RENEWABLE ENERGY PROJECT DEVELOPMENT
PROGRAM SOUTHEAST ASIA
THE WAY FORWARD FOR SMART GRID IN VIETNAM
Presented by:
Electricity Regulatory Authority of Vietnam (ERAV)
Frankfurt am Main, 14/11/2013 ERAV
Electricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
2
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
3
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
4
1. Vietnam Power system Overview (1)
• Average electricity consumption growth rate 2006-2012: 12.2%
• Electricity Consumption in 2012: 105.4 Billion kWh
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
MW
Year
National
North
Central
South
Peak Load (1996-2012)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
5
• Generation (2012)
Total (Million kWh) 120,257
Hydro 52,795
Coal fired thermal 22,716
Oil fired thermal 43
Gas turbine 41,170
Gas thermal 80
Import from China 2,676
Other 423
Hydro 43.90%
Coal fired thermal 18.89% Oil fired
thermal 0.04%
Gas turbine 34.24%
Gas thermal 0.07%
Import from China 2.23%
Other 0.35%
1. Vietnam Power system Overview (2)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
6
• Generation Installed Capacity (June 2013)
Total (MW) 27,323
Hydro 12,647
Coal fired thermal 5,130
Oil fired thermal 550
Gas turbine 7,455
Gas thermal 468
Diesel & Small hydro 1,000
Other 139.5
Hydro 46.29%
Coal fired thermal 18.78%
Oil fired thermal 2.01%
Gas turbine 27.28%
Gas thermal 1.71%
Diesel & Small hydro
3.66%
Other 0.51%
1. Vietnam Power system Overview (3)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
7
• Generation Installed Capacity By Owner (June 2013)
Total (MW) 27,323
EVN 17,516
PVN 2,958
Vinacomin 1485
BOT 1480
Other IPP 3884
EVN 64.11%
PVN 10.83%
Vinacomin 5.43%
Other IPP 19.63%
BOT 5.42%
1. Vietnam Power system Overview (4)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
8
1. Vietnam Power system Overview (5)
• Transmission Network
Transmission Voltage
Level: 500kV, 220kV,
110kV
- 500kV: Spine line, 3
region link
- 220kV: Transmission
line in each region, 2
region link
- 110kV: Connected to
220kV Substations or
power plans.
Import from China
Export to Cambodia
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
9
• Transmission Network and peak load of Power
Companies (PCs) in 2012
EVN
NPC
8905 MW EVN
SPC
9587 MW
EVN CPC
2050 MW
500, 220kV transmission line
EVN HCMPC
3625 MW
Import From China 1000 MW
EVN
HNPC
2218 MW
Export To Cambodia 175MW
1. Vietnam Power system Overview (6)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
10
• Network overview in 2012
U«ngBÝ
Ph í cLong
159,627 km TG: 3589 MVA 218.424 km 32.715 MVA
220V
96.5% Rural HHs
98.8% Village
100% District
100% Province
6KV(2,9%)
10KV(14%)
15KV(12.1%)
22KV(44,6%)
35KV(26,2%)
RURAL
ELECTRIFICATION
1. Vietnam Power system Overview (7)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
11
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (1)
1.Load Forecast
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
12
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (2)
2. Volume of Transmission Network to be constructed
3. Total Generation Installed Capacity
Category Unit 2011-2015 2016-2020 2020-2025 2026-2030
500kV Substation MVA 17,100 26,750 24,400 20,400
220kV Substation MVA 35,863 39,063 42,775 53,250
500kV Transmission Line km 3,833 4,539 2,234 2,724
220kV Transmission Line km 10,637 5,305 5,552 5,020
Category 2013 (as of June) 2,020 2,030
Hydro 12,647 17,325 17,325
Pump Storage 0 1,800 5,725
Coal/Oil Fired Thermal 6,148 36,000 75,750
Gas Turbine 7,455 12,375 17,325
RE and Other 1,139 4,200 13,800
Nuclear 0 1,000 9,700
Import 1,000 2,300 7,175
Total 28,389 75,000 146,800
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
13
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (3)
2. Investment Required
Period
2011-
2015
2016-
2020
2021-
2025
2026-
2030
2011-
2030
I- Generation: Total
Capital/annual average
(Bill.USD)
22.076 28.830 27.005 32.441 110.352
4.415 5.766 5.401 6.482 5.518
II- Network: Total
Capital/annual average
(Bill.USD)
7.245 10.523 12.345 15.868 45.981
1.449 2.105 2.469 3.174 2.299
III- Total
Capital/annual average
(Bill.USD) (III=I+II)
29.321 39.353 39.349 48.280 156.303
5.864 7.871 7.870 9.656 7.815
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
14
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (4)
3. Requirement for Modernization of Power System :
Modernization of dispatching of power system
Modernization of communication of power system
Modernization of control and automation of power system
Modernization of Demand Management; Demand-Side
Response (DSR) program implementation
4. Requirement for Information Technology of Power
System: Information technology required for power system operation
Information technology required for power market operation
Information system for system and market operation
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
15
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
16
2. Overview of Vietnam’s Smart Grid
The needs of Smart Grid:
Vietnamsese power market
Social views of electricity pricing policy
Increasing of electricity quality and reliability
Import energy
Investment stressed
Reduce of GHG
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
17
2. Overview of Vietnam’s Smart Grid (1)
Applications applied by National Load Dispatch Center, National Transmission Company and Distribution Companies:
o SCADA/EMS/DMS at NLDC, PCs, and grid automation;
o TOU – Time Of Usage;
o AMR and load research;
o Billing and;
o Customer Service Center.
