View
219
Download
1
Category
Tags:
Preview:
DESCRIPTION
Â
Citation preview
Current Project House, Hampstead Freelance architectural designer for the extension and remodel of Garden Suburbs, a private home involving: London
May 2011 - Present Parquet Flooring Freelance architectural designer for high end residential projects 1285 Finchley Road, involving: London, NW11 0BH
July 2009 - July 2011 Stiff&Trevillion Architects S&T Architects is a medium sized firm comprising 20 people. 16 Woodfield Rd, During my time there I contributed to around 30 different projects London My tasks have involved:
July 2008 - Present Excel Agency Freelance accountant for Excel Agency property development firm
ResumeAntony Joury, M.Arch6 Woodstock Rd,Golders Green, London,NW11 8ER
Education
Employment
Home +44 208 458 4759Mobile +44 7974 421 641E-mail a_joury@hotmail.comUK Citizen - Full Drivers Licence
My career objective is to work in an environment that will test the limits of my current abilities and help me grow as a design proffessional. I am keen to relocate from the UK to the US to participate in the vibrant architecture and design community in the States.
2011-2013 RIBA Part 2 Masters of Architecture, Pass with Merit, University of Westminster, London
2005 - 2008 RIBA Part 1 Bsc. (Honours), 2.1, The Bartlett School of Architecture, UCL, London
Summer 2002 Foster and Partners, Worked on site in London making large and small scale models of London the site and structural details.
My biggest achievement at this firm was the successful application for works to a listed hotel in West London. Due to the buildings listed status and the councils unwillingness to change the appearance of the building, the application was initially rejected. Through continual perseverance, however, I managed to convince the council to allow the works to go ahead.
• Completing, and submitting planning applications• Detailed CAD drawings including plans, sections, elevations• 3D computer modelling, as well as hand modelling• Numerous site visits, involving measuring and documenting• Composition of brochures to pitch to prospective clients
• Design of the parquet flooring showroom in North London• Detailed CAD drawings including plans, sections, elevations• 3D computer modelling for prospective clients
• Submitting a full planning application to the Hampstead Trust & Barnet Council
• Measurement of the entire house• Detailed CAD drawings including plans, sections, elevations• 3D computer modelling of proposed rear extension
Design Adobe Photoshop, InDesign, Illustrator, Advanced After Effects
CAD Vectorworks Advanced Rhino 4.0 S.R.9 Intermediate Autocad Basic
3D Software Cinema 4D, Artlantis Studio 2.0 Advanced& Animation Autodesk Maya 2010,VRay Basic Parametric Grasshopper Plug-in for Rhino Intermediate
IT Skills
September 2013 Competition/Installations Group project which secured $30,000 for a 2 week project in Blackrock Desert, Nevada, constructing 2 installations for the Burning Man Festival
January-March 2009 Competition The Socio Design Foundation ran a student competition entitled Honourable Mention ‘PRISONED’. This project involved coming up with an architectural design to express a philosophy on what sort of experience imprisonment should be like.
December 2005 Exhibition Bartlett Installation Project entitled ‘MARKET’ UCL Quad,Euston,London
December 2003 Exhibition Bartlett Installation Project entitled ‘SHELTER’ Borough Market,London
Andrew Trevillion Stiff & Trevillion Architects a.trevillion@stiffandtrevillion.com
William Firebrace Masters Tutor Yr2 Wisalon@gmail.com
Arthur Mamou-Mani Masters Tutor Yr1 Arthurmani@gmail.com
Additional references available on request
Music 17 years playing classical guitar
Sport Football, cricket, squash, rollerblading and skateboarding
Travel Extensive road trips across the US, as well as frequent travel to Israel and continental Europe
Exhibitions, Competitions & Installations
References
Interests
University Work2003 - 2013
3rd year Degree and installation project
2003 - 2008
The final year project consisted of an underground yeshiva (religious school of learning) and mikveh (ritual cleansing bath) underneath a defunct synagogue in Tangiers, Morrocco
Section (originally 1:50)
Final Drawings were drawn by hand and then edited in photoshop. A subterranean synagogue and mikveh in Morocco, funneling natural light and rainwater.
