Planning personnel cost and headcount using the SAP HCM solution "Personnel Cost Planning and Simulation": - Process in SAP HCM - technical basics - Centralised planning or involving browser based line manager tools - Proven best practise for common scenarios and challenges in personnel cost planning and calculations - Rolling forecasts

Citation preview

Page 1: SAP HCM Personnel Cost Planning and Simulation

Personnel Cost and Headcount Planning in SAP HCM

Peter GilbergSven Ringling

iProCon Group

SAP HCM Best practice Conference,London, 8th Nov. 2012

#HCMBP2012

Page 2: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Basic Approaches

Do a Forecast counting

each Penny

Find the differences afterwards

Punish the culprits

Slide: 2

Create a Plan based of

Forecast and business

parameters

Act according

to your plan

Improve planning quality through learning

loop

From:

To:

Page 3: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 3Session 4B - Personnel Cost Planning

Page 4: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

How it fits into SAP HCM

Slide 4Session 4B - Personnel Cost Planning

Cost-accounting

PersonnelCost

planning

OrganisationalManagementPersonnel

master data

CompensationManagement

Training & EventsManagement

Quota Planning(sits in OM)

Payroll Results

BI (Business Intelligence)

Page 5: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

What is it all about?

• Payroll results• Master data• Organisational structure

Forecast for personnel cost based on current information

• Assumptions for the whole organisation• Apply to change forecast

Applying scenarios

• Line managers make changes according to business requirements

• May comprise more than one planning cycle

Interactive Planning

Slide 5Session 4B - Personnel Cost Planning

Page 6: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Cost Item = Central Building Block

Slide 6Session 4B - Personnel Cost Planning

cost item

wagetype symbolic account FI/CO account

0..1

0..n n..m

• Using the symbolic account concept from payroll• 3 types:

• Direct cost items: derived from data basis, e.g. Basic salary• Dependant cost items: calculated from other cost items, e.g. NI

contributions• Additional cost items: created in planning run, e.g. Headcount

or FTE

Configuration BAdI Programming

Page 7: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

The Planning Process in SAP

Slide 7Session 4B - Personnel Cost Planning

Planning preparatio

n

Data collection

Planning run

using business rules

Detail planning(applying

same business

rules)

Transfering results

Framework and

configuration

Data basis from PA, PY, OM, T&EM

Planning runs per scenario

Agreed final plan version

Integrated in SAP CO

plans

Page 8: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Result of planning process

Data basisDesign principle: logic required in detail planning should not sit

here

Planning run scen. 1

Planning run scen. 2

Plan scen 2 after detail planning

Transferred to plan version in

CO module

Planning run scen. 3

Plan scen 3 after detail planning

Slide: 8

Page 9: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 9Session 4B - Personnel Cost Planning

Page 10: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Planning Preparation

Slide 10Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detail-planning transfer of results

Implementation in SAP

Configuration Development

Define parametersTop management

directionStatutory

frameworkCollective

agreements Scenarios

Page 11: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

E.g.: Variations and scenarios

Slide 11Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detail-planning transfer of results

Scenario 2:„Recession“

Scenario 1:„Normal“

Bonus employees

BonusExecs

Annual salary change

EE subgroup 10: „Salaried employees“

EE subgroup 20:

„Executives“

feature

HCP01

Page 12: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 12Session 4B - Personnel Cost Planning

Page 13: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Data collection

Slide 13Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Purpose: data basis for all planning scenarios

How: basic valuation of all relevant objects

employee position Orgunit Quota

PA: IT0666 OM: IT5010

Data basis = direct cost items

Page 14: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Employee Data

■ Data collection methods

► Infotype 0008 – basic salary

► Infotype 0014 – recurring payments / deductions

► Infotype 0015 – additional payments

► Difference between actual and planned pay

► Compensation guidelines (from compensation management)

► Payroll results (real or simulated)

► Simulated payscale change

► Data from training and event management

► Custom data collection methods (enhancement – often used for

country specific payroll infotypes not included in standard, such as

0071 for UK pension schemes)Slide 14Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Page 15: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Payroll results or master data??

