Innovative Solutions for Challenging Drainage Projects

Preview:

Citation preview

1

© 2015 Armtec LP • Confidential & Proprietary

Doug Lowry,P.Eng.

Region Engineer

Armtec, Drainage Solutions

Drew Willms

Sales Engineer

Armtec, Drainage Solutions

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

FRIDAY JUNE 5 TH, 2015 / 9AM PST / 11AM CST / 12PM EST

TECHNICAL WEBINAR

2

© 2015 Armtec LP • Confidential & Proprietary

CPD CREDIT CERTIFICATES

• CPD Credit Certificates will be given out for attending Live Webinars• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical

Informal• Formal completion certificates are emailed within one week of attending• Check your local guidelines if unsure of your requirements

Email your complete attendee list should there be multiple individuals viewing the same screen.:

• Full Name• Title• Email

webinars@armtec.com

Armtec will send certificate to all participants

3

© 2015 Armtec LP • Confidential & Proprietary

Armtec is one of Canada’s largest infrastructure company supplying precast, corrugated steel and HDPE products and solutions. Every day, our proven products, engineered solutions and dedicated people are counted on to support construction and infrastructure projects in communities everywhere. With a national presence and a local focus on exceptional customer service, we are dedicated to building excellence.

ABOUT ARMTEC

4

© 2015 Armtec LP • Confidential & Proprietary

YOUR SPEAKERS

Doug Lowry P.Eng.Region Engineer

Armtec, Drainage Solutions

Doug.Lowry@armtec.com

Drew WillmsSales Engineer,

Armtec, Drainage Solutions

Drew.Willms@armtec.com

5

© 2015 Armtec LP • Confidential & Proprietary

AGENDA

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

1. Pennask Culvert Rehabilitation

2. YVR Detention System

3. Noisy River Bridge

4. Putnam Rail Trestle Replacement

6

© 2015 Armtec LP • Confidential & Proprietary

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

PENNASK CULVERT REHABILITATION

7

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Owner: BC MOTI

Consultant: Associated Engineering

Contractor: PW Trenchless

Location: Pennask Tributary Creek, 50km outside of Kelowna, BC along Highway 97C

Existing Culvert Condition: 2440mm Span x 1739mm Rise Galvanized Multi-Plate

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

8

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Project Requirements• Restore structural capacity of the culvert• 75+ year service life

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

9

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Challenges & Project Conditions

• Approximately 30ft. surcharge

• Timeline – difficult winter conditions

• Max. water velocity 3.0 m/sec with sand and gravel bedloads

• Acidic drain rock• Water inside conduit: 4 ≤ pH ≤ 9• Leachate from acidic surcharge

(3 ≤ pH ≤ 9) around conduit/grout

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

10

© 2015 Armtec LP • Confidential & Proprietary

STRUCTURAL PLATE

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Product Galvanized Aluminum Strata-CAT

Multi-Plate

Mini-Span

Bridge-Plate

Tunnel Liner Plate

Aluminum SPCAP

Durability

3 coatings types are available toaddress varying site conditions:

• Galvanized• Aluminum• Strata-CAT Polymer Coating

11

© 2015 Armtec LP • Confidential & Proprietary

STRUCTURAL PLATE DURABILITY

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Coating Selection Criteria

12

© 2015 Armtec LP • Confidential & Proprietary

STRUCTURAL PLATE DURABILITY

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

1Durability of Structural Plate Corrugated Steel Pipe and Deep Corrugated Structural Plate Structures,, February 27, 2012

Estimated Material Service Life (EMSL)

Approach for Galvanized SPCSP1

13

© 2015 Armtec LP • Confidential & Proprietary

STRUCTURAL PLATE DURABILITY

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Strata-CAT Polymer Coating

= Add-On Life

Zinc Primer

Estimated Material Service Life (EMSL)

Approach for Polymer Coated SPCSP

14

© 2015 Armtec LP • Confidential & Proprietary

PENNASK CULVERT RELINE

Solution• Reline with 2046 x 1538mm Polymer Coated Multi-Plate Pipe Arch• Polymer Coated hardware• Aluminum fish baffles• 4mm crown plates• 6mm invert plates

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

15

© 2015 Armtec LP • Confidential & Proprietary

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Installation

1) Dewatering & Cleaning 2) Install Rails/Bracing 3) Prepare Staging Area 4a) Assemble & Slipline

PENNASK CULVERT RELINE

16

© 2015 Armtec LP • Confidential & Proprietary

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

4b) Sliplining (continued) 5a) Grouting 5b) Grout Inspection 6) End Treatments

Installation

PENNASK CULVERT RELINE

17

© 2015 Armtec LP • Confidential & Proprietary

PENNASK CULVERT RELINE

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

18

© 2015 Armtec LP • Confidential & Proprietary

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

YVR DETENTION SYSTEM

19

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Owner: Vancouver Airport Authority

Consultant: Urban Systems Ltd.

Contractor: Hexcel Construction Ltd.

