17
AVENUE FOR NEW PRODUCT APPROVAL Introduction to 1

Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

Embed Size (px)

Citation preview

Page 1: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

AVENUE FOR NEW PRODUCT APPROVAL

Introduction to

1

Page 2: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NEW PRODUCT EVALUATION

New Product Evaluation Committee Policy

Evaluate new products which have a

potential to fulfill a real need, economically

provide a satisfactory level of service, and

are not covered by an existing

specification.

2

Page 3: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

AVENUE FOR NEW PRODUCT APPROVAL

3

Page 4: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

AVENUE FOR NEW PRODUCT APPROVAL

4

Page 5: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

AVENUE FOR NEW PRODUCT APPROVAL

New Product Evaluation>> New Product Submission

Process

>> New Product Evaluation Form

>> New Product Evaluation

Committee: Guidelines | Agenda

>> Status of New Product

Submissions

5

Page 6: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

6

Status of New Products

A listing of the status for products submitted to the New Product Evaluation Program are now available.

This listing provides an update of products submitted and where the product is in the process. This list

will be updated periodically. If you wish to know the status of a submission after the date posted, then

please contact the New Product Evaluation Engineering in the Physical Chemical Branch Office at 404-

608-4810 or [email protected].

*All New Products must fall under one of these items: **Which item below does your product meet? □ No Existing GDOT Specification □ Product falls outside of current GDOT specification Details: If product does not meet one of these items or is covered by the specifications, then please call the New Product Evaluation Engineer at 404-608-4810 or email at [email protected].

It is the responsibility of each company to stay in contact with the Office of Materials and Testing on

an annual basis. If the company fails to contact the Office of Materials and Testing New Product

Evaluation Engineer at 404-608-4810 for a period of one year, it will be classified “Withdrawn/No

Action” and must be resubmitted for future evaluation.

Links:

New Products Status by NPE Number

o NPE #s are created by Year ##, Month ##, dash order in which the product submission was received –

example 1305-2, 2013 in May this product was the second one received.

New Products Status by Company Name

o The manufacturing company names are listed alphabetically. Please note that the distributors are not

listed.

Please note:

The purpose of the New Products Evaluation Program is to provide a well-defined and organized system within the Department to handle

requests from various sources for consideration of new products developed for use in road and bridge construction or maintenance. To

provide such a system the Department has established a New Products Evaluation Committee, which will operate in accordance with the

following stated guidelines and procedures.

The Department will evaluate only those new products which have the potential to fulfill a real need, economically provide a satisfactory level

of service, and are not covered by existing specifications. It is the burden of the vendor to demonstrate that a need for a new product exists

and that their product has a good potential for satisfying this need. Vendor proposals that attempt to place the Department with the

responsibility for developing the application for a product being offered will not be considered. The Department will consider for evaluation

only those products adequately developed, screened, and tested by the manufacturers.

Page 7: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NEW PRODUCT EVALUATION ONLINE

7

Page 8: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NEW PRODUCT EVALUATION FORM

8

Page 9: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NEW PRODUCT EVALUATION COMMITTEE

Bridge Design (Ben Rabun)

Construction (Andy Lindsey)

Maintenance (Erany Robinson)

Materials (Brad Young)

Roadway Design (Robert Graham)

Traffic Operations (Victor Johnson)

Design Policy and Support (Tom Cox)

Utilities (Jamie Lindsey)

Environmental Compliance (Daryl L. Williams)

Transportation Data (Scott R. Susten)

Georgia Soil and Water Conservation Commission Representative (Ben Ruzowicz)

9

Voting members are made up of individuals from the following offices:

Page 10: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NEW PRODUCT EVALUATION PROCESS

Manufacturers submit Application and Fee

Applications distributed to NPE Committee

Members

Agenda distributed to NPE Committee

Members and posted on GDOT web site

Manufacturers of New Products invited

Quarterly Committee meetings (Feb., May, Aug.,& Nov.)

Committee classifies status of product

10

Page 11: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NPE COMMITTEE STATUS CLASSIFICATION

11

Accepted

Rejected

Field Test

Laboratory Test

Action Pending

No Application

Withdrawn

Withdrawn/No Action

Project to Project

Allow the Use

Meets Specification

Page 12: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

NPE COMMITTEE STATUS FIELD TEST

12

Committee classifies status of product as

Field Test or Lab Test

Manufacturers have to submit a Fee

Field Test location has to be located and

approved

Pilot Field Test has to be approved by the

Materials Engineer, Director of Construction,

and Chief Engineer

Page 13: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

EXAMPLES OF NEW PRODUCTS 2012

13

Page 14: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

EXAMPLES OF NEW PRODUCTS 2012

14

TAPCO Blinker Beacon

YH-DD1 Solar Roadway Marker

Page 15: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

EXAMPLES OF NEW PRODUCTS 2012

15

Nap-Gard Green Rebar 7-2750

IAS Water Quality Skimmer

Page 16: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

EXAMPLES OF NEW PRODUCTS 2012

16

Bekaert’s Dramix

R.E.L.L. Corp. Solid Manhole Riser

Page 17: Gdot new product evaluation presentation quarterly meeting 090313 acec meeting

AVENUE FOR NEW PRODUCT APPROVAL

17

Questions and

Answers