours per Day X Days/Year

A Heat recovery unit equal to a Venmar HRV 600i should be installed in the space above the training area. The unit should be hung from upper ceiling support. The unit should be ducted to the training area and the office and balance for 410 CFM into the training area and 40 CFM into the office. Unit should be turned on if the light switch in the office or the training are is turned on.

Estimated cost for this installation:

DescriptionHeat Recovery Unit

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Add Heat Recovery unit

Building: Fire Station

Install a 450 CFM heat recovery unit to supply air to the training area and office.

Page 131: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 3 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

Open area

Air Transfer

RateDiversity

Factor ConstantInterior Temp Avg. OA Temp Hours per year

Day per year

32 10 1 1.08 70 28 4 30

0.00 KWH0.00 KW 0.00 Gallons

15.55 Gallons

Implementation Plan

$148.15

# Units

Labor and Material Cost/Unit Total Source

2 60 $120.0023% Equivalent of 10% Overhead and 10% Profit

Total $148.15

Recommend Work to be performed by – Town employees

Owner Action – Install with own work force

Contractor Mark Up

Estimated cost for this installation:

DescriptionPlastic

Energy Savings heating = Open Area X Air transfer rate X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Since the damaged area is above a drop ceiling placing back the insulation and installing plastic and taping to hard ceiling is the most cost effective method of solving this problem. This could be complete by town employees.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Repair holes in ceiling

Building: Fire Station

Repair solid ceiling above the drop ceiling in the training area of the Fire Station. Openings in the hard ceiling allows heated air to raise in to attic space. Please see pictures of opening in this report.

Page 132: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Picture of Damage to Hard Ceiling in Fire Station

Page 133: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 4 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

2057.59 KWH39.84 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$6,879.47

# Units Total Source7 61.62 431.341 65.35 65.35

4 975 39001 1175.68 1175.682 6 12

23% Equivalent of 10% Overhead and 10% Profit$6,879.47$4,127.68

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Fire Station

Lights in the fire station are T-12 fluorescents and incandescent bulbs and should be replaced with high efficient Fluorescents and LED Bulbs

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

It is my recommendation that the Town of Madison installs solid state lighting in the high bay garage area and high efficiency T-8 lamps in the office, training, kitchen and restrooms. This installation will allow the town to take advantage of the low installation cost of the T-8 while receiving the most benefits from the solid state lighting. These benefits include long life of 60,000 plus hours, smaller fixtures with more flexibility on location. This will allow the lights to be installed in a manor which will allow installation of the vehicle exhaust extraction system. It is also recommended that the outside lighting be replaced with solid state lighting. It is also recommend that occupancy sensors be installed. Please see attached detail lighting sheet and sketch.

Contractor Mark Up

LUMAPRO Model #: 2ZE23 LUMAPRO Model # 2UWU3

DuroSiteTM LED High Bay Fixture Options and Accessories Occupancy

Sensor Version With Oval Light Pattern

Total Prior to PSNH RebateTotal Post PSNH Rebate

13 Watt Compact Fluorescent

Estimated cost for this installation:

Description

Street Light

Page 134: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

No work in this area # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 6 100.8 832 503.194 0.6048

Proposed: 6 100.8 832 503.194 0.6048 0 0Proposed lighting controls:

2 Recommendation:

Training Center Switch 2 No work in this area # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 100.8 832 167.731 0.2016

Proposed: 2 100.8 832 167.731 0.2016 0 0Proposed lighting controls:

3 Recommendation:

Remove existing channel strip light and replace with two 22

Watt Circular fluorescent # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 F96T12/ 1 126 832 104.832 0.126

Proposed: 2 22 832 36.608 0.044 68.224 0.082Proposed lighting controls:

4 Recommendation: Remove incandescent fixture

and replace with 22 Watt Circular fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 75 832 62.4 0.075

Proposed: 1 22 832 18.304 0.022 44.096 0.053Proposed lighting controls:

5 Recommendation: Remove incandescent fixture

and replace with 22 Watt Circular fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 200 832 166.4 0.2

Proposed: 1 22 832 18.304 0.022 148.096 0.178Proposed lighting controls:

6 Recommendation: Remove incandescent fixture

and replace with 22 Watt Circular fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 100 832 83.2 0.1

Proposed: 1 22 832 18.304 0.022 64.896 0.078Proposed lighting controls:

Location:

1 - 100 Watt

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

No work in this area

Shower

No work in this area

Location:

Men's Rest Room2-100 watt bulb

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

No work in this area

Location:

Location:

Location:

Kitchen

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

No work in this area

3 Blub F32T8/TK735

No Work

3 Blub F32T8/TK735

No Work

Location:

1 - 75 Watt Incandescent

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

Women's Restroom

Lighting Audit Report Madison New Hampshire - Fire Station

No work in this area

No work in this area

Training Center - Switch 1

Page 135: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

7 Recommendation:Replace existing Incandescent

bulb with 13 watt compact fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 100 832 83.2 0.1

Proposed: 1 13 832 10.816 0.013 72.384 0.087Proposed lighting controls:

8 Recommendation:

Remove existing channel strip light and replace with two 22

Watt Circular fluorescent # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 126 832 104.832 0.126

Proposed: 2 22 832 36.608 0.044 68.224 0.082Proposed lighting controls:

9 Recommendation:

Remove existing channel strip light fixture and replace with

LED high bay fixture # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 5 122.4 832 509.184 0.612

Proposed:

2 150 624 187.2 0.3 321.984 0.312Proposed lighting controls:

10 Recommendation:

Remove existing channel strip light fixture # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 5 122.4 832 509.184 0.612

Proposed: 0 150 624 0 0 509.184 0.612Proposed lighting controls:

11 Recommendation:

Remove existing channel strip light fixture and replace with

LED high bay fixture # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 5 122.4 832 509.184 0.612

Proposed:

2 150 624 187.2 0.3 321.984 0.312Proposed lighting controls:

12 Recommendation:Remove exisitng T-12 fixture

and replace with T-8 strip fixture # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 126 832 104.832 0.126

Proposed: 1 58.8 832 48.9216 0.0588 55.9104 0.0672Proposed lighting controls:

Location:

3 Fd40T12/

LUMAPRO Model # 2UWU3 None

Location:

Shop area switch 2

None

2 F96T12/

Location:

Shop area switch 32 F96T12/

DuroSiteTM LED High Bay Fixture Options and Accessories Occupancy

Sensor Version With Oval Light Pattern Part # HB6C4T

LUMAPRO Model #: 2ZE23 - 22 Watt No work in this area

Location:

Shop area Switch 12 F96T12/

DuroSiteTM LED High Bay Fixture Options and Accessories Occupancy

Sensor Version With Oval Light Pattern Part # HB6C4T

Location:

Equipment Closet

No work in this area

1- 100 watt

1- 13 Watt

2 F96T12/

Lighting Report - Town of Madison Fire Station - Page 2

Fixture mounted occupancy sensor

Fixture mounted occupancy sensor

Upper Storage Area - Rear

Location:

Office

Page 136: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

13 Recommendation:Replace existing Incandescent

bulb with 13 watt compact fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 60 832 49.92 0.06

Proposed: 1 13 832 10.816 0.013 39.104 0.047

Proposed lighting controls:

14 Recommendation:Remove existing Mercury Vapor fixture and replace

with LED fixture # of FixturesAverage Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 250 2000 500 0.25

Proposed:1 110 2000 220 0.11 280 0.14

Proposed lighting controls:

15 Recommendation:Lights should be removed

after installation of LED street light # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 500 50 50 1

Proposed: 0 0 0 0 0 50 1Proposed lighting controls:

16 Recommendation:Lights should be removed

after installation of LED street light # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 3 90 50 13.5 0.27

Proposed: 0 0 0 0 0 13.5 0.27Proposed lighting controls:

KW Rate: 12.82 0.08008Existing System Annual Monthly Annual $ Montly $

KWH: 3,522 $282

KW: 60.9048 5.0754 $780.80 $65.07

Proposed System Annual Monthly Annual $ Montly $

KWH: 1464.0064 $117

KW: 21.0624 1.7552 $270.02 $22.50

Saved Annual Monthly Annual $ Montly $

KWH: 2057.5864 $165

KW: 39.8424 3.3202 $510.78 $42.56

None

Lighting Cost/Payback AnalysisMadison New Hampshire - Fire Station

KWH Rate:

Outdoor500 Watts Quartz

None

Location:

OutdoorIncandescent - Floods

1-60 watt

1- 13 Watt

None

Photothelic eye

Location:

Outdoor250 Watt Mercury Vapor

LITHONIA Model # ALX1 7000L SR3 MVOLT SPA DDBXD

Lighting Report - Town of Madison Fire Station - Page 3Location:

Location:

Back Storage Area - Front

None

Page 137: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 5 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

KW of Vending Machine

Reduce Hours of Operation

1.2 1314

2312.64 KWH0.08 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$395.06

# Units Total Source1 285 2851 35 35

23% Equivalent of 10% Overhead and 10% Profit$395.06

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Vending Mizer and Delamping

Building: Fire Station

Vending machine in kitchen area should have a vending mizer installed and display lights removed

Lamp removal

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Energy Savings = KW of equipment X Reduced Hours of Operation

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The lamps in vending machines are designed only to draw people to the machine to buy produce, where this machine is located it has little effect. Therefore these bulbs should be removed. A Vending mizer allows the machine to run at a slightly higher temperature and shuts down certain features when no one is present. When someone activate the occupancy sensor the machine returns to full operation and normal set temperature. The vending mizer has no effect on product or operation of machine.

Total Prior to PSNH Rebate

Watts of Lamps to be removed

84

Hours Per Year

8760

Contractor Mark Up

Estimated cost for this installation:

DescriptionVending Mizer

Page 138: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 6 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

19.29 Gallons

Implementation Plan

$88.64

# Units Total Source1 71.8 71.80 0 0

23% Equivalent of 10% Overhead and 10% Profit$88.64

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Programmable T-Stats

Building: Fire Station

A programmable T-Stat should be install for the furnace which serves the Office and training area. The Thermostat for the high bay area should be set at 60 degrees.

