21
Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved. Phase 1 Review Pre job Brief Phase 1 Review Pre-job Brief Update of the Advanced Logic System Erik Matusek, Manager, Next Generation Safety System Platform August 6, 2014 1

08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Phase 1 Review Pre job BriefPhase 1 Review – Pre-job BriefUpdate of the Advanced Logic System

Erik Matusek, Manager, Next Generation Safety System Platform

August 6, 2014

1

Page 2: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Purpose/AgendaPurpose/AgendaPurpose• Discuss the Phase 1 submittal including a review of the ALS Topical g p

Report Addendum• Discuss some considerations for ISG-06 Phase 2 submittal

Agenda• Introduction/Background • ISG-06 Phase 1 Submittal

ALS T i l R t Add d R i– ALS Topical Report Addendum Review• ISG-06 Phase 2 Considerations

– Technical Documentation a,c,e

– Schedule of Document Submittals• Wrap-up

2

Page 3: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Introduction/BackgroundIntroduction/Background• The NRC completed the Safety Evaluation Report (SER) of the

Advanced Logic System (ALS)Th ALS T i l R t d i S t b 2013– The ALS Topical Report was approved in September 2013.

– Westinghouse has been using the ALS on projects

• Westinghouse desires to update the ALS to provide better alignment• Westinghouse desires to update the ALS to provide better alignment with Operating Plant market needs as well as potential future applications in AP1000 Protection and Safety Monitoring System (PMS).

• The updated version of ALS is referred to as “ALS II.”

• LTR-NRC-14-15, “Phase 0 Meeting: Update of the Advanced Logic System” Rev 1 dated May 7 2014 documented the presentation usedSystem”, Rev.1, dated May 7, 2014 documented the presentation used in April 17, 2014 meeting with NRC.

• Phase 1 documents submitted in LTR-NRC-14-39 dated July 1 2014

3

Phase 1 documents submitted in LTR NRC 14 39 dated July 1, 2014.

Page 4: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 Submittal

4

Page 5: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 SubmittalChange DriversChange Drivers

a,c,e

1. Site Transition from Scottsdale, AZ to Warrendale, PA; examples include:

6002 00006 Security Plan (revised)– 6002-00006, Security Plan (revised)– NA 4.50, Electronics Development Procedure (replaced)

2 Platform Maintenance/Corrective Actions; examples include:2. Platform Maintenance/Corrective Actions; examples include:– 6002-00011, ALS Platform Specification (revised)– NA 4.51, FPGA Development Procedure (revised)

a c ea,c,e

Th Ph 1 b itt l t d f i t

5

The Phase 1 submittal accounted for inputs from all three of these change drivers

Page 6: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 SubmittalSummary of documentsSummary of documentsThe following documents were submitted by LTR-NRC-14-39 for the ISG-06 Phase 1 Review:

• 6003-00301, “Advanced Logic System Topical Report Addendum” • 6003-00000, “Advanced Logic System (ALS) II Project Management Plan” • 6003-00001, “ALS II Quality Assurance Plan” • 6002-00002, “ALS Configuration Management Plan” • 6003-00003, “ALS II VV Plan” • 6003-00004, “ALS II Equipment Qualification Plan”

6003 00005 “ALS II T t Pl ”• 6003-00005, “ALS II Test Plan” • 6002-00006, “ALS Security Plan” • 6003-00010, “ALS II Platform Requirements Specification”• 6003 00011 “ALS II Platform Specification”• 6003-00011, ALS II Platform Specification• 6002-00030, “Advanced Logic System Design Tools”• 6002-00031, “ALS Diversity Analysis”

6

Page 7: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 Submittal[ ]a c e[ ]a,c,e

• 6002-00301-P-A (Rev 4) is the Approved Topical Report for the ALSfor the ALS

a,c,e

The Addendum approach is reflective of

7

the minimal impact that ALS II has on the ALS Approved Topical Report

Page 8: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 Submittal[ ]a c e[ ]a,c,e

a,c,e

• ISG-06 Enclosure B table specifically addresses documentation for a digital I&C upgrade LAR.

