DavidMcQuillingPanhandleEnergy
Outliney PlantAppliedvs.FieldAppliedCoatingsy GirthWeldCoatingsy FBEpatchsticksy RecentConcerns
PlantAppliedVsFieldAppliedPlantAppliedCoatings FieldAppliedCoatingsy Controlledenvironment
y Centralizedinspectiony Permanentmountequipmenty Nearcontinuouslineoperationy Routinedestructivetestingy Highqualityair/powersourcesy Blastmedia/coatingstorage/
handling/recyclingproceduresy IndustryGuidelines(NACESP
0394)y Handing/Transportation
y Mustaddressenvironmentalconditionsy Wind/Dust/Heat/Rain/
Coldy Multiplefieldinspectionpointsy Movingequipmenty Constantstart/stopoperationy Limitedtestcapabilityy Onsiteairandpowergenerationy Fieldblastmedia/coatingstorage
/handling/recyclingproceduresy IndustryGuidelines(NACESP
0402)y Handling/Lowering/Backfill
HowDoWeQuantifyFieldCoatingQuality?y Whatisgoodenough?y Manufacturersperformancedataisgenerallynotbasedonfieldappliedproducts.
y Unrealistictoexpectfieldappliedcoatingstoperformaswellasthoseappliedinacoatingmillorlaboratorysetting.
y Needtoremovesubjectiveevaluationsy Doesntlookprofessionaly Bubblesincoatingy Shouldntsmokewhenappliedtoheatedpipey Contaminationofsubstratebyheatingaftercleaning
y Drivingfactorsshouldberelatedtoperformance
PHMSAConstructionIssuesGirthWeldCoatingsFusionBondedEpoxy TwoPartEpoxyy IncorrectApplication/Procedures
y Coatingovermudorrusty Failuretofollowmanufacturers
recommendationsy IncorrectfeatheringofexistingFBEy Waterinpipeduringheating
y EnvironmentalIssuesy Inconsistentpipetemperaturesy Coatinginhighwindwithblowing
dirty MechanicalIssues
y DamagetofactoryFBE(heat/mechanical)
y ProceduralIssuesy Nospecificationsonsite
y IncorrectApplication/Proceduresy Failingtofollowmanufacturers
instructionsy Inadequatesurfacepreparationy Applicationafterepoxystartsto
sety Inadequatemixingy Applyingaboveorbelow
recommendedtemperaturey UsingunapprovedIRtemperature
sensors
CommonLiquidGirthWeldCoatingsy 100%SolidsEpoxyy Denso7000/7200y SPC3888/4888y 3MScotchkote 323y Powercrete F1y NapGard 71850
y 100%SolidsEpoxy/Urethaney SPC2888
y 100%SolidsPolyamideEpoxyy NapGard 71847/1848PatchCompound
y Near100%SolidsEpoxy Polyaminey Wilko GatorKure(96%solids)
FieldAppliedCoatingsHowDoWeEnsure/ImproveQualityy Proceduresy Shouldincludeproductspecificcoatingparametersy Shouldaddressrealisticfieldconditionsandvariablesy Shouldaddresswhatifconditionsandprovidealternativesy Shouldclearlyoutlinestopworkconditionsy Shouldmeshwithcapabilitiesofonsiteequipmenty Shouldbebasedoncoatingperformancedatay Shouldhaveprovisionsforchangesduringconstruction
FieldAppliedCoatingsHowDoWeEnsure/ImproveQualityy FieldPersonnelTrainingy DifficulttobelieveanyoneonROWbelievescoatingovermudis
acceptabley Flashrusty Failuretofollowprocedures
y InspectorTraining/Knowledgey Cannotinspectqualityintoaprojecty Cannotcatcheverythingy Moremanualstepswhenusingliquidgirthweldcoatings
y AllTrainingMustbeProductSpecific OneSizeDoesNotFitAll
HotMeltPatchSticksy Easytoapplyy Usableinallweatherconditionsy Quicksettingforimmediateinstallationandhandlingy Nosolventsy Nomixing,metering,orpotlifeproblemsy Flexibley Colormatchedtofusionbondedepoxycoatings
y Easytousey Speedsproductiontimey Facilitatesquickrepairattheditch
HotMeltPatchSticksy Ifitssoeasy,whydowehavesuchaproblem?y Failingtofollowmanufacturersinstructionsy Notadequatelyheatingpipebeforeapplicationy Inadequatesurfacepreparationy Useondefectslargerthan0.5in2y Applicationovertwopartepoxyy Improperaccelerateddryingbypattingy Useonbaremetal
HotMeltPatchSticksManufacturersInstructionsy VariationsinPlantandFieldAppliedSpecificationsy ThicknessofRepairsy SurfacePreparation
y VariationsbetweenManufacturersy ThicknessofRepairsy SurfacePreparationy MaximumSizeofRepairAreay Smallholidaysanddamagedareasy Minorpinholesandabrasionsy Holidaysupto2mmindiametery Recommendedforpinholesbutcanbeusedtorepairotherdefectsat
discretionofenduser
HotMeltPatchSticksNACESP0402y Section 8.2 Coating System Repairsy Patched areas should overlap the parent coating aminimum of 13 mm (0.50 in.).y The surface to be repaired should be suitably preparedto ensure adhesion of the patch material.y Minimum thickness of the repaired coating shall be inaccordance with Section 7 of this standard.