Energy Saving = BTU/hr of Furnace * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

60000 36

Estimated Annual Electrical Savings

Based on reducing the runtime of the furnace by 1 hour per week during the heating season

Estimated Annual Electric Demand Savings Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Honeywell T4110D1007 will install in place of exiting Honeywell TH5110D non programmable stat. Stat should be program only to heat the building to 48 degrees during unoccupied time and heat up to 68 degrees 1 hour prior to schedule events in the fire house.

Estimated cost for this installation:

DescriptionHoneywell TH4110D1007

Contractor Mark UpTotal Prior to PSNH Rebate

Page 139: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 7 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Area

Avg. Wind Speed

Diversity Factor

Constant Interior Temp

Avg OA Temp Hours per year

3.75 7 0.75 1.08 60 28 6048

0.00 KWH0.00 KW 0.00 Gallons

68.89 Gallons

Implementation Plan

$1,379.88

# Units Total Source3 71 2133 108 3243 93.5 280.53 65 1951 72.7 72.71 32.5 32.5

23% Equivalent of 10% Overhead and 10% Profit$1,379.88

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Door Weather Stripping

Building: Fire Station

Over all the door weather striping is in OK condition at the fire house, however weather stripping breaks down over time and with use. Therefore it is recommend that the door weather stripping at this building is set to a medium priority at this time. For this type of building and use it is anticipated that the weather-stripping for these doors should be replaced every 10 to 12 years.

Total

DescriptionOverhead - Top Seal Cap

Overhead Felt

Entrance Door Bottom Kit

Contractor Mark Up

Over Head - Perimeter SealOverhead - Bottom Seal

Entrance Door Jam Kit

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Entire perimeter of the overhead door and entrance doors should be sealed to eliminate heat loss, Sealing kits from American garage door supplies is in the appendix of this report. The overhead doors are showing heat loss through the joints where the panel come together. Installing Wool Felt with Backing Type Adhesive, Thickness 1/16 In, Width 2 In, F1 Grade, Density 1 Lbs/Sq Yd between each door panel will reduce heat loss with affecting operation of door.

Estimated cost for this installation:

Page 140: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would
Page 141: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 8 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$8,839.51

# Units Total Source1 7160 71601 220 220

23% Equivalent of 10% Overhead and 10% Profit$8,839.51

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Unit set up

Contractor Mark UpTotal Prior to PSNH Rebate

AEA quoted price

Estimated cost for this installation:

DescriptionGas Monitor Kele quoted price

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

It is recommended that a Honeywell Multi-point sample draw gas monitor model VASQN82 CO CO2 8XTL3 be installed in the fire station. Unit should be located outside of office area with draw points 3 feet above the floor in the shop area.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: CO and CO2 Alarm

Building: Fire Station

The fire station has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide could build up in this space and cause harm. It is recommended that a monitor capable of detecting and reporting CO and CO2 be installed in the space and trip an audible alarm. Note that this unit can be tied into future vehicle exhaust extraction system.

Page 142: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 9 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units Total Source

0% Equivalent of 10% Overhead and 10% Profit$0.00

Recommend Work to be performed by – Qualified Contractor after design by quilfied professional

Owner Action – Solicited Bids from quilfied design professional

This recommendation cost was not estimated

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

Description

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

This system should be design by quilfied design professional and therefore no implementation plan is given at this time

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Vehicle Exhaust Extraction system

Building: Fire Station

The fire station has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide and other gas could build up in this space and cause harm. It is recommend that a quilfied design professional design an system to extract these gases directly from the exhaust pipe of the trucks. This system should also include a gas monitoring system as outline in previous recommendation.

Page 143: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - HWY Garage

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Overall the R-Value of this building is in acceptable range. Major areas of insulation in need of repair were noted and are listed in the recommendation.

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The Building is a metal frame building was built in 1985 and is good condition. The building was built to be a hwy and the use of the building has not changed.

The retrofit recommendation include lighting, HVAC improvements, l and building envelope improvement and sealing. I am also recommending a CO and CO2 monitoring system be installed as a safety issues, it should be noted that this retrofit has the potential to increase energy cost. Hight priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 7 recommendation are being made for this building.

This building does not have any on-site renewable energy fit which would have less than a 10 year payback. This building has low purchased energy usage due use of waste oil heat If usage of this building changes the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are addressed later in this report.

Most of the heat for this building is supplied from a waste oil heater which is in its service life and is currently in good condition. The original oil fired heater should remain as backup only as it has reached it life expenancy and is in fair to poor condition.

Overall the Indoor air quality of this building is good. A couple of issues was noted during the Energy Audit. A major of the building is a garage area with out an exhaust extraction system and/or a CO or CO2 monitoring system. It is recommended that a exhaust extraction system and CO and CO2 monitoring system be installed.

The temperature in this space is controlled by manual thermostats and humidity is not controlled. Due to usage a programmable thermostat with a timed override would ensure building is set back during un-occupied periods. Since humidity is not a concern with in this space due to climate and use it is recommended that humidity control stays the same.

Page 144: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 291 (Millions of BTU/hr)

Cooling 0.0%Heating 88.5%Bean Cooker 0.5%Lighting 8.5%Fans 0.4%Domestic Hot Water 0.5%Plug Load (Include Computers) 1.6%

Total 100.0%

0%

89%

0% 8%

0%1%

2%

Hwy GarageENERGY USAGE PROFILE

Cooling Heating Bean Cooker Lighting Fans Domestic Hot Water Plug Load (Include Computers)

Page 145: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Fuel Oil Electric Fuel Oil

Utility Costs $1,839 $1,080 $2,463 $1,024Utility Usage 9,790 1,839 11,890 1,900$ Cost/Unit (kWh, Therm, Gal) $0.19 $0.59 $0.21 $0.54

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Fuel Oil

Change in Cost -25% 5%Change in Usage -18% -3%Change in $ Cost/Unit -9% 9%Change in Degree Day 29% -9%

Fuel oil usage decresed in line with heating degree day. Fuel oil usage includes purchased fuel usage and waste oil usage, Fuel cost is for purchased oil only. Electrical had a dramatic decrease which most likely was a result of decreased usage.

Meter Data and Utility History Summary

Town of Madison New HampshireHighway Garage

8/01/2009 to 7/31/2010Current Year Previous Year

Electric63%

Fuel Oil37%

Utility Cost Comparison Current Year

Page 146: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Highway Garage

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Highway Garage 9,790 1,839 2,400 121 149 0.50

Building Type

Site EUIEst Regional

Rating Building121 50% Highway Garage

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Fire/Police Station

Page 147: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 37 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

8454.69 KWH47.46 KW

0.00 Gallons0.00 Gallons

Implementation Plan

$28.00

# Units Total Source2 65.35 130.74 975 39001 1175.68 1175.681 28 28

23% Equivalent of 10% Overhead and 10% Profit$6,427.63$3,856.58

Recommend Work to be performed by – Qualified Contractor

Total Prior to PSNH RebateTotal Post PSNH Rebate

Street Light3 Watt LED

Contractor Mark Up

Estimated cost for this installation:

DescriptionLUMAPRO Model # 2UWU3

DuroSiteTM LED High Bay Fixture

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Please see attached detail lighting sheet and sketch for detail of work.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Hwy Garage

The Higway Garage is lite with T-12 flourencts and has old HID lights which are not used. It is my recommendation that these HID lights be replaced with soild state lighting and the Flourcents be removed in the shop area and replaced with high efficency flourcents in the office area.

Page 148: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Replace Mercury Vapor with Solid State # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 250 2000 500 0.25

Proposed: 1 110 2000 220 0.11 280 0.14Proposed lighting controls:

2 Recommendation:

Replace Flourecents with solid state lighting, locate new lights inplace of HID lights # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 14 157.5 2080 4586.4 2.205

Proposed: 4 150 2080 1248 0.6 3338.4 1.605Proposed lighting controls:

3 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 75 2080 156 0.075

Proposed: 1 3 2080 6.24 0.003 149.76 0.072Proposed lighting controls:

4 Recommendation:

Replace T-12 Flourcents withT-8 # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 84 2080 349.44 0.168

Proposed: 2 58.8 2080 244.608 0.1176 104.832 0.0504Proposed lighting controls:

5 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 14 157.5 2080 4586.4 2.205

Proposed: 2 58.8 40 4.704 0.1176 4581.7 2.0874Proposed lighting controls:

6 Recommendation:

0 # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 0 0 0 0 0

Proposed: 0 0 0 0 0 0 0Proposed lighting controls:

Lighting Audit Report Madison New Hampshire - Hwy Garage

Location:

Out side250 Watt Mercury Vapor

3 Watt LED

Location:

Shop Area2-F96-T22

DuroSiteTM LED High Bay Fixture Options and Accessories Occupancy

Sensor Version With Oval Light Pattern Part # HB6C4T

No work in this area

Location:

Bathroom75 watt

3 Watt LEDNo work in this area

Location:

0

Office2 - f40 T12

2 - F32 T8No work in this area

Location:

Storage Area above Office

0No work in this area

Lighting Cost/Payback Analysis

2-F96-T22

2 - F32 T8No work in this area

Location:

Lower level restroom

Page 149: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

KW Rate: 12.82 0.08008Existing System Annual Monthly Annual $ Montly $

KWH: 10,178 $815

KW: 58.836 4.903 $754.28 $62.86

Proposed System Annual Monthly Annual $ Montly $

KWH: 1723.552 $138

KW: 11.3784 0.9482 $145.87 $12.16

Saved Annual Monthly Annual $ Montly $

KWH: 8454.688 $677

KW: 47.4576 3.9548 $608.41 $50.70

Madison New Hampshire - Hwy Garage

KWH Rate:

Page 150: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 38 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

56.25 Gallons

Implementation Plan

$88.64

# Units Total Source1 71.8 71.80 0 0

23% Equivalent of 10% Overhead and 10% Profit$88.64

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total

DescriptionHoneywell TH4110D1007

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Honeywell T4110D1007 will install in place of exiting Honeywell T87 non programmable stat. Stat should be program only to heat the building to 55 degrees during unoccupied time and heat up to 68 degrees 1 hour prior to schedule occupied times.