Plan (originally 1:50)Basement 1
The building transports natural light down incisions that run along the facade of the building above. Heliostats on the roof reflect the maximum amount of light down the incisions during the course of the day.
Axonometric perspective
This drawing shows the light funnels and heliostats in relation to the movement of the sun over the course of the day. This structure is nescessary in order to acheive the effect in the basement synagogue, portrayed in the perspective.
Selective Axonometric
This axonometric depicts the movement of people down into the synagogue and mikveh, against the movement of light and water. Light and water are transported vertically down through incisions, whereas the occupants take a circular route down to the mikveh, which is 2 levels below ground.
Shelter Project 2003
This was a group project which involved the construction of an installation in Borough Market under the title of shelter.
The parasitic installation clung onto a 3m high fence. As one progressed through the shelter, different lights were activated to lure the occupant further in.
The culmination of the installation was a focused window into the space beyond the fence, which was generally ignored by everyday commuters.
Burning Man Project
2013
$30,000 Art Grant won by 2 members of the DS17 Architecture Studio at Westminster to construct installations at the festival
This installation consisted of 2 types of interactive structures that are based on the work of Swedish mathematician Niels Fabian Helge von Koch and in particular his invention of the Koch Snowflake, which is a recursive 2D tetrahedral geometric pattern.
4 timber-made fractal pods surround a space frame structure of a similar fractal nature. The timber pods are inhabitable and can fit up to 2 people within them. The central scaffolding fractalwas dressed with climbing nets, inviting occupants to climb and engage with the structure.
Fractal Cult
The second project was a plywood structure consisting of two concave forms. The plywood would be steam bent in order to acheive the curved wave-like shape and braced by several ribs across its interior facade.
A tensile system of guy wires provide additional support to the tall end of the installation which would be susceptible to the high winds experienced in the desert.
Shipwreck
Masters Thesis - The Caretakers
2012 - 2013
The proposal was to provide a space for all the many associations attached to the Olympic Parks development, ensuring a secure and sustainable master planning development strategy for the area with 3 main aims:
1. Provide a singular debating forum for all public, private and 3rd sector organisations with a vested interest in the Park, in order to provide a sustainable development strategy that will be mutually beneficial to all parties involved.
2. Provide sufficient workspace for all organisations involved so that they can all reside under one roof as opposed to being physically as well as ideologically disconnected from each other.
3. Provide a security arrangement for the park that would preclude the need for “the big blue wall” that encompasses the entire site, through the creation of a raised roads and walkways
The Caretakers - Sketch Proposal - Lines of Sight
for the Olympic Park siteBuilding is the Caretaker
Exploded Diagram of Proposal
Surveillance Rooms
Central Core
Glazed Ramp
Glazed Front Facade
Debating Chamber
Caretakers House
Back and Side Facades
Laminated glass tread
Embedded Titanium insert
Laminated glass panel balustrade
Bonding layers Glass sheets
Outer connector attached to glass
balustrade
Inner connector attached to metal
insert
Laminated glass tread
Laminated glass panel balustrade
Embedded Titanium insert
First component of connector attached to glass balustrade
Second component of connector attached to
glass tread
Laminated glass tread
Laminated glass panel balustrade
Embedded Titanium insert
First component of connector attached to glass balustrade
Second component of connector attached to
glass tread
Interlocking mechanism securing second member of connector component to embedded insert
Detailed Drawings of Glazed Ramp
Side Elevation - Stage of Development +20 years
Year 0 Year 10Year 20
View Inside Debating Chamber
View From Viewing Platform
View Inside Surveillance Zones
Caretakers House
Debating Chamber
Public Glass Ramp
Section
Surveillance Rooms
Scale model of site
Raised Walkways
Main Entrance
0 m
114 m
Debating Chamber
View from Office Space
Surveillance Room
Stiff + Trevillion Projects2009-2011
300
ELEC
3343
2900
Royal China BARBBQ
GREETING
SECTION B-BScale: 1:201
PANTRYLIQUOR
DISPLAY
BAR DETAIL: SEE DRAWING
3041-42
BBQ DETAIL: SEE DRAWING
3041-44
LIQUOR DISPLAY: SEE DRAWING
3041-49
LACQUER PAINTED WALL WITH
CONCEALED FLUSH DOOR
LACQUER PANELS FROM TOP OF
BAR COUNTER TO CEILING
MARBLE/ GRANAITE WALL
DROPPED BAR
PRELIMINARY TENDER 11.09.2009Project
HARROW MIDDLESEX,HA1 4AQDrawing PROPOSED SECTION B-B
3041Project No Drawing No Revision
Scale: Date Revised1:20/ 1:40 AUGUST/09 00/00/000
-A1/ A3@
ROYAL CHINA,148-150 STATION ROADNo. Date Revision NotesGENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission. 31
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
This building originally consisted of a ground floor restaurant unit with residential units on the first and second floor. The proposal is to replace the shop front and fascia over the two bays comprising the Royal China unit so that we can incorporate into the new shop front a level access, and a complete renovation of the interior of the restaurant. As well as requiring detailed plans and sections of the proposal, the client requested the composition of several 3D images.
