Page 1: Cement stabilization of soils ppt
Page 2: Cement stabilization of soils ppt

Stabilization of low quality aggregate or soil can be done by mechanical, chemical, electrical or thermal.Chemical stabilization involves addition of cement, lime, fly-ash, bitumen, chemical compounds etc

Page 3: Cement stabilization of soils ppt
Page 4: Cement stabilization of soils ppt

Two primary methods of soil stabilization

•Mechanical•Chemical or additive

Page 5: Cement stabilization of soils ppt

When unsuitable construction conditions are encountered, a contractor has four options;

1.Find a new construction site 2.Redesign the structure so it can be constructed on the poor soil.3.Remove the poor soil and replace it with good soil.4.Improve the engineering properties of the site soils.

Page 6: Cement stabilization of soils ppt

Advantages to soil stabilization

Page 7: Cement stabilization of soils ppt

Need of Stabilization

Page 8: Cement stabilization of soils ppt

Basic ingredients for cemented base/sub-base in pavement

Page 9: Cement stabilization of soils ppt

Environmental Benefits of Soil Stabilization

Page 10: Cement stabilization of soils ppt

Laboratory Test Requirements

Page 11: Cement stabilization of soils ppt

Advantages of Cement Stabilization

Page 12: Cement stabilization of soils ppt

Mix design

Page 13: Cement stabilization of soils ppt

Cement Stabilization process

Page 14: Cement stabilization of soils ppt

Tsunami Affected Area Rehabilitation Project (TAARP)- 1500 Million Grant in

Trincomalee District Funded By ADB-EU

Page 15: Cement stabilization of soils ppt

Roads Taken for rehabilitation

1.Trincomalee-Pulmoddai Road (7.0 km - 27.00 km & 27.00-47.5km)

2. Bhogahawatte-Pulmoddai Road (12.00 km-27.55 km).

Page 16: Cement stabilization of soils ppt

Road Before Construction Trincomalee-Pulmoddai Road (7.0 km - 27.00 km & 27.00-47.5km)

Page 17: Cement stabilization of soils ppt

Road Before ConstructionBhogahawatte-Pulmoddai Road (12.00 km-27.55 km).

Page 18: Cement stabilization of soils ppt

Pug mill

Page 19: Cement stabilization of soils ppt

Pug Mill

Page 20: Cement stabilization of soils ppt

Surface Preparation

Page 21: Cement stabilization of soils ppt

Sub base Surface under Preparation for CSB Laying

Page 22: Cement stabilization of soils ppt

Sieving the Soils collected from the Gravel Quarry

Page 23: Cement stabilization of soils ppt

Spreading Stabilized Gravel

Page 24: Cement stabilization of soils ppt

Leveling Stabilized Gravel

Page 25: Cement stabilization of soils ppt

CSB Surface is Leveled and Compacted

Page 26: Cement stabilization of soils ppt

Leveled & Compacted

Page 27: Cement stabilization of soils ppt

Levels and compaction is Carried out on the Completed CSB Surface

Page 28: Cement stabilization of soils ppt

Stabilization Process

• 1.Seiving Collected Gravel from Borrow Pit• 2.Seived Gravel is Processed to Pug-mill• 3.Processed Gravel is sent to Stabilization• 4.Gravel Stabilization Process• 5.Stabilized Gravel for Road Work

Page 29: Cement stabilization of soils ppt

Sand is Applied on CSB Surface to Maintain Moisture for Curing

Page 30: Cement stabilization of soils ppt

Geo-Textiles Laid on CSB Surface to Maintain Moisture for Curing

Page 31: Cement stabilization of soils ppt

Primed Surface after Curing

Page 32: Cement stabilization of soils ppt

Finished Cement stabilized Road after surfacing Complete