Estimated cost for this installation:

Energy Saving = BTU/hr of Boiler * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

350000 18Based on reducing the runtime of the furnace by 1/2 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Programmable T-Stat

Building: Hwy Garage

A programmable T-Stat should be installed to replace the existing non programable thermostat.

Page 151: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 39 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Area Existing U-value

New U-value

Interior Temp

Avg OA Temp

Hours per year

840 0.75 0.55 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

381.02 Gallons

Implementation Plan

$1,680.00

$3,717.21

# Units

Material Total Source

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Weatherization- Insulation Repair

Building: Hwy Garage

The insulation in the walls of the Hwy Garage have dropped severly and needs to be replaced.

Estimated cost for this installation:

Description

Building Envelope R-Value improvement – including WindowsEnergy Savings heating = Area X (Existing U-Value – New U-Value) X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = Area X (Existing U-Value – New U-Value) X (Avg. OA Temperature Cooling Season - Interior Temperature) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Remove the insterior wall panels to expose the damaged insulation, and remove the insulation. The removal of the panels should be done in such a manor that they can be reused. Then install R-13 fiberglass roll insullation and a 6 mil plastic vapor/air barrier. Reinstall wall panels

Estimated cost for this installation:

Page 152: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Hwy Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:36:13 AMImage DateIR_1875.jpgImage Name0.95Emissivity0.0 °FReflected apparent

temperature3.2 ftObject Distance

Hwy Garage is showing insulation damage in all walls.

Description

1 (3)

Page 153: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Hwy Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:38:52 AMImage DateIR_1891.jpgImage Name0.95Emissivity77.0 °FReflected apparent

temperature3.2 ftObject Distance

Description

2 (3)

Page 154: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Hwy Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:38:06 AMImage DateIR_1885.jpgImage Name0.95Emissivity77.0 °FReflected apparent

temperature3.2 ftObject Distance

Description

3 (3)

Page 155: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 40 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$8,839.51

# Units Total Source1 7160 71601 220 220

23% Equivalent of 10% Overhead and 10% Profit$8,839.51

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

DescriptionGas Monitor Kele quoted priceUnit set up AEA quoted price

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

It is recommended that a Honeywell Multi-point sample draw gas monitor model VASQN82 CO CO2 8XTL3 be installed in the Garage. Unit should be located outside of office area with draw points 3 feet above the floor in the shop area.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: CO and CO2 Alarm

Building: Hwy Garage

The Hwy Garage has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide could build up in this space and cause harm. It is recommended that a monitor capable of detecting and reporting CO and CO2 be installed in the space and trip an audible alarm. Note that this unit can be tied into future vehicle exhaust extraction system.

Page 156: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 41 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Area Avg. Wind Speed

Diversity Factor

Constant Interior Temp

Avg OA Temp Hours per year

1.13 7 1 1.08 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

29.68 Gallons

Implementation Plan

$546.54

# Units Total Source1 71 711 108 1081 93.5 93.51 65 651 72.7 72.71 32.5 32.5

23% Equivalent of 10% Overhead and 10% Profit$546.54

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Overhead Felt Entrance Door Jam Kit

Entrance Door Bottom Kit

Contractor Mark UpTotal

Estimated cost for this installation:

DescriptionOverhead - Top Seal Cap

Over Head - Perimeter SealOverhead - Bottom Seal

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Entire perimeter of the entrance doors should be sealed to eliminate heat loss, Sealing kits from American garage door supplies is in the appendix of this report.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Door Weather Stripping

Building: Hwy Garage

Over all the door weather striping is in poor condition at the town hall, weather stripping breaks down over time and with use. Therefore it is recommend that the door weather stripping at this building is set to a medium priority at this time. For this type of building and use it is anticipated that the weather-stripping for these doors should be replaced every 10 to 12 years.

Page 157: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Hwy Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:36:45 AMImage DateIR_1879.jpgImage Name0.95Emissivity0.0 °FReflected apparent

temperature3.2 ftObject Distance

Hwy garage door is showing heat loss.

Description

1 (1)

Page 158: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 42 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Unit watt rateing

Hours of operation

168 8760

160.00 KWH17.80 KW -6.67 Gallons0.00 Gallons

Implementation Plan

$1,200.00

# Units Total Source1 1200 1200

0% Equivalent of 10% Overhead and 10% Profit$1,200.00

Recommend Work to be performed by – Town Employees

Owner Action – Unplug refrigerator

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Replace Bean Cooker w/ Propane

Building: Hwy Garage

The town of Madison uses an electric cooker to cook beans each August. This casuses the demand at the Hwy Garage to rasie by 17.8 KW at a rate of $12.83 per KW. This results in a demand charge of $228.38 and the electric used could be replaced with 6.67 gallons of propane at a charge of $15.67

Diversity factor of compressor runtime

0.2

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated Annual Fuel Oil Savings

A specfic cooker was not choosen to replace electric cooker, however an allowance of $1,200.00 was estimated to purchase a new propane fired cooker.

Estimated cost for this installation:

DescriptionAllowance for New Cooker

Page 159: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 43 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units Total Source

0% Equivalent of 10% Overhead and 10% Profit$0.00

Recommend Work to be performed by – Qualified Contractor after design by quilfied professional

Owner Action – Solicited Bids from quilfied design professional

Estimated cost for this installation: This recommendation cost was not estimated

Description

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

This system should be design by quilfied design professional and therefore no implementation plan is given at this time

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Vehicle Exhaust Extraction system

Building: Hwy Garage

The Hwy Garage has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide and other gas could build up in this space and cause harm. It is recommend that a quilfied design professional design an system to extract these gases directly from the exhaust pipe of the trucks. This system should also include a gas monitoring system as outline in previous recommendation.

Page 160: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Madison Garage

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Overall the R-Value of this building is in acceptable range. Areas of insulation in need of repair were noted and are listed in the recommendation.

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The Building is a metal frame building was built in 1968 and is good condition. The building was built to be a garage and the use of the building has not changed. Part of this building is used for Madison TV and fits well as an energy user withing this building.

The retrofit recommendation include lighting, HVAC improvements, l and building envelope improvement and sealing. I am also recommending a CO and CO2 monitoring system be installed as a safety issues, it should be noted that this retrofit has the potential to increase energy cost. High priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 10 recommendation are being made for this building.

This building does not have any on-site renewable energy fit which would have less than a 10 year payback. This building has a potential to lower its purchased energy usage by using waste oil to heat If usage of this building changes the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are addressed later in this report.

Most of the heat for this building is supplied from a waste oil heater which is in its service life and is currently in good condition. The original oil fired heater should remain as backup only as it has reached it life expenancy and is in fair to poor condition.

Overall the Indoor air quality of this building is good. A couple of issues was noted during the Energy Audit. A major of the building is a garage area with out an exhaust extraction system and/or a CO or CO2 monitoring system. It is recommended that a exhaust extraction system and CO and CO2 monitoring system be installed.

The temperature in this space is controlled by manual thermostats and humidity is not controlled. Due to usage a programmable thermostat with a timed override would ensure building is set back during un-occupied periods. Since humidity is not a concern with in this space due to climate and use it is recommended that humidity control stays the same.

Page 161: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 255 (Millions of BTU/hr)

Cooling 0.0%Heating 83.2%Pumps 0.0%Lighting 9.7%Fans 0.4%Domestic Hot Water 0.6%Plug Load (Include Computers) 6.1%

Total 100.0%

0%

83%

0% 10%

0%

1%

6%

Madison GarageENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Fans Domestic Hot Water Plug Load (Include Computers)

Page 162: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Fuel Oil Electric Fuel Oil

Utility Costs $2,104 $3,723 $2,133 $5,611Utility Usage 12,509 1,514 13,334 2,133$ Cost/Unit (kWh, Therm, Gal) $0.17 $2.46 $0.16 $2.63

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Fuel Oil

Change in Cost -1% -34%Change in Usage -6% -29%Change in $ Cost/Unit 5% -7%Change in Degree Day 29% -9%

Fuel usage decreased dremactically due to insulation of roof. Electrical decreased slightly, since this is a mostly un air conditioned building this decrease is based on a slight decrease in light and plug load.

Meter Data and Utility History Summary

Town of Madison New HampshireMadison Garage

8/01/2009 to 7/31/2010Current Year Previous Year

Electric36%

Fuel Oil64%

Utility Cost Comparison Current Year

Page 163: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Madison Garage

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Madison Garage 12,509 1,514 4,200 61 81 0.80

Building Type

Site EUIEst Regional

Rating Building61 80% Madison Garage

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Fire/Police Station

Page 164: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 44 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

2764.35 KWH16.01 KW

0.00 Gallons0.00 Gallons

Implementation Plan

$2,990.43

# Units Total Source4 65.35 261.44 650 26001 1175.68 1175.681 28 28

23% Equivalent of 10% Overhead and 10% Profit$4,984.05$2,990.43

Recommend Work to be performed by – Qualified Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Madison Garage

The Higway Garage is lite with T-12 flourencts and has old HID lights which are not used. It is my recommendation that these HID lights be replaced with soild state lighting and the Flourcents be removed in the shop area and replaced with high efficency flourcents in the office area.

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Please see attached detail lighting sheet and sketch for detail of work.