Royal China
Alfie’s Dubai is the third venue in the Alfred Dunhill restaurant portfolio following Shanghai and Hong Kong.
After working on the 3D imagery for the Dunhill club in London I was contacted independently to work on the images for their project in Dubai.
Alfies + Dunhill Restaurant Dubai
150mm SCREED
250
ENTRANCE
Existing Ceiling
3830
service void
PATINATED COPPER
THREE ROWS OF HANGING TUBE CHANDELIERSMIRRORED PANELS TO MATCH ENTRANCE LOBBY
TWO-WAY MIRRORED
PANELS BACKING ON TO
THE OFFICE
Existing Ceiling
3830
1200
MIRROR
BANQUETTE 4
BANQUETTE 3
100
10
0
EXISTING RWP
CONSTRUCTIONProject
Marylebone High StreetDrawing PROPOSED
3072Project No Drawing No Revision
Scale: Date Revised1:20 JAN/10 15/02/2010
IA0@
GROUND FLOOR SECTION A-A
Cafe LucNo. Date Revision Notes
Fabric panels, mirrors, cornice & ceiling supports included. General details updated. A 16/2/10GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission. 310
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
Existing ceiling height corrected following site inspection - proposal amended to fit B 2/3/10Updated as highlighted following Client meetingC 4/3/10Patinated copper to wrap columns up to bar height. Paneling continued beyond bar as highlighted.D 12/3/10Return air slot detail,architectural strip lights and wall light included as highlightedE 18/3/10Pelmet included & other updates as highlightedF 31/3/10GLASS DISPLAY OVER THE BAR REVISED, GLASS WINDOWS LOWERED TO THE BACK OF THE BANQUETTE AND MIRRORS TO THEIS WALL ONLY OMITED. SHUTTERS TO THE ROOF REVISED
G 2/4/10
LOUVRE DESIGN AMENDEDH 8/4/10HIGH LEVEL COPPER STRIP DETAIL INCLUDED AS HIGHLIGHTED AND AREA BEHIND LOBBY DRAWN UPI 13/4/10
2600
2050
SEE DRAWING 3072-312 FOR ELEVATION OF AREA BEHIND LOBBY The project involved the refit of an existing
restaurant in Marlybone. The entire existing restaurant was stripped out, including the kitchen and shopfront. A new bespoke kitchen was then installed along with new furniture, lighting, services, and finishes.
A 3D model of the proposed fit-out was requested. This involved many changes as the clients were extremely fussy about detail.
During the course of constructing the model, I met the clients various times to discuss amendments including furniture layouts, lighting, and materiality.
Cafe Luc
Orbit House was originally a 4 storey office building located just off the Hanger Lane in London.
The building has been granted planning consent for a change of use to a 167 bedroom hotel, which is currently under construction.
The image on the left portrays one of the room layouts which was drawn at 1:20. I was part of the team that was responsible for organising all 167 rooms. This was quite challenging as due to the existing structure of the building, most of the rooms were not uniformally shaped, resulting in a different layout for almost every one.
Below are the images I produced for the Royal Eagle Hotel, which is mentioned briefly in my CV.
The proposal was to introduce external floodlighting to this listed hotel in London. This was particularly challenging due to its listed status and as a result, detailed drawings, and indepth lighting analyses had to be drawn up and documented for the application to be eventually accepted.
