PRE FEASIBILITY REPORT
for
PROPOSED PIGMENTS, DYES & DYE INTERMEDIATES
MANUFACTURING UNIT
of
M/s. SHREE PARSHWNATH COLOURANTS LLP
Plot No. D-2/CH/50, Dahej Industrial Estate-2,
Taluka: Vagra, Dist: Bharuch – 392 130 (Guj.)
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
1
CONTENTS
Sr. No. Description Page No.
1. Executive Summary 2
2. Introduction of the Project/Background information 9
3. Project Description 11
4. Site Analysis 16
5. Planning Brief 20
6. Proposed Infrastructure 22
7. Rehabilitation and resettlement (R & R) Plan 23
8. Project Schedule & Cost Estimates 24
9. Analysis of Proposal (Final Recommendations) 24
2
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. Shree Parshwnath Colourants L.L.P proposes pigments, dyes and intermediates
products manufacturing unit to be located at Plot. No. D-2/CH/50, Dahej Industrial Estate-2,
Taluka Vagra, Dist: Bharuch, Gujarat.
1.2 Project Details
Proposed Products along with Production Capacity
Sr.
No.
Products * CAS No. Proposed
Capacity
(MT/Month)
A PIGMENTS 1200
1 PIGMENT GREEN 7 1325-53-6
2 PIGMENT GREEN 36 40302-13-7
3 PIGMENT BLUE 15.0 147-14-8
4 PIGMENT BLUE 15.1 147-14-8
5 PIGMENT BLUE 15.3 147-14-8
6 PIGMENT BLUE 15.4 147-14-8
7 PIGMENT BLUE 15.6 147-14-8
8 PIGMENT BLUE 60 81-77-6
9 PIGMENT ORANGE 5 3468-63-1
10 PIGMENT ORANGE 13 3520-72-7
11 PIGMENT ORANGE 16 6505-28-8
12 PIGMENT ORANGE 34 15793-73-4
13 PIGMENT ORANGE 36 12236-62-3
14 PIGMENT ORANGE 38 12236-64-5
15 PIGMENT ORANGE 43 442-06-0
16 PIGMENT ORANGE 62 52846-56-7
17 PIGMENT ORNAGE 64 72102-84-2
18 PIGMENT ORANGE 70 15793-72-4
19 PIGMENT RED 1 6410-10-2
20 PIGMENT RED 2 6041-94-7
21 PIGMENT RED 3 2425-85-6
22 PIGMENT RED 8 6410-30-6
23 PIGMENT RED 38 6358-87-8
24 PIGMENT RED 48 3564-21-4
25 PIGMENT RED 48.1 7585-41-3
26 PIGMENT RED 48.2 7023-61-2
27 PIGMENT RED 48.3 15782-05-5
3
28 PIGMENT RED 48.4 5280-66-0
29 PIGMENT RED 49.1 1103-38-43
30 PIGMENT RED 49.2 1103-39-5
31 PIGMENT RED 53 2092-56-0
32 PIGMENT RED 53.1 5160-02-1
33 PIGMENT RED 57 5858-81-1
34 PIGMENT RED 57.1 5281-04-9
35 PIGMENT RED 63.1 6417-83-0
36 PIGMENT RED 112 6535-46-2
37 PIGMENT RED 122 980-26-7
38 PIGMENT RED 144 5280-78-4
39 PIGMENT RED 146 5280-68-2
40 PIGMENT RED 149 4948-15-6
41 PIGMENT RED 166 3905-19-9
42 PIGMENT RED 168 4378-61-4
43 PIGMENT RED 170 2786-76-7
44 PIGMENT RED 176 12225-06-8
45 PIGMENT RED 177 4051-63-2
46 PIGMENT RED 178 3049-71-6
47 PIGMENT RED 179 5221-31-3
48 PIGMENT RED 185 51920-12-8
49 PIGMENT RED 187 59487-23-9
50 PIGMENT RED 188 61847-48-1
51 PIGMENT RED 207 71819-77-7
