COUNTY AGENCY PIN PROJECT DESCRIPTION FUND SOURCES FFY TOTAL 4-YEAR PROGRAM in millions of dollars PHASE AQ CODE FFY 2022 FFY 2023 FFY 2021 FFY 2020 4-YEAR PROGRAM (FFY) Starting October 01, 2019 Tuesday, June 2, 2020 Page 1 of 43 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 11 TOTAL PROJECT COST 189.567 FTA 5337 189.567 MISC 2020 MISC 1410.433 1410.433 2020 NFA MTA NYCT CM09-6891 DESIGN AND PROCUREMENT OF 1025 60-FOOT R211 RAILCARS. 940 CARS WILL REPLACE EXISTING FLEET AND MEET EXPANSION NEEDS SYSTEMWIDE, 10 CARS WILL BE PROTOTYPE CARS WITH OPEN GANGWAYS FOR FEASIBILITY STUDY (75 WILL REPLACE EXISTING FLEET ON THE SI RAILWAY UNDER SI09-6891) 1600.000 1600.000 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST : SYSTEM-WIDE TPC : $2.7-$3.3 B 0.817 FTA 5324 CR 0.817 CONST 2020 CONST 2.483 2.483 2020 NFA MTA NYCT E-T04-03-34 INTERNAL STATION HARDENING (PART 4) - IMPLEMENT RESILIENCY MEASURES AT SIGNAL AND COMMUNICATION ROOMS AT SIX STATIONS IN ORDER TO PROTECT THEM FROM FLOOD DAMAGE. STATION HARDENING WILL GREATLY REDUCE REPEATED INVESTMENTS TO REPAIR EQUIPMENT RELATED TO SIGNALING AND COMMUNICATIONS AFTER STORM EVENTS. THIS PROJECT WILL PROTECT THE COMMUNICATION ROOM AT 148TH ST STATION - LENOX LINE, MANHATTAN, NY (D2013 -RESL -024) 3.300 3.300 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST : NEW YORK TPC : $2-$4 M 52.278 FTA 5324 CR 52.278 CONST 2020 CONST 17.426 17.426 2020 NFA MTA NYCT E-T04-03-36 PROTECTION OF STREET LEVEL OPENINGS IN FLOOD PRONE AREAS BY IMPLEMENTING RESILIENCY MEASURES TO PROTECT VULNERABLE STREET LEVEL OPENINGS, SUCH AS, STREET STAIRS AT STATIONS, ELEVATORS, ESCALATORS,VENTS, HATCHES AND MANHOLES IN VULNERABLE FLOOD ZONES. THE RANGE OF SOLUTIONS BY LOCATION INCLUDE, BUT ARE NOT LIMITED TO: MECHANICAL CLOSURE DEVICES, MANHOLE INSERTS, WATERTIGHT HATCHES, WATERTIGHT STAIRCASE COVERS, AND FLOOD LOG BARRIERS ACROSS THE SYSTEM. BREAKOUT FROM PIN E T04 03 01 BASED ON UPDATED PROJECT SPECIFICATIONS (D2013 RESL 022) 69.704 69.704 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST : SYSTEM-WIDE TPC : $0.5-$0.6 B 14.507 FTA 5324 CR 14.507 CONST 2020 CONST 7.403 7.403 2020 NFA MTA NYCT E-T06-03-03 FLOOD PROTECTION TO THE VULNERABLE SUBSTATIONS IN THE FLOOD PRONE AREA IN THE BOROUGH OF BROOKLYN, MANHATTAN AND QUEENS. HARDENING OF THE SUBSTATIONS WORK INCLUDE: REPLACEMENT OF EXISTING CONVENTION DOORS FOR PERSONNEL ACCESS WITH FLOOD DOORS; REPLACEMENT OF ROLL UP DOORS FOR EQUIPMENT AND VEHICULAR ACCESS WITH HYDRAULIC FLOOD GATE OR ERECTABLE LOGS; REPLACEMENT OF PERSONNEL ACCESS HATCH AND VENTILATION; WATER TIGHT WALL AND CEILING PENETRATION; REPLACEMENT OF TRACTION DRY TYPE TRANSFORMER WITH OIL FILLED TRANSFORMER; RAISE THE ELECTRICAL EQUIPMENT. THE SCOPE FOR THIS WORK WAS BROKEN OUT TO SEPARATE PINS: E-T09-03-08, E-T09-03-12, E-T09-03-05, E-T09-03-11, E-T09-03-07, E-T09-03-06. D2013-RESL-018 21.910 21.910 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST : MULTI TPC : $100-$225 M

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...d2016-ccip-14002, d2017-ccip-003 AQC:B8 NEW YORK TPC : $32-$50 M TOTAL 4YR COST : 38.187 38.187 0.000 0.000 0.000 MTA NYCT NFA 2020

  • Upload
    others

  • View
    17

  • Download
    0

Embed Size (px)

Citation preview

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 1 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

189.567 FTA 5337 189.567 MISC2020MISC 1410.433 1410.433 2020NFA

MTA NYCT

CM09-6891

DESIGN AND PROCUREMENT OF 1025 60-FOOT R211 RAILCARS. 940 CARS WILL REPLACE EXISTING FLEET AND MEET EXPANSION NEEDS SYSTEMWIDE, 10 CARS WILL BE PROTOTYPE CARS WITH OPEN GANGWAYS FOR FEASIBILITY STUDY (75 WILL REPLACE EXISTING FLEET ON THE SI RAILWAY UNDER SI09-6891)

1600.000 1600.000 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :SYSTEM-WIDE TPC : $2.7-$3.3 B

0.817 FTA 5324 CR 0.817 CONST2020CONST 2.483 2.483 2020NFA

MTA NYCT

E-T04-03-34

INTERNAL STATION HARDENING (PART 4) - IMPLEMENT RESILIENCY MEASURES AT SIGNAL AND COMMUNICATION ROOMS AT SIX STATIONS IN ORDER TO PROTECT THEM FROM FLOOD DAMAGE. STATION HARDENING WILL GREATLY REDUCE REPEATED INVESTMENTS TO REPAIR EQUIPMENT RELATED TO SIGNALING AND COMMUNICATIONS AFTER STORM EVENTS. THIS PROJECT WILL PROTECT THE COMMUNICATION ROOM AT 148TH ST STATION - LENOX LINE, MANHATTAN, NY (D2013�-RESL�-024)

3.300 3.300 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST :NEW YORK TPC : $2-$4 M

52.278 FTA 5324 CR 52.278 CONST2020CONST 17.426 17.426 2020NFA

MTA NYCT

E-T04-03-36

PROTECTION OF STREET LEVEL OPENINGS IN FLOOD PRONE AREAS BY IMPLEMENTING RESILIENCY MEASURES TO PROTECT VULNERABLE STREET LEVEL OPENINGS, SUCH AS, STREET STAIRS AT STATIONS, ELEVATORS, ESCALATORS,VENTS, HATCHES AND MANHOLES IN VULNERABLE FLOOD ZONES. THE RANGE OF SOLUTIONS BY LOCATION INCLUDE, BUT ARE NOT LIMITED TO: MECHANICAL CLOSURE DEVICES, MANHOLE INSERTS, WATERTIGHT HATCHES, WATERTIGHT STAIRCASE COVERS, AND FLOOD LOG BARRIERS ACROSS THE SYSTEM. BREAKOUT FROM PIN E T04 03 01 BASED ON UPDATED PROJECT SPECIFICATIONS (D2013 RESL 022)

69.704 69.704 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.5-$0.6 B

14.507 FTA 5324 CR 14.507 CONST2020CONST 7.403 7.403 2020NFA

MTA NYCT

E-T06-03-03

FLOOD PROTECTION TO THE VULNERABLE SUBSTATIONS IN THE FLOOD PRONE AREA IN THE BOROUGH OF BROOKLYN, MANHATTAN AND QUEENS. HARDENING OF THE SUBSTATIONS WORK INCLUDE: REPLACEMENT OF EXISTING CONVENTION DOORS FOR PERSONNEL ACCESS WITH FLOOD DOORS; REPLACEMENT OF ROLL UP DOORS FOR EQUIPMENT AND VEHICULAR ACCESS WITH HYDRAULIC FLOOD GATE OR ERECTABLE LOGS; REPLACEMENT OF PERSONNEL ACCESS HATCH AND VENTILATION; WATER TIGHT WALL AND CEILING PENETRATION; REPLACEMENT OF TRACTION DRY TYPE TRANSFORMER WITH OIL FILLED TRANSFORMER; RAISE THE ELECTRICAL EQUIPMENT. THE SCOPE FOR THIS WORK WAS BROKEN OUT TO SEPARATE PINS: E-T09-03-08, E-T09-03-12, E-T09-03-05, E-T09-03-11, E-T09-03-07, E-T09-03-06. D2013-RESL-018

21.910 21.910 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST :MULTI TPC : $100-$225 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 2 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

117.946 FTA 5324 CR 117.946 CONST2020CONST 39.215 39.215 2020NFA

MTA NYCT

E-T07-03-12

IMPLEMENT RESILIENCY INITIATIVES ALONG THE ROCKAWAY LINE TO PROTECT VARIOUS ASSETS FROM FUTURE STORM SURGES AT A MINIMUM 100 YEAR +2 PROTECTION. THE LOCATIONS INCLUDE HOWARD BEACH STATION, BROAD CHANNEL STATION, BEACH 105 ST STATION AND ADJACENT ROW, NORTH CHANNEL BRIDGE, SOUTH CHANNEL BRIDGE, AND BEACH 116 ST STATION. SPLIT OUT OF PIN E-T07-03-09 (D2013-RESL-028)

157.161 157.161 0.000 0.000 0.000 AQC:B9 TOTAL 4YR COST :QUEENS TPC : $100-$225 M

500.000 500.000 CONSTFTA 5309 NS 2021CONST 270.000 270.000 2021NFA

500.000 500.000 CONSTFTA 5309 NS 2022CONST 270.000 270.000 2022NFA

MTA NYCT

G710-01AA

SECOND AVE SUBWAY PHASE 2 CONSTRUCTION SUPPORT ACTIVITIES (96ST ALONG 2AVE TO 125ST THEN WEST TO 5AVE): SITE PREP FOR NEW TUNNEL AND 3 NEW STATIONS (125, 116, 106 STREETS), INTERMODAL CONNECTION, DESIGN DEVELOPMENT, REAL ESTATE, AND PROFESSIONAL SERVICES

1540.000 0.000 770.000 770.000 0.000 AQC:NON TOTAL 4YR COST :NEW YORK TPC : $1.4-$1.8 B

CONST 19.151 19.151 2020NFAMTA NYCT

MW03-2062

REPLACEMENT OF NINE ESCALATORS AT THE FOLLOWING STATIONS IN MANHATTAN, THE BRONX AND BROOKLYN TO MAINTAIN A STATE OF GOOD REPAIR: 125TH ST (BW7), 181 ST (8 AV), PELHAM BAY PARK (PELHAM), BROADWAY JUNCTION (FULTON/JAMAICA).

19.151 19.151 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :MULTI TPC : $40-$60 M

CONST 11.415 11.415 2020NFAMTA NYCT

MW03-6182

REPLACEMENT OF SEVEN ESCALATORS AT THE FOLLOWING STATIONS IN BROOKLYN AND MANHATTAN TO MAINTAIN A STATE OF GOOD REPAIR: HIGH ST (8 AV), SMITH ST/9 ST (6 AV), AND BOWLING GREEN (LEX).

11.415 11.415 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :MULTI TPC : $32-$50 M

8.650 FTA 5309 8.650 CONST2020CONST 20.285 20.285 2020NFA

MTA NYCT

MW11-3766

PROCUREMENT AND INSTALLATION OF LOW-RESISTANCE CONTACT RAIL WITHIN THE CANARSIE TUBE, BETWEEN BROOKLYN & MANHATTAN TO PROVIDE SUFFICIENT POWER FOR INCREASED OPERATIONS. D2016-CCIP-003, D2016-CCIP-14002, D2017-CCIP-003

28.935 28.935 0.000 0.000 0.000 AQC:B9 TOTAL 4YR COST :MULTI TPC : $32-$50 M

16.280 FTA 5337 16.280 CONST2020CONST 24.420 24.420 2020NFA

MTA NYCT

MW19-6556

REHABILITATION OF FOUR (4) PUMP ROOMS TO MAINTAIN A STATE OF GOOD REPAIR, THREE IN MANHATTAN AND ONE IN QUEENS.

40.700 40.700 0.000 0.000 0.000 AQC:B9 TOTAL 4YR COST :MULTI TPC : $32-$50 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 3 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

115.173 115.173 MISCCMAQ 2021MISC 50.504 50.504 2021NFA

MTA NYCT

MW38-1456

MODERNIZATION OF PARSONS BLVD INTERLOCKING ON THE QUEENS BOULEVARD LINE TO SUPPORT THE IMPLEMENTATION OF COMMUNICATION BASED TRAIN CONTROL (CBTC).

165.677 0.000 165.677 0.000 0.000 AQC:B6 TOTAL 4YR COST :QUEENS TPC : $100-$225 M

CONST 37.613 37.613 2020NFAMTA NYCT

MW38-1957

REPLACEMENT OF INTERLOCKING CONTROL AND TRAIN OCCUPANCY INDICATION SYSTEM ON THE BROADWAY-7TH AVENUE LINE TO ACHIEVE A STATE OF GOOD REPAIR.

37.613 37.613 0.000 0.000 0.000 AQC:B6 TOTAL 4YR COST :NEW YORK TPC : $50-$85 M

58.686 FTA 5309 58.686 CONST2020CONST 134.473 134.473 2020NFA

MTA NYCT

PW08-2548

CONSTRUCT THREE (3) NEW POWER SUBSTATIONS ON CANARSIE LINE IN MANHATTAN AND BROOKLYN TO INCREASE CAPACITY OF OPERATIONS UNDER COMMUNICATION BASED TRAIN CONTROL (CBTC) D2016-CCIP-003, D2016-CCIP-14002, D2017-CCIP-003.

193.159 193.159 0.000 0.000 0.000 AQC:B6 TOTAL 4YR COST :MULTI TPC : $175-$385 M

2.041 FTA 5309 2.041 CONST2020CONST 5.165 5.165 2020NFA

MTA NYCT

ST01-0810

CONSTRUCT NEW STAIRS ALONG WITH ANCILLARY MODIFICATIONS TO IMPROVE EFFICIENCY IN OPERATIONS AT 1ST AVENUE STATION IN MANHATTAN AND BEDFORD AVE STATION IN BROOKLYN ALONG THE CANARSIE LINE. D2016-CCIP-003 & D2016-CCIP-14002, D2017-CCIP-003

7.206 7.206 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

19.406 FTA 5309 19.406 CONST2020CONST 49.858 49.858 2020NFA

MTA NYCT

ST04-0810

CONSTRUCTION OF ADA ELEVATORS ALONG WITH ANCILLARY IMPROVEMENTS AT BEDFORD AVENUE STATION IN CANARSIE BROOKLYN TO IMPROVE ACCESSIBILITY. D2016-CCIP-003, D2016-CCIP-14002 D2017-CCIP-003

69.264 69.264 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :KINGS TPC : $100-$225 M

11.217 FTA 5309 11.217 CONST2020CONST 26.970 26.970 2020NFA

MTA NYCT

ST04-3484

CONSTRUCTION OF ADA ELEVATORS ALONG WITH ANCILLARY IMPROVEMENTS AT 1ST AVENUE STATION ALONG THE CANARSIE LINE IN MANHATTAN TO IMPROVE ADA ACCESSIBILITY. D2016-CCIP-003, D2016-CCIP-14002, D2017-CCIP-003

38.187 38.187 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :NEW YORK TPC : $32-$50 M

CONST 24.000 24.000 2020NFAMTA NYCT

ST04-6131

PROVIDE FULL ADA (AMERICANS WITH DISABILITIES ACT) ACCESSIBILITY AT THE WOODHAVEN BOULEVARD STATION ON THE JAMAICA LINE IN QUEENS.