Orbit House + Royal Eagle Hotel
ROYAL EAGLE HOTEL
34005.006BEAMER II PROJECTORWITH MOUNTING PLATE FOR METAL HALIDE LAMPSGRAPHIT MHIT-CE 70W G12 6600LMSPOT REFLECTORHOUSING, HINGE, AND MOUNTING PLATE: CORROSION-RESISITANT CAST ALUMINIUM,NO-RINSE SURFACE TREATMENT. DOUBLE POWDER-COATED. OPTIMISED SURFACEFOR REDUCED ACCUMULATION OF DIRT. HINGE WITH INTERNAL WIRING, 130° TILT.GRADUATED DISC: CORROSION-RESISTANT ALUMINIUM. MOUNTING PLATE ROTATABLETHROUGH 240° CONTROL GEAR WITH TEMPERATURE CONTROLLER, TIMER-IGNITOR, CAPACITOR. 2CABLE ENTRIES. THROUGH-WIRING POSSIBLE. 3-POLE TERMINAL BLOCK.REFLECTOR: ALUMINIUM, SILVER, MIRROR-FINISH ANODISEDSCREW-FASTENED SNOOT WITH SAFETY GLASS: CORROSION-RESISTANT CASTALUMINIUM, DOUBLE POWDER-COATED. CROSS-BAFFLE: METAL, BLACK LACQUERED.CUT-OFF ANGLE 50°. WITHOUT SPILL LIGHT.PROTECTION MODE IP65: DUST-PROOF AND WATER JET-PROOF.MAX. REFERENCE AREA EXPOSED TO WIND LOADS 0.06M SQUAREDWEIGHT 7.30 KGENEC10, IP65, GOST
PRELIMINARYProject
26-30 CRAVEN RD, W2 3WBDrawing NE ELEVATION & SE ELEVATION
3069Project No Drawing No Revision
Scale Date Revised1:200 FEB 10 MAY 10
BA3@
PROPOSED LUMINAIRE POSITIONS
ROYAL EAGLE HOTELNo. Date Revision Notes
POSITION OF LUMINAIRES ON FACADE AMENDEDA 18/3/10GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission. 301
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com 1:100 @ A1
POSITION OF LUMINAIRES AMENDED IN ACCORDANCE WITH PLANNING REQUIREMENTS
SIZE OF LUMINAIRES ON ELEVATION AMENDED IN LINE WITH ERCO LIGHTING SPECIFICATIONS
1:5 DIAGRAM OF LUMINAIRE WITH DIMENSIONS ADDED TO DRAWING
B 11/5/10
NE ELEVATION AS PROPOSED
Scale: 1:100
A-A
301
SE ELEVATION AS PROPOSED
Scale: 1:100
B-B
301
283
160
205
153
336
PLEASE NOTE:-
THE LIGHTS WILL BE PAINTED TO MATCH THE COLOUR OF THE BUILDING SO AS NOT TO STAND OUT
THE LIGHTS ON THE SE FACADE AT FIRST FLOOR LEVEL ARE POSITIONED BEHIND THE BALCONY RAILINGS
ALL THE LIGHTS WILL BE WIRED FROM THE INSIDE AND THERE WILL BE NO VISIBLE CABLING ON THE BUILDING
THE LUMINAIRES WILL EMIT A WARM WHITE LIGHT ALONG THE FACADE OF THE BUILDING
ELEVATION OF LUMINAIRE
Scale: 1:5
C-C
301
svp
5 amp
FIRE NOTICE
1350
1000
1500
900
520
380
538
1230
150
690
HE
IGH
T O
FF C
AR
PE
T
12
L K J-J
L K J-J LKJ-J
1
LINE OF BULKHEAD OVER BED
1
LINE OF BULKHEAD
1
3625
6131
1010
STR
UC
TUR
AL
OP
ENIN
G
1300
2470
930
2470
600
2104
2470
1700
2104
930
1140 1140
1255
CEN
TER
OF
LIG
HT
PLA
TE
1675
1000
2104
2470
150100
A A
B B
C
C
D
D
1
2
5
4
7
11
13
18
22
25
26
24
DSSODSSO BT
ROOM No. 130,230,330TYPE 25QUAD
8