52 PIGMENT RED 208 31778-10-6
53 PIGMENT RED 210 61932-63-6
54 PIGMENT RED 242 52238-92-3
55 PIGMENT RED 254 84632-65-5
56 PIGMENT RED 264 88949-33-1
57 PIGMENT VIOLET 19 1047-16-1
58 PIGMENT VIOLET 23 6358-30-1
59 PIGMENT VIOLET 32 12225-08-0
60 PIGMENT YELLOW 1 2512-29-0
61 PIGMENT YELLOW 3 6486-23-3
62 PIGMENT YELLOW 12 6358-85-6
63 PIGMENT YELLOW 13 5102-83-0
64 PIGMENT YELLOW 14 5468-75-7
65 PIGMENT YELLOW 16 5979-28-2
66 PIGMENT YELLOW 17 4531-49-1
67 PIGMENT YELLOW 24 475-71-8
68 PIGMENT YELLOW 62 12286-66-7
69 PIGMENT YELLOW 65 6528-34-3
4
70 PIGMENT YELLOW 73 13515-40-7
71 PIGMENT YELLOW 74 6358-31-2
72 PIGMENT YELLOW 81 22094-93-5
73 PIGMENT YELLOW 83 5567-15-7
74 PIGMENT YELLOW 93 5580-57-4
75 PIGMENT YELLOW 95 5580-80-8
76 PIGMENT YELLOW 97 12225-18-2
77 PIGMENT YELLOW 101 2387-03-3
78 PIGMENT YELLOW 109 5045-40-9
79 PIGMENT YELLOW 110 5590-18-1
80 PIGMENT YELLOW 120 29920-31-8
81 PIGMENT YELLOW 127 71872-67-8
82 PIGMENT YELLOW 128 79953-85-8
83 PIGMENT YELLOW 129 15680-42-9
84 PIGMENT YELLOW 138 30125-47-4
85 PIGMENT YELLOW 139 36888-99-0
86 PIGMENT YELLOW 147 4118-16-5
87 PIGMENT YELLOW 150 68511-62-6
88 PIGMENT YELLOW 151 31837-42-0
89 PIGMENT YELLOW 153 29204-84-0
90 PIGMENT YELLOW 154 68134-22-5
91 PIGMENT YELLOW 155 68516-73-4
92 PIGMENT YELLOW 158 66186-93-6
93 PIGMENT YELLOW 168 71832-85-4
94 PIGMENT YELLOW 174 78952-72-4
95 PIGMENT YELLOW 175 35636-63-6
96 PIGMENT YELLOW 183 65212-77-3
97 PIGMENT YELLOW 184 14059-33-7
98 PIGMENT YELLOW 185 76199-85-4
99 PIGMENT YELLOW 188 23792-68-9
100 PIGMENT YELLOW 191 129423-54-7
101 PIGMENT YELLOW 191.1 154946-66-7
102 PIGMENT YELLOW 194 82199-12-0
103 PIGMENT YELLOW 196 68186-90-3
104 PIGMENT YELLOW 213 220198-21-0
105 COPPER PHTHALOCYANINE BLUE CRUDE 147-14-8
B SOLVENT DYES 500
106 SOLVENT BLACK 3 4197-25-5
107 SOLVENT BLACK 27 12237-22-8
108 SOLVENT BLUE 35 17354-14-2
109 SOLVENT BLUE 36 14233-37-5
110 SOLVENT BLUE 58 61814-09-3
5
111 SOLVENT BLUE 59 6994-46-3
112 SOLVENT BLUE 68 4395-65-7
113 SOLVENT BLUE 79 74499-36-8
114 SOLVENT BLUE 97 61969-44-6
115 SOLVENT BLUE 98 71819-49-3
116 SOLVENT BLUE 101 6737-68-4
117 SOLVENT BLUE 102 15403-56-2
118 SOLVENT BLUE 104 116-75-6
119 SOLVENT BLUE 107 12223-02-8
120 SOLVENT BLUE 122 67905-17-3
121 SOLVENT BLUE 128 18038-99-8
122 SOLVENT BROWN 53 64696-98-6
123 SOLVENT GREEN 3 128-80-3
124 SOLVENT GREEN 5 79869-59-3
125 SOLVENT GREEN 7 6358-69-6
126 SOLVENT GREEN 28 71839-01-5
127 SOLVENT GREEN 33 10671-57-8
128 SOLVENT ORANGE 58 71775-93-4
129 SOLVENT ORANGE 60 61969-47-9
