View
215
Download
0
Category
Tags:
Preview:
DESCRIPTION
Undergraduate Portfolio of Works
Citation preview
UNDERGRADUATE
PORTFOLIO OF WORKSDANIEL S FIORE
UNIVERSITY AT BUFFALO2009-2012
DANIEL S FIOREBS.ARCH 13UNIVERSITY AT BUFFALO
516_655_8084
GRAPHICS
DETAILEXPLORATION
RICK ROLL
MEDICALLIBRARY
ORTHOGONALTENSION
BOTANICALFOLLY
AGGREGATEDVOID
UNDERGRADUATE RESEARCH, ANALYSIS AND DESIGN FALL 2009-FALL 2012
Large Day Time Population
Large Evening Population
No Major Population Change over 24 Hours
WEEKDAYS
WEEKENDS
Residential And Commercial
Residential
Commercial
GRA
PHIC
S
AN URBAN ANALYSIS OF ELMWOODAVENUE IN BUFFALO, NY, DIAGRAMMING INFRASTRUCTURE AND DEMOGRAPHICSIN PLACE AND ITS EFFECT ON THEREGIONS URBAN FABRIC.
THE ANALYSIS FOCUSED MAINLY ON ANARCHITECTURAL TYPOLOGY UTILIZIED AND ITS RELATIONSHIP WITH THE SURROUNDING URBANISM IN THINGS SUCHAS PEDESTRIAN MOVEMENTS, MASS TRANSITCIRCULATION, AND POPULATION DENSITIES ACROSS TIME SPANS.
BUS STOP
MORE BUSYLESS BUSYCOMMERCIALRESIDENTIALRESIDENTIAL AND
COMMERCIAL
DOES NOT ALLOW EXIT FROM ELMWOOD AVE.
ALLOWS FOR EXIT FROM ELMWOOD AVE. PRIVATE PARKING LOTS
PAID PUBLIC PARKING FREE TWO HOUR PARKING
METERED TWO HOUR PARKING
GRA
PHIC
S
Reinforced Concrete+ Steel Frame
Concrete Columns
Bricks, Glass and Concrete Blocks
Interior Wall Cladding
Average
Media-TIC
Comm
unication Void
Utilities
Weightless Quality
Dier ent Fo rms
Same Volu me
Same P r ogram Wei ght
Media-TIC, Barcelona
Va r ying Mate r ia l Wei g hts
Wei ght Di str ib ut i on_ Dens i ty
Mo re So l i d Mo re Trans parant
Weig ht was s aved in MEDIA-TIC by :
[1] us ing highly calculated st ruct ual and facade systems.
[2] us ing custo m and l ight weight mater ia l s
[150 k i los /meter^2 ]
Same Volume+Dierent Weig ht
Dierent Dens ity
Sp acia l Di str i b ut i on
100%
60%
Space Time
Entirely Steel Frame
Hanging Floor Connectors
ETFE* and Glass
* Extremely light weight material that can support the weight of a semi-truck
Luminous paint
Boll Fiore Hobert
Space Time Material Techtonics
Daily Occupancy
Long-Term Tenancy
long term lease o ce spacenew business incubator--short term lease start-up spaceITC house and public area
1 2 3 4
4 52 310
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Daily and Long-Term Occupancy Comparing the predicted fluxuation patterns of the amount of people occupying three dif ferent sect ions of the bui lding, over the course of a day and over f ive years . The dif ference are a result of the dif fer ing f luxuation rates and patterns of the specif ic programs at each level .
Hours
Years
Air/Engergy RelationsMaterial Techtonics
45%
90%
100%
1 5 10 15 20 25 5 410Days 30
Off Site Assembly On Site Assembly
Off Site Assembly On Site Assembly
1 5 10 15 20 25 301 5 10 15
Perc
ent
of T
otal
Mat
eria
l Use
dPe
rcen
t of
Tot
al M
ater
ial U
sed
[For
Fra
me
Stru
ctur
e][F
or F
acad
e Sy
stem
s]
Construction and Assembly Timeline Describing the distribution of material weight over the course of construct ion t ime, and catego-r iz ing the mater ia ls by off site assembly and on site assembly .