Estimated cost for this installation:

DescriptionLUMAPRO Model # 2UWU3

22" HID - LED Retrofit

Street Light 3 Watt LED

Contractor Mark UpTotal Prior to PSNH RebateTotal Post PSNH Rebate

Page 165: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Replace Mercury Vapor with Solid State # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 250 2000 500 0.25

Proposed: 1 110 2000 220 0.11 280 0.14Proposed lighting controls:

2 Recommendation:

Replace Flourecents with solid state lighting, locate new lights inplace of HID lights # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 400 2080 3328 1.6

Proposed: 4 150 2080 1248 0.6 2080 1Proposed lighting controls:

3 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 75 2080 156 0.075

Proposed: 1 3 2080 6.24 0.003 149.76 0.072Proposed lighting controls:

4 Recommendation:

Replace T-12 Flourcents withT-8 # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 84 2080 349.44 0.168

Proposed: 2 58.8 2080 244.608 0.1176 104.832 0.0504Proposed lighting controls:

5 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 75 2080 156 0.075

Proposed: 1 3 2080 6.24 0.003 149.76 0.072Proposed lighting controls:

6 Recommendation:

0 # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 0 0 0 0 0

Proposed: 0 0 0 0 0 0 0Proposed lighting controls:

Lighting Audit Report Madison New Hampshire - Madison Garage

Location:

Out side250 Watt Mercury Vapor

LED Street light

Location:

Shop Area400 Watt HID

HID - LED retrofit kitNo work in this area

Location:

Bathroom75 watt

3 Watt LEDNo work in this area

Location:

0

Madison TV2 - f40 T12

2 - F32 T8No work in this area

Location:

Storage

0No work in this area

Lighting Cost/Payback AnalysisMadison New Hampshire - Madison Garage

75 watt

3 Watt LEDNo work in this area

Location:

Lower level restroom

Page 166: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

KW Rate: 12.82 0.08008Existing System Annual Monthly Annual $ Montly $

KWH: 4,489 $360

KW: 26.016 2.168 $333.53 $27.79

Proposed System Annual Monthly Annual $ Montly $

KWH: 1725.088 $138

KW: 10.0032 0.8336 $128.24 $10.69

Saved Annual Monthly Annual $ Montly $

KWH: 2764.352 $221

KW: 16.0128 1.3344 $205.28 $17.11

KWH Rate:

Page 167: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 45 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

54.64 Gallons

Implementation Plan

$88.64

# Units Total Source1 71.8 71.80 0 0

23% Equivalent of 10% Overhead and 10% Profit$88.64

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total

DescriptionHoneywell TH4110D1007

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Honeywell T4110D1007 will install in place of exiting Honeywell T87 non programmable stat. Stat should be program only to heat the building to 55 degrees during unoccupied time and heat up to 68 degrees 1 hour prior to schedule occupied times.

Estimated cost for this installation:

Energy Saving = BTU/hr of Boiler * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

340000 18Based on reducing the runtime of the furnace by 1/2 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Install Programmable T-Stat

Building: Madison Garage

A programmable T-Stat should be installed to replace the existing non programable thermostat.

Page 168: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 46 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Area Existing U-value

New U-value

Interior Temp

Avg OA Temp

Hours per year

720 0.6 0.55 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

81.65 Gallons

Implementation Plan

$1.23

# Units

Material Total Source

Instruct insulation contractor to repair vapor barrier

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Weatherization - Vapor Seal Repair

Building: Madison Garage

Insulation was installed in the ceiling of the HWY garage and a vapor barrier was install however it showed signs that it leaked and allowed condensation to form on the steel of the building. This should be repair by the existing contractor and therefore no cost in included in this audit.

Estimated cost for this installation:

Description

Building Envelope R-Value improvement – including WindowsEnergy Savings heating = Area X (Existing U-Value – New U-Value) X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = Area X (Existing U-Value – New U-Value) X (Avg. OA Temperature Cooling Season - Interior Temperature) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Page 169: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 47 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

273.75 KWH1.50 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$139.38

# Units Total Source1 112.9 112.90 0 0

23% Equivalent of 10% Overhead and 10% Profit$139.38

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

DescriptionINTERMATIC Model # EI500WC

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Time Clock should be installed in the power wiring of the water heater and time clock set 1 hour prior to space being occupied and shut off 1/2 prior to space being unoccupied.

Estimated cost for this installation:

Energy Saving = KW of Water Heater * Reduce Runtime from time clock

Btu/hr Reduced Run Hours

1.5 182.5 Based on reducing the runtime of the water heater by 1/2 hour per day

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Timer on domestic hot water heater

Building: Madison Garage

It was observed during the energy audit that the electric hot water heater was on when the space was not occupied. Installing a time clock will shut off the water heater when space is unoccupied but ensure hot water when needed.

Page 170: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 48 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Area Existing U-value

New U-value

Interior Temp

Avg OA Temp

Hours per year

140 0.75 0.55 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

63.50 Gallons

Implementation Plan

$3,470.62

# Units

Material Total Source

Install 2" x 8' x 4' Insulated Sheathing on the interior of the wall of the garage. The insulation should be installed in such a manor that thewall's metal support structure is covered.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Weatherization - Insulation of Walls

Building: Madison Garage

The wall beam of the madison garage should be insulated.

Estimated cost for this installation:

Description

Building Envelope R-Value improvement – including WindowsEnergy Savings heating = Area X (Existing U-Value – New U-Value) X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = Area X (Existing U-Value – New U-Value) X (Avg. OA Temperature Cooling Season - Interior Temperature) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Page 171: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date 10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Madison Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

FLIR T200_ WesternCamera Model9/15/2010 10:53:28 AMImage DateIR_1931.jpgImage Name0.95Emissivity0.0 °FReflected apparent

temperature3.2 ftObject Distance

Wall beams are losing excessive heat through siding connection points.

Description

1 (1)

Page 172: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 49 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$8,839.51

# Units Total Source1 7160 71601 220 220

23% Equivalent of 10% Overhead and 10% Profit$8,839.51

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated cost for this installation:

DescriptionGas Monitor Kele quoted priceUnit set up AEA quoted price

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

It is recommended that a Honeywell Multi-point sample draw gas monitor model VASQN82 CO CO2 8XTL3 be installed in the Garage. Unit should be located outside of office area with draw points 3 feet above the floor in the shop area.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: CO and CO2 Alarm

Building: Madison Garage

The Madison Garage has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide could build up in this space and cause harm. It is recommended that a monitor capable of detecting and reporting CO and CO2 be installed in the space and trip an audible alarm. Note that this unit can be tied into future vehicle exhaust extraction system.

Page 173: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 50 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

Open Area Avg. Wind Speed

Diversity Factor

Constant Interior Temp

Avg OA Temp Hours per year

2.25 7 1 1.08 70 28 6048

0.00 KWH0.00 KW 0.00 Gallons

59.35 Gallons

Implementation Plan

$546.54

# Units Total Source1 71 711 108 1081 93.5 93.51 65 651 72.7 72.71 32.5 32.5

23% Equivalent of 10% Overhead and 10% Profit$546.54

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Overhead Felt Entrance Door Jam Kit

Entrance Door Bottom Kit

Contractor Mark UpTotal

Estimated cost for this installation:

DescriptionOverhead - Top Seal Cap

Over Head - Perimeter SealOverhead - Bottom Seal

Energy Savings heating = Open Area X Avg. Wind Speed X Diversity Factor X 1.08 X (Interior Temperature – Avg. OA Temperature Heating Season) X Hours/day X Days/YearEnergy Savings Cooling = [(Open Area X Avg. Wind Speed X Diversity Factor)/13.8] X (Avg. OA Enthalpy Cooling Season - Interior Enthalpy) X Hours/Day X Days/Year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

The Entire perimeter of the entrance doors should be sealed to eliminate heat loss, Sealing kits from American garage door supplies is in the appendix of this report.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Door Weather Stripping

Building: Madison Garage

Over all the door weather striping is in poor condition at the town hall, weather stripping breaks down over time and with use. Therefore it is recommend that the door weather stripping at this building is set to a high priority at this time. For this type of building and use it is anticipated that the weather-stripping for these doors should be replaced every 8 to 10 years.

Page 174: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Inspection Report

Report Date 10/11/2010

Company Arbogast Energy Auditing Customer Town of Madison NH

Address 317 Austin St #4 Site Address Madison Garage

Thermographer Elmer Arbogast Contact Person Sue Stacy

Image and Object Parameters Text Comments

Description

Madison Garage door is leaking excessive heat out the top seal.

1 (1)

Page 175: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 51 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons

1200.00 Gallons

Implementation Plan

$13,864.20

# Units Total Source1 7495 74951 1800 18001 375 3751 1560 1560

23% Equivalent of 10% Overhead and 10% Profit$13,864.20

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Waste Oil Heater

Building: Madison Garage

The town of Madison already burns waste oil to heat the Hwy garage, if the Hwy garage effiecency is improved than the waste oil could be burned at the Madison Garage. This would reduce the need to purchase #2 fuel oil.

Oil Piping

Unit will replace 1300 gallons of purchased fuel.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Clean Burn CB2500 used-oil(waste oil) furnace with 250 gallon tank, tank stands,tank drain, pump mount, draw assembly, gauge, copper line, sheething, and pump wiring should be installed in the north east corner of the garage utilizing exisitng exhaust hole.

Contractor Mark UpTotal Prior to PSNH Rebate

Exhaust VentingPower and Control wiring

Estimated cost for this installation:

DescriptionClean Burn CB 2500

Page 176: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 52 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality YesComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units Total Source

0% Equivalent of 10% Overhead and 10% Profit$0.00

Recommend Work to be performed by – Qualified Contractor after design by quilfied professional

Owner Action – Solicited Bids from quilfied design professional

Estimated cost for this installation: This recommendation cost was not estimated

Description

Contractor Mark UpTotal Prior to PSNH Rebate

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

This system should be design by quilfied design professional and therefore no implementation plan is given at this time

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Vehicle Exhaust Extraction system

Building: Madison Garage

The MadisonGarage has vehicle which run inside the building dangerous level of Carbon Monoxide and Carbon Dioxide and other gas could build up in this space and cause harm. It is recommend that a quilfied design professional design an system to extract these gases directly from the exhaust pipe of the trucks. This system should also include a gas monitoring system as outline in previous recommendation.