130 SOLVENT ORANGE 63 16294-75-0
131 SOLVENT ORANGE 86 81-64-1
132 SOLVENT ORANGE 105 31482-56-1
133 SOLVENT ORANGE 112 70546-25-7
134 SOLVENT ORANGE 196 71775-93-3
135 SOLVENT RED 19E 56358-09-9
136 SOLVENT RED 23 85-86-9
137 SOLVENT RED 24 85-83-6
138 SOLVENT RED 27 1320-06-5
139 SOLVENT RED 52 82-39-0
140 SOLVENT RED 111 82-38-2
141 SOLVENT RED 127 61969-48-0
142 SOLVENT RED 135 20749-68-2
143 SOLVENT RED 149 71902-18-6
144 SOLVENT RED 151 114013-41-1
145 SOLVENT RED 161 85750-13-6
146 SOLVENT RED 164 71819-51-7
147 SOLVENT RED 168 71832-19-4
148 SOLVENT RED 169 27354-18-3
149 SOLVENT RED 172 63512-13-0
150 SOLVENT RED 179 6829-22-7
151 SOLVENT RED 195 164251-88-1
152 SOLVENT RED 196 52372-36-8
6
153 SOLVENT RED 197 52372-39-1
154 SOLVENT RED 207 10114-49-5
155 SOLVENT RED 227 2944-28-7
156 SOLVENT VIOLET 13 81-48-1
157 SOLVENT VIOLET 14 67577-84-8
158 SOLVENT VIOLET 26 2872-48-2
159 SOLVENT VIOLET 38 63512-14-1
160 SOLVENT VIOLET 49 205057-15-4
161 SOLVENT VIOLET 59 6408-72-6
162 SOLVENT YELLOW 14 842-07-9
163 SOLVENT YELLOW 16 4314-14-1
164 SOLVENT YELLOW 18 6407-80-3
165 SOLVENT YELLOW 33 8003-22-3
166 SOLVENT YELLOW 43 19125-99-6
167 SOLVENT YELLOW 44 2478-20-8
168 SOLVENT YELLOW 59 27908-75-8
169 SOLVENT YELLOW 72 61813-98-7
170 SOLVENT YELLOW 82 12227-67-7
171 SOLVENT YELLOW 85 2478-20-8
172 SOLVENT YELLOW 93 4702-90-3
173 SOLVENT YELLOW 98 12671-74-8
174 SOLVENT YELLOW 107 67990-27-6
175 SOLVENT YELLOW 114 7576-65-0
176 SOLVENT YELLOW 124 34432-92-3
177 SOLVENT YELLOW 131 71819-82-4
178 SOLVENT YELLOW 133 51202-86-9
179 SOLVENT YELLOW 145 27425-55-4
180 SOLVENT YELLOW 157 27908-75-4
181 SOLVENT YELLOW 160.1 94945-27-4
182 SOLVENT YELLOW 163 13676-91-0
183 SOLVENT YELLOW 167 38489-24-6
184 SOLVENT YELLOW 172 68427-35-0
185 SOLVENT YELLOW 185 27425-55-4
186 SOLVENT YELLOW 196 38215-36-0
187 SOLVENT YELLOW 257 --
C OTHER DYES 500
188 OPTICAL BRIGHTENER (OB) 7128-64-5
189 OPTICAL BRIGHTENER 184 (OB 184) 7128-64-5
190 OPTICAL BRIGHTENER 1 (OB 1) 1533-45-5
191 ACID RED 52 3520-42-1
192 ACID YELLOW 184 61968-07-8
193 ACID YELLOW 250 93859-32-6
7
194 BASIC VIOLET 1 8004-87-3
195 BASIC VIOLET 11 2390-63-8
196 BASIC VIOLET 11.1 39393-39-0
197 BASIC YELLOW 40 12221-32-5
198 DISPERSE ORANGE 47 12236-03-2
199 DISPERSE YELLOW 186 108173-53-1
200 DISPERSE YELLOW 201 80748-21-6
D INTERMEDIATES 250
201 8-AMINOQUINALDINE 18978-78-4
202 DINITRONAPTHALENE 602-38-0
203 4-CHLORO 1,8 NAPTHALICANHYDRIDE 4053-08-1
204 1,5 DIAMINO NAPTHALENE 2243-62-1
205 1,8 DIAMINO NAPTHALENE 479-27-6
206 1-CHLORO ANTHRAQUINONE 82-44-0