24.000 24.000 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :QUEENS TPC : $26-$40 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 4 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

3.913 FTA 5307 3.913 MISC2020MISC 0.978 0.978 2020NFA

MTA-BUS

U7030210

REPLACE FACILITY PAINT BOOTHS THAT ARE PAST THEIR USEFUL LIFE, AND BASED ON CONDITION AT THE EASTCHESTER AND COLLEGE POINT DEPOTS

4.891 4.891 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

3.600 FTA 5307 3.600 MISC2020MISC 0.900 0.900 2020NFA

MTA-BUS

U7030212

ENVIRONMENTAL REMEDIATION SERVICES INCLUDING DETECTION OF REMEDIATION NEED AT VARIOUS MTA BUS LOCATIONS TO MAINTAIN A STATE OF GOOD REPAIR

4.500 4.500 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.3-$5.6 M

2.000 FTA 5307 2.000 MISC2020MISC 0.500 0.500 2020NFA

MTA-BUS

U7030213

REPLACE THE CHASSIS WASH AND OIL-WATER SEPARATOR THAT ARE PAST THEIR USEFUL LIFE, AND BASED ON CONDITION AT THE COLLEGE POINT DEPOT IN QUEENS

2.500 2.500 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :QUEENS TPC : $2-$4 M

6.300 FTA 5307 6.300 MISC2020MISC 1.575 1.575 2020NFA

MTA-BUS

U7030215

PROJECT ADMINISTRATION - TO SUPPORT THE IMPLEMENTATION AND SUPERVISION OF CAPITAL PROJECTS AS WELL AS ON-GOING GENERAL ADMINISTRATIVE FUNCTIONS

7.875 7.875 0.000 0.000 0.000 AQC:B1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $9.5-15.5 M

5.400 FTA 5307 5.400 MISC2020MISC 1.350 1.350 2020NFA

MTA-BUS

U7030216

DESIGN MANAGEMENT - TO PROVIDE ENGINEERING DESIGN SERVICES TO SUPPORT THE CAPITAL PROGRAM

6.750 6.750 0.000 0.000 0.000 AQC:C5 TOTAL 4YR COST :SYSTEM-WIDE TPC : $6-$9.4 M

5.400 FTA 5307 5.400 MISC2020MISC 1.350 1.350 2020NFA

MTA-BUS

U7030217

CONSTRUCTION MANAGEMENT - TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES TO SUPPORT THE CAPITAL PROGRAM

6.750 6.750 0.000 0.000 0.000 AQC:C5 TOTAL 4YR COST :SYSTEM-WIDE TPC : $6-$9.4 M

13.488 FTA 5339 13.488 MISC2020MISC 3.372 3.372 2020NFA

MTA-BUS

U7030219

PURCHASE 25 40-FOOT STANDARD DIESEL BUSES BASED ON FLEET REQUIREMENTS AND AVAILABLE FUNDING TO REPLACE VEHICLES APPROACHING THE END OF THEIR USEFUL LIFE. BUSES TO BE OPERATED IN QUEENS

16.860 16.860 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :QUEENS TPC : $15-$25 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 5 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

30.758 FTA 5307 30.758 MISC2020MISC 7.689 7.689 2020NFA

1.794 FTA 5339 1.794 MISC2020MISC 0.448 0.448 2020NFA

31.373 31.373 MISCFTA 5307 2021MISC 7.843 7.843 2021NFA

1.830 1.830 MISCFTA 5339 2021MISC 0.458 0.458 2021NFA

32.001 32.001 MISCFTA 5307 2022MISC 8.000 8.000 2022NFA

1.867 1.867 MISCFTA 5339 2022MISC 0.467 0.467 2022NFA

32.641 32.641 MISCFTA 5307 2023MISC 8.160 8.160 2023NFA

1.904 1.904 MISCFTA 5339 2023MISC 0.476 0.476 2023NFA

MTA-BUS

U80303XX

FUNDS FOR FUTURE MTA-BUS TRANSIT PROJECTS TO BE IDENTIFIED THROUGH TIP ACTIONS - BLOCK FUND

167.709 40.689 41.504 42.335 43.181 AQC:J1 TOTAL 4YR COST :MULTI TPC : $175-$385 M

3.328 NHPP 3.328 PRELDES2020PRELDES 0.832 0.832 2020NFADETLDES 7.150 7.150 2023NFA

NYSDOT

X02172

REHABILITATION OF SHORE PARKWAY VIADUCT OVER SHELL ROAD/SUBWAY YARD - REPLACE THE CONCRETE DECKS, REPAIR SUPERSTRUCTURE & SUBSTRUCTURE ALONG WITH OTHER DETERIORATED ELEMENTS TO ENSURE CONTINUED SAFE OPERATIONS, BROOKLYN (BIN 2231359)

11.310 4.160 0.000 0.000 7.150 AQC:A19 TOTAL 4YR COST :KINGS TPC : $100-$225 M

DETLDES 6.035 6.035 2020NFACONINSP 5.535 5.535 2021NFACONST 41.426 41.426 2021NFA

NYCDOT

X02173

REHABILITATION OF BELT PARKWAY BRIDGE OVER NOSTRAND AVENUE IN BROOKLYN TO BRING TO A STATE OF GOOD REPAIR (BIN #2-23143)

52.996 6.035 46.961 0.000 0.000 AQC:A19 TOTAL 4YR COST :KINGS TPC : $50-$85 M

CONINSP 0.800 0.800 2020NFACONST 5.300 5.300 2020NFA

NYSDOT

X02709

SAFETY IMPROVEMENTS TO WESTCHESTER AVE BRIDGE OVER THE ARTHUR SHERIDAN EXPRESSWAY TO IMPROVE SAFETY FOR MOTORIST, PEDESTRIANS AND BICYCLISTS

6.100 6.100 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :BRONX TPC : $6-$9.4 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 6 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

0.191 REC TRAILS 0.191 CONST2020CONST 0.048 0.048 2020NFA

OPRHP

X02710

THE BRONX RIVER ALLIANCE WILL KEEP THE BRONX RIVER OPEN TO RECREATIONAL CANOE AND KAYAK USE IN THE NAVIGABLE LOWER 8 MILES WITHIN BRONX COUNTY AND MAINTAIN THE BRONX RIVER BLUE-WAY, A DESIGNATED NATIONAL WATER TRAIL, THROUGH REMOVAL OF BLOCKAGES AND LITTER, MAINTENANCE AND IMPROVEMENT OF PUBLIC BOAT LAUNCH INFRASTRUCTURE AND THE IMPROVEMENT OF SEVERAL PORTAGE ACCESS POINTS (RTP AWARD 2017 - OPRHP #173969)

0.239 0.239 0.000 0.000 0.000 AQC:C14 TOTAL 4YR COST :BRONX TPC : < $0.75 M

0.540 HSIP 0.540 CONINSP2020CONINSP 0.060 0.060 2020NFA

3.150 HSIP 3.150 CONST2020CONST 0.350 0.350 2020NFA

2.400 STBG LG URB 2.400 CONST2020CONST 0.600 0.600 2020NFA

NYSDOT

X05172

IMPROVE SAFETY ON THE W/B GRAND CENTRAL PARKWAY BY ADDING AN AUXILIARY LANE (0.90 MILES) BETWEEN THE N/B EXIT RAMP TO FRANCIS LEWIS BLVD. (EXIT 20A) AND THE EXIT RAMP TO 188TH ST TO REDUCE A WEAVING CONDITION. IN ADDITION, A SHOULDER IS TO BE ADDED WITHIN THE EXISTING RIGHT-OF-WAY, QUEENS COUNTY

7.100 7.100 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $6-$9.4 M

1.368 1.368 CONINSPNHPP 2023CONINSP 0.342 0.342 2023NFA

13.042 13.042 CONSTNHPP 2023CONST 3.260 3.260 2023NFA

NYSDOT

X07155

DECK REPLACEMENT OF THREE BRIDGES ON THE HARLEM RIVER DRIVE (E135 ST - E139 ST) IN MANHATTAN TO ADDRESS STRUCTURAL DEFICIENCY AND SAFETY ISSUES, BINS: 1077000, 107701A & 1077010 (SPLIT FROM X80658)

18.012 0.000 0.000 0.000 18.012 AQC:A19 TOTAL 4YR COST :NEW YORK TPC : $15-$25 M

PRELDES 50.000 50.000 2020NFANYCDOT

X07157

TRANS-MANHATTAN EXPRESSWAY REHABILITATION FROM HARLEM RIVER DRIVE TO GEORGE WASHINGTON BRIDGE IN MANHATTAN TO BRING TO A STATE OF GOOD REPAIR (BIN 2-26724-0)

50.000 50.000 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :NEW YORK TPC : $387.0-$476.8 M

11.628 HSIP 11.628 CONST2020CONST 1.292 1.292 2020NFA

1.152 1.152 CONINSPSTBG LG URB 2021CONINSP 0.128 0.128 2021NFA

NYSDOT

X07214

SAFETY IMPROVEMENTS ON ROCKAWAY BLVD BETWEEN FARMERS BLVD AND 3RD ST TO REDUCE FATAL & INJURY ACCIDENTS TO INCLUDE UPGRADING TRAFFIC SIGNALS, SIDEWALKS, CURB RAMPS, CROSSWALKS, RESURFACING/ REPAIRING PAVEMENT, PAVEMENT MARKINGS, SIGNS AND AN EXTENSION OF A LEFT TURN BAY, QUEENS

14.200 12.920 1.280 0.000 0.000 AQC:A6 TOTAL 4YR COST :QUEENS TPC : $12.5-$19 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 7 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

2.240 STBG LG URB 2.240 DETLDES2020DETLDES 0.560 0.560 2020NFA

29.040 29.040 CONSTNHPP 2021CONST 7.260 7.260 2021NFA

4.000 4.000 CONINSPSTBG LG URB 2021CONINSP 1.000 1.000 2021NFA

15.600 15.600 CONSTSTBG LG URB 2021CONST 3.900 3.900 2021NFA

NYSDOT

X11026

REPLACEMENT OF NON-REDUNDANT SUPERSTRUCTURE AND SUBSTRUCTURE REPAIR OF BRONX RIVER PARKWAY BRIDGE, STATE ROUTE 907H OVER METRO NORTH, 236TH STREET TO BRING STRUCTURE TO STATE OF GOOD REPAIR, BRONX (BIN 1075049)

63.600 2.800 60.800 0.000 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $50-$85 M

1.168 STBG-OFF 1.168 PRELDES2020PRELDES 0.292 0.292 2020NFADETLDES 1.250 1.250 2021NFA

1.000 1.000 CONINSPNHFP 2021CONINSP 0.250 0.250 2021NFA

9.000 9.000 CONSTNHFP 2021CONST 1.000 1.000 2021NFA

2.000 2.000 CONINSPSTBG-OFF 2021CONINSP 0.500 0.500 2021NFA

28.600 28.600 CONSTSTBG-OFF 2021CONST 7.150 7.150 2021NFA

NYSDOT

X22869

CONSTRUCT AN AUXILIARY LANE (0.94 MILES) ON THE EASTBOUND I-495 LONG ISLAND EXPRESSWAY BETWEEN THE EXIT RAMP TO CLEARVIEW EXPRESSWAY AND THE EXIT RAMP TO SPRINGFIELD BLVD TO ADDRESS CONGESTION DUE TO HIGH VOLUME OF TRUCK TRAFFIC, QUEENS COUNTY - SCOPE INCLUDES OCEANA BRIDGE (BIN: 1055300)

52.210 1.460 50.750 0.000 0.000 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $50-$85 M

1.912 HSIP 1.912 DETLDES2020DETLDES 0.212 0.212 2020NFA

3.472 3.472 CONSTCMAQ 2021CONST 0.868 0.868 2021NFA

15.210 15.210 CONSTHSIP 2021CONST 3.690 3.690 2021NFACONINSP 1.860 1.860 2021NFA

NYSDOT

X22872

SAFETY IMPROVEMENTS ON LONG ISLAND EXPRESSWAY FROM 48TH STREET TO LITTLE NECK PARKWAY IN QUEENS, TO CORRECT SAFETY DEFICIENCIES USING COST EFFECTIVE ACCIDENT REDUCTION MEASURES (HSI #14005 & HSI #15001: JUN 2015 & MAR 2016) (NYSDOT HSIP 2019)

27.224 2.124 25.100 0.000 0.000 AQC:A10 TOTAL 4YR COST :QUEENS TPC : $26-$40 M

PRELDES 0.105 0.105 2020NFA 1.440 1.440 CONSTCMAQ 2021

CONST 2.516 2.516 2021NFADETLDES 0.215 0.215 2021NFA

NYCDPR

X50198

DEVELOPMENT OF PEDESTRIAN AND BIKE TRAILS IN HARLEM RIVER GREENWAY BETWEEN HIGH BRIDGE AND HAMILTON BRIDGE IN THE BRONX TO IMPROVE CONNECTIVITY AND ENHANCE SAFETY IN THE REGION. PH. 2 OF COMPLETED DEPOT PLACE GREENWAY PROJECT (X50152).

4.276 0.105 4.171 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $3.3-$5.6 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 8 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

2.500 2.500 CONSTSTP ENHANCE 2022CONST 0.625 0.625 2022NFA

NYCDOT/NYCEDC/GJDCX55064

IMPLEMENT SAFETY IMPROVEMENTS TO THE AREA SURROUNDING THE AIRTRAIN STATION PLAZA INCLUDING RE-STRIPING OF NORTHBOUND & SOUTHBOUND SECTIONS OF SUTPHIN BLVD AND E/B & WB ARCHER AVENUE IN QUEENS TO ADDRESS PED/VEHICLE CONFLICT (RELATED PIN X77013)

3.125 0.000 0.000 3.125 0.000 AQC:A6 TOTAL 4YR COST :QUEENS TPC : $2-$4 M

1.040 NHPP 1.040 DETLDES2020DETLDES 1.960 1.960 2020NFA

3.200 3.200 CONINSPNHPP 2021CONINSP 0.400 0.400 2021NFA

27.000 27.000 CONSTNHPP 2021CONST 3.750 3.750 2021NFA

NYSDOT

X72031

REPLACEMENT OF 138TH BRIDGE OVER MAJOR DEEGAN EXPWY IN THE BRONX. THIS PROJECT WILL DO A FULL STRUCTURE REPLACEMENT AS WELL AS IMPROVING THE VERTICAL CLEARANCE ABOVE THE EXISTING 14’-3” ON 138TH STREET BRIDGES OVER THE MAJOR DEEGAN EXPRESSWAY (BIN: 1066790)

37.350 3.000 34.350 0.000 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $32-$50 M

2.000 2.000 CONINSPSTBG-OFF 2021CONINSP 0.500 0.500 2021NFA

20.000 20.000 CONSTSTBG-OFF 2021CONST 32.000 32.000 2021NFA

NYCDOT

X72045

REHABILITATION OF WEST TREMONT AVENUE BRIDGES OVER THE MAJOR DEEGAN EXPRESSWAY & METRO NORTH RAILROAD IN THE BRONX TO ADDRESS STRUCTURAL DEFICIENCIES AND IMPROVE PEDESTRIAN ACCESS TO MORRIS HEIGHTS MNRR STATION AND THE ROBERTO CLEMENTE STATE PARK (BIN: 2-24146-0 & NYSDOT FUNDED BIN 1-06693-0)

54.500 0.000 54.500 0.000 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $50-$85 M

ROWINCD 0.052 0.052 2021NFA 1.040 1.040 PRELDESSTBG LG URB 2021

PRELDES 0.260 0.260 2021NFA 1.120 1.120 DETLDESSTBG LG URB 2022

DETLDES 0.280 0.280 2022NFA

NYSDOT

X72698

REHABILITATION OF ARTHUR AVENUE AND 176TH ST BRIDGES OVER CROSS BRONX EXPRESSWAY TO EXTEND THE SERVICE LIFE OF THE STRUCTURES IN THE BRONX (BINS 1066350 & 1066370)

2.752 0.000 1.352 1.400 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $32-$50 M

3.125 NHPP 3.125 DETLDES2020DETLDES 0.781 0.781 2020NFAROWACQU 16.300 16.300 2021NFA

1.000 1.000 CONINSPNHPP 2021CONINSP 11.250 11.250 2021NFA

33.985 33.985 CONSTNHPP 2021CONST 292.015 292.015 2021NFA

15.551 15.551 CONSTSTBG LG URB 2021CONST 3.888 3.888 2021NFA

NYSDOT

X72707

REHABILITATION/REPLACEMENT OF 6 BRIDGES ON CROSS BRONX EXPWY CORRIDOR BETWEEN BOSTON ROAD & BRONX RIVER PARKWAY IN THE BRONX TO ADDRESS STRUCTURAL DEFICIENCIES AND EXTEND SERVICE LIFE OF STRUCTURES WITH OPTION TO BUILD CONTINUOUS CONNECTOR ROAD IN MISSING SEGMENT (BINS 1066407,106641A,1066419, 1067089,1075559,1076270)

377.895 3.906 373.989 0.000 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $364.9-$449.6 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 9 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 1.000 1.000 2020NFA 2.000 2.000 CONINSPCMAQ 2022

CONINSP 0.500 0.500 2022NFA 12.800 12.800 CONSTCMAQ 2022

CONST 3.200 3.200 2022NFA

NYSDOT

X72711

CROSS BRONX EXPRESSWAY MOBILITY IMPROVEMENTS, THROUGH ACTIVE TRAFFIC DEMAND MANAGEMENT STRATEGIES ALONG THE CBE CORRIDOR IN THE BRONX TO ENHANCE SAFETY, MOBILITY AND RELIABILITY [ITS: TM12, TM20, TM22]

19.500 1.000 0.000 18.500 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $21-$31 M

1.664 NHPP 1.664 PRELDES2020PRELDES 0.416 0.416 2020NFA

4.240 4.240 DETLDESNHPP 2022DETLDES 1.060 1.060 2022NFA

NYSDOT

X72713

REHABILITATE THE CROSS BRONX EXPWY VIADUCT BETWEEN WEBSTER & THIRD AVE IN THE BRONX - WILL REPLACE CONCRETE DECK, REPAIR SUBSTRUCTURE & OTHER DETERIORATED ELEMENTS TO ENSURE CONTINUED SAFE OPERATIONS. IF FEASIBLE, JOINTS WILL BE ELIMINATED (BIN 1066349)

7.380 2.080 0.000 5.300 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $100-$225 M