Applications are intend to apply:
o Outage management;
o Unmaned substation;
o Upgrading of information and metering data transmission system;
o Wide - area grid monitoring;
o Using all functions of EMS, DMS.
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
18
• Accessment on existing situation:
o The grid in general is not modern, not synchronization, low automation level.
o Information and Communication Infrastructure is not complete (SCADA/EMS is work now, but some substation lack of Remote Terminal Unit, tele-reading meter install with unstable data link…)
o Lack of infrastructure and legal framework to implement smart grid applications for end-user (i.e.: incentives for customer who participated in the demand-side response program...)
o Lack of technical standards for applications (i.e: smart distribution grid structure, ICT, integration of RE t distribution grid…)
o Electricity tariff is not fully reflected the cost; lack of investment…
2. Overview of Vietnam’s Smart Grid (2)
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
19
2. Overview of Vietnam’s Smart Grid (3)
Some milestones:
19 Mar
2013
8 Nov 2012
March 2012
21 Jul 2011
In the Master Plan VII, PM had assigned MOIT to develop Smart Grid Program
ERAV (subsidiary of MOIT) developed the Smart Grid Project and Implementation Roadmap
PM approved the Smart Grid Program- 3 phases Roadmap
17 Jan 2013
Minister of MOIT established the SG development Steering Committee in Vietnam
Committee Regulation and the Operation plan of 2013
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
20
2. Overview of Vietnam’s Smart Grid (4)
Smart Grid Development Steering Committee
MOIT MOF
EVN EVN NPT
EVN PCs
EVN NLDC
MPI MOST MOC
ERAV
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
21
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
22
3. Smart grid development Roadmap
1.Phase 1 2. Phase 2 3. Phase 3
Smart Grid Program
Smart Transmission and System Operation
Subprogram
Smart Distribution
Network Subprogram
Smart Metering
Subprogram
Smart Customers
Subprogram
Transversal – Social Friendly subprogram
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
23
3. Smart grid development Roadmap (1)
• Phase 1 (2012 - 2016):
o Enhance power system operation efficiency program: complete the
SCADA/EMS project for NLDC, Install completely the devices to
collect operation data from substations/power plants connected to
110kV grid and above....
o Pilot projects: Advanced Metering Infrastructure (AMI) in HCMC
PC, integration of Renewable Energy Sources in CPC
o Building of regulatory framework: Load research, load control
mechanism, financial mechanism and regulations for smart grid
implementation.
o Develop technical regulations: standards for AMI, automation and
tele-control of substations, integration of RES and distribution smart
grid structure...
o Social Support Program: Dissemination of Smart Grid program for
customer and stakeholders
1.Phase 1 2. Phase 2 3. Phase 3
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
24
3. Smart grid development Roadmap (2)
• Phase 2 (2017-2022):
o Continue enhance power system operation efficiency program, focus
on distribution network: Deploy SCADA/DMS system for the
distribution power corporations, deploy the automation equipment for
110kV substations, build the Smart Grid implementation capacities
for the distribution power corporation.
o Dissemination of AMI lesson learnt. Extension of AMI system to big
customers in all PCs.
o Integrate distributed generations, new energy generations, and
renewable generations into the network at medium and low voltage;
pilot project for Smart Home, Smart City.
o Build the regulatory framewok for smart grid applications
o Develop the technical regulations: standards of energy storage,
smart appliances.
o Social Support Program (continued).
1. Phase 1 2. Phase 2 3. Phase 3
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
25
3. Smart grid development Roadmap (3)
• Phase 3 (2022 and upward):
o Continue the Information and Communication Technology
Infrastructure Installation program for distribution network: Deploy
the SCADA/DMS system for all provincial/district power companies
to reach efficient number of MV/LV substations; Develop AMI
system to residential customer, provide customer the opportunities
to trade on the retail competitive market; Continue encouraging the
introduction of distributed generations
o Implement the smart grid applications which allow to electricity
demand-supply balancing in customer level (Smart Homes) with
their own RES; Use of renewable energy widely in distribution grid
with the time-of-usage electricity price mechanism associated with
retail competitive power market..
o Build regulatory framework which allows to deploy smart grid
applications base on existing information technology infrastructure
1. Phase 1 2. Phase 2 3. Phase 3
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
26
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
27
Economical Barriers for the
investments
Uncertainty about assets
ownership and operation
Lack of technological
standardization
Impossibility to adapt the utilities
to the new technologies
requirements
Social refusal for new equipment
or the new staff conditions
Communication network
weakness
International Experience
Barriers for Smart Grids implementation
4. Barriers and keyplayers
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
28
Keyplayers
4. Barriers and keyplayers (1)
Utilities
Power market participants
Customer
Government - Regulators
Techno-Service Providers
Others
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
29
Content
1. Vietnam Power System Overview
2. Overview of Vietnam’s Smart Grid
3. Smart grid development Roadmap
4. Barriers and keyplayers of Smart Grid
5. On-going projects
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
30
Regulatory framework, technical standards
5. On-going projects
Wind Grid code: technical standards for connection of wind power into the system
Demand-Side Response: regulation for demand side response; Pilot DSR Implementation Project
Advanced Metering Infrastructure (AMI): technical standard for AMI
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
31
Infrastructures
5. On-going projects
New SCADA/EMS system
• The 3rd generation system for System Operator
Pilot Advanced Metering Infrastructure
Pilot Demand Side Response
Automation and tele-control for substations project
Automation and tele-control for generators project
Mini-SCADAs
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
32
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
THANK YOU FOR YOUR
KIND ATTENTION
For further information:
Email: [email protected]