[Steel Frame Structure]
[ETFE Facade Systems]
Interior/Exterior Enclosure
Compared Performance of the Four EnclosuresOverlaying information descr ibing the static vs. movable facades over the course of and average day.
S
E
N
W
12pm
6am
9am
3pm
6pm
Most Stat ic
Fluxuating
Amount of F luxuation
Fluxuation of People
Time of Greatest Sun Exposure
Facade Act iv i ty in One Day
GRA
PHIC
S
Air/Engergy Relations
12 pm6 am 6 pm
12 pm6 am 6 pm
12 pm6 am 6 pm 12 pm6 am 6 pm 12 pm6 am 6 pm 12 pm6 am 6 pm
Fal l Winter Spring Summer
12 pm6 am 6 pm
12 pm6 am 6 pm 12 pm6 am 6 pm
12 pm6 am 6 pm
12 pm6 am 6 pm
12 pm6 am 6 pm
Seasonal Fluxuation of ETFE Diaphram Volumes
[Vol
ume
Fille
d]
[T ime in One Day]
Comparing how the SW and SE facades perform over the course of the day during varying seasonal conditions .
[SW]
Warm Air/GasCool Air/Gas
[SE]
PERSONAL WORK
AN ANALYSIS OF THE FUNCTIONAL SYSTEMS AND SOCIAL PATTERNS WITHINTHE MEDIA-TIC BUILDING IN BARECELONA SPAIN. THE OVERLAYMENT OF CONSTRUCTION TYPOLOGIES, SOCIAL FUNCTION, AND BUILDING FUNCTION PROVIDES AN INSIGHT TO THE INTERGRATION OF A BUILDINGS SYSTEMS AND FUNCTIONS
GRA
PHIC
S
AN ANALYSIS OF THE FUNCTIONAL SYSTEMS AND SOCIAL PATTERNS WITHIN THE MEDIA-TIC BUILDING IN BARCELONA, SPAIN. THE OVERLAYMENT OF CONSTRUCTION TYPOLOGIES, SOCIAL FUNCTION, AND BUILDING FUNCTION PROVIDES INSIGHT INTO THE INTEGRATIONOF A BUILDINGS SYSTEMS AND FUNCTIONS
orientation along the meridian
palm dom
e
fern house
ancient rainsforest
desert ho
use
bego
nia ro
om
galle
ry
victo
rian
ivy ro
om
orch
id h
ouse
house 1
0
cloud forest
florida everglades
AN ANALYSIS OF THE EXECUTION OF CONCEPTUAL IDEAS WITHIN THE BUFFALO BOTANICAL GARDENS, BUFFALO NY.
THE BUILDING IS BASED ON THE IDEA OF BECOMING A SERIES OF GARDENS ALIGNED ALONG A CONCIEVED MERIDIAN SLICING THOUGH BUFFALO. IN ADDITION TO CONCEPTUAL IDEAS, AN ANALYSIS WAS CONDUCTED AS TO ONES SENSORIAL REACTION TO THIS.
palm dom
e
fern house
ancient rainsforest
desert ho
use
bego
nia ro
om
galle
ry
victo
rian
ivy ro
om
orch
id h
ouse
house 1
0
cloud forest
florida everglades
sensorial reaction
climactic s
ensory
monume
ntality o
f
space
smell sensory
GRA
PHIC
S
DET
AIL
EXPL
ORAT
ION
RESEARCH, ANALYSISAND DETAILED DOCUMENTATIONOF CONCEPTUAL IDEAS AND HOW THEY WERE UTILIZEDIN ACTUAL CONSTRUCTION METHODSOF THE MENEFEE CABIN, A BLOCK CONSTRUCTION BUILDING BY CLARK +MENEFEE ARCHITECTS
DET
AIL
EXPL
ORAT
ION
DET
AIL
EXPL
ORAT
ION
1 2 4 8
CONIBEAR SHELLHOUSETHE MILLER HULL PARTNERSHIP, LLCSEATTLE, WA
TIMOTHY BOLL DANIEL FIORE KATHRYN HOBERT
3/4 = 1 - 0
1 SLAB ASSEMBLY
Existing Pile Caps
Existing Grade Beams
Gravel Fill between Beams
Vapor Retardant Membrane
2 Rigid Board Insulation at Perimeter
6-1/2 Concrete Slab w/ #5 Reinforcement bar @ 4 o.c.