0.123 HPP 0.123 PRELDES2020PRELDES 0.031 0.031 2020NFA

1.415 STBG LG URB 1.415 PRELDES2020PRELDES 0.354 0.354 2020NFA

0.848 0.848 CONINSPCMAQ 2021CONINSP 0.212 0.212 2021NFA

8.480 8.480 CONSTCMAQ 2021CONST 2.120 2.120 2021NFA

1.339 1.339 CONSTHPP 2021CONST 0.335 0.335 2021NFACONST 10.251 10.251 2021NFA

1.552 1.552 CONINSPNHPP 2021CONINSP 0.388 0.388 2021NFA

4.780 4.780 CONSTSTBG LG URB 2021CONST 1.195 1.195 2021NFA

NYSDOT

X73127

CONSTRUCT EXIT RAMP ON THE NORTH BOUND HUTCHINSON RIVER PARKWAY AT BARTOW AVE FOR MOBILITY IMPROVEMENT ON NORTH BOUND BRUCKNER EXPRESSWAY BETWEEN WILKINSON AVENUE AND HUTCHINSON RIVER PARKWAY EXIT RAMP TO REDUCE TRAFFIC CONGESTION, BRONX (NY411 & TRANSFERRED EARMARK: NY118, PROGRAM CODE RPS0)

33.423 1.923 31.500 0.000 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $32-$50 M

0.424 0.424 DETLDESNHPP 2021DETLDES 0.106 0.106 2021NFA

NYSDOT

X73150

REPLACEMENT OF 4 BRIDGE DECKS OVER BROOKLYN-QUEENS EXPWY IN BROOKLYN: REPLACE CONCRETE DECKS, REPAIR CONCRETE SUBSTRUCTURES & REPAIR OTHER DETERIORATED ELEMENTS TO ASSURE CONTINUED SAFE OPERATIONS (BINS: 1065530, 1065549, 1076459, 1076460)

0.530 0.000 0.530 0.000 0.000 AQC:A19 TOTAL 4YR COST :KINGS TPC : $15-$25 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 10 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.640 NHPP 1.640 PRELDES2020PRELDES 0.410 0.410 2020NFA

2.880 2.880 DETLDESNHPP 2021DETLDES 0.720 0.720 2021NFA

4.800 4.800 CONINSPNHPP 2023CONINSP 1.200 1.200 2023NFA

0.320 0.320 CONSTNHPP 2023CONST 59.930 59.930 2023NFA

NYSDOT

X73151

BRUCKNER EXPRESSWAY (278I) OVERPASS REHABILITATION AT ROSEDALE AVE IN THE BRONX COUNTY TO REPAIR DETERIORATED BRIDGE ELEMENTS TO ASSURE CONTINUED SAFE OPERATIONS & A POSSIBLE FULL SUPERSTRUCTURE REPLACEMENT (BIN: 1075789)

71.900 2.050 3.600 0.000 66.250 AQC:A19 TOTAL 4YR COST :BRONX TPC : $70-$130 M

2.000 NHPP 2.000 PRELDES2020PRELDES 0.500 0.500 2020NFA

5.600 5.600 DETLDESNHPP 2022DETLDES 1.400 1.400 2022NFA

5.600 5.600 CONINSPNHPP 2023CONINSP 1.400 1.400 2023NFA

31.590 31.590 CONSTNHPP 2023CONST 42.897 42.897 2023NFA

5.040 5.040 CONINSPSTBG LG URB 2023CONINSP 1.260 1.260 2023NFA

47.530 47.530 CONSTSTBG LG URB 2023CONST 11.883 11.883 2023NFA

NYSDOT

X73152

BROOKLYN-QUEENS EXPRESSWAY BRIDGE REHABILITATION OVER 47TH ST QUEENS - REPLACE EXISTING CONCRETE OVERLAY AND PERFORM ISOLATED SUBSTRUCTURE AND SUPERSTRUCTURE REPAIRS TO EXTEND THE STRUCTURE USEFUL LIFE (BIN 1065589)

156.700 2.500 0.000 7.000 147.200 AQC:A19 TOTAL 4YR COST :QUEENS TPC : $100-$225 M

OPER 2.400 2.400 2020NFAOPER 2.400 2.400 2021NFAOPER 2.400 2.400 2022NFAOPER 2.400 2.400 2023NFA

NYSDOT

X73156

OPERATING HOV LANE ON GOWANUS & PROSPECT EXPRESSWAYS TO IMPROVE MOBILITY IN BROOKLYN [ITS: ST06]

9.600 2.400 2.400 2.400 2.400 AQC:A7 TOTAL 4YR COST :KINGS TPC : $15-$25 M

DETLDES 1.000 1.000 2020NFACONST 7.760 7.760 2021NFA

NYSDOT

X73157

ACTIVE TRAFFIC MANAGEMENT FOR IMPROVED INCIDENT RESPONSE ON THE GOWANUS EXPRESSWAY - ESTABLISH TECHNICAL BASE CONDITIONS AND ADMINISTRATIVE FRAMEWORK FOR PARTNER AGENCIES WITH THE PURPOSE OF PROVIDING AN INTEGRATED, EFFICIENT AND FLEXIBLE INCIDENT RESPONSE SYSTEM ON THE GOWANUS CORRIDOR FROM THE APPROACH OF THE VERRAZANO BRIDGE TO THE BROOKLYN BATTERY TUNNEL ENTRANCE, BROOKLYN [ITS: PS08, PT14, ST06, TM06, TM19, TM22]

8.760 1.000 7.760 0.000 0.000 AQC:NON TOTAL 4YR COST :KINGS TPC : $7.5-$12 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 11 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.600 1.600 CONINSPSTBG LG URB 2021CONINSP 0.400 0.400 2021NFA

14.400 14.400 CONSTSTBG LG URB 2021CONST 3.600 3.600 2021NFA

NYSDOT

X73158

CONSTRUCTION OF A COMMUNITY PARK IN QUEENS UNDER THE NEW KOSCIUSZKO BRIDGE TO MITIGATE IMPACTS ASSOCIATED WITH THE CONSTRUCTION OF THE NEW KOSCIUSZKO BRIDGE - PARK IS UNDER THE JURISDICTION OF THE NYCDPR

20.000 0.000 20.000 0.000 0.000 AQC:C14 TOTAL 4YR COST :QUEENS TPC : $15-$25 M

2.191 NHPP 2.191 CONINSP2020CONINSP 0.244 0.244 2020NFA

24.300 NHPP 24.300 CONST2020CONST 2.700 2.700 2020NFA

NYSDOT

X73161

GOWANUS EXPRESSWAY- REPLACEMENT OF THE SOUTHBOUND GOWANUS EXPRESSWAY ENTRANCE RAMP D CONCRETE DECK, WHICH IS LOCATED AT THE PROSPECT AVENUE/HAMILTON AVENUE INTERSECTION, REPLACING OF THREE SIGN STRUCTURES WITH PANELS, REPLACING OF LIGHT POLES BASES, RESEALING OF THE GOWANUS MAINLINE DECK JOINTS AND STRUCTURAL STEEL REPAIRS IN BROOKLYN TO MAINTAIN A STATE OF GOOD REPAIR, IMPROVE SAFETY AND MOBILITY (BINS: 1065318, 1076750 AND NUMEROUS OTHER BINS)

29.435 29.435 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :KINGS TPC : $26-$40 M

8.800 NHPP 8.800 CONINSP2020CONINSP 2.200 2.200 2020NFA

NYSDOT

X73163

HUNTS POINT ACCESS IMPROVEMENT, PHASE 1 (EVERGREEN AVE TO BRUCKNER SHERIDAN INTERCHANGE) WILL RECONSTRUCT THE BRUCKNER EXPRESSWAY VIADUCT AND CONNECTING RAMPS TO EDGEWATER ROAD TO PROVIDE DIRECT HIGHWAY CONNECTIONS TO HUNTS PT MARKET THEREBY REDUCING CONGESTION ON LOCAL STREETS. THIS PROJECT WILL ALSO RECONSTRUCT BRYANT AVE PEDESTRIAN BRIDGE TO MAKE IT ADA ACCESSIBLE AS WELL AS BUILD A NEW BIKE/PED PATH TO IMPROVE ACCESS TO GARRISON PARK AND CONCRETE PLANT. (BINS: 1075819, 106666H, 1075310, 1066669 & 8 OTHERS, 12 TOTAL)

11.000 11.000 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $0.5-$0.7 B

CONINSP 10.400 10.400 2020NFACONST 655.200 655.200 2020NFADETLDES 10.400 10.400 2020NFA

NYSDOT

X73164

HUNTS POINT ACCESS IMPROVEMENT, PHASE 2 (E 141 ST TO BARRETTO ST) WILL RECONSTRUCT & WIDEN THE BRUCKNER EXPRESSWAY VIADUCT AND CONNECTING RAMPS TO LEGGETT AVE TO PROVIDE DIRECT HIGHWAY CONNECTIONS TO HUNTS PT MARKET THEREBY REDUCING CONGESTION ON LOCAL STREETS AND IMPROVE QUALITY OF LIFE FOR THE SOUTH BRONX COMMUNITY (BINS: 1066669 & 106666E)

676.000 676.000 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $0.6-$0.8 B

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 12 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

CONINSP 10.800 10.800 2022NFACONST 475.193 475.193 2022NFA

NYSDOT

X73165

HUNTS POINT ACCESS IMPROVEMENT, PHASE 3 (BARRETTO ST – BRUCKNER SHERIDAN INTERCHANGE) IN THE BRONX WILL REPLACE THE CONCRETE DECKS ON BRUCKNER VIADUCT, PERFORM REPAIRS OF DETERIORATED ELEMENTS & WIDEN THE BRUCKNER EXPRESSWAY FROM TWO TO THREE LANES. THE PROJECT WILL ALSO RELOCATE THE MERGING SHERIDAN EXPRESSWAY RAMPS FROM LEFT HAND TO RIGHT HAND ENTRANCES. THESE IMPROVEMENTS WILL REDUCE CONGESTION ON THE HIGHWAY/LOCAL STREETS AND POLLUTION CAUSED BY IDLING VEHICLES (BINS: 106666F-G & 1066669)

485.993 0.000 0.000 485.993 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $437.8-$539.5 M

PRELDES 1.250 1.250 2020NFADETLDES 1.000 1.000 2021NFACONINSP 2.200 2.200 2022NFACONST 22.000 22.000 2022NFA

NYSDOT

X73168

REHABILITATION OF WOOLLEY AVENUE AND BRADLEY AVENUE BRIDGES OVER STATEN ISLAND EXPRESSWAY TO EXTEND SERVICE LIFE OF BRIDGES AND ENSURE SAFETY OF TRAVELING PUBLIC IN STATEN ISLAND (BINS 1067720, 1067730) (FORMERLY PIN: X76168)

26.450 1.250 1.000 24.200 0.000 AQC:A19 TOTAL 4YR COST :RICHMOND TPC : $21-$31 M

15.000 NHPP 15.000 CONINSP2020 116.778 NHPP 116.778 CONST2020 20.000 STBG LG URB 20.000 CONST2020

CONST 4.922 4.922 2020NFA

NYSDOT

X73580

REHABILITATION OF TWO BRIDGES ON THE VAN WYCK EXPRESSWAY (I-678) / LONG ISLAND EXPRESSWAY INTERCHANGE (I-495) IN QUEENS TO EXTEND SERVICE LIFE OF STRUCTURES (BIN 1055789 & 105578E) - TOLL CREDIT MATCH

156.700 156.700 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :QUEENS TPC : $100-$225 M

CONINSP 4.000 4.000 2020NFACONST 242.600 242.600 2020NFA

NYSDOT

X73582

VAN WYCK EXPRESSWAY ACCESS & CAPACITY IMPROVEMENTS TO AND FROM JFK INTERNATIONAL AIRPORT, PHASE 1 (HILLSIDE AVE TO 133RD AVE) RECONSTRUCTS NINE OVERPASSES TO PROVIDE ROOM FOR THE IMPROVEMENTS, QUEENS COUNTY (BINS: 1055710, 1055700, 1055680, 1055670, 1055660, 1055650, 1055640, 1055630, 1055620). FFY 2017 WAS ENVIRONMENTAL EIS WORK

246.600 246.600 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $175-$385 M

CONINSP 2.000 2.000 2020NFACONST 450.000 450.000 2020NFAROWACQU 8.000 8.000 2020NFA

NYSDOT

X73583

VAN WYCK EXPRESSWAY ACCESS & CAPACITY IMPROVEMENTS TO AND FROM JFK INTERNATIONAL AIRPORT, PHASE 2 - RECONSTRUCTS/RETROFITS THE LIRR BRIDGES (BINS: 7066688, 7076800, 7066687) & RECONSTRUCTS ONE OVERPASS (BIN 1055690) TO PROVIDE ROOM FOR THE IMPROVEMENTS, QUEENS

460.000 460.000 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $414.4-$510.6 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 13 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

CONINSP 8.480 8.480 2021NFACONST 559.680 559.680 2021NFA

NYSDOT

X73584

VAN WYCK EXPRESSWAY ACCESS & CAPACITY IMPROVEMENTS TO AND FROM JFK INTERNATIONAL AIRPORT, PHASE 3 (QUEENS BLVD - JFK) - WIDEN THE EXPRESSWAY AS A FOURTH LANE WOULD BE ADDED IN EACH DIRECTION BETWEEN HOOVER AVENUE AND FEDERAL CIRCLE. SCOPE ALSO INCLUDES RETAINING WALLS AND BRIDGES SOUTH OF 133RD AVE (BINS: 1076499, 1055619, 1076489, 1075630, 1075710, 5522079) AND NORTH OF HILLSIDE AVE (BINS 1055720, 1076449), QUEENS

568.160 0.000 568.160 0.000 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $0.5-$0.6 B

CONINSP 1.600 1.600 2020NFACONST 35.000 35.000 2020NFA

NYSDOT

X73585

VAN WYCK EXPRESSWAY ACCESS & CAPACITY IMPROVEMENTS TO AND FROM JFK INTERNATIONAL AIRPORT PHASE 2 RECONSTRUCTS THE LIRR BRIDGE IN ORDER TO PROVIDE ROOM FOR THE IMPROVEMENTS IN QUEENS COUNTY BIN: 7076810 SPLIT FROM PIN X73583

36.600 36.600 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $32-$50 M

1.883 1.883 CONSTHPP 2021CONST 0.471 0.471 2021NFACONINSP 3.657 3.657 2021NFACONST 21.968 21.968 2021NFA

NYCDOT

X75752

WYCKOFF AVENUE RECONSTRUCTION BETWEEN FLUSHING AND GATES AVENUES TO BRING TO A STATE OF GOOD REPAIR DUE TO THE PRESENCE OF DETERIORATED PAVEMENT, CURBS, AND SIDEWALKS AND IMPROPERLY RESTORED UTILITY CUTS, BROOKLYN (NY129)

27.979 0.000 27.979 0.000 0.000 AQC:A10 TOTAL 4YR COST :KINGS TPC : $26-$40 M

9.920 DISCR FA 9.920 CONST2020CONST 2.480 2.480 2020NFA

NYCDOT

X75926

RECONSTRUCTION OF NASSAU STREET. RECONSTRUCT THREE BLOCKS OF NASSAU STREET FROM PINE STREET TO MAIDEN LANE. ROADWAY RECONSTRUCTION WILL INCLUDE A NEW CONCRETE BASE AND ASPHALT WEARING COURSE. WORK WILL ALSO INCLUDE NEW SIDEWALKS, PEDESTRIAN RAMPS AND STREET LIGHTS. NEW YORK COUNTY (EMERGENCY RELIEF FUNDED PROJECT)

12.400 12.400 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST :NEW YORK TPC : $12.5-$19 M

16.824 DISCR FA 16.824 CONST2020CONST 4.206 4.206 2020NFA

NYCDOT

X75927

RECONSTRUCTION OF GREENWICH STREET. RECONSTRUCT FOUR BLOCKS OF GREENWICH STREET, FROM BARCLAY STREET TO CHAMBERS STREET. ROADWAY RECONSTRUCTION WILL INCLUDE A NEW CONCRETE BASE AND ASPHALT WEARING COURSE. WORK WILL ALSO INCLUDE NEW SIDEWALKS, PEDESTRIAN RAMPS, STREET LIGHTS AND TRAFFIC SIGNALS. NEW YORK COUNTY (EMERGENCY RELIEF FUNDED PROJECT)

21.030 21.030 0.000 0.000 0.000 AQC:C15 TOTAL 4YR COST :NEW YORK TPC : $21-$31 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 14 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

7.199 7.199 CONSTHPP 2023CONST 1.800 1.800 2023NFA

LOCAL

X76021

TRANSPORTATION PARKING FACILITY SERVING THE HARLEM HOSPITAL COMPLEX: THE PROPOSED PARKING FACILITY WOULD PROVIDE UP TO 99 ADDITIONAL VEHICLE PARKING SPACES ON THE HARLEM HOSPITAL CENTER (HHC CAMPUS) NY314

8.999 0.000 0.000 0.000 8.999 AQC:NON TOTAL 4YR COST :NEW YORK TPC : $7.5-$12 M

1.134 HPP 1.134 CONST2020CONST 0.283 0.283 2020NFA

NYCDPR

X76122

RECONSTRUCTION AND ADAPTIVE REUSE OF 69TH STREET - PHASE 2: PEDESTRIAN PATHS, STAIRS, SEATING, LANDSCAPING, LIGHTING & OTHER TRANSPORTATION ENHANCEMENT ACTIVITIES ALONG RIVERSIDE BLVD & AT RIVERSIDE PARK SOUTH TO CREATE PED ACCESS & LIGHTING OF HISTORIC 69TH ST TRANSFER BRIDGE IN RIVERSIDE PARK SOUTH, MANHATTAN (NY014 & NY660)

