HIRARC FORM
Company : BVB Conducted by : Mohd Fadhlie Muhammad Sutan Mudo
Process / Location : Route survey (Name, designation) SHO
Approved by : Shahairul Amir Ismail Date: (from… to ….) 17 May 2010 to 31 May 2010
(Name, designation) Project Manager
Date : 17 May 2010 Review Date : 31 May 2010 Next Review Date: 2 Weeks
1. Hazard Identification 2. Risk Analysis 3. Risk Control
No Work Activity
Hazard Which can cause/effectExisting Risk
Control (if any)
Likelihood Severity RiskRecommended
Control Measures
PIC (Due
date/status)
1
Working by the road side
Slip, fall Hit by moving vehicle Nil 3 4 12
(Med)
-Refer SOP, Use proper PPE (Safety vest, safety boot)
Surveyor, (complete)