2 Lower Wall Assembly
Cast in Place Concrete
Air Cavity
3-5/8 Metal Studs
R-13 Batt Insulation
5/8 Gypsum Wall Board
Vapor Retarding Acrylic Interior Primer
3 Aluminum Storefront Window System
4 Second Floor Assembly
10 Inch Steel I Beams
2 Composite Steel Decking
R-14 Insulation under Decking Between Beams
2-1/2 Concrete Topping Slab
Hot Rubberized Asphalt Membrane
Protective Sheet
Orange Composite
1 Rigid Board Insulation
2 Concrete Topper Slab
5 Upper Wall Assembly
Metal Siding
Vertical 1 Z channels
Breathable Wall Membrane
5/8 Minimum R-3.8 Insulated Wall Sheathing
6 Metal Studs @ 16 o.c.
R-13 Batt Insulation
Vapor Retarding Acrylic Interior Primer
6 Roof Assembly
Painted Steel Purlins
2x6 Pressure Treated
Nailing Boards
Pressure Treated Tongue and Groove Planking
1/2" Plywood Sheathing
Vapor Retardant Membrane
R-21 High Performance Rigid Board Insulation
1/4 Overlayment BoardPVC Membrane
STUDY, ANALYSIS AND DOCUMENTATIONOF CONSTRUCTION IDEOLOGIES ANDPRACTICESOF THE STEEL FRAME BUILDING,CONIBEAR SHELL HOUSE, BYMILLER HULL ARCHITECTS
DET
AIL
EXPL
ORAT
ION
2x6 Pressure
Nailing Boards
Pressure G
1/2" Ply
V
RBoard Insulation
1/4 OP
RICK ROLLTHE LIVING WALLSECOND SEMESTERSPRING 2010IN CONJUNCTION WITH ANDREW HILFIKER LINEA SPAMPINATO MORGANE LEBEUF JOSEPH SWERDLIN DANIEL VRANA
RICK
ROL
L
RICK
ROL
L
STARTING WITH A 6 X 6 X 8 VOLUMEAND SHIFTING IT NO MORE THEN TWO TIMES, THEVOLUME MUST ADAPT TO HOUSE THREE SLEEPING
SPACES AND INTERIOR CIRCULATION.
BY SLICING DIAGONALLY ACROSS THE SIDE OF THE VOLUME AND SHIFTING UPWARDS, THE SPACE BEGINS TO RETHINK AN ENTRANCE
BY FORCING A USER TO ENTER BY ROLLING THOUGH THE ENTRANCE AND THEN MOVING ONLY VERTICALLYTHROUGH A CIRCULATION SHAFT BETWEEN THE THREE SPACES. THE STRIP WINDOWS COME IN RESPONSE TO BOTH A NEED FOR CROSS
VENTILATION AND IN REPSONSE TO THE NEIGHBORING CONDITIONS AND A WAY TO CREATE SOCIAL INTERACTIONS BETWEEN THE THREE UNITS.
BOTH THE MODULAR AND CONSTRUCTION CONCEPTS ARE FORMED FROM THE RECTANGULAR ELEVATION TO ACCOMADATE SHIPPING AND PACKAGING IN THE ORIGINAL VOLUMETRIC FORM. THE STRUCTURAL SYSTEM WARPS TYPICAL WOOD FRAMING TO CONFORM TO THE ANGLES OF THE MODULAR SCHEME.
RICK
ROL
L
RICK
ROL
L
COLLECTIVE LIGHTINGFOURTH SEMESTERSPRING 2011
COLL
ECTI
VE L
IGHT
ING
COLL
ECTI
VE L
IGHT
ING
MOSQUES RELY HEAVILY UPON DIRECTIONALLITY TO THE MIRAB WHICH IS DIRECTED AT THE KAABA, THE MOST HOLY POINT OF THE ISLAMIC RELIGION IN MECCA.THE MOSQUE RE-APPROACHES THE DIRECTIONALITY OF ITS CONGREGATION BY USING A CURVED MIRAB TO REMOVE EMPHASIS FROM A SPECIFIC DIRECTION AS PEOPLE GATHER AROUND THE IMAM. THE ROOF BEGINS TO STEP OFF OF THE PRAYER ROOM AND CAST A LIGHT SYNONOMOUS WITH HOLINESS DOWN UPON THE IMAM AND ACROSS THE GATHERING CONGREGATION. ON A COLLEGE CAMPUS, THE ROOF ALLOWS THE STUDENTS TO CONGREGATE ATOP THE BUILDING INDEPENDENT OF RELIGION AND GAZE BACK UPON THEIR CAMPUS.