How and why to use payroll results?• Posting run fills planning cluster• For future periods, this can be based on a simulation• Very tempting: looks accurate and no little extra config

The downside:• If all comes from payroll, dependencies are not ‚known‘ to cost

planning, so detail planning won‘t work• Master data and configuration for the whole planning period must be

available so payroll can run• Performance issues (may run for hours or even days)• You may not have payroll for all countries running in SAP

Blended solution• Often some elements are taken from PAST payroll results (e.g.

overtime) as basis for forecast

Seite 15Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Page 16: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Filling data basis from payroll posting

Slide: 16

Page 17: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Data Collection for Employee

■ Run Report (transaction PHCPDCEM)

■ Data collection► Infotype 0008 – basic pay► Infotype 0015 – Additional Payments

■ View Infotype 0666 „Planning of Pers. Costs“

■ Manipulate data (transaction PHCPDCUI)

■ Delete data basis (transaction PHCPDCDL)

Slide 17Session 4B - Personnel Cost Planning

Demo Video on : http://ow.ly/f3GUy

Page 18: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Organisational Data

■ Data collection methods

► Infotype 1005 – planned compensation

► Data from connected objects (e.g. averages)

► Data for vacant positions

► Data from quota planning

► TEM (Training cost)

► Custom data (Enhancement)

Slide 18Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Page 19: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Putting a £-Sign to Vacancies

Slide 20Session 4B - Personnel Cost Planning

Infotype „Planned Compensation“ (Positions)

Transparent

High data maintenance effort

One cost item only

Jobs

Transparent

Low data maintenance effort

Possibly several cost items

Requires proper job catalogue

Occupier

No data maintenance

Several cost items

Not transparent

Page 20: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 21Session 4B - Personnel Cost Planning

Page 21: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Planning run

Slide 22Session 4B - Personnel Cost Planning

Feel Good Inc.

PCP CD ...

planning preparation

data collection

planning run Detailplanning transfer of results

PA: IT666

OM: IT5010

Planning run in Cluster PCL5 Cost items

Page 22: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Cost items

Slide 23Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Planning run uses same data basis to calculate several scenarios. The result of the planning run are the dependent and additional cost items incl. key figures – added to the direct cost items from the data collection.

• From data collection• Basis for dependent cost items• e.g. Basic salary

Direct

• Relative value based of other cost items• May have capping limit• e.g. Employer NI contribution, pension

Dependent

• Fixed value• e.g. Allowance for work clothingAdditional

• e.g. headcount• May depend on work percentage – e.g. FTEStatistical key figures

Page 23: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Planning Run

■ How it works► Manage planning runs (transaction PHCPADMN)► Perform a planning run► Show results► Delete plans (transaction PHCPPRMV)

■ Examples► Dependent and additional cost items► Valuation of vacancies► Cost distribution

Slide 24Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

Demo Video on : http://ow.ly/f3H8y

Page 24: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 25Session 4B - Personnel Cost Planning

Page 25: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Detail Planning

Slide 26Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detailplanning transfer of results

- Individual changes for each object (e.g. Employee) on cost item level

- Options:

- For whole plan done centrally

- For orgunits done by line managers

- Done in browser as BSP (old) or WebDynpro (new)

- No Portal required

- Can be integrated in MSS in portal

Line manager

Planning run in Cluster

PCL5What makes this great?The rules for dependent cost items, whether in configuration or BAdI programming, are applied, whenever a change is made in detail planning. So, if basic salary is increased, NI is increased accordingly

Page 26: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Detail Planning

■ Examples:► Salary change► Headcount change► Central budgets► Organisational changes

Slide 27Session 4B - Personnel Cost Planning

Demo Video on : http://ow.ly/f3HqB

Page 27: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Transfer of plans

Slide 28Session 4B - Personnel Cost Planning

planning preparation

data collection

planning run Detail-planning transfer of results

- Transfer into CO module

- Cost items are linked to symbolic accounts

- Symbolic accounts linked to GL accounts

- Activity types only possible via modification

- Creating budgets (CO as well as compensation management)

