HIRARC FORM Company : BVB Conducted by : Mohd Fadhlie Muhammad Sutan Mudo Process / Location : Route survey (Name, designation) SHO Approved by : Shahairul Amir Ismail Date: (from… to ….) 17 May 2010 to 31 May 2010 (Name, designation) Project Manager Date : 17 May 2010 Review Date : 31 May 2010 Next Review Date: 2 Weeks 1. Hazard Identification 2. Risk Analysis 3. Risk Control No Work Activit y Hazar d Which can cause/effect Existing Risk Control (if any) Likeli hood Sever ity Risk Recommende d Control Measures PIC (Due date/sta tus) 1 Workin g by the road side Slip , fall Hit by moving vehicle Nil 3 4 12 (Med) -Refer SOP, Use proper PPE (Safety vest, safety boot) Surveyo r, (complet e) 2 3

1. HIRARC Road Survey

Embed Size (px)

Citation preview

Page 1: 1. HIRARC Road Survey

    HIRARC FORM  

  Company :  BVB   Conducted by :  Mohd Fadhlie Muhammad Sutan Mudo

 Process / Location : Route survey   (Name, designation)  SHO

  Approved by :  Shahairul Amir Ismail   Date: (from… to ….)  17 May 2010 to 31 May 2010

  (Name, designation)  Project Manager    

  Date :  17 May 2010   Review Date : 31 May 2010 Next Review Date:  2 Weeks

1. Hazard Identification 2. Risk Analysis 3. Risk Control

No Work Activity

Hazard Which can cause/effectExisting Risk 

Control (if any)

Likelihood Severity RiskRecommended 

Control Measures

PIC (Due 

date/status)

1

 Working by  the road side

 Slip, fall  Hit by moving vehicle Nil 3 4 12 

(Med)

-Refer SOP, Use proper PPE (Safety vest, safety boot)

 Surveyor, (complete)

2          

3          

4          

5