COLL
ECTI
VE L
IGHT
ING
COLL
ECTI
VE L
IGHT
ING
ORTHOGONAL TENSIONMIXED USE OFFICE BUILDINGPITTSBURGH, PAFIFTH SEMESTERFALL 2011
ORTH
OGON
AL T
ENSI
ON
NORTH
Railroad St.
Smallman St.
.evA ytrebiL
.evA nneP
21st st
20th st.
ts d
n22
.ts
dr32
ORTH
OGON
AL T
ENSI
ON
LOCATED ON THE STRIP DISTRICT IN PITTSBURGH PA,A MIXED USE OFFICE BUILDING AND MARKET FORMS TO RESPOND TO THE URBAN FABRIC OF THE STRIPDISTRICT FROM WHERE IT CURRENTLEY BEGINS TO DWINDLE TO THE EXTEND OF OUR SITE. BASED ON PREVIOUS FACADE STUDIES IN WHICH TEXTILE AND NATURAL PATTERNS WERE OVERLAYED, A SERIES OFVERTICAL LOUVERS PULL APART ACROSS THE FACADESOF THE BUILDING TO OPEN UP DOUBLE HEIGHT ATRIUMSAT VARIOUS LEVELS TO LOOK OUT THROUGHT VIEWINGCORRIDORS ATOP PITTSBURGH. THE MARKET RESPONDSIN THE SAME WAY, EXCEPT, BEING LOW TO THE GROUNDUSES THE LOUVER SYSTEM TO CONTROL LIGHT
SCALE 1/8 = 1
0 8 16 32 48
ORTH
OGON
AL T
ENSI
ON
ORTH
OGON
AL T
ENSI
ON
BOTANICAL FOLLYBUFFALO BOTANICAL GARDENS ADDITIONSIXTH SEMESTERSPRING 2012B
OTA
NIC
AL F
OLL
Y
BOTA
NIC
AL
FOLL
Y
THE EXISTING BUFFALO BOTANCAL GARDENS, A LORD AND BURNHAM GREENHOUSE STRUCTURE LOCATED IN OLMSTEDS PARK SYSTEM, RELIED ON A THEORETICAL CONCEPT OF EXHIBITS DERIVED FROM A MERIDEAN PASSING THROUGH THE CITY OF BUFFALO AND AROUND THE GLOBE. BEING LISTED ON THE NATIONAL HISTORIC REGISTERY THE ADDITION HAD TO WORK IN CONJUNCTION WITH THE FRONT FIVE HOUSES AS WELL AS THE ORIGINAL MASONRY CHIMNEY.
THE PROJECT PROLIFERATES THE CONCEPTUAL EXHIBIT OF THE MERRIDEAN AND RE-CONNECTS THE BUILDING WITH THE PARK SYSTEM USED TO HOUSE IT. A SERIES OF BOARDWALKS SHUFFLES USERS AROUND FROM THE EXISTING HOUSES TO A SERIES OF NEW HOUSES AND AN EVENT VENUE. THE BUILDING CONNECTS THE USERS TO THE PARK THROUGH VIEWS OUT OF THIS RAISED PLATEAU AND BY LIGHTLY TOUCHING THE GROUND AS TO NOT DISTURB THE NATURAL ENVIRONMENT PRESENT. AT THE SAME TIME THE HOUSES PHYSICALLY PULL AWAY FROM THE SITE, AS THE ENCLOSED ENVIRONMENTS EXTEND THROUGH THEIR FLOOR PLANES RECONNECTING WITH THE PARK BELOW AND CREATING MULTIPLE ENVIRONMENTS FOR THE USER TO TRAVERSE.