1.417 1.417 0.000 0.000 0.000 AQC:C10 TOTAL 4YR COST :NEW YORK TPC : $3.3-$5.6 M

19.600 NHPP 19.600 CONST2020CONST 4.900 4.900 2020NFA

NYCDOT

X76126

REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN MANHATTAN INCLUDING MASONRY ARCHES, APPROACH RAMPS SUBSTRUCTURES, MODULAR JOINT REPLACEMENT AND MISC REPAIRS TO BRING TO A STATE OF GOOD REPAIR (CONTRACT 7) - BRIDGE NY 2018, BUILD AWARD 2018, TRANSFERRED EARMARK: NY218, NY242, NY256, NY280, NY284, NY324, NY325, NY514, NY553, NY610, NY 616 (PROGRAM CODE RPS1)

24.500 24.500 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :NEW YORK TPC : $175-$385 M

5.250 5.250 CONSTHSIP 2021CONST 13.735 13.735 2021NFA

0.500 0.500 DETLDESHSIP 2021CONINSP 2.842 2.842 2021NFA

NYCDOT

X76128

DELANCEY STREET RECONSTRUCTION & SAFETY IMPROVEMENT FROM BOWERY TO CLINTON ST AND RIDGE ST FROM RIVINGTON ST TO DELANCEY ST IN MANHATTAN TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY INTERSECTION CURB EXTENSIONS, ROAD NARROWING AND MEDIAN CONSTRUCTION, BIKE LANES & LANDSCAPING, NYSDOT HSIP 2019

22.327 0.000 22.327 0.000 0.000 AQC:A2 TOTAL 4YR COST :NEW YORK TPC : $21-$31 M

10.000 10.000 CONSTHSIP 2021CONST 51.760 51.760 2021NFACONINSP 7.198 7.198 2021NFADETLDES 4.637 4.637 2021NFA

NYCDOT

X76129

QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 2) FROM 73TH STREET TO ELLIOT AVE IN QUEENS TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY EXPANDING EXISTING PEDESTRIAN WALKWAYS, INSTALLATION OF RAISED BIKE LANES, LIGHTING AND LANDSCAPING, NYSDOT HSIP 2019 - PRELIMINARY ENGINEERING FOR THE CORRIDOR WAS COMPLETED UNDER X77338

73.595 0.000 73.595 0.000 0.000 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $70-$130 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 15 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

0.719 NHPP 0.719 CONST2020CONST 0.180 0.180 2020NFA

NYCDOT

X76302

COMPREHENSIVE BRIDGE PREVENTIVE MAINTENANCE PLAN FOR THE MOVABLE BRIDGES WITHIN THE CITY AND FORCE ACCOUNT TO EXTEND SERVICE LIFE

0.899 0.899 0.000 0.000 0.000 AQC:A6P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

CONINSP 17.900 17.900 2021NFA 86.569 86.569 CONSTNHPP 2021

CONST 28.642 28.642 2021NFA 13.431 13.431 CONSTSTBG LG URB 2021

CONST 3.358 3.358 2021NFA

NYCDOT

X76426

WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 - TO REMOVE NEOPRENE AND REPLACE WITH CABLE GUARD ELASTOMERIC CABLE WRAPPING. TO REHABILITATE THE CONCRETE FASCIA AND CONCRETE PAVEMENT IN THE MANHATTAN AND BROOKLYN APPROACHES TO BRING TO STATE OF GOOD REPAIR. (BIN 2240039)

149.900 0.000 149.900 0.000 0.000 AQC:A19 TOTAL 4YR COST :NEW YORK TPC : $100-$225 M

20.250 20.250 CONSTNHPP 2022CONST 5.063 5.063 2022NFA

NYCDOT

X76427

PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES (CONTRACT) - IN ALL NEW YORK CITY BOROUGHS TO EXTEND SERVICE LIFE OF THE BRIDGES

25.313 0.000 0.000 25.313 0.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $26-$40 M

10.530 10.530 OPERNHPP 2023OPER 2.632 2.632 2023NFA

NYCDOT

X76429

EAST RIVER BRIDGES DE-ICING - IMPLEMENT A PROACTIVE APPROACH TO SNOW AND ICE CONTROL BY COMBINING THE ADVANTAGES OF ANTI-ICING AND THE USE OF NON-CORROSIVE CHEMICAL TO EXTEND SERVICE LIFE.

13.162 0.000 0.000 0.000 13.162 AQC:A2 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

CONINSP 0.804 0.804 2020NFA 0.530 OTHER FA 0.530 CONST2020

CONST 2.683 2.683 2020NFA

NYCDOT

X76716

JAMAICA BAY GREENWAY IMPLEMENTATION PLAN WILL DEVELOP PLAN TO COMPLETE THE GREENWAY, CLOSE GAPS IN EXISTING ROUTE, ENHANCE SECTIONS, IMPROVE ACCESS FROM ADJACENT COMMUNITIES, ESTABLISH LINKS TO TRANSIT AND IMPLEMENT BIKE/PED ACCESS (FED LANDS HWY)

4.017 4.017 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

3.080 3.080 MISCCMAQ 2021MISC 0.770 0.770 2021NFA

8.950 8.950 MISCCMAQ 2023MISC 2.237 2.237 2023NFA

NYCDOT

X77005

LAUNCH THE HUNTS POINT CLEAN TRUCK PROGRAM TO REPLACE, RETROFIT, OR REPOWER (WITH CNG, EV OR HYBRID) TRUCKS FY 2006 OR OLDER & PROVIDE FUNDING FOR CONSTRUCTION OF AN ALTERNATIVE FUELS SERVICE STATION FOR VEHICLES SERVING HUNTS PT / PORT MORRIS, BRONX

15.037 0.000 3.850 0.000 11.187 AQC:NON TOTAL 4YR COST :BRONX TPC : $26-$40 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 16 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

5.000 5.000 CONSTCMAQ 2022CONST 14.528 14.528 2022NFA

NYCEDC/DOT/GJDC

X77013

PHYSICAL IMPROVEMENTS OF STATION PLAZA AT THE ARCHER AVE/SUTPHIN BLVD INTERSECTION IN JAMAICA, QUEENS INCLUDING SIGNAL TIMING MODIFICATIONS, LANE RESTRIPING, PED SAFETY IMPROVEMENTS, & AIR QUALITY IMPROVEMENTS TO ADDRESS CIRCULATION (RELATED X55064)

19.528 0.000 0.000 19.528 0.000 AQC:D1 TOTAL 4YR COST :QUEENS TPC : $32-$50 M

0.780 0.780 CONSTHPP 2021CONST 0.945 0.945 2021NFA

NYCDOT

X77056

LIBRARY LANE-COLES LANE IMPROVEMENTS - FULL RECONSTRUCTION OF COLES LANE, A SHORT STREET (APPX. 216·FOOT ) BETWEEN EAST KINGSBRIDGE ROAD AND BAINBRIDGE AVENUE IN THE FORDHAM SECTION OF THE BRONX (NY709, NY733)

1.725 0.000 1.725 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $2-$4 M

2.921 HPP 2.921 CONST2020CONST 1.279 1.279 2020NFACONINSP 0.745 0.745 2020NFA

NYCDOT

X77227

IMPROVEMENT TO THE NEW YORK PUBLIC LIBRARY VICINITY: IMPLEMENT PEDESTRIAN/SAFETY IMPROVEMENTS TO NYPL IN MANHATTAN ON 40TH AND 42ND ST. SIDEWALKS; RESTORE UPPER LIBRARY TERRACE PAVEMENT & ADA-COMPLIANCE ACCESSIBILITY IMPROVEMENTS, NY684

4.945 4.945 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :NEW YORK TPC : $4.6-$7.5 M

1.040 CMAQ 1.040 MISC2020MISC 0.260 0.260 2020NFA

1.020 1.020 MISCCMAQ 2022MISC 0.255 0.255 2022NFA

NYCDOT

X77261

MUNICIPAL PLUG-IN AND ADVANCED VEHICLE PROGRAM TO REDUCE EMISSIONS FROM CITY-OWNED DIESEL & GASOLINE-POWERED FLEET VEHICLES; PURCHASE OF NATURAL GAS VEHICLES TO REPLACE MEDIUM AND HEAVY DUTY GASOLINE & DIESEL VEHICLES AS WELL AS PLUG IN HYBRID & BATTERY

2.575 1.300 0.000 1.275 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : $15-$25 M

DETLDES 0.900 0.900 2020NFA 1.250 1.250 CONSTCMAQ 2022

CONST 4.469 4.469 2022NFA 9.000 9.000 CONSTFTA 5339 DIS 2022

CONST 2.250 2.250 2022NFA

NYCDOT

X77263

SAFE ROUTES TO TRANSIT 86TH STREET BROOKLYN. THIS PROJECT WILL IMPROVE SAFETY AND STATE OF GOOD REPAIR FOR THE TRANSIT PUBLIC UTILIZING BUS SERVICE BY CONSTRUCTING A SERIES OF CONCRETE BUS BULBS, BUS PADS, AND OTHER IMPROVEMENTS AT EXISTING BUS STOPS ALONG 86TH STREET IN BENSONHURST AND BATH BEACH, BROOKLYN (D2020-BUSC-065)

17.869 0.900 0.000 16.969 0.000 AQC:B7 TOTAL 4YR COST :KINGS TPC : $15-$25 M

1.300 1.300 DETLDESCMAQ 2021DETLDES 0.325 0.325 2021NFA

12.466 12.466 CONSTCMAQ 2022CONST 15.616 15.616 2022NFA

NYCEDC

X77265

MODERNIZATION OF HUNTS POINT TERMINAL MARKET FREIGHT RAIL AS PART OF A COMPREHENSIVE EFFORT TO INCREASE THE EFFICIENCY AND ENVIRONMENTAL SUSTAINABILITY OF THE MARKET WHICH CONSISTS OF FREIGHT RAIL AND TRAFFIC CIRCULATION IMPROVEMENTS

29.707 0.000 1.625 28.082 0.000 AQC:NON TOTAL 4YR COST :BRONX TPC : $50-$85 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 17 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

3.600 HPP 3.600 CONST2020CONST 1.900 1.900 2020NFA

NYCDOT

X77278

RECONSTRUCTION OF SCHENCK AVE FROM JAMAICA AVE TO FLATLANDS AVE TO IMPROVE PED SAFETY AND TRAFFIC CIRCULATION WITH CONSTRUCTION OF NEW CURBS, REALIGN CROSSWALKS AND REPAIR ROADWAYS AT 2 LOCATIONS (COZINE AVE TO STANLEY AVE & PITKIN AVE TO LIBERTY AVE) BROOKLYN, NY273

5.500 5.500 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :KINGS TPC : $6-$9.4 M

1.000 STBG LG URB 1.000 MISC2020MISC 0.250 0.250 2020NFA

NYCDOT

X77333

DATA COLLECTION FOR ASSET MANAGEMENT PLANNING IN FFY 2020 & FFY 2021 FOR CITY OWNED NON EAST RIVER BRIDGES, CITYWIDE

1.250 1.250 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

8.190 8.190 MISCSTBG LG URB 2021MISC 2.047 2.047 2021NFA

NYCDOT

X77334

DATA COLLECTION FOR ASSET MANAGEMENT PLANNING IN FFY 2022 & FFY 2023 1 FOR CITY OWNED NON EAST RIVER BRIDGES, CITYWIDE

10.237 0.000 10.237 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

9.580 9.580 MISCSTBG LG URB 2023MISC 2.395 2.395 2023NFA

NYCDOT

X77335

DATA COLLECTION FOR ASSET MANAGEMENT PLANNING IN FFY 2024 & 2025 FOR CITY OWNED NON EAST RIVER BRIDGES, CITYWIDE

11.975 0.000 0.000 0.000 11.975 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

CONST 36.732 36.732 2021NFADETLDES 4.408 4.408 2021NFA

NYCDOT

X77338

QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 1) FROM ROOSEVELT AVE TO 73RD STREET IN QUEENS TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY EXPANDING EXISTING PEDESTRIAN WALKWAYS, INSTALLATION OF RAISED BIKE LANES, LIGHTING AND LANDSCAPING. ALSO MASTER PIN FOR NEPA PURPOSES TO INCLUDE CONSTRUCTION FOR THE CORRIDOR WITH OTHER PINS: X76129 (PHASE 2), X77384 (PHASE 3), X77385 (PHASE 4). PRELIMINARY ENGINEERING FUNDING SHOWN WAS AUTHORIZED IN FEB 2016.

41.140 0.000 41.140 0.000 0.000 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $40-$60 M

0.059 TAP LG URBAN 0.059 CONST2020CONST 0.015 0.015 2020NFA

NYCDOT

X77349

SAFE ROUTES TO SCHOOL PROGRAM (PS135) - IMPLEMENT PEDESTRIAN SAFETY MEASURES SUCH AS ONE CURB EXTENSION AT THE INTERSECTION OF LINDEN BLVD AND EAST 48 ST AND ANOTHER ONE AT LINDEN BLVD AND TROY AVE, BROOKLYN (SPLIT WITH X77373)

0.074 0.074 0.000 0.000 0.000 AQC:A6 TOTAL 4YR COST :KINGS TPC : < $0.75 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 18 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 0.148 0.148 2020NFACONINSP 0.296 0.296 2021NFA

2.964 2.964 CONSTTAP LG URBAN 2021CONST 1.976 1.976 2021NFA

ROOSEVELT ISLAND

X77352

ROOSEVELT ISLAND BRIDGE BIKE RAMP - CONSTRUCT A RAMP FOR BICYCLES CONNECTING THE ROOSEVELT ISLAND BRIDGE AND AN ACCESS ROAD. THE RAMP WILL BE ADDED TO AN EXISTING PARKING AND VEHICLE & PEDESTRIAN EXIT RAMP STRUCTURE, ELIMINATING THE NEED FOR BICYCLES TO SHARE A DANGEROUS APPROACH INTENDED FOR AUTOMOBILES. ROOSEVELT ISLAND OPERATING CORP.

5.384 0.148 5.236 0.000 0.000 AQC:C2 TOTAL 4YR COST :NEW YORK TPC : $4.6-$7.5 M

0.607 TAP LG URBAN 0.607 CONST2020CONST 0.152 0.152 2020NFA

NYCDOT

X77357

CROPSEY AVENUE CORRIDOR SAFETY IMPROVEMENTS - TO INCREASE TRAFFIC SAFETY ON CROPSEY AVENUE BETWEEN 26TH AVE & NEPTUNE AVE IN BROOKLYN INCLUDING THE CONSTRUCTION OF PEDESTRIAN SAFETY ISLANDS AND EXPANDED MEDIAN TIPS.

