REroute I-70 CorridorHIGHWAYS TO BOULEVARDS: Creating Value In Cities By Design

UNIVERSITY OF COLORADO DENVER Jordan Block, Samantha Danforth, AnaClaudia Magalhaes, Brandon Mcnellis, Jason Newsome, & Jian Tang

REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESthe reroute

DowntownDenver

Boulder

Denver International Airport

MARYLAND

UTAH

why is it important?CONTEXT MAP

why is it important?REGIONAL GROWTH - I-70 EAST DRAFT ENVIRONMENTAL IMPACT STATEMENT

DEVELOPMENTPOPULATION JOBS

New development in Downtown Denver, DIA, Stapleton, and the Gateway Area is expected to increase population by 75% and increase employment by 71% in the region. These values represent build-out conditions projected for 2030.

feasibility

BASELINE ADT - CDOT 2011 ADT

65

135

90

105175

130

125

225

200

160 70

��������� ���������������������������������������� ��������������������������������������congestion, road delays, and safety problems.

*numbers in thousands

110

170

125

125250

175

175

275

250

215 100

2011 ADT VS. 2030 ADT PROJECTIONS - CDOT

ADT on I-70 is projected to increase by 20-35% between now and 2030; ADT on I-270 and I-76 is projected to increase by 40-80%.

135

90

105

175

130

125

225

200

160 70

65

*numbers in thousands

2030 ADT

175

175

100

275

250

215

NUMBER 1: REROUTE I-70

9% ������������� � redistributed from the new boulevard to the new I-70 alignment, a 14-20% increase over current I-76 and I-270 ADT.

*numbers in thousands

9% OF TRAFFIC = THROUGH TRAFFIC91% OF TRAFFIC = LOCAL TRAFFICdrcog’s, may 2000

155115170

125

9%

140125

250

125110

redistributing ADT

REDI

STRI

BUTI

ON

NUMBER 2: RE-STITCHING THE NETWORK

*numbers in thousands

ADT along the new boulevard will decrease 30-40%�������������������������������absorbed by an enhanced street network.

8575 155115

30-40%

9%

175

175

100

275

250

215

250

140125

redistributing ADT

REDI

STRI

BUTI

ON

NUMBER 3: IMPROVED OPTIONS

*numbers in thousands

7065 8575

11%

9%

175

175

100

275

250

215

250

140125

30-40%

ADT along the new boulevard will decrease 11%�������������������������������absorbed by enhancing access to transit and other mobility options.

redistributing ADT

REDI

STRI

BUTI

ON

SUMMARY

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%ADT ALONG NEW I-70 ALIGNMENT ONLY INCREASED BY 13-20%

11%

9%

30-40%

redistributing ADT

REDI

STRI

BUTI

ON

SUMMARY

10%

40-50%

10%

30-40%

Through Traffic10%

90%Local Traffic

VSCurrent ADT Composition ADT Distribution ThroughImproved Infrastructure

Current I-70 Denver Blvd

REALIGMENT

STRENGTHEDNETWORK

IMPROVEDOPTIONS

redistributing ADT

objectives

what is our vision?APPROACH

what is our vision?GOALS

what is our vision?STRATEGIES

DESIGN SOLUTIONS CHECKLIST objectives

PREREQUISITES � Designing a city for people

� Enhance region

� Working with existing plans

MOBILITY � ������

� Network

� Connections

� Access

� Choice

ECONOMY � Development

� Access

ENVIRONMENT � Nature

� Health and Safety

PLACE � Experience

� Foster neighborhood identity

� Connect communities

big moves

REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver Bllvddd

= Rerouted I-70

DESIRED CONNECTIONSbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver BBllllvvl ddd

= Desired Connections

= Existing Streets

RAIL CONSOLIDATIONbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Needing Consolidation

= Existing Rail

RAIL CONSOLIDATIONbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Consolidated Rail

= Existing Rail

RELOCATE NATIONAL WESTERN STOCKSHOWbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver Bllvddd

= Proposed Site

= Existing Stock Show

DEVELOPABLE LANDbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvver Blvdddddd

= ROW AREA

POTENTIAL DEVELOPMENTbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Potential Development

NEW AREAS OF CHANGEbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeD nvvver Blllvddddd