SOUTHWEST ELEVATIONSCALE 3/32 = 1
0 8 16 32 64
BOTANICAL FOLLY
BOTA
NIC
AL
FOLL
Y
SOUTHWEST ELEVATIONSCALE 3/32 = 1
0 8 16 32 64
BOTANICAL FOLLY
BOTA
NIC
AL
FOLL
Y
ALE 1/16 = 1
16 32 64N
ANICAL FOLLY
BOTA
NIC
AL
FOLL
Y
BOTA
NIC
AL F
OLL
Y
AGG
REG
ATED
VOI
D
AGGREGATED VOIDINTEGRATED MULTI USERESIDENTIAL DESIGNELMWOOD AVE, BUFFALO NYSEVENTH SEMESTERFALL 2012
AGG
REG
ATED
VOI
D
N
0 4 8 16 32
1/16 = 1
THE PROJECT INCORPORATES 12 RESIDENTIAL UNITS AND A PUBLIC PROGRAM INTO A COMPLEX WHERE BOTH COMPLIMENT EACH OTHER, AS WELL AS THE URBAN FABRIC SURROUNDING THEM.
LOCATED ON THE BUSTLING ELMWOOD AVENUE IN BUFFALO, THE PROJECT ATTEMPTS TO PROLIFERATE THE ALLEYWAY ADJACENT TO IT THROUGH USE OF THE PUBLIC PROGRAM. THE GREENWAY ALLEY IS YEARNING TO BECOME A CIRCULATION VEIN NOT SECONDARY TOO, BUT IN CONJUNCTION WITH THE MAIN THOROUGH FARES OF THE CITY INCLUDING ELMWOOD AVENUE. IT USES A PUBLIC PLAZA TO CREATE PATHWAYS FOR A FARMERS MARKET AND ENCOURAGES USE OF THE ALLEYWAY AND CIRCULATION ACROSS THE SITE.
THE DESIGN TAKES ADVANTAGE OF BUFFALOS RUST BELT, INDUSTRIAL HISTORY AND ITS PROXIMITY TO SOME OF THE MAJOR SHIPPING HUBS OF NORTH AMERICA, BY RE-USING CONTAINERS AND VARIOUS DISSAEMBLED PARTS OF THEM, TO CREATE AN ALMOST EXCLUSIVLEY RECYCLED BUILDING.
THE DESIGN TAKES ADVANTAGE OF BOTH THE ARCHITECTURAL AND STRUCTURAL ELEMENTS ALREADY DESIGNED WITHIN THE CONTAINERS TO MAXIMIZE THE EFFICIENCY GAINED FROM THEIR RE-USE. BARRING SITE CAST CONCRETE ELEMENTS SUCH AS FOUNDATION SLABS AND ELEVATOR SHAFTS, EVERY COMPONENT OF THE BUILDING INCLUDING THE UNITS THEMSELVES, FLOOR SLABS, COLUMNS AND RAILINGS, AS ILLUSTRATED IN GREEN, IS DERVIED FROM SOME SORT OF CUSTOMIZED OR DISASSEMBLED SHIPPING CONTAINER.
