RSOE Status ReportHungary

Belgrade, 03.12.2013

Roles of RSOE in IWT projects

Project RSOE role

WP5 Leader, Partner

WP5 Leader, Partner

Communication Leader, Partner

SuAc. Leader, Partner

Partner

Expert Group Coordinator

Feasibility Study Project Coordinator

Project Coordinator

NEWADA duo involvement

• ICT services coordination• WLAN installation in Port of

Győr• FIS Portal development

RSOE in IRIS Europe 3

• 150 pcs inland AIS transponders (IRIS II)

• Cca. 150 pcs inland ECDIS viewer + cca. 10-15 pcs inland ECDIS viewer with radar function (navigation mode)

• On-shore pilot IT equipments

• DGNSS pilot monitoring service

• Aim: Establishing Danube Law Enforcement Cooperation Platform (police, customs, disaster mgt.)

• 2-years project (start Sept 2013)

• Kick-Off Conference: Danube Ministries of Interior has adopted a joint declaration to cooperate

• Activities:

– 5 Expert Groups (5th EG is about Information Exchange & RIS)

– 3 joint operations

– High level conference at the end

Kick-Off Conference, Budapest, 17 September 2013(MOI State Secretaries represented the Danube countries)

DARIF Kick-Off Conference

Feasibility Study - Transport Operational Programme Project

• PannonRIS infrastructure update (VHF, microwave uplink, AIS)

• Inland ECDIS production including survey

• On-shore radar and camera system

• Meteorological information system

• Marking system and AtoN concept

• DGNSS for Danube navigation concept

• Waste management concept

• Integrated logistics information system

RIS on-shore infrastructure

AIS PSS

AIS DGNSS

WLAN

RADAR

Dense AIS traffic

Web shiptracker

ESRI map - ECDIS overlay possibility