1 COMBINED DETECTOR & SOUNDERIN LINE WITH LIGHT FITTING AND CENTRAL TO BED ALSO COMBINED WITH THE ALARM BEACON IN 10% OF BEDROOMS
2 DOUBLE BED
3 TUB CHAIR
4 DESK 1300x600
5 DESK CHAIR
6 AC UNIT TO BE LOCATED CENTRAL TO DOOR
7 COAT RAIL WITH THREE BRUSHED SS HOOKS
8 MIRROR
9 MIRROR LIGHT BOX INSET INTO TOWER
10 HANGING RAIL
11 AC CONTROLLER
12 BEDHEAD LIGHTS
13 DESK LAMP
14 PICTURES 2no. 530w x 690h
15 DSSO
16 BT
17 MDF SKIRTING
18 SERVICE PIPEWORK TO A/C UNIT ON TOP FLOOR TO DROP STRAIGHT INTO BULKHEAD FROM ROOF SPACE(FIRE STOPPED AT CEILING LEVEL)
19 SPANDREL PANEL
20 2 GANG LIGHT SWITCH
21 BED HEAD BOARD
22
TRUCKLE BED
23
SOFA BED24
BEDSIDE TABLE 450
25
FLAT SCREEN TV MOUNTED ON BRACKET
AERIAL SOCKET BOX SET ABOVE SSO FOR TV
26
LOCATION OF BEDSIDE TABLEWHEN TRUCKLE BED IS IN USE
LINE OF RAISED TRUCKLE BED
LINE OF RAISED TRUCKLE BED
BULKHEAD SWITCHING ARRANGEMENT:LHS OF BED; 1 TWO WAY SWITCH TO CEILING LIGHT, 1 SWITCH FOR BEDHEAD LIGHT RHS OF BED; 1 TWO WAY SWITCH TO CEILING LIGHT, 1 SWITCH FOR BEDHEAD LIGHT
ALL DIMENSIONS TO BE CHECKED ON SITE.
4
17
25
24
2
6
11
21
4
20
22
25
SECTION C-C
SECTION D-D
SECTION A-A SECTION B-B
RAISED TRUCKLE BED
6
7
18
4
910
13
14
15 15
17
16
2322
2
6
8
12
21
17
20 20
1525 24
TYPICAL FLOOR PLAN
RO
OM
LIGH
T SWITC
H 1000
WALLPAPER DIXON TURNER DT WTI 35
COMMENTS
GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission.
No. Date Revision Notes
TITLE BLOCK UPDATEDROOM NO. NOTE UPDATED
A 8/1/10
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
Project
1-6 RITZ PARADEDrawing TYPE 25- QUAD - ROOM 130,230,330
3033Project No Drawing No Revision
Scale Date Revised1:50 NOV 09 JAN 10
FA3@
INDICATIVE BEDROOM LAYOUT
ORBIT HOUSE
04241:25 @ A1
VENTILATION DUCT RELOCATED ABOVE CEILING.
B 11/1/10
BED POSITION MOVED SO CL IS 1300. NATURAL AUBERGINE PAINT ABOVE HEADBOARD CHANGED TO WALLPAPER DIXON TURNER DT WTI 35.
C 8/2/10
ROOM NUMBERS UPDATED. DSSO 15 RELOCATED.
D 26/2/10
ROOM NUMBERS UPDATED.E 4/3/10LIGHTS SETTING OUT ADDEDF 26/3/10
870
2000
4500
1500
1991
1300
415
1140
VOID
18500
RAMP
1850
AQUARIUMDISPLAY
ZUMEX
PASTRYDISPLAY
TILL
SOUP
ORANGEJUICE
UNDERCOUNTERGLASSWASHER
TILL
DIRTIES RETURN /
WASH UP
HOTWATER
COFFEE
14
4
20
19
18
17
16
15
9
10
8
7
5
13
12
11
32
22
21
6
12
13
9
23
14
24
24
12
12
Bar counter 1200mm hWhite Carrara Marble top with Natural timber bar front and Nickel plinth all to detail drawings from specialist supplier Antique and Design
FOOD PREP
DRINK PREP
PORPOSE MAND LOWER COUNTER TOP
Counter: White Carrara Mable Top8-900mm H
RIbbed panel up to 1400mm high. Detail frawing from specialist supplier.