Page 177: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Historical Building

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality)

Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

R-Value of this building was not measure since it is not a conditioned space.

N/A

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The Building is a wood frame building was built in 1898 and is used as a museum.

The retrofit recommendation include lighting improvemen. High priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 1 recommendation are being made for this building which have the potential to reduce the building.

This building does not have any on-site renewable energy fit which would have less than a 10 years. If usage of this building increases the addition of on-site renewable should be reviewed with new usage. On-site renewable energy sources for all buildings are addressed later in this report.

N/A

N/A

N/A

Page 178: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 293 (Thousand of BTU/hr)

Cooling 0.0%Heating 0.0%Pumps 0.0%Lighting 91.3%Fans 8.7%Domestic Hot Water 0.0%Plug Load (Include Computers) 0.0%

Total 100.0%

0% 0%0%

91%

9%

0%0%

Historical BuildingENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Fans Domestic Hot Water Plug Load (Include Computers)

Page 179: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Fuel Oil Electric Fuel Oil

Utility Costs $147 $0 $155 $0Utility Usage 86 0 140 0$ Cost/Unit (kWh, Therm, Gal) $1.71 $0.00 $1.11 $0.00

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Fuel Oil

Change in Cost -5%Change in Usage -39%Change in $ Cost/Unit 54%Change in Degree Day 29% -9%

Electrical decreased greatly, since this is a lighting and ceiling fan load only it has to be assume this decrease is a result of decrease in usage

Meter Data and Utility History Summary

Town of Madison New HampshireHistorical Building

8/01/2009 to 7/31/2010Current Year Previous Year

Electric100%

Fuel Oil0%

Utility Cost Comparison Current Year

Page 180: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Historical Building

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Historical Building 86 - 3,959 0 0 0.98

Building Type

Site EUIEst Regional

Rating Building0 98% Historical Building

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Office

Page 181: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 36 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

70.28 KWH21.08 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$701.23

# Units Total Source7 58 4069 18 1620 58

23% Equivalent of 10% Overhead and 10% Profit$701.23$420.74

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Historical Building

The Historical building consist mainly of incandesent bulbs and should be upgraded to solid state

3- watt LED

Contractor Mark Up

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Please see attached detail lighting sheet and sketch for detail of work.

Total Prior to PSNH RebateTotal Post PSNH Rebate

Estimated cost for this installation:

Description18 Watt LED

Page 182: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 60 40 2.4 0.06

Proposed: 1 3 40 0.12 0.003 2.28 0.057Proposed lighting controls:

2 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 4 100 40 16 0.4

Proposed: 4 3 40 0.48 0.012 15.52 0.388Proposed lighting controls:

3 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 7 150 40 42 1.05

Proposed: 7 18 40 5.04 0.126 36.96 0.924Proposed lighting controls:

4 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 100 40 8 0.2

Proposed: 2 3 40 0.24 0.006 7.76 0.194Proposed lighting controls:

5 Recommendation:

Replace Incandecent with LED # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 100 40 8 0.2

Proposed: 2 3 40 0.24 0.006 7.76 0.194Proposed lighting controls:

6 Recommendation:

0 # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 0 0 0 0 0

Proposed: 0 0 0 0 0 0 0Proposed lighting controls:

KW Rate: 0 0.08008

Lighting Audit Report Madison New Hampshire - Historical Building

Location:

Front office60 watt

3 Watt LED

Location:

Basement100 watt

3 Watt LEDNo work in this area

Location:

Main Hall150 watt

18 Watt LEDNo work in this area

Location:

0

Kitchen100 watt

3 Watt LEDNo work in this area

Location:

Lecture Hall

0No work in this area

Lighting Cost/Payback AnalysisMadison New Hampshire - Historical Building

KWH Rate:

100 watt

3 Watt LEDNo work in this area

Location:

Lower level restroom

Page 183: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Existing System Annual Monthly Annual $ Montly $

KWH: 76 $6

KW: 22.92 1.91 $0.00 $0.00

Proposed System Annual Monthly Annual $ Montly $

KWH: 6.12 $0

KW: 1.836 0.153 $0.00 $0.00

Saved Annual Monthly Annual $ Montly $

KWH: 70.28 $6

KW: 21.084 1.757 $0.00 $0.00

Page 184: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Observations - Transfer Station Trailer

Original Design and Current Use)

Retrofits)

On-Site Renewable Energy)

Age and Condition of the Mechanical Equipment)

Indoor Air Quality) Overall the Indoor air quality of this building is good.Space temperature and Humidity)

R- Value)

Maintenance)

People’s energy awareness)

Overall the R-Value of this building is below acceptable range, however due to the type of use of this trailer building envelope improvements are not recommended.

Maintenance is on call manor, changing over to a preventive maintenance approach would result in future energy usage and extend the life of the equipment resulting in reduced future operation cost.

The occupant energy awareness in this building as throughout most of the town buildings is very good. A yearly review of energy usage is recommended to keep the awareness of energy usage high.

The layout of the land at the transfer station creates winds such that a wind mill could be installed however the payback was greater than a 15 year payback. Therefore at this time onsite renewable are not recommended for this site. As wind technology improves this site should be re-evaluated for the application of wind power. On-site renewable energy sources for all buildings are addressed later in this report.

The Building is a trailer was built in 1980 and is fair condition.

The retrofit recommendation include lighting and HVAC improvements. High priority recommendations all have a payback of less than 5 years or have health safety issues attached. A total of 4 recommendation are being made for this building which have the potential to reduce the building.

The electric heater in the trailer is in very poor condition and should not be used. The propane heaters are over 30 years old and have exceed the life expectancy of this type of equipment. However due to the type of use of this space they are not recommended to be replaced.

The temperature in this space is controlled by manual thermostats and humidity is not controlled. Due to use of this space it is recommended that a occupancy sensor be installed to operate heater in office area. Since humidity is not a concern with in this space due to climate and use it is recommended that humidity control stays the same.

Page 185: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Total Facility Consumption 32 (Millions of BTU/hr)

Cooling 5.4%Heating 77.1%Pumps 0.0%Lighting 5.6%Fans 1.1%Domestic Hot Water 4.6%Plug Load (Include Computers) 4.8%

Total 98.7%

5%

78%

0%6%1% 5%

5%

Transfer Station TrailerENERGY USAGE PROFILE

Cooling Heating Pumps Lighting Fans Domestic Hot Water Plug Load (Include Computers)

Page 186: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Utility Analysis Period:

8/1/2009 to 7/31/2010 8/1/2008 to 7/31/2009Electric Propane Electric Propane

Utility Costs $516 $534 $391 $975Utility Usage 2,155 272 1,642 358$ Cost/Unit (kWh, Therm, Gal) $0.24 $1.97 $0.24 $2.72

CDD HDD CDD HDD353 7,263 273 7,998

Current Year Vs

Previous Year Electric Propane

Change in Cost 32% -45%Change in Usage 31% -24%Change in $ Cost/Unit 1% -28%Change in Degree Day 29% -9%

Propane usage drop dramitically and Electrical had a dramatic increase.

Meter Data and Utility History Summary

Town of Madison New HampshireTransfer Station Trailer

8/01/2009 to 7/31/2010Current Year Previous Year

Electric49%

Propane51%

Utility Cost Comparison Current Year

Page 187: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

Energy Benchmarking - Transfer Station Trailer

Source EUI Rating for

your Building

Energy use and cost reduction potential (%)

Walk-thru energy assessment

recommended?above 60% below 25% No40 to 60% 20 to 35% Maybe20 to 40% 35 to 50% Yes

Below 20% above 50% Definitely

Rating from the most efficient to the least efficient - 2010 consumption

Site EUI

Rank Building

Annual Total Electrical Use

(kWh)

Annual Total Non-Electrical Fuel Use (Gals)

Occupied Building Gross

Floor Area (sq-ft)Site EUI Rating

Source EUI: Annual Total

Source Energy Use per Sq-Ft

(kBtu/sf)

Rating (Regional Source EUI

Comparison)1 Transfer Station Trailer 2,155 272 226 142 208 0.50

Building Type

Site EUIEst Regional

Rating Building

142 50% Transfer Station Trailer

Source: Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark

The calculation of EUI (Energy Use Intensity) is shown below. EUI, expressed in kBtu/sf, is normalized for floor area, the most dominant influence on energy use in most buildings. Its use usually provides a good approximation of how your building's energy performance compares to others. Site EUI indicates the rate at which energy is used at your building (the point of use). Source EUI indicates the rate at which energy is used at the generation sources serving your building (the point of source) and indicates the societal energy penalty due to your building The lower the EUI, the higher the rating, indicating that the building is more efficient than other buildings. The greater the EUI, the lower the rating, indicating that there is an opportunity for higher potential benefits from operational improvements.

To compare the buildings shown below to each other, and to determine the ranking of the buildings from having the most to the least opportunity for demand-side improvements from a financial perspective, please see the Site EUI ranking below.

The Site EUI below has been applied to a Department of Energy statistical model from the Oak Ridge National Laboratory web site, http://eber.ed.ornl.gov/benchmark. The Department of Energy has estimated energy use and cost reductions for building source EUI ratings (percentiles) in the table below. Please see the DOE Regional Source EUI Comparison graph below to rate your building in relation to the regional distribution of similar type buildings. (Note: The Source EUI includes the inefficiencies of electrical generation and transmission. A reduction in 'electrical' source EUI includes a benefit in terms of reduction of air pollution emissions and green house gases, and is thus an indicator of societal benefit.)