207 1,5 DICHLORO ANTHRAQUINONE 82-46-2
208 1,8 DICHLORO ANTHRAQUINONE 82-43-9
209 5 ACETOACETLY AMINO BENZIMIDAZOLONE 26576-46-5
210 5-(2’-HYDROXY-3’NAPHTHOYL)-
AMINOBENZIMIDAZOLONE
26848-40-8
211 PERYLENETETRACARBOXYLIC DIANHYDRIDE 128-69-8
212 1-PHENYL-3-METHYL-5-PYRAZOLONE (PMP) 89-25-8
213 QUINIZARINE 81-64-1
Total 2450
By-Products
1 POLY ALUMINIUM CHLORIDE 1327-41-9 800
2 SODIUM ALUMINIUM SILICATE 12003-51-9 1080
3 ALUMINIUM HYDROXIDE 21645-51-2 870
4 COPPER SULPHATE 7758-99-8 50
5 Dilute HCl 7647-01-0 300
6 Dilute H2SO4 7664-93-9 1000
7 SODIUM HYPOCHLORIDE 7681-52-9 100
Total 4200
* All products are water insoluble.
1.3 Raw Materials Consumption
Reference: Form-I, Annexure-1
1.4 Water Requirement, Waste Water Generation and Treatment
Total water requirement will be 380 KL/Day which will be met through GIDC water supply.
Total wastewater generation will be 255 KL/Day. Industrial waste water (240 KL/Day) will be
sent to propose ETP consists of primary, secondary & tertiary treatment and treated waste
8
water will be sent to GIDC drainage line. Domestic waste water (15 KL/Day) will be disposed
through septic tank & soak pit.
1.5 Air Pollution Source and Control Management
Sr.
No.
Stack/Vent
attached to
Stack
Height
(meter)
Stack
Diameter
(meter)
Fuel name &
Quantity
Type of
Emission
APCM
1. Boiler-I
(5 TPH)
13 1.5 Agro Waste/Coal
/Briquettes
(1.5 MT/hr.)
PM
SO2
NOx
Multicyclone
Separator with
Bag filter
2 Boiler-II
(5 TPH)
13 1.5 Agro Waste/Coal
/Briquettes
(1.5 MT/hr.)
PM
SO2
NOx
3 Thermic Fluid
Heater
(5 Lac KL/hr.)
12 0.225 Agro Waste/Coal
/Briquettes
(500 Kg/Day)
PM
SO2
NOx
3. Process Vent 15
0.3 -- HCl Water scrubber
followed by
Caustic
scrubber
5 D.G. Set*
(1000 KVA)
10 0.3 Diesel
250 Liter/hr.
PM
SO2
NOx
--
* To be used in emergency only.
1.6 Hazardous Waste
SR.
NO.
TYPE OF
WASTE
CATEGORY
NO.
QUANTITY DISPOSAL
1 ETP Sludge 34.3
400 MT/Month Collection, Storage, Transportation and
sent to common TSDF site for disposal.
2 Used Oil 5.1 60 Kg/Month Collection, Storage, Transportation and
given to GPCB registered reprocessor/
refiner
9
4 Discarded
Drums
Bags
33.1
1000 Nos./Month
50MT/Month
Collection, Storage, Decontamination,
Transportation & given to GPCB
authorized Vendor
5 Distillation
Residue
20.3 4 MT/Month Collection, Storage, Transportation and
sent for co-processing in cement
industries or to CHWIF for disposal.
1.7 Green Belt
Total 19,950 m2
land area is available at site; out of this area about 3,990 sq. meter (20 %)
area will be covered as greenbelt and other forms of greenery.