PatchSticksRepairstoBareSteely NoreferencecanbefoundtosupportpositionthatHotMeltPatchStickscannotbeusedonbaresteel.
y Scotchkote 226Pcanbeusedonholidaysupto2mmindiameter.Thefollowing3Mtwopartepoxiesshouldbeusedforbaresteelareaslargerthanpinholes,dependingonthefunctionalandapplicationpropertiesrequired:
Scotchkote 323Scotchkote 323iScotchkote 352Scotchkote 327
AccuracyofIRGunsy Widelyusedinindustryinbothplantandfieldapplicationsy VariationsbetweenFBEManufacturersSpecificationsy Heattemperaturesshallbemonitoredandcontrolledwithanopticalandrecordingpyrometer.PyrometersinstalledtomonitorpipetemperaturebeforethecoatingapplicationshallbecheckedperiodicallywithaTempil Sticktoassureaccuratecalibrationoftheinstrument.
y Infraredsensingdevicesshallbeusedtomonitorthetemperatureoftheappliedcoating.Donotuseonuncoated/baresteel.
y Duetovariedemissitivity;optical/IRpyrometersshouldnotbeusedtodeterminepreheatonblastedsurfaces.
y Liquidcoatingvendorsgenerallysupportuse
ContaminationofSubstratewithAppliedHeaty Applicationofheataftercleaningbutpriortocoatingapplicationisacommonindustrypracticey ApplicationstandardsforFBEproductsrequirenoncontaminatingheatsourcey Theheatsourceshallnotleavearesiduetocontaminantonthepipesurface.
y Preheattheparentcoatingsurfaceusinganoncontaminatingheatsource,suchasportablehandheldbutanetorch.
y Theheatsourceshallnotleavearesidueorcontaminantonthepipesurface.Oxidationofthesteelintheformofblueingorotherapparentoxideformationisnotacceptable.
SteamfromPreHeatingPipeBeforeCoatingy Commonindustrypracticetopreheatpipepriortoapplicationof100%solidliquidcoatingstoacceleratecuretimey Productmaysteamwhenappliedtohotpipey Manufacturersproducttestingindicatesnodegradationofcoatingperformancewhenappliedoverheatedpipey Allproductsaredifferenty Tgy VOCContent
AirBubblesinEpoxyCoatingsy Voidswillexistinallepoxycoatingsy Standardsforacceptablelevelsporosityarewidelyusedintheindustryy ReferenceAppendixGofRP0394
y Appearanceofbubblesatsurfaceisgenerallynotacauseofconcern
PathsForwardy Focusontechnicalaspectofanyqualitycontrolissuesrelatedtocoatingsystemsy Focusonperformanceofindustrialcoatingsystems,notaestheticsy Onesizedoesnotfitall cantpaintwithabroadbrushy Proceduresandtrainingarecriticaltoquality
Field Applied CoatingsOutlinePlant Applied Vs Field AppliedHow Do We Quantify Field Coating Quality?PHMSA Construction Issues Girth Weld CoatingsCommon Liquid Girth Weld CoatingsField Applied CoatingsHow Do We Ensure / Improve QualityField Applied CoatingsHow Do We Ensure / Improve QualityHot Melt Patch SticksHot Melt Patch SticksHot Melt Patch SticksManufacturers InstructionsHot Melt Patch SticksNACE SP0402Patch Sticks Repairs to Bare SteelAccuracy of IR GunsContamination of Substrate with Applied HeatSteam from Pre-Heating Pipe Before CoatingAir Bubbles in Epoxy CoatingsPaths Forward