Office

Page 188: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 10 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

124.80 KWH1.20 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$152.15

# Units Total Source2 61.62 123.24

23% Equivalent of 10% Overhead and 10% Profit$152.15

$91.29

LUMAPRO Model #: 2ZE23

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Contractor Mark UpTotal Prior to PSNH RebateTotal Post PSNH Rebate

Estimated cost for this installation:

Description

The town of madison should replace the overhead light in the office area and the lamp in the storage area with circular flourescents. Please see attached detail lighting sheet and sketch.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Lighting/Lighting Control Upgrade

Building: Transfer Station

Lights in the fire station are T-12 fluorescents and incandescent bulbs and should be replaced with high efficient Fluorescents

Energy Savings = [Watts of Existing Fixture-Watts of New Fixture] x Number of Fixture x Lighting hours per year

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Page 189: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

1 Recommendation:

Remove existing channel strip light and replace with two 22

Watt Circular fluorescent # of FixturesAverage

Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 2 f40T12 1 84 1248 104.832 0.084

Proposed: 1 22 1248 27.456 0.022 77.376 0.062Proposed lighting controls:

2 Recommendation: Remove incandescent fixture

and replace with 22 Watt Circular fluorescent # of Fixtures

Average Watts

Usage (hrs ann.)

KWH (Used)

KW (Used)

KWH (Saved)

KW (Saved)

Existing: 1 60 1248 74.88 0.06

Proposed: 1 22 1248 27.456 0.022 47.424 0.038Proposed lighting controls:

KW Rate: 12.82 0.08008Existing System Annual Monthly Annual $ Montly $

KWH: 180 $14

KW: 1.728 0.144 $22.15 $1.85

Proposed System Annual Monthly Annual $ Montly $

KWH: 54.912 $4

KW: 0.528 0.044 $6.77 $0.56

Saved Annual Monthly Annual $ Montly $

KWH: 124.8 $10

KW: 1.2 0.1 $15.38 $1.28

Location:

Lighting Audit Report Madison New Hampshire - Transfer Station

Lighting Cost/Payback AnalysisMadison New Hampshire - Transfer Station

KWH Rate:

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

No work in this area

Kitchen

LUMAPRO Model #: 2ZE23 - 22 Watt bulb

No work in this area

Location:

Women's Restroom1 - 60 Watt Incandescent

Page 190: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 11 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW

75.96 Gallons0.00 Gallons

Implementation Plan

$87.65

# Units Total Source1 71 710 0 0

23% Equivalent of 10% Overhead and 10% Profit$87.65

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

DescriptionLEVITON PR150-1LW

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

A occupancy sensor should be installed in series with the thermostat in the heater serving the front office area. This will only allow the heater to come on when the office is occupied, thus creating energy savings. Since the trailer will be protected from frezzing from the unit in the storage area this unit can remain off when the trailer is unoccupied.

Estimated cost for this installation:

Energy Saving = BTU/hr of Furnace * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

48000 144Based on reducing the runtime of the furnace by 4 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Controls Upgrade

Building: Transfer Station

A occupancy sensor should be install in series with the T-Stat for the furnace which serves the Office area. This thermostat then should be set at 70 degrees. The Thermostat for the storage area should be set at 55 degrees.

Page 191: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 12 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

216.00 KWH1.50 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$1.23

# Units Total Source1 1 10 0 0

23% Equivalent of 10% Overhead and 10% Profit$1.23

Recommend Work to be performed by – Town Employee

Owner Action – Instruct town employees to level electric heat breakers off

Total Prior to PSNH Rebate

Description

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Electric breakers were shut off during the energy audit and the town employees which used this trailer should be instructed to leave these breakers shut off.

Estimated cost for this installation:

Energy Saving = KW of Furnace * Reduce Runtime from Programmable T-Stat

Btu/hr Reduced Run Hours

1.5 144Based on reducing the runtime of the furnace by 4 hour per week during the heating season

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Permanently Shut off electric heat

Building: Transfer Station

It was observed during the energy audit that the electric heat was coming on. The space has an propane fired unit which should be used.

Page 192: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 13 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort YesMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

273.75 KWH1.50 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$139.38

# Units Total Source1 112.9 112.90 0 0

23% Equivalent of 10% Overhead and 10% Profit$139.38

Recommend Work to be performed by – Qualified Contractor

Owner Action – Solicited Bids from Contractor

Total Prior to PSNH Rebate

DescriptionINTERMATIC Model # EI500WC

Contractor Mark Up

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Time Clock should be installed in the power wiring of the water heater and time clock set 1 hour prior to space being occupied and shut off 1/2 prior to space being unoccupied.

Estimated cost for this installation:

Energy Saving = KW of Water Heater * Reduce Runtime from Time Clock

Btu/hr Reduced Run Hours

1.5 182.5 Based on reducing the runtime of the water heater by 1/2 hour per day

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Timer on domestic hot water heater

Building: Transfer Station

It was observed during the energy audit that the electric hot water heater was on when the space was not occupied. Installing a time clock will shut off the water heater when space is unoccupied but ensure hot water when needed.

Page 193: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 53 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

PV solar is an on-site renewable energy which would reduce the town's purchased electrical energy.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

As PV solar technology improves and the price of the panels decrease the Town should have buildings reevaluated for the application of PV Solar

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: PV Solar

Building: All Buildings

When evaluating PV solar application for the Town of Madison building I did not find a fit. The best candidate would be the library however the payback period would be excessive. The main reason the Town of Madison buildings do not have a good fit with PV solar is the lack of south facing roofs that do not have shading.

Page 194: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 54 General Finding Impacts

Energy Savings YesFuel Savings YesElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

Thermal solar is an on-site renewable energy which would reduce the town's purchased fuel.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

As Thermal solar technology improves and the price of the panels decrease the Town should have buildings reevaluated for the application of Thermal Solar

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Thermal Solar

Building: All Buildings - except Library

When evaluating Thermal solar application for the Town of Madison building I found one building with a potential fit. The best candidate would be the library and a evaluation of this application is in this report. The main reason the Town of Madison buildings do not have a good fit with PV solar is the lack of south facing roofs that do not have shading.

Page 195: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 55 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

Wind power is an on-site renewable energy which would reduce the town's purchased electric.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

As wind power technology improves and the price of the panels decrease the Town should have buildings reevaluated for the application of wind power.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Wind energy

Building: All Buildings

When evaluating Wind Energy application for the Town of Madison building I did not find a fit. The best candidate would be the transfer station trailer. The main reason the Town of Madison buildings do not a fit with wind energy is the lack of maintained wind. There is however the potential for wind energy with in the Town of Madison on the Ridge east of route 113 between Madison and Route 16

Page 196: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 56 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings YesIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

Combined Heat and Power (CHP) is an on-site electrical production which would reduce the town's purchased electric while using the waste heat from this process to heat their buildings.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

With current use of the town building CHP does not have an application for the Town of Madison. If the town was going to build a cental district heat plant then CHP should be part of that project. District heating is addressed later in this report.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Combine Heat and Power

Building: All Buildings

When evaluating combined heat and power application for the Town of Madison building I did not find a fit. The best potential fit for the town's building would be micro CHP, however the town does not have a year round heating requirment or the disired electrical use profile for this type of CHP. The town of madison does not have a central heating plant and therefore is not a fit for the steam based CHP.

Page 197: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 57 General Finding Impacts

Energy Savings NoFuel Savings NoElectric Savings NoDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability Yes

Recommendation:

Estimated Economic Impact Summary

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

District heating is a heat production and delivery method which allow small communities to take advantage of large scale heat production. This includes burning of waste wood products, combine heat and power and other central heating plant saving methods.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

No action at this time unless approached by outside source which wants to install a district heating source.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: District Heating

Building: All Buildings

When evaluating district heat application for the Town of Madison building I did not find a fit. I would not recommend that the Town build a district heating plant, however if an outside source was planning to build a large heating plant to burn waste wood and was willing to sell the town heat then I would recommend the town investigate this option. The contract should be written such that guarantees the town a lower BTU cost than oil or propane.

Page 198: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 58 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

.

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

Estimated cost for this installation:

Description

Bio Energy is the use of Bio product such as wood that is renewable to heat building versus using fossil fuels which have a limited supply.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

No action at this time.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Bio Energy

Building: All Buildings

When evaluating Bio Energy application for the Town of Madison building I did not find a fit. The best fit for bio energy for the Town's building would be wood pellets. However do to the low usage of fuel by the town's building, I could not justify an application at any of the buildings.

Page 199: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

DETAILED FINDINGS Finding # 59 General Finding Impacts

Energy Savings YesFuel Savings NoElectric Savings YesDemand Savings NoIndoor Air Quality NoComfort NoMaintenance and Reliability No

Recommendation:

Estimated Economic Impact Summary

.

0.00 KWH0.00 KW 0.00 Gallons0.00 Gallons

Implementation Plan

$0.00

# Units

Labor and Material Cost/Unit Total Source

0% Equivalent of 10% Overhead and 10% Profit$0.00

Recommend Work to be performed by – Qualified Consultant

Owner Action – Hire Qualified consultant

Estimated cost for this installation:

DescriptionContractor Mark UpTotal

Energy Awareness creates energy saving by having people stay focus on energy savings and latest technology.

Estimated Annual Electrical Savings Estimated Annual Electric Demand Savings

Estimated Annual Propane Savings Estimated Annual Fuel Oil Savings

Have a qualified consultant review energy usage and energy star portfolio manager yearly. Cost will be $550.00 for 2011 an anticipate an increase of 5% per year there after.

FINDINGS, RECOMMENDATIONS & IMPLEMENTATION

Finding Description: Yearly Energy Review

Building: All Buildings

Energy usage tends to drift higher as people lose focus on saving energy. In addition technology is consistently advancing and recommendation that did not make sense today may make sense in a few years. In addition continually review energy usage will create behavior changes that will reduce energy usage.