0.759 0.759 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :KINGS TPC : $0.6-$1.5 M

0.232 TAP LG URBAN 0.232 CONST2020CONST 0.058 0.058 2020NFA

NYCDOT

X77360

SAFE STEPS TO TRANSIT PHASE III, INCREASES PEDESTRIAN SAFETY AND ACCESSIBILITY TO BUS AND RAIL STATIONS BY UPGRADING SIDEWALKS, AND INSTALLING NEW CURB EXTENSIONS, MEDIAN TIP EXTENSIONS, PEDESTRIAN REFUGE ISLANDS, AND PEDESTRIAN SIGNALS AT THE FOLLOWING LOCATIONS: PARK ROW AND BEEKMAN (MANHATTAN) & FLATBUSH AVE AND UTICA (BROOKLYN)

0.290 0.290 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

CONINSP 1.220 1.220 2022NFACONST 7.865 7.865 2022NFA

NYCDOT

X77362

CONSTRUCT BROOKLYN WATERFRONT GREENWAY ON COMMERCIAL ST (DUPONT TO ASH ST) & BOX ST (COMMERCIAL TO MANHATTAN AVE) IN GREENPOINT, BROOKLYN, WITH A SHARED-USE PATH WITH RAISED CROSSINGS, STORM-WATER INFRASTRUCTURE AND PED WAY-FINDING SIGNAGE TO PROVIDE SAFE ACCOMMODATIONS FOR CYCLISTS AND PEDESTRIANS (VISION ZERO PROJECT)

9.085 0.000 0.000 9.085 0.000 AQC:C2 TOTAL 4YR COST :KINGS TPC : $7.5-$12 M

DETLDES 0.266 0.266 2020NFA 10.000 10.000 CONSTCMAQ 2022

CONST 2.500 2.500 2022NFACONINSP 30.000 30.000 2022NFA

50.000 50.000 CONSTNHPP 2022CONST 168.234 168.234 2022NFA

NYCDOT

X77363

RECONSTRUCTION SHORE ROAD BRIDGE OVER THE HUTCHINSON RIVER IN THE BRONX - COMPLETE REPLACEMENT OF MOVEABLE BRIDGE, APPROACHES, SUBSTRUCTURE, STRUCTURE, INCLUDING ELECTRICAL, MECHANICAL AND BRIDGE CONTROL SYSTEMS TO ADDRESS STRUCTURAL DEFICIENCIES (BIN 2-24020-0)

261.000 0.266 0.000 260.734 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $366.7-$451.8 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 19 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.911 CMAQ 1.911 CONST2020CONST 0.478 0.478 2020NFA

0.119 CMAQ 0.119 DETLDES2020DETLDES 0.030 0.030 2020NFA

NYCDOT

X77367

PEDESTRIAN NETWORK DEVELOPMENT V PED IMPROVEMENTS 2020 - INCREASE PEDESTRIAN SAFETY AND ACCESSIBILITY BY UPGRADING SIDEWALKS, INSTALLING CURB EXTENSIONS, MEDIAN TIP EXTENSIONS, PEDESTRIAN SIGNALS AND BY BUILDING OUT TEMPORARY CURB EXTENSIONS AT THE FOLLOWING LOCATIONS: BROADWAY, ISHAM ST, 211 ST (MHTN); NEW LOTS AVE & VAN SICLEN AVE, BKLYN; EAST TREMONT AVE AND WHITTEMORE AVE (BX); FOX ST, WESTCHESTER AVE AND E 165 ST, AND SOUTHERN BLVD (BX); E 170TH STREET, TELLER AVE TO MORRIS AVE (BX); 30 ST AND 2 AVE (MHTN); AND, RIVERSIDE DRIVE & HENRY HUDSON PARKWAY OFF RAMPS (MHTN)

2.538 2.538 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.546 CMAQ 0.546 CONST2020CONST 0.136 0.136 2020NFA

0.034 CMAQ 0.034 DETLDES2020DETLDES 0.009 0.009 2020NFA

NYCDOT

X77368

UNIONPORT ROAD PED SAFETY IMPROVEMENTS FROM STARLING AVE TO WESTCHESTER AVE & INTERSECTION OF FT INDEPENDENCE ST & HEATH AVE IN THE BRONX – TO INCREASE PEDESTRIAN SAFETY AND ACCESSIBILITY BY CONSTRUCTING MEDIANS, ADDING CROSSWALKS, AND INSTALLING NEW CURB EXTENSIONS

0.725 0.725 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $0.6-$1.5 M

0.320 CMAQ 0.320 CONST2020CONST 0.080 0.080 2020NFA

NYCDOT

X77369

ASTORIA PEDESTRIAN IMPROVEMENTS: 30TH AVE: MAIN AVE TO 8TH ST, 8TH ST FROM ASTORIA BLVD TO WELLING COURT, MAIN AVE FROM VERNON BLVD TO ASTORIA BLVD AND ASTORIA BLVD FROM 8TH ST TO MAIN AVE - INCREASE PED SAFETY AND ACCESSIBILITY NEAR THE ASTORIA FERRY TERMINAL BY UPGRADING SIDEWALKS, AND INSTALLING NEW TRAFFIC CONTROLS, CURB EXTENSIONS, NECKDOWNS, SIDEWALK EXTENSIONS, AND CROSSWALKS IN QUEENS

0.400 0.400 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : < $0.75 M

DETLDES 1.953 1.953 2020NFA 6.500 6.500 CONSTCMAQ 2021

CONST 8.519 8.519 2021NFACONINSP 3.255 3.255 2021NFA

NYCDOT

X77370

SAFE ROUTES TO SCHOOL PROGRAM TO IMPLEMENT PEDESTRIAN SAFETY MEASURES, INCLUDING REFUGE ISLANDS, MEDIAN TIP EXTENSION, CURB EXTENSIONS AND SIDEWALKS AROUND THE FOLLOWING SCHOOLS IN MANHATTAN: P.S. 153, NEW DESIGN MIDDLE AND KIPP INFINITY CHARTER SCHOOL (WAS PREVIOUSLY NAMED I.S. 195), P.S. 92, J.H.S. 275 / I.S. 275, P.S. 83 LUIS MUNOZ RIVERA SCHOOL AND P.S. 128 AUDUBON SCHOOL

20.227 1.953 18.274 0.000 0.000 AQC:A6 TOTAL 4YR COST :NEW YORK TPC : $15-$25 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 20 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

0.297 TAP LG URBAN 0.297 CONST2020CONST 0.074 0.074 2020NFA

NYCDOT

X77373

SAFE ROUTES TO SCHOOL PROGRAM TO IMPLEMENT PEDESTRIAN SAFETY MEASURES, INCLUDING REFUGE ISLANDS, CURB EXTENSIONS AND SIDEWALKS AROUND PS 191 IN THE VICINITY OF PARK PL (BUFFALO AVE-RALPH AVE) BROOKLYN (SPLIT FROM X77349)

0.371 0.371 0.000 0.000 0.000 AQC:A6 TOTAL 4YR COST :KINGS TPC : < $0.75 M

8.320 8.320 CONSTCMAQ 2021CONST 4.452 4.452 2021NFA

0.626 0.626 DETLDESCMAQ 2021DETLDES 0.156 0.156 2021NFACONINSP 2.236 2.236 2021NFA

NYCDOT

X77375

BICYCLE NETWORK DEVELOPMENT LANE MARKING CONSTRUCTION TO EXPAND THE PARTIALLY IMPLEMENTED NETWORK BY ADDING 150 ADDITIONAL MILES CITYWIDE

15.790 0.000 15.790 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $15-$25 M

2.080 2.080 DETLDESCMAQ 2021DETLDES 0.520 0.520 2021NFA

9.000 9.000 CONSTCMAQ 2022CONST 2.250 2.250 2022NFA

NYCDOT

X77377

BICYCLE NETWORK DEVELOPMENT LANE MARKING CONSTRUCTION TO EXPAND THE PARTIALLY IMPLEMENTED NETWORK BY ADDING 300 ADDITIONAL MILES CITYWIDE. THIS INCLUDES CONCRETE WORK WHICH INVOLVES THE CONSTRUCTION OF NEW BIKE LANES.

13.850 0.000 2.600 11.250 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

2.250 2.250 DETLDESCMAQ 2023DETLDES 0.563 0.563 2023NFA

NYCDOT

X77379

BICYCLE NETWORK DEVELOPMENT LANE MARKING CONSTRUCTION TO EXPAND THE PARTIALLY IMPLEMENTED NETWORK BY ADDING 300 ADDITIONAL MILES CITYWIDE. THIS INCLUDES CONCRETE WORK WHICH INVOLVES THE CONSTRUCTION OF NEW BIKE LANES.

2.813 0.000 0.000 0.000 2.813 AQC:C2 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

3.510 3.510 DETLDESCMAQ 2023DETLDES 0.877 0.877 2023NFA

NYCDOT

X77381

NYC CONGESTED CORRIDOR REDUCTION PROGRAM WILL CONDUCT A PLANNING LEVEL TRAFFIC OPERATIONS ANALYSIS OF THE CORRIDORS INCLUDING IDENTIFICATION OF OPERATIONAL DEFICIENCIES FOR EXISTING AND FUTURE CONDITIONS AND DEVELOPING A PLAN THAT WILL IMPROVE SAFETY AND PROMOTE THE USE OF EFFICIENT TRAVEL MODES (BUS, BICYCLE, WALKING, ETC.) TO IMPROVE MOBILITY, SAFETY, AND THE QUALITY OF LIFE FOR ALL STREET USERS THROUGHOUT NEW YORK CITY

4.387 0.000 0.000 0.000 4.387 AQC:C3 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 21 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

7.195 7.195 CONSTHSIP 2021CONST 0.799 0.799 2021NFA

NYCDOT

X77382

SCHOOL SAFETY 4D - IMPROVE TRANSPORTATION ELEMENTS THAT PROMOTE AND ENABLE KIDS TO SAFELY USE INFRASTRUCTURE IN THEIR COMMUNITIES. THESE IMPROVEMENTS BENEFIT THE GREATER COMMUNITY AS WELL AS PROVIDE SAFER ROUTES TO COMMUNITY FACILITIES AND TO THE BUSY COMMERCIAL CORRIDORS, PRIMARILY IN JEROME AVENUE AND GRAND CONCOURSE. THE SCHOOL LOCATIONS INCLUDE: P.S. 85, P.S. 218, P.S. 307, & ROSALYN YELLOW CHARTER SCHOOL.

7.994 0.000 7.994 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $15-$25 M

7.000 7.000 CONSTHSIP 2021CONST 0.778 0.778 2021NFA

NYCDOT

X77383

ATLANTIC AVENUE RECONSTRUCTION FROM CONDUIT BOULEVARD TO ROCKAWAY BOULEVARD TO INCLUDE MEDIAN TIP EXTENSIONS, PEDESTRIAN REFUGE RECONSTRUCTION IN CROSSWALKS, AND OTHER OPERATIONAL & TRAFFIC CALMING TREATMENTS TO REDUCE INJURIES AND FATALITIES FOR ROAD USERS AND PEDESTRIANS, QUEENS

7.778 0.000 7.778 0.000 0.000 AQC:A6 TOTAL 4YR COST :QUEENS TPC : $7.5-$12 M

5.000 5.000 CONSTHSIP 2022CONST 80.556 80.556 2022NFA

NYCDOT

X77384

QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 3) FROM ELLIOT AVE TO YELLOWSTONE BLVD IN QUEENS TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY EXPANDING EXISTING PEDESTRIAN WALKWAYS, INSTALLATION OF RAISED BIKE LANES, LIGHTING AND LANDSCAPING - PRELIMINARY ENGINEERING FOR THE CORRIDOR WAS COMPLETED UNDER X77338

85.556 0.000 0.000 85.556 0.000 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $70-$130 M

5.000 5.000 CONSTHSIP 2023CONST 0.556 0.556 2023NFA

NYCDOT

X77385

QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 4) FROM YELLOWSTONE BLVD TO UNION TURNPIKE IN QUEENS TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY EXPANDING EXISTING PEDESTRIAN WALKWAYS, INSTALLATION OF RAISED BIKE LANES, LIGHTING AND LANDSCAPING - PRELIMINARY ENGINEERING FOR THE CORRIDOR WAS COMPLETED UNDER X77338

5.556 0.000 0.000 0.000 5.556 AQC:A2 TOTAL 4YR COST :QUEENS TPC : $4.6-$7.5 M

CONST 58.000 58.000 2021NFANYCDOT

X77386

REHABILITATION OF THE METROPOLITAN AVENUE BRIDGE OVER CSX TRANSPORT IN QUEENS TO BRING IT TO A STATE OF GOOD REPAIR (BIN # 2-24750-0)

58.000 0.000 58.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :QUEENS TPC : $50-$85 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 22 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 2.845 2.845 2020NFACONINSP 6.740 6.740 2023NFA

36.237 36.237 CONSTNHPP 2023CONST 9.059 9.059 2023NFA

NYCDOT

X77387

RECONSTRUCTION OF THE HEMPSTEAD AVENUE BRIDGE OVER THE CROSS ISLAND PARKWAY QUEENS TO BRING TO A STATE OF GOOD REPAIR (BIN # 2-23178-0)

54.881 2.845 0.000 0.000 52.036 AQC:A19 TOTAL 4YR COST :QUEENS TPC : $50-$85 M

CONINSP 2.100 2.100 2021NFADETLDES 0.700 0.700 2021NFA

11.200 11.200 CONSTSTBG-OFF 2021CONST 2.800 2.800 2021NFA

NYCDOT

X77388

REHABILITATION OF THE EAST 183RD STREET BRIDGE OVER THE METRO-NORTH RAILROAD ALONG THE HARLEM-LINE IN THE BRONX TO BRING TO A STATE OF GOOD REPAIR (BIN #: 2-24180-0) (HBBA24180)

16.800 0.000 16.800 0.000 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $15-$25 M

DETLDES 2.600 2.600 2020NFACONINSP 4.895 4.895 2021NFA

21.463 21.463 CONSTSTBG-OFF 2021CONST 5.366 5.366 2021NFA

NYCDOT

X77389

REHABILITATION OF THE SEELEY STREET BRIDGE OVER PROSPECT AVENUE IN BROOKLYN TO BRING TO A STATE OF GOOD REPAIR (BIN # : 2-24447-0)

34.324 2.600 31.724 0.000 0.000 AQC:A19 TOTAL 4YR COST :KINGS TPC : $32-$50 M

DETLDES 2.207 2.207 2020NFACONINSP 2.014 2.014 2021NFA

10.742 10.742 CONSTSTBG-OFF 2021CONST 2.685 2.685 2021NFA

NYCDOT

X77390

RECONSTRUCTION OF THE KANE STREET BRIDGE OVER THE I-278 BROOKLYN-QUEENS EXPRESSWAY (BQE) IN BROOKLYN TO BRING TO A STATE OF GOOD REPAIR (2-23038-0)

17.648 2.207 15.441 0.000 0.000 AQC:A19 TOTAL 4YR COST :KINGS TPC : $15-$25 M

DETLDES 1.143 1.143 2020NFACONST 18.285 18.285 2022NFA

NYCDOT

X77391

79TH STREET CROSSTOWN SELECT BUS SERVICE PRIMARILY ALONG 79TH STREET, BETWEEN EAST END AVE AND HUDSON PARKWAY ENTRY/EXIT IN MANHATTAN WILL MAKE PERMANENT CORRIDOR-BASED BUS RAPID TRANSIT TREATMENTS AND PEDESTRIAN SAFETY IMPROVEMENTS ALONG THE EXISTING M79 BUS ROUTE TO MAKE THE BUS SERVICE MORE RELIABLE AS WELL AS MAKING THE STREET SAFER AND MORE ACCESSIBLE. (SBS PREVIOUSLY IMPLEMENTATED UNDER PIN X77275)

19.428 1.143 0.000 18.285 0.000 AQC:A10 TOTAL 4YR COST :NEW YORK TPC : $15-$25 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 23 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.820 CMAQ 1.820 MISC2020MISC 0.455 0.455 2020NFA

NYCDOT

X77392

FDNY AMBULANCE IDLE REDUCTION - MODERNIZED VEHICLE FLEET WITH AN ONBOARD ANTI-IDLING TECHNOLOGY SYSTEM THAT WILL ALLOW SHUT DOWN OF THE VEHICLES MOTIVE/DRIVE ENGINE, AND OPERATE ALL NECESSARY EMERGENCY RESPONSE SYSTEMS ON BATTERY POWER TO REDUCE DIESEL EMISSIONS IN THE FIVE BOROUGHS OF NEW YORK CITY

2.275 2.275 0.000 0.000 0.000 AQC:K1 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.122 CMAQ 0.122 PRELDES2020PRELDES 0.031 0.031 2020NFA

0.819 0.819 CONSTCMAQ 2021CONST 0.205 0.205 2021NFA

0.082 0.082 DETLDESCMAQ 2021DETLDES 0.020 0.020 2021NFA

NYCDOT

X77393

PEDESTRIAN NETWORK DEVELOPMENT V PED IMPROVEMENTS 2021 - INCREASE PEDESTRIAN SAFETY AND ACCESSIBILITY BY UPGRADING SIDEWALKS, CURB EXTENSIONS OR PED REFUGE ISLANDS, ADA COMPLIANT RAMPS AND PEDESTRIAN SIGNALS AT THE FOLLOWING LOCATIONS: 14 ST & WASHINGTON ST (MHTN); BAYSWATER PARK AT BEACH 35 ST (QNS); AND 3 AVE FROM 135 ST TO 138 ST (BX)

1.279 0.153 1.126 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.341 0.341 DETLDESCMAQ 2021DETLDES 0.085 0.085 2021NFA

1.365 1.365 CONSTCMAQ 2022CONST 0.342 0.342 2022NFA

NYCDOT

X77394

PEDESTRIAN NETWORK DEVELOPMENT V PED IMPROVEMENTS 2022 - INCREASE PEDESTRIAN SAFETY AND ACCESSIBILITY BY UPGRADING SIDEWALKS, CURB EXTENSIONS OR PED REFUGE ISLANDS, ADA COMPLIANT RAMPS AND PEDESTRIAN SIGNALS AT THE FOLLOWING LOCATIONS: E 163RD ST AND BROOK AVE (BX); BROADWAY, FORM CANAL ST TO 14TH ST (MHTN); BOSTON RD AND VYSE AVE (BX); COOPER AVE AND 80TH ST (QNS); FLATBUSH AVE, FOSTER AVE, BEDFORD AVE, (BK)

2.133 0.000 0.426 1.707 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.800 CMAQ 0.800 CONST2020CONST 0.200 0.200 2020NFA

NYCDOT

X77395

NORTHERN BOULEVARD WALKABLE CORRIDORS BETWEEN 31ST STREET / 40TH STREET TO 114TH STREET - IMPLEMENT CORRIDOR SAFETY IMPROVEMENT MEASURES TO IMPROVE BIKE/PED SAFETY (SPLIT FROM X77262)

1.000 1.000 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : $0.6-$1.5 M

1.451 1.451 CONSTTAP LG URBAN 2021CONST 0.363 0.363 2021NFA

NYCDOT

X77396

CONNECTING COMMUNITIES: A VISION FOR THE HARLEM RIVER BRIDGES - IMPLEMENT BICYCLE AND PEDESTRIAN FACILITIES IDENTIFIED IN THE HARLEM RIVER BRIDGES PLAN INCLUDING (BUT NOT LIMITED TO) PROTECTED BIKE LANES AND PEDESTRIAN ISLANDS TO IMPROVE SAFETY & ACCESSIBILITY ON: WILLIS AVE (WILLIS AVE BRIDGE TO THE HUB) AND BROADWAY (BROADWAY BRIDGE TO THE NEW PROTECTED BIKE LANES AT VAN CORTLANDT PARK), BRONX (TAP 2019)