+100Raised floor
RAMP
RAMP
22
COVERS
76 sqm
AREA
BAR 14
(823 sqft)
SEATING 38
TOTAL 52
Under counter- FridgesNatural timber Under
Island counter with open shelves to hold bread bags. Detail drawing from specialist supplier
35mm White Carrara marble top
Under counter- Glass washer
PICK UP
PICK UP
100x100mm Squire Mild steel columns with decoarative wrought Iron/ Mild steel brackets to an approved finish supporting the perforated mesh roof which is laid to undulate between the columns.
Oak floor with natural Linseed oil finish to an approved sample lifted off the main concouse level by 100mm with a nickle illuminated signage plinth full perimeter by specialist supplier.
Ramp up from the main concourse level.
OPENING IN ROOF OVER
Ramp up from the main concourse level.
Existing Floor to the concourse to the bar area only
Free standing tables and chairs
Nickel Finish signage risers to match the existing in the Village to the full extent of the raised floor with internally illuminated logo
Existing glass balustrade and handrail.
Adjustable Leather seating with fixed pole to the floor; Detail drawings from specialist supplier Antique and Design
Bakery and Communal Table
Boulangerie et Table Commune
Bakery and Communal Table
Boulangerie et Table Commune
Baker
y
Bou
lang
erie
et T
able
Comm
une
and
Com
mun
al T
able
AA AB AC
43
42
AD
PRELIMINARYProject
Westfield village, LondonDrawing PROPOSED PLAN
3137Project No Drawing No Revision
Scale: Date Revised1:50/1:100 JULY/10 05/08/2010
CA1/A3@
Le Pain Quotidien, Kiosk K2000ANo. Date Revision Notes
RE-NUMBER 3116-110A 08/07/10GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission. 10
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
NOTES ADDED B 16/7/10
10M4 53210
14500
5815
KOISK K2000A
LOCATION
L50FFL 19.450
SITE EXTENT
SOUPZUMEX
TABLE
BREAD SLICER
Faema E61715X54X565
Aquarium
FOOD PREP
DRINK PREP
PICK UP
PORPOSE MAND
LOWER COUNTER
TOP
LOWER COUNTER
TOP
+100
Raised floor
RAMP
RAMP
22
12
00
33
00
10
80
40
0
AA AB AC
PRELIMINARYProject
Westfield, LondonDrawing PROPOSED ELEVATION A-A
3137Project No Drawing No Revision
Scale: Date Revised1:20/1:40 JULY/10 08/07/2010
AA1/A3@
Le Pain Quotidien, Koisk K2000ANo. Date Revision Notes
RE-NUMBER FROM 3116-120 A 08/07/10GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission. 21
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
Bar to detail Drawing
by Specialist supplier
Le Pain Quotidien is a chain of cafe’s in London with whom Stiff + Trevillion Architects work with fairly extensively.
The location for their newest branch was the Wextfield shopping centre in Shepherds Bush, London.
The clients planned to construct an island unit, which would fit comfortably into a balcony which hungover one of the lower level stairacases.
A 3D model was requested alongside all the relevant proposed sections and plans. The drawings and model were the most challenging, and most rewarding projects I have had to work on during my time at S+T Architects.
Le Pain Quotidien
PRELIMINARYNo. Date Revision Notes
ISSUED TO STRUCTURAL BECO WALLFORM FOR COMMENTA 12/1/10GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission.
GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission.