- Transfer into BI

Page 28: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Agenda

■ Personnel Cost Planning – Basics

■ The Planning Process► Preparation► Data collection► Planning run► Detail planning and data transfer

■ Selected Best practices

Slide 29Session 4B - Personnel Cost Planning

Page 29: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Selected Best Practices

Slide 30Session 4B - Personnel Cost Planning

• Absence Valuation• Plan vs. Actual: rolling forecast• Accumulate cost items• Manual maintainance of infotype 5010

Simplifying the process Higher quality in the results

Page 30: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Valuation of absences

SAP standard can consider absences• But deletes all cost items for absence period

of defined absences• In some cases, you want only some cost items

deleted or change valuation

Custom solution:• Selectively delete or change cost items in

absence periods• BAdI HRHCP00_DC_COSTITEMS

Slide 31Session 4B - Personnel Cost Planning

Page 31: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Having a plan

Slide 32Session 4B - Personnel Cost Planning

1 2 3 4 5 6 7 8 9 10 11 120

5000

10000

15000

20000

25000

30000

35000

Plan

Plan

Page 32: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Comparing Plan & Acutal

Slide 33Session 4B - Personnel Cost Planning

1 2 3 4 5 6 7 8 9 10 11 120

5000

10000

15000

20000

25000

30000

35000

PlanPayroll

Page 33: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Create a rolling forecast

Slide 34Session 4B - Personnel Cost Planning

1 2 3 4 5 6 7 8 9 10 11 120

5000

10000

15000

20000

25000

30000

35000

PlanPayrollForecast

Page 34: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Accumlate Cost Items

Seite 35Session 4B - Personnel Cost Planning

Basic Pay

Overtime

Bonus payment

NIPension

ERXYZbenef

is

NIPension

ERXYZbenef

is

NIPension

ERXYZbenef

is

Page 35: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Accumlate Cost Items

Seite 36Session 4B - Personnel Cost Planning

Basis Pay

Overtime

Bonus paymentBasis NI and

pension

Transparent calculationImproved performance in planning run

NIPension

ERXYZbenef

is

Page 36: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Manual Maintenance of Infotype 5010

■ Some elements difficult to forecast based on existing HR data

► E.g. overtime depends on future business volume more than data from past

► Requires judgement from line manager► Based on business data like sales forecasts► Not assigned to particular employee

Slide: 37

■ Pragmatic solution:► Estimate overtime volume

and capture it directly in IT 5010 for department

► Also applicable for training cost, recruitment cost, entertainment,…

Page 37: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Further Proven Enhancements

Recruitment Wave

Simulated leavers• By age• According to contract end date in infotype 0016

Integrating pensioners• In SAP standard, they are not part of OM and therefore excluded from cost

planningUK pension schemes:

• Custom data collection method for infotype 0071

Get overtime and shift allowances from payroll• Selective reading of payroll results – may even shift to different periods (e.g. for

overtime at Easter)

UK NI calculation and BUPA without using payroll results

Integration into Processes & Forms

Seite 38Session 4B - Personnel Cost Planning

Page 38: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Project examples

Client Scope Time / effort

Chemicals, 1,000 staff, UK + German subsidiary

Pragmatic implementation incl. detail planning and BI, but no line manager involvement

- 10 weeks- 15 consultant days

Bank, Germany, 4,000 staff

Complex implementation incl. detail planning with line managers and 3rd party CO interface

- 9 months- 60 consultant days

International organisation, 2,000 staff

Complex implementation with many bespoke planning elements (e.g. recruitment wave)

- 6 months- 50 consultant days

IT service provider, 800 staff

Building a pragmatic pilot without line manager involvement

- 2 weeks- 5 consultant days

Group of universities, >50,000 staff

Full redesign and performance optimisation

- 3 months- 20 consultant days

Slide: 39

Page 39: SAP HCM Personnel Cost Planning and Simulation

www.iprocon.com

Questions?

Slide: 40

s.ringling@iprocon.

com

[email protected]