1.8 Power & Fuel Requirements
• Power Requirement: 1 MW
• Sources:
- DGVCL
- D.G. Set (Proposed): 1000 KVA
(to be used in emergency only)
• Fuel Requirement:
- Agro waste/Coal/Briquettes: 3.02 MT/hr
- Diesel: 250 Liter/day
2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy
of mining lease/letter of intent should be given.
Identification of the project
Proposed pigments, dyes & dye intermediates manufacturing unit.
Identification of the project proponent
• Mr. Amal Jobaliya
• Mr. Hitesh D. Jobaliya
• Mr. Dhaval Jobaliya
10
2.2 Brief description of nature of the Project
Proposed pigments, dyes & dye intermediates manufacturing unit.
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufactured is increasing in domestic as well as
in international market. To meet this demand, they propose the project. By setting up this
unit will be able to meet the demand of various products locally. The project will save forex
as certain products import will be reduced. This will also generate direct and indirect
employment opportunity for various levels of people.
2.4 Demands-Supply Gap
Based on our informal survey of the market with our current customers and various traders,
we have found that there is a big potential for the range of the products we are planning.
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials and the non availability of some
materials, we will have to import some of the key raw materials as they are not available
indigenously. This will make us very competitive against imported finished products and we
will export our finished products in the international market.
2.6 Export possibility
We shall explore the possibility of export the products.
2.7 Domestic/Export Markets
Our products have good demand in domestic & international markets. We shall explore the
possibility of export the products.
2.8 Employment Generation (Direct and Indirect) due to project.
Company will give direct employment to local skilled and unskilled people based on
qualification and requirement as per prevailing norms of state government In addition to
direct employment, indirect employment shall generate ancillary business to some extent
for the local population.
11
3 Project Description
3.3 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
3.4 Location (map showing general location, specific location and project boundary &
project site layout) with coordinates.
• Map showing general location
(Courtesy: Environmental Information Center, New Delhi)
12
• Specific location and project boundary
13
Plot Layout
14
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Major factors involved in the selection of site are listed below:
• Site is very well connected by road and rail
• Proximity to Raw Material suppliers
• Proximity to common effluent treatment and hazardous/solid waste disposal facilities
• Availability of sufficient land free from cultivation
• Availability of water for industrial use
• Availability of power evacuation facilities
• Efficient transport facilities within the industrial estate and to & fro the city area.
• Environment-friendly zone.
• Availability of port facility
• Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Reference: Section-1.0, Sub-section 1.2, Page No. 2 of this report.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project, etc. should be given)
Reference: Form-1, Annexure-1, 2 & 3.
3.6 Raw Material required along with estimated quantity, likely source, marketing area of
final product/s, mode of transport of raw material and Finished product.
• For raw materials along with consumption quantities - Reference: Form-I, Annexure-1
• We will procure raw materials (as and when require) as much as possible from the
domestic market.
• We shall explore the possibility of export of the finished products.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
Resource optimization/recycling and reuse shall be explored.
15
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement shall be met through GIDC water supply.
Power & Fuel Requirement
Reference: Section-1.0, Sub-section 1.8, Page No. 9 of this report.
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Reference: Form-I, Annexure-4, 5 and 6.
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS
& BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH
LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT,
GREEN BELT DEVELOPMENT MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
16
4.1 Connectivity
• Site is very well connected by road
• Availability of water, power, fuel, etc.
4.2 Land Form, Land Use and Land Ownership
(Courtesy: Environmental Information Center, New Delhi)
4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from
HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette
notification should be given.
17
(Courtesy: Environmental Information Center, New Delhi)
AREAS UNDER DIFFERENT LANDUSE
Area Statistics of Landuse / Landcover Map
Sr.
