index

1. Manufacturing process

2. Product segmentation

3. Supply chain stages

4. Logistics process

5. Problems in supply chain & logistic activity

6. The solutions.

Page 3: Elnahda cement ppt

• Introduction• ELNAHDA Cement was established in 2008• EL NAHDA Cement is one of the largest cement

producers in Egypt. With an production facility in Qena.• ELNAHDA Cement produces approximately 5500 tons

per day. • ELNAHDA Cement is home to more than 500

employees.• The company’s cement has proudly built some of Egypt’s

most well known landmarks and is building its future around serving the market and growing customer demands.

Page 4: Elnahda cement ppt

• Manufacturing process

1-limestone blending

2-limestone is burned with coal inside rotary kilns

3-burned limestone is blended with slag or gypsum in grinding mills

Page 5: Elnahda cement ppt
Page 6: Elnahda cement ppt
Page 7: Elnahda cement ppt
Page 8: Elnahda cement ppt

•Product segmentation• ordinary Portland cement (OPC)

It is made by blending clinker with gypsum. Used in construction where high initial strength is required

• Portland pozzolana cement (PPC)

In addition to gypsum, PPC contains fly ash in the tune if 25-30%. Addition of fly ash reduces the per ton cost of cement. The long term strength of PPC is higher than OPC

• Portland slag cement (PSC)

In addition to gypsum PSC contains blast furnace slag. PSC is used where structure are susceptible to attack of chloride and sulphate (marine, water and treatment plants)

Page 9: Elnahda cement ppt

Supply chain stages include:• Customers• Retailers• Wholesalers/Distributors• Manufactures• Component / raw material suppliers

Page 10: Elnahda cement ppt

Supplier:

Page 11: Elnahda cement ppt

Distributors / Branches• We have two branches:• 1- in Cairo (maadi)

2-in Qena (Nile towers) • the company have no Distributors • cement cannot be distributed over long distance

and is distributed in regionally.

Page 12: Elnahda cement ppt

Some of Retailers in egypt.

Page 13: Elnahda cement ppt

customer:Customer Segments:• Individual House Builders These are retail customers. Since they have limited technical

knowledge of construction material, brand value and durability are the top most criteria for selection.

Page 14: Elnahda cement ppt

• Infra-Commercial –Industrial This segment consists of builders and big construction

companies who have sufficient technical knowledge of product. Quality, price and service are most important for these buyers

Page 15: Elnahda cement ppt

• Logistics process Logistics is the process of strategically

managing the acquisition, movement and storage of materials, parts and finished inventory from suppliers though the firm and on to customers. It requires right product in the right place at the Right time.

Page 16: Elnahda cement ppt

• Customer service We work hard to be sure that customer receives the right

product, at the right quality, in the right condition, for the right cost in order to meet the customer satisfaction. If the product have any problem the customer call us and we fix the problem.

Page 17: Elnahda cement ppt

• Demand Forecasting

now we work hard to know or to forecast the expected future demand to be sure that we delivered the product in the right place, but we have problem that our Factory are so far from Cairo and Alexandria and to solve this problem we working now to open new Factory in 6th of October

Page 18: Elnahda cement ppt
Page 19: Elnahda cement ppt

• Material handling

• By keeping track with latest market development, we are engaged in Manufacturing, Exporting and Supplying wide range of the finest quality Cement Plants and its Components

• Our product range is manufactured using supreme quality raw material in compliance with the international quality standards.

Page 20: Elnahda cement ppt

• Packaging

The packaging process in our factories occurs during the manufacturing it’s the last step in the packaging machine in the manufacturing process.

Page 21: Elnahda cement ppt

Order processing to supplier

• We get Limestone from the Limestone quarries in El-Menya

• We get coal from the Egyptian company for coal

• We get fly ash from the Power plants in Western desert

• We get gypsum from the Egyptian Co. For Gypsum in Ismailia

Page 22: Elnahda cement ppt

Order processing from coustomer

we take orders through.

1.Phone

2.Our official site

3.E-mail

4.Fax

Page 23: Elnahda cement ppt

Transportations

We don’t support delivering our products, but the retailer and customer make his order and take it from the factory direct.

Page 24: Elnahda cement ppt

Reverse logistics

When the customer or the retailer face any problem with our product we compensate him and the retained product we take it and re cycle it again.

Page 25: Elnahda cement ppt

Problems in supply chain & logistic activity:

In supply chain 1.The difficulty in getting coal for manufacturing.

-We recommend importing the amount required for production.

Page 26: Elnahda cement ppt

2-the electricity problem.

-We recommend having another source of power like using coal.

Page 27: Elnahda cement ppt

In logistics activity3-The cost of reverse logistics.

- We recommend paying more attention to the quality standard and performing quality test after the manufacturing and before distribution.