Page 200: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

NAME: Madison Town Hall & Library DATE: 9/22/2010ADDRESS:

CITY,ST,ZIP: Madison, New HampshirePHONE:

ITEM QTY TYPE HARDWARE WIDTH LENGTH PRICE EA TOTAL

7 Town Hall Vertical 48 96 $569.00 $3,983.00

4 Town Hall Vertical 42 54 $325.00 $1,300.00

9 Library Roller Shades 30 36 $125.00 $1,125.00

5 Library Roller Shades 24 36 $100.00 $500.00

4 Library Roller Shades 24 27 $77.00 $308.00

4 Library Roller Shades 24 54 $150.00 $600.00

Sub Total $7,771.00

Tax N/A

TOTAL PRICE $7,771.00

DEPOSIT $3,885.50

This proposal includes installation BALANCE DUE $3,885.50

OPTIONOVERALL SIZE

SIGNATURE OF OWNER________________________________________ DATE:__________________

Inflector products will be manufacturing as per the above specifications in a professional manner. Customer understandsthat these are custom made to fit only these windows at the address stated above and is responsible for full payment ofthe above cost when the products are delivered and accepted. A 50% deposit is required to manufacturer said system(s).This quote is valid for 30 days after the above date unless stated in writing. Delivery of the product(s) is expected within20 working days after the receipt of this contract.

SOLARIZE REPRESENTATIVE AUTHORIZED SIGNATURE Lisa Getchell

I HAVE REVIEWED THE ABOVE CONTRACT AND FOUND IT TO BE SATISFACTORY. I AUTHORIZE THEMANUFACTURE OF THE PRODUCT(S). I HAVE ENCLOSED A NON-REFUNDABLE 50% DEPOSIT AND AGREE TO PAYTHE REMAINDER WHEN PRODUCT(S) ARE DELIVERED AND ACCEPTED.

INFLECTOR WINDOW PROPOSAL

Customer has selected the following Inflector system(s), style(s) and quanity(s) to be custom manufactured and installedat the address listed above to the exact measurements and specification listed below.

Page 201: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

ESTIMATEDate

9/22/2010

Estimate #

20102

Bill To

Arbogast Energy Auditing317 Austin St # 4Westbrook, ME 04092

Ship To

Town of Madison

Dirigo Waste Oil LLC92 College AveWaterville, ME 04901

Terms

Due On Delivery/Pick Up

Rep

TA

WE ACCEPT CASH, CHECKS, VISA, MASTERCARD, & DISCOVER.ATTRACTIVE FINANCING OFFERS AS WELL.

Phone # 207 873 0881Fax # 207 877 9701

Sign & Fax To Accept

[email protected]

Total

Subtotal

Sales Tax (5.0%)

Description Qty Total

Clean Burn CB2500 used-oil(waste oil) furnace with 250 gallon tank, tank stands,tank drain, pump mount, draw assembly, gauge, copper line, sheething, and pumpwiring

7,495.00T

FOR LIMITED TIME INCLUDES FREE BASIC CHIMNEY PACK - CLASS APACKAGE 8"

$7,869.75

$7,495.00

$374.75

Page 202: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

SECTION 3

Weatherstripping

We can help you select the best system.TM

1-800-233-1487 Fax: (218) 751-6551

Page 203: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

American Garage Door Supply Inc.1-800-233-1487 Fax: (218) 751-6551

2010 - 2

Aluminum RetainerWith Bulb Seal• Black Vinyl Seal• Won’t tear or deform• Remains pliable in the coldest weather• Cushions door when closing• Aluminum holder

comes slotted allowing for adjustment and perfect fit.

Garage Door Threshold• Solid black vinyl garage door threshold • Seals out the elements• Prevents driving rains and snow from backing into the garage• Helps keep out dirt & leaves• Keeps door bottom from contact with concrete to prevent rust on

metal doors and water damage on wood doors• Easy to install

Need bottom replacement seal for yourNational Brand door?

Call our professionals and let us help you.

• Rigid and Flexible PVC• Lengths Cut To Order• Standard Cut Lengths; 8’2”, 9’2”, 10’2”, 12’2”, 14’2”, 16’2”• Standard Color: Black• Can Be Used On Both Shiplap and T & G Steel Door

Top Seal - SectionalTop Seal Caps - Sectional Doors

1- 5/8” Top Seal Cap 2” Top Seal CapTC-158 TC-200

$2.75/Ft $3.00/Ft

One tube comes with every 20 feet ofthreshold. Installation works bestwhen temperatures are above 50º F.

Rolling Steel Bottom Seal• Dual Durometer

Rigid & Flexible• Standard Colors

Black & Grey.

Bottom Rubber Seal ForWood Doors

Part# Description Price/ft Price/Roll

WS138 1-3/8” Door Thickness, Soft Sponge $1.70 $130.00WD138 1-3/8” Door Thickness, Dense Rubber $2.00 $150.00WD134 1-3/4” Door Thickness, Dense Rubber $2.20 $160.00

Bulk Rolls 100’ Lengths

RB-21

$1.85/ft

Part# Description Price WRG10 Bulb Seal Retainer, T & G Type 10’2” $12.50 ea.WRG12 Bulb Seal Retainer, T & G Type 12’2” $15.00 ea.WRG14 Bulb Seal Retainer, T & G Series 14’2”.$17.50 ea.WRL-10 Bulb Seal Retainer, L-Type, 119-1/2" $28.50 eaWRL-12 Bulb Seal Retainer, L-Type, 145 -1/2" $31.50 eaWRR-400-V 4” Vinyl Bottom Bulb Seal, T $2.25 ft.

Bottom Bulb Seal Also Available In Bulk Rolls

Part# Description Price/ Ft. 100 ft. rollTV35BLN Threshold $5.85 $526.50

Part# Description Price/ftTS-14 Dual Contact Top Seal $1.45/ft.TS-15 Single Contact Top Seal $1.35/ft.

Part# Description Price/TubeTV35 Adhesive only $13.00

Choose From 2 Popular Retainers

L TypeG Type

TS-14TS-15

1-1/2”

1-1/2”

1-3/4” 1-3/4”

WEATHERSTRIPPING - BOTTOM SEALS

Typical Weather SealProfiles

2-1/4”

1-1/2” 1”

13/32”

Outside Door | Inside Door

Page 204: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

American Garage Door Supply Inc.1-800-233-1487 Fax: (218) 751-6551

2010 - 3

Aluminum/Vinyl Perimeter Seal • Heavy duty aluminum extrusion

with flexible sealing flap.• Standard mill finish with gray vinyl. • Eliminates drafts and heat loss.• Vinyl flap stays flexible in

subzero temperatures

Rolling Steel Clip-on Brush Seals For use on commercial rolling steel doors. TheWGS combines a 3/4” plastic guide with effi-cient brush seal. Fits 3/16” guides use alone or with epoxy foradditional hold.

Reverse Angle Clip-on Vinyl SealFor use on commercial sectional doors. Dualduometer construction provides a hard vinylholding section and a flexible flap.

Climate Seals2” Extruded PVC stop w/ 1” Vinyl Flap.Will Not Rot, Low MaintenanceAvailable in white or brown 7’, 8’, 9’, 10’, 12’, 14’, or 16’ LengthsCan be UPS’d in 7’ and 8’ lengthsLarger sizes and other colors also available

Part# Description Price ea.AV21-10 1” Aluminum, 2” Vinyl, 10’1” $17.50AV21-12 1” Aluminum, 2” Vinyl, 12’1” $21.00AV21-14 1” Aluminum, 2” Vinyl, 14’1” $24.50AV21-16 1” Aluminum, 2” Vinyl, 16’1” $28.00Note: UPS up to 84” only

Part# Description Price/ft.WGS10 With 1” Nylon Brush $4.55WGS150 With 1 1/2” Nylon Brush $5.55WGS520 With 2” Nylon Brush $6.20WGS530 With 3” Nylon Brush $7.15

Note: UPS up to 84” only

Clips on to guides up to 1/4”

Clip On Vinyl Guide SealFor Rolling Steel Doors

• Use as vinyl perimeter seal on rolling steel or curtain doors

• Use as bottom seal on curtain doorswith double or single angle bottom rails

• Fits 3/16” or 1/4” thick steel angle guides• Standard grey color• Standard cut lengths; 8’6”, 10’6”, 12’6”, 14’6”, 16’6”.Part# Description Price/BoxGS-20-8.5* Clip On Vinyl Seal, 8’6” $220.00 GS-20-10.5 Clip On Vinyl Seal, 10’6” $275.00 GS-20-12.5 Clip On Vinyl Seal, 12’6” $330.00 GS-20-14.5 Clip On Vinyl Seal, 14’6” $385.00 GS-20-16.5 Clip On Vinyl Seal, 16’6” $440.00

Part# Description Price ea.CS100W-8 Climate Seal, White, 8’ $14.00CS100W-10 Climate Seal, White, 10’ $17.50CS100W-12 Climate Seal, White, 12’ $21.00CS100W-14 Climate Seal, White, 14’ $24.50CS100W-16 Climate Seal, White, 16’ $28.00CS100B-8 Climate Seal, Brown, 8’ $14.00CS100B-10 Climate Seal, Brown, 10’ $17.50CS100B-12 Climate Seal, Brown, 12’ $21.00CS100B-14 Climate Seal, Brown, 14’ $24.50CS100B-16 Climate Seal, Brown, 16’ $28.00

AV21

WEATHERSTRIPPING - JAMB SEALS

Available in Unit Quantities of 25 Lengths only*GS-20-8.5 available as (per ea.) at $10.00 each.

3/4”

1”

Standard Sizes 7’, 8’, 10’, 12’, 14’, 16’

Part# Description Price/ftWRJ-G Clip-On Vinyl Seal- Gray $1.65/ftWRJ-B Clip-On Vinyl Seal- Brown $1.65/ftWRJ-W Clip-On Vinyl Seal- White $1.65/ft

Any lengths UPSable

14', 16' Lengths Extrusion Folded in Half with Single Length Blade.