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
Project
CLARKSON CLOSE, CAMBRIDGEDrawing SECTION DD
3050Project No Drawing No Revision
Scale Date RevisedNTS MARCH 2010 -
-A3@
AS PROPOSED
GRACE PAVILLION
3031:20 @ A2
REISSUED TO STRUCTURAL ENGINEERB 13/1/10
2400
BA D550
815 250
150 150
150
192
135
TRAVERTINE SLAB
BLACK STEEL FLAT FASCIA TO BRIDGE
313
C2715
SAND BLINDING
ROCKWOOL ROCK FLOOR
COMPACTED HARDCORE
50
150
284
857
200 467
ROOFING: ZINC-PLUSFINISH: ANTHRA-ZINC (BRONZE)
FIXED OVER WBP PLY
CONCEALED EDGE GUTTERZINC ROOFING MATERIAL LINING
SOFFIT & FASCIA:EXTERNAL SHEATHING BOARD SOFFIT
EPS BOARD SUBSTRATESILICONE RENDER FINISH
STEEL GUTTER SUPPORT STRAPS
FLAT EDGE SEAM
SAND BLINDING
FLOOR FINISH BUILD UP :
- 30mm TRAVERTINE SLAB
- 12MM FULLY BEDDED ARDUFLEX ADHESIVE
WITH THERMONET UNDERFLOOR HEATING
WITHIN TOP SECTION OF THICKNESS.
- DITRA MATTING WITH LEVELLING COMPOUND
TO COVER ENTIRE SURFACE TO FORM BARRIER
BETWEEN EUFH
- 30MM DUKKABOARD FULLY BONDED TO
SLAB.
- SLAB TO BE TREATED WITH LIQUID DPM.
SAND AND CEMENT RENDER TO WALL TO BE
TAKEN DOWN TO CONCRETE FOORING DRIP
DETAIL 150MM ABOVE GROUND LEVEL -
DULUX WEATHERSHIELD PAINT FINISH.
INTERNAL FINISH OF BECO WALLFORM TO BE
2-COAT SAND & CEMENT RENDER WITH
SMOOTH TROWEL FINISH SPEC TO BE
CONFIRMED BY ARMOURCOAT
PRE-CAST WHITE CONCRETE
BENCH. FIXING METHOD TO
ENGINEER'S DETAILS. RECESSED
LED LIGHTS TO UNDERSIDE.
TRELLIS
311
2609
837
BLACK STEEL FLAT FASCIA
10.89 (+2.40) FINISHED CEILING LEVEL
10.89 (+2.709) PARAPET LEVEL
(-1.165) EXCAVATION FOR FOOTING
10.89 (+2.46) BOTTOM OF CEILING JOIST LEVEL
(+0.43) TOP OF BENCH LEVEL
(±0.00) FINISHED FLOOR LEVEL
(-0.15) EXISTING GROUND LEVEL
(-0.695) EXCAVATION UNDER WALL
(-0.536) BASE OF POOL
Perhaps one of the most interesting projects I have worked on is Grace Pavilion. The client requested a small office/studio be
built in the back of his garden in Cambridge.
With the clients request in mind, I set about researching various influences, the most predominant of which was Mies Van Der
Rohes’s Barcelona Pavilion.
The final design of the pavillion was developed gradually through a series of 3-Dimensional iterative steps. A combination of Photoshop and Artlantis helped to conclude in the final
resolution.
Grace Pavilion
PRELIMINARY
GENERAL NOTES:
Do not scale from this drawing.
Check drawing on receipt and immediatelyreport any discrepancies to the Architect.
Verify all dimensions and levelson site prior to construction.
The contents of this drawing areStiff + Trevillion Architects LLP copyrightand shall not be re-used without their written permission.