No. Class Names
Area (In
Hectares) Area (In Sq.Km.) Area %
1 Water Body 1363.73 13.64 4.34
2 Open/Barren Land 5076.01 50.76 16.17
3 Agriculture Land 1159.56 11.60 3.69
4 Fallow Land 6291.40 62.91 20.04
5 Open/Degraded Vegetation 412.59 4.13 1.31
6 Vegetation Medium Density 397.40 3.97 1.27
7 River & Canal 23.25 0.23 0.07
8 Marshy Land 919.33 9.19 2.93
9 Salt Affected Land 128.45 1.28 0.41
10 Settlement & Habitation 324.50 3.25 1.03
11 Mud Flat 863.17 8.63 2.75
12 Jetty 32.91 0.33 0.10
13 Salt Pans 2083.03 20.83 6.63
14 Mangrove(Sparse) 117.30 1.17 0.37
15 Mangrove(Dense) 223.00 2.23 0.71
16 Marshy Vegetation 46.55 0.47 0.15
17 Industrial Area 290.32 2.90 0.92
18 Sea 11589.46 115.89 36.91
18
(Courtesy: Environmental Information Center, New Delhi)
4.4 Existing Infrastructure
This is proposed project activity so now there is only open land.
4.5 Soil Classification
Soil Characteristics under Project Area are as below Table;
CATEGORY AREA_SQ
KM DESCRIPTION TAXONOMY1
TAXONOMY
2 CLASS SUB_CLASS
A 88.93
Very deep,
moderately well
drained, calcareous,
fine soils on very
gently sloping
alluvial plain with
slight erosion and
moderate salinity;
associated with very
Fine,
montmorilloniti
c (calcareous),
hyperthermic
Typic
Chromusterts
Fine,
montmorillo
nitic
(calcareous)
hyperthermi
c Udic
Chromusters
Soils of
west
coast
(soils of
Gujarat
plain)
Soils of
alluvial
plains
19 Seasonal Water Body 59.04 0.59 0.19
Total 31400.99 314.01 100.00
19
deep moderately
well drained,
calcareous, fine soils
with moderate
erosion.
C 108.64
Very deep, poorly
drained, calcareous
fine-loamy soils on
very gently sloping
coastal plain with
moderate erosion
and strong salinity;
associated with very
deep , imperfectly
drained, calcareous,
fine soils with
severe erosion and
strong salinity.
Fine-loamy,
mixed
(calcareous),
hyperthermic
Aeric
Haplaquepts
Fine, mixed
(calcareous),
hyperthermi
c Typic
Halaquepts
Soils of
west
coast
(soils of
Gujarat
plain)
Soils of
coastal
plains
- 116.43 Sea - - - - (Courtesy: Environmental Information Centre, New Delhi)
SOIL CHARACTERISTICS MAP
(Courtesy: Environmental Information Centre, New Delhi)
20
4.6 Climatic data from secondary sources.
Climatic data from primary & secondary sources will be incorporated in EIA Study.
4.7 Social infrastructure available.
Various Programs/ Projects related to Social & Economic development of surrounded area
has been planned, which are as follows.
Depending on the growth of the company the required social infrastructure will be
provided.
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed pigments, dyes & dye intermediates manufacturing unit.
5.2 Population Projection
Population data will be incorporated in EIA Study.
5.3 Land use planning (breakup along with green belt etc.)
Industrial Area (Processing Area)
Processing Area (Plant facilities, R&D, ETP Area and Engineering / Utility Services) = 11,970
m2
Residential Area (Non Processing Area)
Non Processing Area (Green belt, Raw material storage area, finished storage area,
Administration Building, Parking, road and open area) = 7,980 m2
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed project activity.
• Social Welfare
• Cordial relation with the industry shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.