1.814 0.000 1.814 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $1.2-$2.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 24 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

CONINSP 0.500 0.500 2021NFADETLDES 0.380 0.380 2021NFA

5.000 5.000 CONSTTAP LG URBAN 2021CONST 1.250 1.250 2021NFA

ROOSEVELT ISLAND

X77397

ROOSEVELT ISLAND EAST PROMENADE BIKE LANE - CONSTRUCT A BIKE LANE ON THE EASTERN PROMENADE FROM LIGHT HOUSE PARK TO AN EXISTING BIKE LANE LOOP AT THE CORNELL TECH CAMPUS ELIMINATING THE NEED FOR BICYCLES TO SHARE VEHICLE ACCESS ROAD, ROOSEVELT ISLAND OPERATING CORP (TAP 2019)

7.130 0.000 7.130 0.000 0.000 AQC:C2 TOTAL 4YR COST :NEW YORK TPC : $6-$9.4 M

0.793 0.793 CONSTTAP LG URBAN 2021CONST 0.198 0.198 2021NFA

NYCDPR

X77398

RANDALL’S ISLAND SUNKEN GARDEN CONNECTOR - RESTORE A CONNECTION BETWEEN THE SUNKEN GARDEN FIELDS ON THE SOUTHERN END OF RANDALL’S ISLAND PARK AND THE EXISTING WATERFRONT PATHWAY ALONG ITS SOUTHWESTERN SHORELINE TO ENHANCE ACCESSIBILITY FOR NON-MOTORIZED USERS, NEW YORK COUNTY (TAP 2019)

0.991 0.000 0.991 0.000 0.000 AQC:C2 TOTAL 4YR COST :NEW YORK TPC : $0.6-$1.5 M

0.234 0.234 CONSTTAP LG URBAN 2021CONST 0.058 0.058 2021NFA

NYCDOT

X77399

SAFE ROUTES FOR NON-DRIVERS - BOSTON RD: IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION ZERO PRIORITY CORRIDORS AND CREATE NEW PEDESTRIAN ISLANDS AT BOSTON RD (PELHAM PKWY TO E 233 ST), BRONX (TAP 2019)

0.292 0.000 0.292 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : < $0.75 M

0.321 TAP LG URBAN 0.321 CONST2020CONST 0.080 0.080 2020NFA

NYCDOT

X77400

SAFE ROUTES FOR NON-DRIVERS - ROCKAWAY BLVD: IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION ZERO PRIORITY CORRIDORS AND CREATE CONCRETE PEDESTRIAN ISLANDS AT ROCKAWAY BLVD FROM NASSAU EXPRESSWAY TO ATLANTIC AVE TO IMPROVE SAFETY & REDUCE INJURIES IN QUEENS (TAP 2019)

0.401 0.401 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : < $0.75 M

0.321 0.321 CONSTTAP LG URBAN 2021CONST 0.080 0.080 2021NFA

NYCDOT

X77401

SAFE ROUTES FOR NON-DRIVERS - NORTHERN BLVD: IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION ZERO PRIORITY CORRIDORS AND CREATE NEW PEDESTRIAN ISLANDS, MEDIAN EXTENSIONS, AND OTHER PEDESTRIAN ACCESSIBILITY ENHANCEMENTS ON NORTHERN BLVD, 56 ST -114 ST TO IMPROVE SAFETY & REDUCE INJURIES IN QUEENS (TAP 2019)

0.401 0.000 0.401 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : < $0.75 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 25 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

0.401 TAP LG URBAN 0.401 CONST2020CONST 0.100 0.100 2020NFA

NYCDOT

X77402

SAFE ROUTES FOR NON-DRIVERS - JAMAICA AVE: IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION ZERO PRIORITY CORRIDORS AND CREATE MEDIAN PEDESTRIAN ISLANDS AND MEDIAN TIP EXTENSIONS AT JAMAICA AVE, FRANCIS LEWIS BLVD – E 241ST ST TO IMPROVE SAFETY & REDUCE INJURIES IN QUEENS (TAP 2019)

0.501 0.501 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : < $0.75 M

0.445 TAP LG URBAN 0.445 CONST2020CONST 0.111 0.111 2020NFA

NYCDOT

X77403

SAFE ROUTES FOR NON-DRIVERS - MERRICK BLVD: IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION ZERO PRIORITY CORRIDORS AND CREATE FULL CONCRETE MEDIANS AND MEDIAN TIP EXTENSIONS AT MERRICK BLVD FROM SPRINGFIELD BLVD TO HOOK CREEK BLVD TO IMPROVE SAFETY & REDUCE INJURIES IN QUEENS (TAP 2019)

0.556 0.556 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :QUEENS TPC : < $0.75 M

0.614 TAP LG URBAN 0.614 CONST2020CONST 0.154 0.154 2020NFA

NYCDOT

X77406

CONNECTING COMMUNITIES: A VISION FOR THE HARLEM RIVER BRIDGES IMPLEMENT PEDESTRIAN FACILITIES IDENTIFIED IN THE HARLEM RIVER BRIDGES PLAN AS PART OF THE BETTER BUSES PROGRAM - CONSTRUCT PEDESTRIAN IMPROVEMENTS FOR THE SAFETY OF TRANSIT RIDERS ALONG EDWARD L GRANT HIGHWAY BETWEEN JEROME AVENUE AND THE WASHINGTON BRIDGE INCLUDING CONCRETE CONSTRUCTION OF BUS BOARDING ISLANDS, PEDESTRIAN SAFETY ISLANDS, AND MEDIAN EXTENSIONS, BRONX (TAP 2019) FTA FLEX

0.768 0.768 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :BRONX TPC : $0.6-$1.5 M

CONINSP 7.362 7.362 2023NFA 21.572 21.572 CONSTNHPP 2023

CONST 39.040 39.040 2023NFA

NYCDOT

X77407

RECONSTRUCTION OF THE 5TH AVENUE BRIDGE OVER LIRR AND SEA BEACH IN THE BOROUGH OF BROOKLYN TO BRING TO A STATE OF GOOD REPAIR. BIN #: 2-24358-0

67.974 0.000 0.000 0.000 67.974 AQC:A19 TOTAL 4YR COST :KINGS TPC : $50-$85 M

CONST 2.000 2.000 2021NFANYCDOT

X77905

INSTALLATION OF EMERGENCY GENERATOR FOR THE STATEN ISLAND FERRY MAINTENANCE FACILITY IN STATEN ISLAND TO ENABLE THE FACILITY REMAIN FUNCTIONAL IN TIME OF CRISIS, D2013-SAND-017

2.000 0.000 2.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $3.3-$5.6 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 26 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.645 FTA 5324 1.645 CONST2020CONST 0.182 0.182 2020NFA

NYCDOT

X77907

IMPLEMENT IMPROVEMENTS TO BERTHING FACILITIES & CONSTRUCT RESILIENT MOORINGS POINTS INCLUDING ADDITIONAL PIER FIXED MOORING POINTS, PIER STRENGTHENING & VESSEL MODIFICATIONS TO PREVENT MOORED FERRY VESSELS FROM DAMAGING PIER INFRASTRUCTURE DURING HEAVY WIND AND TIDE CONDITIONS AND ENABLE FACILITIES TO WITHSTAND SEVERE WEATHER AT STATEN ISLAND FERRY FACILITIES ON STATEN ISLAND, D2013-SAND-015 & D2013-SAND-024

1.827 1.827 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $12.5-$19 M

16.000 FTA 5324 CR 16.000 CONST2020CONST 21.333 21.333 2020NFA

1.500 FTA 5324 CR 1.500 DETLDES2020DETLDES 0.500 0.500 2020NFA

NYCDOT

X77913

CONDUCT PRELIMINARY FEASIBILITY STUDY TO EVALUATE AND SELECT CURRENT OR PROPOSED FERRY LANDING SITES FOR UPGRADES TO STORM RESILIENCY AND LANDING ACCESS. DESIGN AND CONSTRUCT TWO STANDARD NGV-COMPATIBLE FLEX BARGES, AND UPGRADES TO OTHER LANDINGS AS IDENTIFIED IN THE FEASIBILITY STUDY. LOCATIONS FOR STUDY, EVALUATION AND CONSTRUCTION ARE IN QUEENS, BROOKLYN AND MANHATTAN. D2013-RESL-015

39.333 39.333 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :MULTI TPC : $32-$50 M

MISC 2.750 2.750 2020NFANYSDOT

X80565

PROVIDE FOR UTILITIES SUPPORT TO MANAGE THE JOINT TRANSPORTATION MANAGEMENT CENTER (JTMC) ON A 24/7 BASIS TO MANAGE AND PROVIDE REAL TIME TRAFFIC CONDITIONS TO MOTORISTS WITHIN CITY OF NEW YORK FOR 2022 - 2025

2.750 2.750 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

1.480 NHPP 1.480 OPER2020OPER 0.370 0.370 2020NFA

NYSDOT

X80577

ITS OPERATIONAL SUPPORT FOR STATE FISCAL YEAR 2019-2021 TO MANAGE THE JOINT TRANSPORTATION MANAGEMENT CENTER (JTMC) ON A 24/7 BASIS BY PROVIDING REAL TIME TRAFFIC CONDITION TO MOTORISTS FOR THE CITY OF NEW YORK

1.850 1.850 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

1.200 1.200 CONINSPSTBG LG URB 2021CONINSP 0.300 0.300 2021NFA

6.400 6.400 CONSTSTBG LG URB 2021CONST 1.600 1.600 2021NFAOPER 4.000 4.000 2022NFA

NYSDOT

X80601

PROVIDE MAINTENANCE AND FIELD SUPPORT FOR THE INTELLIGENT TRANSPORTATION SYSTEM TO MANAGE TRAFFIC ON THE STATE HIGHWAY SYSTEM IN NEW YORK CITY [ITS: TM01 TM06 TM07]

13.500 0.000 9.500 4.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 27 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

8.000 NHPP 8.000 OPER2020OPER 2.000 2.000 2020NFA

NYSDOT

X80616

HIGHWAY EMERGENCY LOCAL PATROL PROJECT 2017-2022. TO PROVIDE HIGHWAY EMERGENCY LOCAL PATROL (HELP) FOR INCIDENT MANAGEMENT ALONG THE LONG ISLAND EXPRESSWAY FROM THE VAN WYCK EXPRESSWAY TO THE NASSAU COUNTY LINE, FROM JOHN F. KENNEDY AIRPORT IN QUEENS TO THE BRUCKNER EXPRESSWAY IN THE BRONX [ITS: PS08]

10.000 10.000 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

OPER 7.560 7.560 2022NFANYSDOT

X80628

HIGHWAY EMERGENCY LOCAL PATROL (HELP) SFY 2022-2027 FOR INCIDENT MANAGEMENT ALONG THE LIE, VWE, HRP, & NEW ENGLAND THRUWAY FOR TOTAL OF 26 CENTRAL LANE MILES IN QUEENS & THE BRONX [ITS: PS08]

7.560 0.000 0.000 7.560 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

0.400 0.400 CONSTNHPP 2022CONST 0.100 0.100 2022NFA

3.680 3.680 CONINSPSTBG LG URB 2022CONINSP 0.920 0.920 2022NFA

34.320 34.320 CONSTSTBG LG URB 2022CONST 10.580 10.580 2022NFA

NYSDOT

X80656

REHABILITATION OF NELSON AVE, E L GRANT & JESSUP AVE BRIDGES OVER THE CROSS BRONX & MDE DEPOT PLACE BRIDGE TO INCLUDE DECK REPLACEMENT, STEEL REPAIRS, AND BEARINGS TO ADDRESS STRUCTURAL DEFICIENCIES, BRONX (BINS 1066230, 1066220, 1066840 & 1066240)

50.000 0.000 0.000 50.000 0.000 AQC:A19 TOTAL 4YR COST :BRONX TPC : $50-$85 M

1.410 HPP 1.410 CONST2020CONST 0.352 0.352 2020NFADETLDES 1.200 1.200 2020NFA

7.009 NHPP 7.009 CONST2020CONST 1.752 1.752 2020NFA

2.000 STBG LG URB 2.000 CONINSP2020CONINSP 0.500 0.500 2020NFA

2.520 STBG LG URB 2.520 CONST2020CONST 0.630 0.630 2020NFA

NYSDOT

X80658

SUPERSTRUCTURE REPLACEMENT OF ASTORIA BLVD OVER BROOKLYN-QUEENS EXPRESSWAY TO ADDRESS STRUCTURAL DEFICIENCY AND SAFETY ISSUES, QUEENS (BINS: 1072010) (TRANSFERRED EARMARK: NY109, PROGRAM CODE RPS0)

17.373 17.373 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :QUEENS TPC : $21-$31 M

2.000 CMAQ 2.000 DETLDES2020DETLDES 0.500 0.500 2020NFA

1.600 1.600 CONINSPCMAQ 2022CONINSP 0.400 0.400 2022NFA

11.440 11.440 CONSTCMAQ 2022CONST 2.860 2.860 2022NFA

NYSDOT

X80659

LONG ISLAND EXPRESSWAY CORRIDOR ACTIVE TRANSPORTATION & DEMAND MANAGEMENT, QUEENS MIDTOWN TUNNEL TO MAIN STREET IN QUEENS TO ENHANCE MOBILITY AND TRAVEL TRIP RELIABILITY

18.800 2.500 0.000 16.300 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $21-$31 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 28 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

0.400 STBG LG URB 0.400 MISC2020MISC 0.100 0.100 2020NFA

NYSDOT/NYCDOT

X80670

COORDINATED INTELLIGENT TRANSPORTATION SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS A MULTI-YEAR RESEARCH, DEVELOPMENT AND TRAINING PROJECT FOCUSING ON THREE PROGRAM AREAS: CONGESTION MANAGEMENT, EMERGENCY MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

0.500 0.500 0.000 0.000 0.000 AQC:C3 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.440 0.440 MISCSTBG LG URB 2021MISC 0.110 0.110 2021NFA

NYCDOT

X80671

COORDINATED INTELLIGENT TRANSPORTATION SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS A MULTI-YEAR RESEARCH, DEVELOPMENT AND TRAINING PROJECT FOCUSING ON THREE PROGRAM AREAS: CONGESTION MANAGEMENT, EMERGENCY MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

0.550 0.000 0.550 0.000 0.000 AQC:C3 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.470 0.470 MISCSTBG LG URB 2023MISC 0.117 0.117 2023NFA

NYCDOT

X80672

COORDINATED INTELLIGENT TRANSPORTATION SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS A MULTI-YEAR RESEARCH, DEVELOPMENT AND TRAINING PROJECT FOCUSING ON THREE PROGRAM AREAS: CONGESTION MANAGEMENT, EMERGENCY MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

0.587 0.000 0.000 0.000 0.587 AQC:C3 TOTAL 4YR COST :MULTI TPC : < $0.75 M

13.912 13.912 MISCNHPP 2022MISC 3.478 3.478 2022NFA

NYSDOT

X80702

INTELLIGENT TRANSPORTATION SYSTEM (ITS) OPERATIONS FOR FY 2022-2024 AT REGION 11 TO PROVIDE CONSULTANT STAFF SUPPORT TO MANAGE THE JOINT TRANSPORTATION MANAGEMENT CENTER (JTMC) ON A 24/7 BASIS TO PROVIDE REAL TIME TRAFFIC CONDITIONS TO MOTORISTS WITHIN NEW YORK CITY

17.390 0.000 0.000 17.390 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $15-$25 M

3.441 HPP 3.441 OPER2020OPER 0.860 0.860 2020NFA

3.120 NHPP 3.120 OPER2020OPER 0.780 0.780 2020NFA

34.580 STBG LG URB 34.580 OPER2020OPER 24.155 24.155 2020NFA

NYCDOT

X80705

IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC MANAGEMENT CENTER FACILITY FOR COMPUTERIZED SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK CITY FOR FISCAL YEAR 2021. FUNDING INCLUDES TRANSFERRED EARMARKS NY277 NY373 NY378 NY437 NY444 NY493 NY501 NY560. (PROGRAM CODE RPS2) [ITS: TM06 & TM07]

66.936 66.936 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $50-$85 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 29 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

3.250 3.250 OPERNHPP 2021OPER 0.813 0.813 2021NFA

35.970 35.970 OPERSTBG LG URB 2021OPER 25.902 25.902 2021NFA

NYCDOT

X80706

IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC MANAGEMENT CENTER FACILITY FOR COMPUTERIZED SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK CITY FOR FISCAL YEAR 2022 [ITS: TM06 & TM07]

65.935 0.000 65.935 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $50-$85 M

3.380 3.380 OPERNHPP 2022OPER 17.129 17.129 2022NFA

37.141 37.141 OPERSTBG LG URB 2022OPER 9.285 9.285 2022NFA

NYCDOT

X80707

IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC MANAGEMENT CENTER FACILITY FOR COMPUTERIZED SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK CITY FOR FISCAL YEAR 2023 [ITS: TM06 & TM07]

66.935 0.000 0.000 66.935 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $50-$85 M