No. Date Revision Notes
Stiff + Trevillion Architects LLP16 Woodfield RoadLondon W9 2BE
T +44(0)20 8960 5550F +44(0)20 8969 8668mail@stiffandtrevillion.comwww.stiffandtrevillion.com
Project
LONDON SW3Drawing KITCHEN
3080Project No Drawing No Revision
Scale Date RevisedNTS MAY 10
-A3@
AS PROPOSED
STAR HOUSE
4341:20 @ A1
SVP
KITCHENT-04
CC
BB
AA
D D
EE
F
F G
G
PROPOSED SECTION
Scale: 1:20
A-A
434
PROPOSED SECTION
Scale: 1:20
B-B
434
PROPOSED SECTION
Scale: 1:20
C-C
434
PROPOSED SECTION
Scale: 1:20
D-D
434
PROPOSED SECTION
Scale: 1:20
E-E
434
PROPOSED SECTION
Scale: 1:20
F-F
434
PROPOSED SECTION
Scale: 1:20
G-G
434
CUPBOARD CUPBOARD
CROCKERYCROCKERY
CUPBOARD CUPBOARD
DRINKS/FREEZER
FRIDGE
BACKLIT PHOTOGRAPHS
DRAWER
DRAWER
600 600 site 600 600
750
1850
900
853 2430 696
100
800
600
1200
1200
600600EQ1090EQ600site
2786 1457 700
900
1200
100
DISHWASHER
600600600
CONCEALED MERCURY EXTRACTION TO BE FACE FIXED TO CHIMNEY BREAST, OVER CLAD IN MDF FINISH TBC
GLASS GLASS GLASS GLASS
SINK
BIN
DRAWER
DRAWER
DRAWER
SINK
5025
025
025
010
0
1500
600600300
900
297
KITCHEN TO HAVE THE AESTHETIC OF THE ROUNDHOUSE KITCHENSUNFRAMED WHITEHANDLESS DESIGN
FIXED SHELF
GLASS
PAINTED BACK GLASS SPLASHBACK WITH MAGNETIC STRIPS BURIED IN THE WALL BEHIND.
WHITE LACQUER FRONTED CUPBOARDS WITH SPRAY PAINTED INTERIOR.18mm SPRAY PAINTED ADJUSTABLE SHELVES .
WHITE CORIAN CANTILEVERED SHELF.
DRAWER
DRAWER
DRAWER
DRAWER
CUPBOARD CUPBOARD
PAINTED MDF GRID BEHIND CUPPARD DOORS FOR WINE STORAGE. APERTURES TO BE MIN 125MM SQUARE.
ADJUSTBALE SHELVES ON CHROME STUDS AND FERRULES
ADJUSTBALE SHELVES ON CHROME STUDS AND FERRULES
ALLOW FORT INSERTS IN PRICING. DETAILS TBC
INTEGRATED APPLIANCES TBC, DOORS TO MATCH KITCHEN BY CONTRACTOR. 11
66
WHITE LACQUER PANEL TO BE FLUSH WITH CUPBOARD FRONTS
900
1500
1050
SPLASHBACK NIB TO RETURN.ALLOW FOR GLOSS PAINTED TIMBER CAPPING
PULL OUT BIN DRAWER
LAQUERED BACK PANEL
CORIAN TOP TO ISLAND WITH INTERGRAL SINK
CORIAN TOP TO UNITS WITH INTERGRAL SINK AND ROUTED DRAINER.SINK TO HAVE MASCERATER TO WASTE
CORIAN TOP TO NICHE COUNTER SURFACE
INTERGRATED DISHWASHERADJUSTABLE SHELVES
ADJUSTABLE SHELVES
ADJUSTABLE SHELVES
ADJUSTABLE SHELVES
ADJUSTABLE SHELVES
ADJUSTABLE SHELVES
ADJUSTABLE SHELVES
NOTES :
ALL CUPBOARD FRONTS AND PANELS TO BE WHITE HIGH GLOSS LAQUERED FINISH. COLOUR REF TBC
INTERIORS TO BE SPRAY PAINT FINISH, COLOUR REF TBC.
TOPS OF COUNTER TO BE 50MM WHITE CORIAN. ALL SINKS AND DRAINERS TO BE INTEGRAL.
SPLASHBACK TO BE TOUGHENED GLASS WITH BLUE BACK PAINTED FINISH - SAMPLE TO BE APPROVED.
CLIENT TO CONFIRM ALL APPLICANCES.
The subject is a Grade 2 Listed property constructed in 1877 in yellow brick with red dressings over four storeys and an attic, located to the north side of the River Thames on the Chelsea Embankment, with views over the river to the south side and
the Chelsea Physic Garden to the North.
The proposed works involve the removal of a non original existing painted timber and glazed screen which protrudes out onto the fourth floor terrace, and the introduction of a more sympathic assembly of French doors and sash windows in painted timber and glazing, set back in line with the building. A general internal refurbishment, and a roof extension to the
property is also to take place.
This is one of the few projects of which all aspects I worked extensively on. The client requested detailed drawings and 3D images of almost every room in the house. The examples below
show the kitchen, bathroom, and kids room.
Star House
Recommended