21
5.5 Amenities/Facilities
Details of amenities available in study area
Taluka Village Educational Medical Drinking
Water
Post &
Telegraph
Communication Approach
to Village
Nearest
Town
Power
Supply
Vagra Galenda P(2),Ac,O RP,CHW T,W,TK PO BS PR,KR Bharuch EA
Samatpor P(2),Ac RP,CHW W,TK -(-5 Kms) BS PR,KR Bharuch EA
Vav P(2),Ac RP,CHW T,W,TK,HP -(-5 Kms) BS,RS PR,KR Bharuch EA
Jolva P(2),Ac,O PHS,FPC,RP,CHW W,TK -(-5 Kms) BS,NW PR,KR Bharuch EA
Vadadla P(2),Ac CHW W,TK PO BS PR,KR Bharuch EA
Dahej
P(4),H,Ac(4),O PHC,D,FPC,RP,
CHW
T,W,TK PTO,
Phone
BS,RS,NW PR,KR Bharuch EA
Lakhigam P(2) PHS,RP,CHW W,TK po BS,NW PR,KR Bharuch EA
Luvara P(2),Ac RP,CHW W,TK -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Jageshwar P(2),Ac,H RP,CHW W,TK PO BS,NW PR,KR,NR Bharuch EA
Ambheta P(2),Ac CHW T,W,TK PO BS,NW KR,NR Bharuch EA
Suva P(2),Ac -(5-10 Kms) W,TK,R -(-5 Kms) BS,NW PR,KR,NR Bharuch EA
Rahiad P(2),Ac(2),O RP,CHW W,TK PO BS,NW PR,KR.NR Bharuch EA
Harinagar
Un
inhabited
Padariya P(2),Ac RP,CHW W,TK PO BS PR,KR Amod EA
Kadodara
P(2),Ac(2),H PHS,FPC,
RP,CHW
W,TK PO BS PR,KR Bharuch EA
Sambheti P(2),Ac -(10+Kms) W,TK PO BS,RS PR,KR Bharuch EA
(Courtesy: Census Dept., GOI)
22
ABBREVIATIONS
1. Education
P-Primary Elementary School
H-Matriculation or Secondary
O-Other Educational Institution
PUC-Higher Secondary/Intermediate/pre-
University/junior Collage
AC – Adult literacy class
TR – Training center
3. Drinking Water
T-Tap Water
HP-Hand Pump
TK-Tank Water
W-Well Water
R-River Water
C-Canal
N - Nallah
S – Spring
5. Transportation
RS- Railway Station
BS-Bus Station
NW-Navigable Waterway
2. Medical Facilities
RP-Registered Private Practitioner
PHS-Primary Health Centre
FPC-Family Planning Centre
D- Dispensary
CHW - Community Health Worker/Health Worker
H - Hospital
NH - Nursing Home
MH - Maternity Home
PHC - Public Health Centre
CWC - Child Welfare Centre
TB - T.B Clinic
O – Others
4. Post & Telegraph
PO-Post Office
PTO-Post & Telegraph
Phone-Telephone
Communication
6. Approach to Village
PR-Pucca Road
KR-Kuccha Road
7. Power Supply
EA-Electricity for all
purposes
EAG - Electricity for
Agriculture
ED - Electricity for
domestic
EO - Electricity for other
purpose like Industrial,
Commercial etc.
6.0 Proposed Infrastructure
6.1 Industrial Area (Processing Area)
Processing Area (Plant facilities, R&D, ETP Area and Engineering / Utility Services) = 11,970
m2
6.2 Residential Area (Non Processing Area)
Non Processing Area (Green belt, Raw material storage area, finished storage area,
Administration Building, Parking, road and open area) = 7,980 m2
6.3 Green Belt
Total 19,950 m2 land area is available at site; out of this area about 3,990 sq. meter (20 %)
area will be covered as greenbelt and other forms of greenery.
6.4 Social Infrastructure
• Water Supply by GIDC
• Power supply by DGVCL and D.G. Set (emergency standby)
23
6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
• Site is very well connected by road
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power facilities
• Availability of water for industrial use
• Availability of port facility
• Availability of CETP & TSDF in the region
6.6 Drinking water Management (Source & Supply of water)
Total water requirement shall be met through GIDC supply.
6.7 Sewerage System
Sewage pipes will be laid in entire premises for the removal and disposal of mainly non-
harmful liquid wastes from offices, canteen and domestic waste to be came from different
sections of unit. These liquid wastes will be sent to septic tank & soak pit.
6.8 Solid Waste Management
Reference: Section-1.0, sub-section 1.6, Page No. 8 of this report.
6.9 Power Requirement & Supply/Source
Reference: Section-1.0, sub-section 1.8, Page No. 9 of this report.
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no habitation on the proposed project activity area and it is open industrial land, so
R & R policy is not applicable to this project. There shall not be displacement of any
24
population in project area. The increasing industrial activity will boost the commercial and
economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We shall start construction after getting EC. We shall start manufacturing after applying for
CCA.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total Project Cost for proposed project activity is Rs. 40 Crores.
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed project.
• Social Welfare shall be done.
• Cordial relation with the industry shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.