3.510 3.510 OPERNHPP 2023OPER 14.800 14.800 2023NFA

38.900 38.900 OPERSTBG LG URB 2023OPER 9.725 9.725 2023NFA

NYCDOT

X80708

IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC MANAGEMENT CENTER FACILITY FOR COMPUTERIZED SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK CITY FOR FISCAL YEAR 2024 [ITS: TM06 & TM07]

66.935 0.000 0.000 0.000 66.935 AQC:A7 TOTAL 4YR COST :MULTI TPC : $50-$85 M

DETLDES 0.300 0.300 2023NFANYSDOT

X80729

PROVIDE MAINTENANCE AND FIELD SUPPORT FOR THE INTELLIGENT TRANSPORTATION SYSTEM TO KEEP IT OPERATIONAL ON THE STATE HIGHWAY SYSTEM IN NEW YORK CITY FIVE BOROUGHS [ITS: TM01 TM06 TM07]

0.300 0.000 0.000 0.000 0.300 AQC:A7 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

2.808 HSIP 2.808 SCOPING2020SCOPING 0.312 0.312 2020NFA

NYSDOT

X80730

STUDY OF PRIORITY INVESTIGATION LOCATIONS (PIL) ON VARIOUSSTATE HIGHWAYS IN THE CITY OF NEW YORK TO ADDRESS SAFETY (07/01/20-07/01/23)

3.120 3.120 0.000 0.000 0.000 AQC:C3 TOTAL 4YR COST :MULTI TPC : $2-$4 M

1.090 1.090 CONSTSTBG LG URB 2021CONST 0.272 0.272 2021NFA

NYCDOT

X80731

INSTALLATION OF PAVEMENT SAFETY MARKINGS ON INTERSTATE EXPRESSWAYS AND PARKWAYS ON THE FEDERAL HIGHWAY SYSTEM IN BRONX, KINGS, NEW YORK, QUEENS AND RICHMOND COUNTIES TO ENHANCE AND MAINTAIN SAFETY (SEP-14)

1.362 0.000 1.362 0.000 0.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 30 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

1.170 1.170 CONSTSTBG LG URB 2023CONST 0.293 0.293 2023NFA

NYCDOT

X80732

INSTALLATION OF PAVEMENT SAFETY MARKINGS ON INTERSTATE EXPRESSWAYS AND PARKWAYS ON THE FEDERAL HIGHWAY SYSTEM CITYWIDE TO ENHANCE AND MAINTAIN SAFETY (SEP-14)

1.463 0.000 0.000 0.000 1.463 AQC:A6 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.180 HSIP 0.180 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.230 0.230 CONINSPHSIP 2021CONINSP 0.026 0.026 2021NFA

2.480 2.480 CONSTHSIP 2021CONST 0.276 0.276 2021NFA

NYSDOT

X80734

IMPROVE SIGNAGE AT EXIT RAMPS TO PREVENT WRONG-WAY DRIVING ON EXIT RAMPS. THIS PROJECT ENHANCES SAFETY BY PREVENTING DRIVING IN THE WRONG DIRECTION ON A ONE-WAY EXIT RAMP, BY INSTALLING SIGNS AND MARKINGS, SUCH AS “DO-NOT-ENTER” AND “WRONG-WAY” SIGNS, THROUGHOUT NEW YORK CITY. STATEWIDE HSIP

3.212 0.200 3.012 0.000 0.000 AQC:C13 TOTAL 4YR COST :MULTI TPC : $2-$4 M

CONST 106.471 106.471 2020NFAMOYNIHAN STN DEVELOP

X82266

MOYNIHAN STATION REDEVELOPMENT / IMPROVEMENTS: GENERAL CONSTRUCTION FOR VARIOUS TRAIN STATION CONCOURSES INCLUDING SAFETY ELEMENTS, PLATFORM VENTILATION ETC INCLUDING GENERAL & ADMIN COSTS, TO PROVIDE AMTRAK WITH A NEW PORTAL RELIEVING PAX CONGESTION, MHTN (FRA ADMINISTERED)(TIFIA FUNDING & D2013-RESL-030 )

106.471 106.471 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :NEW YORK TPC : $1.5-$1.8 B

5.001 FBP 5.001 CONST2020CONST 1.250 1.250 2020NFA

NYCDOT

X82295

REPLACE KENNEDY AND BARBERI-CLASS FERRIES, STATEN ISLAND THROUGH THE CONSTRUCTION OF THREE NEW GENERATION VESSELS FEATURING FOUR CYCLOIDAL DRIVES PER FERRY WITH MORE ADVANCED PROPULSION AND STEERING CONTROL SYSTEMS TO AUGMENT THE RESILIENCE OF SIF SYSTEM (FBD 2011 & REMAINING FBP 2017 FUNDS TO BE FLEXED TO FTA)

6.251 6.251 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :MULTI TPC : $298.8-$368.2 M

0.237 0.237 CONSTFBP 2022CONST 0.550 0.550 2022NFA

0.236 0.236 DETLDESFBP 2022DETLDES 0.550 0.550 2022NFA

PANYNJ

X82329

INSTALL A FERRY LANDING AT LGA IN QUEENS FOR THE FERRY SERVICE BETWEEN THE AIRPORT AND MANHATTAN. THE PROJECT INCLUDES THE CONSTRUCTION OF 82FT LONG - 6FT WIDE ALUMINUM GANGWAY AND WILL SERVICE A 90FT STEEL BARGE FOR DOCK

1.573 0.000 0.000 1.573 0.000 AQC:NON TOTAL 4YR COST :QUEENS TPC : $1.2-$2.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 31 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

6.740 FTA 5307 6.740 MISC2020MISC 7.081 7.081 2020NFA

6.964 6.964 MISCFTA 5307 2021MISC 6.536 6.536 2021NFA

6.964 6.964 MISCFTA 5307 2022MISC 6.536 6.536 2022NFA

12.800 12.800 MISCFTA 5307 2023MISC 14.200 14.200 2023NFA

NYCDOT

X82344

PREVENTIVE MAINTENANCE OF STATEN ISLAND FERRY VESSELS AND FACILITIES FROM WHITEHALL IN MANHATTAN TO ST. GEORGE IN STATEN ISLAND TO MAINTAIN A STATE OF GOOD REPAIR

67.821 13.821 13.500 13.500 27.000 AQC:B3 TOTAL 4YR COST :MULTI TPC : $100-$225 M

4.579 4.579 MISCFTA 5307 2022MISC 1.145 1.145 2022NFA

7.693 7.693 MISCFTA 5307 2023MISC 1.923 1.923 2023NFA

NYCDOT

X82351

BLOCK FUND FOR FUTURE NYCDOT TRANSIT PROJECTS TO BE IDENTIFIED THROUGH TIP ACTIONS (SEE U80303XX FOR MTA-BUS BLOCK)

15.340 0.000 0.000 5.724 9.616 AQC:J1 TOTAL 4YR COST :MULTI TPC : $50-$85 M

2.340 FBP 2.340 CONST2020CONST 0.585 0.585 2020NFA

NYCDOT

X82366

NEW YORK CITY DOT FERRY DIVISION - ST GEORGE PASSENGER SLIPS WIRE ROPE RECONSTRUCTION REPLACES TRANSFER BRIDGE WIRE ROPES SYSTEM, RECONDITION AND RESTORE SLIP MACHINERY TO ITS ORIGINAL OPERATING PARAMETERS AT THE STATEN ISLAND ST GEORGE FERRY TERMINAL (2018: FBP FY2015; 2019: FBD 2011 & FBP 2016)

2.925 2.925 0.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $6-$9.4 M

0.174 FBP 0.174 DETLDES2020DETLDES 0.043 0.043 2020NFA

0.400 0.400 CONINSPFBP 2021CONINSP 0.100 0.100 2021NFA

11.200 11.200 CONSTFBP 2021CONST 2.800 2.800 2021NFA

NYCDOT

X82372

NEW YORK CITY DOT FERRY DIVISION - ST GEORGE FERRY TERMINAL WATERFRONT BULKHEAD RECONSTRUCTION AND SLIP SCOUR REMEDIATION - RESTORE SCOUR PROTECTION OF TRANSFER BRIDGE FOUNDATIONS BY LENGTHENING EXISTING PILE ENCASEMENTS AND BACKFILLING THE IMMEDIATE UNDERWATER AREA WITH RIP-RAP. REMOVAL & RENEWAL OF DETERIORATED PORTIONS OF THE SUBSTRUCTURE STEEL BRACING OF SLIPS 4, 5, & 6 WHICH SUPPORT THE PILES. RECONSTRUCTION OF THE STEEL BULKHEAD WHICH SUPPORTS THE FERRY TERMINAL BUILDING AND IS SUBJECT TO ACCELERATED CORROSION DUE TO WAVE & FERRYBOAT ACTION (FERRY BOAT PROGRAM FY2016, 2017, 2018 & 2019)

14.717 0.217 14.500 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $12.5-$19 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 32 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

2.400 2.400 CONSTFTA 5307 2021CONST 0.600 0.600 2021NFA

NYCDOT

X82373

IMPROVE THE STATEN ISLAND FERRY VESSEL GANGWAY SYSTEM UTILIZED AT THE ST. GEORGE FERRY TERMINAL AND THE SI FERRY MAINTENANCE FACILITY BY MODIFYING RAISED PLATFORMS AND WALKWAYS (GANGWAY SYSTEM) TO INCREASE SAFETY FOR DEPLOYING THE SYSTEM AND FOR THOSE TRAVERSING THE GANGWAY IN STATEN ISLAND (D2018-PFGP-012)

3.000 0.000 3.000 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $2-$4 M

3.903 3.903 CONSTFTA 5307 2021CONST 0.976 0.976 2021NFA

NYCDOT

X82374

SI FERRYBOAT ENVIRONMENTAL COMPLIANCE UPGRADES - VESSELS WILL BE MODIFIED TO HOLD GREY WATER ONBOARD IN ORDER TO COMPLY WITH THE USEPA NO DISCHARGE ZONE. VESSEL MODIFICATION WILL REQUIRE TANK FABRICATION AND INSTALLATION, AS WELL AS PIPE AND PUMP INSTALLATION FOR GREY WATER AND OILY WATER. HOLDING TANKS AND HARDWARE WILL BE INSTALLED ON LAND (D2018-PFGP-012)

4.879 0.000 4.879 0.000 0.000 AQC:B8 TOTAL 4YR COST :RICHMOND TPC : $4.6-$7.5 M

DETLDES 0.411 0.411 2020NFAPRELDES 0.411 0.411 2020NFACONST 3.280 3.280 2021NFA

NYCEDC

X93591

FULL REHABILITATION OF THE ELECTRICAL SYSTEM OF THE ARTHUR KILL LIFT BRIDGE IN STATEN ISLAND, RE-TENSIONING THE COUNTERWEIGHT ROPES, AND REPLACING TWO COUNTERWEIGHT ROPES (ONE IN EACH TOWER) THAT LIFT IT, IN ORDER TO INCREASE SAFETY AND ENSURE THE ONGOING USEFULNESS AND RELIABILITY (NYS RAIL INFRASTRUCTURE IMPROVEMENTS AWARD, 2018)

4.102 0.822 3.280 0.000 0.000 AQC:A19 TOTAL 4YR COST :RICHMOND TPC : $3.3-$5.6 M

CONINSP 0.700 0.700 2021NFACONST 13.200 13.200 2021NFA

NYSDOT

XM1542

SIGN AND STRUCTURE REPAIR/REPLACEMENT TO IMPROVE SAFETY ON STATE HIGHWAY SYSTEM, CITYWIDE

13.900 0.000 13.900 0.000 0.000 AQC:C13 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

CONINSP 0.250 0.250 2020NFANYSDOT

XM1850

BUILD CURB RAMPS, CROSSWALKS AND SIDEWALKS AT VARIOUS LOCATIONS IN THE BRONX AS REQUIRED BY ADA TO BE BROUGHT UP TO ACCESSIBLE STANDARDS, TRANSFERRED EARMARK: NY670 (PROGRAM CODE RPS9)

0.250 0.250 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :BRONX TPC : $1.2-$2.5 M

CONINSP 0.972 0.972 2020NFACONST 7.560 7.560 2020NFA

NYSDOT

XM1901

PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SAFETY AND SUSTAINABILITY ON STATE - OWNED BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE

8.532 8.532 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 33 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

CONINSP 0.300 0.300 2020NFACONST 1.500 1.500 2020NFA

NYSDOT

XM1930

PREVENTIVE MAINTENANCE OF PAVEMENT ON THE STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY FILLING & SEALING CRACKS AND JOINTS CITYWIDE

1.800 1.800 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

CONINSP 2.000 2.000 2020NFACONST 22.100 22.100 2020NFA

NYSDOT

XM1948

MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN NEW YORK CITY

24.100 24.100 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $21-$31 M

CONINSP 0.300 0.300 2020NFACONST 3.050 3.050 2020NFA

NYSDOT

XM1965

REPLACE SIGN PANELS ON STATE HIGHWAYS, TO PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT TIME VISIBILITY IN THE BRONX, KINGS, QUEENS, & RICHMOND COUNTIES

3.350 3.350 0.000 0.000 0.000 AQC:C13 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

MISC 8.900 8.900 2020NFANYSDOT

XM1970

PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

8.900 8.900 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

DETLDES 0.100 0.100 2020NFA 0.480 STBG LG URB 0.480 CONINSP2020

CONINSP 0.120 0.120 2020NFA 6.400 STBG LG URB 6.400 CONST2020

CONST 1.600 1.600 2020NFA

NYSDOT

XM2002

PREVENTIVE MAINTENANCE - REGIONAL BRIDGE WASHING TO EXTEND LIFE CYCLE ON STATE-OWNED BRIDGES CITYWIDE, IN NEW YORK CITY ON STATE HIGHWAY SYSTEM

8.700 8.700 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

CONINSP 0.165 0.165 2021NFACONST 1.100 1.100 2021NFADETLDES 0.055 0.055 2021NFA

NYSDOT

XM2030

PREVENTIVE MAINTENANCE OF PAVEMENT ON THE STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY FILLING & SEALING CRACKS AND JOINTS. IN NEW YORK CITY, CITYWIDE.

1.320 0.000 1.320 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

MISC 1.650 1.650 2020NFANYSDOT

XM2040

PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.

1.650 1.650 0.000 0.000 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 34 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

CONINSP 1.500 1.500 2020NFACONST 8.000 8.000 2020NFA

NYSDOT

XM2045

WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE APPURTENANCES TO ADDRESS SAFETY AND EXTEND SERVICE LIFE, CITYWIDE IN NEW YORK CITY

9.500 9.500 0.000 0.000 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

CONINSP 2.000 2.000 2021NFACONST 16.250 16.250 2021NFA

NYSDOT

XM2048

MAINTENANCE REPAIR OR RESURFACING OF PAVEMENT TO EXTEND THE SERVICE LIFE OF THE PAVEMENT ON STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN NEW YORK CITY

18.250 0.000 18.250 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $15-$25 M

DETLDES 0.102 0.102 2020NFACONINSP 0.714 0.714 2021NFACONST 3.000 3.000 2021NFA

NYSDOT

XM2049

MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO EXTEND THE SERVICE LIFE ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

3.816 0.102 3.714 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

CONINSP 0.204 0.204 2021NFACONST 1.632 1.632 2021NFA

NYSDOT

XM2050

BUILD CURB RAMPS, CROSSWALKS AND SIDEWALKS IN NEW YORK CITY, CITYWIDE AS MANDATED BY 28 CFR 35.150 TO BE INCLUDED IN THE NYSDOT ADA TRANSITION PLAN. NON-ACCESSIBLE ASSETS IDENTIFIED WILL BE BROUGHT UP TO ACCESSIBLE STANDARDS

1.836 0.000 1.836 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.500 0.500 2020NFACONINSP 3.060 3.060 2021NFACONST 20.000 20.000 2021NFA

NYSDOT

XM2051

PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF THE STRUCTURES, CITYWIDE, IN NEW YORK CITY

23.560 0.500 23.060 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

1.200 1.200 CONINSPNHPP 2021CONINSP 0.800 0.800 2021NFA

14.112 14.112 CONSTNHPP 2021CONST 3.528 3.528 2021NFA

NYSDOT

XM2055

PREVENTIVE AND CORRECTIVE MAINTENANCE - BRIDGE EXPANSION JOINTS RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

19.640 0.000 19.640 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $15-$25 M

MISC 8.900 8.900 2021NFANYSDOT

XM2070

PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

8.900 0.000 8.900 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 35 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 0.100 0.100 2020NFACONINSP 0.510 0.510 2021NFACONST 6.000 6.000 2021NFA

NYSDOT

XM2101

PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SAFETY AND SUSTAINABILITY ON STATE - OWNED BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE

6.610 0.100 6.510 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

DETLDES 0.500 0.500 2020NFACONINSP 1.734 1.734 2021NFACONST 11.020 11.020 2021NFA

NYSDOT

XM2121

ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK CITY

13.254 0.500 12.754 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

DETLDES 0.204 0.204 2020NFACONINSP 0.624 0.624 2021NFACONST 4.000 4.000 2021NFA

NYSDOT

XM2125

LANDSCAPING REQUIREMENTS INCLUDING SOIL RESTORATION, TREE TRANSPLANTING, SIDEWALK, WALL AND FENCE WORK, TO MITIGATE CONSTRUCTION IMPACTS AND/OR BEAUTIFY ROADSIDE ENVIRONMENT ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

4.828 0.204 4.624 0.000 0.000 AQC:C11 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

DETLDES 0.051 0.051 2021NFACONINSP 0.156 0.156 2022NFACONST 1.500 1.500 2022NFA

NYSDOT

XM2130

PREVENTIVE MAINTENANCE OF PAVEMENT ON THE STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY FILLING & SEALING CRACKS AND JOINTS. IN NEW YORK CITY, CITYWIDE.