– The table lists the documentation for review phases 1, 2, and 3– Phases 1 and 2 lists the documentation required for a platform development projectPhases 1 and 2 lists the documentation required for a platform development project.– Phase 3 covers installation and operational aspects of a system (application of a platform).

• The ALS Topical Report (6002-00301-P-A) and the ALS Topical Report Addendum (6003-00301) maps platform development documentation to Phases 1 and 2 of ISG-06 Enclosure B. a c eISG 06 Enclosure B. a,c,e

a,c,e

8

, ,

Page 9: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 1 Submittal[ ]a c e[ ]a,c,e

a,c,ea,c,e

9

Page 10: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 Considerations

10

Page 11: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsTechnical DocumentationTechnical DocumentationPer the Phase 0 meeting/presentation:• The existing ALS technical document structure flow will be g

maintained– Configuration Control of the ALS documents will continue to be

maintained via the 6002-00007 and all child documentsa,c,ea,c,e

As additional life-cycle activities are being

11

As additional life-cycle activities are being executed, some minor clarifications are required

Page 12: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsTechnical Documentation ClarificationsTechnical Documentation - ClarificationsClarifications are in red• The existing ALS technical document structure flow will be

i t i dmaintained– Configuration Control of the ALS documents will continue to be

maintained via the 6002-00007 and all child documents a,c,e

Requires a revision to the ALS II Project

12

Requires a revision to the ALS II Project Management Plan (6003-00000) to address

these clarifications

Page 13: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsTechnical Documentation 6003 00000 Changes

A revision will be implemented in the ALS II Project Management Plan (and other plans as necessary) to reflect the technical document clarifications.

Technical Documentation – 6003-00000 Changes

• Summary of Requirements and Design Specification Documents – Board requirements documents: 6003-xxx01– Board design specifications: 6003-xxx02

• Derived from the hardware portion of requirements in xxx01 documentsDerived from the hardware portion of requirements in xxx01 documents. – FPGA requirements

• Derived for FPGA portion of requirements in xxx01 documents a,c,e

– FPGA requirements• Derived from xxx06 FPGA requirements documents a,c,e

13

Page 14: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsTechnical Documentation 6003 00000 ChangesThe Project Management Plan will also be revised to reflect a consistent approach on the FPGA Common Modules.

G

Technical Documentation – 6003-00000 Changes

• The FPGA common modules can be shared by multiple boards and are contained in “companion” documents to the FPGA design description documents of 6002-xxx03 (Core A) and 6002-xxx04 (Core B) a,c,e

14

Page 15: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsRevised Technical Document Flow from Phase 0Revised Technical Document Flow from Phase 0

a,c,e

a,c,e

Notes:

a,c,e

15

Page 16: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 Considerations[ ]a c e[ ]a,c,e

a,c,e

• The IVV plan includes simulation, tool assessment and general review activities per the ALS development processactivities per the ALS development process

• The SER recognizes that the Core Logic Board code is application specific

a,c,e

16

Page 17: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 Considerations[ ]a c e[ ]a,c,e

a,c,e

a,c,e

17

Page 18: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 Considerations[ ]a c e[ ]a,c,e

a,c,e

18

Page 19: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsSchedule of Document SubmittalsSchedule of Document Submittals• Document submittals will be done per ISG-06

– ALS Topical Report paragraph 12 7 provides a list of all documents– ALS Topical Report, paragraph 12.7, provides a list of all documents

• Schedule for documentation– Topical Report and Phase 1 Documents – Submitted on July 1, p p y ,

2014 (Complete)

– Phase 2 Documents – Applicable documents shall be submitted 30 days following the release of the respective ALS Platform CM y g pRelease Letters associated with the identified project control points (as defined in Section 2.2.1.2 of 6003-00000, Revision 1, ALS II Project Management Plan).

– Documents identified in Appendix B of 6003-00000, shall be docketed with the NRC; other documents will be available for audit by the NRC (as was done with ALS).

19

Page 20: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

ISG-06 Phase 2 ConsiderationsSchedule of Document SubmittalsSchedule of Document Submittals

a,c,e

20

Page 21: 08/06/2014 Phase 1 Review - Pre-job Brief Update of the ... · • Discuss some considerations for ISG-06 Phase 2 submittal ... with Operating Plant market needs as well as potential

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Discussion and Wrap-up