AGG
REG
ATED
VOI
D
AGG
REG
ATED
VOI
D
AGG
REG
ATED
VOI
D
HORIZONTAL STRUCTURAL MEMBERS 4 x4x1/4 STEEL SQUARE TUBING
PERIMETER STRUCTURE OF CONTAINER+FLOOR 3 X3X1/4 STEEL SQUARE TUBING C ROSS MEMBER UNDER FLOOR
VERTICAL STRUCTURAL MEMBERS 4 X4X1/4 STEEL SQUARE TUBING
THICKENED MATTE FOUNDATION 1 8 SLAB WITH 42 DOWNTURN AT PERIMITER N OTE: SLAB USED TO FACILITATE MOVEMENT OF
CONTAINERS AROUND SITE FOR MARKET STANDS
LATERAL BRACING CONCRETE ELEVATOR SHAFT 1 CONCRETE EGRESS STAIR SHAFT 1 GLASS EGRESS STAIR SHAFT WITH CORSS BRACING 1 /16 CORRUGATED COR-TEN STEEL AS CONTAINER WALL N OTE:ALL CONTAINER STRUCTURE IS WELDED FOR MOMENT CONNECTIONS
NOTE: EXCLUDING SITE CAST CONCRETE ELEVATOR SHAFTS AND EGRESS SHAFTSALL BUILDING COMPONENTS TO BE RECYCLED FROM EXISTING CONTAINERS
BUILDING STRUCTURAL SYSTEMS
AGG
REG
ATED
VOI
D
MECHANICAL SERVICING SYSTEMS
MECHANICAL SERVICE SPACE 400 SQ.FT GAS, ELECTRIC + WATER METERS 400 SQ.FT CHILLERS AND BOILERS RESIDENTIAL UNITS ARE SUPPLIED WITH HOT AND COLD WATER FOR HYDRONIC HEAT PUMP SYSTEMS PUBLIC SPACE REQUIRES NO HVAC EXCEPT IN LOBBY SPACE SERVICE CHASES WILL SUPPLY POTABLE WATER
VERTICAL SERVICE CHASES 2X8 TO SUPPLY ALL POTABLE WATER AND ELECTRIC SERVICING TO ALL BUILDING FLOORS
HORIZONTAL SERVICE CHASES TO SUPPLY POTABLE WATER TO INDIVIDUAL HEAT PUMP CLSOETS AND ELECTRIC SERVICING TO INDIVIDUAL UNITS
MECHANICAL VENTILATION INTAKE TO TRAVEL ALONG CIELING FROM HEAT PUMP CLOSET TO EXTERIOR AT PRIVATE BALCONY AND SERVICE IDIVIDUAL UNITS
MECHANICAL VENTILATION EXHAUST TO TRAVEL ALONG CIELING FROM HEAT PUMP CLOSET TO EXTERIOR AT PRIVATE BALCONY AND SERVICE IDIVIDUAL UNITS
THERMAL WELLS TO ASSIST IN THERMAL CONTROL 68 TONS COOLING REQUIRED 23 WELLS AT 450 SUPPLIES 69 TONS HVAC CAPACITY
CHILLERBOILERHEAT PUMPFOR LOBBYSERVICING
FOUNDATION SLAB
12 REINFORCED CONCRETE SLAB WITH 42 DOWNTURN AT EDGE
1 DIAMETER CONCRETE PILINGS AT BASE OF 4X4X1/4 STEEL PILINGS
CONTAINER FLOOR ASSEMBLY
4X4X1/4 STEEL TUBE FRAME
3X3X1/4 STEEL CROSSMEMBERS
1 MARINE GRADE MAHOGANY PLYWOOD
CONTAINER WALL ASSEMBLY
1/16 COR-TEN CORRUGATED STEEL
2 RIGID BOARD INSULATION
VAPOR BARRIER
1/16 COT-TEN CORRUGATED STEEL
ELEVATOR AND EGRESS CORES
8 REINFORCED SITE CAST CONCRETE
ALL WINDOWS
1 INSULATED GLASS WITH ALUMINUM FRAME
CONTAINER WALL ASSEMBLY
1/16 COR-TEN CORRUGATED STEEL2 RIGID BOARD INSULATION
VAPOR BARRIER1/16 COR-TEN CORRGUATED STEEL
ELEVATOR AND EGRESS CORE
8 SITE CAST REINFORCED CONCRETE
ALL WINDOWS
1 DOUBLE PANE INSULATED GLASS
CONTAINER FLOOR ASSEMBLY
4 TUBULAR STEEL FRAME3 TUBULAR STEEL CROSS MEMBER
1 MARINE GRADE MAHOGANY PLYWOODROTATED FLOOR ASSEMBLY WITH 6 FIBERGLASS INSULATION
4 TUBULAR STEEL FRAME3 TUBULAR STEEL CROSS MEMBER
1 MARINE GRADE MAHOGANY PLYWOOD
FOUNDATION SLAB
12 REINFORCED CONCRETE SLABWITH 42 DOWNTURN AT EDGE
1 DIAMETER CONCRETE PILINGS AT BASEOF 4 TUBULAR STEEL COLUMNS
AGG
REG
ATED
VOI
D
AGG
REG
ATED
VOI
D
Recommended