1.707 0.000 0.051 1.656 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

MISC 1.680 1.680 2021NFANYSDOT

XM2140

PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.

1.680 0.000 1.680 0.000 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.600 0.600 2021NFACONINSP 1.200 1.200 2023NFACONST 6.400 6.400 2023NFA

NYSDOT

XM2142

SIGN AND STRUCTURE REPAIR/REPLACEMENT TO IMPROVE SAFETY ON STATE HIGHWAY SYSTEM, CITYWIDE

8.200 0.000 0.600 0.000 7.600 AQC:C13 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

DETLDES 0.050 0.050 2020NFACONINSP 1.500 1.500 2021NFACONST 8.000 8.000 2021NFA

NYSDOT

XM2145

WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE APPURTENANCES TO ADDRESS SAFETY AND EXTEND SERVICE LIFE, CITYWIDE IN NEW YORK CITY

9.550 0.050 9.500 0.000 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $15-$25 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 36 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 0.102 0.102 2020NFACONINSP 2.080 2.080 2022NFACONST 20.000 20.000 2022NFA

NYSDOT

XM2148

MAINTENANCE REPAIR / RESURFACING OF PAVEMENT TO EXTEND THE SERVICE LIFE OF THE PAVEMENT ON STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN NEW YORK CITY

22.182 0.102 0.000 22.080 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $21-$31 M

DETLDES 0.104 0.104 2021NFACONINSP 0.728 0.728 2022NFACONST 3.000 3.000 2022NFA

NYSDOT

XM2149

MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO EXTEND THE SERVICE LIFE ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

3.832 0.000 0.104 3.728 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

SCOPING 1.500 1.500 2020NFACONINSP 0.780 0.780 2022NFACONST 2.508 2.508 2022NFA

NYSDOT

XM2160

MAINTENANCE REPAIR AND PREVENTIVE MAINTENANCE OF VARIOUS ELEMENTS ON RETAINING WALLS TO ENHANCE SAFETY ON THE STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

4.788 1.500 0.000 3.288 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

DETLDES 0.306 0.306 2020NFAPRELDES 0.102 0.102 2020NFACONINSP 0.312 0.312 2022NFACONST 3.052 3.052 2022NFA

NYSDOT

XM2165

REPLACE SIGN PANELS ON STATE HIGHWAYS, TO PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT TIME VISIBILITY CITYWIDE, IN NEW YORK CITY

3.772 0.408 0.000 3.364 0.000 AQC:C13 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

MISC 8.900 8.900 2022NFANYSDOT

XM2170

PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

8.900 0.000 0.000 8.900 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

PRELDES 0.050 0.050 2021NFADETLDES 0.100 0.100 2022NFA

0.480 0.480 CONINSPNHPP 2022CONINSP 0.120 0.120 2022NFA

3.200 3.200 CONSTNHPP 2022CONST 0.800 0.800 2022NFA

NYSDOT

XM2202

PREVENTIVE MAINTENANCE - REGIONAL BRIDGE WASHING TO EXTEND LIFE CYCLE ON STATE-OWNED BRIDGES CITYWIDE, IN NEW YORK CITY ON STATE HIGHWAY SYSTEM

4.750 0.000 0.050 4.700 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 37 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 0.102 0.102 2020NFACONINSP 3.120 3.120 2021NFACONST 20.000 20.000 2021NFA

NYSDOT

XM2220

ON-DEMAND MAINTENANCE - WHERE & WHEN EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS LOCATIONS IN NEW YORK CITY

23.222 0.102 23.120 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

MISC 1.710 1.710 2022NFANYSDOT

XM2240

PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.

1.710 0.000 0.000 1.710 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.051 0.051 2021NFACONINSP 1.560 1.560 2022NFACONST 8.000 8.000 2022NFA

NYSDOT

XM2245

WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE APPURTENANCES TO ADDRESS SAFETY AND EXTEND SERVICE LIFE, CITYWIDE IN NEW YORK CITY

9.611 0.000 0.051 9.560 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

DETLDES 0.104 0.104 2021NFACONINSP 2.000 2.000 2022NFACONST 20.000 20.000 2022NFA

NYSDOT

XM2248

MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN NEW YORK CITY

22.104 0.000 0.104 22.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $21-$31 M

DETLDES 0.104 0.104 2022NFACONINSP 0.742 0.742 2023NFACONST 3.000 3.000 2023NFA

NYSDOT

XM2249

MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO EXTEND THE SERVICE LIFE ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

3.846 0.000 0.000 0.104 3.742 AQC:A10 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

DETLDES 1.040 1.040 2022NFACONINSP 3.180 3.180 2023NFACONST 20.000 20.000 2023NFA

NYSDOT

XM2251

PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF THE STRUCTURES, CITYWIDE, IN NEW YORK CITY

24.220 0.000 0.000 1.040 23.180 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

DETLDES 0.520 0.520 2021NFA 1.200 1.200 CONINSPNHPP 2023

CONINSP 0.300 0.300 2023NFA 4.000 4.000 CONSTNHPP 2023

CONST 1.000 1.000 2023NFA

NYSDOT

XM2255

PREVENTIVE AND CORRECTIVE MAINTENANCE - BRIDGE EXPANSION JOINTS RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

7.020 0.000 0.520 0.000 6.500 AQC:A10 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 38 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

MISC 7.600 7.600 2023NFANYSDOT

XM2270

PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

7.600 0.000 0.000 0.000 7.600 AQC:A10 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

DETLDES 0.104 0.104 2022NFACONINSP 0.530 0.530 2023NFACONST 6.000 6.000 2023NFA

NYSDOT

XM2301

PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SAFETY AND SUSTAINABILITY ON STATE - OWNED BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE

6.634 0.000 0.000 0.104 6.530 AQC:A19 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

DETLDES 0.114 0.114 2021NFANYSDOT

XM2320

ON-DEMAND MAINTENANCE - WHERE & WHEN EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS LOCATIONS IN NEW YORK CITY

0.114 0.000 0.114 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

DETLDES 0.102 0.102 2022NFACONINSP 1.802 1.802 2023NFACONST 11.060 11.060 2023NFA

NYSDOT

XM2321

ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK CITY

12.964 0.000 0.000 0.102 12.862 AQC:A19 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

DETLDES 0.053 0.053 2023NFANYSDOT

XM2330

PREVENTIVE MAINTENANCE OF PAVEMENT ON THE STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY FILLING & SEALING CRACKS AND JOINTS. IN NEW YORK CITY, CITYWIDE.

0.053 0.000 0.000 0.000 0.053 AQC:A10 TOTAL 4YR COST :MULTI TPC : $2-$4 M

MISC 1.710 1.710 2023NFANYSDOT

XM2340

PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.

1.710 0.000 0.000 0.000 1.710 AQC:A19 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.052 0.052 2022NFACONINSP 1.590 1.590 2023NFACONST 10.000 10.000 2023NFA

NYSDOT

XM2345

WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE APPURTENANCES TO ADDRESS SAFETY AND EXTEND SERVICE LIFE, CITYWIDE IN NEW YORK CITY

11.642 0.000 0.000 0.052 11.590 AQC:A2 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 39 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 0.100 0.100 2023NFANYSDOT

XM2348

MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN NEW YORK CITY

0.100 0.000 0.000 0.000 0.100 AQC:A10 TOTAL 4YR COST :MULTI TPC : $21-$31 M

DETLDES 0.106 0.106 2023NFANYSDOT

XM2349

MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO EXTEND THE SERVICE LIFE ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

0.106 0.000 0.000 0.000 0.106 AQC:A10 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

DETLDES 0.318 0.318 2022NFAPRELDES 0.106 0.106 2022NFA

NYSDOT

XM2365

REPLACE SIGN PANELS ON STATE HIGHWAYS, TO PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT TIME VISIBILITY CITYWIDE, IN NEW YORK CITY

0.424 0.000 0.000 0.424 0.000 AQC:C13 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

DETLDES 0.112 0.112 2022NFACONINSP 3.240 3.240 2023NFACONST 20.000 20.000 2023NFA

NYSDOT

XM2420

ON-DEMAND MAINTENANCE - WHERE & WHEN EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS LOCATIONS, CITYWIDE

23.352 0.000 0.000 0.112 23.240 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

DETLDES 0.220 0.220 2022NFANYSDOT

XM2425

LANDSCAPING REQUIREMENTS INCLUDING SOIL RESTORATION, TREE TRANSPLANTING, SIDEWALK, WALL AND FENCE WORK, TO MITIGATE CONSTRUCTION IMPACTS AND/OR BEAUTIFY ROADSIDE ENVIRONMENT ON STATE HIGHWAY SYSTEM, CITYWIDE

0.220 0.000 0.000 0.220 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

DETLDES 0.053 0.053 2023NFANYSDOT

XM2445

WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE APPURTENANCES TO ADDRESS SAFETY AND EXTEND SERVICE LIFE, CITYWIDE IN NEW YORK CITY

0.053 0.000 0.000 0.000 0.053 AQC:A2 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

DETLDES 0.560 0.560 2023NFANYSDOT

XM2455

PREVENTIVE AND CORRECTIVE MAINTENANCE - BRIDGE EXPANSION JOINTS RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY

0.560 0.000 0.000 0.000 0.560 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 40 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

DETLDES 1.040 1.040 2022NFANYSDOT

XM2460

MAINTENANCE REPAIR AND PREVENTIVE MAINTENANCE OF VARIOUS ELEMENTS ON RETAINING WALLS TO ENHANCE SAFETY ON THE STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK CITY.

1.040 0.000 0.000 1.040 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

DETLDES 0.108 0.108 2023NFANYSDOT

XM2521

ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK CITY

0.108 0.000 0.000 0.000 0.108 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

0.662 0.662 MISCHSIP 2021MISC 0.074 0.074 2021NFA

6.140 6.140 MISCHSIP 2022MISC 0.682 0.682 2022NFA

7.294 7.294 MISCHSIP 2023MISC 0.810 0.810 2023NFA

NYSDOT

XT1556

FEDERAL FISCAL YEAR 2020-2024 ORDER-ON-CONTRACT FOR SAFETY PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

15.662 0.000 0.736 6.822 8.104 AQC:J1 TOTAL 4YR COST :MULTI TPC : $21-$31 M

0.864 0.864 MISCNHPP 2022MISC 0.216 0.216 2022NFA

0.880 0.880 MISCNHPP 2023MISC 0.220 0.220 2023NFA

NYSDOT

XT1557

BRIDGE ASSET MANAGEMENT TEAM BLOCK FOR WORK ORDERS DESIGN TO ADDRESS FLAG CONDITIONS - BLOCK FUND

2.180 0.000 0.000 1.080 1.100 AQC:J1 TOTAL 4YR COST :MULTI TPC : $21-$31 M

5.753 CMAQ 5.753 MISC2020MISC 1.438 1.438 2020NFA

3.895 3.895 MISCCMAQ 2021MISC 0.974 0.974 2021NFA

22.267 22.267 MISCCMAQ 2023MISC 5.567 5.567 2023NFA

NYSDOT

XT1580

FFY 2020 - 2024 CMAQ FOR FUTURE CMAQ ELIGIBLE PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

39.894 7.191 4.869 0.000 27.834 AQC:J1 TOTAL 4YR COST :MULTI TPC : $100-$225 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 41 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

27.316 CMAQ 27.316 MISC2020MISC 6.829 6.829 2020NFA

15.672 15.672 MISCCMAQ 2021MISC 3.918 3.918 2021NFA

1.635 1.635 MISCCMAQ 2022MISC 0.409 0.409 2022NFA

7.557 7.557 MISCCMAQ 2023MISC 1.889 1.889 2023NFA

NYCDOT

XT1582

FFY 2020-2024 CMAQ FOR FUTURE CMAQ ELIGIBLE PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

65.225 34.145 19.590 2.044 9.446 AQC:J1 TOTAL 4YR COST :MULTI TPC : $70-$130 M

0.081 HSIP 0.081 MISC2020MISC 0.009 0.009 2020NFA

0.101 0.101 MISCHSIP 2021MISC 0.074 0.074 2021NFA

2.295 2.295 MISCHSIP 2022MISC 0.255 0.255 2022NFA

2.295 2.295 MISCHSIP 2023MISC 0.255 0.255 2023NFA

NYCDOT

XT1605

FFY 2020 - 2024 HSIP FOR FUTURE PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

5.365 0.090 0.175 2.550 2.550 AQC:J1 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

34.128 NHPP 34.128 MISC2020MISC 8.532 8.532 2020NFA

13.406 STBG LG URB 13.406 MISC2020MISC 3.351 3.351 2020NFA

19.754 STBG-OFF 19.754 MISC2020MISC 4.938 4.938 2020NFA

36.945 36.945 MISCNHPP 2021MISC 9.236 9.236 2021NFA

5.227 5.227 MISCSTBG LG URB 2021MISC 1.307 1.307 2021NFA

3.133 3.133 MISCNHPP 2022MISC 0.783 0.783 2022NFA

13.776 13.776 MISCSTBG LG URB 2022MISC 3.444 3.444 2022NFA

4.914 4.914 MISCNHPP 2023MISC 1.228 1.228 2023NFA

0.797 0.797 MISCSTBG LG URB 2023MISC 0.199 0.199 2023NFA

NYCDOT

XT1607

FFY 2020-2024 STBG LARGE URBAN AND NHPP FOR FUTURE PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

165.098 84.109 52.715 21.136 7.138 AQC:J1 TOTAL 4YR COST :MULTI TPC : $175-$385 M

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 42 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

4.289 NHPP 4.289 MISC2020MISC 1.072 1.072 2020NFA

10.791 STBG LG URB 10.791 MISC2020MISC 2.698 2.698 2020NFA

9.391 STBG-OFF 9.391 MISC2020MISC 2.348 2.348 2020NFA

4.294 4.294 MISCNHPP 2021MISC 1.073 1.073 2021NFA

2.499 2.499 MISCSTBG LG URB 2021MISC 0.625 0.625 2021NFA

53.896 53.896 MISCNHPP 2022MISC 13.474 13.474 2022NFA

24.391 24.391 MISCSTBG LG URB 2022MISC 6.098 6.098 2022NFA

13.963 13.963 MISCNHPP 2023MISC 3.491 3.491 2023NFA

NYSDOT

XT1816

FEDERAL FISCAL YEAR 2020-2024 ORDER-ON-CONTRACT FOR PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK FUND

154.393 30.589 8.491 97.859 17.454 AQC:J1 TOTAL 4YR COST :MULTI TPC : $2.0-$2.5 B

42.325 CMAQ 42.325 MISC2020MISC 10.581 10.581 2020NFA

42.325 42.325 MISCCMAQ 2021MISC 10.581 10.581 2021NFA

42.325 42.325 MISCCMAQ 2022MISC 10.581 10.581 2022NFA

42.325 42.325 MISCCMAQ 2023MISC 10.581 10.581 2023NFA

MTA NYCT

ZZ01-Q400

CMAQ FOR VARIOUS MTA-NYCT PROJECTS TO BE INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK FUND

211.624 52.906 52.906 52.906 52.906 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $175-$385 M

488.206 FTA 5307 488.206 MISC2020MISC 122.051 122.051 2020NFA

488.206 488.206 MISCFTA 5307 2021MISC 122.050 122.050 2021NFA

488.206 488.206 MISCFTA 5307 2022MISC 122.050 122.050 2022NFA

488.206 488.206 MISCFTA 5307 2023MISC 122.050 122.050 2023NFA

MTA NYCT

ZZ01-XX07

FTA 5307 FUNDS FOR VARIOUS PROJECTS TO BE INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK FUND

2441.025 610.257 610.256 610.256 610.256 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.6-$4.4 B

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, June 2, 2020 Page 43 of 43

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 11

TOTAL PROJECT COST

86.183 FTA 5337 86.183 MISC2020MISC 21.546 21.546 2020NFA

586.183 586.183 MISCFTA 5337 2021MISC 146.546 146.546 2021NFA

586.183 586.183 MISCFTA 5337 2022MISC 146.546 146.546 2022NFA

586.183 586.183 MISCFTA 5337 2023MISC 146.546 146.546 2023NFA

MTA NYCT

ZZ01-XX37

FTA 5337 FOR VARIOUS MTA-NYCT PROJECTS TO BE INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK FUND

2305.916 107.729 732.729 732.729 732.729 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.6-$4.4 B

31.183 FTA 5339 31.183 MISC2020MISC 7.796 7.796 2020NFA

31.183 31.183 MISCFTA 5339 2021MISC 7.796 7.796 2021NFA

31.183 31.183 MISCFTA 5339 2022MISC 7.796 7.796 2022NFA

31.183 31.183 MISCFTA 5339 2023MISC 7.796 7.796 2023NFA

MTA NYCT

ZZ01-XX39

FTA 5339 FOR VARIOUS MTA-NYCT PROJECTS TO BE INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK FUND

155.916 38.979 38.979 38.979 38.979 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $175-$385 M