8', 10', 12'- Single Lengths

Page 205: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

American Garage Door Supply Inc.1-800-233-1487 Fax: (218) 751-6551

2010 - 4

1-1/2” StraightStandard Commercial Brush Seal

Heavy Duty Commercial Brush Seal Aircraft Hangar Brush

1-1/4” x 45º

Side View Of Header Seal

Side View Of Header Seal

Top View Of Jamb Seal

3” Straight

To minimize air dirt infiltration around rolling steel, sectional and sliding doors, install the best weatherseals available. Our brush weatherseals’ unique property of conforming to irregular surfaces provides the most effective seal. Thousands of filaments form a solidwall for a complete weather tight seal without impairing door movement.

The heaviest seals availableanywhere. Our heavy dutybrushes seal out the ele-ments around large industri-al rolling steel doors, section-al doors, and other largedoors including aircrafthangar doors. available inbrush lengths up to 7”. ULRating for smoke seals on allbrushes up to 4” in length

Crimped polypropylene brush was developed for special usein sealing aircraft doors. This lower priced brush seals thelargest gaps usually associated with hangar doors whileproviding the advantages of nylon brush weather seal. The

brush can be combined with angled or straight holders and is available in brush trim

lengths of 2”, 3” and 4”

These nylon seals are designed for the largest gap on large sectional, industrial rolling steel and aircraft hangar doors.

Keeps • Drafts • Rain • Snow • Wind • Sand • DebrisOut: • Light • Noise • Insects • Rodents • Birds • Bats

BrushPart # Type Length Price/ftBPS151 Polypropylene 1” $3.90BPS155 Polypropylene 1.5” $4.55BPS152 Polypropylene 2” $4.90BPS153 Polypropylene 3” $5.55

BrushPart # Type Length Price/ftGS34 Nylon 1-3/4” $12.35GS25 Nylon 2-1/2” $13.35GS30 Nylon 3” $14.65GS40 Nylon 4” $15.95GS50 Nylon 5” $18.20GA34 Nylon 1-3/4” $12.35GA25 Nylon 2-1/2” $13.35GA30 Nylon 3” $14.65GA40 Nylon 4” $15.95GA45 Nylon 5” $18.20GLS34 Nylon 1-3/4” $14.30GLS25 Nylon 2-1/2” $15.30GLS30 Nylon 3” $16.90GLS40 Nylon 4” $17.90GLS50 Nylon 5” $20.50

1-3/8”Straight

1-1/2”45º Angle

5-1/2”Straight

BrushPart # Type Length Price/ftBP4121 Polypropylene 1” $3.60BP4125 Polypropylene 1.5” $4.25BP4122 Polypropylene 2” $4.55BP4123 Polypropylene 3” $5.20

BrushPart # Type Length Price/ftBPS31 Polypropylene 1” $5.20BPS35 Polypropylene 1.5” $5.85BPS32 Polypropylene 2” $6.20BPS33 Polypropylene 3” $6.50

CALL FOR PRICES

NylonConstruction

WEATHERSTRIPPING - BRUSH SEALS

1-1/2”

1-1/4”3”

Page 206: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

American Garage Door Supply Inc.1-800-233-1487 Fax: (218) 751-6551

2010 - 5

The importance of sealing openings in a building applies to entrance doors just as it does to overhead doors. Any gaparound a door causes energy loss due to air infiltration. Dirt and debris are just as much of a problem. Brush designedDoor Bottom Seals and Door Jamb Seals provide the most effective means of solving these problems. Mounted using spe-cial finished holders, brush weatherseals provide an attractive and effective solution to gaps for any door.

Keeps • Drafts • Light • Insects • Noise • Dust • SandOut: • Wind • Rain • Snow • Sleet • Fumes • Rodents

Jamb Seal Kits

Kit Product Brush DoorCode Length Bottom Width Price ea.A180CLA04BL3 0.41” 3’ $10.40A180CLA04BL3.5 0.41” 3.5 12.00A180CLA04BL4 0.41” 4’ 13.65B210CLA05BL3 0.53” 3’ 11.40B210CLA05BL3.5 0.53” 3.5’ 13.00B210CLA05BL4 0.53” 4’ 14.65C380CLA06BL3 0.59” 3’ 12.35C380CLA06BL3.5 0.59” 3.5’ 13.65C380CLA06BL4 0.59” 4’ 15.60D480CLA09BL3 0.94” 3’ 14.95D480CLA09BL3.5 0.94” 3.5’ 17.55D480CLA09BL4 0.94” 4’ 19.85Other lengths and finishes available

AstraSweeptm

Jamb Seal KitsKit Door Size Finish Color Product Code W x H Price ea.C380CLA06BL67 6’ x 7’ Clear Andodized 97.50C380DUR06BL67 6’ x 7’ Duradonic 122.00C380CLA06BL68 6’ x 8’ Clear Andodized 104.00C380DUR06BL68 6’ x 8’ Duradonic 131.00C380CLA06BL77 7’ x 7’ Clear Andodized 100.00C380DUR06BL77 7’ x 7’ Duradonic 126.00C380CLA06BL78 7’ x 8’ Clear Andodized 108.00C380DUR06BL78 7’ x 8’ Duradonic 135.00C380CLA06BL87 8’ x 7’ Clear Andodized 104.00C380DUR06BL87 8’ x 7’ Duradonic 131.00C380CLA06BL88 8’ x 8’ Clear Andodized 112.00C380DUR06BL88 8’ x 8’ Duradonic 140.00

Corner Seal Kits (3” Legs)Kit Finish Color Product Code Price ea.C38090CLA06BL Clear Andodized 38.00C38090DUR06BL Duradonic 52.00

Kit Door Holder BrushProduct Code Size Length Size Price ea.JR40CLA04BL17 3’ x 7’ .375 .41 $34.80JR40CLA04BL18 4’ x 7’ .375 .41 36.40JR40CLA04BL20 6’ x 7’ .375 .41 40.65J135CLA04BL17 3’ x 7’ .450 .41 55.25J135CLA04BL18 4’ x 7’ .450 .41 59.80J135CLA04BL20 6’ x 7’ .450 .41 62.40

Aluminum door sweeps in both clear andadonized finish with black brush are the perfectcompliment to corresponding door jamb seals.The Aluminum holders are pre-slotted for ease ofinstallation and sweeps are prepackaged for fas-teners for 3’, 3.5’ and 4’ doors.

Jamb seal kits apply to the header and jamb only.

AstraSweepTM corner seals seal the holebetween the astragal seal and the doorsweep. AstraSweep Kits include two cornerseals, two door sweeps and two astragalseals- all the materials neccessary to sealtheinside (gaps up to 1 inch) and bottoms ofa double door. Holders are preslotted foreasy installation.

Door Bottom Seal Kits

WEATHERSTRIPPING - ENTRANCE DOOR SEALS

Kit Door Holder BrushProduct Code Size Length Size Price ea.J140CLA04BL17 3’ x 7’ .750 .41 56.00J140CLA04BL48 4’ x 7’ .750 .41 58.50J140CLA04BL20 6’ x 7’ .750 .41 66.50VX75BLK 1.95/Ft.

JR40 and J140 kits come with screw slots for after-installation adjust-ments. J135 kits have countersunk screw holes for a neat flush finish.Fasteners and installation instructions are provided with all kits.

All jamb seals have clear anodoized finish. Other finishes are available.

Page 207: 1384851/FULLTEXT01.pdfUniversity of Gävle Master of Science – Energy Engineering ii Abstract Shifting the load demand of a commercial office space to utilise off peak tariffs would

American Garage Door Supply Inc.1-800-233-1487 Fax: (218) 751-6551

2010 - 6

Loading Dock areas present a great opportunity to sealaround the many openings of a building. Not only do doorsprovide areas for air infiltration but the dock levelers them-selves can act as wind tunnels robbing a building of heatresources. Our 90º retainer & seal forms the perfect fit fordock leveler seals and other specialty applications. Orderyour choice of retainer size, brush length and seal width.

Rope Seal For use in sealing the back portion of a dock leveler.Constructed of neoprene molded in a rope, Our Ropeseal is placed near the hinge of a dock leveler and isheld in place with hooks. The seal is formed as the lev-eler lowers compressing against the rope. Order byspecifiing the length in feet.RS10NEOPR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.90/ft

Welded DockLeveler Brush Seal

BN955

Brush Seals

BN969BN996

BN916

BN913

Holder Brush BrushPart Number Length Length Type Price Ft.BN9554 0.55” .41” Nylon $3.25BN9551 0.55” 1.00” Nylon $3.90BN9695 0.69” .53” Nylon $3.60BN9691 0.69” 1.00” Nylon $3.90BN9965 0.96” .59” Nylon $3.90BN9961 0.96” 1.00” Nylon $4.25BN9169 1.06” .94” Nylon $4.90BN9161 1.06” 1.19” Nylon $5.20BN9166 1.06” 1.61” Nylon $5.55BN9162 1.06” 2.00” Nylon $6.20BN9163 1.06” 3.00” Nylon $7.15BN9131 1.38” 1.75” Nylon $12.35BN9132 1.38” 2.53” Nylon $13.65BN9133 1.38” 3.00” Nylon $14.65BN9134 1.38” 4.00” Nylon $15.95

Part # Description PriceWDL71 Welded Dock Leveler Kit $149.50 ea.

for 8’ leveler includes:(2- WH15) (2- XTB90) (2- BN100)

WDL73 Welded Dock Leveler Kit $162.50 ea. same as above with 1-1/2” Brush

WH15 *Weldable Holder (8’) $32.50/ea.XTBT90 * T-Retainer(8’) $15.60/ea.BN100 1” Nylon Brush only $2.30/ft.BN112 1-1/2” Nylon Brush only $3.25/ft.BT90 1-1/2” Flexible PVC Blade Seal $.65/ft.

Grey, Brown or WhiteB90 90º Bracket for Mechanical $1.65/ft.

(Screw On)

WEATHERSTRIPPING - DOCK LEVELER SEALS

WH15 XTBT90