11
Leon CountyLeon CountyBoard of County Board of County CommissionersCommissioners
MICCOSUKEE ROAD MICCOSUKEE ROAD RESURFACIINGRESURFACIING
INTERMITTENT ROAD INTERMITTENT ROAD CLOSURECLOSURE
From North MERIDIAN STREETFrom North MERIDIAN STREET
To DOCTORS DRIVETo DOCTORS DRIVE
33
June 7, 2010 through August 13, June 7, 2010 through August 13, 2010 2010
Between 8:00 a.m. and 5:00 p.m.Between 8:00 a.m. and 5:00 p.m. Roads will be re-opened to traffic Roads will be re-opened to traffic
after 5:00 p.m. each day until 8:00 after 5:00 p.m. each day until 8:00 a.m. next day. a.m. next day.
DATES AND TIMEDATES AND TIME
44
SCOPE AND SEQUENCE OF WORKSCOPE AND SEQUENCE OF WORK
1. Milling the existing asphalt.1. Milling the existing asphalt.
2. Lay down the new structural course.2. Lay down the new structural course.
3. Temporary Striping3. Temporary Striping
FULL ROAD CLOSUREFULL ROAD CLOSURE
55
SCOPE AND SEQUENCE OF WORKSCOPE AND SEQUENCE OF WORK
4. Repair the curb, gutter, and ADA Access 4. Repair the curb, gutter, and ADA Access Ramps.Ramps.
5. Utility adjustment.5. Utility adjustment.
6. Install final friction course.6. Install final friction course.
7. Put down the new pavement marking 7. Put down the new pavement marking (Striping). (Striping).
LANE CLOSURELANE CLOSURE
66
Road Closure in FIVE PHASES. Road Closure in FIVE PHASES. Daily Road Closure between 8:00 Daily Road Closure between 8:00
a.m. and 5:00 p.m. a.m. and 5:00 p.m. Roads will be re-opened to traffic Roads will be re-opened to traffic
after 5:00 p.m. each day until 8:00 after 5:00 p.m. each day until 8:00 a.m. next day. a.m. next day.