= Areas of Change

= Potential Development

CHARACTER AREASbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd

Denver Blvd

38th Ave

= East

= West

= Central

= Nodes

design

PROPOSEDsite plan

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDeDeDeenvnvnvnvvvererererr B B B BBBlvlvlvlvvvdddddd

PROPOSED��������������

EXISTING����������������

= Existing Blocks

PROPOSED����������������

= Proposed Blocks= Existing Blocks

EXISTINGland use

= Mixed Use Commercial = Industrial Mixed Use

= Residential = Parks and Opens Space

= Commercial = Industrial

= Mixed Use = Civic/Entertainment

PROPOSEDland use

= Mixed Use Commercial = Industrial Mixed Use

= Residential = Parks and Opens Space

= Commercial = Industrial

= Mixed Use = Civic/Entertainment

EXISTING��������������������

= Existing Buildings

PROPOSED��������������������

= Proposed Buildings= Existing Buildings

STREET HIERARCHYperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Secondary Streets

= Interstate

= Primary Streets

TRANSIT CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Relocated Rail Stations

= Rail Transit

= Rail Station

EXISTING BIKE CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Existing Bike Routes

PROPOSED BIKE CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Proposed Bike Routes

EXISTING GREEN CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Green Nodes

= Green Connections

PROPOSED GREEN CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Green Nodes

= Green Connections

CONNECTIONS MADEperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Connections Made

= Existing Connections

COMMUNITY ENHANCEMENTSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= New Development

= Restitched Fabric

experience

EAST AREAaerial perspective

EAST AREAaerial perspective

DENVER BOULEVARD AND MONACO STREETindustry incubator

DENVER BOULEVARD AND MONACO STREETindustry incubator

WEST AREAaerial perspective

WEST AREAaerial perspective

DENVER BOULEVARD AND FEDERAL AVENUEmixed use

DENVER BOULEVARD AND FEDERAL AVENUEmixed use

CENTRAL AREAaerial perspective

CENTRAL AREAaerial perspective

1

2

3

(44th and Fox)

44TH AVENUE AND FOX STREETtransit oriented development 1

44TH AVENUE AND FOX STREETtransit oriented development 1

GLOBEVILLEre-stitching communities 2

GLOBEVILLEre-stitching communities 2

riverfront redevelopmentBEFORE

3

SOUTH PLATTE RIVER GREENWAY

3riverfront redevelopment

CENTRAL AREAaerial perspective

1

2 3

3(Denver Blvd and Josephine)

CENTRALtransit plaza 1

CENTRALtransit plaza 1

DENVER BOULEVARD AND BRIGHTON BOULEVARD

2gateway to central area

DENVER BOULEVARD AND BRIGHTON BOULEVARD

2gateway to central area

DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3

DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3

ELYRIA SWANSEAre-stitching communities 4

ELYRIA SWANSEAre-stitching communities 4

evaluation

MAINTENANCE COST SAVINGSevaluation

Denver Boulevard annual maintenance costs:$284,909 +Increased capacity on new I-70:$207,077

Interstate 70 annual maintenance costs:

vs.

Total $491,986

Total $843,166

58%

DEVELOPMENTvalue added

Total buildable land = 51,050,223 sq ft (1,172 acres) New Development = 36,810,313 sq ft (845 acres) ������= 14,239,910 sq ft (327 acres) Park Land = 4,197,322 sq ft (96 acres)

Floor Space = 200,431,703 sq ft 63% Residential 22% Commercial 5% Industrial 1% Civic

DESIGN SOLUTIONS CHECKLIST evaluation

PREREQUISITES � Designing a city for people

� Enhance region

� Working with existing plans

MOBILITY � ������

� Network

� Connections

� Access

� Choice

ECONOMY � Development

� Access

ENVIRONMENT � Nature

� Health and Safety

PLACE � Experience

� Foster neighborhood identity

� Connect communities

CITY FOR PEOPLE ENHANCE REGION EXISTING PLANSprerequisites

250

175

175

100

275

250

215

125

70

140

65 175

125

125

110

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%

DEVELOPMENTPOPULATION JOBS

TRAFFIC NETWORK CONNECTIONS ACCESS CHOICEmobility

250

175

175

100

275

250

215

125

70

140

65 175

125

125

110

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%