Location: Vancouver International Airport

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

20

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Project Requirements• Design for 200m3 storage volume• Minimum 75 year service life• Minimal infiltration/exfiltration

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

21

© 2015 Armtec LP • Confidential & Proprietary

PROJECT BACKGROUND

Challenges & Constraints

Geometric• Needed to fit the system in a trench

width of 4.5m• Maximum depth of the system was

1.9m due to a high water table• Total available footprint was 60m x

4.8m

Time-dependent• Needed the system onsite within 4

weeks of order placement

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

22

© 2015 Armtec LP • Confidential & Proprietary

YVR DETENTION SYSTEM

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Solution

2 x 55m runs of 1400mm Hel-Cor CSP• Trenchcoat Polymer Laminated• H-500 Hugger-Band Couplers

23

© 2015 Armtec LP • Confidential & Proprietary

YVR DETENTION SYSTEM

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

24

© 2015 Armtec LP • Confidential & Proprietary

STORMWATER DETENTION

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

CSP Detention Systems

• Hel-Cor & Ultra-Flo CSP• Pre-fabricated bulkheads & fittings

Hel-Cor CSP Detention System Bulkheads & Risers

25

© 2015 Armtec LP • Confidential & Proprietary

STORMWATER DETENTION

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

CSP Detention Systems

• Aluminized & Trenchcoat Polymer-Laminated for superior durability• Smooth interior of Ultra-Flo simplifies maintenance

Polymer-Laminated CSP Detention Tanks Ultra-Flo Tank w/ Bulkheads, Risers, & Flow-Restricting Outlet Stub

26

© 2015 Armtec LP • Confidential & Proprietary

STORMWATER DETENTION

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Design Considerations for CSP Detention Systems

1. Required storage volume

2. Geometry / footprint

3. Required lifespan

4. Pre-treatment

5. Infiltration / exfiltration

6. Outflow / release structure

7. Maintenance

27

© 2015 Armtec LP • Confidential & Proprietary

STORMWATER DETENTION

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

Advantages of CSP Detention

• Customizable shape, size, layout• Cost effective• Familiar installation methods• Easy maintenance• Can perforate to create a retention / infiltration system

28

© 2015 Armtec LP • Confidential & Proprietary

STORMWATER DETENTION

INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS

HDPE Detention Systems

• Steel-reinforced HDPE for superior durability• Up to 3000mm dia. for storage of large volumes• Pre-fabricated bulkheads & fittings• Watertight system

DuroMaxx Detention System DuroMaxx Detention Tank w/ Bulkhead & Access Riser

29

© 2015 Armtec LP • Confidential & Proprietary

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

NOISY RIVER BRIDGE

30

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

• Owner: County of Dufferin• Consultant: R. J. Burnside & Associates• Project: Replacing Cast in Place Box Culvert

31

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Major Site Constraints:• Couldn’t close road • Couldn’t enter or contaminate stream• Contract limits = County Right of Way

32

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Stage 1 - Construction

Temporary Geotextile Wall

33

© 2015 Armtec LP • Confidential & Proprietary

Temporary Wall Construction

1. Pull geotextile tight, keep tension applied until backfill is placed.

Compacted fill

Native Soil

Depression for geotextile wrap

Removable form

2. Place backfill in specified lifts and compact to 95% Standard Proctor.

34

© 2015 Armtec LP • Confidential & Proprietary

Temporary Wall Construction

1. Place second removable form by repeating step 2.

Native Soil

2. Place second layer of geotextile and reinforced fill by repeating steps 3 through 4.

3. After completion of second lift, jump the first form.

35

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Detour 1 Temporary Wall

36

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Multi-Plate

Bridge-Plate

• Long Span Soil Steel Structures • Spans 5m to 20m

• 400 x 150 mm Corrugation • Arches & Boxes

37

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGEStructure:• 36 m long, 9m half round arch on concrete footings; footings encased in sheet piling• 5.0mm thick Bridge Plate, 5 plates per ring • Constructed in halves

38

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Steel Erection - Phase 1

39

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Backfilling - Phase 1

40

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Phase 2 - Steel Erection

41

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Phase 2 - Backfilling

42

© 2015 Armtec LP • Confidential & Proprietary

NOISY RIVER BRIDGE

Completed Project

43

© 2015 Armtec LP • Confidential & Proprietary

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

PUTNAM RAIL TRESTLE

44

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

Replacement of a high maintenance wooden rail trestle with minimum track shutdown

45

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

Twin 3050mm diameter Multi-Plate Soil-Steel Structures

46

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

Installation of Uni-axial geogrids to create a 1:1 Reinforced Slope, 8m high

47

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

Partially buried trestle with Wrapped Face Geogrid Reinforced Slope

48

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

Installation of Geocell Slope Protection System

49

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

50

© 2015 Armtec LP • Confidential & Proprietary

PUTNAM RAIL TRESTLE

51

© 2015 Armtec LP • Confidential & Proprietary

Contact Your Local Sales Rep:www.armtec.com/sales-offices/

Todays Speakers:

Doug Lowry

Doug.Lowry@armtec.com

Drew Willms

Drew.Willms@armtec.com

52

© 2015 Armtec LP • Confidential & Proprietary

UPCOMING WEBINARS

Stay connected or get involved with Armtec events. We are dedicated to the continuing education of our customers, colleagues and fellow employees through personalized lunch and learns and free online webinars.

For more info please visit www.armtec.com/events

53

© 2015 Armtec LP • Confidential & Proprietary

Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news.

Webinars will be posted with in five business days from the broadcast date. We will notify all subscribers over our social media channels.

Today’s session will be available on YouTube and SlideShare

JOIN US ON SOCIAL MEDIA!

54

© 2015 Armtec LP • Confidential & Proprietary

Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects

REFER QUESTIONS TO YOUR LOCAL ARMTEC SALES REPS

55

© 2015 Armtec LP • Confidential & Proprietary